NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS

Important Notes

* The contractor shall supply and install all equipment and


material mentioned hereunder in accordance with the
Technical Specifications and from approved and
reputable manufacturers, all in compliance with the
Technical Specifications, manufacturer's instructions and
shall carry out all the necessary testing and commissioning
to the approval and satisfaction of the Engineer Note

* The Contractor is advised to read carefully the notes on


pricing for Plumbing, Drainage & fire fighting installation
when pricing the works in this section. Note

* The Contractor is advised to read carefully the notes and


specifications on drawing for Plumbing & engineering
installation when pricing the works in this section. Note

* All plumbing installation shall only be carried out by


QGEWC approved contractor Note

* The contractor shall be responsible for the maintenance


of all the equipment and networks for the duration of the
maintenance period from the date of handing over the
project to the Client Note

2/7/1
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR
`
PLUMBING & ENGINEERING
INSTALLATIONS (Cont’d)

Below Slab Drainage

HDPE soil, waste and vent pipes and fittings to relevant


BS Standard including all joints in running lengths,
supports, brackets and fixing as specified

32mm Diameter pipe work

A Basement floors 69 m

B Ground floor 46 m

C Podium floors 2 m

D Terrace floor 1 m

E Typical floors 14 m

F Roof floor 3 m

G Vertical riser 11 m

40mm Diameter pipe work

H Basement floors 29 m

J Ground floor 1 m

K Podium floors 3 m

L Terrace floor 1 m

M Typical floors 209 m

N Vertical riser 4 m

TO COLLECTION QR

2/7/2
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Below Slab Drainage (Cont’d)

HDPE soil, waste and vent pipes and fittings to relevant


BS Standard including all joints (Cont'd)

50mm Diameter pipe work

A Basement floors 139 m

B Ground floor 32 m

C Podium floors 73 m

D Terrace floor 30 m

E Typical floors 695 m

F Roof floor 4 m

G Vertical riser 32 m

65mm Diameter pipe work

H Basement floors 3 m

J Ground floor 1 m

K Podium floors 10 m

L Roof floor 2 m

M Vertical riser 534 m

N Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/3
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Below Slab Drainage (Cont’d)

HDPE soil, waste and vent pipes and fittings to relevant


BS Standard including all joints (Cont'd)

75mm Diameter pipe work

A Basement floors 411 m

B Ground floor 14 m

C Podium floors 49 m

D Terrace floor 47 m

E Typical floors 606 m

F Roof floor 2 m

G Vertical riser 350 m

H Extra for bends, branches, etc. Item

80 mm Diameter pipe work

J Basements floors 21 m

K Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/4
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Below Slab Drainage (Cont’d)

HDPE soil, waste and vent pipes and fittings to relevant


BS Standard including all joints (Cont'd)

110mm Diameter pipe work

A Basement floors 434 m

B Ground floor 91 m

C Podium floors 47 m

D Terrace floor 202 m

E Typical floors 512 m

110mm Diameter pipe work (Cont'd)

F Vertical riser 1409 m

G Extra for bends, branches, etc. Item

125mm Diameter pipe work

H Basement floors 43 m

J Vertical riser 236 m

K Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/5
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Below Slab Drainage (Cont’d)

HDPE soil, waste and vent pipes and fittings to relevant


BS Standard including all joints (Cont'd)

160mm Diameter pipe work

A Basement floors 176 m

B Terrace floor 1 m

C Vertical riser 134 m

D Extra for bends, branches, etc. Item

200mm Diameter pipe work

E Basement floors 169 m

F Vertical riser 7 m

G Extra for bends, branches, etc. Item

Under Ground Drainage

HDPE soil, waste and vent pipes and fittings to


relevant BS Standard including excavation,
disposal, backfilling and all joints in running
lengths, supports, brackets and fixing as
specified

50mm Diameter pipe work

H Ground floor 1 m

TO COLLECTION QR

2/7/6
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Under Ground Drainage(Cont’d)

HDPE soil, waste and vent pipes and fittings to relevant


BS Standard including all joints (Cont'd)

75mm Diameter pipe work

A Basement floors 11 m

B Extra for bends, branches, etc. Item

110mm Diameter pipe work

C Basement floors 30 m

D Extra for bends, branches, etc. Item

Ancillaries

200 x 200 mm ceiling floor drains (CFD) as specified.

E Basement floors 41 No

F Ground floor 13 No

G Podium floors 27 No

H Terrace floor 9 No

J Typical floors 207 No

K Roof floor 1 No

TO COLLECTION QR

2/7/7
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Ancillaries (Cont'd)

200 x 200 mm parking drains (PD) as specified.

A Basement floors 91 No

B Podium floors 18 No

200 x 200 mm area drains (AD) as specified.

C Basement floors 1 No

D Podium floors 1 No

300 x 300 mm area drains (AD) as specified.

E Basement floors 6 No

200 x 200 mm terrace drains (TD) as specified.

F Ground floor 3 No

G Terrace floor 24 No

Roof drain bottom discharge (RD-01) as


specified

H Top of roof 4 No

Roof drain side discharge (RD-02) as


specified

J Top of roof 8 No

TO COLLECTION QR

2/7/8
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Ancillaries (Cont'd)

Trench drain as specified

Basement floors

A Overall size 2400 x 200 x 200 mm 1 No

B Overall size 2700 x 200 x 300 mm 1 No

C Overall size 3010 x 250 x 245 mm 1 No

D Overall size 3380 x 250 x 200 mm 1 No

E Overall size 5580 x 400 x 300 mm 1 No

F Overall size 5750 x 300 x 200 mm 1 No

G Overall size 6800 x 400 x 300 mm 1 No

H Overall size 7250 x 300 x 200 mm 1 No

J Overall size 8800 x 300 x 200 mm 1 No

K Overall size 13150 x 300 x 200 mm 1 No

Ground floor

L Overall size 6000 x 400 x 300 mm 1 No

M Overall size 6800 x 400 x 300 mm 1 No

N Overall size 7000 x 400 x 300 mm 4 No

P Overall size 7150 x 400 x 300 mm 1 No

Q Overall size 7200 x 400 x 300 mm 1 No

TO COLLECTION QR

2/7/9
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Ancillaries (Cont'd)

Trench Drain (Cont'd)

Podium floors

A Overall size 1300 x 200 x 200 mm 1 No

Ceiling cleanouts as specified.

32 mm Diameter

B Basement floors 10 No

C Ground floor 11 No

D Roof floor 2 No

40 mm Diameter

E Basement floors 3 No

50 mm Diameter

F Basement floors 13 No

G Ground floor 1 No

H Podium floors 3 No

J Terrace floor 1 No

K Typical floors 23 No

L Roof floor 1 No

TO COLLECTION QR

2/7/10
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Ancillaries (Cont'd)

Ceiling cleanouts(Cont'd)

65mm Diameter

A Podium Floors 4 No

75mm Diameter

B Basement floors 9 No

C Ground floor 2 No

D Podium floors 9 No

E Terrace floor 2 No

F Typical floors 69 No

110mm Diameter

G Basement floors 44 No

H Ground floor 18 No

J Podium floors 32 No

K Terrace floor 18 No

L Typical floors 23 No

M Roof floor 1 No

TO COLLECTION QR

2/7/11
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Ancillaries (Cont'd)

Ceiling cleanouts(Cont'd)

125mm Diameter

A Basement floors 7 No

B Podium floors 3 No

160mm Diameter

C Basement floors 9 No

D Podium floors 2 No

200mm Diameter

E Basement floors 15 No

250mm Diameter

F Basement floors 10 No

TO COLLECTION QR

2/7/12
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Ancillaries (Cont'd)

Gate valves as specified; jointing to drain water pipework


in all floors.

A 65mm Diameter Gate valve 4 No

B 80mm Diameter Gate valve 2 No

Gate valves as specified; jointing to waste water


pipework in all floors.

C 110mm Diameter Gate valve 3 No

D 125mm Diameter Gate valve 1 No

E 160mm Diameter Gate valve 1 No

Gate valves as specified; jointing to soil & waste


water pipework in all floors.

F 75mm Diameter Gate valve 2 No

Gate valves as specified; jointing to condensate drain


pipework in all floors.

G 75mm Diameter Gate valve 1 No

H 200mm Diameter Gate valve 1 No

Vent cap as specified

75mm Diameter

J Top of roof 1 No

110mm Diameter

K Top of roof 6 No

TO COLLECTION QR

2/7/13
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Sump pit

Concrete sump pit including complete with heavy duty


cover and all finishes necessary builder's work as per the
drawing number M.DR-B4.101-SP, M.PL-DE.006 and
specification (Concrete measured separately).

A Overall size 2000 x 2000 x 2000 mm; Ref:


SP-01 1 No

B Overall size 2000 x 2000 x 2000 mm; Ref:


SP-02 1 No

C Overall size 2000 x 2000 x 2915 mm; Ref:


SP-03 1 No

D Overall size 2000 x 2000 x 2000 mm; Ref:


SP-04 1 No

E Overall size 2000 x 2000 x 2000 mm; Ref:


SP-05 1 No

F Overall size 600 x 600 x 600 mm; Ref: SP-06 2 No

Soil Manhole

Rectangular soil manhole complete with heavy


duty cast iron cover, frame and ladder including
excavation, disposal, backfilling, concrete work,
trenching, channeling, rendering and coating as
specified and as shown on drawings.

G Overall size 600 x 600 x 590 mm; Ref SMH-01 1 No

H Overall size 600 x 600 x 690 mm; Ref SMH-02 1 No

TO COLLECTION QR

2/7/14
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Oil interceptor

A 1661 x 1305 x 578 mm Oil interceptor as per drawings


and specifications; Ref: O.I.B4/01 1 No

B 1661 x 1305 x 578 mm Oil interceptor as per drawings


and specifications; Ref: O.I.B4/02 1 No

C 2092 x 1534 x 686 mm Oil interceptor as per drawings


and specifications; Ref: O.I.B4/03 1 No

TO COLLECTION QR

2/7/15
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Rain water pipe installation

HDPE rainwater pipes and fittings to relevant BS


Standard including excavation, backfilling, disposal etc,
all joints in running lengths, supports, brackets and fixing
as specified

50 mm Diameter pipe work

A Vertical riser 4 m

75 mm Diameter pipe work

B Basement floors 8 m

C Ground floors 1 m

D Vertical riser 5 m

E Extra for bends, branches, etc. Item

110 mm Diameter pipe work

F Basement floors 402 m

G Ground floor 69 m

H Podium floors 343 m

J Terrace floor 75 m

K Roof floor 12 m

L Vertical riser 1150 m

M Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/16
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Rain water pipe installation (Con'd)

HDPE rainwater pipes and fittings to relevant BS


Standard including all joints (Con'd)

125 mm Diameter pipe work

A Basement floors 14 m

B Podium floors 28 m

C Vertical riser 5 m

D Extra for bends, branches, etc. Item

160 mm Diameter pipe work

E Basement floors 47 m

F Podium floors 4 m

G Vertical riser 275 m

H Extra for bends, branches, etc. Item

200 mm Diameter pipe work

J Basement floors 66 m

K Vertical riser 11 m

L Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/17
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Rain water pipe installation (Cont’d)

250 mm Diameter pipe work

A Basement floors 125 m

B Vertical riser 11 m

C Extra for bends, branches, etc. Item

Under Ground Drainage

HDPE rainwater pipes and fittings to relevant BS


Standard including all joints in running lengths, supports,
brackets and fixing as specified

50 mm Diameter pipe work

D Basement floors 5 m

75 mm Diameter pipe work

E Ground floor 1 m

F Extra for bends, branches, etc. Item

110 mm Diameter pipe work

G Basement floors 505 m

H Extra for bends, branches, etc. Item

125 mm Diameter pipe work

J Basement floors 18 m

K Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/18
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Rain water pipe installation (Cont’d)

Ancillaries

Gate valves as specified; jointing to rain water pipework


in all floors.

A 200mm Diameter Gate valve 2 No

B 250mm Diameter Gate valve 1 No

Rectangular rain water manhole complete with heavy


duty cast iron cover, frame and ladder including
excavation, disposal, backfilling, concrete work,
trenching, channeling, rendering and coating as specified
and as shown on drawings.

C Overall size 600 x 600 x 470 mm; Ref RMH-01 1 No

D Overall size 600 x 600 x 520 mm; Ref RMH-02 1 No

E Overall size 600 x 600 x 670 mm; Ref RMH-03 1 No

F Overall size 600 x 600 x 750 mm; Ref RMH-04 1 No

G Overall size 600 x 600 x 800 mm; Ref RMH-05 1 No

H Overall size 600 x 600 x 350 mm; Ref RMH-06 1 No

J Overall size 600 x 600 x 750 mm; Ref RMH-07 1 No

K Overall size 600 x 600 x 830 mm; Ref RMH-08 1 No

L Overall size 600 x 600 x 480 mm; Ref RMH-09 1 No

M Overall size 600 x 600 x 750 mm; Ref RMH-10 1 No

TO COLLECTION QR

2/7/19
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Rain water pipe installation (Cont’d)

Ancillaries (Cont’d)

A Overall size 600 x 600 x 830 mm; Ref RMH-08 1 No

B Overall size 600 x 600 x 480 mm; Ref RMH-09 1 No

C Overall size 600 x 600 x 750 mm; Ref RMH-10 1 No

D Overall size 800 x 800 x 1000 mm; Ref RMH-11 1 No

E Overall size 800 x 800 x 1070 mm; Ref RMH-12 1 No

F Overall size 800 x 800 x 1170 mm; Ref RMH-13 1 No

G Overall size 1000 x 1000 x 1310 mm; Ref RMH-14 1 No

H Overall size 1000 x 1000 x 1510 mm; Ref RMH-15 1 No

J Overall size 1000 x 1000 x 1810 mm; Ref RMH-16 1 No

K Overall size 1000 x 1000 x 2020 mm; Ref RMH-17 1 No

L Overall size 600 x 600 x 460 mm; Ref RMH-18 1 No

M Overall size 600 x 600 x 740 mm; Ref RMH-19 1 No

N Overall size 600 x 600 x 640 mm; Ref RMH-20 1 No

P Overall size 600 x 600 x 720 mm; Ref RMH-21 1 No

Q Overall size 800 x 800 x 980 mm; Ref RMH-22 1 No

R Overall size 800 x 800 x 640 mm; Ref RMH-23 1 No

TO COLLECTION QR

2/7/20
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Rain water pipe installation (Cont’d)

Ancillaries (Cont’d)

A Overall size 600 x 600 x 430 mm; Ref RMH-24 1 No

B Overall size 600 x 600 x 650 mm; Ref RMH-25 1 No

C Overall size 600 x 600 x 800 mm; Ref RMH-26 1 No

D Overall size 600 x 600 x 490 mm; Ref RMH-27 1 No

E Overall size 600 x 600 x 710 mm; Ref RMH-28 1 No

F Overall size 1000 x 1000 x 1570 mm; Ref RMH-29 1 No

G Overall size 1000 x 1000 x 2110 mm; Ref RMH-30 1 No

TO COLLECTION QR

2/7/21
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Overflow Pipes

HDPE overflow pipes and fittings to relevant BS


Standard including all joints

65mm Diameter pipe work

A Basement 2 m

80mm Diameter pipe work

B Basement 1 m

C Vertical riser 7 m

HDPE drain pipes and fittings to relevant BS Standard


including all joints

65mm Diameter pipe work

D Basement 2 m

80mm Diameter pipe work

E Basement 1 m

Hand hole with perforated pipe

F Overall size 300 x 300mm hand hole with perforated


pipe as per the drawings and specification 6 No

Connections

G Stormwater connection to Lusail Water Utility


Connection Item

H Soil connection to Lusail Water Utility


Connection Item

TO COLLECTION QR

2/7/22
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS

Sanitary Fittings & Accessories

Supply & fix the following sanitary fittings from an


approved manufacturer complete with all necessary
accessories, fittings, waste traps, flexible hoses, etc. as
specified including connection to all services and drains
as per the drawings and specifications

Water closet, Dual flush system wash down, wall


mounted,ideal standard Alto wall hung WC as specified
(Ref WC)

A Ground floor 11 No

B Podium floors 20 No

C Typical floors (level 5th to 27th ) 115 No

Counter-type lavatory,solid surface material with


necessory waterproofing including ideal standard
countertop wash basin and Euroeco Cosmopolitan T-self
closing pillar as specified (Ref LAV1)

D Ground floor 8 No

E Podium floors 16 No

F Typical floors (level 5th to 27th ) 92 No

Wall Hang Type lavatory with ideal standard wall hung


washbasin and Eurostyle Cosmopolitan single lever mixer
as specified (Ref LAV2)

G Ground floor 3 No

H Podium floors 4 No

J Typical floors (level 5th to 27th ) 23 No

TO COLLECTION QR

2/7/23
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Sanitary Fittings & Accessories (Cont’d)

Supply & fix the following sanitary fittings from an


approved manufacturer complete with all necessary
accessories, fittings, waste traps, flexible hoses, etc. as
specified including connection to all services and drains
as per the drawings and specifications (Cont’d)

Shower (Ref SH)

A Basement floors 15 No

Automatic Soap Dispenser, Stainless steel, bright


polished-shutter resistant, deck mounted on vanity, (Ref
SD)

B Ground floor 11 No

C Podium floors 20 No

D Typical floors (level 5th to 27th ) 115 No

Tissue Dispenser , (Ref TD)

E Ground floor 4 No

F Podium floors 8 No

G Typical floors (level 5th to 27th ) 46 No

Hand spray, hand shower bidet DN 15 with shower hose


1.5m and porter (Ref HH)

H Ground floor 11 No

J Podium floors 20 No

K Typical floors (level 5th to 27th ) 115 No

TO COLLECTION QR

2/7/24
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Sanitary Fittings & Accessories (Cont’d)

Supply & fix the following sanitary fittings from an


approved manufacturer complete with all necessary
accessories, fittings, waste traps, flexible hoses, etc. as
specified including connection to all services and drains
as per the drawings and specifications (Cont’d)

Stainless steel Hand Dryer, in satin finish ( Ref HD)

A Ground floor 7 No

B Podium floors 12 No

C Typical floors (level 5th to 27th ) 69 No

Stainless steel paper Holder, surface mounted, (Ref PH)

D Ground floor 11 No

E Podium floors 20 No

F Typical floors (level 5th to 27th ) 115 No

Nylon coated grab Bar (Ref GB)

G Ground floor 12 No

H Podium floors 16 No

J Typical floors (level 5th to 27th ) 92 No

TO COLLECTION QR

2/7/25
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Sanitary Fittings & Accessories (Cont’d)

Supply & fix the following sanitary fittings from an


approved manufacturer complete (Cont’d)

Nylon coated movable Grab Bar (Ref MGB)

A Podium floors 4 No

B Typical floors (level 5th to 27th ) 23 No

Mirror, 6 mm thick with 2.5 mm beveled polished edges


500 x 1200 mm high

C Ground floor 3 No

D Podium floors 4 No

E Typical floors (level 5th to 27th ) 23 No

1300 x 1200 mm high

F Ground floor 2 No

G Podium floors 4 No

H Typical floors (level 5th to 27th ) 23 No

1500 x 1200 mm high

J Ground floor 2 No

K Podium floors 4 No

L Typical floors (level 5th to 27th ) 23 No

TO COLLECTION QR

2/7/26
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Sanitary Fittings & Accessories (Cont’d)

Supply & fix the following sanitary fittings from an


approved manufacturer complete (Cont’d)

Soap Holders

A Basement floors 15 No

Towel Rail

B Basement floors 15 No

Cloth Hook

C Basement floors 15 No

D Ground floor 11 No

E Podium floors 20 No

Typical floors (level 5th to 27th ) 115 No

Waste Bin

F Basement floors 2 No

G Ground floor 15 No

H Podium floors 28 No

J Typical floors (level 5th to 27th ) 161 No

TO COLLECTION QR

2/7/27
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Hot and cold water installation

Copper type K pipe work with joints and fittings as


specified including all clips, supports, installation and
testing

15mm Diameter pipe work

A Basement floors 4 m

B Ground floor 14 m

C Podium floors 57 m

D Terrace floor 18 m

E Typical floors 464 m

F Vertical riser 491 m

20mm Diameter pipe work

G Basement floors 10 m

H Ground floor 18 m

J Podium floors 58 m

K Terrace floor 22 m

L Typical floors 952 m

M Vertical riser 773 m

TO COLLECTION QR

2/7/28
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Hot and cold water installation (Cont'd)

Copper type K pipe work with joints and fittings as


specified (Cont'd)

25mm Diameter pipe work

A Basement floors 10 m

B Podium floors 14 m

C Terrace floor 1 m

D Typical floors 208 m

E Vertical riser 13 m

32 mm Diameter pipe work

F Basement floors 58 m

G Ground floor 8 m

H Podium floors 26 m

J Terrace floor 4 m

K Typical floors 117 m

L Vertical riser 160 m

TO COLLECTION QR

2/7/29
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Hot and cold water installation (Cont'd)

Copper type K pipe work with joints and fittings as


specified (Cont'd)

40 mm Diameter pipe work

A Basement floors 16 m

B Ground floor 9 m

C Terrace floor 3 m

D Typical floors 78 m

E Vertical riser 57 m

50 mm Diameter pipe work

F Basement floors 7 m

G Podium floors 6 m

H Terrace floor 42 m

J Vertical riser 46 m

65 mm Diameter pipe work

K Basement floors 76 m

L Terrace floor 28 m

M Vertical riser 173 m

N Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/30
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Hot and cold water installation (Cont'd)

Copper type K pipe work with joints and fittings as


specified (Cont'd)

80 mm Diameter pipe work

A Basement floors 7 m

B Vertical riser 41 m

C Extra for bends, branches, etc. Item

100 mm Diameter pipe work

D Terrace floor 20 m

E Vertical riser 44 m

F Extra for bends, branches, etc. Item

125 mm Diameter pipe work

G Terrace floor 6 m

H Vertical riser 2 m

J Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/31
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Municipality water installation

Copper type K pipe work with joints and fittings as


specified including all clips, supports, installation and
testing

65mm Diameter pipe work

A Basement floors 226 m

B Vertical riser 20 m

C Extra for bends, branches, etc. Item

Cistern water installation

Copper type K pipe work with joints and fittings as


specified including all clips, supports, installation and
testing

50mm Diameter pipe work

D Basement floors 115 m

E Ground floor 1 m

65mm Diameter pipe work

F Vertical riser 15 m

TO COLLECTION QR

2/7/32
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Treated water pipe

Copper type K pipe work with joints and fittings as


specified including all clips, supports, installation and
testing

15mm Diameter pipe work

A Basement floors 1 m

20mm Diameter pipe work

B Vertical riser 4 m

32mm Diameter pipe work

C Podium floors 15 m

D Terrace floor 7 m

E Typical floors 142 m

40mm Diameter pipe work

F Ground floor 8 m

G Podium floors 17 m

H Terrace floor 10 m

J Typical floors 141 m

K Vertical riser 96 m

TO COLLECTION QR

2/7/33
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Treated water installation (Cont'd)

Copper type K pipe work with joints and


fittings as specified (Cont'd)

50mm Diameter pipe work

A Podium floors 30 m

B Terrace floor 1 m

C Typical floors 551 m

D Vertical riser 451 m

65mm Diameter pipe work

E Basement floors 81 m

F Ground floor 11 m

G Podium floors 9 m

H Terrace floor 36 m

J Typical floors 290 m

K Vertical riser 8 m

L Extra for bends, branches, etc. Item

80mm Diameter pipe work

M Basement floors 6 m

N Extra for bends, branches, etc. Item

P Vertical riser 24 m

TO COLLECTION QR

2/7/34
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Treated water installation (Cont'd)

Copper type K pipe work with joints and fittings as


specified (Cont'd)

100mm Diameter pipe work

A Basement floors 6 m

B Terrace floors 39 m

C Vertical riser 24 m

D Extra for bends, branches, etc. Item

125mm Diameter pipe work

E Terrace floors 1 m

F Vertical riser 54 m

G Extra for bends, branches, etc. Item

150mm Diameter pipe work

H Terrace floor 46 m

J Vertical riser 20 m

K Extra for bends, branches, etc. Item

200mm Diameter pipe work

L Terrace floor 2 m

M Vertical riser 2 m

N Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/35
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Stainless steel pipe work with joints and


fittings as specified including all clips,
supports, installation and testing

500mm Diameter pipe work

A Basement floors 42 m

B Extra for bends, branches, etc. Item

Polypropylene pipe work with joints and


fittings as specified including all clips,
supports, installation and testing

Hot and cold water embedded in walls

15mm Diameter pipe work

C Basement floors 45 m

D Ground floor 87 m

E Podium floors 160 m

F Typical floors 917 m

20mm Diameter pipe work

G Ground floor 4 m

H Podium floors 18 m

J Typical floors 108 m

22mm Diameter pipe work

K Basement floor 45 m

TO COLLECTION QR

2/7/36
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Ancillaries

Gate valves as specified; jointing to hot and cold water


pipework in all floors.

A 15mm Diameter Gate valve 165 No

B 20mm Diameter Gate valve 214 No

C 25mm Diameter Gate valve 25 No

D 32mm Diameter Gate valve 91 No

E 40mm Diameter Gate valve 46 No

F 50mm Diameter Gate valve 6 No

G 65mm Diameter Gate valve 10 No

H 80mm Diameter Gate valve 4 No

J 125mm Diameter Gate valve 2 No

TO COLLECTION QR

2/7/37
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Ancillaries (Cont’d)

Gate valves as specified; jointing to municipality water


pipework in all floors.

