STANDARD DATA BOOK


FOR ANALYSIS OF RATES
(First Revision)

Published by
lndian Roads Congress
on blhalf ol lhe Govl. of lodi.,
Minlslry of Shlpping, Roadlr.nsport & Highways

Cgpies can be had from the S..relary,


lndian Roads Congrcss, Jaml,.gat Horse,
New Delhi - 110011

Pice Rs,1200/-
NEW OELHI .2003
(Ph)s packing and poslage charyes)

,
)
Ap.il,
First Published
First Revision
1994
June, 2003
FOREWORD TO THE FIRST REVISION )
Reprinted Seprcmber, 2003
Reprinted Scptemb€r.2004 oflhe Standard Oata Book forAnalysis of Rates
)
I have great pleasure to presenl the firsl revised edition
Rcprinted April. 2006 lor Road and Bridge Works.
)
The Standard Data Eook for Analysis of Rales for Road and Eridge WorlG was frst brcught out by
this Ministry in the year l99tl Since then analysis ot reles and eslimales for Nalional Highway Works a.6
prepared on the basis ofthe Oata Book. This scientilic approach provides foruniformity in inputs for various
)
items of works, besides standardrzation in nomenclature. Further its compatibility wilh lhe specifications
ol work is ensured. which had been chaoged to equjpment intensive construclion in around l9S5 from laboun )
intensive conslructon methods. The later stillforms the basis foranalysis of rates adopted by State PWos
owing to its merits, Minislry's Standard Deta Book is being adopted by various agencies for projects olher
lhan National Highways.
)
However, a need had been felt for revision afld updation of the Standard Data Book on account of lh€ )
icllowing:

(i) Technologlcrl upgradalaon as per currently r€visod MORT&H Spscificalions for Road 3nd Bddge Wo s )
publishod ln August, 2001.
(iD lnc'B,3€d lev.l ot m€cianizaUon.
(iii) chrng6! in 6aze, caFcdy and tyD€s of equipment lldce '1994. ,
(iv) Ratonslisalioo in ovorheads and conlractols profil, bas€d on exp€ri.nce and generEl increase in

(The Rishts of Pubticatio ond Translation ore Reseryed) (v) Indll3lon of n€w Chapt€rs on Concret€ Pav8m€nt. Goo-synlh€lici, R€inforced Earth .nd Maintenanc€ )
of Roads.
(vi) l.co.poralion of us€ ot nyash ln rcad conslruclion.
)
This revised edalion of the Standard Data Book has been finalised in a record time with proper research,
analysis and validation, along with a user-friendly Wndow-based software for eflicaenl application This would
nol have b€en possible wlhout untiring efforts ofconcemed officers and slaffofthe Minislry of Road Transpo.t ,
& Highways. lndian Roads Congress and RITES. consultanls engaged for the work. I would like to express
my appreciaiion ot S/Shri S.C. Sharma and C.C. Bhattacharya, former DG(RO) & AS for lheir valuable
guidance.lwould alsolike to express my appGciation for commendable efforts put in by S/Sh ri Jai Prakash )
S K Kaislha, R.S Ninan, A.P.S. Selhi, Chief Engineers, Shri S.S. Nahar, Superintending Engineer,
S/Shn Sudip C haudhary and AtuiKumar, Executive Engineers of lhe Minislry of Road Traosport & Highways,
Shri G. Sharan, Secretary, lRC, S/Shri R.K. Jain & K.8. Thandavan, Technical Consullants, IRC and
)
Shri S C Kakkar. Under Secretary, IRC aod S/Shri N Venkataraman & Harbhajan Singh of RITES

I am sure this Oata Book, in its present form, would prove to be very useful to all pracliciog Highway
)
€nginee6. The Data Book, however, needs to be updated periodically u/ith changes of technology aod
environment. The Ministty would, therefore, welcome lhe feedbacusuggestions from useas, so lhat any furlher )
ampliicatiorvrioditcaUorrupdating mey be attempted in due cou6e.

L.
0u0J+ )
,j
New D6rhi o'oro, o*ullifio"jlnilvenpmenrl a )
t January,2003. Special Secretary to the Govl of lndia
)
Printed at Gopsons Papers Ltd., Noida
(500 copies)
)
)
,
I )

)
CONTENTS
)
PART A. ROAD WORKS
)
Parl A.
Road Works
, Chapter Item No. Description Page

) Basic Approech and General CondiUons for the PrepaElion of Standard Data Book 3

'1. Carriage ofMaterlals - I


, Preamble I
, 1.1. Loading and Unloading of Slone Eoulder/Slone Aggregates/ 10
Sand/Kankar/Moo{um

, 1.2. Loading and Unloading of Slone Boulder by Manual Means 11

- 1.3. Loading and Unloading ofcement or Steel 11

, by ManualMeans and Stacking

1.4. Cost of Haulage Excluding Loading and Unloading 12


) 1.5. Hand Broken SloneAggregales 63 mm NominalSize 14

1.6. Crushing of Stone Aggregates 13.2 mrn NominalSize . 14


) 1.7. Crushing of Stone Aggregates 20 mm NominalSize 15

) 1.8. Crushing of Stone Aggregates 40 mm Nominal Size '16

2. Slte Clearance '18

, Preamble 18

) 2.1. Removal
Cutting ofTrees, Trunks. B.anches and 19

2.2. Clea.ing Gra6s and Removal ofRubbish 21

, 2.3. Clearing and Grubbing Road Land 21

2.4. Dismantling of Structures 23


) 5. Dismanlling ofFlerible Pavements 36
\2
2.6. Dismantling ofoement Concrete Pavemenl 37
)
2.7. Dismantling of Guard Rails 38

) 2.8. Dismantling of Kerb Slone 39

2.9. Dismantling of Kerb Stone Channel 40


) 2-1O. Dismanlling of Kilomelre Stone 40

)
(v)

)
)
)
Part A. Part A.
Road Works Road Works
Chapter Item No. Descriptlon Page
Chapter Item No. Description Page

2.11 Dismantling ot Fencing 42 3.17. Coostruction of Embankment wilh Mate.iat 70


deposlled from Roadway Cutting
212 Disman ing ofolWaler Pipe Llne 42
3.'18. Construclion of Subgrado and Earthen Shot Uers 71
2.13. Removal of Cbment Concrete Pipe of Sewer Gutter 43
3.19. Compac{ing Odglnal Grouhd 72
2 14. Removal of Telephone/Eleclric Poles & Lines 44
3.20. Stipplng .nd Storing Top Soil 74
3 Earthwork, Erosion Cont.ol lnd Oralnages 45
Sfipping, Storing and Re.laying Top Soilfrom Bonow Areas 74
Preambl6 45 ln Ag.icultlre Flelds
3.22. Turfino with Sods
3.1. Excavation in Soilby Manual Means 4A 75

3.2. Excavadon in Ordinary Rock by Manual M€ang 49 3.23. S€€ding and Mulching

3.3. Excavalion in S.il with Dozer wllh lead upto 100 m 50 3.24. Suface Orains ln Soil 77
3.2s. Surface Drains in Ordinary Rock
3.4. Excavalion in ordinary Rock with Oozer with lead 50 79
upto i00 m 3.26. Surfaco Drains in Hard Rock 80
Excavadon ln Hard Rock (requiring blasling) 51 3.27. Sub-.Surface Oraln6 wih Perforated pip€ 80
wilh disposal upto 1000 m
3.2a. Aggregate Sub-Surtace Drains
36 Ercavalion in Soil using Hydraulic Excavator CK 90 and 52 8t
Tlpper with dlsposal upto 1000 m 3.29. Undorground Dlaln at Edgo of pavemenl 82
37 Excavatibn ln Ordinary Rock uslng Hydraulic Excavalor 53 3.30. Preparation and Surfac! TrBatrnent of Formalion 82
CK 90 and Tipper wlth dis@sal upto 1000 m Construclion of Rockfill Embankment 83
3.8 Excavation in Hard Rock (blasling prohibited) 54
Excavation in Hilly Areas in Soil by Mechanical M6ans 84
3.9 Excavation in Hard Rock (controlled blasting) with disposal 56
3.33 Excavation in Hilly Areas in Ordinary Rock by lrechanical 85
upto l0O0 m Means nol requirlng Blasting
3.10 Excavation in Marshy Soil 57 3.34. Excavation in Hilly Areas in Hard Rock reqliring Btasting 86
3.11 Removal of Unserviceable Sollwith disposal upto 1000 m 58
3.35. Work in Urban Roeds 87
3.12 Pre-splitting of Rock Excavallon Slopes 59
3.36. Conslruclion of Embankment wilh Flyash/pond Ash evailable 89
Excavalion tor Structurls 60 from Coal or Lignlle Bumlng Thermal plants as Wasle
Maleri.l
3.14 Scarifying Existing Granular Surfacr to a depth of 67
50 mm by Manual Means 4 Sub-Bases, Bases (Noh.Bltumlnou3).nd Shoulders
91
Scarirying Existing Bituminous Suface to a depth of 50 mm 61
Preambie 91
by Mechanical Means
4.1. Granular SutBase with Close Gradod Matoriat
3.16 Construction ofEmbdhkmenl with l\4aterial obtainod from 68
Bonowpits 4.2. Gr8nllar SuFBase wih Coerse Graded Material 95
4.3. Lime Slabilizatioi lor lmprovlng Subg.Ede 9?

(vi)
(vi0

E
.r
)
)
Part A.
Road Works Part A.
) Chapter Item No. Description Page
Road Wo*s
Chapter Item No. Descriplion Page
) 4.4. Lime Treated Soil for Sub-Base

4.5 Cement Treated Soil Sub-8ase/Base


5.9. Surface Dressing 141
100
) 4.6. Cement Treated Crushed Rock or Combination 101
5.10. Open-GradedPremixSurfacing 143

in SuUBase/Base 5.1 1. Close-Graded Premix Surfacing/Mixed Seal Sudaclng 't 46


) 4.7. Making 50 mm x 50 mm Fuflows 102 5.12. SealCoal 147

4I lnverte.l Chokp 5.13. Supply of Stone Aggregates for Pavement Courses 150
) 103
5.14-
4.9. Water Bound Macadam 104 Mastic Asphalt 15'1

) 4.10. Crushed Cement Concrete Sub-Base/Base 107 5.15. SIurry Seal 153

4.11. Penetration Coat Over Top Layer of Crushed Cement 109 5.16. Recycling of Bituminous Pavement wilh Central 157
) Concrete Base Recycling Planl

4.12- WetMix Macadam ,|10 '


5.17 Fog Spray 159

) 4.13. Construction of l\,4edian and lsland with Soiltaken from 112 5.18. Bituminous Cold Mix (lncluding Gravel Emulsion) 160
Roadway cutting
5.19. Sand Asphall Base Course 168
) 4.14. Construction of Median and lsland with Soil laken from 1'13
5.20. Modified Binder 170
BorrowAreas
5.21. Crack Prevention Courses 172
) 4.15. Conskuclion of Shoulders 114
5.22. Recipe Cold Mixes 177
4-16. Foolpaths and Separators 114
, 4.17. Crushe. Run Macadam Base 116 6 Cement Concrete Pavement 18'l

4.15. Lime, Flyash Stabilised SoilSub-Base 118 Preamble 181


) 6.1. Dry Lean Cemenl Concrete Sub-Base 183
5 Bases and Surface Courses (Bituminous) 121

) Preamble 121
6.2. Cement Concaete Pavement 184

5.1. Prime Coat 123


6.3- Rolled Cemenl Concrete Base 187

) 5.2. Tackooat 124


6.4. Transition Section between Rigid and Flexible Pavemenls 't
88

5.3 Bituminouslvacadam 125


6.5. ,Conslruction of Base/Sub-Base of Pavement with Lean 189
) Cqncrete - Flyash
5.4. BituminousP€netaation[4acadam 124 6.6. C;menl - Flyash Concrele Pavement 19'1

I 5.5. Buill'up Spray Groul 130


7 Geosynthetics and Reinforced Earth 194
5.6. Dense craded Bituminous Macadam 132
) 5.7. Semi-DenseBituminousConcrete 135
Preamble '194

5.8. BituminousConcrele 138


7.1. Sub-Surface Drain with Geotextiles 195

) 7.2. Narrow Filter Sub-Surface Drain 196

, (viii)
(x)

)
)
)
Part A.
Road Works Part A
Chapter Description Page Road Wo.ks
ChaPter Item No Descrlptlon Page

7.3. Laying Paving Fabric Beneath a Pavement Overlay 197


8.20. Tubular SteelRailing on Medium Weight SteelChannel 234
7.4. Laying BoulderApron in Crates of Synthetic Geogrids 't
98 (ISMC series) 100 mm x 50 mm

7.5. Reinforced Earth Structures 199 8.21 Tubular Steel Railing on Precast RCC Posts, 1.2 m High 236
Abovo Grcund Level
8 Trafric Signs, Markings and other Road Appurtenances 205
8.22. Reinforc€d Cement Concrete Crash Barrier 237
Preamble 205 Metal Eeam Cra6h Banier 238
8.23.
8.1. Caslin-Situ Cemenl Concrete M 20 Kerb 207 4.24. Road TIaIfic Signals Electrically operated 240
4.2. Caslin-Situ Cement Concrele lvl 20 Kerb with Channel 209 8.25. Flexible Crash Banier, Wre Rope Safely Bar er 241
8.3 Printing New Letters and Figures of any Shade 211 8.26. Anti-Glare Devices in Median
8.4. Relro-ReflectorisedTrafficSigns 213 8.27. St eet Lithting 245
8.5. Direction and Place ldFntificalion Signs upto 0.9 sqm 215 8.28. Lighting on Bddges 247
Size Board
8.29. Cable Ducl Across the Road 248
8.6. Direction and Place ldentilication Signs with Size 216
more than 0.9 sqm Size Board 8.30. High,lay Patrolllng and Traflic Aid Post 251

A.7. Ovefiead Signs 218 8.3f. Items Related to Underpass/subway/Overhead Bridge/ ?51
Overtload Foot Bridge
8.8. Painling Two Coals on New Concrete Surfaces 220
8.32. Traffic Conlrol System and Communication System 251
8.9. Painting on Steel Surfaces 221
8.33. Gantry Mounted Variable Message Sign Board
8.10. Painting on Wood Surfaces 221
8.34. TGffic lmpact Altenuators at Abutments and Piers
8.11. Painting Lines, Dashes, Arrows, etc. on Roads in Two Coats 222
8.35. Road lrarkers/Road Stud with Lens Refector
on NewWork
8.36. Tralfc Cone 254
8.12. Painling Lines, Dashes, A(o\/s, elc. on Roads in Two 223
Coats on Old Work 8.37. Roadside Amenilies 258

i].13. Road Marking with Hol Applied Thermoplastic Compound 225 Rumble Strips 259
with Refleclorising Glass Beads on Bituminous Surface 260
8.39. Policeman Umbrella
4.14. Kilomelre Stone 226 8.40. High Mast Pole Lighting at lnterchanges and Flyovers 261
8.15 Road Delineators 224 8.41 . TollPlaza 282
8.'16. Boundary Pillar 4.42. Safety Oevices and Signs in Constructon Zones 263
4.17 G.l. Barbed Wire FencinE 1.2 m High 230 8.43. Podable Banicade in Construction Zone 264
8.18. G l. Barbed Wire Fencing 1.8 m High 231 8.44. Permanent Type Barricade in Construction Zone 265

8.19 Fencing with Welded SteelV\(re Fabric 75 mm x 50 mm 233 8.45. Orum Delineator in Conslruction Zone 268
8.46. Flagman 269

(x)
1n)
t

Part A. PartA.
Road Works Road wo*s
Chapter Item No. Oescrlption Page chapter Item No. Oescrlption Page

9. Pipe Culverts 270 11 Horticulture 291

Preamue 270 Preamble 29'l


9.1 PCC l:3:6 in Foundation 271 111 Spreading of SluQp Farm Yard Manure o./and Qood Earth 292

Laying Relnforc€d Coment Concrote Pipe 272 11.2. Grassing wilh 'Doob' Grass 292
NP 4Prestressed Concrete Pipe on First Class Bedding 254
11.3. Maklng Lawns including Ploughing aod Oragging with
in Slhgle Row
'Swagha' breaklng of Clod
9.3. Laylng Reinfoloed Cement Conc.6le Pipe 274 114 Mainlenance of Larns or Turfing of Slopes 295
NP,{/Prest ess6d Concrete Pipe on Fi st Class Bedding
in Double Row 11.5 Turfng Lawns wlth Fine Grassing including Plolghing. 295
Dressing
10. Maintenance of Roads 277
116 Malntenance of L6{ns with Fine Grassing for lhe Fkst Year 296
Preamble 277 11.7 Plantino and Malntalning of Perman€nt Hedges 297
10.1. Restoralion of Rain Cuts 278 11.8 Planting and Maloblning oI Flowering Plants and Shrubs 299
1O.2. Maintenance o, Earthen Shoulders (tilling with fresh soil) 279 11.9. Planting of Tre€s rnd their Maintenance for Ono Year 300
'10.3- Mainlenance of Earthen Shoulders (stripping excess soil) 2AO
1 1.'10 Renovaljoh of Lawns lncluding, Weeling, Forking th€ Ground, q0l
10.4. Filling Polholes and Patch Repairs with 281 Top Oressing with Fo*ed Soll
Open-Graded Premax Surfacing, 20 mm 302
11_11. Supply of Sit€ Well Decayed Farmyard Manure
10.5. Filling Pot-holes and Patch Repairs with Bituminous 242
11.12 Supply at Sits of WbrUstore.Deolled Neem Cake s02
Concrete, 40 mm
10.6. Crack Filling 243 11.13. Supplying Sludge 303

10.7. Dusling 284 1 1.14. Haf Brick Clrcular Tree Guard 303

10.8. Fog Seal, Crack Prevenlion Cou6es, Slurry Seal, 2e4 11 15. Edglng with 2nd Class Brick, Laid Ory Lengthwise 304
Surtace Dressing tor Mainlenance Works 305
1 1.16. Making Tree Guard '1.3 m High trom Empty Bitumen Drums
10.9. Repair ofJoint Grooves with Epoxy Mortar 285
11_17. Making Tree Guard 2.0 m High Lom Empty Bitumen Drums 306
10.10. Repair ofOId Joints Sealant 286 't 1.18. Wrought lron and Mild SteelWelded Work 307
10.11. HillSide Orain Clearance 286
1't.19. tth Ms kon 308
Tree Guard
10.'!2. Landslide Clearance in Soil 287
309
11_20. TreE Guard with MS Angle lron and SleelWire
10.'13. Landslide Clearance in Hard Rock Requiring Blasting 288
11.21. Compensatory Alfo.estalhn 310
10.14. Snow Clearance on Roads with Dozer 289
'10.'15. Snow Clearance on Roads with Snow Blowers 290

(xii) (xiii)
1.

B. BRIOGE WORKS

Part B.
Bridge Works Part B.
Brldge Works
Chapter ltem No. O.scription Page
Chaptet ltem No. Oesc ption Page
Basic Approach [or the Prepa6tlon of Standard Oata Book 315
12.21 Sand Filling in Wells 422
12. Foundation 318
Providing St6€l Liner 10 mm Thick for Curbs and 6 mm Thick 422
12.22
Preemble 3'18 for Steining of Wells
12.1 Excavation for Structures 321 12.23 Bored Cast-ln-Situ M 35 Grade RCC Pile of 423
12.2 Filling Annular Space Around Footing in Rock Oiameler Tm mm

12.3 Sand Filling in Foundation Trenches 331 12.24 Bored Cast-ln-Situ M 35 Grade RCC Pile of 424
Diarnet€. I 000 mm
12 4 PCC 1:3:6 in Foundalron 331
Eored Cast-ln-Situ M 35 Grade RCC Pile of 425
12.5 Erick Masonry Work in Cement Mortaa 113 in Foundation Diameter I 200 mm
'12.6 Cemenl Mortar 1:3 333 't2.26 Ddv€n Cast-lrFPlac€ l,l 35 Grade RCC Pile of 427
12.7 Stone Masonry in Cement Mortar l:3 in Foundation 333 Dlameler 75O mm

12.A Plain/Reinforced Cement goncrete in Open Foundataon 335 't2.27 Driven Cest-ln-Place M 35 Grade RCC Pile of 42A
Oam€ter 1000 mm
I 12.9 Providing & Conslructing Temporary lsland for Construction 348
of Well Foundation 12.24 Oriven Cast-ln-Place M 35 G.ade RCC Pile of 430
t DianEter i200 mm
12.10 Providing and Leying Cutting Edge of Mild Sleel for Well 350
Foundalion 12.29 Ddven P.ecast Ve,tical M 35 Grade RCC Pil€ of 431
Diameter 5OO mm
12.11 Plaan/Reinforced Cement Concrete in Well Foundation 351
12.30 Oriven Precast Vert'cal M 35 G,ade RCC Pile of 432
12.12 Sinking of6 m External Diameler Well through allType 371 Oameter 750 mm
of Strata
12.31 D.iven Precast Vertical M 35 Grade RCC Pite of 434
'12-13 Sinking of 7 m External Diameter Well through allTypes 377
Diarnoter 1000 mm
of Strata
Driven Precast Ve,ticalM 35 Grade Rcc Pile ofsize 135
12.14 Sinking of I m External Oiameler Well through allTypes 383
300 mm r 300 mm
of Strata
12.33 Driven Precast Vertical M 35 Grade RCC Pile of Size 436
12.15 sinking of I m Extemal Diameter Well lhrough all Types 389
500 mm t 500 mm
of Strata
12.34 Driven Precast Vertical M 35 Grade RCC Pile ofsize 437
12.16 Sinking of 10 m Exlernal Diameter Well lhrough allTypes 395
750 mm ! 750 mm
of Strata
12.35 Driven Vertical Steel Piles of H-Secllon Sleel Column 438
i 12.17 Sinking of 11 m Extemal Diameter \vell lhrough all TyPes 401
400 mm x 250 mm (ISHB series)
of Skata
12.36 Driven vertlcal Steel Piles of H-Section steelColumn 439
12.18 Sinking ol12 m External DiameterWell through alllypes 407
I ol Strata
12.37
450 mm r 250 mm (ISHB series)
Pile Load Test on Single VedicalPile 440
12.19 Sinking ofTwin D-Type Wellthrough allTypes of Strata 413
12.38 Cement Concrete for Reinforced Concrete in Pile Cap 441
12.20 Pneumatic Sinking of Wells Mth Equipment 419
12.39 Levelling Course ior Pite Cap 447

(nv) (xv)

)
)
\
!

Parl B.
B.ldge Wo.ks Pe.t B,
Chapter ttem No, Descrlption Page
Brldgo Work!
Chapter ltom No. D..criptlon Page
12.40 Supplying, Fitting and placing Uncoated HySD Bar 448
Reinforcemenl in Foundation 14.4 Providing and Lrrlng Cement Concrele Woaring Coat M 30 492
12.4'l
crade lncluding Rolnfoa6ment
Supplying, Fitting and Placing Uncoated Mitd Steet 449
Reinforcement in Foundation 't4.5 MaslicAsphalt 493
13. Substructure
450 14.6 Construction otite.Cast RCC Railing of M 30 Grado, 495
Aggregato Ske Dt Excoodlno t2 mm
Preamble 450
14.7 Conslruction ot RCC Railing ol M 30 Grade, ln-situ 497
13.1 Edck Masonry Work in 'l:3 451 with 20 mm Nonial Siz€
13.2 Poinling with Cemenl Mortar (1:3) on Brick Work 451 14.8 Provldlng, Flttlno.nd Fi)dng Mild Steel Railing 498
13.3 Plestering with Cement Mo.tar (1:3) on Brick Work 452 14.9 Dralnage Spoub 499
13.4 Stone Masonry Work in Cement Mortar 1:3 lss i J4.10 rcC M I 5 Gradc Lgvelling Course Below Approach Slab 500
Plain/Reinforcod Cement Concrete in Substructure 455 11.11 Reinforce(ioeEE Concrote Approach Slab 500
13.6 Supplying, Fitting & Placing HySD Bar Reinforcement 459 14.'t2 Providing Anti-Co.ro8lve Treatment to HYSO Reinlorcement 501
13.7 Supplylng, Flttlng & Placjng Mild Sleel Reinforcement 460 with Fuslon Bond Epoxy Costing (FBEC)
13.8 Providing W€ep Holss In Brick Masonry/ptain/ 461 14.13 Providing, Prgcdng, T6nspordng end Placing ln Position 502
Reinforced Concrete Precast-PEten&Ed Cooca6ta GirdeG
13.9 Backfilling Bohind Abutmont, Wng WaI and Retum Wa 462 14.11 Providing and F-E Hellcel Pipes ln Voided Concrete Slab6 504
,|3.10
Providing and Laylng oI Filter M6dia with Granular Materials 463 1il.15 Crash Baniers 505
,|3.1'l
Supplying, Fitting 6nd Fixing Cast Steet Rocker Bearing 464 14.16 Painling on CorEte Sufacs 505
13.12 Supplying, Fitling aod Fixing Forged Steet Ro er Bearing 465 14.17 Buried Joint 506
13.13 Supnlying, Filting and Fixing Stiging ptate Bearing with pTFE 466 14.18 FillerJoint 507
Surface Sliding on Staiitess Steet
14. t9 Asphaltic Plug Jdrt 5'10
13.14 Suppliing, Fitting and Fixlng Etastomeric Bearing 467 14.20 Elastomoric SlabS-tsel Expanslon Joint 512
13.15 Suppling, Fltting and Fixing Sliding plat6 Bearing with 468
Staihless St6ol Ptalewilh Mlld Steel Matrix
14.21 Compregsion Sd Jolnt 513

13.16 14.22 Slrip Seal Expardon Joint 515


Supplying, Fitting and Fixing POT-PTFE Bearing 469
1il. Superstruclure 14.23 Modular St lp,/B.r Seal Joint B€yond 70 mm and upto 516
471 to 140 mm \
Preamble 471 14 24 Modula. Slrip/Bd Seal Joint Beyond 140 mm and upto 517
14.1 Fumishing and Placing Relnforced./prestressed Concrete to 210 mm
472
14.2 St pplying, Fitling and Placing HYSD Bar Reinforcement 489 1S. Riv6r Tralnlng & Protection Works 519
14.3 High Tensile Steel Wres,/Strands lncluding all Accessories 490 Preamble 519
for Slresslng
15.1 Providing and Lrying Boulders Apron on River 8ed s20
15-2 Eoulder Apron t id in Wre Crales s21
(xvi)
(xvii)
)
Pan B-
Bridge Workg Part B.
Brldge Works
Chapler ltem No. Descrlptlon Page
Chaptor ltem No. Descriptlon Page )
15.3 Cement Concrete Blocks (size 0.5x0.5x0.5 m) 522 16.1 'l Epory Bonding of New Concrete to Old Concrete 542 I
15.4 Providing and Laying Pilching on Slopes 522 16.12 Providing External Preslressing with High Tensile Steel 542
Providing and Laying Filter Material Underneath Pilching Wredstrahds-Span 25 m ,
in Slopes 16.13 Providing Extemal Prestressing with High Tensile Steel 544
15.6 Geotextile Filter 524 Wres,/Slran&-Span 50 m )
15.7 Toe Proteclion 16 14 Providing Extemal Prestressing with High Tensile Steel 546

15.8 Providing and Laying Flooring 525


Wre,/St ands-Span i00 m ,
16.15 Replacemeot of Eeanngs 547
15.9 Dry Rubble Flooring 526
't 5.10 Curtain Wall 527
16.16 Reclification of Bea ngs 548
549
t
16.17 Replacemenl ol Expansion Joints
15.11 Flexible Apron 16.18 Replacement ot Damaged Concrete Railing 550
)
15.12 Gabion Structrre for Retaining Earth 528 16.19 Replacement of Crash Barler 550
Replacement of oamaged Mild Steel Railing
15.'t 3 Gabion Structure for Erosion Conkol, River Training Works
and Protection Works
530 16.20
16.21 Repair of Cra8h Bani€r 552
)
16.22 Repah of RCC Railing 553
15. Repair and Rehabilitation 532 )
16.23 Repair of Steel RallinO 554
Preamble 532
16.1 Removal of Existing Cemehl Concrete Wearing Coat
17. Usage Rates o, Plant end Machlnery ,
including its Oisposal
16.2 Removal of Existing Asphaltic Wearing Coat 533 )
16.3 Guniling Concr€te Surfac€ with Cemenl MortarApplied with 534
Compressor ,
16.4 Providing and lns€dino Nipples with Approved 535
FixingCompound ,
16.5 Sealing of Cracks/Porous ConcrEte by lnjeclion Process 536
16.6 Patd ng of Oamaged Conqete Sur{ace with 537 )
PolvrPr Concrete
16.7 Sealing ot CEcUPorous Concrete with Epo:ry 538 ,
Grout by ln eclioo through Nipples
16.8 Applyins Epory Mortar Ovor Loached, Honey Combod and
Spalled Concrete Surface and Exposed Steel Reinforcement
,
540
Removal of Oefective Concrote
)
16.'t 0 Applying Pre-Pack€d Cement Baged Polymer for 541
Repl.cem€nt of Spalled Concrete
,
(xviii) (xix) )
,
t.
,
)

) ABBREVITATIONS

)
Millimetre
Centirn€tre
) Mete
km Kilometre
) sqm Square rEtre
ha Hectrare
Sq. km
, SquareKilometre
CubicMetre
I Litre
) kt Kilolilre
kg Kilogram
, t
q quintal
tcnne
t.km tonne kilometre
, MoRTAH Minlstry of Road Transportand Highways
ts lndianStanderd
PART-A
, tRc lndian Roads CoaEress
T&P Tools and Planls

) G Galvanised lrcn ROAD WORKS


o Cast lron
RCC Reinforced Cement Concrete
, Plain Cement Concrete
GL Ground Level

, Rs
Dia
Rupees
Dieneter
Minimum
)
No. Nurhber

, tr
Le.
Hour
Thal is
€g
) WBM Waler Bound Macadam
B[I Bit0minous Macadam
) SDBC Semi-Dense Bituminous Concrete
BC Bituminous Concrete
FE loader Front end Loader
) ot\4c Oplimum Moisture Content
L Lead in Kalornetre
) HMP llot Mix Plant
RR Road Roller

,
) ()o()

)
)
f

A. Road Works I
Basic Approach and General Conditions for the Preparation ,
of Standard Data Book
)
The basic approach for the preparation ofStandard Data Book for Road Works is indicated as under
)
Description ofitems

1. The descriplion of items is given briefly and linked with the relevant ctause of lhe [,1oRT&H
)
Specifcations for Road and Bridge Wo*s, \,vhich may be refened for detailed descrlption, provisions
and interpretation. )

2. Mechanical Means ,
Oue to mechanization ofconstructon work, rate Enalysis forvarious items have been prepareC
using mechanical means. Howsver, manualmeans have alsobeen provided forcertain cases,
)
where areas may be inaccessible formachines orquantum ofwork may nol be large enough Io
justry us6 ofmachines. )
3. Overhead Charges
)
The overhead charges include lheloliowing elements
I
i. Site accommodalion, selling upplant. accessroad, walersupply, electricity and generalsite
arrangements.
)
ii. Office fu rniture, equipmentand communications
,
iii Expenditureon

a)
,
Corporate office of contractor
b) SitesupeNision
c) Docurnenlation and 'as builr d6wings )
iv. I\,4obilisation/de-mobilisation of resources )
v Labourcampswith minimum amenities and transportation to work sites
,
vi. Lig ht vehicles for site supervision including ad ministrative and managerial requ iremenls
,
vii.Laboratory equipment and quality conkolincluding field and laboratory testing

,
1 ,
)
(:
(
) viii Minor T&P ancl survey instruments and
setting out works, inctuding verification o, tine
dimensions, triatpits and tore holes, where 6.3 ll has bcen assumed that a urater d*er woold make on€ taip per hour on an averag6. Water
) required
charges have not been included for bms whore lhe requkement is very nominal. lt is assufiEd
ix. Watch and ward that the sam€ would be covered un&r sundd€s.

