Professional Documents
Culture Documents
L (cm) 5 h
h 0.5 altura
b=0.5h minimo 25 cm
b
4.- Predimensionamiento de columnas 0.25
TIPO DE COL. A.TRIBUT cm2 f'c kg/cm2 n C.M kg/m2 C.V kg/m2 N.P
C1 33.7 280 0.25 680 250 12
C1 23.8 280 0.3 680 250 12
C1 17.8 280 0.3 680 250 12
C2, C3 16.5 280 0.25 680 250 12
C2, C3 17.8 280 0.3 680 250 12
C4 8.74 280 0.2 680 250 12
C4 17.8 280 0.3 680 250 12
2828.22222
RVADAS EN UNA DIRE H = L/25 0.152 0.17m
RVADAS EN DOS DIRE H= L/40 0.14875 M
H=PERIMETRO /180 0.13055556
0.5
PG Kg P kg AREA (bxD) a cm b cm
376092 413701.2 5910 75 75
265608 292168.8 3478 70 50
198648 218512.8 2601
184140 202554 2894 70 40
198648 218512.8 2601
97538.4 107292 1916 50 40
198648 218512.8 2601
CARGAS CONSIDERADAS EN EL DISEÑO
Muros de Albañileria 1800kg /m3
Concreto Armado 2400kg/m3
Peso de acabados 100kg/m2
Tabiqueria Movil 120kg/m2
S/C Vivienda 250 kg/m2
S/C corredores 250 kg/m2
S/C Escaleras 250 kg/m2
peso de viga 100 kg/m2
peso de columna 60 kg/m2
CM
0.17 0.05
0.2 0.05
0.25 0.05
0.3 0.05
100
120
250
100
60
680
I=( B*H^3)/12
0.5
0.25
m
m
Lc 2.7
0.4 0.4
0.65 0.65
PREDMIENSIONAMIENTO PARA LOSAS EN DOS SENTIDOS
METRADOS DE CARGAS
CM 650 KG/m2 AREA
CV 250 KG/m2 A TRIB h
UTAR
WU= 1.4CM+1.7 CM IA
wu= 1.335 ton/m2 B b
A 2.71 m
B 3.45 m
b= A/20 0.2 m
h=Ln/α 0.27 m
b
Lv= 2 Lv
b=B/20 0.185 b= 25 cm
h= 1.4 hs
hs=(Ln/α) hs=(2Lv/α) b=Lv/8
Ln=2LV h= 2b
h= 0.51 cm
h= Ln/16
b= 1.2h; b= 25 cm
CANTIDAD POR CARGA MUERTA Kg/m2 CARGA VIVA
DESCRIPCION M2 kg/m2
Peso de acabados 100
peso tab. Movil 120
peso de ladrillo de techo 30x30x17 8.33
peso de Tecnopor 1.20x30x12 2.5
Sobre carga 250
SI SE USA TECNOPOR
CARGAS PARA APLICAR AL ETABS Kg
CARGA MUERTA C.M 222.03 64.62
SOBRE CARGA C.V 250
SOBRECARGA AZOTEA C.V.A 100
CARGA MUERTA AZOTEA C.M.A 102.03
CARGA VIVA DENSIDAD PESO
AZOTEA Kg/m3 kg
8
15 0.81
100
Ton/m2 220
Ton/m2
Ton/m2
Ton/m2
0.22 Ton/m2
0.25 Ton/m2
0.10 Ton/m2
0.10 Ton/m2