PRODUCTIVITY RATES

Ite Output Productivity


Description No. Trade Unit
m unit / day man-days per unit
MECHANICAL WORKS
1 Mech'l
1 Exhaust fans no.
1 Helper
1 Mech'l
2 Split Units no.
1 Helper
1 Mech'l
3 Blower no.
1 Helper
1 Mech'l
4 Kitchen Hood lm.
1 Helper
1 Mech'l
5 Ducting lm.
1 Helper
1 Mech'l
6 Fire Fighting System lm.
1 Helper
1 Mech'l
7 Conveying System (Elevator) no.
1 Helper
1 Mech'l
8 Escalator no.
1 Helper

9 Others.. Please insert

ELECTRICAL WORKS
1 Electrician
1 Electrical Conduits and Boxes lm. 8?
1 Helper
1 Electrician
2 Electrical Wiring and Cables lm.
1 Helper
1 Electrician
3 Telephone System lm.
1 Helper
1 Electrician
4 Electrical panel Board no.
1 Helper
1 Electrician
5 Fire Alarm System lm.
1 Helper
1 Electrician
6 Electrical Devices (Sockets & Switches) no.
1 Helper
1 Electrician
7 Lighting Fixture no.
1 Helper

8 Others.. Please insert

10

11

12

13

14

15

16

17

18

19

20

PLUMBING WORKS
1 P. Fitter
1 Sewer Piping mt
1 Fit. Helper
1 P. Fitter
2 Water Closet no.
1 Fit. Helper
1 P. Fitter
3 Urinal no.
3 Urinal no.
1 Fit. Helper
1 P. Fitter
4 Water Pipe and Fitting mt
1 Fit. Helper
1 P. Fitter
5 Sanitary Fitting no.
1 Fit. Helper
1 P. Fitter
6 Mixer no.
1 Fit. Helper
1 P. Fitter
7 Drains no.
1 Fit. Helper
1 P. Fitter
8 Toilet Accessories no.
1
1 P. Fitter
9 Water Tank no.
1 Fit. Helper
1 P. Fitter
10 Bath Tub no.
1 Fit. Helper
1 P. Fitter
11 Others.. Please insert no.
1
1 P. Fitter
12 no.
1 Fit. Helper

PRODUCTIVITY RATES
Ite Output Productivity
Description No. Trade Unit
m Qty/day Man-Days per unit
CONCRETE TROWEL FINISH
1 Mason
1 Screed and concrete finishes with trowel (smooth finish) sqm
1 Helper
1 Mason
2 Smooth trowel finish to concrete sqm
1 Helper
CEMENT-SAND SCREED
Leveling the cement-sand screed and finished smoothly 1 Mason
1 sqm
for roofslab waterproofing with material shifting 1 Helper
TERRAZO TILES
1 Mason
1 Terrazzo tiling with cement mortar and grouting sqm
1 Helper
1 Mason
2 Terrazzo steps tread with riser LM
1 Helper
CERAMIC TILES
1 Mason
1 Ceramic tile steps treads & risers LM
1 Helper
1 Mason
2 Ceramic tile flooring (Grouting Included) sqm
1 Helper
1 Mason
3 Ceramic wall tile without plaster (Grouting included) sqm
1 Helper
MARBLE FLOORS / WALLS
Marble / Granite flooring without design with cutting on 1 Mason
1 sqm
edges 1 Helper
1 Mason
2 Marble / Granite flooring with design with cutting on edges sqm
1 Helper
1 Mason
3 Marble granite fixed to walls sqm
1 Helper
1 Mason
4 Marble / Granite fixed to walls sqm
1 Helper
1 Mason
5 Marble granite steps / tread & riser LM
1 Helper
1 Mason
6 Marble granite skirting to the staircase LM
1 Helper
1 Mason
7 Marble thresholds LM
1 Helper
1 Mason
8 Black Granite kerb LM
1 Helper
1 Mason
9 Marble/Granite wall cladding with fixtures & sqm
1 Helper
PVC VINYL FLOORS / THREADS
1 Mason
1 PVC vinyl flooring sheet fixed with adhesive & welding sqm
1 Helper
1 Mason
2 PVC vinyle floor sheet fixed to wall LM
1 Helper
1 Mason
3 PVC vinyle tread & riser fixed with adhesive LM
3 PVC vinyle tread & riser fixed with adhesive LM
1 Helper
PLASTERING
1 Mason
1 Rush coat for plaster work sqm
0 Helper
1 Mason
2 Fixing level dots for plaster sqm
1 Helper
1 Mason
3 Plaster internal wall single coat with smooth sqm
1 Helper
1 Mason
4 Plaster internal walls two coats with smooth sqm
1 Helper
1 Mason
5 Fixing corner beads to walls & columns LM
1 Helper
1 Mason
6 Fixing plaster mesh to walls sqm
1 Helper