)
x Traffic management durlng construclion 5.4, Oulput ofplanrequipmenl is considered for lhe compacted quantities

) xi Expendilure on safeguarding envjrcn menl 6.5. The usage charges for machlnes lElude ownership charges, cost of repair and mainlenance
including replacementoftyres and nllniog and operaling charges which lncludes crew, fueland
) xii. Sundries lubricanls.

) xiii- Fanancing Expendifu re 7. lvlatotials

xiv. SaleyTum over ter 7.1 Quantiti€s of materials given in the lale analysis ale approximate ror lhe purpose ofestimating
, and include nolmalwastages. Aclualconsumption would have to be based on mix design
xv Worl lnsurance/compenselion
) 3.'l Forthe purpose ofcalculetion ot ovolhead chaig€s, the projects
7-2 The rates fo materialshould include b6sic cost al localions ol stone crushers, loading, unloading
cost Iocarriage and slacking at planl sites as the case may be,
ere categorized into 2 types
as underand overhead charges, provided as indicated againsteach,
, 7.3 Theallernative proposal for curching own aggregale by installing crushershould be comparcd
l: with procurement of crushed aggregates from lhe marketand proposalfound economicalmay be
Catogory Cosl up to Rs.50 crores l0percent
) adopted.
Category 2: Costabove Rs. 50 c.ores 8 per cent
f .4. The specifications of rnaterials shall be govemed by section 1000 of MoRTAH Specifications for
). 4 Contractor Profit l0 per cenl ol cost of works
Road and Bridge Works.

, Conkaclor profit is atso added on overheadchaBes. 8.

8.1. The labourwages should be as per rates fixed by state govemment


) 5. Easic lnputs

Basic inputs are ontygiven in thestandarddata book. The rates for materiatand 4.2. One mate has been provided for 25 labours.
) oblainedfrom locat authoritjes for the erea wh6re the project is toceted.
labour are to be

8.3. Skilled labour include mason, carpenler, blacksmith, mechanics and othertrades

) 6 Plants and Equipment


9. Carrlego of Matedals
A dozer is proposed fo. excavaljoo where cutting anct filing for the roadway
rl longer leads, a combinalion of hydraulic excavaicr and tipperis proposed.
is within 1OO m. For
9.1. The unil lor vehicle for caniage has been laken as under:

t 6.2 Keepang in vi€w lhe iob and managedal faclors and the age factor
of machines, the output of ptant
a) ln hourswhere lead isdefinedhcluding t,ne required for loading and unloading
and equipmentis taken approximatety 70 per centofthe rated capacity gaven
by manufacture
b) ln tonne - km where lead is vad6ble. The loading and unloading tor such cases have been
) under ideal condilions.
provided seperabv.

)
) I
5

)
)
)
9.2. Where the quantity of materialto be lransported is smallsuch asdismantled materials and lhe
lnlheliohtofabove,lheauthodtlesengagedlnpreparinglhecostestimatesmayexercisetheir
same are required to be loaded manually, provision oftractoFtrolley has been made instead of i, i.i"-.'"ir"J*uit", *" additional cost
to the extent of 2 to 3 per cent keeping in view lhe
tipper. '.#;;;;;;"*ned above. support delarls ror the exlra cost based on actual
sile
)
grven
conartions in specifrc cases will have to be
in iuslilicalion '
10. General

'10.9 Credit Ior Dismantled Material


)
't 0.1. Theclause numbers refer to l\,,loRT&H Specilications for Road and BidgeWorks.

The dismantled matedals should beexamined and


a realistic assessmenl made forthe creditfor ,
10.2. Assurnptrons made have been indicated in respective chapter in lhe fo,m ofnotes, where requked auctioned
for works or '
such maleials.which can be utilized
10.3. Sundrieslocaterforunforeseencontingencyandmiscellaneousitemshavebeenaddedinthe.
ln lhe rate analyses of some ilems, the
like
quantities of sub_items involved in that analyse6
overheadcharges. 10.10
exiaration to, rounaaon, toundation concrete, Painting' lettering etc- have
rates 'r
b€en given ' The
where lhe same have aheady been analysed '
'10.4- Arrangementfortraffcduring conslruction shallb€ as perClause 112 ofMoRT&H Specilicaljons io, sJ iturns may Ue tafren from rclevanl chapteG
for Road and Bridge Works.
'
by the Engineer before startof
10.11. The source of mate,ialand samPles are required lo be approved ,
10.5. The supply of materials willbe taken either at the location of mixing plant or at the work site as
the case may be-
and works'
10-12. The rates of items include costoftesting ofsoil, matedals
10.5. Contractor will make his own arrangemenls for bonowing earlh. However, compensation frrrearth
119 of MoRT&H
taken from pdvate land has been incloded in the rate analysis forconstruction ofembankment 10.'13- The use ol surface bv conslruction vehicles shall be governed by Clause
with bonowed earth. Specificallons.

10.7. The requirementofmachinery has been wo*ed outassuming effeclive wo*ing pedod of6 hours 10-14. The contractor shall anange to provideand maintain an adequate equipped
field labo'atory as pe'
pershiftof 8 hours. Clause 121.

10.8. The cost ofea(hwork in urban roads willbe comparatively higher due to followng reasons:-
10.15. Quality Controlofworks shallbe govelned by Section 900 of I\'4oRT&H Specifications

a) There is mlxed trafflc on urban rcads like slowmoving hand and animaldriveo carts, rickshaws, cassetles as
'10.16. The various acilvities of works shall also be docun€nted by pho{og raphs and vedio
cycles, two/lhre€ wh€eler apartfrom the usual vehicular traffic resulting into trafficjams. This
per Clauses 125 & 126 ofMoRT&H Specifications.
causes loss ofworking time which may be in the range of 1O-15 per cent.

b) There is considerable disruption of kaflic adversely affecling the efficiency of the working 10.17. The classilication ofsoilshallbe as PerClause 301.2 oflvloRT&H Specillcalions'
parties including mechines due to congestion caused by pedestrian lrafflc, local road side
venders, parking ofvehicles by the road side, encroachments by the shopkeepers and local 10.18. The earth excavated from foundalions has been considered to be back{illed and balance utilized
shops \ll/ho make use of the berms ofthe road in front of thes€ shops and unauthodzed locally for road work except in thecase ofmarshy soil.
conversion of toad berms into mini local ma*et. The oulpul of manpower and machines is
substantially reduced duetofactors mentioned above. 10.19. The rate analysrs for removal of unsu itable soil does not provide for replacement by su itable soil
l
which will have to be paid separately
c) Cost of living in urban areas is comparatively more resultjng into higher wages.
10.20. Items for hilly terrain have been analysed separately.
d) At limes, wo* is executed during nighttime due to heavy traflic during day time. This involves
exta expenditure by way ofmaking arrangementfor lighling and special transport for working 10.2,1_ The hire charges rates for machinery and equipments are applicable for lhe year 2001-2002'
parties dueto odd hour. Suitable escalalion may be added forsubsequent years dePending upon the market situation'

10.22. 1O percentextra cemefll may be provided forconcreting underwatel, where required.

6 7

t
a
(,

) 10.23- Grade of cement may be adopted as permix design. ChaPter-{


) 10.24, Ouantities ofcemenl invarious grades ofcementconcrele have been traken as per IRC:21_2000
and IRC:18-2000. Carriage of Materials
) 10.25 Therates forrigid, semi-rigid and llexible crash barriers have been analysed in ChapteGS.

) 10.26 The coars€ and frne aggregates shell conrorm lo lS:383 Preamble:
10.27 Cerlain equipments like road rollers, are required lo be available at site for complete period of the -...-^',i.i^^n{linmrhasbeenmadeinhourswhereleadiskno,vnlikedisposaloflhematerialsupto
, shilt, though from the consideration of thek output, lhey may be required only for 3 to 4 hours. ' l::i:' ;";;a;," ,""0 u,*o'" *u
'. been made ""'riage
of hol mix or concrele mix rrom plants or earlh

This is necessitated lo malch with lhe output ofother associated machines like HM. Pavers ;;;; ;has inte'msortonoe-kilometer (!km)' which can be adopted
;,#;,#;;;,
) etc in such cases, the hire charges ot roact rollers have been multiplied with a factor of 0.65 to as per aclual conditions'
account for lhe idl6 period.
has been made for a tractor trolley
insiead oft'pperwhere dismanlled materials ot sorls or
) 10.28.
2.
' Provision arc requred to be transponed Thls anangement
For pricing of RCC slab oJkerts, the iems given in respective chapters in bridge section may be
,j"iri n"u,ng .or" uoh'rme as compared wth weghl
willbe econoraical
, 10.29. Wherever electrb gene€tor has not been provided to run a plant orequipment, is assumed lhat road Provision has accordingly
_fhe the riding surfac; ol the
3 cost of carriage will vary dependrng upon
it is fitled wlth a dieselengin6.
Oeen madeconsiaering surtaceroads,
unsLlfaced graveled roadsand katchatracks'
)
'10,30. Some of the fnns ln the fuld of conslruction chemicals have evolved new brands of chemicals for and rnechanical means for adoplion as
peractual
4. Analysis forloading has been done both for manual
) water proofng, 6eal;ng ofcracks. cemenling compunds etc. The rnarket can b€ explored to meet
such requirernents
HMPorbatching plantandthere is automatic loading
l 10.3'l Some of mejor steelproducing firms have evolved thermo-machanically treated steelwhich has
enhanced streng(h, belter conosion resistanc€. ductility, rveld ability and high temperatLrre lhennal
5
" \ here loading
in
is done by mechanical plant like
iioo"r., or*,t,"^ alo;ding and un-loading has been mede at rateol10 percenl ofcost ofcarriage
toaccountfoftinelakenbythelippellorgetlingloadedalthePlantandun.loadinginthepaveror
) resistance. E nqu iries from lhese lirms can be rnade on technical specifications and use of such
products considered in works based on perfornance in wofis where these have already been otheMise at site.
used. generally taken for estimation purpose'
, 6 Although the markel rales for sLrpply ofaggregales atsile are
have also been analysed as most ofthe conkactors prefer to crush their
10.32. Provi6ioo of lly ash has boen made ln embankn€nt conslruction, sub-base construclion and in rate folrushing otaggregale
invalue'
own aggregate; incaseollarge projecls exceeding Rs 50 crores
) cemenl concGte pavernent,

10.33. The Standard Oata Book is ior Department use only.ltcannot be produced in Courl ofLawas
I TThecostolmaterialshallbeevaluatedconsidednglhecostatcrushingpbntsandcoslofcalriage
) reference/aulhodty and thus lsa privilege document. iocludingloadingandunloadingortheralesfolsupplyalsit€dePendingUponsystembeingfollow€d
wilh the rates for own crushing and cerriaqe
at padic;lar localions. These lates should be compa'ed
't0.34. ln case it is decided to include the following ilemEand lheir maintenanco in the BOQ, the scope
) t end specificatioos should be wo.ked out and delined in a delailed manner in the tenderdocument
bY lhe conslruct'on agencY

lo avoid any dispute during execution.


)
lvloRT&H clause ltem

) 120 Sit€ oflice and fumiture for Engineerand his staff.


'122 Sile residential accommodelion for Engineerand olher supervisory staff.
'124 Providing and rneintaining vehicle for the Engineer.
)
9
) It

)
)
Roi worb r l4eirg! ofMrLti.!

Chapter-1 Unit Quantity Rato


,
Sr., Rofaaan9o to O6criPtlon
Rs.
No. MoRT&H
,
Carriage of Materials Spocncatlons

Cost for 5.S clm: a+b+c


)
Sr. Descriptlon Unit Ouantity Rats
per
No MoRT&H
Speclfications
Rs. Rats cum = {a+b+c)/ 5.5
)
Note t nloadlng wlll b€ bY tipPlng.
,
1.1 Loading aod Unloading ot Stone 1.2. Loading and Unloadlng ofStono Boulders by
Boulder/Stono A00regatesrsend/ Manual lreans )
Ken karrilloorurh

Placing tipper at loading poinl, loading Taking ouqrt =5.5 c0m


)
with front end loader, dumping, turning
forreturn kip, excluding time forhaulage a) Labour )
and return trip. Mate day 0.11

Mazdoo. for loading and unloading day 0.75


,
Taking output:5.5 cum b) t achln€ry
Tipp€r 5.5 tonne capacity 0.75 )
Time .equi.od lor
i) Positioning of tipper al loading point l Min c) Ov€rhe.ds @ % on (a+b) )
ii) Loading by front end loader 'l cum '13 Min

bucket capacity @ 25 cumperhour d) Cont.ector'6 profit @ %on (a+b+c)


iii) Maneuvering, r€versing. dumping end 2 Min )
tuming for retum Cosr lo. 5 scum = a+b+cld
iv) Waitingtime, unk reseen 4 Min )
contingencies, etc. Rate per cum = (a+b+c+d)/s 5

Total 20 Min No(e: Unloadins wlll b€ bY tlPPing.


)
.) Machln€.y 1.3. Loading.nd lJhloading ol Cement or )
Tipper 5.5 tonnes capacity 0.33 Steel by Manual Means .nd Stacklng
Fronl end-loader 1 cum bucket capacjty
qrr trour
0.33
Unit
)
@ 25 = toone
Taking ouEut = 10 tonnes
b) Overheads @ % on (a) )
.) Labour
c) Contractor's profit @ % on la+b) Mate
Mazdoor for loading and unloading
day
dav
0.08
2.00
)
)
l0 )
)

I
)
Rmd wo,t! i l-Cmi.8. ofM.r.ri.ls
Rord Wortr : l -c-iasc olM.t.ritk
)
Sr. Reference to Oescription Unit Quantlty Rate Descrlptlon Un it Quantlty Rete
Reterence to
) No. MoRT&H Rs
Sr.
No. MoRT&H Rs.
Speclfications
Specifications
)
b) Machinery CaseJl : Unsurtacad Gravelled Road

) Truck 10 tonne capacity 2AO


Speed wilh load :
20 lrn/hour
c) Overheads @ % on (a+b) Speed for empty relurn trip : 30 krn/hour
)
d) Conhactor's profit @ % on (a+b+c)
a) irachlnery
) cost tor 10 tonnes : a+blc+d i) Tippor l0 tonnos capaclg
fime tak€l| ioronwad haulage wilh load hour 0.5

) Rate per lonn€s = (a+b+c+d)/10 Tirne taken forempv retum lnp hqir 0.33

1-4- Cost ol Haulago oxcluding Loading and b) Overheads @ o on lal


) Unloading
c) Contractor's proflt@ % on (a+b)
Haulage of materials by tipperexcluding cost
, of loadjrig, unloadinq and stacking. Cost for 100 t km = alb+c
) Unit = t.km
Rate per t.km = (a+b+c)/100
Taking output l0toones toadand lead

I 10 km = 100 t.km Case-lll : Kalcha Trackand Track in River


8ed/Nallah 8ed and choo Bed
Casel : Sudaccd Road
) Speedwihbad : l0 krwtour
Speed with load : 25 krdhour
Speed while retumiog empty : 15 krn/hour
) Speedwhile relurnjog empty | 35 km/hour
a) irechlnory
a) Machinery i) Tlpp€rl0 tonnes capaclty
) i) Tipper'lO tonne capacaty Time tak€o for onwad haulage hour 1

Time taken for onward hautagewith hour 0.4 Time laken forempv return trip 0.67
) load
Time laken foremply return kip 029 b) OverhG.ds @ '/" on (a)

) b) Overheads @ % on (a) c) Contractor's profit@ % bn (a+b)

) c) Contraclor's p.ofil @ % on (a+b) Cost for 100 t.km = a+b+c

, Cosl ror 1001km = a+b+c Rate pe.tkm = (a+b+c)/100

Rate per t.km = (a+b+c)/100


)
il l3

)
I
)
Rold Wo*s : l -C!Eiag. ofMat riats
Road Work : l{airg. of Maldials

Sr. Reference to De3crlplion Unit Quantity Rate


No. MoRT&H Sr, Relgrence to Descrlplion Unit Ouantity Rate
Rs. Rs.
Specifications No MoRT&H
Specilicalions
1.5 Hand Broken StoneAggregates 63 mm
Nornln.l Siz6 b) Materlal
Stone Bould€r ol size 1 50 mm and below cum 800
Supply ofquanied stone, hand breaking into
c) Machinery
coaase aggregete 63 mtn nominalsize
lnleqral6d stone crusher ol20o TPH Houa 6
(passing 80 mm and retaaned on 50 mm
including belt conveyorand vibrating
sieve) and stacking es directed.
sc€€ns
L,nit = cum Front end load€r 1 cum buckel capacity Hour N
Taking output = l culn Tipper5.Scum capacity Hour n
a) Labour d) Overhead charges € % on (a+b+c)

Mate day 0.m e) Conkactor'6 profil € % on (a+b..1d)


day 1.5

b) Material
Cost 101600 cum = (a+b+cdr€)x0.95
Supply of quanied stone I SO-200 mm size cum 1_10 nate p€. cum = (a+bE+dralx0.956o0

c) Overheads @ % on (a+b) Note : 1 . 600 cum ol stone boulders ar6 no€d6d lo

d) Contractoas profit get m0 cum of stone cilps of size 13.2


@ % on (a+b+c)

Rale per cum = a+b+c+d


2- 95 per cenl of above cost will be a{ributed
1,6. tolh6 produclion of 600 cum of stone d ps
Crushing ofStone Aggregates .13.2
mm
Nominal SIze o113.2 mm sizs and balance 5 per cenl to
the production ol slone dustwhich clmes
Crushing ofstone boutders of 150 mm size in out as a by-producl.
an ihtegrated stone crushing unitof200 tonnes
3. The inlegrated stone crusher includes
per hour capacity comprising of primary anc,
pdmary and secondary crushing unils.
secondary crushing units, belt conveyor and
vibrating screens toobtain stoneaggregates of 1.7. Crushlng of Stone aggrogates 20 mm
13.2 mm nominal size Nomlnal Slze

lJnil : cum Crushing olslone boulders o1150 mm size io


Taking Output = 600 cum at crusher location an inlegrated slone crushing unit o, 200 lonnes
per hourcapacity compdsing ol pdmary end
a) Labour secondary crushing unils, belt conveyor and
Mate day vibrating screens looblain slone aggregales
0.76
MazdoorSkitted day of 20 mm nominalsize.
2
lrazdoor including breaking of any over_ dey 17
sizeboulder l.Jnil : crm
Takinq OJlput = 670 cum al crusher location

l4
15

_1,
i,\ .
Ro.d Wo*s : l-Cunas. of Mat*ials
R.id Wolk: l.Ctriag. olMalcrials

Sr. nelerence to Descrlption Unlt Ouantity Fate


Sr. Reretence to Descriplion LJnit Quantity Rate
No. MoBT&H Rs.
No. MoRT&H Rs.
Specllications
Specifications
a) Labour
Mate day 0.76 Unit:cum
l\lazdoorSkilled day 2 Taking Output = 750 cum atcrusher
Ivazdoor including breakingolany size day 17
boulder
a) Labour
b) Materlal Mate day 0.76
Stone Eoulder ol slze 150 mm and below cum 800
lMazdoorSkilled day 2
c) Machinery d.v 17
lnlegraledstonecrusherol200TPH Hour 6
including belt conveyor and vibralinO b) M.terial
Stone Boulder ofsize 150 mm and below cum 800
Fronl end loader 1 cum buckel capacily Hour x
Tippers.s cum capacily Hour 20 c) Machin€ry
d) Overhead charges @ % on (a+b+c) lnlegraled stonecrusher of 200 TPH Hour 6
includiing beltcfiveyorand vibating
e) Conlractor's profit @ % on (a+b+c+d)
Cosl lor 670 cum = (a+b+c+d+e)x0.90 Frontend loader l cum bucketcapacity Hour 20
Rate per cum = (a+b+c+d+e)x0.90/670 Tipper 5 5 cum capacity Hour 20

Nole : 1. 800 cum ol slone boulders are needed to d) Overhead chaQes @ % on (a+b+c)
gel600cum ol slonechips ol size 20 and
40 mm. e) Contractor's proflt @ % on (a+b+c+d)
2. 90 psr cent o, above cost will be atlributed
lo the produclion o, 670 cum of stone Cost for 750 cum : (a+b+c+d+e)xo.85
aggregates of 20 mm size and balance 10
per cenl willbe forsmallersize aggregates Rate per cum = (a+b+c+cl+e)r0.85/750
and stono dusl which comes out as a by-
producl. Note 1 . 800 cum of slon€ boulders are needed to
3. The integrated slone crusher includes g€t 600 cum of stone chips of size 13.2
primary and sacondarycrushing unils.

1.8. Crushing of Slone Aggregates 40 mm 2. 85 per cenl of above cosl will be ettributed
Nomlnal Size to the production of 750 cum ot stone
aggregales of40 mm stre and balance 15
Ctushlngolslone boulderso, 150 mm size
percentwillbe bf smaller size aggregates
in anintegraled slone crushing unitof200
and slone dusl ufiich comes out as a by-
tonnes per hour capacily comprising ol
product
pimary and secondarycrushing units, bell
conveyor and vibraling screens to oblain 3. The integraled stone crusher includes
) stone aggregates of 40 mm nominal sizB. primary and secohdary crushing 0nits.

) l6 t1

)
,

Chapter-2 Chapter-2 t
Site Glearance
Site Glearance
,
Preamble:
Description Unit Quantity Rate
,
Sr.
1 Unless olheMisestated, therales include sorting and disposal of unse.viceable materialand slacking No. MoRT&H Rs.
of serviceable materialwith alllifis and upto a lead of 1000 m. Speclficetlons ,
2. The €tes inciude T&P and scaffolding required forat6ms oldismantling
2.1 201 culting ol Trees, lncludlng cuttlng of )
3. Carriage ofdismanUed meterials, bushes. branches oftroe. elc.. has been catered with a lractor- Trunks, Eranches and Remov:l
trolley ol 3 lonnes capacity with manual loading and unloading @ 2 trips per hour within a lead of )
Cutting of kees. iocluding cutting ol t(rnks,
1000 m. This will be economicalfor such works as cohpared wath a tipper.
branches and renrcval of sturnps. roots,
4. For cutting oftrees abov6 1800 mm girth, 4 mazdooB have been consideaed to cater tor large size stacking of serviceable materialwilh all lifrs )
lrees. which willfallin this category and upto e lead of 1000 m and earth flling in
the depressiodpil.
5. Where only grassl/vild gloMh is met, iteh No. 2 i.e. clearing grass and removal of rubbish c6n be ,
applied. As regardswild growth disposal of grass, the sarne can be dried and bumt. lJnit = Eech

6. The dismantling of struclures has been calered both by manual and EEchanical means, The eslimator
(l) Glrth koln 300 mm to 600 mm
)
can use his discrelion depending upon quantum of wo* end particular site coflditons r) L.bour
7. Cutting ofrivets has been provided separately
Mate day 002 )
Mazdoon for culting lrees includang day 0.60
8. Oismantliog of Hume pipes hes been celered manually as pipes can be easily rolled by men to a culting. rEflling. compaction of backfilling
,
suitable stackng plac€ s/ithin the right ot s/ay. and staclhg ot seNiceable matedals
within 1000 m lead by olanuel rneans.
9. For dismantling of struc.tures, which remain submerged in water. the cost may be enhanced by 50
)
per clnt b) Machinery
Tlactor-trclley 0.10
1 0 Dismantling of utilities is .equired to be don6 onder lhe supeNision of concemed departments wilh
)
prior rnformation to lhe users.
c) Overhea& @ '/' on (a+b)
11. ln certain items ofdismantling, like, pipe culverls, utilities, eb., excavation in 6erth and dismantling
dl Contractor's proflt
,
ofmasonryworks is notincluded in this anelysis for which suitable notes have been in6erted. These @ % on (r+b+c,
items are required lo be priced separately based on actual quantitjes at site and naturo of wo*.
Rate lor sach tree = a+b+ctd )
12. The dismanlled materials should be examined anda realistic assessment and provision made ajter
due process for the credit for such materials. which c€n be utilized for works oa auclioned. (ll) Glrth lrom 600 mm to 900 mm
)
13. ln case where lead br disposal is rnore lhan 10OO m. exha cost of caniage is required to be added a) Labour
based on toane*ilom€lerage- Mate day 0.04
)
Mazdoors for cutting l.ees including day 0.90
14. AllminorT&P items requhed tordismantling are akeady included in overhead charges. cutting, refilling, compaction of backfi lling,

1 5. For dismantling of utility seNices like water pipe lines, eleclric and telephone lin66. prior intimalion
and slackrng of serviceable matedals )
should bg given to useas. wilhin 1000 m lead by rnanualmaans

)
l8 t9 I
)
)
-l
) \lork 2-Sir. Cl.lm*
Rotd :
R6.d Wo*s : 2-Sir. CI.!m*

)
S.. Referenc€ lo Descrlption Unit Quanlity Rate Desc.iption Unit Quantity Rate
Sr. Refetence to
No. MoRT&H Rs. Rs
) Specifications No. MoRT&H
Speciflcetlons
) b) Machlnery
Clearlng Grassand Rsmoval of Rubbish
201
Traclor-trolley 030
) c) Overhe.d. @ % on (.+b) Cleaing grass rd removalol rubbish upto
a distance of 50 metres outside lhe periPhery
d) Contractors p.olit
, @ % on (.+b+c) of lhe area .

R.t6 for each k6. . a+b+c+d


By Manual Me.ns
, (lil) Glrth f.om 800 mmto 1800 mm
Taking oulput = t Hectare
) .) Lebour
0.08 a) Labour
day 2_O0
) Mazdoors for cutting trees including
cutting, refi lling, compaction of backlilling
day 2_O0
day 50.00
aod sleckjng ol servicea: le matedals
t within 1000 m b) Ov6.ho.d3 @ % on (.)

b) Machinery
, Traclor-troiley 040
c) Contrsctort Proflt @ %on(.rb)

R.l... por H€ct ao . .+b+c


) c) Overheads @ % on (a+b)

d) Contractor's p.ofit @ % on (a+bac) 2.3 201 Cleadng .nd G.ubblng Road L.od
) Rete for each tree : a+b+c+d
Clearing and grubbing road land including
(iv)Girth above l800 mm uptooting rank Yegetalion, grass, bushes,
t shnrbs, saplingsand lrees girh upto 300 mm
a) Labour removal of stunps of lrees cut earlier and
, lvale
Mazdoors forculting trees including
day 0.16 disposal o, unserviceable maleials and
day 4.00 stacking of servi:eable maledal to be used or
culting relllllng, compactionof backfilling auctioned, upto a lead o{ 1000 m including
) and stacking ofserviceable mate als removal and disposalof top organic soil not
within 1000 m exceeding 150 mm in lhickness
, b) Machinory
Tracbr-tlolley 060
) Taking oulput = 1 Hectare
c) Overheadi @ % oo (a+b)

) d) Contr.cto/s prolit @ % on (.+b+c)

Rat6 for e.ch troo = i+b+c+d


,
) 20 2t

) I
)
Ro.d wort : 2-siL clddc. R6dd \vor& | z-Sil. Cl.eec.

