LEGEND CLASSIFICATION :
Notification
H – Hold Point : As Notification point, however work may not proceed beyond this point without acceptance or formal waiver from Inspection
Authority ( Client / Owner ).
A1 – 100% Inspection or Test : Execution or Inspection by GKE
A2 – Random Inspection : Inspection by GKE at random sample ( 20 % )
W – Witness : Witness or Inspection by Client/Owner and Sub-Contractor may proceed if Client/Owner not appearance at the pointed time
Witness point shall be given by notification
SW – Spot Witness : Witness of Inspection by Client / Owner and to be done at spot or random ( Random sample )
R – Review : Review of Certificate / Document to ensure compliance with specification
A – Approval : Approval documentation ( Procedure, Work Instruction, Inspection report, etc )
ABBREVIATIONS :
AWS = American Welding Society PWHT = Post Weld Heat Treatment ASME = American Society Mechanical Engineers
CSA = Canadian Standard Association TP = Inspection Test Plan ASNT = American Society Non Destructive Testing
WPS = Welding Procedure Specification Tech.Spec. = Technical Specification STM = American Society Testing of Material
PQR = Procedure Quality Report N/A = Not Applicable API = American Petroleum Institute
NDE = Non Destructive Examination WQTR = Welder Qualification Test Record
NOTES :
1. Ref. Inspection Activities & Approval Section of Document
a. Where there is a Subcontractor element, the Subcontractor involved will sign the approval of the activity ( NDE / PWHT )
b. Where there is no Subcontractor element, GKE will sign approval of activity and present to the Client.
c. This Inspection test Plan at INSPECTION ACTIVITY COOLUM should be understood to all concerns person will be in charge of tank work.
411329398.doc Page 1 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
Description :
INSTALLATION OF BOILER
LEVEL OF INSPECTION
REFERENCE VERIFYING ACCEPTANCE
No. ITEM ACTIVITIES
DOCUMENT DOCUMENT CRITERIA
GKE ADHI PLN
411329398.doc Page 2 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
d. Welding Control
d.1. Welding Procedure
QA Manual /
d.1.1. Check compliance with specification, Approved WPS &
Contract Doc. R R R/A
generate new WPS and qualify PQR if required PQR
ASME IX
411329398.doc Page 3 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
e. NDE Control
e.1. NDE Procedure Approved NDE
e.1.1. Check compliance with specification of QA Manual / Procedure R R R/A
the codes Contract Doc.
NDE Operator R R R/A
e.2. NDE Operators Qualification
e.2.1. Check compliance with specification and certificate
ASME I / ASME V /
validity Calibration R R R/A
e.3. Equipment Calibration Certificates ASNT-TC-1A Certificates
e.3.1. Check compliance with specification and
validity
g. Testing Control
Hydrostatic / Pneumatic / Service Test Procedure QA Manual / Approved Testing R R R/A
g.1. Check compliance with specification, generate new Contract Doc. Proc.
Procedure if required ASME I
411329398.doc Page 4 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
Material Receiving,
b. Check mill certificate against material received
Handling Mill Certificate A1 A1 SW
And Storage Proc.
c. Material without mill certificate or without any correlation Material Receiving, Material Receiving
between mill certificate and material shall be considered Handling Non Conformance A1 A2 SW
irrelevant material than report to Client And Storage Proc. report
4.0 INSTALLATION
a. Doing Marking on several location
a.1. Center line of furnace on upper side of the primary Inspection Report A1 A1 SW
support beams and on the bottom floor Tech. Spec /
a.2. Furnace elevation to every four main columns at Drawing None A1 A2 SW
every stages
a.3. Drum Center Line on upper side on the primary None A1 A1 W
Support beam
411329398.doc Page 5 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
b. Lifting of Economizer
Check the distance between components and distance from Tech. Spec /
Inspection Report A1 A1 SW
the center of furnace Drawing
e. Suspension Rod
e.1. Preassemble on the ground, check the right position Tech. Spec /
of the rod. None A1 A2 SW
Drawing
Ensure the safety and lock the nuts well.
