R A/C 0.

7
Proporción 1 2.3 2.3
DESARROLLO C A P
A ZAPATAS
*PESOS SECOS Kg/m3 PSC Kg
Cemento 42.5 1 - 42.5
Arena 2.3 0.028 1700 110.718
Piedra 2.3 0.028 1700 110.718
Agua 42.5 0.7 - 29.75
Volumenes Absolutos Kg PE m3
Cemento 42.5 3125 - 0.014
Arena 110.718 2700 - 0.041
Piedra 29.75 2800 - 0.011
Agua 29.75 1000 - 0.030
∑ 0.095
Volumen absoluto de 1 m3
m3
V (1m3) 1 0.015 0.985
- - - Bls
Factor Cemento 0.985 0.095 - 10.370

Cantidades de Materiales (Valores por cada 1m3)

Cemento 10.370 Bls


Arena 2.3 2700 1700 3.653 m3
Piedra 2.3 2800 1700 3.788 m3
Agua 42.5 10.370 0.7 0.309 m3

Proporción 1 1.8 1.8


B VIGAS
*PESOS SECOS Kg/m3 PSC Kg
Cemento 42.5 1 - 42.5
Arena 1.8 0.028 1700 86.649
Piedra 1.8 0.028 1700 86.649
Agua 42.5 0.7 - 29.75
Volumenes Absolutos Kg PE m3
Cemento 42.5 3125 - 0.014
Arena 86.649 2700 - 0.032
Piedra 86.649 2800 - 0.031
Agua 29.75 1000 - 0.030
∑ 0.106
Volumen absoluto de 1 m3
m3
V (1m3) 1 0.015 0.985
- - - Bls
Factor Cemento 0.985 0.106 - 9.259

Cantidades de Materiales (Valores por cada 1m3)

Cemento 9.259 Bls


Arena 1.8 2700 1700 2.859 m3
Piedra 1.8 2800 1700 2.965 m3
Agua 42.5 9.259 0.7 0.275 m3

Proporción 1 4
C MUROS
*PESOS SECOS Kg/m3 Kg
Cemento 42.5 1 - 42.5
Arena 4 0.028 1700 192.553
235.053

Volumenes Absolutos Kg m3
Cemento 42.5 3125 - 0.014
Arena 192.553 2700 0.071
Agua 42.5 0.7 1000 0.030
∑ 0.115
Aire Incorporado 1% 0.001
∑ 0.116

Cantidades de Materiales (Valores por cada 1m3)

Cemento 1 0.116 8.6 Bls


Arena 4 8.6 1700 0.020 m3
Agua 42.5 8.6 0.700 0.257 m3

Cantidades de Mortero
Vm 1 1 0.12 0.23 0.12
Vm= 0.023 m3/m2

Cantidades de Materiales (Valores por cada 1m2)

Cemento 8.6 0.023 0.20 Bls/m2


Arena 0.020 0.023 0.000 m3/m2
Agua 0.257 0.023 0.006 m3/m2
Lad 38.87 Lad/m2
D TARRAJEO
Cantidades de Materiales (Valores por cada 1m3) Vol.Mort. Por m2
Cemento 8.6 Bls 1
Arena 0.020 m3 V.M.m2 0.015
Agua 0.257 m3

Cantidades de Materiales (Valores por cada 1m2)

Cemento 8.6 0.015 0.130 Bls/m2


Arena 0.020 0.015 0.000 m3/m2
Agua 0.257 0.015 0.004 m3/m2

METRADOS

01.00.00 Concreto
01.01.00 Zapatas (m3)
Descripción #Elem.Igual #Pieza * Elem Long. Ancho Alto
Zapata Z-12 20 1 1.8 1.8 0.7
Zapata Z-14 20 1 1.6 1.6 0.7

Total (m3)

01.02.00 Concreto en Solado (m3)


Descripción #Elem.Igual #Pieza * Elem Long. Ancho Alto
Zapata Z-12 20 1 1.8 1.8 0.1
Zapata Z-14 20 1 1.6 1.6 0.1

Total (m3)

01.03.00 Concreto en Columnas (m3)


Descripción #Elem.Igual #Pieza * Elem Long. Ancho Alto
Columna C9 20 1 0.45 0.25 4.05
Columna C10 20 1 0.65 0.25 4.05
20 1 0.25 0.2 4.05

Total (m3)

01.04.00 Concreto en Vigas (m3)


Descripción #Elem.Igual #Pieza * Elem Long. Ancho Alto
VIGAS 1 1 5.35 0.25 0.55
Total (m2)