Sr. Reference to De3c.iption Unit Quantity Rate Unit Quantity Rato


Sr. Relerence to Oescription
No. MoRT&H Rs. Rs.
No' MoRT&H
Speclficatlons
Speclflcatlons

L By Menual Means : b) irachlnery


Dozer 80 H P wilh attachment for r€moval hour 10.00
A. ln area of lightjunsle of trees & slumps
Tracto.-tolley hoor 1.00
a) Labou.
Mate day 6.00 cl Ove.he.ds @ % on (a+bl
day 150.00
dl Conlr.clor'6 Prollt @ % on {a+b+c}

b) XLchln.ry per Hsctare


Rate = i+b+c+d
Tra&r+oley hour 1.00
B. ln a.Ea of thomy lunola
c) Ovarte.dr @ % on (r.b)
.) Labour
.D Contr.ctor'. prcflt @ '/.on(.+b+c) Mate dav 024
Mazdcrr day 600
Rata per Hectiia . a+b+cd
b) Machlnery
B. ln .rE ol thomy,ungL Dozer 80 HP with attachment for removal hJr 12.00
of lrees & stumps
a) Labour Trador-tolhy tlolr 't.50
Mate day 8.00
dav 200.00 cl Overh..d3 @ % on (.+b)

d) Contr.ctor's Profit @ % oo (a+b+cl


b) Machinery
TractcFtrolley 200 Rats per Hectart ..+b+c+d

c) overheads @ % on (a+b) 202 Dlstllantlinq of Struc(!tts

Dismantling of existing struclures like culveds,


a d) Contractor's profit @ % on (a+b+c)
bridges, relaining walls and other structue
compdsing of masonry, cement concrcte,
Rats p6r Hocteae - a+b+c+d
wood vrod(, steel work, including T&P and
scaffolding $/herever necessary, sorting lhe
It ll. By l/lechanical Means :
disrnanded rnal€rial, disposal ol unseNiceable
rnaterial ad sta€king the serviceable rnaterial
A. tn area of lightlunglo
wi\rh a tifrs and lead o, 1OOO melres

a) Labour
Mate day 0.'t6 Taking ouFut= 1.25 cum
Mazdoor day 4.00

22 23
,

Rord Wotu:2-SircCletu€
Rold Work : 2'SiL Clcrecr

)
Sr. Reterence to Oescription Unit Quantity R.te Un it Quantlty Rate
No MoRT&H Sr Reference lo Descrlption
Rs.
, Speclticatlons No. MoRT&H Rs.
Specifications
) 2.4.lil 202 (i) Lim€rcem€otconcrete
C. Prestrcssedrrcinf otcad cemant
concrcte grade M-20 & abovo
, l. By Manual Means :

a) Labour
A. Llme concaele, cement concrcte glade 0.15
, li-l0.nd below
Mate
Blacksmith
day
day o.25
Mazdoor for dismanlling, loading and day 3.50
) i) L.bout unloading
Mate day 0.04
b) Machlnery
, Mazdoor lor dismantling and loading day 1.00
TractoFlrolley 027
b) Machlnory
) Traclor-trolley o_27
c) Overheads @ % on (a+b)

d) Conlractor's profit @ % on (a+b+c)


, c) ove.hc.ds @ '/" on (a+b)
Cost for 1.25 cum: a+b+c+d
d) Conkactor's proflt @ % on {a+b+c)
) Rale per cum = (a+bac+d)/l.25
Cost lor 1.25 cum = a+b+c+d
, ll. By Mechanical lvlean6 fo.ltems No. 202
(B)&{c)
Rate per cum = (a+b+c+d)/l.25

, B. Cemenl concrete grade M-I5 & M-20


A. comenl concr€lo grade M-i5 & M-20

a)Labour
) a) Labour day 0.02
day 0.05 I\,4azdoor for loading and unloading day 0.25

, Mazdoor tordlsmantling end loading dav 125 l\,4azdoor with pneumalic breaker day 0.25

b) Llachinery b) Machinery
) TracloFlrolley o.27
Ak Compressor 250 cfm with 2leads of hour 0.67
pneumatic breaker @ 1.5 cum Per hour

, c) Overhe.ds @ % on (a+bl
TractcFtrolley hour 0.21

d) Contr.ctois profit
c) Overhc.ds @ % on (a+b)
, @ % on (a+b+c)
d) Contracto.'6 profll @ % on (.+b+c)
cost for 1.25 cum = a+b+c+d
) Cost for 1 .25 cum = a+b+cld
Rate pe. cum = (a+b+c+d)/,1.25
Rat. per curn = (.+b+c.dytl.25
)
) 21 25

)
)
)
RMd wo*!:2.Sirccl.!fue n .d $'otlc : 2.Sn CL'fue

Sr. Reterence to Oescrlptlon Unit Quantlty Rate Oesc ption Unlt Quantlty Ra(e
5r. R6ference io
No. MoRT&H Rs. Rs.
No. MoRT&H
Sp.cificallons
Specifications
B. Pr63tae3s€dlI einforced cem€nt B. ln cement mortaa
coac.ote gado M-20 ll above
!) Labout
a) Labour Male day 0.03
Male day 005 Mazdoor for dismanuing, loedlng and day 0.15
Mazdoor \ulth pneumatic breaker day 0.66 unlbodirE
Elacksmith day 0.25
Mazdoor for loading and unloading day o25 b) ilachlnery
Trador.llolley
b) ll.chlnery c) Overheads @ % on la+b)
Air Compressor 250 cfrn with 2 leads of hour 1.00
pneumatic breaker @ 1.00 cum por hour d) Contractor's proflt @ % on (a+b+c)
Tractor-trolley ho{rr 0.27
Cosl for 1.25 cum = a+b+c+d
c) ovorheads @ % on (a+b)
p€. cum
Ralo = (a+b+c+d)/1.25
d) Cohtractor'6 profit @ % on (a+b+c) C. ln mud mortar

cost for 1.25 cum = a+b+c+d a) Labour


day 0.016
Rate per cum = (a+b+c+d)/1.25 Mazdoor for dismantling and loading day 0.40

2.4.liil 202 (ii) Dlsmantling Brick/Til€ Work b) Machlnery


Tractor-trolley o_27
A. ln llme hortar
c) Overheads @ % on (alb)
a) Labour
d) Contractor's profit @ % on (a+b+c)
day 0.o2
Mazdoorfor d smantling, loeding and clay 0.5 Cost lor 1.25 cum = a+b+c+d
unloading
Ralo per cum = la+b+c+d)/'|.25
b) Machlnory
Tracbctrolley hour o_27 D. Dry brick pitching or brlcksoling

c) Ov.rfio.d. @ % on (.+b) al Ltboul


Ma16 day 0.014
O Conlracto/s profit @ % on (a+b+c) Mazdoorfoadismantllng, loading and day 0.35

Cost for 1.25 cum = a+b+c+d unloading

Rats p6r cum = (.+b+crd)fi.25 b) triachinery


Tracbr"l.olley 0.27 )
26 21 t
)
I

I
Roid Worts | 2-Sn. ch,lme
Ro.d worls : 2-sil. Clc'@a
)
Sr. Reference to Oescrlptlon Unit Ouantlty Rate
Sr. Reference to Description Un it Quantity Rate
) No MoRT&H
Specitications
Rs.
No. MoRT&H Rs.
Specificatlons
, c) Overh€ads @ % on (a*O) dl Contiaaior'a profit @ % on (a+b+c)

) d) Conhactor's profit @ % on (a+b+c) cost for t .25 cum = a+b+c+d

Rrta por cum (a+blc+d)/t.25


) Cost for 1.25 cum = a+b+c+d '
Rale per cum = (a+b+c+d)/1.25 C. Rubble 3tono maaonry ln mud moiat
)
2.4. {rii) 202 (iii) Dlsmantling Slone Masonry a) Labour
) A. Rubbl€ stone masonry in lame mortar
Mate
Mazdoor lor dismantling, loading and
0.02
0.50
unloading
) a) Labour
Male day o.o24 b) Machinery
) Mazdoo, lo.dismantling, loading and day Tractor-lrolley o27
unloading
c) Overheads @
) b) M.chln.ry
% on (a+b)

Tractorkolley hour o.27 d) Contractor's profit @ % on {a+b+c)


)
c) Overheads @ % on (a+b) Cost for j.25 cum = a+b+c+d

) d) Conkaclor's protit @ % on (a+b+c) Rate per cum = (a+b+c+d)/1.25

) Cost for 1 25 cum = a+b+c+d D. Dry rubble masonry

Rate per cum = (a+b+c+d)/1.25 a) Labour


) Mate day 0 018
B. Rubble stone haBonry in cement mortar Mazdoor for dismantling, loading and day 0.45
) e) L.bour
unloading

) Mate
Mazdoor ,or dismantling, loading and
day
day
0.03
0.75
b) Machinery
Tracto.-lrolley 0.27
unloading
) c) Overfieads @ '/" on (alb)
b) Machinory
d) Contractor'E profit @ % on (a+b+c)
) Tractor kottey o.27
cosr tor I 25 cum= a+b+c+d
c) Ove.heads @ % on (a+b)
) Rate per cum = (a+b+c+dYl.25

) 28
29

)
Road worlo : 2-Silc Cl.@c. Rosd worti : 2-Sit. Cl€lme

Sr. Referenc6 to Descrlptlon Unlt Quantlty Rate Descrlptlon Unit Quantity Rate
Sr. R6fetence to Rs
No MoRT&H Rs. MoRT&H
No
Specificatlons speclflcallons

{lv)Wood Work Wrought Fr.med


and
e Dbman0lng.tone pltchlngrdry stone 2.a. (lv) m2
3p.ll3 Fixed In Frames ot Trussss uPto a
Helght ol5 m above Pllnth Lsv€l
., L.bour
Mal6 day 0.016 a) Labou.
Mate day 0.06
Madoo. tor disdEn{ing, badingand day 0.10
Carpenler day 0.s0
unloeding
1.00
Mazdoor lordismantling, loading and
b) Machinery unloading
T€clortmlley hour o27
b) lachlnery
a"7
cl Ovorh.ads @ % on (a+b) Tractor{olleY

dl contrrcto.'i profi( @ % on (a+b+c) c) overheads @ % on (a+b)

cost for 1.25 cum = a+b+c+d d) Contractor's prolit @ % on (a+b+c)

R.te po. cum E (.+b+c+d)/1.25 cosl lor 1.25 cum: a+b+c+d

Rate p€r cum = (a+b+c+d)/1.25


F. Dlsmantling bould€16 laid ln wire
crates lncluding openlng ofcmtes and
2.a.(v) m2 (v) Steolwort( in alltypes ofSections upto
ttacking dismantled malerials
a Holght of 5 m abovo Plinth Level
excluding Cutling o, Rlvet
t a) Labour
Mate day 0.02 Unit = tonne
Mazdoor for dismantling, loading and day 0.50 Takiog output = 1 tonne
unloading
A. lncluding dismemberlng
b) achln6ry
Tractoclrolley o27 a) Lalrour
Male day 0.14
1.00
cl Overfieed3 @ % on (e+b) Blacksmith daY

Mazdoor for dismantling, loading aod day 2.fi


I dl Cont.rctor'. p.ofit @ %oh(.+brc) unloading
Add25Percentolcostof
cosi for 1.25 cum = e+b+c+d labourforgas cutting .opes, pulleys etc'

Rats per cum = (a+b+c+d)/1.25 b) Machinery


hour 4.17
Tractor-trolley

30 ]I
,
)
Roll Workq ' 2-Sir. al.m.s
Road Work :2.Sil.Ckecc
)
Sr. RefErence to Dcscription Unit Ouantlty Rate
No. MoRT&H Sr. R6terence to Oescrlptlon Unit Qtiantity Rate
) Specifications
Rs.
MoRT&B Rs
No.
Specifications
t c) Ovorhsads @ % on (a+b)
2.4. (vi) 2o2 (vl)Scraping of Brlcks Dismantled from
d) Contractor's profit Brick Work lncluding slacklng
) @ % on (a+b+c)

Rat€ per tonn6 = a+b+c+d Unil = numbers

, Taking output = 1000numbeG


B. Excludang dismemberlhg
A. ln lime/cement mo.tar
, .) L.bour a) Labour
Mate day o.22 014
, Mazdoor for dismantling, loading and day 2.00 3.50
unkreding

) Blacksmith day 050 b) Ove.hc.d6 @ 'n on (.1


Acld 2.5 per cenl of cost oflabour for gas
cutting. ropes, pulleys etc. ci Contr.ctor'. profit @ . % on (.+b)
)
b, i'l.chlnory R.to p.r 1000 l{o.. r a+b+c

) Trdcbr-trclley 0.17
B. ln mud mortar
c) Ovorhe.ds @ o/. on (.+b)
) .) L.bou.
d) Cohtr.ctor's proflt @ % on (r+b+c, day 0.05
Mazdoor day 1_25
) Rate per tonno . a+b+c+d

C, Extra over ltem No (vlA and (v)Btor b) Overheads @ % on (al


) cuttlng .lvot3
c) Contractor'B protlt @ % on (a+b)

) Teking output= 10 rivets Rate per 1000 Nos. = a+b+c

) a) Labour 2.4. (vii) 2O2 (vli)Scraplng ot Ston€ [.om Dlamantlod


Mete day 0.01 Stone Masonry
Blacksmith day 0.13
) day 013 Unlt = cum\
Taking oulput = 1 cum
) b) Ovrrh€.ds @ % on (a)

c) Contrtclor's profll @ o/. on (.+b) A. ln cement and llme mortar


) Cost of 10 rivets = a+b+c a) Labour
Mate 0.06
, Rale,or e.ch riv.t - (s+b+c)lto
day 1.40

) 32
l3
)
)
)
Ro.d Wort! : 2.SiL Clcde6 R.rdu.*s : 2-Sil. Ct rm6e

Sr. Reference to Desc ptlon Unit Quantity Rale Reference to Descdptlon Unlt Quantity Rate
Sr.
No MoRT&H Rs. MoRT&H Rs
No.
Speclflcations Speclfications

b) Overheads @ % on (a) 2.a. {lx) m2 i


(k) Removlng typss o, Hume Pipes and
Stacking rvurln a lead of 1000 metres
c) Conlractor'3 protit @ '/. on (a+b) includlng E .thwork .nd Dismantllng
otMasonryMorks
Rate per cum = a+b+c
Unit = melre
B. ln mud mo ar Taking output = l metro

a) Labour
Mate day 001 A. Upto 500 firr dla
day 0.30
.) L.bour
Male dav 0.02
bl Ovo.h..d. @ % on (.1
Mazdoor Jay 0.52
c) conlr.ctor'. profrl @ % on (.+b)
b, Ov.rh..& C 'a o.r (.)
R.t pcl cum . &b+c
(viii)
c) conlr.ctort profit C %on(-|b)
2.4. m2 (vlii) Scirplng Pla.ter ln Llme or Ccment
Mortar taom BrlcUstone Ma6oory RaL per metlt . a.b+c
Unit = sqm
B, Above 5oo illn to 900 mn di.
Taking oulpul = 100 sqm

., Lrbout a) L.bour
Mat! 0.16 Mate day 0.03
Mazdoor br scsrping erd loadhg day 4.00 tlazdoor day 0-70

b) Machlnery b) Ov.rter& @ % or (.)


Traclor-trolley 0.x2
c) Co[lrrctolt Pioft @ *on(.+b)
c) Overhord3 @ % on (.+b)
p!, m.tn .
R.ta arb+c
d) Cont .ctor'! p.olll e % on (.+b+cl
C. Abova 900 arm
Cost tor 100 sqm = a+b+cd

Rrto por 3qm . (.+b+c+drnoo :) Lebour


day
day

b) Overheads @ % on (a)

34 35
Rord wnk : 2.Snc Cl@@
lo.d Wo,tJ :r-Sir. Cldee

Sr. Descriptlon Unlt Quantity Rat€ Unit Quantity Rate


Rofetence to DescrlptioD
No. MoRT&H Rs. Sr.
Rs.
Speclficatlons No. MoRT&H
Speclflcatlons
c) Contr.ctor's proflt @ % on {.+b) B. Granularcourses

Rate per m6trc - a+b+c a) Labour


day 0.04
The excavation ol earlh, disrnantling of
Mazdoor fo,r disma{ing, loading end 1.00
stone masonry woak in head walls and
unloading
protection works is not included which is
lo bemeasured and paid sepatetely. b) Machinery
033
2. Credil for retrieved storE from masonry
work may be taken as per actual c) Overheads @ i on (alb)
aveihbility.
d) Contrector's proa @ % on (a+blc)
2.5. 202 Olsmantling of Floxlbl. P.vement3
Rate Per cum ia+brc+d
Dsrnanting of flexible pavenEnts and disposal
ofdismanlled malerials uplo a lead of J000 ll. 8y Mechanlcal lvl-ls :
metres, slacking serviceable and
unseNiceable materials sepa( tely. A. Bltuminou3coutt-

Unit = cum
a) Labour
Male day 0.01
Taking output = 1 cum
Mazdoor day 0.30

l. 8y Manual Means :
b) il.chlnery
Traclor-tolley |lour 0.38
A. aituminous courses hour hoor
Ferm tractor with ,i?er @ 60 com per 0.017

a) Labout cl Ovefi€ad! @ A on (a+b)


day 0.06
Mazdoorfor dismantling loading and 1.5 d) Contr.ctor'! Pr @ %on(a+b+c)
unloading r
R.te por cum a+bc+d
bl lrachinery Cem- C?ncieto P.vofiont
2.6. 202 Obmantllng o,
Traclor-irolley hour 0.38
Dismanliing ot cemenlconcrete pavement by
c) Overho.ds @ % on (a+b)
mechanical means alhg pneumatic lools,
breaking lo pieces nolexceeding 0.02 cum
d) Contr.ctor'6 proflt @ % on (a+b+c)
in volume and stocl Piling at designated
Rate poa cum E a+b+c+d locatrons and disposalddismantled materials
uplo a leed of 1OOO n-es, stacking se ice_
able eod unserviceabb rlaledels separately.

36 31
Load wotu:2-Sit cl.{me lon \{o*r : 2.SiL Clclfue

Sr. Reference to Desc.iptlon Unit Quantity Rate


Sr. Retelence to Descrlption Unlt Ouantity Rate )
No. MoRT&H Rs. Rs.
No. MoRT&H
Specifications Speciflcalions )
Unil = cum a) Labout
Taking ouFut = 'l cum Mate day 0.006
)
Mazdoorinduding loading and unloading day 0.15
a) Labour
0.03
)
Male day
b) Machinory
0.50
Semi skilled nEzdoor for operaling day
Tractor-trolley hour 0.05 )
Pneu[Etic tools
Mazdoors as help€6 including loading day 050
c) Overhoads @ % on (a+bl
aad udoading )
b) Machlne.y d) Contractor's profit @ % on (a+b+c)

AIr compressor 250 cfm with t$o leads hour 100 ,


Rate per melre = a+b+c+d
for pneumatic cutteE/hammers @ 1 cum
pet hour
2.4 202 Dismantling of Xerb Stone
)
Tractortolley 0.40
Joint Cutting Machlne with 2-3 blades hour 1.00
Oisrnantling ke6 slone by manual rneans and )
c) overheads @ % on (a+b) disposal ol dismantled material with all lifls

d) Contractor's profit
and upto a lead of I 000 metre )
@ % on (a+b+c)

Unit = runnhg meke


RaIe psr cum : a+b+c+d Taking outprrt. 10 melre )
Note : The above analysis is for removal ofcomplete
pavement. ln case full depth repair work as
a) Libou. ,
Mate day 0.01
required to be done afrer disman ing, provision Mazdoo( including loeding and onloading day 015
of a concrete cuttng and sawing machine may )
be added for 0.25 hours. b) M.chlm.y
Tractor{oley hour o20 )
2.7. 202 olsmantling of Guard Ral16

Oismantling gua.d rails by manualmeansend


c) Ov.rh..d. @ % on (..b) )
disposal of dismantled matedal with all lifts d) Contr.ctor'! profit @ % on (.+brc)
I
and upto a lead of 1000 metres, stacking
serviceable malerials and unseaviceable cosl br .10
m: e+b+c+d
mate*rls separately.
)
Rate per m.Le E (a+blc+dYlo
Unit = running metre
Taking output = 1 meke t
)
l8 39
,

a
al
1!

Rold Wdts : 2-SiG CLtue Rord \*rts : 2sit. Cl.,aN

S.. Referenco to Descrlptlon it Ouantity Rate Description Unit Ouanlity Rale


Un
Sr, Refelence to
No. MoRT&H Rs. Rs.
No MORT&H
Sp€cificatlons Speclllcations
2.9 202 Dlsmanlllng of Kerb Stone Channol c) Overhgads O % on (a+b)

Dismaolling kerb slone chanoet by manual d) Conlraclor's Prorll O % on (a+b+c)


means a d disposal of dismanued materi;l
with alllins and upto a lead of 1000 metre. Rate tor one 5i KM stooe = a+b+c+d

lJnit = runnl.g meke


B. Ordinary KM Stone
Taking oulpul = 10 metre

a) Labour Ouanlily otcemenl concrele = 0.269 cum


Mat€ day 0 015
Mazdoor including loading and unloading day o.225 e) Labour
Mate day 0.02
b) l4achinory Mazdoor - day 0.50
Traclor-trolley 0.30
b) Machlnery
c) OYorhoads @ % on (.+b)
Trador-lrolley holr 0.10

dl Contr.cto.'r profit @ % on (.+b+c)


c) Overheods O % on (.+b)
cost for l0 m= a+b+c+d
d) Conlrsclor's prolit C % on (a+b{+)
Rate po. met.o = (.+b+c+dylo
Rate lot one ordinary KiJl gtone = a+b+c+d
2.10 202 DlBmantllng of Kllometr6 Stone

Dismanlling of kilometre stone including C. Heclomelrc Stone


cutling ofearth, foundation and disposalof
dismaolled materialwith alllifts and lead Ouanlity of cement concret€:0 048 cum
upto 1000 m and back filling of pjt.
q) Labour
Unit = Each Mate day o.m4
Taking oulput = one KM Etone Mazdoo day 0.10

A. Sh KM Stono
b) achlnery
Ouantily of cemenl concr€te = 0.392 cum
Tlaclor-trolley hoJr o02

a) Labour
Mate day 013
c) Overheads I "/. on (a+b)
Mazdoor ctay 0.75
d) Conttaclor's prolil @ % on (a+b+c)

b) Mechinsry
TractoFlroll€y hour 0.15 Rale lor one Heclomelre slone = a+b+c+d

40 -11
I
R@d Works: 2-Sil€ Cle.r c.
Rosd W ks : 2_Sitc Clct.lnce

Sr. Reference to Descriptlon Unit Quantity Rate Descrlptioi Unit Quantity Rate
No. MoRT&H Rs. Sr. Reference to Rs
No. MORT&H
Speciflcations
Speciflcaiions
2.11. 202 Dkm.ntllng ot Fenclng a) Labour
Mate day 0.0s
DisftEnuing of barbed wire fencing^/vire mesh day 2.00
fencing includinq posts, foundation concrete, day 0.25
Plumb€r
back lilling of pit by manuelmeans including
disposal ot dismantled malerial wilh all liffs b) ,rachln.ty
and upto a lead of 1000 mekes, stacking Tfl.rck 10 tonne capacitY hour 0.25
seryiceable malerial and unserviceable Light CBne 3 tonne capacrty tlqr 050
nEterial separately.

Unit= running melre


cl Ovefte.di @ % on (e+b)

Taking output = 30 melres d) Conr.clor'. Proflt @ % on (a+b+c)

a) kbour cost for.t0 metes = slbrc+d


Male day 0.15
lvazdoorincluding loading and unloading day 3.00 R... per metre = (a+b+c+d)/1o
Elacksmilh day 0.75
The rate analysis does nol include any
b) ,r.chlno.y excavatkn in eadh Oa disrmndirE ot masonly
Tracloctrolley 0.15 wo*s whlch 6re lo be m€asured and paid
aeParatety.
c) Ov.rt..d. e % on (.+b)
2_13. 202 Removal ol Cement Conctete PlPe of
d) Coatr.clot". p.ofll @ % on (r+b+c, Sgwer Gutler
Cost for 30 mekes = a+b+c+d Removal of cement concaete pipe of sewer
Rato p.a n.t t . (a.b+c+dy3o gutler 15OO mm dh under the supervision ol
clncer€d departrEnt induding disposal wilh
2.12. 202 Oismrntllng ofcl W.tor Plpa Lln. all lifrs and upto a lead of '1000 melres and
stacking of seNiceable and uGefliceable
OismanlliogofCl water pape line 600 mm dia material reparately bul excluding earlh
including disposalwlh atl lns and tead upto exca\raton ard disrnanting of firasonfy works'
1000 metres and stacking of serviceabte
Unil = running mel.e
fiEterial and unserviceeblo material separably
Taking oulput = 10 melres
uMersupervasion olconcemed departftent
r) Labour
0.10
Unil= running m€tre Mat€
day 2.50
Teking output= 1O metres Mazdoor

b) Machlnory
030
Crane 5 tonne capacitY
hour 1.00
Truck flal body lotonne

42 4l

o
o
t
)
Rold Work i 2-Sit. Cl.'fue

)
Sr. Reference to Descriptlon Un ll Quantity Rato Chapter-3
, No. MoRT&H Rs.
Speciticatlons Earthwork, Erosion Control and Drainage
I c) Ov.rhe.d. @ % on (.+b)
Preamble:
) d) Contr.ctor'. protlt @ % or (.+b+c)
Cost for 10 molres: a+b+c+d 1 . The rales have been enalysed using mechanical means. Menual rheans for certain ilems have also
) been provided which can be used for areas ineccessible to machines and for smalljobs.
Rate por motrr . (.+b+c+dlIo
2. ln the rate analyses ofearlhwork, onlycomp*led volume ofearth has been considered
) The rate analysis does nol include eny
excavation in earth or dismantling of rnasonry 3 Rates have been analyzed lor averageworking conditons.

) works which ale to be measured and paid


sepaEtely,
4. Average achievableoulpuls ofmachines havebeen considered taking intoaccountioband managemenl
factors.

) 2.14. 202 Remova I of Teleph one/Elecl cPolesend 5. Cutting by dozer has been proposed where he cut earth can be utilked tor flling ior embankmenl
Lin€s wilhin a lead of 1OO m. A dozer can economially push the earth upto a distance ot 1OO m.
) Rermval of lelephone/electnc poles including 6. Where lead tor transporting o, earth is nbre f|an 10O m. excavator and lipp€r have tteen provided
excavation and dismant'ang of foundation
) concrete and lioes under the superuision of 7. Awat6r lanker of6 KL capecily which is cornoonly iJsed at construclaon sites has been considered
concerned deparlment, dasposalwith all lifts
and uplo a lead of 1000 metres and stacking
8. The rate caters for disposel ot unsuitEble soilonly upto a distance of 1 km. The cost of transportation
) the serviceable and unseNiceable malerial
beyond the iniliallead ol l kmwillbepaid separately based on tonne-kilometerage-

separately. 9. The replacement of unsuilable soil by suitable soil shall be included separately in he estimate. The
) Unil = each
rale analyses for.emovalol unsuitable soildoes nol provide for replacement by suilable soil.

Taking output = 30 Nos. 10. ln cases where embankmenl is conslructed with earth taken faom roadway, the costofdepositing the
) earth al lhe site ofembankmenl is alrcady included in the disposalof excavated earth.
.) Labout
Mald 11. For narow and restricled areas, plab compactor has been prcposed for cornpaclion to achieve the
) Mazdooa
day
day
0.48
10.00 desi.ed densily.
Eleclriciadlineman day 2.OO
12. For smalljobs where loading and unlGding roquired to be done manualty, tractor - trolley has b€en
) b) Machinory
proposed tor caniage inslead of a lipper.
is

)i
Tractor-trolley hour 150 ," ,* is found suitaHe for lncorporation In works, suibtl€ crodit for lhe aveilable rock

c) OverfiG.da @ % on (.+b)
$fin"ifx:,*
) d) Conkacto.'t p.ofit @ %on(.+b+c)
14. The possability ol usang the blasled tock fragments ,or backfilling b€hlnd structures or backlillang of
foundaton pits or filling in rnedians, separalors or use in servi@ road shall be examined belore
proposing disposal of excevaled roc[
) Cosl ior 30 poles = alb+c+d
15. ln case of hill roads, the cut earlh c6n be pushed down lhe valley in cas6 there is no objection. ln that
Rats pe. polo . (a+b+c+dl3o cese, cosl otdisposalls not requked b be provided.
,
) 1.1 45

)
)
)
Road Wo*r:3.Sdhvo,k Emsion Contreled Drrio.sc Rold Vo|ts : l_Eannrodq 8Bio. Conttll ed Dditr'8c

I
16.'L'EpresentsleadinkmonewEy.Thiswillvaryfto.nprojed{o+roiectandisrequircdbbe
at slto at the time ol eslimallon.
Extra Provislon for High Altitude Areas

17. For inhabited areas, controlled blasling wlth limited charges ofexplosives has been provided
above 2lOO mlrt altifude' the percontage addilion to
involves smaller drill holes and edditional requirernent of eleclric detonators. Provision has accordi .^^sidedno loss of outsut of men aod machin's
under'
beenmade. ,"0 ,*e ratee of ntachlnes are requircd b be made as
-o "iir""r-"*",
18 Any work involved for waler courses at cutuerts (Clause 312)willbe priced under rcspective items,like,
excavation. grubbing, clearing, etc. forwhich rate analyses have separalely beenmade. Per cent of the Yalue ln ManPower cent ofthe valuo ln trachlnes
Altitude in Mtrs to bo added to rates
to bs addod to ratel
19. ln the case ot embankment made lrom earth taken from rcedway cutting, the input of dozer
spreading earlh can bedeletedas thesame is alreedy provided in the cost of excavation. percent
7 per cent 3
2tOOto2400
20. Eerlh excavated from drains a3n be uied ln roadway bems. Hence. carriage for disposal of sam€ is 6 per c€nt
15 per cent
not provided 2401lo27o0
9 per cent
25 per cent
21. ln lhe rale analyses ofsome ilems, the quantitjes ofsub-items involv€d in lhal analyses,like, excavation 27Ol to 3000
12 per c€nt
for loundation, foundalion concrele, paintiog, letlering, etc. have been grven. The rates for sudr items 32 per canl
3001 to 3300
shallbe taken from relevantchaplers where the same have already been analysed. 15 per cent
3301 to 3600
l8 per cant

22. ln case of ro6t fll embankment, ft is assumed tlat fialerial is available at site from rock cutting. 18 per cent
66 per cent
3601to 3900
86 per cent 21 per cent
23. The item of prepareton and su.face trealnent offurr€tbn (Claus€ 310) is required b b€ edded in the 3901 to 4200
cost estimat€ only lf ther€ is substantial lime lag between completlon of sub{rade and laying of suu 24 per cent
4201 to 4500 l08p€rcent
base. As this item is incidentral to worls, it ls not required to be lncluded In BOO.
27 per cent )
4501 to4800 132 Pe. cent
24. The items filling bohind abulmsnts and u,lng wall and provision of filter media has been lncluded In
30 p6r cent
Chapter-15. 4801to5100 186 per cent

25. Excavalion for structures beyond the deplh ot 3 m has been included in Chapter-'l2.
TheaboveprovjsionsarebasedonlhoreportofoelencelnstituteolPhysrologyandAlliedsciences,
physicalwo* capaclty ofind&iduals working In high altitude
26. ln case of high altiludes areas above 2100 m! lhe pe.centage addition to the cost ol manpower and
O",n'C""n. ,"S"ioinS qrrntitalive reduction in he
sel up by Boder Roads Developmenl
usage Ertes ofmachines are required lo be made as pea the Table given on next page. ff," i"-.*naation of the committee o; cost of @nstruction
"r"", "na r"aro,"" i" *tPut of machines while wotking in high altitrdes These fgures are adopted from
t"i
""J
'standard Schedule of Rat€s'of BRO as applicable to high altitude areas'

,
)

46 47 )

a
t
Ro!., lvo*t : 3'Elt6sdq Eltb Cdi'ol &d Dtd!'8'

Chapter-3 DcscrlPtlon Unlt Quantity Rate


Sr. Reterence to Rs
Earthwork, Erosion Control and Drainage No. MoRT&H
Speclrlcatlons
I
Sr. Reference to Description Unit Quantity Rate Ercavatlon ln Ordlnary Rock by Manu.l
3.2. 301
No. MoRTaH Rs.
Specificatlons
Excavation in odinary rock using manual
3.1. 30', Excavation ln Soll by Manu3l Means m€ans including loading in a nuck and c€rrying
of excavaled rnaledal to embsnkrnent site u,ift
Excavation lor roadway ln soilusing manual in alllifts and leads upto 1000 melres.
m€ans includjng loading in truck for carrying
ot6ut earth to embaoknent sile with alllifrs
a}!]99d u!'t^ rnno melres Taking oulput = 120 cum

lJnit = cum a) Labour


Taking ouhut = 't 20 cllm d?y 2_AO

day 70.00
.) L.bour
Male day 1.80 b) Machlnery
Mazdoor day 45_00 Truck 5.5 cum capacity 10.00

b) Machln.ry c) overhoads @ % on (a+b)


Truck 5-5 cum cepacity 10.00
d) Contractor's Proflt @ % on(.+b+c)
cl Ov€rhe.ds @ % on (a+b)
Cosl lor 120 cum = a+b+cd
d) contractor's profii @ % on (a+b+c)
Rate per cum = {e+b+c+d)r120
Cosl o[ 120 cum = a+b+c+d
Note lncrse there is a sifuation rtEre the crcss_
Rate per cum = (a+b+c+d)/120 section is of cul and fill and cul earth is
requircd to be used in erntonkment in the
Note : ln case th6ro is a 6ituation u/here the cross- immediate vicituty, tle item of caniage in lhe
seclion is ol cut and lill and cut earth is lruck shall be omitled
required to be used in embaokmenl in the
imnEdiale vicinity, lhe item ofcarriage in lh6
truck shall be omitted.

