b Installation in Square D.
"I-Line" load centers
CLICK
3
1-Switch the device OFF
before mounting.
O . OFF
2
CLICK
Connection
b Cut to the appropriate length the blue flying neutral supply lead 1 and connect
4 to the neutral terminal block.
b Cut to the appropriate length the cream flying earth supply lead 5 and connect
to the earth terminal block.
b The load connections are made to the outgoing terminals of the unit marked
L (phase) 2 and N (neutral) 3 (recommended torque: 2 N.m).
The neutral wire connected to the load must not be connected to the neutral
terminal block of the load center.
IN
3 L
2
T
1
OUT OUT IN FE
L N
Testing
Periodic test
b To test the operation of the QOE RCBO after installation, press the test button "T"
on the front of the device. The QOE RCBO should trip every time, failure to do so
indicates either no supply to the QOE RCBO, or a faulty device.
b A test for the effectiveness of the QOE RCBO in a protected installation should be
carried out periodically as detailed in local regulation and standards, using suitable
test equipment.
b Minimum operating voltage for the test button: 200 V AC (0.85 Un).
Megger test
b QOE RCBO must be disconnected before any High Voltage dielectric tests are
carried out.
Regulation and standards
b This range complies with the following standards:
v IEC 61009-2-2
v BSEN 61009-1.
b The tripping time is in compliance with the current edition of the UK wiring regulations. (BS7671) and Australia / New Zealand standards
AS/NZS 3190.
Note: Check compatibility with earthing system, do not use on installations which require double pole switching
eg. IT or TT systems.
Specifications
Terminal capacity: Phase in - Plug-on type
Phase & Neutral out - 1 to 16 mm2 (tightening torque 2 N.m).
Insulation voltage: Device must be disconnected before any High Voltage dielectric tests are carried out.
Class: AC.
3534543AD-09/2006
Schneider Electric Industries SAS This product must be installed, connected and used in compliance with prevailing standards and/or installation regulations.
89 boulevard Franklin Roosevelt As standards, specifications and designs develop from time to time, always ask for confirmation of the information given in this publication.
F-92500 Rueil Malmaison (France)
tel : +33(0)1 41 29 85 00
http://www.schneider-electric.com
http://www.squared.com