PRODUCTIVITY RATES
Ite Output Productivity
Description No. Trade Unit
m Qty/day Man-Days per unit
PLASTERING
1 Mason
7 Plaster to ceiling 16mm thick sqm
1 Helper
1 Mason
8 External plaster to walls & columns sqm
1 Helper
1 Mason
10 Plaster to circular areas & arches sqm
1 Helper
Add 15% to above rates for above 4m
11 Extra over for plaster above 4m height

EXTERNAL FINISHES
1 Mason
1 Tyrolean finish to external wall sqm
1 Helper
BLOCKWORKS
1 Mason
1 Hollow block work 10 cm thick No
1 Helper
1 Mason
2 Hollow block work 15 cm thick No
1 Helper
1 Mason
3 Hollow block work 20 cm thick No
1 Helper
1 Mason
4 Solid block work 20 cm thick No
1 Helper
1 Mason
5 Solid block work 10 cm thick No
1 Helper
1 Mason
6 Claustra block work 20cm & pointing sqm
1 Helper
1 Mason
7 Claustra bock work 10cm & pointing sqm
1 Helper
INTERLOCK TILES
1 Mason
1 60/80MM interlocking tiles including sand bed sqm
1 Helper
KERBSTONE
1 Mason
1 High raised kerbstone with pointing upto 30cm No
2 Helper
1 Mason
2 Flat kerbstone including shifting No
1 Helper
0 Mason
3 Compaction for kerb stone bottom LM
1 Helper
1 Carpenter
4 Base concrete formwork on both sides with LM
1 Helper
1 Mason
5 Concreting the base with leveling LM
1 Helper
1 Mason
6 Haunch con. On kerbstone backside LM
1 Helper
0 Mason
7 Bituminous painting on kerb stone back side LM
1 Helper
PROTECTION BOARD
1 Carpenter
1 Protection board - horizontal sqm
1 Helper
1 Mason
2 Protection board - vertical sqm
1 Helper
FLEXELL SHEET
1 Carpenter
1 Flexell sheet LM
0 Helper
HOURDI BLOCK
1 Mason
1 Hourdi block No
1 Helper
GROOVE ON PLASTER
1 Mason
1 All groove on plaster LM
1 Helper
Resource's Basic Data

Budget Materials Rates


Item NO.