48 49
I
Rord lvo*! :3.Elnlmdq Esion Conrrol &d D6inr8. Esi6 Col'olmd DEinag'
)
Ro.d worlc: 3'Erthmdq

Sr. Reference lo Descrlption Unlt Quantlty Rale oescrlptlon Unlt Quantity Rate
Sr. Reference to
No. MoRT&H Rs. Rs.
No. MoRT&H
Speclficallons
Specificallons
3.3 301 Excavatlon ln Soil with Oorer with load
upto 100 metres a) Labour
&y 0.12
Excavatioo for roadway in soil by mechanical day 3.m
means including cuning and pushing the earth
lo site ofembankme uptoadislanceof l00 b) Machlnory
metres (average lead 50 metres), including Dozer, SO HP @ 20 cum Perhour tD!r 6.00

kimming botlom and side slopes in


c) Overhoad6 @ % on (.ib)
a@ordance wilh rcquirements oflines, grades
and cross seclions.
d) Contraclor's Profit @ % on (a+b+c)
Unit = cum
cost for 108 cum = a+b+c+d
Taking oulput = 180cum

e) Labour Rate p€. com = (.+b+c+d)r108


Mate day 008
Mazdoor day 2_OO 3.5. 30'l Exc.vation ln Hard Rock (.equlrlng
bl.sting)lvith di6posal upto 1000 metr€s
b) tlachlncry
Dozer, 80 HP @ 30 @m per hour hour 600 ExcavafDn fo{ roadway in hard rock (cquiring
blasting) by drilling, blasting and breaking.
c) Ovorhoeds @ % on (a+b)
klmming ot botlom and sldo slop€s in
d) Contractor's profit @% on (a+b+c) accordance wdh requirern€nts of lines, grades
and cross secltons, loading and disposal of
cost for 180 cum = alb+c+d cut rcad with in allliffs and leads upto 1000
metres.
Rat6 per cum = (a+b+c+d/l80

3.4 301 Excavatlon ln Ordin.ry Rock with load Taking output = 180 cum
upto 100 metr€3
.l L.bour
E)cavation for roadway in ordinary rock by MatE day 0.22
deploying a doze.,80 HP iicluding drtting and day 3.00
Mazdoor
pushing the cut earlh to site ofernbankment day 2.00
Ddller
upto a dislance of'100 rnetres ( average lead day 0.25
Blaster
50 BEtres ), trimn ng bottom and sid€ slopes
in accordance with lfie requirements orlines, b) tlchlnory
grades and cross sections. Dozer, SO HP @ 30cum Perhour ilqr 6.00
Ai. cofip(essor, 250 ctrn wih 2 jack haffrEr ltour 6.00
Unit = cum Front end loader 1 cum bucket capacrty hqr 6.00
Taking oulput = 108 (rrm Tipper 10 toone capacitY harr 1'1.25

50 5l
R..d Wdk i l-E!nn*!.lq [si6 Cor,Dl rd Dni,.B. R4.d Wdt! : ].Elrt$ulq Esb Cdrr)l dd Dt'in'8c

Unit QuantltY Rate


Sr. Reference lo Description Unit Quantity Rata OesctiPtlon
Refetence to Rs.
No. MoRT&H Rs.
MoRT&H
Speclfications
Speciflcation9
c) lvlatorirls a) Labour 0.08
Gelalin 80 percent kg 63.00 Mate
ctay 2.00
Electric Delonato.s @ '1 dotonator for 252.@ Mazdooa
2 gelatin slicks Af 125 gms each
b) ilachlnery
g cum buckel hour 6.od
Creditlorexcavaledrockirundsuitable cum 90.00 Hydraullcexcavato(O
for use @ 50 percenl quantity blasted capacty @ 60 cum PeI hour
per hour 16.00
Tipper 5.5 clm cap-ily.4lnps
d) Ove.hsads @ % on (a+b+c)
c) Overhetds @ t on (a+b)
e) Contractor's profil @ %oh(a+b+c+d) l
d) contrectot'. plotlt @ % on ('+b+c)
Cost for 180 cum = a+b+c+d+e
cost tor 360 cum = a+brc+d
Rate per cum = (a+b+c+d+e)/180
R.to pcr cum ' (.+b'c+d)860
Note: 1 . The quality and availability ot rcck shall be
check€d before affording credit 3.7 301 Excavrtlon ln Otdlnaay Rock uslng
Hyatf.ulic Ercavltot CK'go TlpPcr
2. ln case some rock is issued to the con- vdth Dlspos.l upto lm m'tlt!'nd
lractoa al site,lhe ltem ofcariage Bhall
be reduced/restricted to thet exteot. Excavation ior roadvray h ordinary rock with
hydraulic excavator ol 0.9 cum bucket
c;pacrty including cuting and loading
ln
3.6 301 Excevatlon ln Soil uslng Hydraulic
Excavator CK-90 and Tippe. wlth Disposal tippers. harEporting tt €flbank rEnt ste
wfiin
upto1000 melres all lifts and l6ad upto 1clo m, tnmming botlom

and side slopes in accordance with


Excavatioo tor roedwork in soil with hydraulic requirements of lines' grades and cross
excavator of 0.9 cum bucket capacity sections,
including cutting and loading in tappers,
trimming bottom and side slopes, In
ac@rdance with requkements otlines, grades Taking outPut= 240 cum
and cross seclioos, and transpo ng to the
embankment location within alllifls and lead a) L.tour
day 0.08
upto 1000 m. Male
2.00

Taking output = 360 cum

52 5l
Road Woda r 3.E rthwk, EEsion Controt sd Dminag. d!wd( f@nd ConEol ed D6i"8'
Ro.d Vo,ts : 3_E

S.. R6ference to Descrlptlon Unlt Quantity Rato LJnlt Quantlty Rate


DescriPtion
MoRT&H
Referanco to Rs.
No. Rs,
l,loRT&H
Speclflcatlons
Speclllcations
b) Machlnory c) Ovsrh.ad. @ % on ('+b)
Hydraulic Excavator 0.90 cum bucket hour 6.00
@ (l+b+cl
capacity @ 36 cum per hour dl Contr.ctorr's prorit % on

Tipper5.5 cum capacity,4 tdps per hour hour 11.00


co6t for 36 cum = a+b+C+d

c) Ov.rh..d. e % on (.+b) Rate Por cum = (.+b+c+d)'3G

dl ConL.ctor's p.ollt @ '/6 on (a+hc) Note: 1 . The quality and availability of rock shall be
checked beforo affording credit
Cost for 240 Cum . a+b+c-+d

Rata par culn E (a+b+c+rrr2a0


2, ln case some lock is issued to the
cont actor al sib, ths ltem of cardage shall
301 Excavatlon in Hard Rock lblasting be Estricted/reduc€d to that €xlent
prohlbitedl
3. Being small quantity, rnanual loading will
Excavation lor roadway in hard rock (blasting be economical In this case and has been
prohibited) with rock breakors including provided ac.odingt.
breaking rock, loading in tipprs and disposal
withjn all lifts and lead upto 1000 mekes, B. Manual Melhod
kimming bottom end side slopes in
accordance with requircments of lines, grades
and cross-sections. Taking output = 16 cum

a) Labour
day 1.U
day 16.00
Mazdoor including loading in lflrck
Taking output = 36 cum Chiseller day 24.00
Blacksmith day 1.00
a) Labour
Mate day 0.40 b) ilachinory
Mazdoorlor trimming stopes inctuding day 10.00 Tipper5.5 cum capacity, I kip per hour hour 2.90
manual loading jn truck 8.00
Credit lor excavated rock found suitable

b) tiachlnery for use @ 50 per c€nt ol excavated


Hydraulic excavator with rock breaker 6.00
attach.nent @6 cum per hour
cl Ov6rte.& @ % or (.+b)
Tipp€r 5.5 curn capactty, 1 trip per hour
Credil tor excavatod rock frcund slitabte
6.50 d) Contr.ctor" Prolit @ %on(.+b+c)
18.00
for use @ S0percenl of excavated Cost for 16 cum = a+b+c+d
quantity
R.t. p6r cum - (.+b+c+d)ll6

54 55
) Ro.n Wq|(': l.Elinwt, Edion Cotr0ot ad Dr.idg.
F Ro, Wo*5 : !Edh*$rl f^sioo Conlrol
'nd
Dhinr3c

) Reterence to Rate
Sr. Descriptlon Unlt Quantity Rate D€criptio. Unlt Quantlty
Sr. Retelence lo
No. MoRT&H Rs. Rs.
, Speclflca(ions No. MoRT&H
Speclflcations
) Note : 1. Cradil is consuered for 50 per cent of c) Materisl.
qugntity of work. Gelatin 80 Per ce.l kg 63.00
I detonator for 1008 00
) Electric delonatq!@
2. Loading frcr disposal will be done rnanualr. 1,2 gelath stickoll25 gms each
b€lng smallquantity. Credit for excavateal rockfound suitablo 90 00
) for use @ 50 per ant quanlity blasted
3, ln case some rock is issued to contrector
) at .1te. the ilem ofcarrlage shall be ooitted d) ovefteads @ % on (.+b+c)
.to the exlent of quantiiy issued to the
e) contractor's profl @ % on (a+b+c+d)
) contractor,

3.9 301 Ercavation ln H.rd Rock (controlled cost tor 180 cum:a.it+c+d+e
) blasting) with dlspos.l upto 1000 metres
Rste per cum = (a+blc+d+e)/180
) Excavation for rcadway in hard rock with
controlled blasting by drilling, blastng and Credit is consideEd for 50 per cent ol
breaking, lrimming of bottom and side slopes quanlity of blaster€d rock, jf found suitable
) in accordanc€ wilh requirements of lines,
grades and cross seclions, loading and
) disposalofcul road with ln all lifts and teads 2 ln case some rct is issued to the
uplo 1000melres. conlractor at site. Or ilem ot camage shall
be reduced to that ctlent.
)
Taking output = 180qrm 3.10. 301 Excavation ln Marst, Soll
)
a) Lebour Excavation lor roadway in marshy soil with
Male dav o.22 hydraulic excavator O.rcum bucket capacity
) Mazdoor day 3.00 including cutling and bading in lippers afld
Ddller 2.00 disposal with ln all lilli and lead upto 1000
) Elaster day 0.50 metres, trimming of bdom and side slopes
in accordance with &quirements of lines,
, b) Mrchlnery
Dozer 80 HP @ 30 cum per hour
qrades and cross-seclihs,
hoJr 6.00
Air compressor, 250 cfm wilh 2 jack
l hammers
6_00
Taking oulput =300c(m
Front end loader I cum bucket capacity 6.00
) Tipper 5.5 cum capacity, 4 trips per hour hour a_20 a) Lrbour
Mate day 0.08
Mazdoor day 2.00
)
) 56 57

)
)
)
I
I
Road Wo*j: l-E.drwd., Edior Conbot ed Dloimac wo 6 | 3-Eidwo.t, Ercsio Conrol ud D,!a.gr
Road

S.. Reference to Descrlption Unit Quantlty Ralo Oescrlptlon Unit Quantity Rate
No MoRT&H S.. Reference to
Rs. MoRT&H Rs.
Specifications No.
Specifications
b) M.chlnery This item does not include replacemeni of
Note :
Hydra ulic excavator 0.9 cum bucket 6.00 unsuitable soil by suitable soil. Replacement,
capacily @ 50 cum per hour where required, is to be provided end paid
Tipper5.5 cum capacily,4 trips per hour 13.64 separately under Clause 305,

c) Ovorheads @ ./o
on la+bl
3-12. 303 Pre€plittlng of Rock Excavatrcn Slopes
dl Conuacto.'s profit @ % on (a+b+c)
Carrying out excavelion in hard rock lo achieve
Cost for 300 cum =.a+b+c+d a specilied slope of the rock face by controlled
useofexplosives and blasting accessories in
Rato per cum ! (a+b+c+d)/3oo
properly aligned and spaced drill holes.
collection ofthe excavated rock by a 80 HP
3.11 301 Remoyal of Unservlceablo Soll wlth dozer,loading in tipperby a front end loader
Disposal upto 1000 metres
and disposing of the materialwith alllifts and
Removal of unseryiceabte soil ancluding lead upto 1000 m, allas specified in Clause
excavation, Ioading and disposelupto .tOOO No.303.
melres lead bul excluding replacement by
suitable soil which shall be paid separately Unit = sqm
as per Clause 305.
Taking olFut = 400 sqm (120 cum considedng
300 mm average depth ofexcavalion overthe
Taking output = 360 cum existing rock face)

a) Labour a) Labour
Mate day Mate 0.60
0.08
Mazdoor day 2.OO
Mazdoor day 15.00

b) Machinery b) irachlnery
Excavator O.9O;um bucket capacity hour
@ 6.00 Air compressor 250 cfm with 2 leads hour 6.00
60 cuh per hour
@20cum per hour
Tipper 5.5 cum capacity, 4 lrips per hou. hour Dozer, 80 HP hour 6.00
Front end loader I cum bucket capacity holir 6.00
c) Overfieads @ % on (srb)
c) Materlals
dl Contaacto.'. profitt @ % on (.+b+cl Gelalin 80 per cent kg 42_OO
Electric detonators @ 1 delonatorfor 672.00
Cost for 360 cum = a+b+c+d
1/2 gelatin stick of 125 gms each

Rato pe. cum = (a+b+c+d)/360

58 59
Ro.d Wdti | 3-EdlE L, Eai6 Cdr,6l rd D6inss. Ro.d WdLt : ].F,rthwk Eosi@ cdtDl od Dni68'

Description Unlt Quantity Rate


Sr. Roference lo Descrlptlon Unit Ouantity Rato Reference to Rs.
No. MoRT&H Rs. MoRT&H
No.
Specitlcatlons SPeclfications
d) Overh6ad3 @ % on (a+b) cl Gontr..lol'. Ptofit @ t( on (.+b)

e) Conhactor's profit @ % on (a+b+c+d) Cost ior 10 cum = a+b+c

Cosl tor 400 sqm =a+b+c+d+e Ratq Por cum. (.+b+c)/10

Rat6 per sqm = (a+b+c+d+€)/400 Note : Cost of dewat6ring may be added, where
requked upto 10 per cent ol labour cost'
Note ln case blasted rock is issued to the contraclor AssessnEnt fo'r dewatering shall be made as
against payment lor conslructed work, the p€r site conditions

cost of caniage shall be redoced to lhat extent.


B. i/lechanic.l Morns
3.13. 3(X Excavation lor Structures
(l) Depth upto 3m

Earlhwo* in excavation ot foondation of


structures as per drawlng and lechnlcal Taking outpul = 300 cum
specification, including selting out.
construclion of shoring and bracing, removal a) L8bou.
of slumps and oihfi delelerious rhatler, Male day o_32
&essang of sides and bottom, backlilling the Mazdoor day 8.00
excavation earlh lo the extent rcquired and
ulilising lhe remaaning earth locally for road b) tl.chlnery
Hydraulic €xcavator 1 0 cuft bucket 600
capacity
l) Ordinary soll
c) Overhoads @ % on la+b)

Taking output = '10 cum d) Conkactor's Profit @ % on (a+b+c)

cost for 300 cum = a+b+c+d

(l) Depth upto 3 lr|


R.to por cum E (a.b+c+d)/300

Note: Cosl ol dev/atering upto 5 per cent of (a+b)


a) Lebour may be added, s/here required. Assessment
day 0.32 br dewaledng shall be made as per site
Mazdoor day 8.00 condilions-

b) Ovcrheads @ % on (a)

60
6l
Ro.d Wolks: 3-!rthro*, Eosion Cont ol Md Dru@8.
Road Wo& : 3-E!nnm'L E osion conkolmd DFinas.

Sr. Reference to Description Unit Quantity Rate


Reference to DeEcriptlon Unit Quantity Rate
No MoRT&H Rs. Sr.
Rs.
Specificatlons No. MORT&H
Specifications
li) Ordinary Rock(not requiring blasting) cl Overh.a& @ % on (a+b)

A. Manual Means d) ConlractoCs profil @ % on (a+b+c)

Depth upto 3 m costfor216 cum = a+b+c+d

Rats per cum E (a+b+c+d)nl6


Taking output=10 cum

Note : Cosl of dev/atering upto 5 per cent of (a+b),


a) Labour may be added, where Iequired.
Mate day 0.40 Assessment ftr dewatering shall be made
Mazdoor day 10 0o as per site cooditions.

b) ove*eads @ % on (a) 2. ln case ofrock, foundation beyond 3mis


notdug and r€nce not included.
c) Contracto.'3 proflt @ % on (a+b)
lii) Ha.d Rock (.equlring blasting)
Cost for 10 cum = a+b+c

Rate per cum = (a.|b+c)/1o

Note : Cosl of dewatering upto 10 per cenl of labou r Takingoulpul:10cum


cost may be added, where required.
Assessment for dewatedng shatlbe made as al Labour
per sile conditions.
Mate day 0.53
Oriller day 0.84
g. Mechanlcal Means day 0.40
Blaster
Mazdoor day 12.00
Unit = cum
Taking output=2'16cum b) machinery
Air Compressor 250 cfm with 2 jack hour 0.67
a) Labou. hammer@ 15 cum per hour
I\,,tate dey 0.24
l\,,lazdoor day 6.00 c) Material
Blasting [,4aterial k9 3.50
b) t .chlnery Detonator electric 14.00
Hydraulic excavator 1.0 cum bucket hour 6.00
capacity d) Overheads @ % on(a+b+c)

62
63
Pold wo*r:3.Eut*o,k, Ebsia C@lhted
Dr.i..s.
Road Wo.lo : l-E-llm*, Erosion Conlrol snd Drrinasc

S.. Ref€ronce to Oesc.lptlon


No. MoRT&H Unlt Quantity Rato
Reference to Oescdption Unit Quantity Rate
Speciflcaflohs Rs. St-
MoRTAH Rs
No.
Specifications
.) Contractor's p.ofit @ % on (a+b+c+d)
2. ln case of rod, foundation b€yond 3mis
Cost for'10 arm : a+b+c+d+e notdug and hence not included.

R.to per cum = (elb+crd+e)/10

Note Cosl o, dewatering Unit = cum


@ 10 per cent of labour
cost mey be addec,, where reouired Taking oulput= 10 cum
Assessrnenl lor dewatenng shallbe
per site conditions.
rnede as l) upto 3 m depth

lv) Hard Rock lbtast,ng prohtbtted)


.) L.bour
MrldSupeNisor day o.40
Takiru oirtput:10 cum Mazdooa dav 10 00

A. Mechanlcal Means b) Machlnery


Tractor'lrolley hcirr 267
a) Leboo. c) ilate.lal
Mate
day 0.20
Selected earth for refrlliog cum 5.00
Maadoor
dav 5.00 d) overheads @ % on (a+bac)
b) Machinery e) Contractor's profil @ % on (a+b+c+d)
Air Compressor 50 cfmwith 2 teads of
2
pneumatic breaker@ 1 10.00 Cost for 1O cum = a+b+c+d+e
cum per hour

c) Ovorheads Rale prr cum =( a+b+c+d+e)/10


@ % on 1a*01

d) Contractor's proflt Nole: Cosl of dewatering @ 3,0 per cent of(a),


@% on (a+b+c) may be added, where required.
Assessment for dewatering shall be
Cosl for tO cum . a+b+c+d
made as pea sile condilions.

Ralo per cum (a+b+c+d)/ro 2. Shoring and slruttiog 20 per cent of (a),
=
where .equired n€y be added.
Note 1. Cost ol dewater,ng upto 5 per
cent of
(a+b), mey be added where
reqLrted
3. lt is assuhed that Ma6hy Soil will be
ASSeSsment for dewalerlng available upto 3 mdepthonly. Ford€epe.
shalt be mrde
as per sile conditlons excavatian below 3 m depth, reler aoalysis
in items 0) to (lv) lor odinary soil.

61
65

I
Ro.d Wo& :3-Ealhwrl [si6 conirotud D6i.!tc
Road Wotu : l-Ea,t@dq Frcion Co.lro, !.d D6inag.

Sr. Reference to Oescrlptlon l.rn it Ouantlty Rato


No. MoRT&H Reforence to Descdption Unit Quanlity Rate
Rr. 6..
Specirlcations No. tloRT&H Rs.
Specltlcallons
8. Mechanical Means
I 305.4.3 Scarlfylng Existing G ranular Sudace lo a
.) Labou. 3.14.
Depth of 50 mltl by ManualMeans
Mate day 0.08
Mezdoor ior dresslng sldes, bo0om day 2.O0 Sc€rifying the erirling granular road surface
and backflling
to 6 depth of 50 lrm and disposal of scarifred
rneterial within d lifts and leads upi, 1000
b) lr.chlnery metres.
Hydraulic excavator 1.0 cum bucket hour o.17
capacity @ 60 cum per hour Unlt = sqm
Tipper 5.5 c'./m capacity. 4 trips per hour hour 0.,(5 Taung output : 100 sqm

c) lr.tari.l .l L.bou.
Selected earth br refilling 5.00 Mate bt 0.20
Mazdoo. indding loadig and unloading .tay 500
d) Overt..ds @ % on (..|blc)
b) ll.chlne.y
.) Cont'.c{or,a protlt @ %on(a+b+c+d) Tracnor-toll€y 1.67

Cost tor 10 cum = a+b+c+d+e c) Ovsrheads @ % on (a+b)

Rate pe. cum = (aab+c+d+cl/10 d) Contractor"! profit @ %on(.+b+c)

L Cost of dewatering @ 20 per ceot of (a+b) Cost ,or 100 sqm = a+b+c+d
may be added. \flhere requked.
Rate per Bqm . (a+ blc+d)/'!00
2. Shoriog and struting @ 10 per cent of
(a+b), where requtEd mey be added. ln case material is lo be rcused et site.
hansporlation c6t calered above br disposal
3. 11 is assumed that Marshy Soit wi
be shallbedeleted.
avallable upto 3 m depth onty. Fordeeper
3.15. 305.4.3 Scarlfylng Exlstng Bltumlhous Sudaceto
ercavation below 3 m deplh, refer anatysis
ln ilems (i) to (iv) for ordinary 6oit. a depth of 50 nm by Mechanlcal Means

Scarirying the exi{ing bituminous road surhce


to a depth of50 mm and disposal of scarifed
malerial withio all lifts and lead upto 1000

Unit = sqm
Taking output = i00 sqm

6r)
6',7
)
Rord Worts : 3"Eaihtu.lq erosion Cont ol md Dninag. Ro.d Wotu | l-Dtnlwdq Eeio Conl'll{d DoinlBc

) Rate
Sr. Reference lo Description Unit Quantity Rat6 Descrlption Unit Quantlty
5r. Refelence to Rs.
) No. MoRT&H Rs.
No.
MoRT&H
Specificatlons
Speclficatlons
) .) Labour b) [lachln..,
1.67
Male day 0.01 Hydraulic Excavator 1 cum bucket

) IVazdoor dav 0.25 capacity @ 60 cum Per hour


Tippr 10 tohne caPacity t.km 160x1
b) ,r.chinery
) Traclor y/ith dpper attachn€nt @ 60 cum 0.08 Add 10 per cent olcost ol caffjage to
Per hour covercoslol loading and unloading

) Front 6nd loEder 1 cum buckel capaclty hdir o.20


050
@ 25 cum per hour Dozer 80 HP for sPreading @ 200 cum
Tipper 5.5 cum 6pacity, 4 t rps per hour hour 023
, per ho{rr
Motor grader for gradi4 @ 100cum
1.00

c) Overheads @ % on (a+b) per hour


) wbter tanke.6 KL caPadly 400
1.00
d) Contnctols profit @ % on (arlr+c) Vibratory mller 8 _10 bones @ 100 cum
) Cosl for 100 sqm = a+b+c+d
Per hour

cl lt aterlal
) R.te par sqm = (.+b+c+d)/100 Coslofwaler KL 24.@
Compensation for earth taken from pivate cum 100.00

) 3.16. 305 Constructlon ol Embankmeni with


Materlal obtained from Borrowplts
land

d) oYorhe.d. @ % on (a+b+c)
) Construclioo of embankment with approved
e) Contrtcto.'3 prorlt @ % on (a+b+c+dl
male al obtained iiom borrowpils with all lifls
) and leeds, kansporting to sjte spreading,
grading lo required slope and compaclinq to
cost ior 1oo cum = a+b+c+d+e

meet requirernentof Table 300-2.


) R.t6 po. cum = (.+b+c+d+e),100

Unlt = cum Note I Compensalion for earth wll vary from place to
) Taking outlM= 10O cum place and wilt have to be assessed realistically
as per Particular ground sifuation' ln case
a) kbour earth is availaHe from Govt land,compensaUon
) Male day 0.04 for earlh will not be requked. The position is
Mazdoor day 1.00 reqlire., lo be clearly stated in the cost
) estimate

)
,
) 68 6g

)
)
)
I

Rod X,6tr : !-tu0tv,!.h &qid Co.rDt od Dtn!.g.


Rod Wo.ks : !t .inwl Er6io. C6tolid Dnin*.

Sr. Refeaence to Oesc.iptlon Unlt


l Ouantity De3c.iption Unlt Quantity
No. MoRT&H Sr. Reference lo Rate
Specificatlons iroRT&H Rs.
No.
Specificallons )
3.17 305 Con6lructlon of Embankmont yrllh
Materlal deposltod f.om Roadwry Note: ln case lhe eadh cuttrng is done by dozer and
Cut ng
pushed for frl*ng in lhe embankment, the input
Construction of enbankment with approved of dozer in the cosl ot embankment shallbe
ftaledals deposited at site from roadway deleted as the same is akeady provided in
culling and excavation trom draln and the coat of e)cavation. However, if ['l€ ea.th is
loundation of olher structures graded and dumped by tippers from roadway cultang, the
compacted to meet requkement ot Table input ofdozerlorspreading is requked to be
30G2. povided.

Unit = qrm
3.'18. 305 constructlon of Subg.ado .nd Eerthen
Takhg ouhut = l0O orm Shouldota
.) Labour
Mate Conslructioo of subgrade and earthen
day o.o2
Mazdoor sioulders with approved meterial obtained
clay 0.50
from borrowpits u/ith all liils and leads.
b) tLchlnery l€nsporling lo site, spreading, grading to
Doz6. 80 HP tur spreading @ 2OO cum hour 0.50 required slope and compacled to meet
P€rho0r requirement of Table 300-2.
Motor grader for grading @ 1 OO cum hour 1.00
perhour
Water tanker 6 n
capacity 4.00 Taking outpd = 100 cum
Mbratory rolle. 8-10 tonnes @ 1OO cum 1.00
Per hour a) Labour
day 0.04
c) Materlal day 1.00
Costofwater KL 24 00
b) li.chlncry
lr) Ov..ft..d. e % on (.+b+c) Hydraulicexcavator 1 cum buckel '| _67

capacity @ 60 cum per hour


., Contr.cto.t prottt @ % on (.+b+c+d, Tipper 10 tonn€ capacity t.km 175x1
Add l0 per cent of cost ot caniage lo
Co6t br 100 cum = a+b+c'+d+e cover c,osl ot loading and unloading
Crozer do HP icr spreading @ 2Oo cum lbi/r o.50
R.t. por cum . (rb+c.d+e)fi00 per hour
Motor gEderfirr grading @ 50cum hour 2.00
per hour
Water lanker with 6 km lead hour 4.00
Vibratory oller &10 tonnes @ 80 cum hour 1.25
per hour

70
7l
Ror! Worlc; l-E nlhdq Emsi6 Connllod Dr.in!s.
lhftrt, frolion dd Dtuintg'
Rod Wotk : l-Et Control

S.. Description Unit Ouantity Rato Descriptlon Unlt Quantlty Rate


No. MoRT&H Sr, Ret6rence to Rs.
Rs.
No,
MoRT&H
Specificatlons
Specltlcations
c) Matorial d) Overh€.ds @ '/. on (a+b+c)
Cosl ofwaler KL 24.N
CompensaUon lor earth takenfrom 100 00 e) Contractor's Prolit @ % on (a+bic+d)
pr,valeland

Cost for 600 cum = alb+c+d+e


d) overheads @ % on (a+b+c)
Rete por cum = (atb.c+d+o)/600
e) Contractor's profit @ % on (a+b+c+d)
Case - ll : Compactlng orlginal ground
cost for 100 com: a+b+c+d+e 6upportlng ambankmsnt

Rate Per cum = (a+b+c+d+e)/l00 Loosening,levelling and Compacling original


ground supporting embankmenl to facilitate
3.19. ;05.3.,1 Comp.ctingOrlglnalGround placement of liast tayer ol embankment
scarified lo a depth of 150 mm, mixed with
Caso - l : Compacting orlglnal ground water al OMC and thencompacted by rolling
suPPorllng su bg rad. so as to achieve minir m dry density as
given
in Table 30G2 for en$snkmentconstruction.
Loosening oftheground uplo a levelof 500
mm below lhe subgrade level, watered, graded
and compacted in layeas to meet requkerneot Taking output = 600 cum
ofTable 300-2 ,o. sLrbgrade construclion.
.) Labour
Mate day 0.08
Taking output 600 cum day 2.00
=

a) L.bour b) ,r.chlnory
hour 6.00
Male 0.12 Tractorwih fl PPer attachment
Vlbratory road roller 8_1 O tonne caPacity 7.50
Mazdoor 3.00
!\later tanker 4.00

b) Machlnery
Traclorwith ripperattachment hour 9.00 c) Material
Motorgraderforgrading horr 600 Water KL 24.OO

Wat6r lanker 6 KL capacity hox 4.00 on (a+bic)


Vibratory roller 8-10 tonne @ 80 cur/hour hour ?.50
d) Overhoads @ %

e) Contractor'6 profit @ % on (a+b+c+d)


c) Meterl.l
Cosl ofwater KL 240o cost for 600 cum = a+b+c+d+e

Rate per sqm = (a+b+c+d+e)/600

12 1)
Rord Wo& : 3-Eidtedq E{3ion Co.trcl sd D6ina!. r.o.d wo.b : l-E!.U!*qlq &Bion colrol ad Ddin!8'

Sr, Reference to Descrlptlon Unit Quantlty Rat€ oescription Unlt Quantlty Rale
5r. Raference to Rr,
No. MoRT&H Rs. rIoRT&H
Speclfications No.
I Speciflcations
3.20. 305 Stdpping .nd Storlng Top Soll a) Labour
Mate day 0.08
Stripping, stodng of top soil by road side at Mazdoor day 200
'15 m inlernal and re-application on
embankment slopes, cul slopes and olher b) Machln.ry
areas in localities where lhe available Dozer,80 HP hdr 6.00
embankrEnt rnatedal is not conducive to plant
gi!\rJth. c) Ovedre.do e '% on (r+b)
d) Contr.ctor's p.otft @ %on(.+b+c)
Taking output = 10 cum
Co3t br 300 dlm . a+b+c+d
.) L.bour
'.qm .
Mate day 0.20 Rrt p.. (.rb+c+dlBo0
day 500
7.22. 307 lurfilrg wltt god.
b) liachlnory
DozerS0HP @ 100 cum perhour hour 0.10 Furnishing and laying of the live sods of
perennial turf formiog grass on embankment
cl Overho.ds @ % on (a+b) slop€, veBes or olhel locations shcn ,n on the
drawing or as directed by the Engineer
d) contractol'3 proflt @ % on (a+b+c) including preparalion ot ground fetching of
sods and welering.
,10
cost for cum = a+b+c+d

Rato per cum = (a+b+c+d)/10 Taking outPut= 100 sqm

3.21 Strlpping, Storing and ReJaying Top soll .) L.bou,


frcm gorrowArcas ln Agrlcultu.e Fields Male day o.12
iriazdoor b. Fepsration ot glound and day 3.00
Stripping of top soil from borrow areas located hlchlng of sods
in agricultore fields, storing at a surtable place.
\
sp€ading and relaying ailer taking the bonor/ bl lrachln.ry
2.00
earth to maintain fertility of lhe agricultural l4later tenker lndrdino $/Etedng ior hour
field, finishing it to the requared levels and 3 mnlh3
satisfaction ol the farll€r. hour 1.00
Tracto(-tolley

Unit = cum
Taking output = 300 cum

74 75

I
R@d Works | 3-E.rthw*, Erosion Conto,6d Dninage
Ro.d Workl : 3-EirdNorlq E@ion Cofiro! dd Drainage

Sr Reference to Descdption Unit Quantity Rate


No. MoRT&H Sr. Reference lo Descriptlon Unit Quantity Rate
Rs.
Specifications No. MoRT&H Rs.
Specifications
c) Il/latertat
Farmyard manure @ 0.18 cum per c) Malerial
0.18
100 sqm at sjte of work Seeds kg 360
Sludge/Farm yard manure @ 0.18 cum 0.43
Coslofwaler per 100 sqm
KL 12 AO
Bitumen Emulsion Ltr 55.20
d) Overheads Jutenetiinq, openweave,2.5cmsquare sqm 264.00
@ % on (a+b+c)
opening
e) Contractor,s profit @ Cost of waterfor 3 months KL 84.00
% on (a+s+c+d)

Cosl for 100 sqm = a+b+c+d+e d) Overh€ads @ % on (a+b+c)

Rats per 100 sqh e) Contractorrs prolit @ o/"


on (a+b+c+d)
= (a+b+c+d+e)/.t00

3.23_ 308 Seeding and Mutching Cosl for 240 sqm = a+b+c+d+e

Preparation of seed bed oo previously laid top Rate per Bqm = (a+b+c+d+o)/240
soil, furnishing and ptacing of seeds, fertilirer,
mulching material, apptyjng bituminous 3.24. 309 Surface Drains In Soll
emulsion at the rate of 0.23 titres per sqm
and laying and fxing jute netting, inctuding Construction of unlined surface drains of
watering for3 months allas perCtause 308. average cross sectional area 0.40 sqm in soil
to specified lines, grades, levels and
dimensions to lhe requiremenlofClauses 301
Taking outpul = 240 sqm and 309. Excavated material to be used in
embankment within a lead of 50 metres
.) Labour (average lead 25 metres).
Mate dav 0.40
Mazdoor dav 10.00
Taking output = 10 nletres
b) aidachlnery
Wiiter tanker 6 KL capacity inctuding A- Mechanlcal MeaEs
hour 14.00
watedng icr 3 months
Tlactor-trolley a) Labour
hour 2.40
Male dey 0.01
Mazdoorlor dressing ofbed and side of day 0.25

16
1',1

)
!

