Professional Documents
Culture Documents
GD-01 N 2789892.352
E 494846.962
N 2789917.414
E 494860.320
142335
GD
N 2789648.402
E 494763.155
28400
°
N 2789890.799 90
86
Notes:
GB-02
°
E 494859.657
1. THIS DRAWING ISSUE HAS BEEN CHECKED AND
APPROVED IN ACCORDANCE WITH 10 DESIGN
P-6
GROUP LTD. QUALITY MANAGEMENT.
2. USE FIGURED DIMENSIONS IN ALL CASES. CHECK
P-5 ALL DIMENSIONS ON SITE. REPORT ANY
41742
DISCREPANCIES IN WRITING TO 10 DESIGN BEFORE
PROCEEDING.
3. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
P-4
STATED.
62566ation
4. ALL DRAWINGS HAVE TO BE READ IN CONJUNCTION
t
WITH ALL RELEVANT ARCHITECTURAL, STRUCTURAL
Al Boursa Stree
ble corridor loc
254544 P-3 AND SERVICES ENGINEER'S DRAWINGS AND
SPECIFICATIONS.
5. DO NOT SCALE OFF THIS DRAWING.
P-2 6. THIS DRAWING IS BASED ON ARCHIVE INFORMATION
KNOWN TO HAVE DISCREPANCIES AND
C-1 C-2 C-3 C-4 C-5
Approx HV Ca
N 2789893.435 INACCURACIES.
P-1
E 494897.300
27
0°
0°
P-0
27
N 2789701.710
N 2789625.165 E 494810.107 N 2789872.580 Key plan
E 494770.612
N 2789884.345
N 2789883.811 606 E 494913.433
208°
E 494913.148
C-C 6°
26
F4
W
C3
3
S1
F3 W1
F3 W1
C-B
C1
C1
Gate
F3 W1
C1
+0.15
15909
F1 W1 F1 W1
ROAD MARKING IN WHITE
CONTINUOS LINES
District
C1 C1
C-A N 2789728.802
F1 W1
E 494835.837
C1
Gate
0° ° Village
24 94
ROAD MARKING IN WHITE
CONTINUOS LINES
SD1
+0.15
+0.15
DIFC ROOM DIC ROOM DIC-DIFC
+0.30 +0.30
N 2789875.405
E 494926.655
28
GV
-
1 24 23
N 2789787.105
274901 E 494879.584
689
N 2789632.820
GV-02
GV.11
Q
E 494797.337
2
49
60
N 2789775.893 N 2789858.583
E 494900.618 E 494953.680
90°
Client
F3 W1
C-B C1
+0.15
F3 W1
C1
C-A N 2789728.802
27 Project Stage
F1 W1
C1
E 494835.837
C-A Tender/Construction
452
ROAD MARKING IN WHITE
CONTINUOS LINES AB
+0.15
SD1
+0.15
Project Title
DIFC ROOM DIC ROOM
+0.30 +0.30
24 23
AB CAFE - L00
SLEEVES AND OPENING
THRU' TRUCK TUNNEL
Scale at A1 DCCA dwg no.
1:500 -
Lead Consultants / Architects