ANALISIS DE RRECIOS UNITARIOS m3/día


zaptas (Concreto) Rendimiento 20 P.U S/. 448.50
Descripción Und. Cuadrilla Cant. Precio Parcial
MANO DE OBRA
Capataz HH 0.10 0.04 S/. 22.01 0.88
Operario HH 1.00 0.4 S/. 20.01 8.00
Oficial HH 1.00 0.4 S/. 18.00 7.20
Peón HH 10.00 4 S/. 16.05 64.20
Operario E.L. HH 1.00 0.4 20.01 8.00
MATERIALES 88.29
Cemento bls 9.259 S/. 23.50 S/. 217.58
Hormigón M3 2.859 S/. 40.50 S/. 115.78
Agua M3 2.965 S/. 5.20 S/. 15.42
Piedra M3 0.275 S/. 29.00 S/. 7.99
S/. 356.76
EQUIPOS
Herramientas Manual. %MO 3% 88.29 2.65
Mezcladora hm 1 0.4 0.40
vibradora hm 1 0.4 0.40
m3/día
Columnas (concreto) Rendimiento 10 P.U S/. 629.84
Descripción Und. Cuadrilla Cant. Precio Parcial
MANO DE OBRA
Capataz HH 0.20 0.16 S/. 22.01 3.52
Operario HH 2.00 1.60 S/. 20.01 32.02
Oficial HH 2.00 1.60 S/. 18.00 28.80
Peón HH 10.00 8.00 S/. 16.05 128.40
Operario Liviano HH 1 0.8 20.01 16.01
MATERIALES 208.75
Cemento bls 10.370 S/. 23.50 S/. 243.71
Hormigón M3 3.653 S/. 40.50 S/. 147.94
Agua M3 3.788 S/. 5.20 S/. 19.70
Piedra M3 0.309 S/. 29.00 S/. 8.95
S/. 420.30
HERRAMIENTAS M.
Herramientas Manual. %MO 3% 208.75 6.26
Mezcladora hm 1 0.8 0.80
vibradora hm 1 0.8 0.80
m3/día
Asentado de Soga en Muros Rendimiento 12 P.U S/. 54.21
Descripción Und. Cuadrilla Cant. Precio Parcial
MANO DE OBRA
Capataz HH 0.10 0.067 S/. 22.01 1.47
Operario HH 1.00 0.667 S/. 20.01 13.34
Peón HH 0.70 0.467 S/. 16.05 7.49
22.30
MATERIALES
Cemento bls 0.203 S/. 23.50 S/. 4.76
Arena M3 0.000 S/. 45.00 S/. 0.02
Agua M3 0.006 S/. 5.20 S/. 0.03
Ladrillos Und. 38.873 S/. 0.68 S/. 26.43
S/. 31.25

HERRAMIENTAS M.
Herramientas Manual. %MO 3% 22.30 0.67
0.67

m3/día
Tarrajeo en Muros Rendimiento 18 P.U S/. 16.92
Descripción Und. Cuadrilla Cant. Precio Parcial
MANO DE OBRA
Capataz HH 0.10 0.044 S/. 22.01 0.98
Operario HH 1.00 0.444 S/. 20.01 8.89
Peón HH 0.50 0.222 S/. 16.05 3.57
13.44
MATERIALES
Cemento bls 0.130 S/. 23.50 S/. 3.05
Arena M3 0.000 S/. 45.00 S/. 0.01
Agua M3 0.004 S/. 5.20 S/. 0.02
S/. 3.08

HERRAMIENTAS M.
Herramientas Manual. %MO 3% 13.44 0.40
0.40

PRESUPUESTO DE OBRA
ITEM DESCRIPCIÓN UND METRADO P.U
01.00.00 CONCRETO SIMPLE
01.01.00 Concreto en Cimiento C. M3 81.200 S/. 448.50
01.02.00 Concreto en Sobre C. M3 11.600 S/. 629.84

02.00.00 MUROS Y TABIQUES


02.01.00 Asentado de Soga en Mu. M2 26.325 S/. 54.21
03.00.00 REVOQUES Y ENLUCIDOS
03.01.00 Tarrajeo en Muros M2 2.943 S/. 16.92

Costo Directo
Gastos Generales 10%
Utilidad 5%
-------------------------
Sub Total
IGV 18%
-------------------------
Presupuesto Total
Cemento Alambre Arena Agua Piedra Chancada Acero
P.E 3125 2700 1000 2800
PSC - 1700 - 1700
Precio 23.5 4.3 45 5.2 40.5 2.8

Cantidad de Ladrillo/m2
#Lad 1
0.23 0.015 0.09 0.015

#Lad 38.87 Lad/m2

Precios
Capataz S/. 22.01
Operario S/. 20.01
Oficial S/. 18.00
Peón S/. 16.05
Cemento S/. 23.50
Hormigón S/. 40.50
Agua S/. 5.20
Piedra S/. 29.00
Arena S/. 45.00
Lad. S/. 0.68
0.09 38.87
1 0.015
m3/m2

Parcial
45.360
35.840

81.200

Parcial
6.480
5.120

11.600

Parcial
9.113
13.163
4.050

26.325

Parcial
2.943
2.943

m3

3.45

m3

7.86
m2

m2

PARCIAL (S/.)

###
S/. 7,306.15

S/. 1,427.21
S/. 49.80

### Presupuesto del Contrato S/. 635,442.40


S/. 4,520.13 Presupuesto del V.R
S/. 2,260.07

###
S/. 9,356.68

###