include

quantity

%Waste
Description
unit Name unit
Price Rate / Notes %Wast
/unit unit e

Excavation
Excvtr day 500 500m3 Excvtr = Excavator 500
excavation in Loader day 400 500m3 -10% 450
-1 m3 1 Tippers day 150 100m3 -10%
normal soil 90
O.labour day 15 50m2 Excvtr-h = Excavator with hammer 50
Excvtr-h day 1200 70m3 70
excavation in Loader day 400 250m3 -40% 150
-2 m3 1 Tippers day 150 60m3 O.labour = -40%
normal soil Ordinary labour 90
O.labour day 15 5m2 15
P.C For Foundation
Cement Ton 250 0.25 10% 0.275
Agg m3 30 0.8 10% 0.88
Sand m3 6 0.4 PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump) 15% 0.46
-1 P.C for foundation m3 1 Water m3 4 0.1125 5% 0.1181
PCast.Eq m3 14 100m3 Crp.Crew = Carpenter Crews (1 Carpenter + 1 assistance) -10% 90
Crp.Crew day 40 5m3 5
PCs.Crew = Cast Crews ( 2#pump pipe, 1#Concrete distrbuation, 1# leveling)
PCs.Crew day 50 100m3 10% 90
R.C For Foundation
Steel Ton 1200 0.1 7% 0.107
Cement Ton 250 0.35 PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator) 10% 0.385
Agg m3 30 0.8 10% 0.88
Sand m3 6 0.4 PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator) 15% 0.46
-1 P.C for Foundation m3 1 Water&ad m3 5 0.1575 5% 0.1654
StrCrew = Striker Crews (1 Craft + 1 assistance)
PCast.Eq m3 14 100m3 -10% 90
Crp.Crew day 40 3m3 3
Stl.Crew day 35 .5ton 0.5
PCs.Crew day 50 100m3 -10% 90
R.C For Column
Steel Ton 1200 0.1 7% 0.107
Cement Ton 250 0.35 PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator) 10% 0.385
Agg m3 30 0.8 10% 0.88
Sand m3 6 0.4 PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator) 15% 0.46
-1 P.C for Column m3 1 Water&ad m3 5 0.1575 5% 0.1654
PCast.Eq m3 14 100m3 Stl.Crew = Steel Crews (1 Craft + 1 assistance) -10% 90
Crp.Crew day 40 1m3 1
Stl.Crew day 35 .5ton 0.5
PCs.Crew day 50 100m3 -10% 90
R.C For Slabs
Steel Ton 1200 0.1 7% 0.107
Cement Ton 250 0.35 PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator) 10% 0.385
Agg m3 30 0.8 10% 0.88
Sand m3 6 0.4 PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator) 15% 0.46
-1 RZ.C for Slabs m3 1 Water&ad m3 5 0.1575 5% 0.1654
PCast.Eq m3 14 100m3 Stl.Crew = Steel Crews (1 Craft + 1 assistance) -10% 90
Crp.Crew day 40 1.5m3 1.5
Stl.Crew day 35 .5ton 0.5
PCs.Crew day 50 100m3 -10% 90
Steel Ton 1200 0.04ton 7% 0.0428
Cement Ton 250 .05ton PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator) 10% 0.055
Agg m3 30 0.11 10% 0.121
Sand m3 6 0.055 PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator) 15% 0.0633
R.C for Hollow Water&ad m3 5 .023.5m3 5% 0.0242
-2 m2 1 Blocks ### 1200 8 10% 8.8
Block Slabs Stl.Crew = Steel Crews (1 Craft + 1 assistance)
PCast.Eq m3 14 100m3 -10% 90
Crp.Crew day 40 5m3 Blocks =40*20*20 (Hollow Block Slab as two way , thickness 27cm, rft=140kg/m3 5
Stl.Crew day 35 .5ton (m3 included blocks)) 0.5
PCs.Crew day 50 100m3 -10% 90

Insulation

Bit.Mtrl m2 2 1.0m2 Bit.Mtrl = Bitmeen Material (2 layers) Bit.Crew = Bitmeen Crews (1 craft, 1 15% 1.15
-1 Bitmeen Insulation m2 1
assistance)
Bit.Crew day 40 80m2 -10% 72
Bit.Mtrl L.m 10 1.0L.m 15% 1.15
-2 Asphalt Insulation m2 1 Bit.Crew 100L.m Bit.Mtrl = Bitmeen Material Bit.Crew = Bitmeen Crews (1 craft, 1 assistance)
day 40 -10% 90
Bathroom Bit.Mtrl m2 10 1.5 15% 1.725
-3 m2 1 Bit.Crew
Insulation day 40 50m2 Bit.Mtrl = Bitmeen Material (2 layers) Bit.Crew =Bitmeen Crews (1craft,1assistance) -10% 36
Masonary
Brick ### 180 440 brick 10% 484
Cement Ton 250 66kg Bricks has dimension = 25*12*6cm Cement =300kg/m3 10% 0.0726
-1 Masonary Works m3 1 Sand m3 6 0.22m3 Bld.Crew = Builder crew 15% 0.253
(1 builder, 1 assistance, 1
Bld.Crew day 50 3m3 labour) 3
Resource's Basic Data