A 65mm Diameter Gate valve 9 No

Gate valves as specified; jointing to treated water


pipework in all floors.

B 32mm Diameter Gate valve 103 No

C 40mm Diameter Gate valve 114 No

D 65mm Diameter Gate valve 31 No

E 80mm Diameter Gate valve 2 No

G 150mm Diameter Gate valve 2 No

Gate valves as specified; jointing to cistern water


pipework in all floors.

H 50mm Diameter Gate valve 4 No

Non return valves as specified; jointing to cold and hot


water pipework in all floors.

J 50mm Diameter Non return valve 2 No

Non return valves as specified; jointing to municipality


water pipework in all floors.

K 65mm Diameter Non return valve 2 No

TO COLLECTION QR

2/7/38
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Ancillaries (Cont’d)

Non return valves as specified; jointing to cistern water


pipework in all floors.

A 50mm Diameter Non return valve 1 No

Non return valves as specified; jointing to treated water


pipework in all floors.

B 65mm Diameter Non return valve 1 No

Solenoid valves as specified; jointing to hot and cold


water pipework in all floors.

C 65mm Diameter Solenoid valve 2 No

Pressure reducing valve set @ 1.5 bars ; jointing to


pipework in all floors as per the drawing M.PL-DE.006
and specification .

D Hot and cold water pipe work 8 Set

E Treated water pipe work 3 Set

Polypropylene check valves as specified; jointing to hot


and cold water pipework in all floors.

F 15mm Diameter Polypropylene check valve 2 No

Landing valves as specified; jointing to hot and cold


water pipework in all floors.

G 20mm Diameter Landing valve 3 No

TO COLLECTION QR

2/7/39
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Ancillaries (Cont’d)

Landing valves as specified; jointing to treated water


pipework in all floors.

A 20mm Diameter Landing valve 2 No

Strainer as specified; jointing to municipality water


pipework in all floors.

B 65mm Diameter Strainer 2 No

Strainer as specified; jointing to cistern water pipework in


all floors.

C 50mm Diameter Strainer 1 No

Strainer as specified; jointing to hot and cold water


pipework in all floors.

D 50mm Diameter Strainer 2 No

E 80mm Diameter Strainer 4 No

F 125mm Diameter Strainer 2 No

Strainer as specified; jointing to treated water pipework


in all floors.

G 80mm Diameter Strainer 2 No

H 150mm Diameter Strainer 2 No

TO COLLECTION QR

2/7/40
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Ancillaries (Cont’d)

Water hammer arrestors complete as specified including


fixed into pipe work in all floors

A Water hammer arrestor; on 32 mm diameter pipework. 2 No

B Ditto: on 40 mm diameter pipework. 112 No

Hose bib as specified; jointing to hot and cold water


pipework in all floors.

C 15mm Diameter Strainer 28 No

Hose bib as specified; jointing to hot and cold water


pipework in all floors.

D 15mm Diameter Strainer 34 No

E 25mm Diameter Strainer 4 No

F 32mm Diameter Strainer 1 No

G 50mm Diameter Strainer 1 No

Connections

H Filling line from external network Item

J Filling line from cistern Item

TO COLLECTION QR

2/7/41
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System

Sprinkler/FHR pipes

ASTM A 53 grade galvanized steel schedule 40


seamless type pipes and fittings to relevant BS Standard
fixed complete including all brackets, supports and
colored paint on primer as specified.

25 mm diameter pipe work

A Basement floors 4577 m

B Ground floor 123 m

C Podium floors 1477 m

D Terrace floor 110 m

E Typical floors 1118 m

F Roof floor 75 m

32 mm diameter pipe work

G Basement floors 1038 m

H Ground floor 7 m

J Podium floors 131 m

K Terrace floor 11 m

L Typical floors 54 m

M Roof floor 8 m

TO COLLECTION QR

2/7/42
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Sprinkler/FHR pipes (Cont'd)

ASTM A 53 grade galvanized steel schedule 40


seamless type pipes and fittings (Cont'd)

40 mm diameter pipe work

A Basement floors 1343 m

B Ground floor 49 m

C Podium floors 146 m

D Terrace floor 23 m

E Typical floors 368 m

F Roof floor 12 m

50 mm diameter pipe work

G Basement floors 462 m

H Ground floor 15 m

J Podium floors 173 m

K Terrace floor 16 m

L Typical floors 55 m

M Roof floor 17 m

TO COLLECTION QR

2/7/43
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Sprinkler/FHR pipes (Cont'd)

ASTM A 53 grade galvanized steel schedule 40


seamless type pipes to relevant BS Standard fixed
complete including all brackets, supports and colored
paint on primer as specified.

65 mm diameter pipe work

A Basement floors 179 m

B Ground floor 13 m

C Podium floors 133 m

D Terrace floor 1 m

E Typical floors 161 m

F Roof floor 16 m

G Extra for bends, branches, etc. Item

80 mm diameter pipe work

H Ground floor 6 m

J Podium floors 104 m

K Terrace floor 14 m

L Typical floors 77 m

M Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/44
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Sprinkler/FHR pipes (Cont'd)

ASTM A 53 grade galvanized steel schedule 40


seamless type pipes to (Cont'd)

100 mm diameter pipe work

A Basement floors 51 m

B Ground floor 5 m

C Podium floors 260 m

D Terrace floor 20 m

E Typical floors 641 m

F Extra for bends, branches, etc. Item

125 mm diameter pipe work

G Podium floors 28 m

H Extra for bends, branches, etc. Item

150 mm diameter pipe work

J Basement floors 1602 m

K Ground floor 30 m

L Podium floors 245 m

M Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/45
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Wet Riser Pipe

ASTM A 53 grade galvanized steel schedule 40


seamless type pipes to relevant BS Standard fixed
complete including all brackets, supports and colored
paint on primer as specified

150 mm diameter pipe work (risers measured separately)

A Basement floors 241 m

B Extra for bends, branches, etc. Item

Vertical risers

ASTM A 53 grade galvanized steel schedule 40


seamless type pipes to relevant BS Standard fixed
complete including all brackets, supports and colored
paint on primer as specified

C 150mm wet riser 238 m

D Extra for bends, branches, etc. Item

ASTM A 53 grade galvanized steel schedule 40


seamless type pipes and fittings to relevant BS Standard
fixed Standard fixed complete including all brackets,
supports and colored paint on primer as specified

E 50mm sprinkler/FHR drain pipe in riser 127 m

TO COLLECTION QR

2/7/46
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Dry Riser Pipe

ASTM A 53 grade galvanized steel schedule 40


seamless type pipes to relevant BS Standard fixed
complete including all brackets, supports and colored
paint on primer as specified

100 mm diameter pipe work (risers measured separately)

A Basement floors 216 m

B Extra for bends, branches, etc. Item

Vertical risers

C 100mm dry riser 29 m

D Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/47
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Drain pipes

ASTM A 53 grade galvanized steel schedule 40


seamless type pipes to relevant BS Standard fixed
complete including all brackets, supports and colored
paint on primer as specified

65 mm diameter pipe work

A Basement floors 15 m

B Extra for bends, branches, etc. Item

ASTM A 53 grade galvanized steel schedule 40


seamless type pipes and fittings to relevant BS Standard
fixed complete including all brackets, supports and
colored paint on primer as specified

50 mm diameter pipe work

C Basement floors 7 m

D Ground floor 2 m

E Podium floors 5 m

F Terrace floor 2 m

G Typical floors 30 m

H Roof floor 2 m

32 mm diameter pipe work

J Basement floors 22 m

K Podium floors 3 m

TO COLLECTION QR

2/7/48
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Drain pipes (Cont'd)

ASTM A 53 grade galvanized steel schedule 40


seamless type pipes and fittings (Cont'd)

32 mm diameter pipe work (Cont'd)

A Typical floors 40 m

B Roof floor 2 m

Valves

Valves to pipe work with all required accessories and


complete as specified

Wet Riser pipe

C 150mm diameter automatic air vent 4 No

D 150mm diameter Pressure gauge and pressure sensor 4 No

E 150mm diameter hammer arrestor 4 No

F 150mm diameter check valve 2 No

Dry Riser pipe

G 100mm diameter automatic air vent 1 No

H 100mm diameter Pressure gauge and pressure sensor 1 No

J 100mm diameter hammer arrestor 1 No

K 100mm diameter check valve 2 No

L 100mm diameter drain point valve 1 No

TO COLLECTION QR

2/7/49
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Sprinklers

Sprinkler from an approved manufacturer fixed to pipe


work with all required accessories and complete as
specified

Upright Sprinkler

A Basement floors 2268 No

B Ground floor 36 No

C Podium floors 464 No

D Terrace floor 5 No

E Roof floor 4 No

Concealed Pendant Sprinkler

F Typical floors 414 No

TO COLLECTION QR

2/7/50
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Sprinklers (Cont'd)

Sprinkler from an approved manufacturer fixed to pipe


work with all required accessories and complete as
specified

Sidewall Sprinkler Head

A Basement floors 118 No

B Ground floor 24 No

C Podium floors 138 No

D Typical floors 21 No

Pendant Decorative Sprinkler

E Podium floors 40 No

F Terrace floor 35 No

G Typical floors 46 No

H Roof floor 19 No

TO COLLECTION QR

2/7/51
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Sprinklers (Cont'd)

Sprinkler from an approved manufacturer fixed to pipe


work with all required accessories and complete as
specified

Pendant Sprinkler

A Basement floors 124 No

B Ground floor 41 No

C Podium floors 34 No

D Terrace floor 8 No

E Typical floors 73 No

F Roof floor 7 No

TO COLLECTION QR

2/7/52
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Ancillaries

Ancillaries from an approved manufacturer fixed


complete as specified

A 65mm diameter landing valve 1 No

B 100mm diameter landing valve 9 No

C 150mm diameter landing valve 61 No

D 150mm Fire alarm check valve 1 No

E 150mm Check valve 2 No

F 25mm diameter Gate valve 38 No

G 32mm diameter Gate valve 50 No

H 40mm diameter Gate valve 1 No

J 50mm diameter Gate valve 39 No

K 65mm diameter Gate valve 92 No

L 80mm diameter Gate valve 7 No

M 100mm diameter Gate valve 1 No

N 150mm diameter Gate valve 76 No

P 150mm diameter Gate valve with supervisory switch 6 No

Q Suction pressure gauge 2 No

R 150mm Diameter OS&Y Gate valve with supervisory


switch 5 No

TO COLLECTION QR

2/7/53
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Ancillaries (Cont'd)

Ancillaries from an approved manufacturer fixed


complete as specified (Cont'd)

A 150mm Diameter Globe valve 1 No

B 150mm diameter Relief valve for fire pump chasing 1 No

C 150mm diameter vortex plate 1 No

D 150mm diameter Air release valve 2 No

E Discharge pressure gauge 2 No

F 150mm diameter flow meter 1 No

G 150mm diameter strainer 1 No

H Enclose cone 1 No

J 150mm diameter Water check valve 1 No

K 100mm (x2) 65 dia. Siamese connection in dry riser 2 No

L 150mm (x4) 65 dia.Siamese connection in wet riser 2 No

M 100mm diameter Non return valve 2 No

N 150mm diameter Non return valve 2 No

TO COLLECTION QR

2/7/54
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Ancillaries (Cont'd)

Ancillaries from an approved manufacturer fixed


complete as specified (Cont'd)

A Preaction valve 1 No

B Electronic sounder 8 No

C 25mm Flushing connection 38 No

D 80mm Flushing connection 2 No

E 150mm Flushing connection 1 No

Zone control valve

Supply & installation from an approved manufacturer


fixed to pipe work with all required accessories, including
electrical supply and complete as specified.

F 150mm Zone control valve 37 No

TO COLLECTION QR

2/7/55
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Pressure reducing valve

Supply & installation of PRV with inlet pressure of 19


and outlet pressure of 12, to serve ground floor to level
13, fixed to pipe work with all required accessories,
including electrical supply and complete as specified.

A Pressure reducing valve (PRV 01/ a-b) 1 No

Supply & installation of PRV with inlet pressure of 19


and outlet pressure of 8, to serve basement floors, fixed
to pipe work with all required accessories, including
electrical supply and complete as specified.

B Pressure reducing valve (PRV 02/ a-b) 1 No

Fire hose units

C Fire hose reel unit with cabinet from 25mm dia x 30


meters long rubber hose reel in upper compartment with
40mm dia PRAV, 65mm dia PRLV and 6kg DP and
9LT gas/water fire extinguisher in the lower compartment
fixed complete with hose reel riser, outlet connection as
specified including nozzle, valve, connection to pipe work
with all integral accessories,Ref; FHC. 13 No

D Fire hose reel unit from 25mm dia x 30 meters long


rubber hose reel in upper compartment with 40mm dia
PRAV, 65mm dia LV, fixed complete with hose reel
riser, outlet connection as specified including nozzle,
valve, connection to pipe work with all integral
accessories,Ref; FHR. 94 No

TO COLLECTION QR

2/7/56
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Fire suppression system

Allow for protected with clean agent system (FM-200)


as specified

A In Oredoo room (27.48 m2) at 1st basement (1 No);


Ref; FSS-B1/05 Item

B In LV room (64.73 m2) at 1st basement (1 No);


Ref;FSS-B1/04 Item

C In TX room (59.40 m2) at 1st basement (1


No);Ref;FSS-B1/03 Item

D In MV room (60.13 m2) at 1st basement (1


No);Ref;FSS-B1/02 Item

E In Storage CCTV room (14.48 m2) at 1st basement (1


No); Ref;FSS-GF/01 Item

Allow for foam fire suppression system as specified

F In Diesel room (8.49 m2) at ground floor (1 No);


Ref;FSS-B1/01 Item

TO COLLECTION QR

2/7/57
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fire Fighting System (Cont'd)

Fire extinguishers wall mounted with necessary brackets


and screws as specified

A Dry powder ABC portable fire extinguisher-6Kg 32 No

B CO2 portable fire extinguisher-6Kg 136 No

C Fire blanket as specified 28 No

Connection for municipality

D Allow for connection from municipality connection. Item

TO COLLECTION QR

2/7/58
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Irrigation water installation

Copper type K pipe work with joints and fittings as


specified including all clips, supports, installation and
testing

15mm Diameter pipe work

A Basement floors 43 m

B Podium floors 2 m

C Vertical riser 65 m

20mm Diameter pipe work

D Basement floors 23 m

E Ground floor 3 m

F Vertical riser 20 m

25mm Diameter pipe work

G Basement floors 5 m

H Ground floor 1 m

J Podium floors 28 m

K Vertical riser 16 m

TO COLLECTION QR

2/7/59
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Irrigation water installation (Cont'd)

Copper type K pipe work with joints and fittings as


specified (Cont'd)

32mm Diameter pipe work

Basement floors 76 m

Ground floor 2 m

Podium floors 87 m

Vertical riser 38 m

40mm Diameter pipe work

A Basement floors 79 m

B Vertical riser 7 m

50mm Diameter pipe work

C Basement floors 197 m

D Ground floor 2 m

E Vertical riser 15 m

65mm Diameter pipe work

F Basement floors 465 m

G Vertical riser 37 m

H Extra for bends, branches, etc. Item

TO COLLECTION QR

2/7/60
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Irrigation water installation (Cont'd)

Copper type K pipe work with joints and fittings as


specified (Cont'd)

80mm Diameter pipe work

A Basement floors 8 m

B Vertical riser 17 m

C Extra for bends, branches, etc. Item

Ancillaries

Gate valves as specified; jointing to irrigation water


pipework in all floors.

D 15mm Diameter Gate valve 34 No

E 20mm Diameter Gate valve 2 No

F 25mm Diameter Gate valve 5 No

G 32mm Diameter Gate valve 3 No

H 50mm Diameter Gate valve 2 No

J 65mm Diameter Gate valve 6 No

K 80mm Diameter Gate valve 2 No

Non return valves as specified; jointing to


irrigation water pipework in all floors.

L 15mm Diameter Non return valve 2 No

TO COLLECTION QR

2/7/61
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Irrigation water installation (Cont'd)

Ancillaries (Cont'd)

Solenoid valves as specified; jointing to irrigation water


pipework in all floors.

A 20mm Diameter Solenoid valve 2 No

B 25mm Diameter Solenoid valve 1 No

C 32mm Diameter Solenoid valve 1 No

D 50mm Diameter Solenoid valve 1 No

E 65mm Diameter Solenoid valve 6 No

Strainer as specified; jointing to irrigation water pipework


in all floors.

F 80mm Diameter Strainer 2 No

TO COLLECTION QR

2/7/62
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Gas Installation

Gas Pipes

Steel ASTM A 53/A 53M, black steel, schedule 40,


type E or S; grade B; black pipes and pipe containment
to relevant standard, including fittings standard fixed
complete with brackets, supports and G.I. pipe sleeves
with fire stop sealant, coated with factory-applied,
corrosion resistant polyethylene as specified and as
shown on drawings

15mm diameter pipe

A Ground floor 6 m

B Podium floors 15 m

C Terrace floor 5 m

D Typical floors 102 m

32mm diameter pipe

E Ground floor 44 m

F Terrace floor 21 m

G Roof floor 27 m

H Top of roof floor 16 m

TO COLLECTION QR

2/7/63
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Gas Installation (Cont’d)

Gas Pipes (Cont’d)

Steel ASTM A 53/A 53M, black steel, schedule 40,


type E or S; grade B; black pipes and pipe containment
to relevant standard, including fittings standard fixed
complete with brackets, supports and G.I. pipe sleeves
with fire stop sealant, coated with factory-applied,
corrosion resistant polyethylene as specified and as
shown on drawings (Cont’d)

Riser pipe

A 15mm diameter pipe 9 m

B 20mm diameter pipe 12 m

C 25mm diameter pipe 26 m

D 32mm diameter pipe 177 m

TO COLLECTION QR

2/7/64
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Gas Installation (Cont’d)

Valves

Valves standard fixed including all brackets and supports


as specified and as shown on drawings

Gate valves

A 15mm diameter 28 No

Isolating valves

B 32mm diameter 1 No

Shut off valves

C 15mm diameter 28 No

D 32mm diameter 1 No

Purging valve

E 32mm diameter 1 No

TO COLLECTION QR

2/7/65
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Gas Installation (Cont’d)

Ancillaries

Equipment from an approved manufacturer, fixed


complete including all pipe connections, all types of
valves, fittings, conduits, wires, cables, etc. control panels
and final power supply connection as specified

A Gas panel comprise with gas regulator, solenoid valve


and isolating valve of 15mm diameter, including all
necessary pipes and fittings as detailed in drawings
and specifications 28 No

B Natural gas detector provision 57 No

C Emergency switch 28 No

D Pressure reducing and metering station 1 No

E 350/75 mbar Gas regulator (increase of 350mbar only);


32mm diameter 1 No

F 32mm diameter gas pipe connection to utility tunnel/ gas


network Item

TO COLLECTION QR

2/7/66
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fuel Installation

Pipes and fittings to relevant standard fixed complete with


pipe sleeves, brackets, supports and applied with
protective coating as specified and as shown on drawings

Mazout filling line

40mm diameter pipe

A Basement floors 9 m

B Ground floor 1 m

Mazout supply line

20mm diameter pipe

C Basement floors 3 m

Mazout return line

25mm diameter pipe

D Basement floors 3 m

Vent pipes

50mm diameter pipe

E Basement floors 10 m

F Ground floor 1 m

TO COLLECTION QR

2/7/67
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fuel Installation (Cont’d)

Pipes and fittings to relevant standard fixed complete with


pipe sleeves, brackets, supports and applied with
protective coating as specified and as shown on drawings

Riser pipe

Mazout filling line

A 40mm diameter pipe 4 m

Mazout supply line

B 20mm diameter pipe 2 m

Mazout return line

C 25mm diameter pipe 2 m

Vent pipes

D 50mm diameter pipe 4 m

TO COLLECTION QR

2/7/68
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Fuel Installation (Cont’d)

Ancillaries

Valves standard fixed including all brackets and supports


as specified and as shown on drawings

Gate valves

A 25mm diameter 1 No

B 40mm diameter 1 No

Isolating valves

C 20mm diameter 2 No

D 40mm diameter 1 No

E 50mm diameter 1 No

Fuel fill cabinet

F Fuel fill cabinet including all necessary pipes and fittings


as specified 1 No

Equipment

Equipment from an approved manufacturer, fixed


complete including all pipe connections, and all types of
valves and fittings as specified

G Diesel fuel tank 1.25m x 1.25m x 2.5m 1 No

TO COLLECTION QR

2/7/69
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Plant and Equpiment

Pump

A One duty, one standby "Domestic lifting pump", Ref:


P-B4/01,02 as per the drawing and specification. 1 Set

B One duty, one standby "WC's lifting pump", Ref:


P-B4/03,04 as per the drawing and specification. 1 Set

C One duty, one standby by with VFD on each pump


"Irrigation transfer pump", Ref: P-B4/05,06 as per the
drawing and specification. 1 Set

D One duty, one standby "Transfer pump", Ref:


P-B4/07,08 as per the drawing and specification. 1 Set

E One duty, one standby "Grey water pump", Ref:


P-B4/09,10 as per the drawing and specification. 1 Set

F One duty, one standby "Storm water transfer pump", Ref:


P-B4/11,12 as per the drawing and specification. 1 Set

G One duty, one standby "Storm water transfer pump", Ref:


P-B4/13,14 as per the drawing and specification. 1 Set

H One duty, one standby by with VFD on each pump


"Domestic booster pump", Ref: P-RF/01,02 as per the
drawing and specification. 1 Set

J One duty, one standby by with VFD on each pump


"WC's booster pump", Ref: P-RF/03,04,05 as per the
drawing and specification. 1 Set

K One duty, one standby by with VFD on each pump


"WC's booster pump", Ref: P-RF/03,04,05 as per the
drawing and specification. 1 Set

TO COLLECTION QR

2/7/70
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Equipments (Cont’d)

Pump (Cont’d)

A Back wash pumps as per the drawing and specification. 1 No

B Odor control dosing tank - dosing pumps as per the


drawing and specification. 1 No

C Post chlorination dosing tank - dosing pumps as per the


drawing and specification. 1 No

Submersible Pumps

D Dulex, one duty, one standby submersible pumps as


specified; Ref: SP/01,02 1 Set

E Dulex, one duty, one standby submersible pumps as


specified; Ref: SP/03,04 1 Set

F Dulex, one duty, one standby submersible pumps as


specified; Ref: SP/05, 06 1 Set

G Triplex, two duty, one standby submersible pumps as


specified; Ref: SP/07, 08, 09 1 Set

H Dulex, one duty, one standby submersible pumps as


specified; Ref: SP/10,11 1 Set

J Dulex, one duty, one standby submersible pumps as


specified; Ref: SP/12 1 No

K Dulex, one duty, one standby submersible pumps as


specified; Ref: SP/13 1 No

TO COLLECTION QR

2/7/71
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Equipments (Cont’d)

Pump (Cont’d)

Fire pump set

A Fire diesel pump, horizontal split case, 48L/s flow rate,


19 bar head,250HP motor data with 2900 RPM speed,
including exhaust pipe, as specified. Ref; FP-B1/01 1 No

B Fire electric pump, horizontal split case, 48L/s


flow rate, 19 bar head , 200HP motor data with 2900
RPM speed, as specified. Ref; FP-B1/02 1 No

C Fire jockey pump, vertical multistage, 4.8L/s flow rate,


19 bar head , 20HP motor data with 2900 RPM speed,
as specified. Ref; FP-B1/03 1 No

Water meter assembly as specified; jointing to pipework.

D Water meter at Basement floor 3 No

Ultrasonic meter assembly as specified; jointing to


pipework.

20mm Diameter

E Podium floors 6 No

F Typical floors 92 No

32mm Diameter

G Podium floors 2 No

H Typical floors 92 No

TO COLLECTION QR

2/7/72
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Equipments (Cont’d)

Electric water heater as per the drawing and specification

A Electric water heater; Ref: EWH-B1/01 4 No

B Electric water heater; Ref: EWH-01 28 No

C Electric water heater; Ref: EWH-02 28 No

Pressure vessel as per the drawing and specification

D 2 numbers of pressure vessel 100 liter each 1 Set

E 2 numbers of Pressure vessel 300 liter each 1 Set

Filter as per the drawing and specification

F Basement floors 2 No

Sand filter as per the drawing and specification

G Basement floors 1 No

Automatic activated carbon filter as per the


drawing and specification.

H Basement floors 3 No

Automatic multimedia filter as per the drawing


and specification.

