no of labouDuration

A Effective Date of Cont 0 0


B Finalise LOl Bo 0 0
C Kick-Off Meeting 10 0.2
D Availability of 0 0
E Completion of M 0 0
F Receive at site- 0 0

Mechanical Comp 0
G 0
Engineering 6.61
A Process Enginee 4 5.5
B Mechanical Engi 6 5.5
C Piping Engineeri 6 6.6
D Civil Engineerin 2 5.5
E Electrical Engin 2 5.51
F Instrumentation 2 5.56
Procurement 16.51
Long Lead Items/ Packages 16.51
A Finalise Lol - Bo 0 0
B Manufcture -Boi 0 14.36
C Transportation & 4 2.16
Electrical / Instrumention items 12.12
35
A Enquiry to order 2 3.31
B Manfacture - Ele 0 8.86
c Transportation and Del 3 3.36 30

Bulk Materials 10.5


A Enquiry to order - Bul 3 4.45 25
B Manufacture Bulk mat 0 7.16
C Transportation and Del 4 1 20
20
no of labours

D Transportation and Del 4 2.25


Construction/ Erection 20.75
2.21 15
A Enquiry to order - civ 3
B piling 20 0.61
10
C Civil & Structural Co 10 7.76 10
D Erection - Boiler Pack 30 6.66
E Piping Fabrication / E 25 5.06
5
F Electrical Erection 10 4.31 3

G Instrumental installat 20 3.86


0
H Painting / Installatio 20 3.76 2.21 0.61 7.76
I Precommisioning 20 2.2
J Mechanical Completi 0 0
duration
labours (month)
3 2.21
20 0.61
10 7.76
30 6.66
25 5.06
10 4.31
20 3.86
20 3.76
20 2.2
0 0

labour curve
35

30
30

25
25

20 20 20 20
20
no of labours

15

10 10
10

5
3

0
2.21 0.61 7.76 6.66 5.06 4.31 3.86 3.76 2.2 0

Duration