Budget Materials Rates


Item NO.

include

quantity

%Waste
Description
unit Name unit
Price Rate / Notes %Wast
/unit unit e

Plaster

Cement Ton 250 5.55kg Plaster had 3 layer 1st (300kg cement,1m3 sand) 10% 0.0061
-1 Lime Plaster m2 1 Sand m3 6 0.020m3 2ed (200kg for 2 : 1 sand ,lime) 15% 0.023
Lime m3 40 0.005m3 3rd (200kg for 2 : 1 sand ,lime) 15% 0.0058
Pla.Crew day 50 25m2 Pla.Crew=plast crew (1craft,1assistance,1labor) 25
Cement Ton 250 5.75kg 1st (300kg cement,1m3 sand) 10% 0.0063
Sand m3 6 0.012m3 2ed (200kg for 2 : 1 sand ,lime) 15% 0.0138
Facad Scratch Lime m3 40 0.004m3 15% 0.0046
-2 m2 1 3rd (200kg for 2 : 1 sand ,lime)
Plaster
Stone Powder m3 0.01m3 4th (200kg for 2 : 1 sand ,lime) 10% 0.011
Pla.Crew day 50 20m2 Pla.Crew=plast crew (1craft,1assistance,1labor) 20
Cement Ton 250 6Kg W.Cement = White Cement 10% 0.0066
W.Cement Ton 600 3Kg 1st (300kg cement,1m3 sand) 10% 0.0033
Sand m3 6 0.012m4 2ed (200kg for 2 : 1 sand ,lime) 15% 0.0138
Artificial Stone Lime m3 40 0.004m4 15% 0.0046
-3 m2 1 3rd (200kg for 2 : 1 sand ,lime)
Plaster S.P. Pow m3 .007m3 10% 0.0077
Pla.Crew=plast crew (1craft,1assistance,1labor)
S.F Pow m3 .003m3 S.P. Pow = Stone particles Powder 10% 0.0033
Pla.Crew day 50 15m2 S.F Pow = Stone Fine Powder 15
Cement Ton 250 6Kg 1st (300kg cement,1m3 sand) 10% 0.0066
W.Cement Ton 600 3Kg 2ed (200kg for 2 : 1 sand ,lime) 10% 0.0033
Sand m3 6 0.012m4 3rd (200kg for 2 : 1 sand ,lime) 15% 0.0138
Cement Stuco Lime m3 40 0.004m4 15% 0.0046
-4 m2 1 Pla.Crew=plast crew (1craft,1assistance,1labor)
Plaster S.P. Pow m3 .007m3 10% 0.0077
S.P. Pow = Stone particles Powder
S.F Pow m3 .003m3 S.F Pow = Stone Fine Powder 10% 0.0033
Pla.Crew day 50 15m2 S.F Pow = Stone Fine Powder 15
Veneer And Cladding
Marble m2 400 1m2 Scratch (450 kg cement for 1 m3 sand) 10% 1.1
Marble Skirting Cement Ton 250 12.75kg For erection (350 kg cement for 1m3 sand) 10% 0.014
-1 m2 1
10CM Sand m3 6 0.035m3 Mrb.Crew= Marble crew (1craft,1assistance,1labor) 15% 0.0403
Mrb.Crew day 50 10m2 10
Ceramic m2 25 1m2 Scratch (450 kg cement for 1 m3 sand) 10% 1.1
Cement Ton 250 12.75kg For erection (350 kg cement for 1m3 sand) 10% 0.014
-2 Ceramic Cladding m2 1 Sand m3 6 0.035m3 15% 0.0403
Cer.Crew=Marble crew (1craft,1assistance,1labor)
Cer.Crew day 50 10m2 10
Flooring
Marble m2 400 1m2 10% 1.1
Cement Ton 250 9kg For erection (300 kg cement for 1m3 sand) 10% 0.0099
-1 Marble m2 1 Sand m3 6 0.03m3 15% 0.0345
Mrb.Crew= Marble crew (1craft,1assistance,1labor)
Mrb.Crew day 50 10m2 10
Ceramic m2 25 1m2 10% 1.1
Cement Ton 250 9kg For erection (300 kg cement for 1m3 sand) 10% 0.0099
-2 Ceramic m2 1 Sand m3 6 0.03m3 15% 0.0345
Cer.Crew=Ceramic crew (1craft,1assistance,1labor)
Cer.Crew day 50 10m2 10
Ceramic m2 10 .1m2 Scratch (450 kg cement for 1 m3 sand) 10% 0.11
Ceramic Skiriting Cement Ton 250 1.3kg For erection (350 kg cement for 1m3 sand) 10% 0.0014
-3 m2 1 Sand m3 6 0.004m3 15% 0.0046
10 Cm Cer.Crew=Ceramic crew (1craft,1assistance,1labor)
Cer.Crew day 50 10m2 10
C.Tiles m2 8 1m2 C.Tiles = Cement Tiles 10% 1.1
Cement Ton 250 6kg For erection (300 kg cement for 1m3 sand) 10% 0.0066
-4 Tiles 20*20*3 m2 1 Sand m3 6 0.02m3 15% 0.023
Cer.Crew= Ceramic crew (1craft,1assistance,1labor)
Cer.Crew day 45 25m2 25
Slp.Wood m3 1000 .009m3 Slp.Wood = Sleepers Wood ( sleeper .4m axial,pieces 1.5m axial) 10% 0.0099
Ins.Mtrl m2 10 .8m2Ins.Mtrl = Insulation Material & Cost excuation 10% 0.088
Flo.Wood = Floor Wood (sewdan For Room
Flo.Wood m3 1000 .84m3 5.2*6. Skirting 10cm) 10% 0.924
-5 Wood m2 1 Nails kg 2 0.25kg For erection (300 kg cement for 1m3 sand) 10% 0.275