J Basement floors 3 No

TO COLLECTION QR

2/7/73
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Equipment (Cont’d)

Water tank

A Domestic water tank, approved type, in roof floor


including all necessary pipes, fittings, valves, connections,
capacity 60m3 as per the drawing and specification. 2 No

B Treated water tank, approved type, in roof floor


including all necessary pipes, fittings, valves, connections,
capacity 48m3 as per the drawing and specification. 2 No

Expansion tank

C Expansion, Ref: EXP-01 as per the drawing and


specification. 1 No

D Expansion, Ref: EXP-02 as per the drawing and


specification. 1 No

E Expansion, Ref: EXP-03 as per the drawing and


specification. 1 No

F Expansion, Ref: EXP-04 as per the drawing and


specification. 1 No

G Expansion, Ref: EXP-05 as per the drawing and


specification. 1 No

H Expansion, Ref: EXP-06 as per the drawing and


specification. 1 No

J Expansion, Ref: EXP-07 as per the drawing and


specification. 1 No

K Expansion, Ref: EXP-08 as per the drawing and


specification. 1 No

TO COLLECTION QR

2/7/74
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Water Supply provisions connection

A Allow for water supply provisions connection with


necessary protection works as per schedules
specification Item

B Allow for pipes, valves, and necessary connection for


water tanks (strom water tanks, grey water tanks) Item

C Allow for pipes, valves, and necessary connection for


water tanks (Domestic water tanks, treated water tanks) Item

Allow for BMS connection

D Allow connection and interface with BMS system and


other systems as specified Item

TO COLLECTION QR

2/7/75
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Builders work in connection with Plumbing & Engineering


Installations

A Allow for marking the position of holes, mortises, chases


and the like in the structure Item

B Allow for providing openings, up stands, plinths and the


like in the structure with waterproof aprons Item

C Allow for cleaning and painting all brackets, supports and


exposed pipe work Item

D Allow for providing and building in the pipe sleeves in


accordance with the drawings Item

E Allow for construction of all plinths, bases and platforms


for plants and equipment (plant & equipment measured
separately) Item

F Allow for any other builders work not specifically


covered by the above items Item

TO COLLECTION QR

2/7/76
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

Sundries

A Allow for fire stopping in accordance with the drawings,


specifications and local authorities requirements Item

B Allow for producing all working drawings for approval


and as required by the specification Item

C Allow for testing and commissioning all the foregoing


installation to the complete satisfaction of the Engineer Item

D Allow for sterilization and cleaning out of all pipe work


system in accordance with the specification Item

E Allow for providing all painting and plates, discs, labels


etc. for identification of plants equipment, appliances,
pipes, valves and the like in accordance with the
specification Item

F Allow for preparing record drawings of the installations


“as fitted” in accordance with the specifications Item

G Allow for providing all operating and maintenance


instruction manuals in accordance with the specification Item

H Allow for providing all loose items and spare parts in


accordance with the specification Item

TO COLLECTION QR

2/7/77
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

OTHER ITEMS

The Contractor shall describe and price below the items


necessary for the full and proper completion of the work
as described in the specification or shown on the
drawings and for which either expressed or implied
provision is required and which are not covered by either
the items or the rates in the Bills of Quantities of contract
or by any other matter whatsoever. Anything not so
separately described shall be deemed to be covered in
the items and rates inserted in the Bills of Quantities.

(i)

(ii)

(iii)

( iv)

(v)

( vi)

(vii)

TO COLLECTION QR

2/7/78
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

COLLECTION

Page 2/7/1

Page 2/7/2

Page 2/7/3

Page 2/7/4

Page 2/7/5

Page 2/7/6

Page 2/7/7

Page 2/7/8

Page 2/7/9

Page 2/7/10

Page 2/7/11

Page 2/7/12

Page 2/7/13

Page 2/7/14

Page 2/7/15

Page 2/7/16

Page 2/7/17

Page 2/7/18

COLLECTION CARRIED OVER QR

2/7/79
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

COLLECTION

COLLECTION BROUGHT FORWARD QR

Page 2/7/19

Page 2/7/20

Page 2/7/21

Page 2/7/22

Page 2/7/23

Page 2/7/24

Page 2/7/25

Page 2/7/26

Page 2/7/27

Page 2/7/28

Page 2/7/29

Page 2/7/30

Page 2/7/31

Page 2/7/32

Page 2/7/33

Page 2/7/34

Page 2/7/35

COLLECTION CARRIED OVER QR

2/7/80
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

COLLECTION

COLLECTION BROUGHT FORWARD QR

Page 2/7/36

Page 2/7/37

Page 2/7/38

Page 2/7/39

Page 2/7/40

Page 2/7/41

Page 2/7/42

Page 2/7/43

Page 2/7/44

Page 2/7/45

Page 2/7/46

Page 2/7/47

Page 2/7/48

Page 2/7/49

Page 2/7/50

Page 2/7/51

Page 2/7/52

COLLECTION CARRIED OVER QR

2/7/81
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

COLLECTION

COLLECTION BROUGHT FORWARD QR

Page 2/7/53

Page 2/7/54

Page 2/7/55

Page 2/7/56

Page 2/7/57

Page 2/7/58

Page 2/7/59

Page 2/7/60

Page 2/7/61

Page 2/7/62

Page 2/7/63

Page 2/7/64

Page 2/7/65

Page 2/7/66

Page 2/7/67

Page 2/7/68

Page 2/7/69

COLLECTION CARRIED OVER QR

2/7/82
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

PLUMBING & ENGINEERING


INSTALLATIONS (Cont’d)

COLLECTION

COLLECTION BROUGHT FORWARD QR

Page 2/7/69

Page 2/7/70

Page 2/7/71

Page 2/7/72

Page 2/7/73

Page 2/7/74

Page 2/7/75

Page 2/7/76

Page 2/7/77

Page 2/7/78

TO SUMMARY OF BILL NO. 2 QR

2/7/83
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION

Important Notes

* The Contractor shall provide all the materials,


labour, cartage, plant and appliances necessary for
the supply, installation, testing and commissioning
of the works and all other minor and incidental
works necessary for the system Note

* The Specifications and Design Drawings are


intended to indicate the nature and scope of the
Project. Contractor shall be responsible for the
preparation of detailed coordinated working
drawings and for installation of plant of the
correct capacity, as per approved drawings and in
line with the best prevailing engineering practices Note

* Contractor shall guarantee for the efficient


performance of various equipment which shall not
be less than the specified ratings when working
under the operating conditions for respective items
as given in the drawings Note

* All works are to be carried out to Q.C.S. and


relevant internationally accepted codes of practice
as well as current QGEWC regulations Note

* Contractor to provide return air openings of


suitable size at all appropriate locations Note

* The Contractor is advised to read carefully the


notes on pricing for Air-conditioning installation
when pricing the works in this section. Note

2/8/1
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Horizontal Ductwork

Galvanized sheet ductwork and fittings to


HVAC/DW-144 standard fixed complete to R.C.
slab soffits including test holes, access panels,
hanging system, supports and turning vanes/
splitters for bends and branches, bends, branch
connections and transformation pieces, plenum
box, bell mouths with wire mesh etc. as per
drawings & specifications.

Galvanized steel rectangular air ducts

Supply air duct

A Basement floor 276 m2

B Ground floor 59 m2

C Podium floor 110 m2

D Terrace floor 34 m2

E Typical floor 878 m2

F Roof floor 43 m2

Return air duct

G Basement floor 183 m2

H Ground floor 5 m2

J Podium floor 11 m2

K Terrace floor 4 m2

L Typical floor 73 m2

M Roof floor 2 m2

TO COLLECTION QR

2/8/2
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Horizontal Ductwork(Cont'd)

Galvanized steel rectangular air ducts

Fresh air duct

A Basement floor 135 m2

B Ground floor 9 m2

C Podium floor 558 m2

D Terrace floor 18 m2

E Typical floor 910 m2

F Roof floor 20 m2

Exhaust air duct

G Basement floor 148 m2

H Ground floor 23 m2

J Podium floor 420 m2

K Terrace floor 19 m2

L Typical floor 912 m2

M Roof floor 47 m2

TO COLLECTION QR

2/8/3
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Horizontal Ductwork(Cont'd)

Galvanized steel rectangular exposed air ducts

Supply exposed air duct

A Terrace floor 110 m2

Fresh exposed air duct

B Roof floor 382 m2

Exhaust exposed air duct

C Roof floor 109 m2

Galvanized steel rectangular fire rated air ducts

Fire rated supply air duct

D Basement floor 15 m2

E Roof floor 5 m2

Fire rated return air duct

F Roof floor 1 m2

Fire rated fresh air duct

G Ground floor 18 m2

Fire rated exhaust air duct

H Basement floor 67 m2

J Ground floor 15 m2

TO COLLECTION QR

2/8/4
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Horizontal Ductwork (Cont'd)

16 Gauge kitchen hood extract ductwork as per


drawings & specifications.

A Ground floor 1 m2

B Podium 1 m2

C Terrace 1 m2

D Typical floor 11 m2

Vertical riser Ductwork

Galvanized steel rectangular air ducts

Supply air duct

E Basement floor 32 m2

F Ground floor 44 m2

G Podium floor 84 m2

H Terrace floor 38 m2

Return air duct

J Basement 40 m2

TO COLLECTION QR

2/8/5
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Vertical riser Ductwork (Cont'd)

Fresh air duct

A Basement floor 449 m2

B Ground floor 262 m2

C Podium floor 169 m2

D Terrace floor 45 m2

E Typical floor 955 m2

F Roof floor 71 m2

Exhaust air duct

G Basement floor 410 m2

H Ground floor 338 m2

J Podium floor 126 m2

K Terrace floor 33 m2

L Typical floor 714 m2

M Roof floor 133 m2

Galvanized steel rectangular exposed air ducts

Fresh exposed air duct

N Roof floor 6 m2

Exhaust exposed air duct

P Roof floor 2 m2

TO COLLECTION QR

2/8/6
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Vertical riser Ductwork (Cont'd)

16 Gauge kitchen hood extract ductwork as per


drawings & specifications.

A Podium floor 9 m2

B Terrace floor 3 m2

C Typical floor 60 m2

D Roof floor 5 m2

TO COLLECTION QR

2/8/7
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ductwork insulation

FSK faced rigid fiberglass insulation, secured to


ducts by wrapped with fiber cloth and coated with
sealfas insulation as per drawings & specifications.

Horizontal & vertical Ductwork

25mm Insulation to internal ductwork

Supply air duct

A Basement floor 308 m2

B Ground floor 103 m2

C Podium floor 194 m2

D Terrace floor 72 m2

E Typical floor 878 m2

F Roof floor 43 m2

Return air duct

G Basement floor 223 m2

H Ground floor 5 m2

J Podium floor 11 m2

K Terrace floor 4 m2

L Typical floor 73 m2

M Roof floor 2 m2

TO COLLECTION QR

2/8/8
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ductwork insulation(Cont'd)

25mm Insulation to internal ductwork

Exhaust air duct

A Basement floor 558 m2

B Ground floor 361 m2

C Podium floor 546 m2

D Terrace floor 52 m2

E Typical floor 1626 m2

F Roof floor 180 m2

Fire rated duct

Supply air duct

G Basement floor 15 m2

H Roof floor 5 m2

Return air duct

J Roof floor 1 m2

Exhaust air duct

K Basement floor 67 m2

L Ground floor 15 m2

Fresh air duct

M Basement floor 18 m2

TO COLLECTION QR

2/8/9
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ductwork insulation(Cont'd)

25mm Insulation to internal ductwork

Kitchen hood exhaust air duct

A Ground floor 1 m2

B Podium floor 1 m2

C Terrace floor 1 m2

D Typical floor 11 m2

50mm Insulation ductwork including aluminum


cladding as per drawings & specifications.

Fresh air duct

E Basement floor 584 m2

F Ground floor 271 m2

G Podium floor 728 m2

H Terrace floor 62 m2

J Typical floor 1866 m2

K Roof floor 90 m2

Kitchen hood exhaust air duct

L Podium floor 9 m2

M Terrace floor 3 m2

N Typical floor 60 m2

P Roof floor 5 m2
TO COLLECTION QR

2/8/10
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ductwork insulation(Cont'd)

Exposed air duct

Supply air duct

A Terrace floor 110 m2

Fresh air duct

B Roof floor 388 m2

Exhaust air duct

C Roof floor 111 m2

TO COLLECTION QR

2/8/11
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries

Supply air grille from an approved manufacturer


fixed to ductwork as detailed in drawings including
all integrals and fixtures as per drawings &
specifications.

Supply air grille, Ref. S.A.G

225 x 225 mm

A Ground Floor 1 No

300 x 300 mm

B Ground Floor 3 No

375 x 375 mm,

C Basement 1 No

D Ground Floor 3 No

450 x 200 mm

E Roof Floor 4 No

800 x 250 mm

F Basement 3 No

1400 x 200 mm

G Basement 2 No

TO COLLECTION QR

2/8/12
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Supply air grille from an approved manufacturer


fixed to ductwork as detailed in drawings including
all integrals and fixtures as per drawings &
specifications.

Supply air grille, Ref. S.A.G

1700 x 200 mm

A Basement 1 No

1700 x 250 mm

B Basement 2 No

2850 x 600 mm

C Ground Floor 1 No

Supply air diffuser from an approved manufacturer


fixed to ductwork as detailed in drawings including
all integrals and fixtures as per drawings &
specifications.

Supply air diffuser, Ref. S.A.D

150 x 150 mm

D Basement 19 No

E Ground Floor 1 No

F Podium Level 6 No

G Typical Floors 46 No

TO COLLECTION QR

2/8/13
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Supply air diffuser, Ref. S.A.D

200 x 150 mm

A Terrace Level 2 No

B Roof Floor 1 No

200 x 200 mm

C Roof Floor 2 No

300 x 100 mm

D Basement 2 No

300 x 150 mm

E Basement 3 No

300 x 300 mm

F Typical Floors 2 No

G Roof Floor 2 No

500 x 200 mm

H Basement 2 No

J Roof Floor 2 No

550 x 250 mm

K Basement 3 No

TO COLLECTION QR

2/8/14
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Supply air diffuser, Ref. S.A.D

600 x 250 mm

A Basement 1 No

700 x 150 mm

B Roof Floor 1 No

700 x 200 mm

C Basement 1 No

750 x 250 mm

D Basement 4 No

850 x 200 mm

E Basement 1 No

1700 x 600 mm

E Basement 2 No

Return air grille from an approved manufacturer


fixed to ductwork as detailed in drawings including
all integrals and fixtures as per drawings &
specifications.

Return air grille, Ref. R.A.G

225 x 225 mm

F Ground Floor 1 No

TO COLLECTION QR

2/8/15
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Return air grille, Ref. R.A.G

300 x 300 mm

A Ground Floor 3 No

375 x 375 mm

B Ground Floor 3 No

Return floor grille from an approved manufacturer


fixed to ductwork as detailed in drawings including
all integrals and fixtures as per drawings &
specifications.

Return floor grille

7000 x 400 mm

C Basement 2 No

D Ground Floor 2 No

Return air diffuser from an approved manufacturer


fixed to ductwork as detailed in drawings including
all integrals and fixtures as per drawings &
specifications.

Return air diffuser, Ref. R.A.D

300 x 300 mm

E Typical Floors 2 No

TO COLLECTION QR

2/8/16
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fresh air grille from an approved manufacturer


fixed to ductwork as detailed in drawings including
all integrals and fixtures as per drawings &
specifications.

Fresh air grille, Ref. F.A.G

375 x 375 mm

A Ground Floor 1 No

1700 x 200 mm

B Basement 1 No

Transfer return grille from an approved


manufacturer fixed to ductwork as detailed in
drawings including all integrals and fixtures as per
drawings & specifications.

Transfer return grille

150 x 150 mm

C Basement 4 No

D Ground Floor 1 No

E Podium Level 6 No

F Terrace Level 1 No

G Typical Floors 48 No

200 x 150 mm

H Terrace Level 1 No

TO COLLECTION QR

2/8/17
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Transfer return grille

300 x 150 mm

A Basement 4 No

B Ground Floor 1 No

C Roof Floor 3 No

900 x 400 mm

D Roof Floor 1 No

Transfer air grille from an approved manufacturer


fixed to ductwork as detailed in drawings including
all integrals and fixtures as per drawings &
specifications.

Transfer air grille, Ref. T.A.G

450 x 250 mm

E Basement 1 No

Transfer fresh grille from an approved


manufacturer fixed to ductwork as detailed in
drawings including all integrals and fixtures as per
drawings & specifications.

Transfer fresh grille

200 x200 mm

F Roof Floor 1 No

TO COLLECTION QR

2/8/18
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Exhaust air grille from an approved manufacturer


fixed to ductwork as detailed in drawings including
all integrals and fixtures as per drawings &
specifications.

Exhaust air grille, Ref. E.A.G

150 x 150 mm

A Podium Level 7 No

B Terrace Level 7 No

C Typical Floors 184 No

375 x 375 mm

D Ground Floor 1 No

Exhaust air diffuser from an approved


manufacturer fixed to ductwork as detailed in
drawings including all integrals and fixtures as per
drawings & specifications.

Exhaust air diffuser, Ref. E.A.D

100 x 100 mm

E Ground Floor 1 No

150 x 100 mm

F Ground Floor 1 No

TO COLLECTION QR

2/8/19
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Exhaust air diffuser, Ref. E.A.D

150 x 150 mm

A Ground Floor 6 No

B Podium Level 19 No

C Terrace Level 2 No

D Typical Floors 23 No

E Roof Floor 1 No

225 x 225 mm

E Ground Floor 1 No

Flow bar diffuser from an approved manufacturer


fixed to ductwork as detailed in drawings including
all integrals and fixtures as per drawings &
specifications.

Flow bar diffuser, Ref. F.B.D

F Basement 48 m

G Ground Floor 14 m

H Podium Level 48 m

J Terrace Level 16 m

K Typical Floors 368 m

TO COLLECTION QR

2/8/20
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fresh air louver with sand trap from an approved


manufacturer fixed to ductwork as detailed in
drawings including all integrals and fixtures as per
drawings & specifications.

Fresh air louver, Ref. F.A.L

A Fresh air louver (40.0m2) in ground floor 1 No

200 x 150 mm,

B Roof Floor 2 No

450 x 250 mm

C Ground Floor 1 No

450 x 450 mm

D Basement 1 No

E Ground Floor 1 No

F Podium Level 2 No

1350 x 900 mm

G Top of roof 2 No

1700 x 800 mm

H Podium Level 1 No

TO COLLECTION QR

2/8/21
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fresh air louver, Ref. F.A.L

1800 x 950 mm

A Top of roof 2 No

1850 x 800 mm

B Podium Level 1 No

1900 x 1300 mm

C Roof Floor 2 No

2200 x 2250 mm

D Roof Floor 4 No

2400 x 1900 mm

E Podium Level 2 No

2500 x 600 mm

F Ground Floor 1 No

3400 x 1500 mm

G Basement 1 No

4900 x 1500 mm

H Basement 1 No

4900 x 2800 mm

J Basement 1 No

TO COLLECTION QR

2/8/22
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fresh air louver, Ref. F.A.L

4900 x 2900 mm

A Basement 1 No

Exhaust air louver from an approved manufacturer


fixed to ductwork as detailed in drawings including
all integrals and fixtures as per drawings &
specifications.

Exhaust air louver, Ref. E.A.L

B Exhaust air louver (20.0m2) in ground floor 1 No

C Exhaust air louver (26.0m2) in ground floor 1 No

200 x 150 mm

D Roof Floor 4 No

450 x 200 mm

E Ground Floor 1 No

450 x 250 mm

F Basement 1 No

TO COLLECTION QR

2/8/23
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Exhaust air louver, Ref. E.A.L

650 x 400 mm

A Basement 1 No

650 x 450 mm

B Basement 1 No

750 x 450 mm

C Top of roof 1 No

1250 x 550 mm

D Podium Level 1 No

1350 x 1000 mm

E Top of roof 1 No

1500 x 1500 mm

F Basement 1 No

1900 x 850 mm

G Podium Level 1 No

2150 x 1350 mm

H Top of roof 1 No

2300 x 600 mm

J Ground Floor 1 No

TO COLLECTION QR

2/8/24
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Exhaust air louver, Ref. E.A.L

2800 x 1600 mm

A Basement 1 No

3500 x 1500 mm

B Basement 1 No

4000 x 1900 mm

C Basement 1 No

4200 x 1800 mm

D Basement 2 No

4600 x 1700 mm

E Basement 1 No

5200 x 1700 mm

F Basement 1 No

7500 x 1350 mm

G Basement 1 No

TO COLLECTION QR

2/8/25
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

* Volume control dampers for the proper volume


control and balancing of the system shall be
installed in the branch ducts to plenum as required
whether or not indicated on the drawings Note

Volume control dampers supply and fixed to suit


the duct size including all integrals and fixtures as
per drawings & specifications.

Volume control dampers, Ref. V.C.D

100 x 100 mm

A Ground Floor 2 No

B Podium Level 2 No

C Terrace Level 1 No

D Typical Floors 23 No

150 x 100 mm

E Basement 1 No

F Ground Floor 4 No

G Podium Level 6 No

H Terrace Level 2 No

J Typical Floors 92 No

K Roof Floor 1 No

TO COLLECTION QR

2/8/26
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Volume control dampers, Ref. V.C.D

150 x 150 mm

A Basement 4 No

B Ground Floor 1 No

C Podium Level 10 No

D Terrace Level 1 No

E Typical Floors 94 No

150 x 200 mm

F Terrace Level 3 No

G Typical Floors 23 No

200 x 100 mm

J Basement 5 No

K Ground Floor 1 No

L Podium Level 6 No

M Terrace Level 1 No

N Typical Floors 46 No

TO COLLECTION QR

2/8/27
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Volume control dampers, Ref. V.C.D

200 x 150 mm

A Ground Floor 2 No

B Podium Level 2 No

C Terrace Level 3 No

D Typical Floors 46 No

E Roof Floor 1 No

200 x 200 mm

F Basement 4 No

G Ground Floor 2 No

H Podium Level 1 No

J Typical Floors 23 No

K Roof Floor 2 No

250 x 150 mm

L Basement 1 No

M Ground Floor 1 No

N Typical Floors 46 No

TO COLLECTION QR

2/8/28
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Volume control dampers, Ref. V.C.D

250 x 200 mm

A Basement 1 No

B Ground Floor 2 No

C Podium Level 4 No

D Terrace Level 3 No

250 x 250 mm

E Basement 2 No

300 x 100 mm

F Basement 1 No

G Typical Floors 46 No

300 x 150 mm

H Basement 4 No

J Podium Level 3 No

K Typical Floors 92 No

300 x 200 mm

L Podium Level 5 No

M Typical Floors 71 No

N Roof Floor 2 No

TO COLLECTION QR

2/8/29
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Volume control dampers, Ref. V.C.D

300 x 250 mm

A Typical Floors 23 No

350 x 150 mm

B Terrace Level 1 No

C Typical Floors 23 No

350 x 200 mm

D Basement 4 No

E Podium Level 6 No

F Terrace Level 3 No

350 x 250 mm

G Basement 2 No

H Podium Level 1 No

400 x 150 mm

J Typical Floors 23 No

400 x 200 mm

K Basement 1 No

L Podium Level 4 No

M Typical Floors 46 No

TO COLLECTION QR

2/8/30
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Volume control dampers, Ref. V.C.D

400 x 250 mm

A Basement 1 No

400 x 300 mm

B Typical Floors 21 No

C Roof Floor 1 No

400 x 400 mm

D Terrace Level 6 No

450 x 150 mm

E Basement 4 No

450 x 200 mm

F Basement 1 No

G Podium Level 2 No

H Terrace Level 2 No

J Typical Floors 23 No

K Roof Floor 1 No

450 x 250 mm

L Podium Level 1 No

TO COLLECTION QR

2/8/31
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Volume control dampers, Ref. V.C.D

450 x 300 mm

A Podium Level 1 No

500 x 150 mm

B Basement 1 No

500 x 200 mm

C Ground Floor 1 No

D Podium Level 1 No

E Roof Floor 3 No

500 x 250 mm

F Basement 1 No

G Ground Floor 1 No

H Podium Level 1 No

J Terrace Level 2 No

500 x 300 mm

K Podium Level 2 No

L Terrace Level 1 No

M Typical Floors 25 No

TO COLLECTION QR

2/8/32
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Volume control dampers, Ref. V.C.D

550 x 200 mm

A Basement 1 No

550 x 250 mm

B Basement 2 No

C Podium Level 2 No

550 x 300 mm

D Ground Floor 1 No

E Terrace Level 1 No

F Typical Floors 21 No

550 x 350 mm

G Podium Level 1 No

550 x 400 mm

H Podium Level 1 No

600 x 200 mm

J Roof Floor 6 No

600 x 250 mm

K Basement 5 No

TO COLLECTION QR

2/8/33
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Volume control dampers, Ref. V.C.D

600 x 300 mm

A Podium Level 3 No

B Terrace Level 1 No

C Typical Floors 2 No

600 x 400 mm

D Podium Level 1 No

600 x 600 mm

E Ground Floor 2 No

600 x 1000 mm

F Roof Floor 1 No

650 x 250 mm

G Basement 1 No

650 x 300 mm

H Podium Level 2 No

650 x 350 mm

J Ground Floor 2 No

700 x 250 mm

K Basement 4 No

TO COLLECTION QR

2/8/34
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Volume control dampers, Ref. V.C.D

700 x 300 mm

A Podium Level 2 No

B Typical Floors 23 No

700 x 350 mm

C Ground Floor 1 No

700 x 400 mm

D Terrace Level 6 No

750 x 250 mm

E Basement 1 No

F Roof Floor 1 No

750 x 300 mm

G Basement 6 No

800 x 300 mm

H Podium Level 1 No

850 x 300 mm

K Podium Level 1 No

850 x 350 mm

L Basement 1 No

TO COLLECTION QR

2/8/35
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Volume control dampers, Ref. V.C.D

900 x 300 mm

A Roof Floor 1 No

950 x 300 mm

B Roof Floor 2 No

1000 x 400 mm

C Podium Level 1 No

1050 x 400 mm

D Podium Level 1 No

1050 x 450 mm

E Terrace Level 2 No

1200 x 450 mm

F Podium Level 1 No

1300 x 450 mm

G Podium Level 1 No

1300 x 500 mm

H Terrace Level 2 No

1400 x 600 mm

J Basement 4 No

TO COLLECTION QR

2/8/36
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fresh air grill with volume control dampers supply


and fixed to suit the duct size including all integrals
and fixtures as per drawings & specifications.