Rold Wods: ].E!.lh6dq tdim Coniro! ud D..i ec Rod wortr: l"E nnw q &6i6 conlrol &d D inlsc

Sr. Reterence to Description Unit Quantity Rate Oescriplion Unit Quantity Rate
No. MoRT&H Rs. S., Rotolence to Rs.
l.lo.
MoRT&H
Specifications
Speclflcatlons
b) Machlnory 309 Surtac€ Drains in Odinary Rock
Hydraulic Excavator 0.3 cum bucket 0.33 3.25-

capacily @ 30 motres perhour consruction of uniined surtace drain of


aveGge cross-seclional alea 0.4 sqm in
c) Ovorh€ads @ % on (a+b) ordinary rock to sPclfied lines, grades, levels
and dimensions as per approved design and
d) Contracto.'s protit @ o/"
on (a+b+c) to lhe requirem€nt of Clauses 301 to 309-
Excavated nratenal to be lsed ir embankrnenl
Cost [o|l0 mekes: a+b+c+d at site.

Rate per metrc = la+b+c+d)/i0 unit = meke


Taking output = 10 metres
8. Manual Moans
A. ochanlcal M;ns
.) L.bour
Mate dey 0.08 a) Labour
day o.02
Mazdoor 2.OO Mate
Mazdoor for dressing ofbed and side day 050
b) oYsrheads @ % on (a) ofdraln

c) Contractor's pront @ % on (a+b) b) fiachlnory


o.67
Hydraulic Excavetor0.3 cum buckel
Cost for 10 metres = e+b+c cspacity @ 15 melres Per hour

Rato per m6tre = (a+b+c)/10 cl Ov.rieads @ % on {a+b)

Note Where liniflg of drain is provided, quantty shall d) contracto.'s Profit @ %on {a+b+c}
be worked out based oo appoved deslgn and
drawing and priced on rdte ofceirentconcrete cost6i 10 met6s : a+b+c+d
ofapproved grade or stoneAflck masonry as
the case may be. Rele per motro E (a+b+c+d)/io

B. Manuel Meana

a) L.bour
day 0.12
Mate
day 3.00

78 't9

I
I I

I a
I
Road Wo*! : 3.E!r{rmdc Eosion Conuol &d Droinrse D'!i'!8c
Road wo*! : l-E.nn{L Edio coiml md

Sr. Reference to Descrlption Unit Quantily Rate


Oescripbn Unit Ouantity Rate
No. MoRT&H Rs. 5,' Reterence to Rs
MoRT&H
Speclflcations l,lo.
specificatlons
b) overheads @ % on (a) d) Overh6.ds @ % on (a+b+c)

c) Contr3ctor's profil @ o/o on (a+b) e) Cont.actor's p.ofit @ % on (a+b+c+d)

Cosl for 10 melres = a+b+c Cosl for 1O metres= a+b+c+d+e

Rate per m€tre = (a+b+c)/10 Rats per metre = (.+b+c+d+o)110

3.26. 309 surface Dralns lh Hard Rock Type of piPe rnay be.todilted depending upon
provision in thede*n.
Rale per melre may be worked out based on
quantity olhard rock as per design
3-28. 309 Aggtsgate Sub_Sutaco D'ains

For iale of hard rock cutting, refer relevant Construction of aggGgate sub_sorface drain
item in this chapter 3m mm x 450 mm ual aggregates conforming
to Table 3OO-4, e&avated material to be
3.27, 309 Sub-Surface Dralns yrith Po.forated Plpe ulilised in roadway.

Construclion of sub-surface drain wilh


pedoreled pipe of 100 mm inlernal diEmeter
Taking output = lolnetres
ol m€tayasbestos cemenucement concrete/
PVC, cbset jointed, perbratrons Engiflg iom
.) Labout
3 mm io 6 mm depending upon size of Male day 0.02
male al surounding the pipe, with 150 mm Mazdoor for exc.vation and back tilling day 1.50
bedding below the pipe and 300 mm cushion
wilh aggregates
ebove the pipe. cross-seclion of excavalion
450 x 550 mm. Excavaled material to be b) M.lorlal
utilised in roadway at site. Crushed stone as Per Teble 300_3 135

Unit = rnetre
Taking output : 10 metres
c) Overheads @ % on (a+b)

a) Labour d) Contractor's Poflt @ %on (a+b+c)


day 0.04
Maz door lor excavation and backflling day 2.O0 cost for 10 metres: a+b+c+d

c) ti,laterlal Rat6 por metre = l.+b+c+d)rlo


Pertorated pipe o, cement concrete, mtr 10.00
intemal dia 'l 00 mm
Crushed stone as per Table 300-3 2.40

80 8l
B!.d Wo*t lEslhmlq Frsiod CdEol 3d r'nnt'!e
Rold Wq}3 : I'Eardr*odq &sid CGel .nd Drrid8. :

UnIT Quantity Rate


Oesc ption
Sr. Reference lo Doscriptlon Unlt Ou6ntlty Rale Sr. Reference to Rs.
No. MoRT&H Bs. No. MORT&H
Speclficatlons Speciflcatlons

3.29 309 Undorground Ordln at Edge of Pavement


b) Machlnery
8'10 lonnes hour 3.00
Srnooh 3wheeled steel aoller

Waterbnker6 KL, one trip per hour hqJr 300


Construclion of an undergrcund drain I mx
1 m {inside dimensions) laned wilh RCC
c) Materl.l
15 cm lhick and covared wlih RCC slab '10 KL 18.00
Cost of waler
cm in lhickness on urban rcads.

d) Overheads @ % on {a+b+c)
Unit= Bunning m€tr6
Taking oulput = one metrg
e) Cont.actor's profit @ % on (a+b+c+d)

a) Earlhwori( in soil 1.50


Cost for 3500 cum = a+b+c+d+e
b) RCC wo M-20 0.495

Rate per cum = {a+b+cr i+e)/3500


Rates lor these il€ms may be l6k€n lrom
chaplers on earlhwo* and subslruclures
3.31 313 Constructionof Rockfill Embankm€nl
rcsp€clively.

Construction of rockfll embankment with


Bate p€r metre = a+b
broken hard rock fragmeots of size not
exceeding 3O0 mm laid in leyers not exceeding
3.30. 310 Prepaaatlon and Sudace Tr6alment of
500 mm thir* including lilling of surface voids
Formatlon
with stone spalls, blinding top layer wilh
glenular material, .olled with vibratory road
Preparalioo and sll'aca lfoalrnern ol ,oamaton
roller, allcomplete as perClause 313.
by removing mud and slurry, watsdng to ihe
exloni n€eded to maintain th6 desked
molslure contsnl , lriftming lo lhs rsquir€d
Taking output = 1 00 cum
line, grade, prolile and rolling wilh 8- 1 0 tonne
smooti wtleel€d lDller, coarFlolo as per Clause
.) Labour
310. Mate day 0.04
Mqzdooa day 1.50
Unit = sqm
Taking outsut = 3500 sqm
bl liilachlnG.y i
Dozer 80 HP forspreading @ 200 cum hour 0.50
al Labosr per hour
Male day o.2a Vibralory road roller 8-1 0 tonnes @ 100 hour 1.00
lilazdoo( day 6.00 cum per hout
Mazdoor skllled day 1.00 Water tanker6 KL, one trip Per hour hour 2.00

83
It2

I
I
I
I

Road Worll : 3-Eantrcd( Bosion CoDrrol sd DEiugc


Rord Wo J: :'El|lw.lq EEid ColJoled Dt in.8.
Sr. Reference to Oescriptlon Uhit Quantity Rate
No. MoRT&H Decrlptlon Unlt Quantity Rale
Rs. Reference to
Specificatlons MoRT&H Rs.

Speclfications
c) Materiat
Costof waler KL 12 00
c) Ovc.he* @ % on (a+b)

d) Overheads @ % on {a+b+c) d) ContracL's profit @ % on (a+b+c)

6) Conkactofs profil @ % on (a+b+c+d) cost lor 260srm = a+b+c+d

Cosl ror 100 cum : a+b+c+d+e Rato per c- = (a+b+c+d)/260

Rate per cum = (a+b+c+d+eyt0o ln cese the d on the valley side is barren
and there is m obiection ,or disposing o,
ll is assumed that rcck is avaitabte tocally at
excavated aaath on the valley side, the
site from roadway cutting.ln case, podjon
of provision ot hnt end loaderand tipper shall
the rock require( breaking to acceptabte size
be deleted a excavaled earlh shall be
of300 mm, breaking charges wi have to be disposed otrcl the velley side
added.

3.33 301 Excavatior-HillyAreas in Ordinary Rock


EARTHWORX ON HILL ROAO
by Mech.r*:al Me.ns not Roqulring
Slastlng
301 Excavatton in Hilty Areas tn Soil bv
Mechanlcal Means
Excavation hhilly area in ordinary rock not
requirang bLiling by mechanical means
Excavation in soitin hilyarea by mechanicat
including cu6g and trimming ofslopes and
means inctuding cufling and trimming
ot s icte disposal of cl. material wilh all lifl and lead
slopes and drsposjng ofercavaled
eanh wth upto 1 000 ndes.
alllifts and tead upto 1OO0 metres

Teking output=170cum
Taking outpd =mO curh

,) Labour
a) Labour
day 0.32
Mate
day 0.24 Mezd@t day 8.00
Mazdoor tor tfilnmrng s opes
and heloino day 6.00
in excavaton. et. bl Machlnoi,
Doz6r ISOHP (D-60 A 12) @ 28.32 cum 6.00
b, Mrchln.ry per hour
Oozer,OO Hp (D.OO A 12)
pe, hour
@43.28cum 600 Front end bder 7.00
Tlpp€r5.5cum capacig, 4 lrips p6r hour 7.00
Fbntondloader
Tlpper 5.S curn c€pactg, 4 trips per 6.00
hour hour 12.N c) Ovorheac @ % on (alb)

84
ll5

)
l
Ro6d Wqt!: l-lrn[qodq Eblion C6r.ol&d D6inas.
Ro.d Wo*s : l-E rrhmrlq F^sion Conlrol ad Dainrgc

Sr. Reference to Oesc.lption t,nit lQuanttty Ral.


No. MoRT&H Description Unit Quantlty Rate
R!. 6r. Refolence to
Specificatiohs Rs.
No, MoRT&H

d) Cohtractot"s profit @ % SPeclfications


or (a+b+c)
c) Mato.lals
Cosl for 170 cum = a+b+c+d Gelatine 80 per cent kg 35 00
Electric detonators @ I detonator lor 140.00
Rate per cum = (a+b+c+d)/l70 2 Gelatine sticks of 125 gms each

Note : ln case the land on the va ey side is berren d) Overh€.ds @ '/" on (a+b+c)
and lhere is no objection for disposing of
excavated earth on the va ey side, the e) Contractor's profit @ on (a+b+c+Cl
'/6
provision of tront end loader and tjpper
sha(
b€ deleted as excsvaled e3dh can be
atisposed cost for 170 cu ,: a+b+c+d+e
oll on the val,ey side.
Rate per cum = (t+b+c+d+oY{70
3.34. 301 Excavation tn Hllly Areas ln Hard Rock
Requlrlng Btasflng Note : ln c€se lhe land on lhe valley side;s banen
and there is no obrection ior disposi.,g ot
Excavetion in hifly areas in had rock requiring excavated ee(h on lhe valley side, the
Dlasliog, by rnechenicat means inctudino provision of lront end loader end tipp€r shall
Irimming of stopes and disposal of cut nuren,l be deHed as excavaH earh can be disposed
with all tifts and teact upto ,0OO melres. offon the valley sire.

ln case ofhillroads, thealtitude effect comes


Taking output = 1 70 culh inlo play. The output of men and machines
decreases prcqessivev afr€r 21m m ebvalbn
a) Ldour leading lo increase in cosl . High ahitude effect
Mete has been explained in lhe basicapproach.
day 049
Mazdoor
dav 10.00
Driter Work In Urban Roads
day 2.00
Blaster
day 0.25
The cosl of earh work in ulban roads inhabited
b) lfachlnory
area will be comparatively higher due to
oozer 18OHp(D{OA i2) @20.32 hqrr 6.00
cum perhour
Ah compressor 250 cfm with
two iack 5.00 a) There is mixed trafl5c on urban rcads like
harnrner @ 20 cum per hour
sb!,v moving hand and anirrEl driven carB.
Front end k€der
'lipp6r5.S 7.00 rickshaws, sldes. trlotrree wheelor apart
cum capacity,4 kips perhour kom llle usual vehicular lraffic resulting into
7.00
traf,ic jams. This causes loss of working
tirne whjch may be in the .ang€ of l0 -15
per cenl.

86
87
Wdil I l_E,rhmnq Emsion Conl'd sd Dnin!8!
R@d Worll: l-E nhm*, Eeion C6uol sd DEinls. Ro.d

Unlt Quantity Rate


Sr. Ralerence to Description ll Quantity Rete to OescriPtion
Un Rs.
No. MoRT&H Rs.
si Referenco
froRT&H
No.
Specltlcations Speciflcations
Flyas h/
b) There is considerable disruption of
traffic constructlon of Emb'nkment with
Suggestive (rom coal or Lignl
3.36. Pond Ash av.ilable
adversely afleciing the efficiency ot lhe
working padies including niachines due lo Burnlng Thormal Plants a3 Waste
coogestion c€used by pedestrian lramc, iratorial
locsl road sire venders, pa*ing of vehicks
llyash
by lhe road side, encroachments by the conslruclion ol €mbankmenl wllh
_ 2001
shopkeepers and localshops who make conlormrnq toTable l oflRC' SP:58
lhermal
use ot lhe beams of lhe rcad in tont ot obtained f.omcoal or lign[e burnrng
spread and
these shops and unauthorised conveFion oower statonsaswasle rnatedal'
..moacted in ol 2OO mm thickness each
layer
of road benns into mlni loaal market. The
58 _ 2001
al OMC. allas specifred in IRC SP:
oulpul of manpower and machines is
substantially .educed due lo factors and as Per approved Plans'
mentioned ebove-

c) Cost ot livlng in urban areas ls Taking output = 360 cum


compaElivaly nbre Gsulting into higher
wages. a) Labour dey 0.16
day 4.00
d) At limes, wo* is executed during night Mazdoor
lime due to heavy lraffc during day time.
This involves extaa expenditure by way of bl Machinery 6.00
Hyd raulc Excavator 0'
9 cum buckel hour
making arrangehent for lighting and
caoacrtY @60 cum/hour
special lransporl ,or wo*ing parties due 360 x 1'2 = I km 432xL
to odd hour. i-'r*, ioi ."p""'tr, flYash
432 tonnes

ln the lighlofabove, the aulhorities engaged lor


in preparing thecostestimates may exercise Add 1 0 per cenl ol cosl of cerriaoe
bading and unloading
their judgrnent and cater fo. the addilional cost
to lhe exlent of 2 to 3 per c€nt, keeping in 200 ho{rr 180
view the sever,ly of factors rEntioned above. OozerS0 HP for spreading @
Supporting delails for the exlra cost based on 3.60
ilororcraoer tor gtaoing @ 10ocunl/hour holr
aclual site conditions in specific caaes will hour 12.@
WatertankererLcaPacity
have to be gaven injustiftcation.
viiitory
q
notler a"to tonne too hour 3.60

c) ovsrheads @ % on (a+b)

89
88
wdt : l-E.ntE!&Gihcd{.d.!d Dnr.8. !
R..d

I
)
l
Sr. Reference to
No. MoRT&H
Oescriptlon Unlt Quantity Rato ChaPter-4
)
Specifications Rs.
)
d) Cohhactor,s profit Sub-Bases, Bases (Non-Bituminous) and Shoulders
@ % on (a+b+c)
)
Cost for 360 cum = a+b+c+d

Rate por curn = (a+b+c+d)/360 Enbte: )


E- ouantlhs of msbdalg p@vlded are apprcximate and sre m€ant ftlr ha plrpos€ of estimating only.

As llyash is available free ofcost


aswasle E Act al quaot'lie. lhall b€ ar per mix design. ,
material from Thermal planls, cosl
haterialhas not been aclded
of E fo,
"on"frrcto,t
a suD oase, two altemawes es unoer have Dc€o Ptouded :
)
a. Mix in place molhod
2. The earthcover on sides and intennediate l b. Plant mix Inethod
)
byers of eadh sandwiciirE tre f,yash
have Although plaol mix melhod has not been providod inthe MoRT&H Specilicelions. it is actually being
not been inctuded in this anatysis.
sern€ are r€quird to b€ provided
The
as per
adopted by sorne ol lhe confactors wio are holding the mixing plants to get better qualily of mix. lt is
also lound economical as it can achieve much rnore progress, lt is re .Jmmended lhat th is point may
,
approved desgn and pacecl separately
as be kepl ifl viewduring future revision ofspecifcatjons otsuFbase.
embankment construction
4lnthecaseofimprovern€nlofsub{radewilhlirneslabilization,soilisassumedlobeEveilableandhas
)
not been provided for Only lime has been catered- ln the case of lime stabilization ofsub-base, soil
has been provided to lorm the sub-base. )
5. ln the case ofmedians, separetors and footpaths, plate compaclorhas b€en calered forcompaclion
due lo restricted space, )
6. lt has been assumed in lhe case ofc.ushed cemenl concrete sub-bas€/base thatduring the process
of dismantling, 25 per cent oI aggregates will get segregaled and only the remaining willhave to be ,
broken/crushed from disrnanded concrete slab podons. Transporletion ofmatenals has been catered
from place of dismanlling lo v/o,k site lncase.sit€ isthesamB, transportalion cost can be deleted.
)
7. Separate mte irr peoehalion coat over top layer of crushed cemeot cancrBt€ base has been provided,
a6 this ilem b optionel.
)
8. U,/hile providing icr rate of materials, delailed locelenquirl* should be made and prevailing market
he
rates ascertained faom concemed suppliers in the area keeping in vlew the location of crushing plants
and lead invoked.
)
9. The rate analyses for crushing ofaggregates has also been included in Chapter-11 The cost of procurcd )
aggregates and crushed aggregates by own crushershould bo compared and economic alternative
adopted. lt hasgenerally be€n obseNed in practice that conkactors are setting up theirown crushing
plants where quantities ofaggregales are large especially for projects above Rs.50 crores. )
1 0. The quantity consideed in lhe output is lhe compacled quantly. Th€ quantities of aggregales provided
jn the rate analysis underthe head malerialare the uncompacted quantities. )
)
90
9t )

)
.)
I

)
RDsd Wodc : +SuL8.sdllcd

)
Ghapter4 Reteaence to
Description Unlt OuantitY Rate
5r. Rs.
) Sub-Bases, Bases (Non-Bituminous) and Shoulders No.
t oRT&H
Spoclflcatlons
) Sr. Reterenco to Description Unit Ouantity Rate
i

c) l{atorlal
No MoRT&H Rs. Close graded gi_anular suEbas€ material

') Specfficatlons as per Table 40G'l

, 4.1 401 Granula. Sub-Baso wlth Closo Gradsd


Matorlel (T.blo 400-11
For Gradlng I ll,lalerlal
53 mm to 9.5 mm @ 50 Per cent 144_O

9.5 mm lo 2 36 mm @ 20 Per cent 57.00


) A. Planl Mix Method 2.36 mm below@ 30 Per cenl 86:40
Constructionolgranularsuubase byproviding Cost ofwaler KL 27.00

) close graded malerial, mixing in a mechanic€l


mix planl al OMC. caniage ofmixed material OR
() to work site, spreading in unitorm layers wilh
molor grader on prepared sut ace and For Gradlng ll liaterlal
100.80
cornpacling with vibratory power roller to 26.5 mm lo 9.5 mm @ 35 Per cent
,) achieve the desteddensity, completeas per 9.5 mm to 2.36 mm @ 25 Per cent
12.00
115.20
Clause401. 2.36 mm belou/ @ 40 Per cent
27.@
) Unit = cum
Cost of waler KL

t) Taking output = 225 cum (450 tonne) OR

e) Lrbour For G.adlng lll aterlal


day o.40 100.80
) Mate
M.zdoor skilled 2.00
9.5 mm to4.75 nun @ 35 Per cenl
4.75 mm to 2.36 mm @ 12.5 Percenl
36.00
Mazdoor dav 8.00 2.36 mm below @ 52.5 Percenl
151.20
t) KL 27.00
b) M.chl.ery
Wet mix plant @ 75 tonne capacity 6.00
) perhour d) Overheads @ % on (a+b'c)

Eloctric generating sct, 125 KVA hour 6.00 % on (a+b+c+d)


€) Contractor's proflt @
) Water tanker 6 KL capacity 5 km lead hour 4.50
wilh one trip per hour
Cost for 225 cum = a+b+c+d+e
Front end loader 1 cum bucket capaciq 6.00
) Tipper 10 tonne t.km 450x1 Rate por cum = (a+b+c+d+e)/225

) Add 10 per cent of cosl ofcarriage to


cover loading and unloading

) Motorgrader 110HP 6.00


Vibratory roller 8-10 t 6.00
)
) 92 93

)
)
)
Ro&d WqIl : 4-SuL0adOa6 wdt! : a-suFa&tsc
BEd

Sr. Reference to Descrlption Unlt Quantity Rate Unlt Ouantity Rate


Releaence to Descrlption
No. MoRT&H Rs. sr. Rs.
MoRT&H
Speclfications NO
Speclfications
B. 8y Mix in Place Melhod OR

Construction of granuler sub-bese by


providing close graded mateflal, spreading For Gr.ding lll tlaterhl
1U.40
in uniform layers y,ith motor greder on 9.5 mm b4.75 mm @ 35 Per cenl
cum 48.00
prepared surtace, mixing by mix in place 4.75 mm to 2.36 mm @ 12.5 Percent
201.60
method wilh rotavator at OMC, and 2.36 mm below @ 52 5 Per ceni
KL 18.00
compacling with vibratory rcllerlo achieve Cost ofvater
lhe desired density, complele as per Clause
d) Overheads @ % on (a+bic)
401.

e) Contractor's Profit @ % on (a+b+c+d)


Taking output = 300 cum
cost for 30ocum = a+b+c+d+e
3) Labour
Male day 0.48
day 2.00 Rate Pe. cum = (a+b+c+d+c)800
luazdoor unskilled day 10.00
4.2 401 G.anular Sub"Ba!. wlth coarre Gtadod
b) machine.y Matorlal (Tlblo 400'2)
Motorg6der 110 HP @ 50 cum hour 6.00
proviling
Vibratory roller 8-10 tonne hqrr 6.00 Construclbn ofgrantrlar sutsbase by
Trador*otavator hcur 12.00 greded matenal, spreadlng in un o'm
coarse
hour 3.00 laverswilh molor graderon prepared surface'
m;xinE by mix in Place melhod
with rotavator
c) Materlal
atOMC, and compacllng wilh vlbratory
roler
Clos6 graded granularsub-base matedal as
lo achleve he desired density, complete
es per Table 400-l
perClause401.
Fo. Gradlng I iiatedel
53 mm to 9.5 mm @ 50 per cent 192.00
9.5 mm 1o2.36 mm @ 20 per cent 76.00 Taking ouiPut = 300 cum
2.36 mm below @ 30 per cent 115 20
KL 18.00 .l Labolt
day 0.40:
Mate
OR day 2.00
Mazdoor skiled
day 8.00
For Grading ll Mated.l Mazdoo.
26.5 mm to 9.5 mm @ 35 per cent 134-40 bl ll.chlnery
9.5 mm to 2.36 mm @ 25 percent 96.00 6.00
Motorgrader l lO HP @ 50 cum Perhour
2.36 mm below @ ilo per cenl 153.60 6.00
VibratorY roller 8_10 tonne
Cost ofwater KL 18.00 hoor 3.00
Watertanker

91 95
E---------------Z
8o.d W6b : 4-Sub.B&/Be
Ied Wo.b : a-SuEBE.r'Bc

Sr. Reterence to Desc.lptlon


No. MoRT&H
Speclficalions
LJnit Ouantlty Rate
Rs. 6ilo
Reference to
MoRT&H
Descriptbn Unlt Quantity Rate
Rs.
Speclfications
c) [.tcrl.l
For coaase graded granular sub_base 4.3. 402 Lime StablllEation tor lmprovlng
Male at!.s perTabte 4OO-2 Subgrade

Fo, gr.ding I Laying aM spreadhg available soil in the


Materiel
53 mm to 26.5 lnm subgrade q| a prepred surface, pulverising,
@ 35 percent ctim 134.40
26.5 mm to4.7S mm mixing the spread soilin place wilh rotavator
@ 45 per cent 172.80
2-36 mm below with 3 peraent slakcd lime having minimum
@ 20 per cen! 76.80
Cost of water contenl of 70 Per c€trl ot CaO, gradang with
KT 18 00 motor grader and cdnpacling wilh the road
OR roller at Ol\Jtr lo the &sjred density to fo.m a
layerof irntroved suDgrade.
For Gradlng ll lllat.rial
26.5 Inm to4.7S mm
@ 75 percent 288.00 Teking outFrl = 300 qrm (525 lonne)
2.36 mm below @ 25 percent
96.00
Cost ofwater
KL 18.00 A. By Mechanlcal lleans
OR a) Labour
0.36
For cr.dlng lll Materl.l Skilled rmzdoor k[ alignment and day 1.00
9.5 mmlo4.75 mm
@66 percent 255.00
geometeaics
2.36 rr|m bebw @ 34 per cent Mazdoo. for s praying li.ie 800
129.@
Cosl ofwater
KL 18.00
bl Machin.ry
d) Overheads @ % on (a+b+c) Tractor rilh ripper and rohvator 12 00
attachments @ 60 cum per hour for
e) Conl.acror,s protit .ipping and 25 cum per hour for mixing
@ % on (a+b+c+d)
MolorGrader'110 HP @ 50 cum per hour 6.00
Cost for 3OO cum = a+b+c+d+e Vibralory roller 8-10 tonne capacity ho!r 6.00 x 0 65'
12.00
Rale porcum = (a+b+c+d+e)/300
c) Materlal
Noie Any one of the gradrng fo/ mater,ar Lime at site 15.75
may be
adopted as perdesiqn Cost ofwater KL 72.O0

d) Overhe.ds @ % m (a+b+c)

e) Contractor's ptoflt @ % on (a+b+c+d)

cost for 300 cum : a+b+c+d+e

Rate per cum = (.+b+c+d{eY300

9',]

I I"
Road Wo*. : 4-SuLArs./Bsa
Ro.d woil{s : 4-SUEB&,B.g

Sr Reter6nce to Description Unit


No. MoRT&H
Ouantity Rate g, Reference to Descrlption LJnlt Quahtlty Rate
Speclflcatlons Rs, MoRT&H Rs
No
Specifications
Note : 'Though vibratory ro €r is r€quired onty
lor 3
nours aS p€r norms, brrt lh€ sam€ has to be 4.4. &2 Lime Trealed Soil for Sub-Base
availablo at sit6 for 6 hours as other machlnes
Providing, laying and spreading soil on a
for sproaa,tng and mixing w,ll take
6
hours. prepared subgrade, pulvensing, mixing lhe
The usag€ rates ot ro er hav6
be€n mufiiptied spread soil in place wilh rolavato. wilh 3 per
wilh a lactor 0,0.65
cent slaked lime with minimum conteot of 70
per cenl of CaO, grading with moto. grader
B. By llanuat Means
and compacting with lh€ .oad.oller at OMC
to achieve atleast 98 per cenl of lhe maximum
Unit = cum
dry density lo lorm a layerofsuFbase-
Taking oulput
= I 50 cum (26G tonnes)
Unit = cum
.) Labour Taking outsut = 300 cum (525 bnne)
day
Mazdoor skllled
1.44 !) Labo .
day r.00
lazdooa day 0.48
day 35.m Mazdoor skilled day 2.@
b) Machlnory Mazdoor 10.00
Vibralory rolter 8-tO tonne @ 60 cum
2.,r0 b) lrachlnery
perhour
Excavato. 0.90 cum bucket capacity 6.00
6.m Tipper for caniage of soil t.km 525x1
c) Maleriat Add 10 per cent ofcost ofceriage lo
Ume at site covercostof loading and unloadihg
8.m
cost ofwater
36.00 MotorGrader i 10 HP @ 50 cum perhour 6.00
d) Overfieads Vibratory roller 8'10 tonn6 6.00
@ % on (e+b+c)
Traclor wilh rotravator and blade @ 25 hour 12.00

c) cum p€r hour


Conttactor'B p.ofit @ % on (a+b+c+d)
12.00

Cosl for 150 cum = a+b+c.rd+e c) Materlal


Lime at sile 15.75
Rete p€r cum
= (a+b+c+d+€Ii50 Costolwaler KL 12.00 )

d) Overheads @ % on (a+b+c)

e) Contractor's profit @ % on {a+b+c+d)

cost for 300 cum = a+b+c+d+e

Rate per cum = (a+b+c+d+e)/300

98
99
)
l
) !
R !d Work;4-SutsBa!.,tsB Ro.d Wdit: +ilBe/Bad
) Quanllty Rate
Unit
Sr. Reference to Description Unit Quantlty Rate Refetence lo DescriPtion Rs.
, No. MoRT&H Rs.
ST,

No
MoRT&H
Specillcations Speclficatlons
) d) Ov.fieads @ *on (a+b+c)
4.5. 403 Cement Treated Soil Sub-Base/Base
('+b+c+d)
) e) Contr.ctofs prcfil @ % on
Providing. laying and spreading soil on a
prepared subgrade, pulverising, adding the Cost lor 3OO crrm = a+blc+d+e
) &signed quanw of cement lo he spread soil,
mixing in place with rotavato( grading wjth the Rat. Pot cum =(a+b+c+d+o)'300
, motor grader and compacling with lhe road
roller al O[,lC to achieve lhe desired unconfned 4.6 403 c€ment Trcated Crushad Rock or
2 and
comblnatlon as Pot Cl'uso 403
compressive strength end to form a layer of
Tablo 400.4 ln Sub'B'63lBase
, sub-base/base.
malenalon
Providing, laying and sFeadrng
desEneo
) e DreDared subgrade, addrng lh€
matenal'
Taking output = 300 cum (525tonne) ouaniitv ot cernent to tre splead
grading with ue
mrtino ;n obce wilh rota{abr'
) Fo. a per cent quantlty of cem.nt by nntoi grader and conpacting
wllh lhe roao
woightofsoil unconmeo-
D[er at OMC i, achi"ve tE d€slred
a layor or
) ;mpressive slrengtn and to fom
.) Lrbour sub-basetbase
) Mal€
Mazdoor skllled
day 0.48
2.00 Unit = cum
10.00 Taking output = 300 cum (600 tonne)

) Quantlty ol cemonl'sumed
ts4 percsnt
b) Machlnery tock by wslgnt
ofqu.ntity ofcru6hod
Excavator0.90 cum bucket capacily hour 6.00
) Tipp€r for carriage of soil tkm 525x1
a) Ltbour clay 0.48
) Add 10 per cenl o, cost of caniage lo Mate
Mezdoor stilled
2.@
covercostot loading and unloading day 10.00
Mazdoor
)
Motor Grader 110 HP @ 50 cum per hour hour 6.00
Vibralory roller 8-10 tonn€ 6.00 bl ll.chlnery 600
cum Pe' hour
) 12.00 Motor Gradel 1 10 HP @ 50 6.00
Tractor wilh rotavator and blade @ 25 hour
vibratoN rcller 8'10 tonne
cum perhour 25 12.00
Tractorwih rotavator and blade @
) Waler tanker 12.00
cumPerhour 10.00
c) Matsrial Water tanker
) Cerient at site {@ 4 per cent of 525 ton.e) tonne 21.00
Costofwater KL 72.00