e.2. Lifting of tertiary beams together with the rod to the Tech. Spec /
right position None A1 A2 SW
Drawing
e.3. Locate beams and rods to right position according to Tech. Spec / None A1 A2 SW
center lines of furnace and boiler Drawing
411329398.doc Page 6 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
e.4. Tertiary beam shall be tack welded temporary to right Tech. Spec /
position None A1 A2 SW
Drawing
LEVEL OF INSPECTION
REFERENCE VERIFYING ACCEPTANCE
No. ITEM ACTIVITIES
DOCUMENT DOCUMENT CRITERIA
GKE ADHI PLN
g. Lifting of long buck stay to the platform before the tertiary Tech. Spec /
None A1 A2 SW
beam of the frame will be assembly Drawing
411329398.doc Page 7 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
j. Lifting of Super heater primary & tertiary after lifting of Tech. Spec / None
economizer 1 & 2 element will be erected from top by crane Drawing A1 A2 SW
LEVEL OF INSPECTION
REFERENCE VERIFYING ACCEPTANCE
No. ITEM ACTIVITIES
DOCUMENT DOCUMENT CRITERIA
GKE ADHI PLN
m. Distance check between upper header of front wall and Tech. Spec / Inspection Report A1 A1 SW
drum : Drawing
m.1. Elevation check of header
m.2. Cross-measure between upper header of front wall
and drum.
m.3. Check the position of upper headers and cross
measure of upper part of furnace
411329398.doc Page 8 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
o.2. Penetrate test of seal welds before lifting super Tech. Spec / Inspection Report A1 A1 SW
heater Drawing
411329398.doc Page 9 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
r. Location and vertical location check Super heater elements. Tech. Spec /
None A1 A2 SW
Drawing
t. Welding Super heater Elements to the casing roof and Tech. Spec /
None A1 A2 SW
Check for tightness Drawing
LEVEL OF INSPECTION
REFERENCE VERIFYING ACCEPTANCE
No. ITEM ACTIVITIES
DOCUMENT DOCUMENT CRITERIA
GKE ADHI PLN
v. Connection Pipe of Super heater : assembly, welding and Tech. Spec / WPQT, NDE
PWHT. The tube shall be earlier ready lifted to the platforms Report, PWHT A1 A1 SW
Drawing
Chart
w. Lifting of air ducts to the platform to be in context with Tech. Spec /
boilers steel construction assembly phases and ITP None A1 A2 SW
Drawing
x. Welding of upper parts of furnace and check for welder WPQT, NDE
qualification and production weld, radiographic examination Tech. Spec /
Report, Electrode A1 A1 SW
and welding arrangement. Drawing
Cert, WIR
411329398.doc Page 10 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
z.3. Assure the wall and side wall butt weld lines are in None A1 A2 SW
horizontal position
LEVEL OF INSPECTION
REFERENCE VERIFYING ACCEPTANCE
No. ITEM ACTIVITIES
DOCUMENT DOCUMENT CRITERIA
GKE ADHI PLN
bb. The connecting pipes of economizer, assembly, welding and Tech. Spec /
WIR, NDE Report A1 A1 SW
inspection Drawing
411329398.doc Page 11 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
LEVEL OF INSPECTION
REFERENCE VERIFYING ACCEPTANCE
No. ITEM ACTIVITIES
DOCUMENT DOCUMENT CRITERIA
GKE ADHI PLN
hh. Checking of Construction and Pressure Vessel Tech. Spec / Approved WIR, A1 A1 R/A
Documentation Drawing PWHT Chart, NDE
hh.1. All welding, heat treatment, test and examination has Report
411329398.doc Page 12 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
LEVEL OF INSPECTION
REFERENCE VERIFYING ACCEPTANCE
No. ITEM ACTIVITIES
DOCUMENT DOCUMENT CRITERIA
GKE ADHI PLN
411329398.doc Page 13 of 14
Coal Fire Steam Power Plant ( 3 x 7 MW ) Project
411329398.doc Page 14 of 14