Fresh air grill with Volume control dampers,


Ref. F.A.G with V.C.D

250 x 150 mm

A Basement 6 No

B Podium Level 5 No

C Terrace Level 1 No

D Typical Floors 23 No

300 x 200 mm

E Basement 5 No

F Ground Floor 2 No

G Podium Level 3 No

H Terrace Level 1 No

J Typical Floors 23 No

K Roof Floor 1 No

TO COLLECTION QR

2/8/37
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fresh air grill with Volume control dampers,


Ref. F.A.G with V.C.D

300 x 250 mm

A Basement 1 No

B Ground Floor 1 No

C Roof Floor 1 No

1100 x 500 mm

D Basement 4 No

E Podium Level 2 No

F Typical Floors 42 No

1400 x 1100 mm

G Basement 2 No

TO COLLECTION QR

2/8/38
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

* Fire dampers shall be installed in the ducts in the


fire rated areas as required whether or not
indicated on the drawings Note

Fire dampers with access panel doors and fixed


complete to suit the duct size including all integrals
and fixtures as per drawings & specifications.

Fire dampers, Ref. F.D

100 x 100 mm

A Ground Floor 2 No

B Podium Level 2 No

C Terrace Level 1 No

D Typical Floors 23 No

150 x 100 mm

E Ground Floor 2 No

F Podium Level 3 No

G Terrace Level 2 No

H Typical Floors 23 No

J Roof Floor 1 No

TO COLLECTION QR

2/8/39
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fire dampers, Ref. F.D

150 x 150 mm

A Basement 8 No

B Ground Floor 1 No

C Podium Level 12 No

D Terrace Level 1 No

Typical Floors 117 No

200 x 100 mm

E Basement 3 No

F Podium Level 1 No

200 x 150 mm

G Terrace Level 3 No

H Roof Floor 9 No

200 x 200 mm

J Basement 1 No

K Ground Floor 1 No

L Roof Floor 2 No

200 x 250 mm

M Basement 1 No

TO COLLECTION QR

2/8/40
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fire dampers, Ref. F.D

250 x 150 mm

A Ground Floor 1 No

B Basement 1 No

C Typical Floors 46 No

300 x 100 mm

D Typical Floors 46 No

300 x 150 mm

E Basement 9 No

F Podium Level 2 No

G Terrace Level 1 No

H Typical Floors 69 No

J Roof Floor 5 No

300 x 200 mm

K Podium Level 6 No

L Typical Floors 25 No

M Roof Floor 1 No

TO COLLECTION QR

2/8/41
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fire dampers, Ref. F.D

350 x 150 mm

A Terrace Level 1 No

B Typical Floors 23 No

350 x 200 mm

C Podium Level 3 No

350 x 250 mm

D Podium Level 2 No

400 x 150 mm

E Typical Floors 46 No

400 x 200 mm

F Podium Level 1 No

G Typical Floors 23 No

400 x 250 mm

H Ground Floor 1 No

J Podium Level 1 No

400 x 300 mm

K Roof Floor 1 No

TO COLLECTION QR

2/8/42
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fire dampers, Ref. F.D

450 x 200 mm

A Terrace Level 1 No

B Typical Floors 46 No

500 x 150 mm

C Basement 4 No

500 x 200 mm

D Terrace Level 1 No

500 x 300 mm

E Podium Level 1 No

550 x 250 mm

F Basement 1 No

600 x 300 mm

G Ground Floor 2 No

600 x 600 mm

H Ground Floor 1 No

700 x 300 mm

J Podium Level 1 No

TO COLLECTION QR

2/8/43
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fire dampers, Ref. F.D

700 x 350 mm

A Podium Level 2 No

750 x 250 mm

B Roof Floor 1 No

750 x 300 mm

C Typical Floors 23 No

750 x 450 mm

D Ground Floor 1 No

750 x 1350 mm

E Roof Floor 2 No

800 x 300 mm

F Podium Level 1 No

G Terrace Level 1 No

800 x 1500 mm

H Roof Floor 1 No

850 x 300 mm

J Podium Level 1 No

TO COLLECTION QR

2/8/44
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fire dampers, Ref. F.D

900 x 300 mm

A Roof Floor 1 No

900 x 400 mm

B Roof Floor 1 No

950 x 300 mm

C Roof Floor 1 No

1000 x 400 mm

D Podium Level 3 No

1000 x 600 mm

E Roof Floor 1 No

1050 x 400 mm

F Podium Level 1 No

1150 x 450 mm

G Podium Level 1 No

1200 x 450 mm

H Podium Level 1 No

TO COLLECTION QR

2/8/45
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Fire dampers, Ref. F.D

1200 x 1800 mm

A Roof Floor 1 No

1300 x 500 mm

B Terrace Level 2 No

1400 x 150 mm

C Basement 1 No

1400 x 600 mm

D Basement 2 No

E Ground Floor 1 No

Non return dampers with access panel doors and


fixed complete to suit the duct size including all
integrals and fixtures as per drawings &
specifications.

Non return dampers, Ref. N.R.D

550 x 300 mm

F Podium Level 2 No

750 x 600 mm

G Top of roof 2 No

TO COLLECTION QR

2/8/46
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Non return dampers, Ref. N.R.D

750 x 750 mm

A Top of roof 2 No

1250 x 500 mm

B Roof Floor 4 No

1500 x 1250 mm

C Podium Level 2 No

Pressure relief dampers with access panel doors


and fixed complete to suit the duct size including all
integrals and fixtures as per drawings &
specifications.

Pressure relief dampers

1100 x 1100 mm

D Podium Level 1 No

E Roof Floor 2 No

TO COLLECTION QR

2/8/47
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Motorized smoke and fire dampers fixed complete


to suit the duct including integrals and fixtures as
per drawings & specifications.

Motorized smoke and fire dampers, Ref. M.S.F.D

450 x 250 mm

A Basement 2 No

450 x 350 mm

B Ground Floor 1 No

500 x 200 mm

C Ground Floor 1 No

750 x 250 mm

D Basement 4 No

1700 x 250 mm

E Basement 2 No

1700 x 600 mm

F Basement 4 No

TO COLLECTION QR

2/8/48
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Motorized dampers fixed complete to suit the duct


including integrals and fixtures as per drawings &
specifications.

Motorized dampers, Ref. M.D

750 X 1350 mm

A Roof Floor 1 No

800 X 1200 mm

B Roof Floor 1 No

1100 X 500 mm

C Podium Level 1 No

1350 X 450 mm

D Podium Level 1 No

* Sound attenuators shall be properly selected and


provided where required to meet the specific
sound levels as per drawings & specifications. Note

Approved type sound attenuator of different sizes,


fixed complete to suit the duct size including all
integrals and fixtures as per drawings &
specifications.

Sound attenuator - Horizontal

800 x 1500 mm

E Roof Floor 1 No

TO COLLECTION QR

2/8/49
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Sound attenuator - Horizontal(Cont'd)

1000 x 600 mm

A Basement 1 No

1000 x 2600 mm

B Basement 1 No

1400 x 2100 mm

C Basement 1 No

1450 x 2200 mm

D Basement 2 No

1500 x 900 mm

E Roof Floor 4 No

1500 x 1150 mm

F Podium Level 2 No

1500 x 1400 mm

G Podium Level 1 No

1500 x 1450 mm

H Podium Level 1 No

1500 x 1500 mm

J Podium Level 1 No

TO COLLECTION QR

2/8/50
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Sound attenuator (Cont'd)

1500 x 1675 mm

A Basement 1 No

1500 x 1800 mm

B Basement 2 No

1500 x 2000 mm

C Basement 4 No

1500 x 2075 mm

D Basement 1 No

1500 x 2700 mm

E Basement 1 No

2100 x 1400 mm

F Basement 1 No

TO COLLECTION QR

2/8/51
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Sound attenuator - Vertically mounted

800 x 700 mm

A Roof Floor 1 No

B Top of roof 1 No

1500 x 800 mm

C Roof Floor 1 No

D Top of roof 1 No

1250 x 1900 mm

E Basement 8 No

1300 x 1900 mm

F Basement 12 No

G Ground Floor 4 No

1400 x 2100 mm

H Basement 2 No

TO COLLECTION QR

2/8/52
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Ancillaries (Cont'd)

Sound attenuator - Vertically mounted

1450 x 1750 mm

A Ground Floor 4 No

1450 x 2200 mm

B Basement 3 No

1750 x 1450 mm

C Basement 12 No

2100 x 1400 mm

D Ground Floor 1 No

2200 x 1450 mm

E Ground Floor 2 No

2250 x 1900 mm

F Ground Floor 2 No

2600 x 1700 mm

G Ground Floor 1 No

TO COLLECTION QR

2/8/53
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work

Black steel seamless schedule 40 type pipes

Black steel seamless schedule 40 type pipes


including fittings jointed and fixed with brackets,
supports, hangers, paint & insulation etc. as per
drawings & specifications.

Chilled water supply pipe

15mm Diameter pipe work

Horizontal

A Roof floor 4 m

20mm Diameter pipe work

Horizontal

B Basement floors 236 m

C Ground floor 47 m

25mm Diameter pipe work

Horizontal

D Basement floors 77 m

E Ground floor 3 m

F Podiums 6 m

G Terrace floor 3 m

H Typical floors 55 m

J Roof floor 3 m

TO COLLECTION QR

2/8/54
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work (Cont'd)

Chilled water supply pipe (Cont'd)

32mm Diameter pipe work

Horizontal

A Basement floors 44 m

B Typical floors 134 m

40mm Diameter pipe work

Horizontal

C Basement floors 5 m

D Podiums 14 m

E Terrace floor 20 m

Vertical

F Basement floors 9 m

50mm Diameter pipe work

Horizontal

G Podiums 46 m

H Typical floors 549 m

TO COLLECTION QR

2/8/55
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work (Cont'd)

Chilled water supply pipe (Cont'd)

65mm Diameter pipe work

Horizontal

A Basement floors 11 m

B Podiums 48 m

C Typical floors 118 m

D Roof floor 4 m

Vertical

E Typical floors 7 m

80mm Diameter pipe work

Horizontal

F Roof floor 6 m

Vertical

G Typical floors 4 m

TO COLLECTION QR

2/8/56
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work (Cont'd)

Chilled water supply pipe (Cont'd)

100mm Diameter pipe work

Horizontal

A Ground floor 21 m

B Podiums 33 m

C Roof floor 21 m

Vertical

D Typical floors 18 m

E Roof floor 5 m

125mm Diameter pipe work

Vertical

F Terrace floor 4 m

H Typical floors 26 m

150mm Diameter pipe work

Horizontal

J Basement floors 34 m

TO COLLECTION QR

2/8/57
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work (Cont'd)

Chilled water supply pipe (Cont'd)

150mm Diameter pipe work (Cont'd)

Vertical

A Ground floor 6 m

B Podiums 12 m

C Typical floors 22 m

200mm Diameter pipe work

Horizontal

D Basement floors 79 m

Vertical

E Basement floors 10 m

F Ground floor 6 m

G Podiums 12 m

H Terrace floor 4 m

J Typical floors 44 m

300mm Diameter pipe work

Horizontal

K Basement floors 103 m

TO COLLECTION QR

2/8/58
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work

Black steel seamless schedule 40 type pipes

Black steel seamless schedule 40 type pipes


including insulations fittings jointed and fixed with
brackets, supports, hangers, paint etc. as per
drawings & specifications.

Chilled water return pipe

15mm Diameter pipe work

Horizontal

A Roof floor 4 m

20mm Diameter pipe work

Horizontal

B Basement floors 236 m

C Ground floor 47 m

25mm Diameter pipe work

Horizontal

D Basement floors 77 m

E Ground floor 3 m

F Podiums 6 m

G Terrace floor 3 m

H Typical floors 55 m

J Roof floor 3 m

TO COLLECTION QR

2/8/59
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work (Cont'd)

Chilled water return pipe

32mm Diameter pipe work

Horizontal

A Basement floors 44 m

B Typical floors 134 m

40mm Diameter pipe work

Horizontal

C Basement floors 5 m

D Podiums 14 m

E Terrace floor 20 m

Vertical

F Basement floors 9 m

50mm Diameter pipe work

Horizontal

G Podiums 46 m

H Typical floors 549 m

TO COLLECTION QR

2/8/60
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work (Cont'd)

Chilled water return pipe (Cont'd)

65mm Diameter pipe work

Horizontal

A Basement floors 11 m

B Podiums 48 m

C Typical floors 118 m

D Roof floor 4 m

Vertical

E Typical floors 7 m

80mm Diameter pipe work

Horizontal

F Roof floor 6 m

Vertical

G Typical floors 4 m

TO COLLECTION QR

2/8/61
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work (Cont'd)

Chilled water return pipe (Cont'd)

100mm Diameter pipe work

Horizontal

A Ground floor 21 m

B Podiums 33 m

C Roof floor 21 m

Vertical

D Typical floors 18 m

E Roof floor 5 m

125mm Diameter pipe work

Vertical

F Terrace floor 4 m

G Typical floors 26 m

150mm Diameter pipe work

Vertical

H Ground floor 6 m

J Podiums 12 m

K Typical floors 22 m

TO COLLECTION QR

2/8/62
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work (Cont'd)

Chilled water return pipe (Cont'd)

200mm Diameter pipe work

Horizontal

A Basement floors 77 m

Vertical

B Basement floors 10 m

C Ground floor 6 m

D Podiums 12 m

E Terrace floor 4 m

F Typical floors 44 m

Pipe work insulation

300mm Diameter pipe work

Horizontal

G Basement floors 64 m

TO COLLECTION QR

2/8/63
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work (Cont'd)

Ancillaries

Gate valve ,Ref. GV

A 25mm Diameter 4 No

B 32mm Diameter 69 No

C 40mm Diameter 11 No

D 50mm Diameter 2 No

E 65mm Diameter 23 No

F 100mm Diameter 7 No

G 200mm Diameter 6 No

Ancillaries

Pressure Independent Control Valve ,Ref. PICV

H 25mm Diameter 4 No

J 32mm Diameter 92 No

K 40mm Diameter 7 No

L 50mm Diameter 2 No

M 65mm Diameter 23 No

N 100mm Diameter 3 No

P 200mm Diameter 2 No

TO COLLECTION QR

2/8/64
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Chilled water pipe work (Cont'd)

Ancillaries (Cont'd)

Chilled Water Energy Meter ,Ref. CH.W.E.M

A 25mm Diameter 2 No

B 32mm Diameter 92 No

C 40mm Diameter 5 No

D 100mm Diameter 1 No

E 200mm Diameter 2 No

Supply & installation of Pressure Differential


Transmitter including connection to pipe work, all
valves ,necessary fittings , accessories & etc. fixed
to chilled water pipe work as per drawings &
specifications.

Vertical

Differential Pressure ,Ref. DP

F Typical floor - Level 13/ Roof 2 No

Supply and fix Automatic Air Vent valves to pipe


work as per drawings & specifications.

G Automatic Air Vent Ref. AAV in vertical riser 4 No

Supply and fix 2 way Differential valve to pipe


work as per drawings & specifications.

H 2 way Differential valve in vertical riser 2 No


Level 13 & Roof

TO COLLECTION QR

2/8/65
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Condensate drainage

A Condensate drainage pipes and fittings to


specifications including jointed and fixed with
brackets, supports, hangers, paint & insulation etc.
as per drawings & specifications. Item

Plant & equipment

Plate & stainless gasket steel type heat exchanger


from an approved manufacturer, install including
insulations all pipe work fittings such as flexible
connections, unions, test plugs, thermometers,
strainer with drain cock, all type of valves,
pressure gauges, sensors, transmitters etc.
complete as per the drawings and specifications.

B HEX - 01/a,b - capacity 1355KW 2 No

HEX - 02/a,b - capacity 1377KW 2 No

Chilled water pumps from an approved


manufacturer, installed and commissioned including
insulations all necessary accessories and fittings, all
type of valves, pressure gauges, sensors, flow
meters, energy meter, transmitters etc. pipe
connections, control panel and final power
connection complete as per the drawings and
specifications.

C CHWP-B1/01a,b,c (2 - Duty/1-Stand by), Speed 2900 1 Set


RPM

D CHWP-B1/02a,b,c (2 - Duty/1-Stand by), Speed 2500 1 Set


RPM

E Chemical feeder unit, complete with all integral


accessories, including control system, and final
connection as per the drawings and specifications. 2 No

TO COLLECTION QR

2/8/66
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Plant and equipment (Cont'd)

Expansion tank as per the drawings and as per


drawings & specifications.

A Basement 3 No

B Roof floor 3 No

Fresh air handling unit with pre-filter, bag filter,


cooling coil and heat pipe from an approved
manufacturer install including anti- vibration
mountings/ springs and all integral accessories and
fittings for connections to duct and chilled water
pipe work as per detail drawing including fittings
such as flexible connections, pressure gauge, air
vent, unions, test plugs, thermometers, thermostat,
strainer with drain cock, all type of valves etc.,
control system with control panel, final power
supply connection and insulation complete as
specified.

C FAHU-P3/01 1 No

D FAHU-P3/02 1 No

E FAHU-RF/01 1 No

F FAHU-RF/02 1 No

TO COLLECTION QR

2/8/67
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Plant and equipment (Cont'd)

Air handling unit with pre-filter, bag filter, cooling


coil and heat pipe from an approved manufacturer
install including anti- vibration mountings/ springs
and all integral accessories and fittings for
connections to duct and chilled water pipe work as
per detail drawing including fittings such as flexible
connections, pressure gauge, air vent, unions, test
plugs, thermometers, thermostat, strainer with
drain cock, all type of valves etc., control system
with control panel, final power supply connection
complete and insulation as specified.

A AHU-B1/01 1 No

Fan coil unit complete with all integral accessories,


capacity to be achieved at medium speed, fixed to
the soffit with anchor bolts, brackets, hanging drop
rods, or other fixing method, and anti vibration
mountings as per detail drawing, connected with
chilled water system including fittings such as
flexible connections, unions, air vent, test plugs,
thermometers, thermostat, strainer with drain cock,
all type of valves etc., control system with control
panel and final power supply connection and
complete as specified.

B FCU-B1/01 1 No

C FCU-B1/02 1 No

D FCU-B1/03 1 No

E FCU-B1/04 1 No

F FCU-B1/05 1 No

TO COLLECTION QR

2/8/68
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Plant and equipment (Cont'd)

Fan coil unit complete with all integral (Cont'd)

A FCU-B1/06 1 No

B FCU-B1/07 1 No

C FCU-B1/08 1 No

D FCU-B2/01 1 No

E FCU-B3/01 1 No

F FCU-B3/02 1 No

G FCU-B4/01 1 No

H FCU-B4/02 1 No

J FCU-B4/03 1 No

K FCU-B4/04 1 No

L FCU-B4/05 1 No

M FCU-B4/06 1 No

N FCU-B4/07 1 No

P FCU-B4/08 1 No

Q FCU-GF/01 1 No

R FCU-GF/02 1 No

S FCU-GF/03 1 No

T FCU-GF/04 1 No

TO COLLECTION QR

2/8/69
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Plant and equipment (Cont'd)

Fan coil unit complete with all integral (Cont'd)

A FCU-GF/05 1 No

B FCU-GF/06 1 No

C FCU-GF/07 1 No

D FCU-POD/01 3 No

E FCU-TC/01 1 No

F FCU-TYP/01 21 No

G FCU-L9/01 2 No

H FCU-RF/01 1 No

J FCU-RF/02 1 No

DX unit from an approved manufacturer fixed


complete with indoor and outdoor unit including
brackets, hangers or other fixing method,
anti-vibration packing, interconnecting cabling and
pipe work, control system and final power supply
connection and complete as specified.

K AC-B1-01A/OU-B1-01A, capacity 4.5 KW 1 No

L AC-B1-01B/OU-B1-01B, capacity 4.5 KW 1 No

TO COLLECTION QR

2/8/70
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Plant and equipment (Cont'd)

Fan from an approved manufacturer fixed complete


with anti vibration mountings, back draft dampers
including control system, variable frequency drive,
panels and final power supply connection and
complete as per drawings & specifications.

Parking ventilation fresh air fans

A F.A.F-B1/01A (Axial) 1 No

B F.A.F-B1/01B (Axial) 1 No

C F.A.F-B2/01A (Axial) 1 No

D F.A.F-B2/01B (Axial) 1 No

E F.A.F-B3/01A (Axial) 1 No

F F.A.F-B3/01B (Axial) 1 No

Fire pump room fresh air fans

G F.A.F-B1/02 (Axial) 1 No

Fire command center fresh air fans

H F.A.F-GF/01 (Axial) 1 No

TO COLLECTION QR

2/8/71
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Plant and equipment (Cont'd)

Pressurization for lift lobby LO/02, LO/03, LO/04


fresh air fans

A F.A.F-TOR/01A (Axial) 1 No

B F.A.F-TOR/01B (Axial) 1 No

C F.A.F-TOR/02A (Axial) 1 No

D F.A.F-TOR/02B (Axial) 1 No

E F.A.F-P3/01A (Axial) 1 No

F F.A.F-P3/01B (Axial) 1 No

Fan from an approved manufacturer fixed complete


with anti vibration mountings, back draft dampers
including control system, variable frequency drive,
panels and final power supply connection and
complete as per drawings & specifications.

Pressurization for staircase ST/01, ST/02, ST/03


fresh air fans

G F.A.F-P3/02A (Axial) 1 No

H F.A.F-P3/02B (Axial) 1 No

J F.A.F-RF/01A (Axial) 1 No

K F.A.F-RF/01B (Axial) 1 No

L F.A.F-RF/02A (Axial) 1 No

M F.A.F-RF/02B (Axial) 1 No

TO COLLECTION QR

2/8/72
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Plant and equipment (Cont'd)

Parking ventilation exhaust air fans

A E.A.F-B1/01 (Axial) 1 No

B E.A.F-B1/02 (Axial) 1 No

C E.A.F-B1/03 (Axial) 1 No

D E.A.F-B1/04 (Axial) 1 No

E E.A.F-B2/01(Axial) 1 No

F E.A.F-B2/02 (Axial) 1 No

G E.A.F-B3/01 (Axial) 1 No

H E.A.F-B3/02 (Axial) 1 No

Generator room exhaust air fans

J E.A.F-B1/05 (Axial) 1 No

Fire pump room exhaust air fans

K E.A.F-B1/06 (Axial) 1 No

Fan from an approved manufacturer fixed complete


with anti vibration mountings, back draft dampers
including control system, panels and final power
supply connection and complete as per drawings &
specifications.

Diesel tank room exhaust air fans

L E.A.F-B1/07 (Double inlet) 1 No

TO COLLECTION QR

2/8/73
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Plant and equipment (Cont'd)

Fire command center exhaust air fans

A E.A.F-GF/01 (Axial) 1 No

Machine room exhaust air fans

B E.A.F-RF/01 (Centrifugal) 1 No

C E.A.F-RF/02 (Centrifugal) 1 No

Garbage room exhaust air fans

D E.A.F-TOR/01(Centrifugal double inlet) 1 No

Jet fans for parking ventilation, AXIAL with 2


sound absorbers, unidirectional, including all
integrals and fixtures as specified, Ref.
J.F-BA/TYP

E Basement 51 No

Jet Nozzles

F 300mm dia. 510 L/s Jet Nozzles in Terrace floor 12 No

Cooling load provisions connection

G Allow for Cooling load provisions connection with


necessary protection works as per schedules Item
specification

Connection of district cooling system

H Allow for connection from district cooling system


and all necessary accessories as specified Item

TO COLLECTION QR

2/8/74
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Allow for BMS connection

A Allow connection and interface with BMS system and


other systems as specified Item

Sundries

B Allow for producing all working drawings for


approval and as required by the specification Item

C Allow for testing and commissioning all the


foregoing installation to the complete satisfaction
of the Engineer Item

D Allow for testing, adjusting and air balancing by


certified third party. Item

E Allow for testing, adjusting and hydraulic


balancing by certified third party. Item

F Allow for sterilization and cleaning out of all pipe


work system in accordance with the specification Item

G Allow for providing all painting and plates, discs,


labels etc. for identification of plants equipment,
appliances, pipes, valves and the like in
accordance with the specification Item

H Allow for preparing record drawings of the


installations “as fitted” in accordance with the
specifications Item

J Allow for providing all operating and maintenance


instruction manuals in accordance with the
specification Item

K Allow for providing all loose items and spare parts


in accordance with the specification Item

TO COLLECTION QR

2/8/75
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

Builders work

A Allow for marking the position of holes,


mortises, chases and the like in the structure Item

B Allow for providing openings, upstands,


plinths and the like in the structure with Item
waterproof aprons

C Allow for providing and building in the pipe


sleeves in accordance with the drawings Item

D Allow for construction of all plinths, bases and


platforms for plant and equipment (plant and
equipment measured separately) Item

E Allow for any other builders work deem


necessary to complete the A/C installation Item

TO COLLECTION QR

2/8/76
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

OTHER ITEMS

The Contractor shall describe and price below


the items necessary for the full and proper
completion of the work as described in the
specification or shown on the drawings and for
which either expressed or implied provision is
required and which are not covered by either
the items or the rates in the Bills of Quantities
of contract or by any other matter what so ever.
Anything not so separately described shall be
deemed to be covered in the items and
rates inserted in the Bills of Quantities.

