PLANILLA DE METRADOS

PROYECTO: CONSTRUCCION DE UNA INSTITUCION EDUCATIVA DE PRIMER Y SEGUNDO NIVEL


ITEM DESCRIPCION UND N° VECES FACTOR CANTIDAD
01 TRABAJOS PROVICIONALES
01.01 SERVICIOS HIGIENICOS M2
01.02 VESTUARIO M2
01.03 CASETA DE GUARDIANIA M2
01.04 CERCO PROVICIONAL ML
01.05 CONSTRUCCION PROVICIONAL DE ALMACEN M2
01.06 CARTEL DE IDENTIFICACION DE OBRA (SEGÚN D UND 1.00
01.07 INSTALACIONES PROVICIONALES EN AGUA GLB 1.00
01.08 INSTALACIONES PROVICIONALES EN ENERGIA E GLB 1.00
02 SEGURIDAD Y SALUD
02.01 EQUIPOS DE PROTECCION PERSONAL-EPP UND 2.00 20.00
02.02 EQUIPOS DE PROTECCION COLECTIVAL-EPC UND 1.00 5.00
02.03 SEÑALES DE SEGURIDAD PROVISIONAL UND 1.00 10.00
02.04 TALLER DE CAPACITACION EN SEGURIDAD Y SALTALLER 10.00
03 TRABAJOS PRELIMINARES
03.01 LIMPIEZA DE TERRENO M2 1.00
03.02 TRAZO DE NIVELES Y REPLANTEO PRELIMINAR M2 1.00
04 MOVIMIENTO DE TIERRAS
04.01 EXPLANACIONES
04.01.01 CORTE DE TERRENO CON MAQUINARIA M3
04.01.02 ELIMINACION DE MATERIAL EXCEDENTE CO M3 1.15 0.00
04.02 EXCAVACION Y ELIMINACION DE TIERRAS
04.02.01 TRAZO DE NIVELES Y REPLANTEO DURANTE M2
04.02.02 EXCAVACION CON MAQUINA EN SOTANO Y M3
04.02.03 EXCAVACION MANUAL DE ZANJAS M3
EXCAVACION MANUAL DE ZANJAS EN FALZAS ZAPATAS
Z-1 2.00
Z-2 2.00
Z-3 4.00
EXCAVACION MANUAL DE ZANJAS EN VIGAS DE CIMENTACION
EXCAVACION MANUAL DE ZANJAS EN MUROS
EXCAVACION MANUAL DE ZANJAS EN CALZADURAS
04.02.04 ELIMINACION DE MATERIAL EXEDENTE M3 1.15 194.82
05 OBRAS COPLEMETARIAS
05.01 MURO DE SOSTENIMIENTO (CALLZADURAS)
05.01.01 TRAZO DE NIVELES Y REPLANTEO DURANTE M2
05.01.02 CONCRETO FC= 140 KGR/CM2 +30% PM M3
05.01.03 CURADO DE CONCRETO M2 1.00
06 ESTRUCTURAS
06.01 ZAPATAS
06.01.01 FALZA ZAPATA M3
ZAPATA TIPO 01 2.00
ZAPATA TIPO 02 2.00
ZAPATA TIPO 03 4.00
06.01.02 ACERO FY=4200 KGR/CM2 G60 KG PESO/M FACTOR N°1CANTIDAD
ACERO FY=4200 KGR/CM2 G60 D= 5/8
Z-1 V 1.552 1.03 7.000
Z-1 H 1.552 1.03 18.000
Z-2 V 1.552 1.03 16.000
Z-2 H 1.552 1.03 15.000
Z-3 V 1.552 1.03 23.000
Z-3 H 1.552 1.03 22.000
ACERO FY=4200 KGR/CM2 G60 D= 3/4
Z-1 V 2.235 1.03 7.000
Z-1 H 2.235 1.03 18.000
Z-2 V 2.235 1.03 16.000
Z-2 H 2.235 1.03 15.000
Z-3 V 2.235 1.03 23.000
Z-3 H 2.235 1.03 22.000
06.01.03 CONCRETO FC= 210 KGR/CM2 M3
ZAPATA TIPO 01 2.00
ZAPATA TIPO 02 2.00
ZAPATA TIPO 03 4.00
06.01.04 CURADO DE CONCRETO M2 8.00
06.02 VIGAS DE CIMENTACION
06.02.01 ACERO FY=4200 KGR/CM2 G60 KGR PESO/M FACTOR N°1CANTIDAD
ACERO FY=4200 KGR/CM2 G60 D= 3/8 (ESTRIBOS) 0.560 1.03
ACERO FY=4200 KGR/CM2 G60 D= 3/8 (ESTRUCTURA 0.560
ACERO FY=4200 KGR/CM2 G60 D= 5/8 (ESTRUCTURA 1.552
ACERO FY=4200 KGR/CM2 G60 D= 3/4 (ESTRUCRURA 2.235
06.02.02 ENCOFRADO Y DESENCOFRADOS M2 2.00 1.10
06.02.03 CONCRETO FC= 210 KGR/CM2 M3
06.02.04 CURADO DE CONCRETO M2
06.03 COLUMNAS
06.03.01 ACERO FY=4200 KGR/CM2 G60 KGR PESO/M FACTOR N°16
ACERO FY=4200 KGR/CM2 G60 D= 3/8 (ESTRIBOS)
ACERO FY=4200 KGR/CM2 G60 D= 3/8 (ESTRUCTURA)
ACERO FY=4200 KGR/CM2 G60 D= 5/8 (ESTRUCTURA)
ACERO FY=4200 KGR/CM2 G60 D= 3/4 (ESTRUCRURA)
06.03.02 ENCOFRADO Y DESENCOFRADOS M2
COLUMNA TIPO I
COLUMNA TIPO 2
COLUMNA TIPO 3
06.03.03 CONCRETO FC= 210 KGR/CM2 M3
COLUMNA TIPO I
COLUMNA TIPO 2
COLUMNA TIPO 3
06.03.04 CURADO DE CONCRETO M2
06.04 VIGAS
06.04.01 ACERO FY=4200 KGR/CM2 G60 KGR PESO/M FACTOR N°16
ACERO FY=4200 KGR/CM2 G60 D= 3/8" (ESTRIBOS)
ACERO FY=4200 KGR/CM2 G60 D= 3/8" (ESTRUCTURA)
ACERO FY=4200 KGR/CM2 G60 D= 5/8" (ESTRUCTURA)
ACERO FY=4200 KGR/CM2 G60 D= 3/4" (ESTRUCRURA)
06.04.02 ENCOFRADO Y DESENCOFRADOS M2
06.04.03 CONCRETO FC= 210 KGR/CM2 M3
06.04.04 CURADO DE CONCRETO M2
06.05 LOSA
06.05.01 TRAZO DE NIVELES Y REPLANTEO DURANTE M2
06.05.02 ENCOFRADO Y DESENCOFRADO M2
ECONFRADO Y DESENCOFRADO EN BASE
ECONFRADO Y DESENCOFRADO EN TAPAS
06.05.03 INSTALACION DE MATERIAL ALIGERADO (P M3
06.05.04 ACERO FY=4200 KGR/CM2 G60 KGR PESO/M FACTOR N°16
ACERO FY=4200 KGR/CM2 G60 D= 1/4"
ACERO FY=4200 KGR/CM2 G60 D= 1/2"
06.05.05 CONCRETO FC= 210 KGR/CM2 M3
VOLUMEN DE LOSA
VOLUMEN EN VIGUETAS
06.05.06 CURADO DE CONCRETO M2
ETRADOS