Wod.Crew = Wood Erection Crew (1 craft, 1assistance) 0.092


Sand m3 6 0.08m3 15%
Flo.Fnsh m2 4 1m2 Flo.Fnsh = Floor Finshing (material &excution) 1
Wod.Crew day 40 10m2 10
Curbes L.m 7 1 L.m Curbes = Cement curbes 12*30*50 with compact sand layer 10cm, mortar 2cm(300kg 10% 1.1
Cement Ton 250 1kg cement for 1 m3 sand) 10% 0.0011
-6 Curbes L.M 1 Sand m3 6 0.014m3 15% 0.0154
Cur.Crew =Curbes Crew (1craft,1assistance,1 labor)
Cur.Crew day 50 10L.m 10
Stairs
Marble m2 300 0.47m2 Marble (for Stair sleeper 0.3width,4cm thick.&stair height 17cm,2cm thick &skirting 10% 0.517
10cm)
Cement Ton 250 0.33kg 10% 0.363
-1 Marble L.M 1
Sand m3 6 0.03m3 For erection (300 kg cement for 1m3 sand, mortar 3cm thickness) 15% 0.0345
Mrb.Crew day 50 10L.m Mrb.Crew= Marble crew (1craft,1assistance,1 labor) 10
Bla.Mtrl kg 3.5 30kg Bla.Mtrl = Blaustrade Material 10% 33
-2 Blaustrade L.M 1 Bla.Erct kg 20 10 L.m Bla.Erct = Blaustrade Erection 10
Hnd.Mtrl L.m 15 1 L.m Hnd.Mtrl = Handrail Material (Wood & Painting) Hnd.Mtrl 10% 1.1
-3 Handrail L.M 1 Hnd.Erct L.m 4 10 L.m Hnd.Erct = Handrail Erection Hnd.Erct 10
Resource's Basic Data