(i)

(ii)

(iii)

( iv)

(v)

( vi)

(vii)

TO COLLECTION QR

2/8/77
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

COLLECTION

Page 2/8/1

Page 2/8/2

Page 2/8/3

Page 2/8/4

Page 2/8/5

Page 2/8/6

Page 2/8/7

Page 2/8/8

Page 2/8/9

Page 2/8/10

Page 2/8/11

Page 2/8/12

Page 2/8/13

Page 2/8/14

Page 2/8/15

Page 2/8/16

Page 2/8/17

Page 2/8/18

Page 2/8/19

COLLECTION CARRIED OVER QR

2/8/78
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

COLLECTION (Cont'd)

COLLECTION BROUGHT FORWARD QR

Page 2/8/20

Page 2/8/21

Page 2/8/22

Page 2/8/23

Page 2/8/24

Page 2/8/25

Page 2/8/26

Page 2/8/27

Page 2/8/28

Page 2/8/29

Page 2/8/30

Page 2/8/31

Page 2/8/32

Page 2/8/33

Page 2/8/34

Page 2/8/35

Page 2/8/36

Page 2/8/37

COLLECTION CARRIED OVER QR

2/8/79
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

COLLECTION (Cont'd)

COLLECTION BROUGHT FORWARD QR

Page 2/8/38

Page 2/8/39

Page 2/8/40

Page 2/8/41

Page 2/8/42

Page 2/8/43

Page 2/8/44

Page 2/8/45

Page 2/8/46

Page 2/8/47

Page 2/8/48

Page 2/8/49

Page 2/8/50

Page 2/8/51

Page 2/8/52

Page 2/8/53

Page 2/8/54

Page 2/8/55

COLLECTION CARRIED OVER QR

2/8/80
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

COLLECTION (Cont'd)

COLLECTION BROUGHT FORWARD QR

Page 2/8/56

Page 2/8/57

Page 2/8/58

Page 2/8/59

Page 2/8/60

Page 2/8/61

Page 2/8/62

Page 2/8/63

Page 2/8/64

Page 2/8/65

Page 2/8/66

Page 2/8/67

Page 2/8/68

Page 2/8/69

Page 2/8/70

Page 2/8/71

Page 2/8/72

Page 2/8/73

COLLECTION CARRIED OVER QR

2/8/81
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Item Description Qty Unit Rate Amount


QR QR

AIR-CONDITIONING INSTALLATION (Cont'd)

COLLECTION (Cont'd)

COLLECTION BROUGHT FORWARD QR

Page 2/8/74

Page 2/8/75

Page 2/8/76

Page 2/8/77

TO SUMMARY OF BILL NO 2 QR

2/8/82
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION

Important Notes

* All electrical items given below shall be read in


conjunction with parts of the Electrical
Technical Specifications and the electrical
drawings except where otherwise indicated. Note

* The contractor shall supply and install all


equipment and material mentioned hereunder in
accordance with the Technical Specifications
and from approved and reputable
manufacturers, all in compliance with the
Technical Specifications, manufacturer's
instructions and shall carry out all the necessary
testing and commissioning to the approval and
satisfaction of the Engineer Note

* The contractor shall be responsible for the


maintenance of all the equipment and networks
for a period of 400 days from the date of
handing over the project to the Client Note

* The Contractor is advised to read carefully the


notes on pricing for Electrical installation when
pricing the works in this section Note

2/9/1
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits

3C x 70mm2 11kV CU/XLPE/SWA/PVC cables +


control triple cable drawn in RCC cable tunnel / trench as
specified including glands and termination

A Cable serving TR-01 from MV Panel 1 No

B Cable serving TR-02 from MV Panel 1 No

C Cable serving TR-03 from MV Panel 1 No

6 No; 4x[1x240mm2] Cu/PVC/PVC 0.6/1.0kV cables


drawn in trunking, trays/ducts as specified including
glands and termination

D Cable serving LV-GEN/Panel from Generator 1 No

3 No (1x240mm2) Cu/PVC/PVC 0.6/1.0kV cables


drawn in trunking, trays/ducts as specified including
glands and termination

E Cable serving LV Panel/01 from Main earthing busbar 1 No

3 No (1x240mm2) Cu/XLPE/SWA/LSF 0.6/1.0kV


cables drawn in trunking, trays/ducts as specified
including glands and termination

F Cable serving LV Panel/02 from Main earthing busbar 1 No

G Cable serving LV Panel/03 from Main earthing busbar 1 No

H Cable serving Generator from Earthing busbar 1 No

J Cable serving LV-GEN/Panel from Earthing busbar 1 No

TO COLLECTION QR

2/9/2
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

2 No (4x240mm2) CU/XLPE/SWA/LSF 0.6/1.0KV


+1x240mm2 CU/XLPE/SWA/LSF 0.5KV cables
drawn in trunking, trays/ducts as specified including
glands and termination

A Cable serving MDB-Essential from LV Panel/01 1 No

2 No (4x240mm2) CU/XLPE/SWA/LSF 0.6/1.0KV


cables drawn in trunking, trays/ducts as specified
including glands and termination

B Cable serving MDB-Essential from LV-GEN/Panel 1 No

4x 240mm2 CU/XLPE/PVC + 1x120mm2 PVC/ECC.


cables drawn in trunking, trays/ducts as specified
including glands and termination

C Cable serving KWHM-GF from Busduct 1;400A tapoff 1 No

D Cable serving Retail from KWHM-GF 1 No

2No (4x150mm2 CU/XLPE/SWA/LSF


0.6/1.0KV)+1x150mm2 CU/XLPE/SWA/LSF 0.5KV
cables drawn in trunking, trays/ducts as specified
including glands and termination

E Cable serving 420 KVAR Capacitor Bank from LV


Panel/01 1 No

F Cable serving 420 KVAR Capacitor Bank from LV


Panel/02 1 No

TO COLLECTION QR

2/9/3
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x150mm2 Cu/FIRE RATED 0.6/1 kV+1x95mm2


CU/XLPE/SWA/LSF 0.5KV cables drawn in trunking,
trays/ducts as specified including glands and termination

A Cable serving FP-B1/02 from LV Panel/01 1 No

B Cable serving MCC-Pumps from LV Panel/01 1 No

4x150mm2 CU/XLPE/SWA/LSF 0.6/1.0KV (Fire


rated cable) cables drawn in trunking, trays/ducts as
specified including glands and termination

C Cable serving FP-B1/02 from LV-GEN/Panel 1 No

4 No (4x120mm2) Cu/FIRE RATED 0.6/1


kV+2 No (1x120mm2) CU/XLPE/SWA/LSF 0.5KV
cables drawn in trunking, trays/ducts as specified
including glands and termination

D Cable serving EMDB from LV Panel/01 1 No

4 No (4x120mm2) CU/XLPE/SWA/LSF 0.6/1.0KV


+2No(120mm2) CU/XLPE/SWA/LSF 0.5KV cables
drawn in trunking, trays/ducts as specified including
glands and termination

E Cable serving MDB-GS from LV Panel/01 1 No

4 No (4x120mm2) CU/XLPE/SWA/LSF 0.6/1.0KV


cables drawn in trunking, trays/ducts as specified
including glands and termination

F Cable serving EMDB from LV-GEN/Panel 1 No

TO COLLECTION QR

2/9/4
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x120mm2 CU/XLPE/SWA/LSF 0.6/1.0KV+1x70


CU/XLPE/SWA/LSF 0.5KV cables drawn in trunking,
trays/ducts as specified including glands and termination

A Cable serving MCC-RF from LV Panel/01 1 No

2 No (4x95mm2) CU/XLPE/PVC +1x95mm2


PVC/ECC. cables drawn in trunking, trays/ducts as
specified including glands and termination

B Cable serving 300 KVAR Capacitor Bank from LV


Panel/03 1 No

4x95mm2 CU/XLPE/SWA/LSF
0.6/1.0kV+PE=50mm2 Cu/XLPE/SWA/LSF 0.5kV.
cables drawn in trunking, trays/ducts as specified
including glands and termination

C Cable serving SDB-EXT from MDB-Essential 1 No

4x95mm2 CU/XLPE/PVC+1x50mm2 PVC/ECC.


cables drawn in trunking, trays/ducts as specified
including glands and termination

D Cable serving KWHM-L22 from Busduct 5;160A tapoff 1 No

E Cable serving KWHM-L23 from Busduct 5;160A tapoff 1 No

F Cable serving KWHM-L24 from Busduct 5;160A tapoff 1 No

G Cable serving KWHM-L25 from Busduct 5;160A tapoff 1 No

H Cable serving KWHM-L26 from Busduct 5;160A tapoff 1 No

J Cable serving KWHM-L27 from Busduct 5;160A tapoff 1 No

TO COLLECTION QR

2/9/5
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x70mm2 CU/XLPE/PVC+1x35mm2 PVC/ECC.


cables drawn in trunking, trays/ducts as specified
including glands and termination

A Cable serving KWHM-L1 from Busduct 1;160A tapoff 1 No

B Cable serving KWHM-L2 from Busduct 1;160A tapoff 1 No

C Cable serving KWHM-L3 from Busduct 1;160A tapoff 1 No

D Cable serving KWHM-L5 from Busduct 1;160A tapoff 1 No

E Cable serving KWHM-L6 from Busduct 2;160A tapoff 1 No

F Cable serving KWHM-L7 from Busduct 2;160A tapoff 1 No

G Cable serving KWHM-L8 from Busduct 2;160A tapoff 1 No

H Cable serving KWHM-L9 from Busduct 2;160A tapoff 1 No

J Cable serving KWHM-L10 from Busduct 2;160A tapoff 1 No

K Cable serving KWHM-L11 from Busduct 2;160A tapoff 1 No

L Cable serving KWHM-L12 from Busduct 3;160A tapoff 1 No

M Cable serving KWHM-L13 from Busduct 3;160A tapoff 1 No

N Cable serving KWHM-L14 from Busduct 3;160A tapoff 1 No

P Cable serving KWHM-L15 from Busduct 3;160A tapoff 1 No

Q Cable serving KWHM-L16 from Busduct 4;160A tapoff 1 No

R Cable serving KWHM-L17 from Busduct 4;160A tapoff 1 No

S Cable serving KWHM-L18 from Busduct 4;160A tapoff 1 No

TO COLLECTION QR

2/9/6
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x70mm2 CU/XLPE/PVC+1x35mm2 PVC/ECC.


cables drawn in trunking, trays/ducts as specified
including glands and termination (Cont'd)

A Cable serving KWHM-L19 from Busduct 4;160A tapoff 1 No

B Cable serving KWHM-L20 from Busduct 4;160A tapoff 1 No

C Cable serving KWHM-L21 from Busduct 4;160A tapoff 1 No

1x50mm2 Cu/PVC 0.5kV cables drawn in trunking,


trays/ducts as specified including glands and termination

D Cable serving Mechanical equipment shaft from Main


earthing busbar 1 No

4x35mm2 Cu/FIRE RATED 0.6/1 kV +PE=1x16mm2


Cu/PVC 0.5kV cables drawn in trunking, trays/ducts as
specified including glands and termination

E Cable serving CBS from EMDB 2 No

F Cable serving UPS from EMDB 1 No

G Cable serving UPS Mains 2 from EMDB 1 No

4x35mm2:CU/XLPE/SWA/LSF 0.6/1.0kV
+PE=16mm2 Cu/XLPE/SWA/LSF 0.5kV. cables
drawn in trunking, trays/ducts as specified including
glands and termination

H Cable serving MDB-UPS from UPS 1 No

TO COLLECTION QR

2/9/7
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x25mm2 CU/XLPE/PVC+1x16mm2 PVC/ECC.


cables drawn in trunking, trays/ducts as specified
including glands and termination

A Cable serving KWHM-L4 from Busduct 1;63A tapoff 1 No

B Cable serving Office 1 from KWHM-L1 1 No

C Cable serving Office 2 from KWHM-L1 1 No

D Cable serving Office 1 from KWHM-L2 1 No

E Cable serving Office 2 from KWHM-L2 1 No

F Cable serving Office 1 from KWHM-L3 1 No

G Cable serving Office 2 from KWHM-L3 1 No

H Cable serving Library from KWHM-L4 1 No

J Cable serving Office 2 from KWHM-L5 1 No

K Cable serving Office 4 from KWHM-L5 1 No

L Cable serving Office 2 from KWHM-L6 1 No

M Cable serving Office 4 from KWHM-L6 1 No

N Cable serving Office 2 from KWHM-L7 1 No

P Cable serving Office 4 from KWHM-L7 1 No

Q Cable serving Office 2 from KWHM-L8 1 No

R Cable serving Office 4 from KWHM-L8 1 No

TO COLLECTION QR

2/9/8
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x25mm2 CU/XLPE/PVC+1x16mm2 PVC/ECC.


cables drawn in trunking, trays/ducts as specified
including glands and termination. (Cont’d)

A Cable serving Office 2 from KWHM-L9 1 No

B Cable serving Office 4 from KWHM-L9 1 No

C Cable serving Office 2 from KWHM-L10 1 No

D Cable serving Office 4 from KWHM-L10 1 No

E Cable serving Office 2 from KWHM-L11 1 No

F Cable serving Office 4 from KWHM-L11 1 No

G Cable serving Office 2 from KWHM-L12 1 No

H Cable serving Office 4 from KWHM-L12 1 No

J Cable serving Office 2 from KWHM-L13 1 No

K Cable serving Office 4 from KWHM-L13 1 No

L Cable serving Office 2 from KWHM-L14 1 No

M Cable serving Office 4 from KWHM-L14 1 No

N Cable serving Office 2 from KWHM-L15 1 No

P Cable serving Office 4 from KWHM-L15 1 No

Q Cable serving Office 2 from KWHM-L16 1 No

R Cable serving Office 4 from KWHM-L16 1 No

S Cable serving Office 2 from KWHM-L17 1 No

TO COLLECTION QR

2/9/9
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x25mm2 CU/XLPE/PVC+1x16mm2 PVC/ECC.


cables drawn in trunking, trays/ducts as specified
including glands and termination. (Cont’d)

A Cable serving Office 4 from KWHM-L17 1 No

B Cable serving Office 2 from KWHM-L18 1 No

C Cable serving Office 4 from KWHM-L18 1 No

D Cable serving Office 2 from KWHM-L19 1 No

E Cable serving Office 4 from KWHM-L19 1 No

F Cable serving Office 2 from KWHM-L20 1 No

G Cable serving Office 4 from KWHM-L20 1 No

H Cable serving Office 2 from KWHM-L21 1 No

J Cable serving Office 4 from KWHM-L21 1 No

K Cable serving Office 2 from KWHM-L22 1 No

L Cable serving Office 4 from KWHM-L22 1 No

M Cable serving Office 2 from KWHM-L23 1 No

N Cable serving Office 4 from KWHM-L23 1 No

P Cable serving Office 2 from KWHM-L24 1 No

Q Cable serving Office 4 from KWHM-L24 1 No

R Cable serving Office 2 from KWHM-L25 1 No

S Cable serving Office 4 from KWHM-L25 1 No

TO COLLECTION QR

2/9/10
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x25mm2 CU/XLPE/PVC+1x16mm2 PVC/ECC.


cables drawn in trunking, trays/ducts as specified
including glands and termination. (Cont’d)

A Cable serving Office 2 from KWHM-L26 1 No

B Cable serving Office 4 from KWHM-L26 1 No

C Cable serving Office 2 from KWHM-L27 1 No

D Cable serving Office 4 from KWHM-L27 1 No

4x25mm2 CU/XLPE/SWA/LSF
0.6/1.0kV+PE=16mm2 Cu/XLPE/SWA/LSF 0.5kV.
cables drawn in trunking, trays/ducts as specified
including glands and termination.

E Cable serving P-B4/01,02 from MCC-Pumps 1 No

F Cable serving P-B4/03,04 from MCC-Pumps 1 No

G Cable serving SDB-(L12-L15) from MDB-GS 1 No

H Cable serving SDB-(L16-L19) from MDB-GS 1 No

J Cable serving SDB-(L20-L23) from MDB-GS 1 No

K Cable serving SDB-(L24-L27) from MDB-GS 1 No

L Cable serving MCC-Chiller pumps from LV Panel/01 1 No

3x25mm2 Cu/FIRE RATED 0.6/1 kV+PE=1x16mm2


CU/XLPE/SWA/LSF 0.5kV cables drawn in trunking,
trays/ducts as specified including glands and termination.

M Cable serving E.A.F-B1/02 from EMDB 1 No

TO COLLECTION QR

2/9/11
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x16mm2 CU/XLPE/PVC+1x16mm2 PVC/ECC.


cables drawn in trunking, trays/ducts as specified
including glands and termination.

A Cable serving Office 1 from KWHM-L5 1 No

B Cable serving Office 3 from KWHM-L5 1 No

C Cable serving Office 1 from KWHM-L6 1 No

D Cable serving Office 3 from KWHM-L6 1 No

E Cable serving Office 1 from KWHM-L7 1 No

F Cable serving Office 3 from KWHM-L7 1 No

G Cable serving Office 1 from KWHM-L8 1 No

H Cable serving Office 3 from KWHM-L8 1 No

J Cable serving Office 1 from KWHM-L9 1 No

K Cable serving Office 3 from KWHM-L9 1 No

L Cable serving Office 1 from KWHM-L10 1 No

M Cable serving Office 3 from KWHM-L10 1 No

N Cable serving Office 1 from KWHM-L11 1 No

P Cable serving Office 3 from KWHM-L11 1 No

Q Cable serving Office 1 from KWHM-L12 1 No

R Cable serving Office 3 from KWHM-L12 1 No

S Cable serving Office 1 from KWHM-L13 1 No

TO COLLECTION QR

2/9/12
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x16mm2 CU/XLPE/PVC+1x16mm2 PVC/ECC.


cables drawn in trunking, trays/ducts as specified
including glands and termination. (Cont’d)

A Cable serving Office 3 from KWHM-L13 1 No

B Cable serving Office 1 from KWHM-L14 1 No

C Cable serving Office 3 from KWHM-L14 1 No

D Cable serving Office 1 from KWHM-L15 1 No

E Cable serving Office 3 from KWHM-L15 1 No

F Cable serving Office 1 from KWHM-L16 1 No

G Cable serving Office 3 from KWHM-L16 1 No

H Cable serving Office 1 from KWHM-L17 1 No

J Cable serving Office 3 from KWHM-L17 1 No

K Cable serving Office 1 from KWHM-L18 1 No

L Cable serving Office 3 from KWHM-L18 1 No

M Cable serving Office 1 from KWHM-L19 1 No

N Cable serving Office 3 from KWHM-L19 1 No

P Cable serving Office 1 from KWHM-L20 1 No

Q Cable serving Office 3 from KWHM-L20 1 No

R Cable serving Office 1 from KWHM-L21 1 No

S Cable serving Office 3 from KWHM-L21 1 No

TO COLLECTION QR

2/9/13
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x16mm2 CU/XLPE/PVC+1x16mm2 PVC/ECC.


cables drawn in trunking, trays/ducts as specified
including glands and termination. (Cont’d)

A Cable serving Office 1 from KWHM-L22 1 No

B Cable serving Office 3 from KWHM-L22 1 No

C Cable serving Office 1 from KWHM-L23 1 No

D Cable serving Office 3 from KWHM-L23 1 No

E Cable serving Office 1 from KWHM-L24 1 No

F Cable serving Office 3 from KWHM-L24 1 No

G Cable serving Office 1 from KWHM-L25 1 No

H Cable serving Office 3 from KWHM-L25 1 No

J Cable serving Office 1 from KWHM-L26 1 No

K Cable serving Office 3 from KWHM-L26 1 No

L Cable serving Office 1 from KWHM-L27 1 No

M Cable serving Office 3 from KWHM-L27 1 No

4x16mm2 Cu/PVC/PVC 0.6/1.0kV +PE=16mm2


Cu/PVC 0.5kV. cables drawn in trunking, trays/ducts as
specified including glands and termination.

N Cable serving Lift 1 from MDB-Essential 1 No

P Cable serving Lift 2 from MDB-Essential 1 No

Q Cable serving Lift 3 from MDB-Essential 1 No

TO COLLECTION QR

2/9/14
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x16mm2 Cu/PVC/PVC 0.6/1.0kV +PE=16mm2


Cu/PVC 0.5kV. cables drawn in trunking, trays/ducts as
specified including glands and termination. (Cont'd)

A Cable serving Lift 4 from MDB-Essential 1 No

B Cable serving Lift 5 from MDB-Essential 1 No

C Cable serving Lift 6 from MDB-Essential 1 No

D Cable serving Lift 7 from MDB-Essential 1 No

E Cable serving Lift 8 from MDB-Essential 1 No

4x16mm2 CU/XLPE/SWA/LSF 0.6/1.0kV


+PE=16mm2 Cu/XLPE/SWA/LSF 0.5kV. cables
drawn in trunking, trays/ducts as specified including
glands and termination.

F Cable serving SDB-B1 from MDB-GS 1 No

G Cable serving SDB-B2 from MDB-GS 1 No

H Cable serving SDB-B3 from MDB-GS 1 No

J Cable serving SDB-B4 from MDB-GS 1 No

K Cable serving SDB-(L4-L7) from MDB-GS 1 No

L Cable serving SDB-(L8-L11) from MDB-GS 1 No

M Cable serving SDB-GF-UPS from MDB-UPS 1 No

TO COLLECTION QR

2/9/15
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x16mm2 Cu/FIRE RATED 0.6/1 kV +PE=1x16mm2


Cu/PVC 0.5kV cables drawn in trunking, trays/ducts as
specified including glands and termination.

A Cable serving Service Lift 1 from EMDB 1 No

B Cable serving Service Lift 2 from EMDB 1 No

4x16mm2 Cu/FIRE RATED 0.6/1 kV+PE=1x16mm2


CU/XLPE/SWA/LSF 0.5kV cables drawn in trunking,
trays/ducts as specified including glands and termination.

C Cable serving SP/07,08,09 from EMDB 1 No

3x16mm2 Cu/FIRE RATED 0.6/1 kV+PE=1x16mm2


CU/XLPE/SWA/LSF 0.5kV cables drawn in trunking,
trays/ducts as specified including glands and termination.

D Cable serving F.A.F-B1/01a from EMDB 1 No

E Cable serving F.A.F-B1/01b from EMDB 1 No

F Cable serving F.A.F-B2/01a from EMDB 1 No

G Cable serving F.A.F-B2/01b from EMDB 1 No

H Cable serving F.A.F-B3/01a from EMDB 1 No

J Cable serving F.A.F-B3/01b from EMDB 1 No

K Cable serving E.A.F-B1/01 from EMDB 1 No

L Cable serving E.A.F-B1/03 from EMDB 1 No

M Cable serving E.A.F-B1/04 from EMDB 1 No

N Cable serving E.A.F-B2/01 from EMDB 1 No

TO COLLECTION QR

2/9/16
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

3x16mm2 Cu/FIRE RATED 0.6/1 kV+PE=1x16mm2


CU/XLPE/SWA/LSF 0.5kV cables drawn in trunking,
trays/ducts as specified including glands and termination.
(Cont'd)

A Cable serving E.A.F-B2/02 from EMDB 1 No

B Cable serving E.A.F-B3/01 from EMDB 1 No

C Cable serving E.A.F-B3/02 from EMDB 1 No

4x10mm2 Cu/PVC/PVC 0.6/1.0kV +PE=10mm2


Cu/PVC 0.5kV. cables drawn in trunking, trays/ducts as
specified including glands and termination.

D Cable serving AHU-B1/01 from MDB-GS 1 No

E Cable serving FAHU-P3/01 from MDB-GS 1 No

F Cable serving FAHU-P3/02 from MDB-GS 1 No

4x10mm2 CU/XLPE/SWA/LSF 0.6/1.0kV


+PE=10mm2 Cu/XLPE/SWA/LSF 0.5kV. cables
drawn in trunking, trays/ducts as specified including
glands and termination.

G Cable serving SDB-P1 from MDB-GS 1 No

H Cable serving SDB-P2 from MDB-GS 1 No

J Cable serving SDB-P3 from MDB-GS 1 No

K Cable serving FAHU-RF/01 from MCC-RF 1 No

L Cable serving SDB-L13-UPS from MDB-UPS 1 No

TO COLLECTION QR

2/9/17
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x10mm2 Cu/FIRE RATED 0.6/1 kV +PE=1x10mm2


CU/XLPE/SWA/LSF 0.5kV cables drawn in trunking,
trays/ducts as specified including glands and termination.

A Cable serving SP/01,02 from EMDB 1 No

B Cable serving SP/03,04 from EMDB 1 No

4x6mm2 CU/XLPE/SWA/LSF 0.6/1.0kV +PE=6mm2


Cu/XLPE/SWA/LSF 0.5kV. cables drawn in trunking,
trays/ducts as specified including glands and termination.

C Cable serving SDB-GF from MDB-GS 1 No

D Cable serving SDB-B1-E from MDB-Essential 1 No

E Cable serving SDB-B2-E from MDB-Essential 1 No

F Cable serving SDB-B3-E from MDB-Essential 1 No

G Cable serving SDB-B4-E from MDB-Essential 1 No

H Cable serving P-B4/05,06 from MCC-Pumps 1 No

J Cable serving P-B4/07,08 from MCC-Pumps 1 No

K Cable serving P-B4/09,10 from MCC-Pumps 1 No

L Cable serving E.A.F-TOR/01 from MCC-RF 1 No

M Cable serving FAHU-RF/02 from MCC-RF 1 No

N Cable serving CHWP-B1/01a from MCC-Chiller Pumps 1 No

P Cable serving CHWP-B1/01b from MCC-Chiller Pumps 1 No

Q Cable serving CHWP-B1/01c from MCC-Chiller Pumps 1 No

TO COLLECTION QR

2/9/18
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x6mm2 CU/XLPE/SWA/LSF 0.6/1.0kV +PE=6mm2


Cu/XLPE/SWA/LSF 0.5kV. cables drawn in trunking,
trays/ducts as specified including glands and termination.
(Cont'd)

A Cable serving CHWP-B1/02a from MCC-Chiller Pumps 1 No

B Cable serving CHWP-B1/02b from MCC-Chiller Pumps 1 No

C Cable serving CHWP-B1/02c from MCC-Chiller Pumps 1 No

4x6mm2 Cu/FIRE RATED 0.6/1 kV+PE=1x16mm2


CU/XLPE/SWA/LSF 0.5kV cables drawn in trunking,
trays/ducts as specified including glands and termination.

