1. Conducting Feasibility study for implementing SOx emission control measures in 5X200 MW Power plant
as per MoEF & CC Guidelines dated 07.12.2015, considering site constraint and conditions of the
units. A feasibility study report shall be submitted for the same.
2. Preparation of DPR
The firm shall prepare a complete bid document for selected Sox removal technology of
5X200MWpower plant unit. Preparation of draft technical bid specifications comprising of the
following-
c. Specifications with all data sheet, general technical requirements, quality assurance, performance
parameters, procedures for construction, erection, testing, trial runs, commissioning, and
performance guarantee tests and commercial operation. Requirement in respect of packing,
transport & storage. All drawings, data other documents & List of exclusions from the EPC
contractors scope required for clear perception of the scope of work.
d. Schedules of guarantees and penalties to the EPC contractor for schedule of completion, performance
in respect of output, availability and auxiliary power consumption.
e. The specification should be complete in all respects, technically comprehensive & should cover
the complete requirements of the project without any spill over.
f. The specification should mention 05 years of O&M of FGD plant including spares,
consumables etc., in bidder’s scope.
5. Firm shall assist Owner/Purchaser in conducting Pre-bid meeting and finalization of Minutes of
Meetings. Firm shall prepare Clarification/errata/amendments to technical /commercial queries
related to the bid document.
6. Evaluation of bids
g. Firm shall evaluate stage-1 & stage-2 bids and also assist Owner/purchaser to conduct post bid
meetings, preparing clarifications etc.
8. Any other necessary Consultancy services ,specifically not mentioned above, but necessary for
completing the above mentioned works shall be in the scope of firm.