) t00
t0l

,
)
)
I
lodd Wdk : +Sub-BdlDe
)
Ro.d Wdil : {-Sub-Bd/BB

Reference to
t
Sr. Descdption Unit QuantltY Rate Oescription unlt Quantity Rate
Reference to
No. MoRT&H Rs Sr. Rs.
Speclfications No.
MoRT&H )
Specifications
c) ate.i.l a) Labour )
Cement at site @ 4 per cent by weight lonn€ 24.00 Mate day 0.08
ol crushed aggregaio (600 tonne) 2.00
Mazdoor dey
)
Gr.ding of m.terlal ,oJ aub+.so coora€
b) Machlnery
37.5 mm to 9.5 mm @ 55 pe. ceot
9.5 lnrn io 4.75 mm @ 20 per cent
cum 211.20
76.80 TractoFtrolleY 0.20 )
4.75 mm to 75 micron @ 25 per cent 96.00
Cost oI waler KL 60.00
c) Overheads @ % on (a+b) I
OR d) Contractor'E profit @ % on (afb+c)
)
Grading of materlalfor base cou6e
Cosl for 2'10 sqm = a+b+c+d
37.5 mm to 9.5 mm @ 32.5 p€r cent 124.00
9.5 mm to4.75 mm @ 5 por cent 19.20 per sqm = (a+b+c+d)/210
)
RatE
4.75 mm to75 micron @ 62.5 p€rcent 240.00
Cosl ofwater KL 60.00
4.8- 404.3.2 lnvcrled chote ,
d) Ovo.he.d3 @ % on (a+b+c) Construclon of inverted choke by providing
laying, spreading and compacling screening
)
6) Contracto/s profit @ % on (aab+c+d) B typ€/coarse sand ol specified grade in

uniform layer on a prePared surface with rllolor ,


cost for 300 cum = a+b+c+d+e grader and compacting with powerrolleretc

Rat€ pe. cum = (a+b+c+d+eY300


,
Taking output = 600 cum
Quanlities of aggregates provided under 'c' )
above are uncompacled quant'lies ., Labour
Mate day 092
Mazdoor skll€d day 2.00 )
4.7. 404.3.1 Making 50 mm x 50 mm FurrowB
day 21.00

Making 50 mm x 50 mm funows, 25 mm
)
deep.450 to thecenter line ofthe road and al b) ]{.chlnery
hour 6.00
Motor Grad€t 1 10 HP
ooe metre interval in the existing thin
Vibaatory roter 8_10 tonnes @ 60
qrm 6.00 )
hfumihous weadng coarse includiog sweeping
per hour
and disposal ofexcrvated rnaterial wihin 100O
ll\ht r tanker hdr 18.00 )
metres lead,

Unit = sqm
c) etodal
720.00 )
scGoning YPe'B'or coarie sand
Taking oulput = 30 m x 7 m= 210 sqm KL 108.00
Cost olvrater
)
102 l0l ,
)

)
I

Rod Wctl : +S!!Ba./Be


--------a Ro.d Wdi6 : 4-SuElr6rr'B,s

Sr. Reference to Descrlptlon Unlt Quantity Rale Unit Quantity Rate


sr.
Rof.rence lo Descrlption
No. MoRT&H Rs. Rs
MoRT&H
Specifications NO,
Specilications
d) overheads @ % on (aib+c) I c) Mats.ial (Refer Tabl6 {00-7' 8 & 9l
I
Aggregate
e) Conkactor'. prcfit @ % on (a+b+c+d) i

Gradlng | 90 mm to 45 mm @ 1 21 cum cum


435 60
Cost f,cr 600 cum = a+b+c+d+e
per 1O sqmlorcompacted lhickness of

Rale per cum = (a+b+c+d+e)/600 100 mm

OR
4.9. 404 Water Bound Macadam
Grading ll 63 mmlo45 mrn/Grading lll 53 cum 435 60

Providing, laying, spreading aod compacling mm to 22.4 mm @ 0 91 cum Per 10 sqm for
stooe aggregates of specilic sizes lo water compacled thickness ol75 mm
bound macadam specification including OR
spreading in uniform lhickness, hand packing,
rolling with 3-wheeled steervibratory roller
Gradlng lll53 mm to 22.4 mm culn 435 60

8-10 tonnes in stages lo proper grade and @ 0.91 cum per 1. sqm for comPacted
thickness of 75 mm
camber, applying and broofiting requisite type
ofscreening/ binding malerials to fill-up the Slon6 Screenlng
inlerslices of coarse aggregate, watering and Type A 13.2 mm lor gradlng I @ 0.27 cum cum 97.20
compacling to lhe requkeddensity. per 10sqm

OR
A. By Manual Means
Type A 13.2 mm for grading ll @012cum cum 57 60
per '10 sqm
Taking oulput = 360 cum
OR

r) L.bour Typs g 11 2 mmfor grading ll @ 0 20 cum cum 96 01

Mate d4 10.08 per 10sqm


Mazdoo. skilled dav 2.N OR
Mazdoor dav 250.00
Typo B 11.2 mm torgradlng lll @ 0'16 cum cum 86.40

b) Machlnory per 10 sqm


Mbratory roller 8l 0 tonne @ 60 cum hour 600 OR
per hour
Crushable type such as Moorum orGravei cum 108.00
OR
for gradlng I @ 0.30 cum Per 10 sqm
Smooth 3-wheeled ste6l roll€r hour 12.OO
OR
@30cunvhour
24_N Crushabletype such as Mooruoor Gravel cum 105.59

irr gredlng ll &lll @ 0 22 cum Per 10 sqm

104 105

j
l

R .d Woti I +&rBrs/BB
Rord Wo&r i 4-Srb-B6ots6er
Sr Reference to Desc.iption
No. MoRT&H
Unit Q(rantlty Rate
sr. Reforence to Description Unlt Quantity Rate
Speclficaflons Rs.
MoRT&H Rs.

Bindlng mate.iat Speclficatlons


!
Brndrng Materiat @ O 08 cum per 10 sqm for cum 28.80 c) ii.torl.l
grading I malenat
Sam€ as in casa of manual means
OR

Eindrng Matenat@ 0.06


d) Overh€ads @ % on (a+b+c)
cLrm per 1O sqm for cum 28.80
gradlng tl materiat
(Any one ot lhe aggregale e) Contractor's profit @ % on (e+b+c+d)
g radrng. screenino
and bhding materjat may be used
as oe; Costfor 360 cum = a+b+c+d+e
des;gn)
Coslofwater KL 144.00 Rato per cum = (a+b+c+d+e)/360
dl Overhe.ds @ % on (a+b+c) Note: As three wheeledsmoot\ rollels are also very
commonly used, the sarne has been provided
e) Contractor,s profit
@ % on (alb+c+d) asanaltemalive.
Cost for 360 cum = e+b+c+d+e
4.10. 405 Crushed Cement Concrote Sub-BaseJBass

Rato per cum = {a+b+c+d+e)/36o


Breaking and crushlng of malerial obtained
by breaking damaged c€rnent concrete slabs
8. By Mechanical Means
to size renge nol exceeding 75 mm as
specified in Table 400.7 lransporting the
aggregates obtained ftom breaking otcernenl
Taking output = 360 cum
concrete slabs ata lead of L km, laying and
compacting lhe same as sub-base/base
a) Labour
course, constructed as V1tsM to Clause 404
Mate
day 0.68 except lhe use ol screening or binding
Mazdoor ski ed
day 2.O0 material.
Mazdoor
day 15.00

b, ti.chtn.ry
Taking output=360 cum
Molororader 110 Hp@ SO cuftyhr. for hour 7.20
sp.a€dirE
Mbietory roller 8-
.) L.bou.
l O tonne @ 60 curvtr. hour 6.00 Mate day 4.16
OR Mazdoor6killed dzy 2.N
Srlooh 3-wheelecl ste€l loller Mazdoor fot caushinq trokencoment ey r02.00
hcur 12.00 concreto pavomenvslabs lntoaggregate
@30cun hr.
\rrel6r tanker 6 KL cepadty
hour 24.00

)
106
107
,
t--
)
,)
I
Road Worts : 4-SuEBai./Bascs
) Ro.d Wnk : 4-Sub-BasdBases

) Sr. Reference to Description Unit Quantlty Rate


No. MoRT&H br. Reterence to Description Unit Quantity Rate
Rs.
) Speclfications ilo. MoRT&H Rs
Specifications
b) Machlnery
) Motorgrade.110 Hp@ 50cur hr hour
2. ln case of breaking ofslabs is done locally
6.00
Vibratory roller 8-10 tonne @60cum without involvenient of transportation, the
hour
) perhour
6.00
provision of tipper, Iront end loader and
loading/u n loadin g charges may be
) OR deleted.

Smooth 3-wheeled steetroller @ 30


) cunYhr
hour 12.00 3. As 3-wheeled smooth steel rollers are
commonly in use, the same has been
Front end loader 1 cum bucket capacity
) Tipper 10 tonne capacity
hour
t.km
6.00
72OxL
provided as an alternative.

) Add 10 per cent of cost ot cariage to 4.1',l. 405.2 Penetration Co.t Over Top Layer of
cover cost of loading and unloading Crushed Cement Concrete Base
)
Spraying ofbitumen over cleaned dry surhce
Water tanker 6 KL capacity with S km hoJr 12.00
ofcrushed cementconcrete base at lhe rate
) lead hour @ 1 trip per hour
of 25 kg pe|lo sqm by a bitumen pressure
c) Mate.lal d istibutor, spreading ot key aggregates at the
) Material available from disman ed concrete rate of0.'13 cum per 10 sqm by a mechanical
slab aller crushing/breaking and only gritter and rolling the surface as per Clause
) caniage is required lo be provided 506.3.8.

Costofwater
) KL 72.00
Unit = sqm
d) Overheads @ % on (a+b+c) Taking output = 7500sqm
, e) ContEcto.'s ptofit @ % on (a+b+c+d) .) Labout
) Cost for 360 cum = a+b+c+d+e
Mate day 0.56
Mazdoorskilled day 2.00

) Rate per cum = (a+b+c+d+e)/360 Mazdoor day 12.00

Note : It is assumed that dismanfling of concrete b) Machinsry


) slab/pavement has been considered Mechanical broom hydraulic @ '1250 sqm hour 6.00
Separately. Hence same is not added in per hour
) this analysis. Odly labour for crushing the Hydraulic self propelled chips spreader ho(lr 6.00
dismantled slab into aggregate has been Front end loader 1 cum bucket capacity hour 6.00
) added. Carriage from stoak pile lo work Tipperlo tonne capacity hour 6.00
site has been provided with a lead of L Mbratory rollerS-10lonne @ 30cum hor 6.00 x 0.65'
) km. Ferhour
Bitumen pressure distibutor @ 1750 sqm hour 4.24
) per hosr

) t08
t09
Ro.d Worti : 4-SuLBddtsas€s Road wnk : 4sub-BsdBls.s

Sr. Reference to Descrlption Unit Quantity Rate Description Unit Quantlty Rate
St Reference to
No. MoRT&H Rs. Rs.
MoRT&H
No.
Specifications Specifications

c) Matcrial b) Machlneiy
Wet mix plant of 75 tonne hourty capacity hour 6,60
Crushed ston€ aggr€gate 11.2 mmsize cum 97.50
Bitumen tonne 0.25 A€caic generating set, 125 Kr'Ahour 6.00
Front end loader I cum capacity
hour 6.00

d) Overheads @ % on (arb+c) Paverfnisher hour 6.00


tonne
Vibratory roller 8.'lO hour 6.00 ' 0.65'

s) Contracto/a p.orit @ % on (a+b+c+d) OR

Smooth 3-wheeled steelroller @ 8-10 hour 12.00


Cost for 7500 sqm = a+b+c+d+e
tonne
Watertanker hour 3.00
R.te persqm = (8+blc+d+olfl500 t.km 495x1
llpper
Note 'Though vibratory rolleris required only for 3 Add 1O per cent ofcost ofcaniage to cover
hours as per norms, the same is required to cost of loading and unloading
be available at site for6 hours to match with
othermachines. The usage rates of vibratory c) Matetlal (Table 400-ll)
roller have been multiplied with a iactor of 45 mm to 22.4 mm @ 30 Per cent cum 89.10
cum 'l'18.80
0.65. 22.4 mm to 2.36 mm @ 40 Percent
cum 89.10
2.36 mm to 75 micron @ 30 Percent
4.12 406 Wet Mix Macadam KL 18.00
Cost ofwater

Providing, laying, spreading and compacting d) Overheads @ % on (a+b+c)


graded stone aggregate to wet mix macadam
specifr cation including p.emixing the material e)Contractot's profit @ % on (a+b+c+d)
with water at OMC in mechanical mix plant
carriage of mixed material by tipper to site, Cost for 225 cum = a+b+c+d+e
layiig in unitorm layers with paver in sub-
base/base course on well prepared surface Rate por cum = (a+b+c+d+sll225
and compacting with vibratory roller to achieve
the desired density. Note: ''1. Though vibratory roller is required only
for
3 hours as per norms, the same is required
Unit = cum to be available at site for 6 hours to match
Taking ouhut = 225 cum (495 tonne) with othe. machines. The usage rates of
vibratory roller have been multiplied with a
a) Labour factorof0.65.
Mate day 0.48
Mazdoorskilled dLf 2.00
Mazdoor day 10.00

ll0 ltl
) l
Rold Wo*s : 4-Su&Basotsa*j
) Road Wo*r : 4-Sub-Bas!,4-s

) Sr. Reference to Descriptlon Unit Quantlty Rate


No. MoRT&H
Rs. Sr. Reference lo Description Unit Quantity Rate
) Specifications
No.
MoRT&H Rs.
2. As 3-wheeled smooth steel rollers are Specifications
) commonly in use, the same has been
Note This analysis provides for medianand island
provided as an alternative which can
) b€
used if the thickness of individual tayer
wilh earthen lop. ln case the surface is
required to be turfed or planted rilh shrubs,
does not exceed .lOO
mm.
) lhe same is requred to be providedseparately

4.13. as per analysis given in the Chapter on


407 Construction of Median and lsland wlth
horticulture. ln case granular fill is required to
, Soll taken from Roadway cutflng
be paved, quantities ofpaving arerequiredto
be calculated as per approved design and
) Construction of Median and lsland above road
provided separately.
levelwith approved material deposited atsite
) from Dadway cutting and excavation fordrain
4.14. &7 Construclion of MEdian and bland with
and loundation of other structures, spread,
Soil taken frcm Borrow Areas
) graded and compacted as per Clause4OT.

Construction ofmedian and lslandabove road


) Unit = cum
level with approved material brought from
Taking output =2.1 cum bonowpits, spread, sloped and cunpacted as
) a) Labour
perClause407.

Mate
) Mazdoor
day
day
0.24 Unil = cum
6.00 Taking output = 21 cum
) b) Machinery
a) Labour
Water lanker 6 KL with S km lead and hour 1.00 0.16
) 1 trip per hour
Mate
Mazdoor
day
day 4.00
Plale compactor @ 3 5 cum per hour hollr 6.00
) b) Machlnsry
c) Materlat
led hcur
water tanker with 5 km 1.00
) Cost ofwater KL 6.00 Plate CompactoJ @ 3.5 cumper hour hour 6.00
Hydraulic Excavator 1.0 crm bucket hour 0.50
) d) Overheads @ % on (a+b+c) capacity @ 60 cum per hqr
I Tipper 10 tonne capacity t.km 52.5 x L
e) Contractor's profit
) @ % on (a+b+c+d)
Add 10 percent ol cosl offansportation
Cost for 21 cum = a+b+c+d+e
) to cover cost of loading and unloading

Rate per cum = (a+b+c+d+elt21


) c) Materlal
Cost ofwaler. KL 6.00

) d) Overheads @ % on (a+b+c)

) l2
ll3
I I
Road wo*s 4-Sub-Bssotsas.! I
: Road Wo*s : {-S$-Base,Aascs

Sr, Reference to Descriptlon Unit Quantity Rate Reference to Description Unlt Quantity Rate
sr.
No. MoRT&H Rs. MoRT&H Rs.
No.
Specifications Specifications
e) Contractor's profit @ % on (a+b+c+d) a) Labour
Mate day 1.36
cost for 21 cum = a+b+t+d+e
Mason day 4.00
Rate per cum = (a+b+c+d+e)r21 Mazdoor day 30.00

Note : This analysis provides formedian and island b) lachlnory


wrth earthen top. ln case the surface is Vibratory road roller 8-1 0 tonne @ horr 0.75
required to be turfed or planted with shrubs, 60cum per hour
thesame is required to be provided separately Water tanker 6 KL capacity @ 1 trip hour 2.00
as per analysis given in the Chapter on per ho{r
l"rrticulture- ln case surface finish is of hard Concrete mixer 0.4/0.28 cum perhour hour 6.00
type, the same may be provided separately
as perapprovd design. c) Materlal
l) For granular sub-base materlal
4.15. construction of Shoulders 53 mm to 26.5 mm @ 35 Per cent cum 20.79
26.5 mm to 4.75 mm @ 45 Per cent cum 26.73
A. Earthen Shoulders cum 'l 1.88
2.36 mm betow @ 20 Percent
The rate as applicable lor subgrade
construction may be adopted. ll) For comont concrots grade Mls' 7.5 cum
B. Hard ShouldeE Aggregate 12 mm crushed @ 0 9 cum cum of 6.75

Rate as applicable lor su base and or concrete


base may be adopted as per approved Sand @ 0.45 cuny'cum ofconcrete cum 3.38

design, cement tonne 1.88

C. Paved Shoulders lll) For cam€nt Plaster l:3


Sand cum 3.84
The rate may be adopted as applicable ior
CenEnt tonne 1.83
diferent layers ofpavernent depending upon
approvd design ofpaved shoulders.
lv) Precast cement concre(e tiles
4.16. 409 Foolpaths and Separators Tiles size 3OO x 300 mm and 25 mm thick Nos 3300.00

Construc{on of footpath/separator by providing v) RCC plp€8


a 150 mm compacted granular sub-base as Pipes 2OO mm dia, 2.5 m long tordrainage mtr 22.50
per Clause 401 and 25 mm thick cement '12.00
vl) Cost ot watsr KL
concrete grade M'15, ovedaid with precast
concrete tiles in cement mortar 1i3 including d) Overheads @ % on (a+brc)
provision ot all drainage anangements but
excluding kerbchannel. o) Conlracto/6 prollt @ % on (a+b+c+d)

Cost for 300 sqm = a+b+c+d+e


Unil = sqm
Taking output = 300 sqm Rate pet 3qm = {a+b+c+d+cY300

I l4 u5
I
1
)
Road Wotu : 4-Sub-Balatsaser Rosd Worl(' | +Sub-Ba,ciks
)
Sr. Reference to Description Unlt Quantity Rate Un it Quantity Rate
Reference to Description
, No MoRT&H Rs. I 5r. Rs.
MoRT&H
Specifications No.
) Specifications
4.17 4't0 Crusher Run Macadam Base li) Fol 45 mm maximum slz'
24.12
) 45 mmto 22.5 mm @ 5 Pe' cent cum
cum 237.60
Providing crushed stone aggregate. depositing 22.4 mm to 5.6 mm @ 50 Pcr cent
213.44
) on a prepared surface by hauling vehicles, Below 5.6 mm @ 45 Per c€rt
cum
36.00
KL
spreading and mixing with a motor g.ader, Cost ol water
) watering aM compac{ing with a vibratory roller
to Clause 410 to form a layer ol sub-base/ d) overheads @ % on (a+b+c)

) base.
% on (a+b+c+d)
e) contractor's Profit @
) Unit = cum
Taking outpul = 360 cum Cost for 360 cum = a+b+c+d+e

) A, By Mix ln Place Melhod Rate Per cum = (a+b+c+d+el'360


.l a) Labout grdng may be
Note Any one of the aggregate
Mate day 0.48 adoPted.
) Mazdoorskilled day 2.OO
Mazdoor day '10.00 B. By Mixing Plaht:
)
b) Machinery Unit = cum
) Tractorattached with rotavator@ 25 cum hour 12.OO Taking output= 225 cum (450 bnnes)
perhour
) Molor grader 110 HP hour 6.00 a) Laboul 0.28
day
Vibralory roller 8-10 tonne @ 60 cum per hour 6.00 Mate
day 1.00
) hour Mazdoor skilled
day 6.00
Watertanker hoor 6.00 Mazdoor
)
c) Materlal b) iiachlnorY
lloJr 6.00
) Aggregate at site Wet mix Plant @ 75 tonne Fr hour
tlour 6.00
Elecfic generator set, 125 IVA
hoJr 6.00
i) For 53 mm maxlmum 6ize Frontend loader 1 cum budet capacity
) 63 mmto 45 mm @ 33 per cent cum 157.46 Motorgrader 1 l0 HP
hour 6.00
hour 6.00
22.5 mm to 5.6 mm @ 32 per cent cum 151.06 Vibratory roller 8-1 0 tonne
) Below 5.6 mm @ 35 per cent cum 166.68 Water tanker
lpur 3.00
t.km 450x1
Costofwater KL 36.00 Tipper
)
OR
Add 1 O p€r cent of cost of c "dage to cover
, cost of loading and unloading

) I l6 ll7
l
Road Wdts : 4-SutB6e/a&res Road wdt(s : 1'sub-B{s'aa!'s

Unit QuantltY Rate


Refelence to Unlt Quantity Rate DescriPtion
Sr. Oescription Reference to Rs.
No. MoRT&H Rs, 9r.
MoRT&H
No.
Speclficatlons Specitications
c) Matsrlal Unit = cum
(720 tonnes' density
Aggregate at site Taklno output = l8O
"um
1.50 Ucum)
l) Fo.53 mm maximum size
63 mm to 45 mm @ 33 per cent cum 98.40 AssumDtions made
22.5 mm to 5.6 mm @ 32 per cent cum u.41 Totat mass taken for analysis = 7201
Below 5.6 mm @ 35 per cent cum 104.18 Lime + FlYash admixture
,O ,ur-""n, = O'2 x720 = 1441
OR ^i.i' = 720'144 = 5761
576 / 16=360cum
ll) For ils mm maxlmum slz€
Flyash
Lime+ =1441
45 mm to 22.5 mm @ 5 p€r cent cum 15.06
22.4 mm to 5.6 mm @ 50 per cent cum 148.50 4 Flyash
Ratio Lime 16

Lime = 29 k9
Belolr/ 5.6 mm @ 45 percent cum 133.43
Flyash = 115 k9'
Cost ofwater KL 18.00

d) Overheads @ % on (alb+c) a) Labout day o.24


Mate 6.00
day
e) Contractor's prollt @ % on (a+b+c+d) Mazdoor
day 1.00
Mazdoor (Skilled)
Cost for 225 cum = a+b+c+d+e
bl Machinery hour 6.00
bucket
Rate per cum = (a+b+c+d+ell225 Hvdraulic excavator O 90 cum
cum soil
caoacitv @ 60 cum/nr' icr 360 578xL
'lipper i oi capacity tor car'iage ol soil t-km
4.'18. Suggestive Llme, Flyash Stabillsed Soil Sub-Base
578tonnes 115xL
ot t.km
Construction of sub.base using lime - flyash Tipper 10T caPacity br carriag€
admixture with granular soil, free from organic l l 5 tol nes f,Yash 3.00
of hour
rnatter/deleterious rnaterial or clayey silts and TioDer 10T capacjty br carriage
io work site
low plasticity clays having Pl between 5 and zg ionnes of lime from store
20 and liquid limit less than 25andcommercial
dry lime, slaked at site or pre-slaked with CaO Add per cent of cost ol camage to
10

content not less than 50 per cent, flyash to cover cost ol loading and unloading
conform to gradation as per Clause 4.3 of pllverisation hour 6.00
IRC: 88-1984, lime + f,yash content ranging
Tractorwilh disc harows icr 9.60
cum Per hour hour
Motor grader 1 o HP @ 50
'l
between 10 to 30 per cent, the minimum un- grading
confined compressive strength and CBR value tor mixing ln-Place arld 6.00
horr
afler28 days curing and 4 days soaking to be Vibratory roller 8-'10 tonne 12.00
hour
7.5 kg/sqcm and 25 percent respectively, all Water lanker
as specified in IRC: 88-'1984.

8
I l9
Road wo*s : 4-suLB8c/B&rcs

I s'. Reference to Description lt


Un Quantity Rate Chapter-5
No MoRT&H
Rs.
Specifications

c) Mate.ial
Bases and Surface Course (Bituminous)
SIaked Lime tonne 29.00
Compensation forearth taken from private cum 360.00
Preamble:
source
1. Various alternatives for machines and materials have been provided. The one that suits a particular
situation and design may be adopted.
d) Overheads @ % on (a+b+c)
2. The Clauses of l\4oRT&H Specifications, which have teen rnentioned foreach item, may be referred for
o) Contractor'a profit @ % on (a+b+c+d) detailed specifications and construction procedure. The raleanalyses mention only brief description.

Cost for480 cum = a+b+c+d+e 1 3. The machinery and equipmenl included in various andysis are as pervarious specifcations of lVloRT&H
and ?re mandatory. As per the present trend, contrElors are procuring machinery and equipment of
higher capacity. Provision has accordingly been made.
Rate per cum = (a+b+c+d+e)/4go
4. The outputs taken for the construction equipment {e for lhe compacted quantities of the relevant
Note : Compensaiion h. earth will vary ftom place items and not for loose quantities.
Io place and will have to be assessed
realisticatly as per particular ground 5. ln case of prime coat and tack coat, minimum quartities of binder indicated in specifications have
been taken. Adjustment, plus or minus, can be ma& for the variation between this quantity and the
situation. ln case earth is availabte from
actualquantity approved by the Engineeraflerthe FEliminary kials.
Govt. land,compensation tor earth willnot
berequired. The positjon is required to be 6. The items of bituminous works required under mirtenance have been added ln the Chapter on
clearly stated in the cost estimale. Maintenance.

2. Costofflyash has not been considered as 7. Tack coat and prime coat, wherever provided, arc rEquired to be measured and paid separately
same will be available free of cost. Only
B. Cleaning of surface is a part of the prime coal and tak coat. As such cleaning of surface has not been
caniage off,yash has been provided. provided forbituminous courses as the sam€ is alredy catered in prjme/tack coat. However, forthose
cases where such coats are not required to be done, cleaning ofsurface shallbe included
3. Lime + Flyash has been taken as 20 per
cent ol total mass and ratio of lime and I presumee that tack coat, where required, willbeprovided immediately preceding the bituminous
fyash as 1:4 frrr estinEtjng purposes. Total l:is
quantities will be as perapproved design.
10. Rolling ofbituminous courses is required to be dorEas per Clause 50'l-6. Provision in the analyses
has accordlngly been made- lt has been obserwd during actual practice at work sites, that the
availability of road rolleris generally inadequate. Ascompaction is the key togood construction, this
pointis being specifically highlighted toensure that load rollers are deployed at site as perprovision in
the rate analyses.

11. Spreading of bituminous mate als shall be done by mechanical means except in areas where a
mechanical paver cannot have access.

12. The source of all materials to be used on the projed must be tested and expressly approved by the
Engineer.

120
t21
t- )
Road Works : s-Bases and Surface Course (Bituminols) ,
13. Quantities of materials taken in the analyse-s are for the purpose of cost estimale only. The actual GhaPter - 5 )
quantity shall be as perjob mix formula.

14. Choice of grade of bitumen shall be made as per the guidelines given in Appendix-4 of MoRT&H Bases and Surface Course (Bituminous) ,
Specifications. Rate
Relerence to OescriPtion Unit OuantltY
Rs.
,
15 The specification and requirements for modifed binder with various type of modifiers have been laid sr.
MoRT&H
down in Clause 521 ofMoRT&H Specitications and IRC: SP:53-2002 which shall be followed. No
specifications )
16. The guidelines given videAnnexure -A to Clause 501of MoRT&H Specifications in regard to protection
of environmentshall befollowedforaparticularsituation. s02 Prime Coat )
5.1
with
17. The quantilies taken as output ofthe item in the rate analysis are the compacted quantities and the Providing and applying primer coat
surface of
)
quanlities of aggregates taken under the head 'malerial' are the un-compacted quantities for the bitumen emulsion on prepared
procurement purposes. surface
oranular base including clearing of road
0'60 kg/
)
lnd sprayingr primer at the rate of
18. The approximate proportions by weight of different aggregates and biturnen (orby volume in unavoidable
cases) necessary to produce the intended mix satisrying the job requirements and meeting the sqm using mechanical rneans' )
designated specifications are for estimating purpose only. The actual quantlties should be worked out
on the basis ofjob mix iomula adopted for the job after working out the same in the laboratory for
particular aggregates and bitumen approved by the Engineer.
Unit = sqm )
Taking output = 3500 sqm

a) Labour
)
day 0.08
Mate
Mazdoor
day 2.00 )
b) ill.chlnery 2.40
)
Mechanlcalbrogm @ 1250 sqm perhour
hour
2.80
Ai. compressor 250 cftn
hour
rLt 2.00
)
Bitumen pressure distributor @ t 750
sqfi
)
Derhour
Water tanker 6 KL capacity @ 1 bip
,'S. 1.00

per hour )
\

c) llrterlrl
tonne 2.10 )
Bitumen €mulsion @ 0 6 kg Per sqm
KL 6.00
Cost of water
)
d) Ovsrhead charges @ % on (8+b+c)
)
e) Contractot'l profit @ %on(a+b+c+d)
,
Cost icr 35OO sqm = a+b+c+d+e

Rate Per Eqm ' (a+b+c+d+e)'3500

t22
Ro.d Wo*s : s-Bas.s lnd Surfre Cou,s€ (Situminous)
f-7 Ro8d Work! : s-Blscs lrd Sufacc C.oo,!c (Eituminous)

Sr. Reference to Description Unit Quantity Rate quantity


No. MoRT&H
Rs
G. Reference to Descriptlon Unit Rate
Speclfacations No- MoRT&H RS
Specificatlons
Note : Bitumen primerhas been provided
@ O.60 kg
persqm as perClause S02.g. payment shall Note: '1. Bitumen emulsion has been provided
be made wilh adjustment, ptus o. minus, for @ 0.20 kg per sqm as perClause 503.8.
the variation between this quantity and the I Payment shall be made with adjustment,
actualquantity approved by the Engineerafter plus or minus, for the variation between
the preliminary kials referred tg in Clause No_ lhis quantty andactualquar ity approved
502.4.3. by the Engineer after preliminary trials
referred to in Clause503.4.3.
5.2. 503 Tack Coat
2. An output of 3500 sqm has been
Providing and applying tack coatwith bitunEn considered in case of prime coat and tack
emulsion using emulsion pressure distributor coat which can be covered by bituminous
at the rate of0.20 kg persqm on the prepared courses on the same day.
bituminous/granular surface cleaned with
mechanical broom. 5.3. 504 Bitumlnous Macadam

Unil = sqm Providing and hying biluminous macadam wilh


Taking oulput = 35OO sqm 100-120 TPH hot mix planl producing an
average output of 75 lonnes per hour using
a) Labour crushed aggregates of specilied grading
Mate day premixed with bituminous binder, transported
0.08
Mazdoor day to site, laid over a previously prepared surface
2.00
with paverlinishertotherequired grade, level
I
b) M.chlnery 1 and alignrnentand rolled as per Claus€s 501.6
Mechanical broom @ i25Osqm per hour I and 50,l.7 to achieve the desired compaction
hour 2.80
Air compressor 250 cfrn hour 2.80
Emulsion pressure distributor hour Unit = cum
2.OO
@ 1 750 sqm per hour Taking orltput = 205 cum (450 tonne)
I
c) i,laterlal a) Labour
Bitumen emulsion @ 0.2 kg per sqm tonne O_70
Mate day 0.84
Mazdoor working with HMP, mechanical day 't6.00
d) Overhead charges @ % on (a+b+c) broom, paver, rolle( asphalt cutter and
assistance tor setting out lines, levels and
e) Contractor,s profit@ % on (a+b+c+d) layout of consfudi6n
Skilled mazdooriorchecking line and
day 5.00
Cost for 3500 sqm = a+b+c+d+e levels

Rate per sqm = (a+b+c+d+e)/3500

124 I
t 125
Road Work : 5-Aa€s md Surfac. Cours. (Bjruminou,
Road Work : 5-B6as &d Suda@ Couls.

Sr. Reference to Descrlption )


No. MoRT&H Unit Quantlty Rate
9r' Reference to Description Unit Quantity Rate
Specifications Rs. MoRT&H Rs.
tlo.
Specifications
b) Machtnery
Batch mix HMp,OG12O trpH
@ 75 tonne hour Grading ll (19 mm nominalslzo)
6.00
per hour aclual outpul 25 - 10 mm 40 per cent clrm 116.M
Mechanical broom hydraulic
@ 1250sqm hour 2.20
10 - 5 mm 40 percent cum 116.M
perhour 5 mm and below 20 percent cum 58.02
Air compressor 2S0 cfin hour 2.20
Paver finisher hydrostatic with
sensor hour 6.00
'Any one of the alternative may be adopted
control@ 75 cum per hour as per approved design
cenerator2s0KvA hour 6.00
Frcnt end loader I i:um bucket
c€pa.city hour
d) Overhead charges @ % on (a+b+c)
6.00
r rpper 10 tonne cap..jty t.tm 450x1
Ad; e) Contractor's protit @ % on (a+b+c+d)
1o per cent ofcost of cardage lo
cover cost of loading and unloading
Cost for 205 cum = a+b+c+d+e
Srnoolh wheeled roller g-,lO tonnes
for ho(,r 6.00 x 0.65.
initial break down rolling Rate per cum = (a+b+c+dr e)/205
Vibratory rolle. g tonnes for intermediate
hour 6.00 x 0.65*
rolling Note : '1. Although the roller are required only for 3
Finish rotling with 6-0 tonnes hours as per norms ot output, but the sanE
smooth hour 6.00 x 0.65.
wheeled tandem roller have to be available at site for six hours as
the hot mix plant and paver will tiake six
c) Material hours tor mixing and paving the output of
450 tonnes considered in this analysis.
I) Eitumon @ 3.3 per cent of mix
tonne To cater for the idle period
ofthis rollers,
14.85
Weight of mix = 205 x 2.2 450 their usage rates have been multiplied by
= tonne
a l'actor of0.65.
ll) Aggregat6
Totat weight of mix 450 tonnJs
=
2. Quantity of biturnen has been taken for
W4rht of bitumen = 14.85 tonnes analysis purpose. The aclual quantity will
l,tGight of aggregate 450-,t4.8S depend uponjob dx formula.
=
435.15 tonnes
=
Taking density ofaggregate j.S
3. Labour for traffic cont.ol. watch and ward
= torvcum and other miscelhneous duties at site
Volume of aggregate : 290. 1 cum
including sundries have been included in
'cradlng I (40 mm nomlnal alze) administrative overheads of lhe contraclor.
mm
37.5 - 25 15 percent cum
mm
25 - 10 45 percent
43.51 4. ln case BM is laid over lreshly laid tack
cum 130.55
10-5mm 2spercent cum
coat, provision ofmechanical broom and
2 mazdoors for the same shallbe deieled
5 mmand below 15 per cent cum 43.51 as the same has been included in the cost
OR
of tack coat.