D Cable serving SP/10,11 from EMDB 1 No

4x6mm2 Cu/FIRE RATED 0.6/1 kV+PE=1x10mm2


CU/XLPE/SWA/LSF 0.5kV cables drawn in trunking,
trays/ducts as specified including glands and termination.

E Cable serving SP/05,06 from EMDB 1 No

4x6mm2 Cu/FIRE RATED 0.6/1 kV +1x6mm2


CU/XLPE/SWA/LSF 0.5KV cables drawn in trunking,
trays/ducts as specified including glands and termination.

F Cable serving FP-B1/03 from EMDB 1 No

2x6mm2 CU/XLPE/SWA/LSF 0.6/1.0kV+PE=6mm2


Cu/XLPE/SWA/LSF 0.5kV. cables drawn in trunking,
trays/ducts as specified including glands and termination.

G Cable serving SDB-GF-E from MDB-Essential 1 No

H Cable serving SDB-P1-E from MDB-Essential 1 No

J Cable serving SDB-P2-E from MDB-Essential 1 No

TO COLLECTION QR

2/9/19
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

2x6mm2 CU/XLPE/SWA/LSF 0.6/1.0kV+PE=6mm2


Cu/XLPE/SWA/LSF 0.5kV. cables drawn in trunking,
trays/ducts as specified including glands and termination.
(Cont'd)

A Cable serving SDB-P3-E from MDB-Essential 1 No

B Cable serving SDB-(L4-L7)-E from MDB-Essential 1 No

C Cable serving SDB-(L8-L11)-E from MDB-Essential 1 No

D Cable serving SDB-(L12-L15)-E from MDB-Essential 1 No

E Cable serving SDB-(L16-L19)-E from MDB-Essential 1 No

F Cable serving SDB-(L20-L23)-E from MDB-Essential 1 No

G Cable serving SDB-(L24-L27)-E from MDB-Essential 1 No

H Cable serving SDB-RF-E from MDB-Essential 1 No

4x4mm2 CU/XLPE/SWA/LSF 0.6/1.0kV +PE=4mm2


Cu/XLPE/SWA/LSF 0.5kV. cables drawn in trunking,
trays/ducts as specified including glands and termination.

J Cable serving P-B4/11,12 from MCC-Pumps 1 No

K Cable serving P-B4/13,14 from MCC-Pumps 1 No

L Cable serving BMU from MCC-RF 1 No

M Cable serving SDB-RF from MCC-RF 1 No

N Cable serving P-RF/01,02 from MCC-RF 1 No

P Cable serving P-RF/03,04,05 from MCC-RF 1 No

TO COLLECTION QR

2/9/20
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

4x4mm2 Cu/FIRE RATED 0.6/1 kV+PE=1x4mm2


CU/XLPE/SWA/LSF 0.5kV cables drawn in trunking,
trays/ducts as specified including glands and termination.

A Cable serving SP/12 from EMDB 1 No

B Cable serving SP/13 from EMDB 1 No

3x4mm2 CU/XLPE/SWA/LSF 0.6/1.0kV, 3x4mm2


Cu/FIRE RATED 0.6/1 kV (AT HIGH
SPEED)+PE=1x4mm2 CU/XLPE/SWA/LSF 0.5kV
cables drawn in trunking, trays/ducts as specified
including glands and termination.

C Cable serving F.A.F-B1/02 from EMDB 1 No

D Cable serving E.A.F-B1/05 from EMDB 1 No

E Cable serving E.A.F-B1/06 from EMDB 1 No

F Cable serving J.F-BA/TYP - BASEMENT 1 from


EMDB (cable length varies) 12 No

G Cable serving J.F-BA/TYP - BASEMENT 2 from


EMDB (cable length varies) 13 No

H Cable serving J.F-BA/TYP - BASEMENT 3 from


EMDB (cable length varies) 13 No

J Cable serving J.F-BA/TYP - BASEMENT 4 from


EMDB (cable length varies) 13 No

TO COLLECTION QR

2/9/21
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

3x4mm2 Cu/FIRE RATED 0.6/1 kV (AT HIGH


SPEED)+PE=1x4mm2 CU/XLPE/SWA/LSF 0.5kV
cables drawn in trunking, trays/ducts as specified
including glands and termination.

A Cable serving E.A.F-RF/01 from EMDB 1 No

3x4mm2 Cu/FIRE RATED 0.6/1 Kv +PE=1x4mm2


CU/XLPE/SWA/LSF 0.5kV cables drawn in trunking,
trays/ducts as specified including glands and termination.

B Cable serving E.A.F-GF/01 from EMDB 1 No

C Cable serving F.A.F-GF/01 from EMDB 1 No

D Cable serving F.A.F-P3/01a from EMDB 1 No

E Cable serving F.A.F-P3/01b from EMDB 1 No

F Cable serving F.A.F-P3/02a from EMDB 1 No

G Cable serving F.A.F-P3/02b from EMDB 1 No

H Cable serving F.A.F-RF/01a from EMDB 1 No

J Cable serving F.A.F-RF/01b from EMDB 1 No

K Cable serving F.A.F-RF/02a from EMDB 1 No

L Cable serving F.A.F-RF/02b from EMDB 1 No

M Cable serving F.A.F-TOR/01a from EMDB 1 No

N Cable serving F.A.F-TOR/01b from EMDB 1 No

TO COLLECTION QR

2/9/22
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Main circuits (Cont’d)

3x4mm2 Cu/FIRE RATED 0.6/1 Kv +PE=1x4mm2


CU/XLPE/SWA/LSF 0.5kV cables drawn in trunking,
trays/ducts as specified including glands and termination.
(Cont'd)

A Cable serving F.A.F-TOR/02a from EMDB 1 No

B Cable serving F.A.F-TOR/02b from EMDB 1 No

TO COLLECTION QR

2/9/23
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Equipment and control gear

Transformer

Supply and install 1600 kVA, 11/0.433kV DIN, 50Hz,


Dry type Transformer from an approved manufacturer
fixed and complete including all integrals as specified.

A Transformer 1, Ref. TR-01 1 No

B Transformer 2, Ref. TR-02 1 No

C Transformer 3, Ref. TR-03 1 No

Generator

1000 kVA, Prime 415/240V, 50Hz Generator from an


approved manufacturer fixed complete including all
integrals, ACB, indicators, status indicator, control panel,
350mm dia. Chimney from basement 1 to top of roof
level as per Dwg. No. M.FG-RI.806 and final
connections as specified.

D Generator, Ref. G1 1 No

Medium Voltage Cubicles

E MV switch gear including Bus Bar, VCBs, CTs, VTs,


protection relays, all accessories, fittings and fixing,
support frame, etc. as per requirement all complete as
per drwg. E.PW-RI.601~604 and specification. 1 No

LV Panels

F 7 way, LV panel with all integral MCCBs, ACBs,


MASD, bus bars, drawouts, terminal blocks, indicators,
digital power meters and Surge Arrestor as specified
including final connections. Ref. LV GEN/PANEL 1 No

TO COLLECTION QR

2/9/24
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Equipment and Control gear (Cont'd)

LV Panels (Cont'd)

A 12 way, LV panel with all integral MCCBs, ACBs, bus


bars, drawouts, terminal blocks, indicators, meters,
earthing busbar, Surge Arrestor and necessary earthing
as specified including final connections.
Ref. LV PANEL/1 1 No

B 6 way, LV panel with all integral ACBs, bus bars,


drawouts, terminal blocks, indicators, meters, earthing
bubar, Surge Arrestor and necessary earthing as
specified including final connections. Ref. LV PANEL/2 1 No

C 4 way, LV panel with all integral ACBs, bus bars,


drawouts, terminal blocks, indicators, meters, earthing
bubar and necessary earthing as specified including final
connections. Ref. LV PANEL/3 1 No

Busbar

Approved type busbar fixed complete as specified


including bus ducts, trunking, coupling pieces, joints,
connections, end caps, supports and end feed units and
termination

D 2500A 4P+E, Busbar to LV PANEL/1 from


transformer TR-01 1 No

E 2500A 4P+E, Busbar to LV PANEL/2 from


transformer TR-02 1 No

F 2500A 4P+E, Busbar to LV PANEL/3 from


transformer TR-03 1 No

G 1000A 4P+E, Busbar ( Bus duct 01) from LV


PANEL/2, with 1 no. 400A + 4 nos. 160A + 1 no. 63A
Tap off Units and 1 no. end cap 1 No

TO COLLECTION QR

2/9/25
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Equipment and Control gear (Cont'd)

Busbar (Cont'd)

A 1000A 4P+E, Busbar ( Bus duct 02) from LV


PANEL/2, with 6 nos. 160A Tap off Units and 1 no.
end cap 1 No

B 1000A 4P+E, Busbar ( Bus duct 03) from LV


PANEL/2, with 4 nos. 160A Tap off Units and 1 no.
end cap 1 No

C 1350A 4P+E, Busbar ( Bus duct 04) from LV


PANEL/3, with 6 nos. 160A Tap off Units and 1 no.
end cap 1 No

D 1600A 4P+E, Busbar ( Bus duct 05) from LV


PANEL/3, with 6 nos. 160A Tap off Units and 1 no.
end cap 1 No

KWH Meter Panels

E KWHM Panels, Ref. KWHM-GF 1 No

F KWHM Panels, Ref. KWHM-L1 1 No

G KWHM Panels, Ref. KWHM-L2 1 No

H KWHM Panels, Ref. KWHM-L3 1 No

J KWHM Panels, Ref. KWHM-L4 1 No

K KWHM Panels, Ref. KWHM-L5 1 No

L KWHM Panels, Ref. KWHM-L6 1 No

M KWHM Panels, Ref. KWHM-L7 1 No

N KWHM Panels, Ref. KWHM-L8 1 No

TO COLLECTION QR

2/9/26
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Equipment and Control gear (Cont'd)

KWH Meter Panels (Cont'd)

A KWHM Panels, Ref. KWHM-L9 1 No

B KWHM Panels, Ref. KWHM-L10 1 No

C KWHM Panels, Ref. KWHM-L11 1 No

D KWHM Panels, Ref. KWHM-L12 1 No

E KWHM Panels, Ref. KWHM-L13 1 No

F KWHM Panels, Ref. KWHM-L14 1 No

G KWHM Panels, Ref. KWHM-L15 1 No

H KWHM Panels, Ref. KWHM-L16 1 No

J KWHM Panels, Ref. KWHM-L17 1 No

K KWHM Panels, Ref. KWHM-L18 1 No

L KWHM Panels, Ref. KWHM-L19 1 No

M KWHM Panels, Ref. KWHM-L20 1 No

N KWHM Panels, Ref. KWHM-L21 1 No

P KWHM Panels, Ref. KWHM-L22 1 No

Q KWHM Panels, Ref. KWHM-L23 1 No

R KWHM Panels, Ref. KWHM-L24 1 No

S KWHM Panels, Ref. KWHM-L25 1 No

T KWHM Panels, Ref. KWHM-L26 1 No

U KWHM Panels, Ref. KWHM-L27 1 No


TO COLLECTION QR

2/9/27
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Equipment and Control gear (Cont'd)

Other items

A 30kW Uninterrupted power supply, Ref. UPS 1 No

B 420kVAR Capacitor Bank including isolator, controller


7steps (7x60) and necessary components. 2 No

C 300kVAR Capacitor Bank including isolator, controller


5steps (5x60) and necessary components. 1 No

Main Distribution Board

D 54 way Main Distribution Board with all integral


MCCBs, MPCBs, isolators, bus bars, terminal blocks,
indicators, digital power meters, DSD motorized
contractors, ATS, MBP, switch disconnectors, surge
arrestors and final connections as per the drawings and
specifications. Ref. EMDB 1 No

E 20 way Main Distribution Board with all integral


MCCBs, isolators, bus bars, terminal blocks, indicators,
digital power meters, switch disconnectors, surge
arrestors and final connections as per the drawings and
specifications. Ref. MDB-GS 1 No

F 27 way Main Distribution Board with all integral


MCCBs, isolators, bus bars, terminal blocks, indicators,
digital power meters, ATS, MBP, switch disconnectors,
surge arrestors, earthing busbar and final connections as
per the drawings and specifications. Ref. MDB-Essential 1 No

G 5 way Main Distribution Board with all integral


MCCBs, fuse, isolators, bus bars, terminal blocks,
indicators, digital power meters, switch disconnectors,
surge arrestors, earthing busbar and final connections as
per the drawings and specifications. Ref. MDB-UPS 1 No

TO COLLECTION QR

2/9/28
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Equipment and Control gear (Cont'd)

Main Distribution Board (Cont'd)

A Main Distribution Board with all integral MCCBs,


isolators, bus bars, indicators, meters, ATS and final
connections as per the drawings and specifications. Ref.
FP-B1/02 1 No

Secondary Distribution Board

Secondary Distribution Board with all integral MCCBs,


RCCBs, isolators, bus bars, indicators, meters and final
connections as per the drawings and specifications.

B Secondary Distribution Board, ref. SDB-B4 1 No

C Secondary Distribution Board, ref. SDB-B4-E 1 No

D Secondary Distribution Board, ref. SDB-B3 1 No

E Secondary Distribution Board, ref. SDB-B3-E 1 No

F Secondary Distribution Board, ref. SDB-B2 1 No

G Secondary Distribution Board, ref. SDB-B2-E 1 No

H Secondary Distribution Board, ref. SDB-B1 1 No

J Secondary Distribution Board, ref. SDB-B1-E 1 No

K Secondary Distribution Board, ref. SDB-GF 1 No

L Secondary Distribution Board, ref. SDB-GF-E 1 No

M Secondary Distribution Board, ref. SDB-EXT 1 No

N Secondary Distribution Board, ref. SDB-GF-UPS 1 No

TO COLLECTION QR

2/9/29
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Equipment and Control gear (Cont'd)

Secondary Distribution Board (Cont'd)

Secondary Distribution Board with all integral MCCBs,


RCCBs, isolators, bus bars, indicators, meters and final
connections as per the drawings and
specifications.(Cont'd)

A Secondary Distribution Board, ref. SDB-P1 1 No

B Secondary Distribution Board, ref. SDB-P1-E 1 No

C Secondary Distribution Board, ref. SDB-P2 1 No

D Secondary Distribution Board, ref. SDB-P2-E 1 No

E Secondary Distribution Board, ref. SDB-P3 1 No

F Secondary Distribution Board, ref. SDB-P3-E 1 No

G Secondary Distribution Board, ref. SDB-(L4~L7) 1 No

H Secondary Distribution Board, ref. SDB-(L4~L7)-E 1 No

J Secondary Distribution Board, ref. SDB-(L8~L11) 1 No

K Secondary Distribution Board, ref. SDB-(L8~L11)-E 1 No

L Secondary Distribution Board, ref. SDB-(L12~L15) 1 No

M Secondary Distribution Board, ref. SDB-(L12~L15)-E 1 No

N Secondary Distribution Board, ref. SDB-(L16~L19) 1 No

P Secondary Distribution Board, ref. SDB-(L16~L19)-E 1 No

Q Secondary Distribution Board, ref. SDB-(L20~L23) 1 No

TO COLLECTION QR

2/9/30
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Equipment and Control gear (Cont'd)

Secondary Distribution Board (Cont'd)

Secondary Distribution Board with all integral MCCBs,


RCCBs, isolators, bus bars, indicators, meters and final
connections as per the drawings and
specifications.(Cont'd)

A Secondary Distribution Board, ref. SDB-(L20~L23)-E 1 No

B Secondary Distribution Board, ref. SDB-(L24~L27) 1 No

C Secondary Distribution Board, ref. SDB-(L24~L27)-E 1 No

D Secondary Distribution Board, ref. SDB-RF 1 No

E Secondary Distribution Board, ref. SDB-RF-E 1 No

F Secondary Distribution Board, ref. SDB-L13-UPS 1 No

Motor control center

G 10 way Motor Control Center with all integral MCCBs,


isolators, bus bars, indicators, digital power meters,
terminal blocks, switch disconnectors, earthing busbar,
surge arrestor and final connections as per the drawings
and specifications. Ref. MCC-Pumps 1 No

H 9 way Motor Control Center with all integral MCCBs,


isolators, bus bars, indicators, digital power meters,
terminal blocks, switch disconnectors, VSDs, earthing
busbar, surge arrestor and final connections as per the
drawings and specifications. Ref. MCC-Chiller Pumps 1 No

J 10 way Motor Control Center with all integral MCBs,


isolators, bus bars, indicators, digital power meters,
terminal blocks, switch disconnectors, thermal relay,
magnetic trip, earthing busbar, surge arrestor and final
connections as per the drawings and specifications. Ref.
MCC-RF 1 No
TO COLLECTION QR

2/9/31
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Equipment and control gear (Cont'd)

Disconnect Switches as specified.

A 400A, 4P waterproof disconnect switch with aluminium


alloy enclosure 1 No

B 80A, 4P waterproof disconnect switch with aluminium


alloy enclosure to fire alarm control panel 1 No

C 63A, 4P waterproof disconnect switch with aluminium


alloy enclosure to fire alarm control panel 2 No

D 63A, 4P waterproof disconnect switch with aluminium


alloy enclosure 7 No

E 50A, 4P waterproof disconnect switch with aluminium


alloy enclosure to fire alarm control panel 11 No

F 50A, 3P waterproof disconnect switch with aluminium


alloy enclosure 1 No

G 40A, 4P waterproof disconnect switch with aluminium


alloy enclosure to fire alarm control panel 2 No

H 40A, 4P waterproof disconnect switch with aluminium


alloy enclosure 101 No

J 40A, 3P waterproof disconnect switch with robust


thermoplastic enclosure 1 No

K 25A, 3P waterproof disconnect switch with robust


thermoplastic enclosure 1 No

L 20A, 6P waterproof disconnect switch with aluminium


alloy enclosure to fire alarm control panel 51 No

M 20A, 3P waterproof disconnect switch with aluminium


alloy enclosure to fire alarm control panel 18 No

TO COLLECTION QR

2/9/32
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Equipment and control gear (Cont'd)

Disconnect Switches as specified. (Cont'd)

A 20A, 3P waterproof disconnect switch with aluminium


alloy enclosure 2 No

B 20A, 3P waterproof disconnect switch with robust


thermoplastic enclosure 1 No

C 10A, 3P waterproof disconnect switch with aluminium


alloy enclosure to fire alarm control panel 1 No

TO COLLECTION QR

2/9/33
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

5DWH $PRXQW
,WHP 'HVFULSWLRQ 4W\ 8QLW
45 45

(/(&75,&$/,167$//$7,21 &RQW¶G

/LJKWLQJLQVWDOODWLRQ

)LQDOVXEFLUFXLWV

$SSURYHGW\SHFDEOHVDQGZLULQJGUDZQLQWRFRQFHDOHG
FRQGXLWVDVVSHFLILHGWRJHQHUDOOLJKWLQJSRLQWV

*HQHUDOOLJKWLQJSRLQW

$ %DVHPHQW  1R

% *URXQG)ORRU  1R

& 3RGLXP/HYHO  1R

' 7HUUDFH/HYHO  1R

( 7\SLFDO)ORRUV  1R

) 5RRI)ORRU  1R

* /LQHDU3URILOH/('VWULSOLJKWSRLQWV $SSUR[OHQJWK
P  ,WHP

+ 5HFHVVHGOLQHDUSURILOHOLJKWSRLQWV $SSUR[OHQJWK
P  ,WHP

- /LQHDUIOH[LEOH/('OLJKWSRLQWV $SSUR[OHQJWKP  ,WHP

72&2//(&7,21 45

5
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Lighting installation (Cont’d)

Fittings and accessories

Following luminaries from approved manufacturer as


specified, fixed complete with bulbs, fluorescent tubes,
diffusers, holders, ceiling rose, supports, bases and
transformers including final connection as specified.

Ceiling mounted lighting fitting for parking and technical


areas, IP 66, with 34W LED light.

A Basement 920 No

B Podium Level 180 No

Ceiling mounted lighting fitting for technical areas, IP 66,


with 55W LED light

C Basement 68 No

D Ground Floor 2 No

E Podium Level 20 No

F Terrace Level 2 No

G Typical Floors 46 No

H Roof Floor 19 No

Wall mounted lighting fitting, for lifts, IP 65, with 11W


LED light

J Basement 40 No

K Ground Floor 10 No

L Podium Level 30 No

TO COLLECTION QR

2/9/35
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Lighting installation (Cont’d)

Fittings and accessories (Cont’d)

Following luminaries from approved manufacturer as


specified, fixed complete with bulbs, fluorescent tubes,
diffusers, holders, ceiling rose, supports, bases and
transformers including final connection as specified.
(Cont’d)

Wall mounted lighting fitting, for lifts, IP 65, with 11W


LED light (Cont’d)

A Terrace Level 10 No

B Typical Floors 230 No

Ceiling mounted lighting fitting, for stairs, IP 40, with


18W LED light

C Basement 50 No

D Ground Floor 15 No

E Podium Level 37 No

F Terrace Level 8 No

G Typical Floors 184 No

H Roof Floor 10 No

Ceiling recessed lighting fitting, for WC, IP 54, with 16W


LED light

J Ground Floor 10 No

K Podium Level 30 No

L Terrace Level 10 No

TO COLLECTION QR

2/9/36
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Lighting installation (Cont’d)

Fittings and accessories (Cont’d)

Following luminaries from approved manufacturer as


specified, fixed complete with bulbs, fluorescent tubes,
diffusers, holders, ceiling rose, supports, bases and
transformers including final connection as specified.
(Cont’d)

Ceiling recessed lighting fitting, for WC, IP 54, with 16W


LED light. (Cont’d)

A Typical Floors 230 No

Ceiling recessed lighting fitting, for lobbies, IP 20, with


9W LED light

B Basement 90 No

C Ground Floor 11 No

D Podium Level 24 No

E Terrace Level 7 No

F Typical Floors 159 No

G Roof Floor 1 No

Ceiling mounted lighting fitting, for storages, IP 40, with


18W LED light

H Ground Floor 5 No

J Podium Level 3 No

K Terrace Level 1 No

L Typical Floors 23 No

TO COLLECTION QR

2/9/37
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Lighting installation (Cont’d)

Fittings and accessories (Cont’d)

Following luminaries from approved manufacturer as


specified, fixed complete with bulbs, fluorescent tubes,
diffusers, holders, ceiling rose, supports, bases and
transformers including final connection as specified.
(Cont’d)

Ceiling mounted lighting fitting, for storages, IP 40, with


18W LED light (Cont'd)

A Roof Floor 1 No

Ceiling recessed lighting profile for lift lobbies with 7W/M


, 985 LM/M LED profile

B Ground Floor 1 No

C Podium Level 3 No

D Terrace Level 1 No

E Typical Floors 24 No

Wall recessed lighting fitting for ramp, IP65 with 6W


LED lamp

F Ground Floor 52 No

G Podium Level 53 No

Ceiling recessed lighting fitting, IP20, with 27W LED


lamp and parabolic diffuser, for offices

H Ground Floor 8 No

TO COLLECTION QR

2/9/38
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

5DWH $PRXQW
,WHP 'HVFULSWLRQ 4W\ 8QLW
45 45

(/(&75,&$/,167$//$7,21 &RQW¶G

/LJKWLQJLQVWDOODWLRQ &RQW¶G

)LWWLQJVDQGDFFHVVRULHV &RQW¶G

)ROORZLQJOXPLQDULHVIURPDSSURYHGPDQXIDFWXUHUDV
VSHFLILHGIL[HGFRPSOHWHZLWKEXOEVIOXRUHVFHQWWXEHV
GLIIXVHUVKROGHUVFHLOLQJURVHVXSSRUWVEDVHVDQG
WUDQVIRUPHUVLQFOXGLQJILQDOFRQQHFWLRQDVVSHFLILHG
&RQW¶G

:DOOPRXQWHGOLJKWLQJILWWLQJIRUSDUNLQJDQGWHFKQLFDO
DUHDV,3ZLWK:/('OLJKW

$ %DVHPHQW  1R

% 5RRI/HYHO  1R

&HLOLQJUHFHVVHGOLJKWLQJILWWLQJIRUVKRZHUV,3ZLWK
:/('OLJKW

& %DVHPHQW  1R

/RZLQWHQVLW\DLUFUDIWZDUQLQJOLJKW

' 7\SLFDO)ORRUV  1R

0HGLXPLQWHQVLW\DLUFUDIWZDUQLQJOLJKW

( 5RRI/HYHO  1R

'HFRUDWLYHVXVSHQVLRQIRUPDLQUHFHSWLRQOREE\

) 7HUUDFH/HYHO  1R

&HLOLQJUHFHVVHGOLJKWLQJSURILOHIRUPDLQUHFHSWLRQOREE\
ZLWK:0/00/('SURILOH

* 7HUUDFH/HYHO  1R

/DQGVFDSH)ORRU/LJKWLQJ

5ROORYHUOLJKW/(',3ZLWK:9/('ODPS

+ *URXQG)ORRU  1R
72&2//(&7,21 45

5
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Lighting installation (Cont’d)