LARGO ANCHO ALTURA AREA PARCIAL TOTAL

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
1.00 1.00
1.00 1.00
1.00 1.00

40.00 40.00
5.00 5.00
10.00 10.00
10.00 10.00

1.00 1.00
1.00 1.00

0.00 0.00
0.00 0.00

0.00 0.00
1.40 335.26 469.36 469.36
194.82 194.82
0.00 0.00
1.70 3.08 10.47
1.70 5.84 19.86
1.70 12.24 83.23
19.24 0.30 0.60 3.46 3.46
1.20 64.83 77.80 77.80
0.00 0.00
224.04 224.04

0.00 0.00
0.00 0.00
1.00 1.00
0.00

33.40 33.40
0.50 3.08 3.08 X
0.50 5.84 5.84 X
0.50 12.24 24.48 X
LONGITUD N° VECES 3666.26 3666.26

3.56 2.00 79.67


0.96 2.00 55.25
3.16 2.00 161.65
2.36 2.00 113.18
3.26 4.00 479.44
4.36 4.00 613.34

3.56 2.00 114.73


0.96 2.00 79.56
3.16 2.00 232.78
2.36 2.00 162.99
3.26 4.00 690.43
4.36 4.00 883.25
40.08 40.08
0.60 3.08 3.70 X
0.60 5.84 7.01 X
0.60 12.24 29.38 X
21.16 169.28 169.28 X
X
LONGITUD 4.92 4.92
0.58 0.58
0.56 0.56
1.55 1.55
2.24 2.24
19.24 0.60 25.40 25.40
19.24 0.30 0.60 3.46 3.46
19.24 0.30 1.20 6.93 6.93

