No Project Drawing No.

Title

1 S-UZA-E-AG-5001 500kV PEMALANG SWITCHGEAR METHOD OF WORK EXTERNAL ROAD CONSTRUCTIO

2 S-UZA-E-AG-5002 500kV PEMALANG SWITCHGEAR METHOD OF WORK FOR EARTHWORK HIGH EMBANK

3 S-UZA-E-AG-5003 500kV PEMALANG SWITCHGEAR METHOD OF WORK CONCRETE WORK

4 S-UZA-E-AG-6001 500kV PEMALANG SWITCHGEAR METHOD OF WORK CONCRETE WORK

5 S-UZA-E-AG-5004 500KV PEMALANG SWITCHGEAR METHOD OF WORK FOR PILING WORK


500 kV PEMALANG METHOD OF WORK FOR U-DITCH WORKS : FILLING GAP, SURFACE
6 S-UZA-E-AG-5005
SIDE SLOPE EMBANKMENT
7 S-UZA-E-AG-5006 500 kV PEMALANG METHOD OF WORK FOR CUTTING OFF PILE HEAD & PILE HEAD TR

8 S-UZA-E-AG-5020 500 kV PEMALANG METHOD OF WORK FOR FOUNDATION OF GANTRY AND APPARATU
500KV PEMALANG SWITCHGEAR METHOD OF WORK FOR CONTROL BUILDING: CONC
9 S-UZA-E-AG-5007
FOUNDATION
10 S-UZA-E-AG-5021 500KV PEMALANG SWITCHGEAR METHOD OF WORK FOR SWITCHYARD AREA : BOUN
500kV PEMALANG SWITCHGEAR METHOD OF WORK FOR SWITCHYARD AREA : EXCAV
11 S-UZA-E-AG-5022
FOUNDATION WORKS
500KV PEMALANG SWITCHGEAR METHOD OF WORK FOR SWITCHYARD AREA: FLEXIB
12 S-UZA-E-AG-5023
(SUBGRADE UP TO SUBBASE)
500KV PEMALANG SWITCHGEAR METHOD OF WORK FOR CONTROL BUILDING : CONC
13 S-UZA-E-AG-5008
STUMP COLUMN, TIE BEAM, AND SLAB
500KV PEMALANG SWITCHGEAR METHOD OF WORK FOR SWITCHYARD AREA : CABLE
14 S-UZA-E-AG-5024
CONSTRUCTION
15 S-UZA-E-AG-5025 500 kV PEMALANG METHOD OF WORK FOR CONCRETE CRACK REPAIR

16 S-UZA-E-AG-5026 500 kV PEMALANG METHOD OF WORK FOR CONCRETE HONEY COMB REPAIR

17 500 kV PEMALANG SWITCHGEAR METHOD OF WORK FOR CONCRETE HONEY COMB R


S‐UZA‐E‐AG‐5026
500 kV PEMALANG METHOD OF WORK FOR CONTROL BUILDING: Concrete Work For Bea
18 S-UZA-E-AG-5010
(Second Floor)
19 S-UZA-E-AG-5017 METHOD OF WORK FOR CONTROL BUILDING: A HALF BRICK WALL, PLASTERING and R
500 kV PEMALANG METHOD OF WORK FOR
20 S-UZA-E-AG-5101
GANTRY TOWER STEEL STRUCTURE BOTTOM PART INSTALLATION
500 kV PEMALANG METHOD OF WORK FOR SWITCHYARD AREA: FLEXIBLE PAVEMENT
21 S-UZA-E-AG-5027
SURFACE DRESSING)
22 S‐UZA‐E‐AG‐5028 500 kV PEMALANG METHOD OF WORK FOR SWITCHYARD AREA: RIGID PAVEMENT