)
126
121
)
)
)
Road wo*r: 5-86<s ed Surrace CouN (Bituminous,
I wo*r : s-Bascs md Surfacc Cou6' (Bituminous)
Rosd

)
Sr. Reference to Description LJnlt Qua ntity Rate DescriPtion Unit QuantitY Rate
Reference to
) No. MoRT&H Rs- Sr.
MoRT&H
Rs.
Specifications No.
) Specifications
5.4. 505 Bituminous Penetration Macadam d) Overhead charges @ % on (a+b+c)
) Construction of penetration macadam over
e) Cont.actor's profit@ % on (a+b+c+d)
prepared base by providing a layer of
,l
compacted crushed coarse aggregate using Cost for 45OO sqm = a+b+c+d+e
chips spreaderwith alternate applications of
) bituminous binder and key aggregates and Rate per sqm = (a+b+c+d+e)/4500
rolling with a smooth wheeled steel roller 8-1 0
) Note: 2 tipperswillbe neededtomatch the capacity
tonne capacity to achieve the desired degree
ofchip spreaderand front end loader'
ofcompaction.
) B. 75 mm thick
A. 50 mm thick
) Unit = sqm
Unit = sqm
Taking outPut = 4500 sqm (337'5 cum
Taking output= 4500 sqm (225 cum)
) comPacted)
a) Labour
a) Labour
) l\4ate day 0.32
Mate
day 0.40
Mazdoor including for brcoming of key day 6.00 day 8.00
Mazdoor including for brooming of key
) a9gregates
Mazdoorskilled day 2.00
aggregates
day 2.O0
Mazdoorskilled
) b) Machlnery
b) Machinery
Hydraulic self propelled chip spreader hour 6.00 hour 6.00
Hydraulic self propdled chip spreader
) br aggregates and key aggregates
both
both ior aggregates and key aggregates
@ 1500 sqm per hourior4500 x 4500 x 2 sqm
@ 15OO sqm Per hour for
) 2 sqm = 9000 sqm
Bitumen Pressure distributor for hour 2.57
Eitumen pressure distributor icr hour
@ 1750 sqm Per hour
) @ 1750 sqm per hour
Tipper5.5cum capacity lor carriage of hour 10.00
Tipper 5.5 cum capacity for carriage of hour 10.00
aggregates lrom stockpile to chip spreader
aggregates from stockpile tochip spreader
) Vibratory roller 8 tonnes hoJr
Vibratory rollerStonnes hour 6.00
6.00 hour 6.00
Frontend loader 1 cum bucket capacity
Front end loader 1 cum bucket capacity hour 6.00
)
c) Materlal c) Material
tonne 30.60
Bitumen @ 6.8 kg Per sqm
) Bitumen @ 5 kg per sqm tonne 22.50
Crushed stone coarse aggregate (loose)
cum 405.00
Crushed stone coarse aggregate passing cum 270.0O
passing 63 mm and reiained on 2 8 mm
) 45 mm and retained on 2.8 mm sieve
sieve @ 0.09 cum Per sqm
@ 0.06 cum per sqm
Key aggregates Passing 26 5 mm and
) Key aggregates passing 22.4 mm and
retalned on 2.8 mm sieve @ 0.015 cum
cum 67.50
retaioed on 2.8 mm sieve @ 0 018cum cum 81.00

persqm persqm
)
) 128 t29
Cot,'s' (Bitumincus)
wotu : 5-B6's trd Surllc'
Road Wo.k : 5-8ls.3 rd Surflc. colN Gituminour)
Road
)
Unit Ouantlty Rate
- DescriPtion Rs. )
Sr. Reference to Oescription Unit QuantitY Rate Reference to
Sr.
No. MoRT&H Rs. MoRT&H
No. )
Specifications Specifications

d) Overhead charges @ % on (a+b+c)


hr Machin9ry hour 6.00 t
;,draulic self propelled chip spreaoer
e) Contractor's profit @ % on (a+b+c+d)
t ittr for aqgregates and
key aggregaes
x 3 sqm
)
,a rSOO sqm Per trour for 3000 3.43
ilr hour
Cost for 4500 sqm = a+b+c+d+e
;itumen Pressure distributor )
1750 sqm Per hour
3OOo x 2 sqm @ hour 10.00

Rate per sqm = (a+b+c+d+e)/4500


TiPPer 5.5 cum capacity
hour 6.00 )
vibratory roller I tonnes hour 6.00
bucket capacitv
Note : 2 tippe.s and 2 rollers will be needed to match
i,l,l-i"no ro'0"' r "" )
the capacity of chip spreader and lront end
loader.
"' Hi.lill .o*n*'losqm@15ks tonne 9.00
)
506 guilt-up Spray crout
Hffi*HHflresate,assins
cum 300.00
)
2 8 mm s€ve
ia mm and retained on
Providing, laying and rolling of built-up spray
39.00
)
grout layerover prepared base consisting of
a two layer composite construction of "'":
:":',lHll$$'"ffi:X
e""i"w@o'13cum
cum

)
compacted crushed coarse aggregates using
*Lii"a on z
per 10 sqm
motor graderforagsjregates. Key stone chips
spreader rnay be used with application of
)
charges @ % on (a+b+c)
bituminous binder after each layer, and with d) overhead
key aggregates placed on top of the second % on (a+b+c+d)
)
layer to serve as a base conforming to the e) Contr.ctol's prollt@
line, grades and cross-section specified, the )
Costfor 3O0O sqm = a{b+c+d+e
compacted layer lhickness being 75 mm.
('+b+c+drcY3000
)
Unit = sqm
Rate Per rqm =
Taking output= 3000 sqm (225 cu.n) )
Note :

a) Labour :1"ff":[Tffifl:[:T]?ff?i ,
day 0.40 bader.
Mate
Mazdoor including icr brooming of key ,
aggregates day 8.00
Mazdoorskilled day 2.00
,

lll
r30
,
)
Road worts : 5-Bes rr'd Surfre Cours€ (Biruminous)
Road wolt! : 5-Basc, lnd Sul[ac-. Offit (Bituminous)

)
Sr. Reference to Desc.iption Unit Quantity Rate
Reference to DescriPtion Unit Or"\ Rate
) No. MoRT&H Rs, Sr.
MoRT&H
Rs.

Speciflcations No.
) Speclfications
5.6. 507 Dense Graded Bituminous Macadam
Smooth wheeled roller 8- 10 toone Ior hour 6.00 x 0.65'
) initial break down rolling
Providing and laying dense graded bituminous
Vibratory roller I tonne tor hterrnediate
hour 6100x065'
) macadam with 100-120 TPH batch type HMP
producing an average outputofTS tonne per rolling
smooth 6 00 x 0.65'
Finish rolling with 6-8
hour using crushed aggregates of specified
) grading, premixed with bituminous binder wheeled

@ 4.0 to 4.5 per cent by weight of lotal mix


) and liller, transporiing the hot mix to work site,
c) Matedals
19.13
laying with a hydrostatic paver frnisher with i) Bitumen @4.25 percentofweight tonne

) sensorcontrollo the required g.ade, leveland ' of mix


alignment, rolling with smooth wheeled,
li) Aggregate
) vibratory and tandem rollers to achievg the
Totalweight of mix = 450tonne
desired compaction as per MoRT&H Weioht ol bitumen = 19"13 tonne
) Specifications Cla,/se 507 complete in all Wei[nt of aggregate = 'l5O -19'13 =
430 87 tonne
respects. Tak;g density of aggregate = 1 5 tor/cum
) Unit = cum
Volume ofaggregate =287 25 cum

Taking output= 195 cum (456 tonne) crading . I 40 mm (Nomln'l Size)


) 37.5 - 25 mm 22.E,cP'nl cum 63.19I
a) Labou. cum 37.34 I
25 -'10 mm 13 Pef cent
) l\4ate day 0.84
10 - 4.75 mm 19 Percent cum
*11
N4azdoorworking wjth HMP, mechanical day cum
4.75 mm and below
16.00 44 Per cent
) broom, paver, roller, asphaltcutterand
Filler @ 2 per cent of weight daggregates tonne 8.62
assislance for setting out lines, levels
) and layout of construction OR
Skilled mazdoor for checking line and day 5.00 cradins - ll. 19 mm (Nombal
size)
cum 86.16
) levels mm
25 - 10 30 Per cent
cum 80.43
b) Machinory
mm
10 - 5 28 Per cent
cum 114.90
,) 5 mm and below 40 Percent
8.62
Batch mix HMP @ 75 tonne per hour hour 6.00 o'aggregates tonne
Frller @ 2 per cent ofweight
Paver finisher hydrostatic \,vith sensor hour 6.00
) control@ 75 cum per hour ' Any one ol the altematives
nay be adopted
Generator 250 KVA hour 6.00 as per apProved design
) Front end loade|I cum bucket capacity hour 6.00
on (a+b+c)
Tipper 10 tonne capacity t.km 450x1 d) overhead charges @ '[
) Add 'l 0 per cent of cost of carriage to a) contractot'E prollt @ * on (a+b+c+d)
cover cost of loadinE and unloading
) Cost ior '195 cum = a+b+c+dte

Rste Per cum = (a+b+e+drc)1195


)
132 133
)
Road Wo*r : 5-8&16 ond Surfae cou6. (Bibminous) 8!0d Wo*s : 5'B's.s rd su'fsc! Cours' (BiNmin'{rs)

Unit Quantity Rate


Sr. Reference to Descrlption Unlt Quantity Rate Reference lo DescrlPtion
5r' Rs.
No MoRT&H Rs. MoRT&H
No.
Specifications Specifications
Note 508 Seml{)ense Bitumlnous Concrcte
''1. Although the rollers are required only for 3 5.7
hours as per norms of output, but the sarne
Providinq and Iaying semldense bituminous
have to be available at site icr six hours as HMP
cnncrete with 100-120 TPH batch type
the hot mix plant and paver will take six 75 tonne per
producing an average outputof
hours for mixing and paving the output of of specified
hour using crushed aggregates
450 tonne considered in this analysis.
grading. premixed with bituminous binder
To cater for the idle period of these rollers,
a 4 5 to 5 Der cent of mix and tlller'
theirusage rates have been multiplied by site laying
a factor of0.65.
iransporting the hot mix to work
with a hvdrostatic paver finisher
with sensor
and
2. Quantity of Bitumen has been taken for control to the required grade' level
analysis purpose. The ac{ual quanry will alionment, rolling with smooth wheeled'
the
depend upon job mix tonrula. vibltorv and tandem rollers to achieve
deslrei comPaction as Per MoRT&H
3. Labour for traffic control, watch and ward
Sp€.;ifications Clause 5OB complete
in all
and other miscellaneous dulies at site
respects.
including sundries have been included in
administrative overheads of the conU'ador.
Unit = cum

4. ln case DBM is lald over freshly laid tack TaKng outPut = 'l 95 cum (450 tonne)
coat, provision of mechanical broom and
2 mazdoors shall be deleted as the sarne a) Labour 0.84
day
has been included in the cost oftack coat Mate
mechanical day 16.00
Mazdoor working with HMP'
qjner and
5. The individual density ior each size of broom. piver, roller, asphalt
and
agg.egates to be used for constuclion i.e. assisb;ce for setting out lines' levels
37.5-25 mm,2!10 mm etc. should be layout of construction
ano day 5.00
found h he laboratory and accordingv tle Skilled mazdoor forchecking line
quantities should be ammended for use in la,€ls
feH. The average density of tonrc/cum
1 .5
is only a reference density in this Oata bl llachlncry
hour 6.00
Book. Batch mix HMP @ 75 tonne Per hour
hour 6.00
Paver finisher hydrostatic with sensor
6. The individual percentage of aggregates
control @ 75 cum Per hour
should becalculated ftom the totalweight hour 6.00
Generator 250 KVA
ofdry aggregates i.e. excluding tie weight capacity hour 6.00
Front end loader 1 cum bucket )
ofbiturnen. The weight offillerwillalso be caPacity t.km 450x1
lipper O tonne
'l
2 percent by weight of dry aggregates.
to
Add '10 per ccnt ot cosl of caniage
cover cost ofloading and unloading

r35
134
Road Wod(r : s-ass.s ed s!,face cors. @iruminos)
RoadWorb:s-BasessdSurfac.CouFe(Bihiminous)

Sr. Reference to Descrlption


No. MoRT&H Unit Quantity Rate
Reterence to Description Unit Quantity Rate
Sr.
Speciflcations Rs.
MoRT&H Rs.
No.
Specifications
Srnooth wheeled roller 8_10
tonne for hour 6.00 x 0.65.
initialbreakdown rolling
' Any one ofthe altemative may be adopted
Vibratory roller 8 tonne for intermediate as per approved design.
hour 6.00 x 0.65.
rolling
Finish rolling with 6-g tonne smooth d) Overhead charges @ *on(a+b+c)
hour 6.00 x 0.65.
wheeled tandem ro er

e) Contractor's profit@ X on (a+b+c+d)


c) Material

'Grading l: 13 mm (Nominat Size) Cost for 195 cum = a+b+c+d+e

i) Bitumen @4.S per cent of weight of


mix ticnne Rate pe. curl1 = (a+b+c+d+e)/195
20.25
ll) Agglrgate Note: '1. Althoughthe rollers are required only for 3
Totslweightofmix = 450 tonne hours as per norms ot ouB4 but the sarn€
Weightof titumen = 20.25 lqnne have to be available at sib br six hours as
Weightofaggregate = 4SO _20.25 the hot mix plant and paver rr,/ill take six
= 429.75
tonne hours formixing and paving the output of
Taking density ofaggregate
= 1.5 lon/cum 450 tonne considered inlhb analysis. To
Volume otaggregate 286.5 cum
= cater tor the idle period of these rollers,
mm
13.2 - 10 20 per cent cum 57.30 theirusage rates have been multiplied by
10-5mm 38percent cum 108.87 a factorof0.65.
below
5 mmand
40 per cent cum 114.60
F ler @ 2 percent olweight ofaggregates 2. Quantity of Bitumen has been taken for
tonne 8.62 analysis purpose. The ac{ualquantity will
OR
depend uponjob mix formula.
Gradlng ll; lO mm
3. Labour icr traffic control, watch and ward
l) Bltumen @ and other miscellaneous dulies at site
S percent ofwelght ot mix tonne 22.50 including sundriesihave been included in
weight of mix = 4gO tonne
administrative ovefi eads olthe contractor.
ll) Aggregats
4. ln case SDBC is laid overfreshly laid tack
Totalwelght of mix 450 tonne
= coat, provision oI broom and 2 mazdoor
Weight of bitumen 22.S tonne
= shall be deleted as the same has been
Weight of aggregate 4 SO -22.50= included in the cost of tad( coat.
= 427 .SO
lonne
Taking density ofaggregate 5. The quantity o, bitumen to be adjusted as
= l.S ton/cum periob mix formula.
Volume ofaggregate 28S
= cum
9.5 - 4.75 mm 57 per
@ cent cum 162.45
4.75 and betow
@ 41 per cent cum '116.85
Filer @ 2 per cent of welght of
aggregales tonne 8.62

136
137
5'86€3 uxt SurfE Courst
(Biunino$)
Rosd Wo*s: 5-B!ses td Su acccou.s.(BituniroE!) Ro.d u/d*s :

Untt QuantitY Rate


Sr. Reference to Oescriptlon Unit Quantity natd Relerence to Rs,
No MoRT&H H.
ns.1 MoRT&H
Specifications ifications
hout 6.00 x 0.65'
509 Bituminous Concrete Vibratory roller 8 tonnebr intermediate

hour 6.00 x 0.65'


Providing aod laying bituminous concrete with ;:l[gh rolins with 6-s t('ne smooth
'100-120 TPH batch type hol mix plant wheeled tandem roller
producing an average outputofTStonne per
hour using crushed aggregates of specified A c) Irl.tcrlal
grading, premixed with bituminous binder
I} Bltum4 @ 5 per centofweight
of mix tcnne 22.50
@ 5.4 to 5.6 per cent of mix and filler,
transporting the hot mix to work site, laying
with a hydrostatic paver finisherwith sensor ll) Aggrogate
Total weight ol rlix = 4g' bnne
control to the required grade, level and
r^,reloht of biturnen = 225 tonne
alignment, rolling with smooth wheeled, 4g) '22 50 = 427 50 tonne
vibratory and tandem rollers to achieve lhe
Girrt a assresac =
'1 5 ton/cum
Taking doflsity ol aggr@te =
desired compaction as per MoRT&H ;um
volume ofaggregate = 285
Specifications Clause 509 complete in all
respects. slzo)
Gr.dlng - | tg mm (iiomhal 99.75
cum
Unit = qrm zo - mm
ld 35 P€rc€nt
cum 55.55
Taking output = '191 cum (450tonnes) 10 - 5 mm 23 Pe(cent
'114.00
cum
5 mm and below 40 P€r cent
8.62
of aggregates tonne
a) Labour Filler @ 2 p€r cent ofweighl
Mate day 0.84
OR
Mazdoor working with HMP, mechanical day 16.00
broom, paver, roller, asphalt cutGr and cradlng 'll 13 mm (Nomlnal slzo) cum 85.50
assistance for settjng out lines, levels and 13.2 - 10 mm 30 Per c€nt
71.25
cum
layout of construction 1o - 5 mm 25 P€r cent
cum 't22.55
Skilled mazdoor ior checkhg line and levels day 5.00 5 mm and below 43 P€r cent
bnne 8.62
of aggregates
Filler @ 2 p€r cent ol Y{eEht
b) Machlnory
may be adopted
Batch mix HMP @ 75 tonne pe. hour llour 6.00 ' Any one ofthe altematives
Paver finisher hydrosl,atic with sensor hour 6.00 as Per approved design'
control @ 75 cum tEr hour
% on (a+b+c)
Generator250l(y'A hoJr 6.00 d) ovs.hoad chargor @
Front end loader 1 cum bucket capacity hour 6.00
% on (a+b+c+d)
Tippe|I 0 tonne capacity t.km 450x1 €) Contr.ctol'e Prollt @
Add 1 0 per cent ot cost of carriage to
Cost lot 191 cum = a+b+cd+e
covercost ofloading and unloading

Srnooth wheeled roller 8-1 0 tonne for hour 6.00 x 0.65" R.to Per cum = (r+Fc+4+cYt9t
initialbreakdown rolling

139
138
I
) Rod Worls : !B.s ud surf@ CdrE (Bibminoc) Rotd Wo*s : 5'Ba*s md Sutf!(, C(c! (Bituminous)

) Unit Rate
Sr. Reference to Descripllon Unlt Quantity Rate - Refelence to DescrlPtion
OuantitY
Rs
sr.
) No. MoRT&H Rs.
l'lo'
MoRT&H
Specifications Specifications
) 510 Surtace Dressing
Note: '1. Althoughthe rollers are required only for3 5.9.
) hours as per no.ms of output but the same Providing and laying surlace dressing
as

wearinq lourse in single coat uing


crushed
have to be available at site for six hours as
) the hot mix plant and paver will take six stone aggregates otspecilled sire on a layeI

ofbituminous binderlaid on preFred


surface
hours tor mixing and paving the output of
wheeled
) 450 tonne considered in this analysis. To and rolling with 8-10 tonne sm@th
cater for the idle period of lhese rollers, steel roller'
) their usage rates have been multiplied by
a tactor 0f0.65. Unit = sqm
9000 sqm
) 2. Ouantity of Bitumen has been laken for
Taking output =

analysis purpose. The actualquanUty will cl*'Ping slze


) case - I :' 19 mm nomlnal
depend uponjob mix formula.

&) Laboul
) 3. Labour for traffic control, watch and ward
Mate
day 0.44
and other miscellaneous duties at site day 9.00
Mazdoor
) including sundries have been included in
adminiskative ovefi eads of lhe conkactor. Mazdoorskilled
day 2.00

) 4. ln case BC is laid over freshly laid tack bl Machlnery


hour 7.20
perhour
coat, provision ofmechanical broom and Mechanicalbroom @ 1250 sqm
hour 7.20
) 2 mazdoors shallbe deleted as the same Arcompressor250 cfm
hour 6.00
has been included in the cost ot tack coat- Hydraulic self propelled chip !pread€r
) 5. The individual density for each saze of
/a 15OO sqm Per hour
hour 6.00
iooer tonne capacity for carriage of
'1 0
aggregates to be used forconstruction i.e. qt road side
) 37.5-25 mm,25-10 mm etc. should be
stone chips trom stockpile
to chip spreader I

hour 6.00
found in the laboratory and acclrdingly the
) Frontend loader '1 cum buclct capacity 6.00
quantities should be ammended foruse in hour
Bitumen Pressure distributor 6.00
tonndqJm
field. The average density of 1 .5 brne weight hour
Srnooth v/heeled roller 8-1 O
) is only a reference density in this Data
Book.
c) Materlal
) 6. The individual percentage ofaggregates Bitumen @ 1 20 kg Per sqm
tonne 10.80
cum 135.00
lr"h"a 19 ram nominai
should be calculated from the totalweight
) "in" "ttlpping,
size @ 0.015 cum Per sqm
ofdry aggregates i.e. excluding tfte welght
ofbitumen. The weight offiller will also be
) 2 per cent by weight ofdry aggregates. 4 Overhead charges @ % o(a'brc)

)
)
140 l4l
)
E-----:'
Ro.d Wo*r: j-Barcr lDd Surhcc Col]ls (Bituminous)
Road Wo*s : 5-BB.3,Dd Surfe Cour.c (Binminous)
Sr. Reference to
Description
No. MoRT&H Unit )

il
Quantity
Speclfications Sr. Reference to Description Unlt Quantity Rate
No MoRT&H Rs. )
e) Specifications
Con tractor's profit
@ % on (a+b+c+d) )
Note; 1. the proposed aggregate fails to
V\,/here
Cost br 9OOO sqm : a+blc+d+e pass the stripping test, an approved
adhesion agent rnay b€ added to the binder
)
Rato per aqm E (a+b+c+d+oygooo
as per Clause 510.2.4. Alternatively, chips
may be pre-coated as per Clause 510.2.5.
)
Crse .ll ; ,3 mm nomhal alze
chlpplng 2. ln put for the second coat where required, )
a) Labour will be the same as per the lst coat
Mate
day
rnentioned above
)
Mazdoor 0.44
hy 5.10 511 Open " Graded Premix Surfaclng
Mazdoor skilted
day
9.00
)
2.00 Providing. laying and rollingofopen - graded
b) .chlnery premix surfacing of 20 mm thiclness
)
Mechanicalbroom composed of 13.2 mm to 5.6 mm aggregates
@ l2SO sqm perhour
Atrcompressor 250 clm holr 7.20 eithe.using penetration grade bitumen orcut- ,)
ho]r 7.20 back oremulsion to required line, grade and
chip spreader
8flr#:r"f, 'JffJT hour 6.00 level to serve as wearing coutse on a
)
Tipper tonne capacity for cafiiaoe
O
previously prepared base, including mixing in
hoor
1
of
srooe chips trom stockpile 6.00 a suitable plant, laying and rolling with a
rocnrpsDreader
on roajside
smooth wheeled roller 8-10 tonne capacity, )
Front end loader .l flnished to required leveland grades.
cum bucket capacity troiJr )
rerEn pressure distributor 6.00
@ 1 7SO sqm hour 6.00 Unit = sqm

Vibratory rollerS_1o
tonne weight
Taking oulput = ,0250 sqm(205cum)
)
hour 6.00 caso - l: Moch.nical method uslng
c) Matorl.t penotratlon grado bitumen and HMP of )
Bihrnen @ ,.OO kg per approp.iate capacity not less than 75
som tonne
Crushed sbne chipping,
,3mm nomioal cum
9.00 tonne/hour )
slze @ 0.0i cum per sqm 90.00
a) Labour
d) Overto.d Mate day 0.84
)
charges @ % on (r+b+c, 't6.00
Mazdoor working with HMP, mad sweeper, day
o) Cor&.ctor". proflt paverand roller )
@ % on (e+b+c+d, Skilled mazdoor for checking line and day 5.00

Cost br9OOO sqm levels )


= a+b+c+d+e
b) Machlnery )
Rate Por3qm i (a+b+c.d*e)AOOO i) Batch type HMP 75 tonne perhour ho{rr 6.00
ii) Electricgenerator set250 L/A hour 6.00
iii) Fronl end loader 1 cum bucket c€pacity hour 6.00
)
iv) Tipper 10 tonne capacity t.km 450x1
142 )'
t43
)
Rotd Works : s'Bts's ud Sutfrc' Cot!'s' (Biiunhous)
Road Wo*s:s-Bat€s d Sutflcc Cours. (Bituninout)

t DescriPtion
U nlt QuantitY Rate
Sr. Reference to Description Unlt Quantity Rate Reference to Rs
No. MoRT&H Rs. I Sr.
MoRT&H
Specifications l
I
No.
Speclficatlons
Case - Open-g'aded P remix surtacing
ll:
Add '10 per cent ot cost of caniage to cover emulsion
cost ofloading and unloading
using cationic bitumen

LJnit = sqm
I Paver finisher hyd rostatic with sensor hour 6.00
Taking outPut = 9OO sqm (24'3 cum)
attachment
'r',/)
Smooth wheeled/tandom roller hour 6.00
&1 0 tonne weight
a) L8bour day 0.80
Mate day 18.00
Mazdoor 2.00
c) Matorial day
Mazdoor skilled
Biturnen @ 14.60 kg per 10 sqm tonne 14.97
Crushed stone chipping, 13.2 mm to cum 276.75
5.6 mm @ 0.27 cum per 10 sqm
bl irachlnery hour 6.00
capacrty
concrete mixer o 4/0 28 cum 6.00
8-'10 tonne hour
smoothwheeled steel roller
d) Ove,head charges @ % on (a+b+c)
)
e) Contractor's profit @ % on (a+b+cad) "' Illil',1'unr."" Emursion @ 21 50 ks tonne 1.94
, per'!0 sqm
Costfor 10250 sqm : a+b+c+d+e
) Crushed stone aggregates
13'2 mm to cum 24.30
Rate per sqm = (a+b+c+d+e)/10250 10 sqm
5.6 mm @ 0.27 cum Per
) Note lf a premix sand seal coat of 'B'type is % on (a+b+c)
proposed. the same is required to be pmvided
d) overhead charges @
)
over the open graded premix carpet % on (a+b+c+d)
immediately on the same day. As the same
e) Contlactor's prolit @
) HMP and other machines will be used tor
laying of premix sand seal coat, out of 6 cost for 9oo sqm = a+b+c+d+e ,

) eftective working hours, 4.00 hours may be


Rate Per sqm = (a+b+c+d+e)'900
utilised for laying ol premix carpet and balance
) 2.00 hours tor the seal coat. The rate tor
the premix sand sealcoat under Clause 513
) (Case ll) has been worked out accordingly by
utilising the HMP for 2.00 hours for the purpose
) of seal coat. ln case type 'A' seal coat is
proposed, HMP can be worked tor six hours
) for the premix carpet as type 'A' seal coat
does not require the useofHMP.
)

)
t45
144
)
Ro.d wo*s:s-Bascllnd su.facccdE @itu inoN) Rood Wo*s : tBes rd sldbcc Co{F (Bitminous)

Unit Quantity Rate


Sr. Reference to Oescriptlon Unit Quantity Rate
Reference to OescriPtion
Sr. Rs.
No MoRT&H Rs. MoRT&H
Specifications No
Specifications
hour 6.00
5.1'1. 512 Close-G.aded Premix Surfacing/Mixed \, Paver finisher hydrostatic with
sansor
Seal Surlacing attachment

hour 6.00
Case - I : Mechanical means uslng HMP O Srnooth wheeled &lOtonneweight
of approprlale capacity rot less than 75
tonne/hour. c) iraterial
Typo - A
r Bitumen @ 22 kg per ',10 sqm tonne 22.50
Providing, laying and rolling of close-graded
1 2 mm to cum 276.75
premix surlacing materialof 20 mmthickness Stone crushed aggregates 1
composed of 11.2 mm to 0.09 mm (Type-A) '10 sqm
0.09 @ 0.27 cum Per
or 13.2 mmto 0.09 mm (Type-B) aggregates
using penehation grade biturnen b tle required OR
line, grade and hvel tl seNe as wearing course
on a previously prepared base, including Type . B
tonne 19.48
mrxing in a suitable plant. laying and rol[ng Bitumen @ 19 kg Per 10 sqm
2 mm to cum 276.75
with a smooth wheeled roller 8-10 tonne Stone crushed aggregates 1 3
cum 10 sqm
capacity, and finishing to required level and O.O9 mm @ 0.27 Per
grade.
d) Ovsrhoad charg€@ % on (a+b+c)

Unit = sqm
@ % on (r+b+c+d)
Taking output = 10250 sqm (205 cum) o) contractol's Profit

a) Labou. Cost for 10250 sqm = a+b+c+d+e


Mate day 0.84
Mazdoorworking with HMP, road sweeper, day 16.00 Rate Per sqm = (a+b+c+d+e)/i0250
paver and roller
may be adopted
Skilled mazdoorfor checking line and day 5.00 ' Any one ofthe altematives
levels
s.12. 513 Seal coat
b) Machlnory
sealing lhevoids
i) Hl\,!P ot appropicate capacity hour 6.00 Providing and laying seal coat
specified
ii) Electric Generator Set 250 KVA hour 6.00 in a bit,-imino,js sutlace laid to the
cross fall using Type A and
iii) Front end bade|I c{m bucket capacity hour 6.00 levels, grade and

iv) Tlpper 10 tonne capacity t.km 450x1 B seal coats

Add 10 pe. cent o.fcost ofcarriage to cover Unit = sqm


(92'25 cum)
costof loading and unloading Takrnq ourpul = 10250 sqm

t46 147
)
Road Wo*s : s'B.s€sand SurfaccCourse (aituminous) I Road Work : J-B4es and Srrfsc. CouBc (Bituminou,
)
Sr. Reference to Description Unlt Quantity Rate U nit Quantity Rate
) Sr' Relerence to Description
Rs.
No. MoRT&H Rs.
No. MoRT&H
) Specifications
Speclfications
Case-l:TypeA
, Unil = sqm
Taking output = 7858 sqm (47 16 cum)
a) Labour
) Mat-- day 0.24
a) Laboul
Mazdoor day 600 Mate day 0.'16
) Mazdoor d.y 4.00
b) Machlnery
) Hydraulic self propelled chip spreader ho{,,r 6.00
b) iiiachlnery
Tipper 5.5 cum capacity hour 6.00
HMP of75 tonnesrDur hour 2.00
) Front end loader I cum bucket capacity hour 6.00
El€c,tric generator let 250 K/A
hour 2.00
BitunEn pressure distributor @ 1750 sqm hour 600 hour 2.00
Fronl end loader 1 cum bucket capi'-city
, Per hour
Tipper 10 tonne c#city t.km 104x1
Srnooth wheeled roller E-10 tonne weight hour 600
) c) ilaterlal Add '10 per cent ol cost of carriage to
cover costof loadirE and unloading
Bitumen @ 9.80 kg pe|10 sqm tonne 10.05
) Crushed stone chipping of6.7 mm size cum tlour 2.00
Paver finisher hydostatic with sensor
defined as 100 per cent passing 11.2 mm
attachment
) sieve and retained on 2.36 mm sieve
Smooth wheeled &1 0 tonne caPacity tDur 2.00
applied @ 0.09 cum per 10 sqm
) c) Material
dl Overhead charges @ o/" on (a+b+c} tonne 5.34
Bitumen @ 6 80*g Per 10 sqm
) Crushed stone cli)ping of 6 7 mm size cum 41.16
e) ContractoCs profit @ %on(a+b+c+d)
defined as PassirE 11 2 mm sieveand
) Costfor 10250 sqm = a+b+c+d+e retained on 2 36 mm sieve applied
@ 0.06 cum Per 10 sqm
) Rate per sqm = (a+b+c+d+e)/i0250
d) Overhead chargts @ % on (a+b+c)
) Note Since seal coat is provided immediately over
the bituminous layers, mechanical broom for e) Contractor's prcfit @ % on (a+b+c+d)

) clearjng has not bee! catered.


