Client: Contractor: ITP Reference Number:

Project Title: Inspection and Test Plan for: Rev: 0

CONTRACT NO:
INTERNAL PLASTERING WORKS Date:
Location:
Legends: ITL= Independent Testing Laboratory, SUB-CON= Sub-Contractor, ITP= Inspection and Test Inspection Points: H= Hold Point, W= Witness Point, R= Review
Plan, CI= Comments Incorporated, IR-Inspection Request Point, S= Surveillance, A=Approval

Inspection Points
Item Inspection and Test Specification
Activity Description Frequency Acceptance Criteria OWNER/ENGINE Verifying Document / Report
No. Activity Reference SUB-CON CONTRACTOR ITL
ER

1 Method Statement
Approval of Method Prior to start Method Statement Comment
1.1 Verrify Approval Approval from NG - -- H -- R
Statement activity sheets
1.2 Test Reports Not Applicable Not Applicable Not Applicable - -- -- -- -- Not Applicable
2 Approval of Material
2.1 Cement Verrify Approval Before work Approval from NG ASTM C150 Type V -- H -- R Verify approved Submittal
Material Submittal form/
2.2 Embedding materials Verify the source and approval. Before work Approval from NG - -- H -- R
Comment sheet
2.3 Sand Visual inspection Before work Approval from NG ASTM C144 -- H S
2.4 Chemicals Verify Approval Before work Approval from NG -- S -- R Verify approved Submittal
3 Prior Activities
Drawings Submittal Form/
3.1 Approved Drawings Verify the Approval Approval from NG - -- H -- R
Comment sheet
3.2 Material Stacking Visual inspection Manufacturer recom -- S -- S

Identification, location and Before work Every existing service has to be correctly
3.4
protection of existing services
Verify location
located and protected prior to block work
Not Applicable -- H -- R Not Applicable

NOC from all concern MEP


3.5 Clearance Obtain clearance for Painting All concern agency to give Clearance on IR .. -- H -- A
agencies

Page 1
Client: Contractor: ITP Reference Number:

Project Title: Inspection and Test Plan for: Rev: 0

CONTRACT NO:
INTERNAL PLASTERING WORKS Date:
Location:
Legends: ITL= Independent Testing Laboratory, SUB-CON= Sub-Contractor, ITP= Inspection and Test Inspection Points: H= Hold Point, W= Witness Point, R= Review
Plan, CI= Comments Incorporated, IR-Inspection Request Point, S= Surveillance, A=Approval

Inspection Points
Item Inspection and Test Specification
Activity Description Frequency Acceptance Criteria OWNER/ENGINE Verifying Document / Report
No. Activity Reference SUB-CON CONTRACTOR ITL
ER

4 Main Activities
As per Contract Specification for Civil
4.1 Surface Preperation Visual Inspection After Work -- S -- S By NG Consultant
Construction Works.
Before & after As per Contract Specification for Civil
4.2 Embedding materials Verify the Approval As Per Approved Drawing -- S -- W By NG Consultant
Work Construction Works.
As per Contract Specification for Civil
4.3 Mortor Preperation Before Work ASTM C270 Type M -- S -- R By NG Consultant
Construction Works.
As per Contract Specification for Civil
4.4 Plastering After Work -- H -- A By NG Consultant
Construction Works.
Visual inspection
Before & after As per Contract Specification for Civil
Curing -- H -- S By NG Consultant
Work Construction Works.
Before & after As per Contract Specification for Civil
4.5 Disposal of waste S S -- S By NG Consultant
Work Construction Works.
ITP SIGN OFF – POST COMPLETION OF WORKS

FOR FOR FOR NG CONSULTANT

SIGN: SIGN: SIGN:

NAME: NAME: NAME:

DATE: DATE: DATE: