VALORIZACION No.

001

OBRA :CONSTRUCCION DE LA CARRETERA TRAMO SAN PEDRO DE LONGUI - PUERTO MAYRO, DISTRITO DE CONSTITUCIÓN, OXAPAMPA,PASCO" PERIODO -2017
PLAZO : 90 DIAS CALENDARIOS.
MODALIDAD DE EJECUCION : ADMINISTRACION DIRECTA INICIO DE LA OBRA : 02 DE NOVIEMBRE 2017
RESIDENTE DE OBRA : ING. JAIME. F.ANGELES MORI TERMINO DE OBRA PROGRAMADO : 30 DE ENERO DEL 2017
INSPECTOR : ING. FIDEL VALDIVIA GAVILAN
PRESUPUESTO ASIG : S/. 590,000.00

PRESUPUESTO BASE AVANCES


SALDO
AVANCE ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO
CODIGO DESCRIPCION UND METRADO P.U PTO. BASE VALORIZAD VALORIZAD
MTDO % MTDO VALORIZADO % MTDO % MTDO VALORIZADO %
O O
OBRAS PROVICIONALES
CARTEL DE OBRA GBL 1.00 611.28 611.28 0.00 0.00 0.00% Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522
TRABAJOS PRELIMINARES
MOVILIZACION Y DESMOVILIZACIÓN EQUIPOS Y MAQ. GLB 1.00 7,000.00 7,000.00 0.00 0.00 0.00% 0.50 3,500.00 50.00% 0.50 3,500.00 50.00% 0.50 3,500.00 50.00%
TRAZO Y REPLANTEO KM 22.13 393.13 8,699.97 0.00 0.00 0.00% 22.13 8,699.97 100.00% 22.13 8,699.97 100.00% 0.00 0.00 0.00%
ROCE Y LIMPIEZA HA 22.13 511.70 11,323.92 0.00 0.00 0.00% 22.13 11,323.92 100.00% 22.13 11,323.92 100.00% 0.00 0.00 0.00%
MOVIMIENTO DE TIERRAS (KM 19+000 AL KM 20+500)
ELIMINACION EXCEDENTE DE CORTE M3 520.00 2.61 1,357.20 0.00 0.00 0.00% 520.00 1,357.20 100.00% 520.00 1,357.20 100.00% 0.00 0.00 0.00%
CORTE DE MATERIAL SUELTO CON MAQUINARIA M3 900.00 4.60 4,140.00 0.00 0.00 0.00% 900.00 4,140.00 100.00% 900.00 4,140.00 100.00% 0.00 0.00 0.00%
CONFORMACIÓN DE TERRAPLEN M3 74.00 23.05 1,705.70 0.00 0.00 0.00% 74.00 1,705.70 100.00% 74.00 1,705.70 100.00% 0.00 0.00 0.00%
PAVIMENTO ( KM 19+000 AL KM 20+500)
PERFILADO/COMPACTADO DE SUB RASANTE EN ZONA CORTE M2 6,750.00 1.90 12,825.00 0.00 0.00 0.00% 6750.00 12,825.00 100.00% 6,750.00 12,825.00 100.00% 0.00 0.00 0.00%
MATERIAL PARA AFIRMADO M3 2,025.00 19.31 39,102.75 0.00 0.00 0.00% 2025.00 39,102.75 100.00% 2,025.00 39,102.75 100.00% 0.00 0.00 0.00%
AFIRMADO CON 20CM DE ESPESOR M2 6,750.00 4.22 28,485.00 0.00 0.00 0.00% 4500.00 18,990.00 66.67% 4,500.00 18,990.00 66.67% 2,250.00 9,495.00 33.33%
RECONFORMACION DE AFIRMADO (KM 0+000 AL KM 19+000)
AFIRMADO ( E= 0.10M) M3 9,355.50 16.83 157,453.07 0.00 0.00 0.00% 6500.00 109,395.00 69.48% 6,500.00 109,395.00 69.48% 2,855.50 48,058.07 30.52%
0BRAS DE ARTE Y DRENAJE
CUNETAS
CONFORMACIÓN DE CUNETAS EN TIERRA SUELTA M 8,560.00 0.68 5,820.80 0.00 0.00 0.00% 7500.00 5,100.00 87.62% 7,500.00 5,100.00 87.62% 1,060.00 720.80 12.38%
ALCANTARILLAS CIRCULARES MELLIZAS D=2.60M (02 UND)
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO M2 267.20 4.83 1,290.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 267.20 1,290.58 100.00%
ENCAUSAMIENTO DE RIO M 40.00 45.49 1,819.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 40.00 1,819.62 100.00%
MOVIMIENTO DE TIERRAS
EXCAVACION PARA ESTRUCTURA NORMAL M3 941.86 24.39 22,971.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 941.86 22,971.97 100.00%
RELLENO CON MATERIAL PRESTADO M3 414.00 45.53 18,849.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 414.00 18,849.42 100.00%
CAMA DE ARENA E= 0.20M M2 113.76 13.13 1,493.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 113.76 1,493.67 100.00%
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA M3 686.21 11.69 8,021.79 0.00 0.00 0.00% Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522
OBRAS DE CONCRETO ARMADO
CONCRETO F´C= 210 KG/CM3 M3 235.87 424.35 100,091.43 0.00 0.00 0.00% Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522
ENCOFRADO Y DESENCOFRADO M2 589.06 47.16 27,780.07 0.00 0.00 0.00% Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522
ACERO CORRUGADO FY= 4200 KG/CM2 GRADO 60 KG 9,447.88 5.29 49,979.29 0.00 0.00 0.00% Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522
COSTO DIRECTO 510,822.51 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522
GASTOS GENERALES 13% 66,406.93 Err:522 Err:522 Err:522
GASTOS DE INSPECTOR 2.5% 12,770.56 Err:522 Err:522 Err:522
PRESUPUESTO BASE 590,000.00 Err:522 Err:522 Err:522