Budget Materials Rates


Item NO.

include

quantity

%Waste
Description
unit Name unit
Price Rate / Notes %Wast
/unit unit e

Painting
Pan.Mtrl m2 5 1m2 Pan.Mtrl = Painting Material (Oil Painting) 10% 1.1
-1 Painting M2 1 Pan.Erct m2 25 1m2 Pan.Erct = Painting Erection 25
Opening work

Frm.Mtrl m3 1000 0.0021m3 Frm.Mtrl = Framing Material (Wood Frame 1*2.2, width 12.5cm ) 10% 0.0023
-1 Framing M2 1
Frm.Erct No 4 10 unit Frm.Erct = Framing Erection 10
Una.Mtrl = Unit And Acessopries Material For one Building (BL=
Opening Uits & Una.Mtrl BL 5 1m2 10% 1.1
-2 M2 1 Building)
accessories
Una.Erct BL 2.5 10m2 Una.Erct = Unit And Acessopries Erection 10
Plumbing
Car.Mtrl FL 4000 1FL Car.Mtrl =Carcassing Material (Pipe and fitting ) 10% 0.9
-1 Sanitry Carcassing Fl 1
Ca.Erct FL 2500 1FL Car.Erct = Carcassing Erection 1
Fix.Mtrl FL 7000 1FL Fix.Mtrl =Fixture Material (Appartus&accessories ) 10% 0.9
-2 Sanitry Fixture
Fix.Erct FL 900 1FL Fix.Erct = Fixture Erection 1
Electric

Cre.Mtrl FL 6500 1FL Car.Mtrl = Electric Carcassing Material (Pipe and Wire ) 10% 0.9
-1 Electric Carcassing Fl 1
Cre.Erct FL 1500 1FL Car.Erct = Electric Carcassing Erection 1
Ute.Mtrl FL 2000 1FL Ute.Mtrl=Electric Fixture Material (Units &accessories ) 10% 0.9
-2 Electric Fixture Fl 1
Ute..Erct FL 700 1FL Ute.Erct = Electric Fixture Erection 1
s Basic Data

Unit
m3
m3
m3
m2
m3
m3
m3
m2

ton
m3
m3
m3
m3
m3
m3

ton
ton
m3
m3
m3
m3
m3
ton
m3

ton
ton
m3
m3
m3
m3
m3
ton
m3

ton
ton
m3
m3
m3
m3
m3
ton
m3
ton
ton
m3
m3
m3
No
m3
m3
ton
m3

m2
m2
m2
m2
m2
m2

No
ton
m3
m3
s Basic Data

Unit
ton
m3
m3
m2
ton
m3
m3
m3
m2
ton
ton
m3
m3
m3
m4
m2
ton
ton
m3
m3
m3
m4
m2

m2
ton
m3
m2
m2
ton
m3
m2

m2
ton
m3
m2
m2
ton
m3
m2
m2
ton
m3
m2
m2
ton
m3
m2
m2
m2
m3
kg
m3
m2
m2
L.m
ton
m3
L.m

m2
ton

m3
L.m
kg
L.m
L.m
L.m
s Basic Data

Unit
m2
m2

m3
No
m2
m2

Fl
Fl
Fl
Fl

Fl
Fl
Fl
Fl
Material Labour Equipment Others Subcont.