Fittings and accessories (Cont’d)

Following luminaries from approved manufacturer as


specified, fixed complete with bulbs, fluorescent tubes,
diffusers, holders, ceiling rose, supports, bases and
transformers including final connection as specified.
(Cont’d)

Landscape Floor Lighting (Cont’d)

Adjustable projector medium LED IP65, with


10W/240V LED lamp

A Ground Floor 8 No

B Terrace Level 12 No

Pole mounted luminaire LED IP65, with 17W/220V


LED lamp

C Terrace Level 12 No

Linear flexible LED IP68, with 13W/m/24V LED lamp

D Terrace Level 18 No

Pole stainless steel ∅ 76 3000mm FFL, with power


supply and all needed accessories

E Terrace Level 6 No

Recessed up light spot LED IP68, with 2.5W/700ma


LED lamp

F Ground Floor 12 No

TO COLLECTION QR

2/9/40
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Lighting installation (Cont’d)

Fittings and accessories (Cont’d)

Following luminaries from approved manufacturer as


specified, fixed complete with bulbs, fluorescent tubes,
diffusers, holders, ceiling rose, supports, bases and
transformers including final connection as specified.
(Cont’d)

Landscape Floor Lighting (Cont’d)

Post light LED IP65, with 13.5w/240V LED lamp

A Ground Floor 17 No

Recessed up light quide LED IP68

B Ground Floor 6 No

Recessed drive over wide LED IP68, with 5W/240V


LED lamp

C Ground Floor 10 No

Landscape Wall Lighting

Adjustable projector wide LED IP65, with 10W/240V


LED lamp

D Ground Floor 10 No

Adjustable projector spot LED IP65, with 10W/240V


LED lamp

E Ground Floor 6 No

TO COLLECTION QR

2/9/41
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

5DWH $PRXQW
,WHP 'HVFULSWLRQ 4W\ 8QLW
45 45

(/(&75,&$/,167$//$7,21 &RQW¶G

/LJKWLQJLQVWDOODWLRQ &RQW¶G

)LWWLQJVDQGDFFHVVRULHV &RQW¶G

)ROORZLQJOXPLQDULHVIURPDSSURYHGPDQXIDFWXUHUDV
VSHFLILHGIL[HGFRPSOHWHZLWKEXOEVIOXRUHVFHQWWXEHV
GLIIXVHUVKROGHUVFHLOLQJURVHVXSSRUWVEDVHVDQG
WUDQVIRUPHUVLQFOXGLQJILQDOFRQQHFWLRQDVVSHFLILHG
&RQW¶G

/DQGVFDSH:DOO/LJKWLQJ &RQW¶G

5HFHVVHGZDOOOLJKW,3ZLWK:9/('ODPS

$ *URXQG)ORRU  1R

/LQHDU3URILOH/('VWULS,3ZLWK:P/('
ODPS

% 7\SLFDO)ORRUV  P

5HFHVVHGOLQHDUSURILOHZLGH/(',3ZLWK
:OP/('ODPS

& 7\SLFDO)ORRUV  P

/LQHDUIOH[LEOH/(',3ZLWK:9/('ODPS

' *URXQG)ORRU  P

( 7\SLFDO)ORRUV  P

/LJKWLQJDFFHVVRULHVLQFOXGLQJQHFHVVDU\ZLULQJDQG
FRQGXLWVZLWKDSSURYHGIDVFLDSODWHIL[HGFRPSOHWHDV
VSHFLILHGLQFOXGLQJILQDOFRQQHFWLRQ

$9RQHZD\RQHJDQJVZLWFKIRUQRQGHFRUDWLYH
DUHDV

) %DVHPHQW  1R

* *URXQG)ORRU  1R

+ 3RGLXP/HYHO  1R

- 7HUUDFH/HYHO  1R

. 7\SLFDO)ORRUV  1R

/ 5RRI)ORRU  1R

72&2//(&7,21 45

5
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Lighting installation (Cont’d)

Fittings and accessories (Cont’d)

Lighting accessories including necessary wiring and


conduits with approved fascia plate fixed complete as
specified including final connection. (Con'd)

10A 250V one way one gang switch

A Ground Floor 4 No

B Podium Level 12 No

C Typical Floors 4 No

10A 250V two way one gang switch for non decorative
areas.

D Basement 8 No

10A 250V waterproof one way one gang switch

E Basement 2 No

10A 250V waterproof two way one gang switch for non
decorative areas

F Roof Floor 2 No

Ceiling mounted movement detector

G Basement 74 No

H Podium Level 18 No

J Roof Floor 2 No

TO COLLECTION QR

2/9/43
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Lighting installation (Cont’d)

Fittings and accessories (Cont’d)

Lighting accessories including necessary wiring and


conduits with approved fascia plate fixed complete as
specified including final connection. (Con'd)

Wall mounted movement detector

A Ground Floor 2 No

B Podium Level 2 No

Ceiling mounted infrared occupancy sensor for corridors

C Basement 13 No

D Ground Floor 4 No

E Podium Level 9 No

F Terrace Level 3 No

G Typical Floors 70 No

H Roof Floor 5 No

Ceiling mounted infrared occupancy sensor for corridors

J Basement 23 No

K Ground Floor 5 No

L Podium Level 21 No

M Terrace Level 5 No

N Typical Floors 115 No

TO COLLECTION QR

2/9/44
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Lighting installation (Cont’d)

Fittings and accessories (Cont’d)

Lighting accessories including necessary wiring and


conduits with approved fascia plate fixed complete as
specified including final connection. (Con'd)

Ceiling mounted ultrasonic sensor for technical rooms

A Basement 6 No

B Ground Floor 1 No

Push button for lighting 6A 250V Non Decorative Areas

C Basement 66 No

D Ground Floor 12 No

E Podium Level 40 No

F Terrace Level 10 No

G Typical Floors 230 No

Power cabinet for airplane lights/medium intensity.

H Roof Floor 5 No

J Allow connection and interface with BMS system and


other systems as specified Item

TO COLLECTION QR

2/9/45
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Emergency lighting installation

Final sub circuits

Approved type cables and wiring drawn into concealed


conduits as specified to emergency lighting points

A Basement 323 No

B Ground Floor 30 No

E Podium Level 123 No

F Terrace Level 19 No

G Typical Floors 415 No

H Roof Floor 21 No

TO COLLECTION QR

2/9/46
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Emergency lighting installation (Cont'd)

Fittings and accessories

Following luminaries from approved manufacturer as


specified, fixed complete with bulbs, fluorescent tubes,
diffusers, holders, ceiling rose, supports, bases and
transformers including final connection as specified.

Ceiling mounted lighting fitting for parking and technical


areas, IP 66, with 34W LED light.

A Basement 147 No

B Podium Level 42 No

Ceiling mounted lighting fitting for technical areas, IP 66,


with 55W LED light.

C Basement 38 No

D Ground Floor 2 No

E Podium Level 8 No

F Terrace Level 2 No

G Typical Floors 46 No

H Roof Floor 9 No

Ceiling recessed lighting fitting, for WC, IP 54, with 16W


LED light

J Ground Floor 3 No

K Podium Level 9 No

L Terrace Level 3 No

M Typical Floors 69 No
TO COLLECTION QR

2/9/47
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Emergency lighting installation (Cont'd)

Fittings and accessories (Cont'd)

Following luminaries from approved manufacturer as


specified, fixed complete with bulbs, fluorescent tubes,
diffusers, holders, ceiling rose, supports, bases and
transformers including final connection as specified.
(Cont'd)

Ceiling recessed lighting fitting, for lift lobbies, IP 20, with


9W LED light

A Basement 20 No

B Ground Floor 4 No

C Podium Level 6 No

D Terrace Level 2 No

E Typical Floors 48 No

Ceiling recessed lighting fitting, for lobbies, IP 20, with


9W LED light

F Basement 11 No

G Ground Floor 4 No

H Podium Level 9 No

J Terrace Level 2 No

K Typical Floors 46 No

L Roof Floor 1 No

TO COLLECTION QR

2/9/48
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Emergency lighting installation (Cont'd)

Fittings and accessories (Cont'd)

Following luminaries from approved manufacturer as


specified, fixed complete with bulbs, fluorescent tubes,
diffusers, holders, ceiling rose, supports, bases and
transformers including final connection as specified.
(Cont'd)

Ceiling mounted lighting fitting, for storages, IP 40, with


18W LED light

A Ground Floor 2 No

B Podium Level 3 No

C Terrace Level 1 No

D Typical Floors 23 No

E Roof Floor 1 No

Ceiling recessed lighting profile for main reception lobby


with 20W/M , 2744 LM/M LED profile

F Terrace Level 1 No

Ceiling recessed lighting profile for lift lobbies with 7W/M


, 985 LM/M LED profile

G Ground Floor 1 No

H Podium Level 3 No

J Terrace Level 1 No

K Typical Floors 22 No

TO COLLECTION QR

2/9/49
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Emergency lighting installation (Cont'd)

Fittings and accessories (Cont'd)

Following luminaries from approved manufacturer as


specified, fixed complete with bulbs, fluorescent tubes,
diffusers, holders, ceiling rose, supports, bases and
transformers including final connection as specified.
(Cont'd)

Ceiling recessed lighting fitting, IP20, with 27W LED


lamp and parabolic diffuser, for offices

A Ground Floor 4 No

Wall mounted lighting fitting for parking and technical


areas, IP 66, with 34W LED light

B Basement 2 No

Ceiling recessed lighting fitting, for showers, IP 66, with


13W LED light

C Basement 4 No

Maintained wall mounted "exit" fitting IP 41 (IK 08), with


3x1.1W High power LED 50000 HRS

D Basement 38 No

E Ground Floor 8 No

F Podium Level 28 No

G Terrace Level 5 No

H Typical Floors 115 No

J Roof Floor 9 No

TO COLLECTION QR

2/9/50
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Emergency lighting installation (Cont'd)

Fittings and accessories (Cont'd)

Following luminaries from approved manufacturer as


specified, fixed complete with bulbs, fluorescent tubes,
diffusers, holders, ceiling rose, supports, bases and
transformers including final connection as specified.
(Cont'd)

Double sided maintained emergency ceiling mounted


"exit" fitting with right/left sign, IP 41 (IK 08), with
4x1.1W High power LED 50000 HRS

A Basement 63 No

B Ground Floor 2 No

C Podium Level 15 No

D Terrace Level 2 No

E Typical Floors 46 No

F Roof Floor 1 No

TO COLLECTION QR

2/9/51
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Emergency lighting installation (Cont’d)

Lighting accessories including necessary cables, wiring


and conduits with approved fascia plate fixed complete
as specified including final connection.

Push button for lighting 6A 250V

A Basement 26 No

B Ground Floor 8 No

C Podium Level 18 No

D Terrace Level 5 No

E Typical Floors 92 No

F Roof Floor 4 No

TO COLLECTION QR

2/9/52
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Emergency lighting installation (Cont'd)

Equipment and Control gear

Emergency Central Battery System

Central Battery System Panel including intelligent


substation panels, display panels, battery rack, local area
power supply units and other integral items, power
cables, ducts, conduits, trunking or trays from an
approved manufacturer and including final connection as
specified in drawings and specifications.

A 30kW Central Battery 1 No

B Secondary Distribution Board, Ref. CBS/B1 1 No

C Secondary Distribution Board, Ref. CBS/P2 1 No

D Secondary Distribution Board, Ref. CBS/8 1 No

E Secondary Distribution Board, Ref. CBS/16 1 No

F Secondary Distribution Board, Ref. CBS/24 1 No

G Allow connection and interface with other systems as


specified Item

TO COLLECTION QR

2/9/53
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation

Final sub circuits

Approved type cables and wiring drawn into concealed


conduits as specified.

13A 250V 3PIN wall mounted B.S duplex switched


socket outlet point for non decorative areas

A Ground Floor ( for UPS) 8 No

B Ground Floor 1 No

13A 250V 3PIN wall mounted B.S switched socket


outlet point for non decorative areas

C Ground Floor 21 No

D Podium Level 6 No

E Terrace Level 2 No

F Typical Floors 46 No

G Roof Floor 2 No

13A 250V 3PIN wall mounted B.S switched socket


outlet point

H Basement 15 No

J Ground Floor 3 No

K Podium Level 9 No

L Terrace Level 3 No

M Typical Floors 69 No

TO COLLECTION QR

2/9/54
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Final sub circuits (Cont’d)

Approved type cables and wiring drawn into concealed


conduits as specified. (Cont’d)

13A 250V 3PIN wall mounted B.S weatherproof


switched socket outlet point

A Basement 1 No

13A 250V 3PIN wall mounted B.S weatherproof


switched socket outlet point for non decorative areas

B Basement 239 No

C Ground Floor 2 No

D Podium Level 56 No

E Terrace Level 3 No

F Typical Floors 46 No

G Roof Floor 13 No

15A 250V 3PIN wall mounted B.S power


switched socket outlet point for non decorative areas

H Podium Level 6 No

J Terrace Level 2 No

K Typical Floors 46 No

TO COLLECTION QR

2/9/55
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Final sub circuits (Cont’d)

Approved type cables and wiring drawn into concealed


conduits as specified. (Cont’d)

20A 250V 3PIN wall mounted B.S socket outlet point


for plug in battery charger for cars

A Basement 41 No

B Podium Level 18 No

Outlet box point for Solenoid Valve

C Roof Floor 2 No

Outlet box point for Gas Detector Panel

D Podium Level 3 No

E Terrace Level 1 No

F Typical Floors 23 No

Waterproof outlet box IP55 point, for motors, Special


lighting

G Basement 18 No

H Ground Floor 5 No

J Roof Floor 2 No

Outlet box point for motorized damper

K Roof Floor 2 No

TO COLLECTION QR

2/9/56
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Final sub circuits (Cont’d)

Approved type cables and wiring drawn into concealed


conduits as specified. (Cont’d)

Outlet box point for 3 way valve

A Basement 17 No

B Ground Floor 8 No

C Podium Level 3 No

D Terrace Level 1 No

E Typical Floors 23 No

F Roof Floor 1 No

Outlet box point for Door Controller

G Podium Level 6 No

H Terrace Level 2 No

J Typical Floors 46 No

K Roof Floor 3 No

TO COLLECTION QR

2/9/57
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Final sub circuits (Cont’d)

Approved type cables and wiring drawn into concealed


conduits as specified. (Cont’d)

Outlet box point for A/C unit, fans, special lighting

A Basement 38 No

B Ground Floor 14 No

C Podium Level 1 No

D Typical Floors 47 No

E Roof Floor 3 No

TO COLLECTION QR

2/9/58
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Final sub circuits (Cont’d)

Approved type cables and wiring drawn into concealed


conduits as specified. (Cont’d)

20A, 3P waterproof disconnect switch with robust


thermoplastic enclousure point.

A Basement 4 No

B Roof Floor 1 No

20A, 2P waterproof disconnect switch with robust


thermoplastic enclousure point.

C Basement 16 No

D Ground Floor 2 No

E Podium Level 6 No

F Terrace Level 2 No

G Typical Floors 46 No

H Roof Floor 1 No

TO COLLECTION QR

2/9/59
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Final sub circuits (Cont’d)

Approved type cables and wiring drawn into concealed


conduits as specified. (Cont’d)

20A, 2P disconnect switch point

A Ground Floor 7 No

B Podium Level 3 No

C Terrace Level 1 No

D Typical Floors 23 No

10A, 2P waterproof disconnect switch with robust


thermoplastic enclousure point.

E Basement 3 No

TO COLLECTION QR

2/9/60
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Fittings and accessories

Following fittings and accessories from approved


manufacturer fixed complete as specified including final
connection

13A 250V 3PIN wall mounted B.S duplex switched


socket outlet for non decorative areas

A Ground Floor ( for UPS) 8 No

B Ground Floor 1 No

13A 250V 3PIN wall mounted B.S switched socket


outlet for non decorative areas

C Ground Floor 21 No

D Podium Level 6 No

E Terrace Level 2 No

F Typical Floors 46 No

G Roof Floor 2 No

13A 250V 3PIN wall mounted B.S switched socket


outlet

H Basement 15 No

J Ground Floor 3 No

K Podium Level 9 No

L Terrace Level 3 No

M Typical Floors 69 No

TO COLLECTION QR

2/9/61
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Fittings and accessories (Cont’d)

Following fittings and accessories from approved


manufacturer fixed complete as specified including final
connection (Cont’d)

13A 250V 3PIN wall mounted B.S weatherproof


switched socket outlet

A Basement 1 No

13A 250V 3PIN wall mounted B.S weatherproof


switched socket outlet for non decorative areas

B Basement 239 No

C Ground Floor 2 No

D Podium Level 56 No

E Terrace Level 3 No

F Typical Floors 46 No

G Roof Floor 13 No

15A 250V 3PIN wall mounted B.S power


switched socket outlet for non decorative areas

H Podium Level 6 No

J Terrace Level 2 No

K Typical Floors 46 No

TO COLLECTION QR

2/9/62
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Fittings and accessories (Cont’d)

Following fittings and accessories from approved


manufacturer fixed complete as specified including final
connection (Cont’d)

20A 250V 3PIN wall mounted B.S socket outlet for


plug in battery charger for cars

A Basement 41 No

B Podium Level 18 No

Outlet box for Solenoid Valve

C Roof Floor 2 No

Outlet box for Gas Detector Panel

D Podium Level 3 No

E Terrace Level 1 No

F Typical Floors 23 No

Waterproof outlet box IP55, for motors, Special lighting

G Basement 18 No

H Ground Floor 5 No

J Roof Floor 2 No

Outlet box for motorized damper

K Roof Floor 2 No

TO COLLECTION QR

2/9/63
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Fittings and accessories (Cont’d)

Following fittings and accessories from approved


manufacturer fixed complete as specified including final
connection (Cont’d)

Outlet box for 3 way valve

A Basement 17 No

B Ground Floor 8 No

C Podium Level 3 No

D Terrace Level 1 No

E Typical Floors 23 No

F Roof Floor 1 No

Outlet box for Door Controller

G Podium Level 6 No

H Terrace Level 2 No

J Typical Floors 46 No

K Roof Floor 3 No

TO COLLECTION QR

2/9/64
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Fittings and accessories (Cont’d)

Following fittings and accessories from approved


manufacturer fixed complete as specified including final
connection (Cont’d)

Outlet box for A/C unit, fans, special lighting

A Basement 38 No

B Ground Floor 14 No

C Podium Level 1 No

D Typical Floors 47 No

E Roof Floor 3 No

TO COLLECTION QR

2/9/65
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Fittings and accessories (Cont’d)

Following fittings and accessories from approved


manufacturer fixed complete as specified including final
connection (Cont’d)

20A, 3P waterproof disconnect switch with robust


thermoplastic enclousure.

A Basement 4 No

B Roof Floor 1 No

20A, 2P waterproof disconnect switch with robust


thermoplastic enclousure.

C Basement 16 No

D Ground Floor 2 No

E Podium Level 6 No

F Terrace Level 2 No

G Typical Floors 46 No

H Roof Floor 1 No

TO COLLECTION QR

2/9/66
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Small power installation (Cont’d)

Fittings and accessories (Cont’d)

Following fittings and accessories from approved


manufacturer fixed complete as specified including final
connection (Cont’d)

20A, 2P disconnect switch

A Ground Floor 7 No

B Podium Level 3 No

C Terrace Level 1 No

D Typical Floors 23 No

10A, 2P waterproof disconnect switch with robust


thermoplastic enclousure.

E Basement 3 No

TO COLLECTION QR

2/9/67
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System

Telephone / Data Systems

Telephone Systems

Approved type cables drawn in concealed PVC


conduits and GI trunkings as per the drawings
and specifications to:

Wall mounted non decorative 4 pairs CAT6A F/UTP


telecom outlet dedicated for telephone (RJ45) points

A Basement floors 11 No

B Ground floor 7 No

C Podium floors 6 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 6 No

Data outlet Systems

Approved type cables drawn in concealed PVC


conduits and GI trunkings as per the drawings
and specifications to:

Wall mounted non decorative 4 pairs CAT6A F/UTP


telecom outlet dedicated for data (RJ45) point

G Basement floors 11 No

H Ground floor 3 No

J Podium floors 6 No

TO COLLECTION QR

2/9/68
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont’d)

Data outlet Systems (Cont’d)

Approved type cables drawn in concealed PVC


conduits and GI trunkings (Cont’d)

Wall mounted non decorative 4 pairs CAT6A F/UTP


telecom outlet dedicated for data (RJ45) point (Cont'd)

A Terrace floor 2 No

B Typical floors 46 No

C Roof floor 6 No

Two wall mounted 4 pairs CAT6 F/UTP telecom outlet


(RJ45), dedicated for data point

D Ground floor 8 No

Floor distribution box (FDB) point

E Basement floors 1 No

F Ground floor 1 No

G Podium floors 3 No

H Terrace floor 1 No

J Typical floors 23 No

Building distribution box (BDB) point

K Basement floors 1 No

TO COLLECTION QR

2/9/69
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont’d)

Telephone / Data Systems (Cont’d)

Fiber termination box (FTB) point

A Ground floor 1 No

B Podium floors 6 No

C Terrace floor 4 No

D Typical floors 92 No

Fittings and Accessories as specified

Wall mounted non decorative 4 pairs CAT6A F/UTP


telecom outlet dedicated for telephone (RJ45)

E Basement floors 11 No

F Ground floor 7 No

G Podium floors 6 No

H Terrace floor 2 No

J Typical floors 46 No

K Roof floor 6 No

TO COLLECTION QR

2/9/70
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont’d)

Telephone / Data Systems (Cont’d)

Fittings and Accessories as specified (Cont’d)

Data outlet Systems

Approved type cables drawn in concealed PVC


conduits and GI trunkings as per the drawings
and specifications to:

Wall mounted non decorative 4 pairs CAT6A F/UTP


telecom outlet dedicated for data (RJ45)

A Basement floors 11 No

B Ground floor 3 No

C Podium floors 6 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 6 No

Two wall mounted 4 pairs CAT6 F/UTP telecom outlet


(RJ45), dedicated for data

G Ground floor 8 No

TO COLLECTION QR

2/9/71
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont’d)

Telephone / Data Systems (Cont’d)

Fittings and Accessories as specified (Cont’d)

Floor distribution box (FDB)

A Basement floors 1 No

B Ground floor 1 No

C Podium floors 3 No

D Terrace floor 1 No

E Typical floors 23 No

Building distribution box (BDB)

F Basement floors 1 No

Fiber termination box (FTB)

G Ground floor 1 No

H Podium floors 6 No

J Terrace floor 4 No

K Typical floors 92 No

TO COLLECTION QR

2/9/72
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

Telephone / Data Systems (Cont'd)

Equipment and Control gear

Telecom cabinet (TC)

A Basement floors 4 No

B Ground floor 1 No

C Podium floors 1 No

D Typical floors 5 No

E Allow for telephone and data control systems complete


with main distribution frame, main fibre optic cables,
conduits & IT racks, MDC,all integral batteries, charger,
IDF racks, control panels, network switches,
management server and other accessories as specified. Item

F Allow for interface with other systems Item

G Allow for service provider coordination or connection. Item

TO COLLECTION QR

2/9/73
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

CCTV Security System

Approved type cables drawn in concealed PVC


conduits and GI trunkings as per the drawings
and specifications

Wall mounted 2 megapixel high resolution color


day/night dome IP camera with auto iris and varifocal
lens, internal housing and infrared illuminator with PoE
point

A Basement floors 4 No

B Ground floor 8 No

C Roof floor 2 No

Wall mounted 2 megapixel high resolution color


day/night dome IP PTZ camera with auto iris and
varifocal lense, internal housing and infrared illuminator
with PoE point

D Basement floors 3 No

E Ground floor 7 No

Wall mounted 2 megapixel high resolution color


day/night dome IP camera for licence plate recognition
with auto iris and varifocal lens, internal housing and
infrared illuminator with PoE point

F Ground floor 4 No

TO COLLECTION QR

2/9/74
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

CCTV Security System (Cont'd)

Approved type cables drawn in concealed PVC


conduits and GI trunkings (Cont'd)

Wall mounted 2 megapixel high resolution color


day/night dome IP camera for face recognition with auto
iris and varifocal lens, internal housing and infrared
illuminator with PoE point

A Ground floor 1 No

2 megapixel high resolution color day/night dome IP


camera with auto iris and varifocal lense, internal housing
and infrared illuminator with PoE point

B Basement floors 43 No

C Ground floor 15 No

D Podium floors 31 No

E Terrace floor 7 No

F Typical floors 184 No

G Roof floor 7 No

H For Lift 10 No

TO COLLECTION QR

2/9/75
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

CCTV Security System (Cont'd)

Approved type cables drawn in concealed PVC


conduits and GI trunkings (Cont'd)

Pendant 2 megapixel high resolution color day/night


dome IP camera with auto iris and varifocal lense,
internal housing and infrared illuminator with PoE point

A Basement floors 85 No

B Podium floors 30 No

Pendant 2 megapixel high resolution color day/night


dome IP PTZ camera with auto iris and varifocal lense,
internal housing and infrared illuminator with PoE point

C Basement floors 24 No

D Podium floors 13 No

Ceiling mounted 2 megapixel high resolution color


day/night dome IP camera for face recognition with auto
iris and varifocal lense, internal housing and infrared
illuminator with PoE point

E Ground floor 2 No

TO COLLECTION QR

2/9/76
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

CCTV Security System (Cont'd)

Fittings and accessories as specified including


final connections

Wall mounted 2 megapixel high resolution color


day/night dome IP camera with auto iris and varifocal
lens, internal housing and infrared illuminator with PoE

A Basement floors 4 No

B Ground floor 8 No

C Roof floor 2 No

Wall mounted 2 megapixel high resolution color


day/night dome IP PTZ camera with auto iris and
varifocal lense, internal housing and infrared illuminator
with PoE

D Basement floors 3 No

E Ground floor 7 No

Wall mounted 2 megapixel high resolution color


day/night dome IP camera for licence plate recognition
with auto iris and varifocal lens, internal housing and
infrared illuminator with PoE

F Ground floor 4 No

TO COLLECTION QR

2/9/77
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

CCTV Security System (Cont'd)

Fittings and accessories as specified including


final connections (Cont'd)

Wall mounted 2 megapixel high resolution color


day/night dome IP camera for face recognition with auto
iris and varifocal lens, internal housing and infrared
illuminator with PoE

A Ground floor 1 No

2 megapixel high resolution color day/night dome IP


camera with auto iris and varifocal lense, internal housing
and infrared illuminator with PoE

B Basement floors 43 No

C Ground floor 15 No

D Podium floors 31 No

E Terrace floor 7 No

F Typical floors 184 No

G Roof floor 7 No

H For Lift 10 No

TO COLLECTION QR

2/9/78
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

CCTV Security System (Cont'd)

Fittings and accessories as specified including


final connections (Cont'd)

Pendant 2 megapixel high resolution color day/night


dome IP camera with auto iris and varifocal lense,
internal housing and infrared illuminator with PoE

A Basement floors 85 No

B Podium floors 30 No

Pendant 2 megapixel high resolution color day/night


dome IP PTZ camera with auto iris and varifocal lense,
internal housing and infrared illuminator with PoE

C Basement floors 24 No

D Podium floors 13 No

Ceiling mounted 2 megapixel high resolution color


day/night dome IP camera for face recognition with auto
iris and varifocal lense, internal housing and infrared
illuminator with PoE

E Ground floor 2 No

TO COLLECTION QR

2/9/79
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

CCTV Security System (Cont'd)

Equipment and control gear

Equipment including wires , conduits, cables,


cable trays, trunkings, and all necessary fixing
and connections as specified.