LONGITUD 0.00 0.00


0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

LONGITUD 0.00 0.00


0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
LONGITUD 0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
NUMERO ESTABLE SEGÚN MATERIAL
SUMATORIA

VARIADO SEGÚN PLANO Y CRITERIO


NUMERO ESTABLE SEGÚN MATERIAL
SUMATORIA
PROYECTO: CONSTRUCCION DE UNA INSTITUCION EDUCATIVA DE PRIMER Y SEGUNDO NIVEL

ITEM DESCRIPCION
07 INSTALACIONES ELECTRICAS
07.01 SISTEMA DE ILUMINACION
07.01.01 SUMINISTRO E INSTALACION DE LUMINARIAS TIPO 2N LED 840
07.01.02 SUMINISTRO E INSTALACION DE LUMINARIAS TIPO RIEGENS LED 3600
07.01.03 SUMINISTRO E INSTALACION DE LUMINARIAS DE EMERGENCIA
07.01.04 INTERRUPTORES
07.01.05 TABLERO DE CONTROL
07.02 SISTEMA DE TOMACORRIENTES
07.02.01 TOMACORRIENTES
07.02.02 TABLERO DE CONTROL
07.03 SISTEMA CONTRAINCENDIOS
07.03.01 SISTEMA DE AGUA CONTRAINCENDIOS
07.03.02 SENSORES DE HUMO
07.03.03 TABLERO DE CONTROL
07.04 SISTEMA DE TELEFONIA E INTERNET
07.04.01 SISTEMA IP INTERIOR Y EXTERIOR
07.04.02 SISTEMA DE MULTIMEDIA
07.04.03 TABLERO DE CONTROL
08 INSTALACIONES SANITARIAS
08.01 SISTEMA DE AGUA POTABLE
08.01.01 INSTALACION DE CAJA DE REGISTRO
08.01.02 SUMINISTRO E INSTALACION DE TUBERIAS DE AGUA D=1/2"
08.01.03 SUMINISTRO DE ACCESORIOS PARA AGUA
08.01.04 SUMINSTRO E INSTALACION DE GRIFERIA TIPO 1
08.01.05 SUMINISTRO E INSTALACION DE GRIFERIA TIPO 2
08.01.06 SUMINISTRO E INSTALACION DE GRIFO CONTRA INCENDIO
08.02 SISTEMA DE DESAGUE
08.02.01 INSTALACION DE CAJA DE PASE Y CONTROL
08.02.02 INSTALACION DE CAJAS DE REUNION
08.02.03 SUMINISTRO DE ACCESORIOS PARA DESAGUE
08.02.04 SUMINISTRO E INSTALACION DE TUBERIAS DE DESAGUE D=2"
08.02.05 SUMINISTRO E INSTALACION DE TUBERIAS DE DESAGUE D=4"
08.02.06 SUMINISTRO E INSTALACION DE TUBERIAS DE DESAGUE D=6"
09.03 SUMINISTROS E INSTALACION DE APARATOS SANITARIOS
09.01.01 SUMINISTRO E INSTALACION DE INODORO TIPO 1
09.01.02 SUMINISTRO E INSTALACION DE URINARIO TIPO 1
09.01.03 SUMINISTRO E INSTALACION DE LAVATORIOS TIPO 1
08.04 SISTEMA DE EVACUACION DE AGUAS PLUVIALES
09.01.01 SUMINISTRO E INSTALACION DE CANALETAS GALVANIZADA
09.01.02 SUMINISTRO E INSTALACION DE TUBERIAS DE DESAGUE D=2"
09.01.03 SUMINISTRO E INSTALACION DE TUBERIAS DE DESAGUE D=3"
09.01.04 SUMINISTRO E INSTALACION DE TUBERIAS DE DESAGUE D=4"
09.01.05 SUMINISTRO E INSTALACION DE ACCESORIOS
09 INSTALACIONES ESPECIALES
09.01 INSTALACIONES DE AIRE ACONDICIONADO
PLANILLA DE METRADOS

UND N° veces FACTOR CANTIDAD LARGO ANCHO ALTURA

UND
UND
UND
PTO
UND

PTO
UND

ML
PTO
UND

ML / PTO
ML
UND

UND
ML
UND
UND
UND
UND

UND
UND
UND
ML
ML
ML

UND
UND
UND

ML
ML
ML
ML
UND

UND
TOTAL