Total
unit

k
Activity ID Activity description Bill QTY Price/U Price/U Price/U Price/U

ec
Unit

Unit

Unit

Unit

Unit
Name Name Name Name Name Price/Unit

ch
nit nit nit nit
A44FN001 Building coordinates
A44FN003 Building permits
A44FN005 Zero & foundation level
A44FN010 Build Axis plot down
A44FN020 Excavation for foundation m3 399.00 Ex.Sub m3 11.25 4490.17
A44FN030 PLain concrete for footings m3 11.00 Cement m3 60.00 Cast Lab. m3 11.16 Cast P.Eq. m3 15.84 Formw m3 12.1118 Carp. Sub. m3 7.62
Agg m3 29.36 Cast P.Sub. m3 5.62
W&add m3 5.00 146.71 1613.83
A44FN040 R.C. for footings m3 40.00 Steel m3 139.89 Cast Lab. m3 13.56 Cast R.Eq. m3 20.04 Formw m3 32.4 Carp. Sub. m3 15.60
Cement m3 84.00 Steel Sub. m3 11.97
Agg m3 29.36 Cast R.Sub. m3 8.76
W&add m3 6.00 361.58 14463.38
A44FN050 Insulation of footings m2 554.72 Ins. Sub m2 4.54 2518.42
A44FN060 Back fill arround footings m3 77.50 Bkf. Sub. m3 10.79 836.23
A44FN070 B.ground level masonry m3 31.00 Mas. Sub m3 139.06 4310.86
A44FN080 Back fill Up to ground levl m3 77.50 Bkf. Sub. m3 10.79 836.23
A44FN090 G. floor concrete slab m2 174.00 Cement m2 2.43 Cast Lab. m2 0.42 Cast P.Eq. m2 0.36 Cast P.Sub. m2 2.59
Agg m2 1.31
W&add m2 0.23 7.33 1275.86
A44GR010 R.C for columns of m3 10.50 Steel m3 278.94 Cast Lab. m3 20.01 Cast R.Eq. m3 32.79 Formw m3 97.7403 Carp. Sub. m3 37.77
Ground Floor Cement m3 84.00 Steel Sub. m3 21.57
Agg m3 29.36 Cast R.Sub. m3 17.08
W&add m3 6.00 625.26 6565.23
A44GR020 R.C for roof slab of m3 42.78 Steel m3 239.94 Cast Lab. m3 20.01 Cast R.Eq. m3 25.20 Formw m3 76.288 Carp. Sub. m3 26.40
Ground Floor Cement m3 84.00 Steel Sub. m3 18.42
Agg m3 29.36 Cast R.Sub. m3 14.81
W&add m3 6.00 540.43 23119.45
A44GR030 Masonry work of G.F. m3 45.26 Mas. Sub m3 147.54 6678.32
A44GR040 Plaster work of Ground Floor m2 370.50 Pla. Sub m2 7.87 2915.84
A44GR050 Sanitary carcassing GR. F. lot 0.13 San. Sub lot 49688.16 6211.02
A44GR060 Electric carcassing GR. F. lot 0.13 EL. Sub lot 26097.45 3262.18
A44GR070 Opining frames GR. F. lot 0.03 D@W Sub. lot 38182.93 954.57
A44GR080 Insulation & protection m2 167.71 Ins. Sub m2 19.38 3250.19
A44GR100 Wall ceramic tiles m2 165.43 WCer. Sub. m2 41.30 6832.39
A44GR090 Floor tiling for ground floor lot 0.25 Fl. Sub. lot 47908.59 11977.15
A44GR110 Painting primer GR. F. m2 371.00 PA. Sub. m2 8.45 3133.85
Ins. Sub
Roof finishing work m2 140.00 m2 55.43 7760.20
Fl.Sub
Facad finishing lot 1.00 Fc. Sub. lot 44244.49 44244.49
Stairs finishings lot 1.00 Stair Sub. lot 17320.51 17320.51
Doors & Windows erection lot 1.00 D@W Sub. lot 34364.64 34364.64
Sanitary fixture lot 0.50 San. Sub lot 49688.16 24844.08
Electric final fix lot 0.50 EL. Sub lot 26097.45 13048.73
Final paints lot 1484.00 PA. Sub. m2 2.11 3132.87
SUBJ: CAPABILITIES OF EQUIPMENT
ITEM
TYPE OF EQUIPMENT ACTIVITY AVE. CAPABILITY REMARKS
NO.