23 S‐UZA‐E‐AG‐5011 500 kV PEMALANG METHOD OF WORK FOR SWITCHYARD AREA: ROOF WORK
500 kV PEMALANG SWITCHGEAR METHOD OF WORK FOR SWITCHYARD AREA: GROUN
24 S-UZA-E-AG-5029
INSTALLATION (EARTHING SYSTEM)
25 S-UZA-E-AG-5013 500 kV PEMALANG METHOD OF WORK FOR SWITCHYARD AREA: PAINTING WORK
26 S-UZA-E-AG-5014 500 kV PEMALANG METHOD OF WORK FOR SWITCHYARD AREA: CEILING WORK
500 kV PEMALANG METHOD OF WORK FOR GANTRY TOWER STEEL STRUCTURE MIDD
27 S‐UZA‐E‐AG‐5102
PART INSTALLATION
500 kV PEMALANG METHOD OF WORK FOR CONTROL BUILDING: PLAIN CONCRETE, F
28 S‐UZA‐E‐AG‐5018
AND EPOXY PAINT
500 kV PEMALANG METHOD OF WORK FOR SWITCHYARD AREA: UNDERGROUND DRA
29 S-UZA-E-AG-5032
ROAD
30 S-UZA-E-AG-5033 500 kV PEMALANG SWITCHGEAR METHOD OF WORK FOR SWITCHYARD AREA: GROUT

31 S-UZA-E-AG-5034 500 kV PEMALANG SWITCHGEAR METHOD OF WORK FOR CABLE TRENCH CONCRETE

32 S-ABA-E-AG-5001 METHOD OF WORK STRINGING CONDUCTOR

33 S-ABA-E-AG-5002 METHOD OF WORK HV APPARATUS INSTALLATION - CIRCUIT BREAKER (CB)


METHOD OF WORK
34 S-ABA-E-AG-5003
ADSS STRINGING WORK
35 S-ABA-E-AG-5004 METHOD OF WORK TEST AND COMMISSIONING 20 KV

36 S‐ABA‐E‐AG‐5035 METHOD OF WORK U - DITCH INSTALLATION


METHOD OF WORK
37 S-ABA-E-AG-5006
TELE-PROTECTION PANEL INSTALLATION AT REMOTE STATION
38 S-ABA-E-AG-5005 METHOD OF WORK OPTICAL BOOSTER/PREAMPLIFIER INSTALLATION

39 S-ABA-E-AG-5005A METHOD OF WORK OPTICAL BOOSTER/PREAMPLIFIER INSTALLATION AT MANDIRANC

40 S-ABA-E-AG-5006A METHOD OF WORK TELE - PROTECTION PANEL INSTALLATION AT MANDIRANCAN SIT


ITP Status
Master ITP Add. ITP
L ROAD CONSTRUCTION

HWORK HIGH EMBANKMENT

E WORK

E WORK

G WORK
ILLING GAP, SURFACE PATCHING AND

HEAD & PILE HEAD TREATMENT

ANTRY AND APPARATUS


ROL BUILDING: CONCRETE WORK FOR

CHYARD AREA : BOUNDARY FENCE


CHYARD AREA : EXCAVATION AND FILL ON

CHYARD AREA: FLEXIBLE PAVEMENT

ROL BUILDING : CONCRETE WORK FOR

CHYARD AREA : CABLE TRENCH

REPAIR

COMB REPAIR

CRETE HONEY COMB REPAIR


G: Concrete Work For Beam, Slab, and Column

ALL, PLASTERING and RENDERING

ION
: FLEXIBLE PAVEMENT (SUBBASE UP TO

: RIGID PAVEMENT

: ROOF WORK
CHYARD AREA: GROUNDING

: PAINTING WORK
: CEILING WORK
EEL STRUCTURE MIDDLE, TOP, & BEAM

G: PLAIN CONCRETE, FLOOR HARDENER,

: UNDERGROUND DRAINAGE & CROSSING

CHYARD AREA: GROUTING WORK

E TRENCH CONCRETE REPAIR

REAKER (CB)

LATION

LATION AT MANDIRANCAN SITE

AT MANDIRANCAN SITE