A CCTV control system including CCTV control


rack, CCTV data storage rack, access control and
monitoring equipment interface unit, monitoring
stations including relevant equipment, IP
network (security server/video matrix/NVR ,
UPS, LCD monitors, mics Keypad etc.,) Item

B Allow connection and interface with other


systems as specified Item

TO COLLECTION QR

2/9/80
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

Access Control System

Approved type cables drawn in concealed PVC


conduits and other accessories as as per the drawings
and specifications

On-line door proximity card reader point

A Basement floors 22 No

B Ground floor 10 No

C Podium floors 6 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 4 No

Vandal-proof request to exit egress button including


manual release device to unlock. the door in case of fire
in the room from the facp or fsp as applicable point

G Basement floors 22 No

H Ground floor 6 No

J Podium floors 6 No

K Terrace floor 2 No

L Typical floors 46 No

M Roof floor 4 No

TO COLLECTION QR

2/9/81
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

Access Control System (Cont'd)

Approved type cables drawn in concealed PVC


conduits and other (Cont'd)

1-Door IP door controller point

A Basement floors 22 No

B Ground floor 10 No

C Podium floors 6 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 4 No

Door contact point

G Basement floors 22 No

H Ground floor 6 No

J Podium floors 6 No

K Terrace floor 2 No

L Typical floors 46 No

M Roof floor 4 No

TO COLLECTION QR

2/9/82
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

Access Control System (Cont'd)

Approved type cables drawn in concealed PVC


conduits and other (Cont'd)

Monitored electric door lock point

A Basement floors 22 No

B Ground floor 6 No

C Podium floors 6 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 4 No

TO COLLECTION QR

2/9/83
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

Access Control System

Fittings and accessories as specified including


final connections

On-line door proximity card reader

A Basement floors 22 No

B Ground floor 10 No

C Podium floors 6 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 4 No

Vandal-proof request to exit egress button including


manual release device to unlock. the door in case of fire
in the room from the facp or fsp as applicable

G Basement floors 22 No

H Ground floor 6 No

J Podium floors 6 No

K Terrace floor 2 No

L Typical floors 46 No

M Roof floor 4 No

TO COLLECTION QR

2/9/84
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

Access Control System (Cont'd)

Fittings and accessories as specified including


final connections (Cont'd)

1-Door IP door controller

A Basement floors 22 No

B Ground floor 10 No

C Podium floors 6 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 4 No

Door contact

G Basement floors 22 No

H Ground floor 6 No

J Podium floors 6 No

K Terrace floor 2 No

L Typical floors 46 No

M Roof floor 4 No

TO COLLECTION QR

2/9/85
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

Access Control System (Cont'd)

Fittings and accessories as specified including


final connections (Cont'd)

Monitored electric door lock

A Basement floors 22 No

B Ground floor 6 No

C Podium floors 6 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 4 No

TO COLLECTION QR

2/9/86
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Low Current System (Cont'd)

Access Control System (Cont'd)

Equipment and control gear

Equipment including wires , conduits, cables,


cable trays, trunkings, and all necessary fixing
and connections as specified.

A Access control system including monitoring equipment


interface unit, monitoring station including relevant
equipment, IP network UPS, Keypad etc.,) Item

B Allow connection and interface with other systems as


specified Item

TO COLLECTION QR

2/9/87
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System

Approved fire resisting cables drawn in


concealed PVC conduits or GI trunkings as
specified including glands and termination

Addressable optical smoke detector point

A Basement floors 92 No

B Ground floor 24 No

C Podium floors 51 No

D Terrace floor 12 No

E Typical floors 276 No

F Roof floor 16 No

Fixed heat detector point

G Basement floors 1 No

H Ground floor 1 No

J Podium floors 3 No

K Terrace floor 1 No

L Typical floors 23 No

M Roof floor 1 No

TO COLLECTION QR

2/9/88
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System (Cont’d)

Approved fire resisting cables drawn in


concealed PVC conduits or trunkings (Cont'd)

Beam detector/Transmitter for fire alarm system point

A Terrace floor 1 No

Beam detector/Receiver for fire alarm system point

B Terrace floor 1 No

Heat rate of rise detector point

C Basement Floor 407 No

D Podium Floor 79 No

Infrared flame detector point

E Basement Floor 1 No

Wall mounted cabinet loudspeaker with 4 watt rated


power tapped at 1 watts point

F Basement floors 13 No

G Ground floor 6 No

H Podium floors 9 No

J Terrace floor 2 No

K Typical floors 46 No

L Roof floor 2 No

TO COLLECTION QR

2/9/89
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System (Cont’d)

Approved fire resisting cables drawn in


concealed PVC conduits or trunkings (Cont'd)

Wall mounted re-entrant loudspeaker with 15 watts rated


power tapped at 4 watts point

A Basement floors 231 No

B Podium floors 39 No

Addressable fire alarm sounder with integrated strobe


light point

C Basement floor 8 No

D Roof floor 6 No

Addressable fire alarm sounder point

E Basement floor 11 No

F Ground floor 2 No

G Podium 3 No

H Roof floor 1 No

TO COLLECTION QR

2/9/90
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System (Cont’d)

Approved fire resisting cables drawn in


concealed PVC conduits or trunkings (Cont'd)

Strobe light point

A Basement floors 54 No

B Ground floor 2 No

C Podium floors 12 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 2 No

Break glass for fire detection system point

G Basement floors 49 No

H Ground floor 2 No

J Podium floors 12 No

K Terrace floor 2 No

L Typical floors 46 No

M Roof floor 2 No

TO COLLECTION QR

2/9/91
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System (Cont’d)

Approved fire resisting cables drawn in


concealed PVC conduits or trunkings (Cont'd)

Fire fighter telephone point

A Basement floors 18 No

B Ground floor 4 No

C Podium floors 9 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 2 No

Fire consumer box point

G Ground floor 1 No

H Podium floors 6 No

J Terrace floor 1 No

K Typical floors 92 No

TO COLLECTION QR

2/9/92
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System (Cont’d)

Fittings and Accessories

Fittings and accessories as specified including


final connections

Addressable Optical Smoke Detector

A Basement floors 92 No

B Ground floor 24 No

C Podium floors 51 No

D Terrace floor 12 No

E Typical floors 276 No

F Roof floor 16 No

Fixed heat detector

G Basement floors 1 No

H Ground floor 1 No

J Podium floors 3 No

K Terrace floor 1 No

L Typical floors 23 No

M Roof floor 1 No

TO COLLECTION QR

2/9/93
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System (Cont’d)

Fittings and Accessories (Cont’d)

Fittings and accessories as specified including


final connections (Cont'd)

Beam detector/Transmitter for fire alarm system

A Terrace floor 1 No

Beam detector/Receiver for fire alarm system

B Terrace floor 1 No

Heat rate of rise detector

C Basement Floor 407 No

D Podium Floor 79 No

Infrared flame detector

E Basement Floor 1 No

TO COLLECTION QR

2/9/94
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System (Cont’d)

Fittings and Accessories (Cont’d)

Fittings and accessories as specified including


final connections (Cont'd)

wall mounted cabinet loudspeaker with 4 watt rated


power tapped at 1 watts

A Basement floors 13 No

B Ground floor 6 No

C Podium floors 9 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 2 No

Wall mounted re-entrant loudspeaker with 15 watts rated


power tapped at 4 watts

G Basement floors 231 No

H Podium floors 39 No

Addressable fire alarm sounder with integrated strobe


light

J Basement floor 8 No

K Roof floor 6 No

TO COLLECTION QR

2/9/95
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System (Cont’d)

Fittings and Accessories (Cont’d)

Fittings and accessories as specified including


final connections (Cont'd)

Addressable fire alarm sounder

A Basement floor 11 No

B Ground floor 2 No

C Podium 3 No

D Roof floor 1 No

Strobe light

E Basement floors 54 No

F Ground floor 2 No

G Podium floors 12 No

H Terrace floor 2 No

J Typical floors 46 No

K Roof floor 2 No

TO COLLECTION QR

2/9/96
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System (Cont’d)

Fittings and Accessories (Cont’d)

Fittings and accessories as specified including


final connections (Cont'd)

Break glass for fire detection system

A Basement floors 49 No

B Ground floor 2 No

C Podium floors 12 No

D Terrace floor 2 No

E Typical floors 46 No

F Roof floor 2 No

Fire fighter telephone

G Basement floors 18 No

H Ground floor 4 No

J Podium floors 9 No

K Terrace floor 2 No

L Typical floors 46 No

M Roof floor 2 No

TO COLLECTION QR

2/9/97
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System (Cont’d)

Fittings and Accessories (Cont’d)

Fittings and accessories as specified including


final connections (Cont'd)

Fire consumer box

A Ground floor 1 No

B Podium floors 6 No

C Terrace floor 1 No

D Typical floors 92 No

TO COLLECTION QR

2/9/98
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Fire Detection and Alarm System (Cont’d)

Equipment and Control gear

Equipment including all necessary accessories,


cables, ducts, conduits, trunking or trays and
final connections as specified.

Fire alarm control panels

A Fire alarm control panel with integral back-up battery,


battery charger, central processing, audio source unit, fire
fighter's telephone unit, amplifiers, remote microphone,
control panels and all accessories as specified including
final connection,Ref;FACP-1 Item

C Fire alarm control panel with integral back-up battery,


battery charger, central processing, audio source unit, fire
fighter's telephone unit, amplifiers, remote microphone,
control panels and all accessories as specified including
final connection,Ref;FACP-2 Item

D Allow for any other control panels and amplifiers


(FSCS,VE/AMP, Lift panel) required to complete fire Item
alarm system

E Allow connection and interface with civil


defence and MOI as specified. Item

F Allow connection and interface with other


systems as specified Item

TO COLLECTION QR

2/9/99
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Voice Evacuation System

Approved fire resisting cables drawn in


concealed PVC conduits or trunkings as
specified including glands and termination.

Ceiling mounted loudspeaker for voice evacuation with 6


watt rated power tapped at 1.5 watts point

A Basement floors 30 No

B Ground floor 7 No

C Podium floors 27 No

D Terrace floor 6 No

E Typical floors 138 No

F Roof floor 2 No

Ceiling recessed loudspeaker for voice evacuation with


6 watt rated power tapped at 1.5 watts point

G For Lift 10 No

TO COLLECTION QR

2/9/100
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Voice Evacuation System (Cont'd)

Fittings and accessories as specified including


final connections

Ceiling mounted loudspeaker for voice evacuation with 6


watt rated power tapped at 1.5 watts

A Basement floors 30 No

B Ground floor 7 No

C Podium floors 27 No

D Terrace floor 6 No

E Typical floors 138 No

F Roof floor 2 No

Ceiling recessed loudspeaker for voice evacuation with


6 watt rated power tapped at 1.5 watts

G For Lift 10 No

TO COLLECTION QR

2/9/101
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Voice Evacuation System (Cont'd)

Equipment and Control gear

Equipment including all necessary accessories,


cables, ducts, conduits, trunking or trays and
final connections as specified

A Voice evacuation panel integrated fire phone,


paging control with amplifier bank from an
approved manufacture fixed complete with all
integral battery, battery charger, and emergency
power supply connection as per the drawings
and specifications Item

B Voice evacuation distribution panels as specified. Item

C Allow connection and interface with other


systems as specified Item

TO COLLECTION QR

2/9/102
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Earthing & Lightning Protection Installation

Earthing Conductors (Cont'd)

Horizontal

A 120mm2 bare copper stranded conductor buried at


600mm below earth level, connected to concrete
reinforcement bars by exothermic welding and to relevant
Specification bonded and fixed as specified including all
accessories and fixings. 46 m

B 120mm2 bare copper stranded conductorin upvc conduit


schedule 80, to relevant Specification bonded and fixed
as specified including all accessories and fixings. 348 m

C 70mm2 bare copper stranded conductor at 600mm


below earth level in upvc conduit schedule 80 to relevant
Specification bonded and fixed as specified including all
accessories and fixings. 357 m

D 50mm2 bare copper stranded conductor buried at


600mm below earth level, connected to concrete
reinforcement bars by exothermic welding and to relevant
Specification bonded and fixed as specified including all
accessories and fixings. 402 m

E 25 x 3 mm Flat tape conductors to relevant


Specification bonded and fixed as specified including all
accessories and fixings. 1141 m

Vertical

F 25 x 3 mm Flat tape conductors to relevant


Specification bonded and fixed as specified including all
accessories and fixings. 136 m

G Allow for preparation of dedicated steel re-bar


with proper electrical continuity to suit the
requirements of lightning conducting all as
specified Item
TO COLLECTION QR

2/9/103
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Earthing & Lightning Protection Installation (Cont'd)

Earthing Conductors (Cont'd)

A Allow for necessary connection of copper conductor to


steel re-bar including U bolt rod clamp and other
accessories to suit the requirements of lightning
conducting all as specified in drawings and specification. Item

B Allow for necessary connection of ring flat tape


conductor on façade to steel re-bar including U bolt rod
clamp and other accessories to suit the requirements of
lightning conducting all as specified in drawings and
specification. Item

C Allow for necessary connection of steel re-bar to copper


cable with exothermic welding as specified in drawings
and specification. Item

TO COLLECTION QR

2/9/104
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Earthing & Lightning Protection Installation (Cont'd)

Earthing Conductors (Cont'd)

Earthing Cables

3No(1x240mm2) Cu/XLPE/SWA/LSF 0.6/1.0kV


cables drawn in trunking, trays/ducts as specified
including glands and termination

A Cable serving Main earthing busbar from Generator


earthing busbar 1 No

B Cable serving Main earthing busbar from Transformer


earthing busbar 1 No

2No (1x120mm2) Cu/XLPE/SWA/LSF 0.6/1.0kV


cables drawn in trunking, trays/ducts as specified
'including glands and termination

C Cable serving Secondary earthing busbar from Main


earthing busbar 1 No

(1x120mm2) Cu/XLPE/SWA/LSF 0.6/1.0kV cables


drawn in trunking, trays/ducts as specified 'including
glands and termination

D Cable serving Main earthing busbar from Ooredo


earthing busbar 1 No

95mm2 Cu/XLPE/SWA/LSF 0.6/1.0KV cables drawn


in trunking, trays/ducts as specified including glands and
termination

E Cable serving Earth pit from Earthing busbar in Ooredo


room 1 No

F Cable serving Earth pit from Earthing busbar in


Transformer room 1 No

TO COLLECTION QR
2/9/105
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Earthing & Lightning Protection Installation (Cont'd)

Earthing Conductors (Cont'd)

Accessories as specified

A Earth termination pit complete with Earth electrode, seal


cap, connection to conductors with clamps and other
accessories including necessary structural works as
specified. 28 No

B Test link in G.I box as specified 28 No

C 500mm high Air terminal as specified 15 No

D Concrete inspecction pits complete with Earth electrode,


cast iron cover, connection to conductors with clamps
and other accessories as specified in drawings and
specfication. 22 No

E Main earthing busbar 1 No

F Secondary earthing busbar 1 No

G Generator earthing busbar 1 No

H Transformer earthing busbar 1 No

J Oredo earthing busbar 1 No

K Allow for bonds to mechanical equipment / ducts and any


other metal work exposed upon roof top as specified Item

TO COLLECTION QR

2/9/106
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Cable tray

Hot dip galvanized perforated Cable tray from an


approved manufacturer fixed complete as per the
drawings and specifications including all brackets,
hangers, etc.

75x 50 mm wide Cable tray

A Basement 4 m

100x 50 mm wide Cable tray

B Basement 456 m

C Ground Floor 72 m

D Podium Level 63 m

E Terrace Floor 30 m

F Typical Floors 246 m

G Roof Floor 93 m

150 x 50 mm wide Cable tray

H Basement 57 m

200 x 50 mm wide Cable tray

J Basement 568 m

K Ground Floor 3 m

L Podium Level 137 m

M Terrace Floor 1 m

TO COLLECTION QR

2/9/107
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Cable tray

Hot dip galvanized perforated Cable tray from an


approved manufacturer fixed complete as per the
drawings and specifications including all brackets,
hangers, etc. (Cont'd)

200 x 50 mm wide Cable tray (Cont'd)

A Typical Floors 671 m

B Roof Floor 39 m

230 x 50 mm wide Cable tray

C Roof Floor 11 m

250 x 50 mm wide Cable tray

D Basement 10 m

300 x 50 mm wide Cable tray

E Basement 129 m

F Roof Floor 2 m

400 x 50 mm wide Cable tray

G Basement 236 m

H Roof Floor 6 m

500 x 50 mm wide Cable tray

J Basement 8 m

TO COLLECTION QR

2/9/108
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Cable tray (Cont’d)

Hot dip galvanized perforated Cable tray from an


approved manufacturer fixed complete as per the
drawings and specifications including all brackets,
hangers, etc.

600 x 50 mm wide Cable tray

A Basement 409 m

B Ground Floor 12 m

C Podium Level 23 m

D Terrace Floor 8 m

E Typical Floors 163 m

F Roof Floor 12 m

G 4x100mm dia PVC ducts to connection from Kahramaa


primary substation as per the dwg. no.E.PW-B1.204
including excavation, disposal, backfilling and
necessary bedding and surrounds etc. Item

H 4x150mm dia PVC ducts to connection from Kahramaa


primary substation as per the dwg. no.E.PW-B1.204
including excavation, disposal, backfilling and
necessary bedding and surrounds etc. Item

TO COLLECTION QR

2/9/109
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

ELV Cable tray

Hot dip galvanized non-perforated cable tray with


returned flange and cover for low current system cables
from an approved manufacturer fixed complete as per the
drawings and specifications including all brackets,
hangers, etc.

200 x 50 mm wide Cable tray

A Basement floors 68 m

B Podium floors 85 m

C Terrace floor 22 m

D Typical floors 834 m

200 x 100 mm wide Cable tray

E Ground floors 25 m

600 x 50 mm wide Cable tray

F Basement floors 53 m

G Ground floors 11 m

H Podium floors 23 m

J Terrace floor 8 m

K Typical floors 168 m

L Roof floor 8 m

TO COLLECTION QR

2/9/110
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Building Management System

A Furnish install and commission fully integrated building


management system for energy management, equipment
monitoring and control and sub systems with open
communication capabilities as specified Including all
system equipment, panels, conduits, cables, field devices
and all necessary accessories as specified Item

TO COLLECTION QR

2/9/111
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Connections

A Allow for necessary cordination and connection from


Kahramaa primary substation Item

B Allow for necessary cordination and connection from


Telecom Network Infrastructure Item

TO COLLECTION QR

2/9/112
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Builders work

A Allow for marking the position of holes,


mortises, chases and the like in the structure Item

B Allow for the provision of electrical trunking


and trays penetrations through concrete roof
slabs at all levels as required Item

C Allow for the provision of electrical trunking


and trays penetrations through concrete/ block
work walls at all levels as required Item

D Allow for providing and building in the pipe


sleeves in accordance with the drawings Item

E Allow for any other builders work not


specifically covered by above items Item

TO COLLECTION QR

2/9/113
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Sundries

A Allow for producing all working drawings for


the approval of the Engineer Item

B Allow for testing and commissioning the


installations on completion to the satisfaction of
the Engineer Item

C Allow for earthing and general earth bonding Item

D Allow for providing all spares and handing to


the Engineer all as specified Item

E Allow for providing all painting plates, disks,


labels etc. for the identification of plant,
equipment cables, switches and the like as
specified Item

F Allow for providing drawings showing the


installations “as fitted”. Item

G Allow for provision of operating and


maintenance manuals to the satisfaction of the
Engineer as specified Item

TO COLLECTION QR

2/9/114
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

Other Items

The Contractor shall describe and price below


the items necessary for the full and proper
completion of the work as described in the
specification or shown on the drawings and
for which either expressed or implied provision
is required and which are not covered by either
the items or the rates in the Bills of Quantities
of contract or by any other matter what so
ever. Anything not so separately described shall
be deemed to be covered in the items and rates
inserted in the Bills of Quantities.

(i)

(ii)

(iii)

( iv)

(v)

( vi)

(vii)

TO COLLECTION QR

2/9/115
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

COLLECTION

Page 2/9/1

Page 2/9/2

Page 2/9/3

Page 2/9/4

Page 2/9/5

Page 2/9/6

Page 2/9/7

Page 2/9/8

Page 2/9/9

Page 2/9/10

Page 2/9/11

Page 2/9/12

Page 2/9/13

Page 2/9/14

Page 2/9/15

Page 2/9/16

Page 2/9/17

Page 2/9/18

Page 2/9/19

COLLECTION CARRIED OVER QR

2/9/116
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

COLLECTION

COLLECTION BROUGHT FORWARD QR

Page 2/9/20

Page 2/9/21

Page 2/9/22

Page 2/9/23

Page 2/9/24

Page 2/9/25

Page 2/9/26

Page 2/9/27

Page 2/9/28

Page 2/9/29

Page 2/9/30

Page 2/9/31

Page 2/9/32

Page 2/9/33

Page 2/9/34

Page 2/9/35

Page 2/9/36

Page 2/9/37

COLLECTION CARRIED OVER QR

2/9/117
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

COLLECTION

COLLECTION BROUGHT FORWARD QR

Page 2/9/38

Page 2/9/39

Page 2/9/40

Page 2/9/41

Page 2/9/42

Page 2/9/43

Page 2/9/44

Page 2/9/45

Page 2/9/46

Page 2/9/47

Page 2/9/48

Page 2/9/49

Page 2/9/50

Page 2/9/51

Page 2/9/52

Page 2/9/53

Page 2/9/54

Page 2/9/55

COLLECTION CARRIED OVER QR

2/9/118
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

COLLECTION

COLLECTION BROUGHT FORWARD QR

Page 2/9/56

Page 2/9/57

Page 2/9/58

Page 2/9/59

Page 2/9/60

Page 2/9/61

Page 2/9/62

Page 2/9/63

Page 2/9/64

Page 2/9/65

Page 2/9/66

Page 2/9/67

Page 2/9/68

Page 2/9/69

Page 2/9/70

Page 2/9/71

Page 2/9/72

Page 2/9/73

COLLECTION CARRIED OVER QR

2/9/119
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

COLLECTION

COLLECTION BROUGHT FORWARD QR

Page 2/9/74

Page 2/9/75

Page 2/9/76

Page 2/9/77

Page 2/9/78

Page 2/9/79

Page 2/9/80

Page 2/9/81

Page 2/9/82

Page 2/9/83

Page 2/9/84

Page 2/9/85

Page 2/9/86

Page 2/9/87

Page 2/9/88

Page 2/9/89

Page 2/9/90

Page 2/9/91

COLLECTION CARRIED OVER QR

2/9/120
NISHAN TOWER - 4B+G+3P+24F BILL NO 2MAIN BUILDING

Rate Amount
Item Description Qty Unit
QR QR

ELECTRICAL INSTALLATION (Cont’d)

COLLECTION

COLLECTION BROUGHT FORWARD QR

Page 2/9/92

Page 2/9/93

Page 2/9/94

Page 2/9/95

Page 2/9/96

Page 2/9/97

Page 2/9/98

Page 2/9/99

Page 2/9/100

Page 2/9/101

Page 2/9/102

Page 2/9/103

Page 2/9/104

Page 2/9/105

Page 2/9/106

Page 2/9/107

Page 2/9/108

Page 2/9/109

COLLECTION CARRIED OVER QR

2/9/121