1 BULLDOZER
D9 CLEARING 500 SQ.M./HR. OUTPUT/8HRS
D9 STRIPPING 200 SQ. M/HR OUTPUT/8HRS
D9 EXCAVATION 700-800 CU.M./DAY OUTPUT/8HRS
D8 EXCAVATION 600-700 CU.M./DAY OUTPUT/8HRS
D7 EXCAVATION 500-600 CU.M./DAY OUTPUT/8HRS
D6 EXCAVATION 500 CU. M./DAY OUTPUT/8HRS
QUARRYING 50 CU.M./DAY
PUSHING 3 CU.M./HR

2 GRADER SUB-GRADING 300SQ.M./HR.


SPREADING 500-600 CU.M./DAY OUTPUT/8HRS
3 PAY LOADER(2.0CU.M. LOADING 300 CU.M./DAY OUTPUT/8HRS
4 CRANE SHOVEL LOADING 35 CU.M. HR.
5 SHEEP FOOT ROLLER STATIC ROLLING -13 PASSES 45 CU.M./HR. 15 CM. LIFT
VIBRATORY ROLLING -14 PASSES 135CU.M./HR. 15 CM. LIFT
6 ROLLER STATIC ROLLING -6 PASSES 24 CU.M./HR. 20 CM. LIFT
7 TANDEM ROLLER STATIC ROLLING -6 PASSES 24 CU.M./HR. 20 CM. LIFT
VIBRATORY ROLLING -6 PASSES 77 CU.M./HR. 30 CM.LIFT
8 PNEUMATIC ROLLER SELF ROLLING 500-600 CU.M./DAY OUTPUT/8HRS
9 PROPELLED
10 DUMP TRUCK 5 CU.M. CAP 5 CU.M./TRIP FLAT ROLLING
4 CU.M./TRIP MOUNTAINOUS
3.5 CU.M./TRIP

11 DUMP TRUCK 10 CU.M. CAP 10 CU.M./TRIP FLAT TERRAIN

12 TRANSIT MIXER CONC. PAVING BLDGS. 24- 36 BAG/BATCH


13 CONCRETE MIXER 10 CU.M./DAY 1 1/2-2 BAG/BATCH 1-BAG/BATCH
14 CONCRETE BATCH PLANT 40 TON PER HR(TPH)
15 BUGGY HAULING CONC. MIX 6 CU.FT/TRIP
16 WHEEL BARROW HAULING AGGREGATE 2.5 CU.FT/TRIP
HAULING CONC. MIX 1.75 CU.FT/TRIP
17 CONCRETE VIBRATOR VIBRATING CONC. MIX 40 CU.M./HR.
18 WATER TRUCK WATERING 1,000 M./HR.
19 ASPHALT DISTRIBUTOR SPRAYING ASPHALT PRIMECOAT 300 SQ.M./HR

20 ROCK CRUSHER CRUSHING MIXED SAND & GRAVEL 30 CU.M./HR.


21 CONCRETE FLOOR FINISHES FINISHING CONC. FLOOR 140 SQ.M./HR.

22 SCRAPPER TOWED 12 CU. HAULING HEAP CAPACITY 11 CU.M./TRIP

23 SCRAPPER TOURNA PULL HAULING HEAP CAPACITY 22 CU.M./TRIP


45 TON
24 BACKHOE, 0.50 CU.M. CAP EXCAVATION 150 CU.M./DAY
EMARKS

T/8HRS
T/8HRS
T/8HRS
T/8HRS
T/8HRS
T/8HRS

T/8HRS
T/8HRS

LIFT
LIFT
LIFT
LIFT
LIFT
T/8HRS

OLLING
AINOUS

ERRAIN

BATCH
PER HR(TPH)