:
Cost for 7858 sqm a+b+c+d+e
Case - ll : Type B
)
Rate per sqm = (arb+c+d+e)n858
Providing and laying gt premix sand sealcoat
) with HMP of appropriale capacity not less than
75 tonne/hours using crushed stonechipping
) 6.7 mm siie and penetration bitumen of
suitablegrade.
)

) 148 t49
Poad Wo*s : 5-Basas aad Surfac. Cours. (Bituminous) Coolst (Bituminous)
Road Wo*J : s-Bases lnd Soficc

Sr. Reference to Description Unit Quantity Rah Unit Ouantity Rate


Reference to DescriPtion
No. MoRT&H Sr, Rs.
Rs.
MoRT&H
Specifications No
Specifications
Note: Sincesealcoat is.equired to be providedover 5'l s MasticAsPhalt
the premixcarpeton the same day, outofthe
5.14.
mastic
6 working hours of the HMP, 4.00 hours are Providing and laying 25 mm thick
paving grade
proposed to be utilised for the p.emix carpet asohalt wearing course with
given in
and the balance 2.00 hours forthe sealcoat. bitumen meeting the requirements
rnaslic cooker
Hence 2.00 hours have been considered for Table 500-29, prepared by using
after
thiscase. This may be linked to rate analysis and laid to required level and slope
providing anli-
worked out underClause 511. cleaning the surfacd, including
lrne
skid surlace with bitumen precoated
5.13. 514 Supply of Stone Aggregates forPavement orained hard stone chipping of 13'2 mm
o Oo5 cum per l0
Coulsss iominal size at the rate ot
of 10 cm
som and at an approximate spacing
press€d
Supply of stone aggregates from approved center to center in both directions'
sources conforming to the physical of surhces
into surface when the tenperature
'l mm to
requirement, specilied in the respective is not less than 1OOoC, protruding
all complete as
specified clauses, including royalties, fees 4 mm over mastic surfac€,
rents, collection, transportation, siacking and per Clause 515.
testing and measured in cum as per Clause
5'14.5 unit = som
iar<ino output = 35.00 sqm 87
(0 cum)
tonne/curn-2 tonne
Compelitive market rates to be ascertained. assumlng a density of2'3
Alternatively, rates forstone c.ushing given in
Chapter-1 may be adopted, il found a) Labour day o.44
economical. ln case fo. supply ofaggregates Mate
day 10.00
at site are not available, nearest crusher site Mazdoor
day 1.00
may be ascertained. Loading and un]oading Mazdoorskilled
charges and cost of carriage may be added
to these rates to arrive at the cost at site. bt Machinery 0.06
per hour hour
Mechanicalbroom @ 1250sqm
hour 0.06
AircomPressor 250 cfm 6.00
hour
Mastic cooker 1 tonne caPacity
hour 6.00
Bitumen boiler 15OO litres capacity
hour 1.00
positiofling of
Tractor for towing and
boiler
mastic cooker and biturnen

)
150 151
Road Wo*s : s-Bses
Sulf.cc Cours€ (Bituminous)
'nd
Road wo*s : 5-Bascsrrd surfaccC@rs. (Biluminous)
Sr. Reference to Descripfion
No. MoRT&H Unit Quantity Rate
Specificatiohs S.' Reterence to Oescrlption LJn lt Quantlty Rate
Rs.
No.
MoRT&H Rs.
c) Material Speclfications
Base maslic (wilhout coarse
aggregates) Note: 1. The rates for 50 mm and 40 mm lhic* layers
= oU per cenl
may be worked outon pro-rata basis.
C^oarse aggregate (6.3
mm to 13.2 mm):
40 per cent 2. Vvlere tack coat is required to be provided
Proportion of material before laying mastic asphalt, the same is
required formastic
asphalt w(h coarse aggregates
required to be measu.ed and paid
(based on
mrx desjgn done by separatelY.
CRRI fora specific
case) 3. The quantities ot binder, filler and
i) Bjlumen 8S/2S or 30/40 .10.2 per aggregales are for estimating purpose.
@ cent tonne 0.20
oy weightof mix = 2 x 1O.Z1OO Exact quantities shall be as per mix
.
r,) ttne aggregate passing = O.2O4
2.36 mm and design.
cum 0.39
retained on 0.075 rnm
@3i.9percent 4. This rate analysis is based on design
Dy weigh, olmix
= 2 x 31.9/1OO = O 636
lonne= 0 638/t 625 O.3s made by CRRI for a specific case and is
=
rneant for estirnating purposes only. Actual
iii) Lime stone dust filler with
catcium content MT
036 design is equfed tc be done h each case.
not tess than 80 per cent
by weioht
@ 17.92 per cent by weighi of mir Z x 516 Slurry Seal
= 5.1s.
17.92/100 = 0.36
V) Coarse aggregates 6.3 mm
to 13.2 mm cum 0.55 Providing and laying slurry seal consisting of
@ 40 per cent by weight of mix 2 y
= a mixture ofllne aggregates, portand cement
40/100 = 0 I MT 0 8/.t.4S6
= = O.ss iller, bituminous emulsion and water on a road
I Pre-coated stone chips
of 13.2 mm cum surface including cleaning ofsurtace, mixing
nominal size for skid resistance 002
ofsllrrry sealin a suitable mobile plant,laying
= 35 x 0.00ylo = 0.018
andcompacting to provideeven rijing surface
,, or chips @ 2 per
li:T"l
Dy weightl"'.o-"1'*
= 0 oi8 x 1 456
cenr ks 0.50
Case - I : 5 mm thlckness
x Ztl.]o =
0.0005 MT= O.S kS

Unit = sqm
d) Ove.head charges oZ Taking output = 16000 sqm (80cum)
@ on (1+!+61
Taking density ot2.2 tonne percum
e) Contractor,s profit o/o
@ on (a+b+c+d) Weight of mix = 176 tonne

Cost for 35 sqm a+b+c+d+e


= a) Labour
Mate day 0.24
Rate per Eqm (a+b+c+d+e)/3S
= Mazdoor day 6.00

152
153
)

Road Wo*r : s-B&scs Surf.cc CouBe (Bitudinous) Rosd Wotu : 5-Bascs lod Surflce Colls'
(BitMinous)
)
'rd
Rate
-' DescriPtion
U nlt Quantily
Rs.
)
Sr. Reference to Descriptio:r Unlt Quantity Reference to
9r.
No. MoRT&H 11 No.
MoRT&H )
Specifications Speclfications
)
b) Machinery a) Labour day 0.20
Mate
Meclanicalbroom hour 6.00
Mazdoor
day 5.00
)
Akcomprcssor250 cfm hour 6.00
Mobile slurry seal equipmenl hour 6.00 l
)
Front end loader 1 cum bucket capacity hour 6.00 b) Machtnery hour 6.00
Tipper5.5 cum capacity for carriage of hour 6.00 Mechanical broom 6.00
aggregate ftom stockpile on road side to Air comPressor 250
cfm
hour
hour 6.00
)
slurry equiprnent, bitumen emulsion and Mobile slurry seal equipment 6.00
hour
filler I Front end loader f cum
bucketcapaclty
hoor 6.00 )
capaclty for camage or
Pneumatic tyred rollerwith individual hour 6.00 Tiooer 5.5 cum
)
wheelload not exceeding l.5tonne
Water tanker 6 KL capacity hour 2.O0
"i,';r:m'm:"'rx;:f#;::.i
filler hour 2 00 )
c) Materlal Water tanker 6 KL capacity
Residual Binder @ 11 percentof mix tonne 80 '19.36 )
x 2.2 x 0.11 .l lr.tgrial tonne 17.16
'!3 Per cent ot mx =
Residual Binder @
Fine aggregate 4.75 mm and below 87 per cum 102.08 ,
cent of total mix, 80 x 2 2 xO.A7 = 15312 cum 74.m
berow .$Per
tonne. Taking density 1.5 = 153.12l1.5 :'":';'rl"::,: ""nd x 0 45 = ,
'
cent of total mix 60 x
2'2
= 102.08 cum 15
112.2tonne. Taking density 2.d
Fille. @ 2 per cent of total mix = tonne 3.52
Fill€r @ 2 Per cent of
total mix =
tonne )
80\22\O02
Costofwater KL 12.00 60x2.2x002 KL 12.00
Coqt ofwater )
d) Ove,head charges @ % on (a+b+c)
d) overhead charges @
%on(a+b+c) )
e) Contractor's prolit @ % on (a+b+c+d)
% on (a+b+c+d)
e) Contractor's profit @
Cost for 16000 sqm = a+b+c+d+e
a+b+c+d+e
Costlor 2oooo sqm =
Rate per sqm = (a+b+c+d+e)/i6000
(a+b+c+d+e)/20000
Rate Per sqm =
Case-ll:3mmthickness
case - lll : 1.5 mm thickness
Unit = sqm
Taking output = 20000 sqm (60 cum)
Yllffi*=,o"oosqm(36cum)

155
I54 I
a[
,
)l Rosd Wotu : 5-Basss
,nd Su.hc. Cours. (Biruminous)

,l Sr. Reference to
Road Wo*! : 5.Brs!s rnd Srficr Coursc (Bitum inous)

Description
No MoRT&H Unlt
) Quantity natd
Specifications 'n.
Reference to Description Unit Quantity Rate
Rs.l MoRT&H Rs.
) a) Labour
lo-
Speclfications
Mate
) Mazdoor day 0.20 6.t6.
Recycling of Bituminous Pavement with
day Central Recycling Plant
5.00
I b) Machtnery
Recycling pavernent by cold milling ofexisting
Mechaoicalbroom
) Air compressor 250 hour 6.00
bituminous layers, planning the surface after
cfm cold milling, reclaiming excavated material to
Mobile slurry seal hour 6.00
equipment the extent of 30 per cent of lhe required
) Iront end loader 1 cum
bucket caoacitu
hour 6.00
quantity, hauling and stockpiling the reclaimed
r rpper5.5 cum
hour 6.00
capacity for caniaoe ot. material near the central,ecycling plant after
) aggrelEle tom stoctelte
on roaO liaa r^
hour 6.00
canying out necessary checks and evaluation,
sruny
"Quiprnenq
b;6n*n emulsion anJ adding fresh material induding rejuvenators
) as required, mixing in a hot mix plant,
Water tanker 6 KL capacity
transporting and laying atsite and compacting
) hour 2.00
tothe required grade, leveland thickness, all
c) Materiat
as spedied in Clause 517.
, tl"*, 4,lu oercent ormix
ffi!1' tonne .t2.67
Unit = cum
Fine aggregate
) 36 mm and below. 82
per cent of totalmix
2.
cum 43.30
Taking oulput = '120 cum (276 tonne)
36 x2.2 xO.B2
04.94 tonhe. Taking =
) rrler @ 2 per cent of
densiv 1.5
totalmix =
al Labour
tonne Mate day 0.48
36x2.2x0.02 1.58
) Cost ofu€ter
Mazdoor day 10.00

KL Mazdoorskilled day 2.00


12.00
) d) Overhead charges
@ %on(a+b+c) b) iilachlnery
Cold milling machine@ 20 cum perhour hour 6.00
) e) Cont.actor,s prorit
@ % on (a+b+c+d) Mechanical broom @ 1250 sqm per hour hour 1.24
Air compressor 250 crm hour 1.24
) Cost for24O0O sqm
= a+b+c+cl+e Eitumen pressure disbibutor @ 1750 sqm hour 0.91
per hour
Rate per sqm (a+b+
) = c+d+ey24ooo Hotmix plant 100-120TPH producing an hour 3.00
Note : average of75 tonne per hour
Tack-coat, ifrequired
) to be provided, before Eleclic generdtor set250 KVA hour 3.00
layrng slurry sealmay
be ln""srreO p"iO Front end loader 1 .00 cum bucket capacity hour 3.00
"nO
) Tipper 5.5 cum capacity hour 18.00
Srnooth wheeled roller&10 tonne lour 3.00 i 0.65'
) Vibratory rollerStonne hour 3.00 x 0.65'
Srnooth wheeled tandem .oller6{ tonne hour 3.00 x 0.65'

)
t56
)
157.
Ro&d Wo&r:5-Bts6!.d
,
Surfr@ CouE (BituminoB)
Ro8d Wo*s : s-BEr.s and Su.fac€ Cou6. (Bituminous)
)
Sr. Reference to Descrip0on
No. MoRT&H Un it Quantity Reference to Description Unit Quantity Rate
Sr. )
Specifications No. MoRT&H Rs.

c) Material
Specificatlons )
Note : 'Although the totalrolling time is only 4 hours
i) Bitumen as pernorms, allthe three rolle6 have to be )
A.bifurnen content is 4.S percent available at site for 3 hours each to match
by wetght
of mix. For reclaimed material, fresh with the output of re-cycling plant- To caterfor )
Drumen will be required their idling time, these have been multiplied
to tie exlent of
60 per cent of normal rcquirernent. wath a hctor of0.65. )
ln a mix of 276 tonne,
reclairned and balance 193.2
B2.B tonne is
5.17. 518 Fog Spray )
tcnne is fresh
mtx.
Providing and applying lowviscosity bitumen )
Bilurnen reguhed br r€dairrEd rix of
82.8 tonne @ 60 per cent
tonne 1.99
emulsion for sealing cracks less than 3 mm
= 82.8 r wide or incipient fretting or drsintegration in ,
0.60x0.04=1.99 an existing bituminous surfacing.
Biturnen requfed fo. fiesh mix
tonnes= 193.2 x
of 1 9g.2 tonne 7.73 )
O.O4 = 7.73 Unit = sqm

li) Aggrsgates
Taking output = 10500 sqm
)
Percentage of mix requiriog
fresh a) Lrbour
aggregates _ 70 per cent
Mate day 0.12
)
Weight of fresh ;rix 276 x
= 0.70 = 193.2 Mazdoor day 3.@
tonne ,
Weight of fresh aggregate in
the mix = b) Machincry
193.2 x 0.96 185.47
= tonne Mechanicalbroom @ 1250 sqm per hour hour 6.00 )
Taking average density o,
L S tonne/cum, Air compressor 250 c-fm hour 6.00
total volume ofaggregate .123.65
= cum Bitumen emulsion pressu re distributor tonne 6.00 )
S_ize wise requi.ement
of fresh aggregates
@ 1750 sqm per hour
J/.5 _ 25 mm @ 23 per cent
25 - 10 mm @ 15 per cent
cum 28.44 )
'10 - 5mm cum 18.55 c) M8tori.l
@ 20 percent
Betow 5 mm @ 40 per cent
cum 24.73 Bitumen emulsion @ 0.75 kg per sqm bnne 7.88 )
cum 49.46
Filler (cement)
@ 2 per cent = S.52 d) Overhead charges @ %on(a+b+c)
tonne of276 tonne
tonne )
d) Ovefiead e) Contracto/s profit @ %on(a+b+c+d)
charges @ % on (a+b+c) )
o) ContEctor,s protit Cost for 10500 sqm = a+b+c+d+e
@ % on (a+b+c+d) )
Cosl for 120 cum of DgM Rate per sqm = (a+b+c+dre)/10500
= a+b+c+d+e
)
Rate per Eqm (a+b+c+d+elt12l
=
)
158
159 ,
Ro6d Work : j-Brscs
rnd Surf.cc Cou.Ec (Bituminour)
Roadwo s:5-Brs6&d Surfac. Cou^c (Biruminous)
Sr. Reference to
No. Description
MoRT&H
Unit Quantity Reference to Description Unit Quantity Rate
Specifications Rari t.
o.
MoRT&H Rs.
Rs.
ln case it is decided Speciflcations
by the Engineer
the fog spray, to blind
the following may Proportlon of aggrogalos
beadded
r)
'19 mm to 9.5 mm 25 per cent
Labour 9.5 mm to 6 mm 29 percent
Mate
6 mm to 0.075 mm 36 per cent
Mazdoor For pre-coating day 0.16
of grit
day 4.00 a) Labour
b) Materiat
Mate day 0.84
size @ 3 7s kg Mazdoor day 16.00
ffi "'onu
"n ' 'm CUTI
26.25 Mazdoorskilled day 5.00

8H::""T,ff J,JI:",T,#,* tonne 0.79 b) Machlnery


5.r8. 519 Orum mix plantfor cold mixes of hour 6.00
(rncrudrng craver appropriate capacity bul not less than
E,ll[;:;;" ""0 ''' T5lonne/hour
Eleclric generalor set 1 25 ,(VA hour 6.00
Front end loader'l cum bucket capaciv hoJr 6.00
Tipper 10 tonne capacity t.km 450xL

fl#trfr#*#$r,,n*im Add 1 0 per c€nl of cost of carriage to cover


costof loading and unloading

;::"1 ;Iij#
;:"ff :lt J,; j#t: .
Paverfinisher hour 6.00
Pneumatictyred roller 12-15 tonne hour 6.00 x 0.65'
Unit = cum
Smooth wheeled steellandem roller 6-8 llour 6.00 x 0.65'
Taking output:2
05 cum (4SO tonne
tonne)

;:"; ;'" ::, i". :-,# ""il,,,;::,"I:


c) Materlal
Bitumen emulsion @8 per cent bnne 36.00
Filler (lime) @ 2 per cent tonne 9.00
Aggregates size 19 lo 9.5 mm - cum 75.00

;.#::"J::J,:'', nso ronne) is assumed 450x0.25x1,/1.5


Aggregates 6ize 9.5 to 6 mm - cum 87.00
Eitumen Emulsion 450 x 0.29 x l/1.5
Filler 8 per cent Aggregates size 6 to 0.075 mm - cum 108.00
By weight of total
2 per cent mix 450x0.36x'l/1.5
Totalaggregates
90 per ceot
d) Overhead chargcs @ % on (a+b+c)

160
t6l
Ro.d Wo.t! : J-Bsa!
lrd Surfac. CouB. (Bitui,inous.)

Road Wo*s: ,-Bascsond Surf.cr Couls€ (Biruminour)


Sr. Reference to
No. Descrlpflon
MoRT&H Unit Quantity Rate
Specifications Reference to Description Unit Quantity Rate
5r,
Rs. MoRT&H Rs.
No.
e) Contractor,s profit speclfications
@ % on 13+6+616;

Cost for 2OS cum a) Labour


= a+b+c+d+e Mate day 0.84
Madoor day 16.00
)
Rale per cum (a+b+c+d+erl205
= Mazdoorskilled day 5.00
(App[cabte to )
Casee I to tV)
b) Machlnery
Note 1 Drum mix plant for cold mixes 60-90 tonne hour 600 )
has beeo assumed per hour producing average output of75
ffiflg"eot"s"t"s
tonne per hour )
Electric generator set 125 lO/A hour 6.00
wIl be rn€asu.d
Front end loader 1 cum bucket capacity hour 6.00 )
Tippe|I 0 tonne capacity t.km 450x1
'r,iffilgrfl{fl1ftry** Add 10 per cent cost of cardage to cover
)
cost of loading and unloading
)
Paverfinisher hour 6.00
)
i:J[T::^:tI#d##T Pneumatic tyred roller 12-'15 tonne
Smooth wheeled steeltandom roller 6-8
hour 6.00 x 0.65'

tonne hour 6.00,( 0,65' ,


c) l'raterlal )
ff:;ijyllT:Htril:HTH:,I Biturnen emulsion @ I percent tonne 36.00
Filler(lime) @ 2 per cent tonne 900 )
,:il:fl [Ir,. *so tonne) is assurned , Aggregates size 37.5 to 19 mm - cum 75.00
450x0.25x1l'1.5 )
Bitumen Emulsion Aggregates size 19 to 6 mm - cum 90.00
8 per 450x0.3x1/1.5
Filler cent )
Tolat aggregates
2 per cent Aggregates size 6 lo 0.075 mm - cum 105.00
90 percenl 450x0.35x1/1.5
)
Proportion of agg.egates
J/.5 mm to 19 mm d) Overhead charges @ %on(a+b+c)
25 percent
I
19mmto6mm
6 mm to 0.075
30 percenl e) Contractor's profit @ % on {a+b+c+d)
mm 35 per cent )
Cost for 205 cum = alb+c+d+e
)
Rate per cum = (a+b.c+d+e)/2r5
)
162 )
t6)
)
) t________"""'

Rotd Wo(tu I 5-Basc, ad Surfr.c CouBc (Bitumhour)


) Road Wortu : 5-Beres .nd Surhc. Cours. (BituminoN)
Sr. Reference to Description
) No. MoRT&H Unit Quantity Rale
Specltications 5r. Reference to Description Unit Quantity Rate
Rs.
) No, MoRT&H Rs
Note : 1 Density ofaggregates
Speciflcatlons
) i 5 gms/cc
has been assumect
b) Machlnery
) 2 Tack Coat where proviJed
wiltbe rneasured
Drum mix planl for coH mixes 60-90 tonne hour 6.00
and paid separately
per hour producing average output of 75
) '3 Though the rotiers
tonneperhour
are required only for Electric generator set 'l 25 KVA hour 6.00
35
nours each as per norms Front end loader 1 cum bucketcapacity
) rnese are required
ol outiut, but
Iippe|I 0 tonne capacily
hour
t.km
6.00
450x1
lo be avajlable al Srte
ror6 hours as lhe drum
) pav€r would take
mix plant and the
6 hours for mixjno and
Add 10 per cent of cost of caniage to

Pdvrng lo cater for the rdle period, covercost of loading and unloading
) have been mu[iptied
therr
Paverfinisher hour 6.00
l:9" of0
ractor:1:.
65
by a
Pneumatic tyred roller 12-15 tonne hour 6.00 x 0.65'
) Smooth wheeled steel tandem roller &8 hour 6.00 x 0.65'
Case - lllj
Using cutback bitumen tonne
and 9.5
) mm or i3.2 mm nominal
size aggregate
c) alraterial
) ronne) js assumed Culback bitumen@5 percent tonne 22.50
;"J::"Jff:ll."." "so Filler (lime) @ 2 percent tonne 9.00
) Cutbackbitumen
Aggregates size 19 to 9.5 mm - cum 78.00
5 per cent 450x0.26x1/'1.5
Filler(time)
) Totalaggregates
2 per cenl Aggregates size 9.5 to 6 mm - cum 93 00
93 per cent 450x0.31 x 1/1.5
) Proportion ot aggregate6
Aggregates size 6 to 0.075 mm -
450x0.36x'l/1.5
cum 108.00

',9 mm to
9.5 mm
) 26 perc€nt
,9.5mmto6mm d) Overhead charges @ % on (a+b+c)
31 per cent
6 mm to 0.075 mm
36 per cent
e) Contractor's prolit @ '/" on (a+b+c+d)
a) Labour
Mate Cost for 205 cum = a+b+c+d+e
Mazdoor day 0.84
Mazdoor skifled day 16.00 Rate per cum = (a+b+c+d+e)/205
day 5.00
Note 1. Density of aggregates has been assumed
1.5 gms/cc

2. Tack coat where prcvided will be measured


and paid separately.

r64

165
)
cou6' (Bituminous)
RGd Wo*s : s-Bar.3 snd Surfac. Cou6. (Bituminous) Ro.d Wo& : 5-8.-!ca ond surfacc
,
Unit QuantitY Rate )
S.- Reference to Descriptlon Unlt Quantity Rate ReferenGe to
DescriPtlon
sr. Rs.
No. MoRT&H Rs MoRT&tl
Speclfications No.
Specifications
)
'3. Thoughthe rollers are required only for3.5 Paverfinisher
hour 6.00 )
hours each as per norms of output, but hour 6.00 x 0.65'
Pneurnatic tyred roller 12-15 tonne
these are required to be available at site
Smooth wheeled steeltandem
roller hour 6.00 x 0.65' )
for6 hours as the drum mix plant and the 64tonne
paver would take 6 hou6 for mixing and I
paving. To cater for the idle period, therr
c) Material
usage rates have been multiplied by a 22.50
factor of 0.65.
Cutback bitumen on @ 5 Per cent
tonne
tonne 9.00
)
Filler (lime) @ 2 Per cent
- cum 75.00
Case - lV : Using cutback bitumen and
Aggregates size 37'5 to 19 mm
,l/'1 5
)
450 x 0.25 x
19 mm or 26.5 mm nomlnal size aggregato - cum 90.00
Aggregates size 19 to 6 mm )
45OxO.3x1/1.5 '!'14.00
Composluon of mlx (450 toone) is assurned - cum
Aggregates size 6 to 0'075 mm
to be as unde[ 450 x 0.38 x 1/1.5
)
Cutback bitumen 5 per cent @ on (a+b+c) )
Filler 2 per cent
4 Ovsrhead charges '/o

Totalaggregates 93 per cent


e) contractor's profit @ % on (a+b+c+d) )
Proportlon of aggregates
' Cost lor 205 cum = a+b+c+d+e )
37.5 mm to 19 mm 25 per cent
'19 mm to 6 mm 30 per cent
Rate Por cum = (a+b+c+d+e)'205 )
6 mm to 0.075 mm 38 per cent

Note: 1. Density of aggregates has been


assumed )
a) Labour 1.5 gfiVcc.
Mate day 0.84
Tack coat where provided wifl
be trEasuGd )
Mazdoor day 16.00 2.
MazdoorsKlled day 5.00 and Paid sePaEtely'
I )
are required only icr 3 5
b) Machlnery '3. Though the rollers
but
Drum mix plant tor cold mixes 60-90 tonne hour 6.00 hours each as per norms of oulput'
gvailable at site
)
fiese are required to be
perhour producing outputof 75 tonne plant and the
lor 6 hours as the drum mix J
per hour
oaver would take 6 hours for mixing
and
Electdc generator set 1 25 l(VA hour 6.00
the idle period' their
pavlng. To cater for
Front end loader 1 cum bucket capacity hour 6.00
N
i )
usage rates have been multiplied by a
Tipper 10 tonne capacity t.km 450x1
i factorof0.65
Add 1 0 per c€nt of cost of carriage to I
cover cost of loading and unloading

161
166
I
Ro0d Work! :5-Brs.3r surficccoor! (Bituhi,ous)
Rod Work! : 5-8r$6 rrd Surfle Cous. (Birminous)
Sr. Reterence to Oescrlpllon
No. MoRT&H Unit Quantity
Specifications Sr' Reference to Description Unit Quantity Rate
Rs.
No. MoRT&H Rs.
3. The.other conhots duing Specificatlons
mixing, taying
shafl be same as specifed
94 and 95 fo. open graded
in IRC-: 14,29, bl t achlnery
premix carpet, Mechanical broom @ 1250 sqm per hour hour 6.00
brtuminous concrete, DBM
Especlively.
and SDBC Air compressor 250 crrn hc,{rr 6.00
Bitumen pressure distributor @ 1750 sqm hour 6.00
per hour
4. Thelemperature of mixing
De stigh y higher than
and rolling wi Hydraulic chip spreader tlour 6.00
conventionat
utJminous mixes as indicated
Srnooth wheeled road roller E-10 tonne hour 6.00
in Tabte 8
oflRCiSp.53_2002
c) Material
5.21. Modified binder tonne 9.45
Cnck provsntion Courses
Crushed stone aggregates 5.6 mm size cLl m 105.00

Case.- I : Strsss absorbing d) Overhead charges @ % on (a+b+c)


mombrans
t.AM) crack wldth le6B than E mm
e) Contractor's prolit @ % on la+b+c+d)
tayins of a stress absorbins
::1$g
membrane "*
over a cracked Cost for '10500 sqm = a+b+c+d+e
rcad surface. wfth
crack width below 6 mm
aner cleaninq wfh a
mechanical broom. using Rate per sqm = (a+b+c+d+e)/10500
modified-binaer

fi l:liiJH; llJil; "j,j## case - ll r Stress absorblng membrane


) mm crushed stone aggregates
IS (SAM) with crack width 6 mm to 9 mm
@ o.flium
with hydraulic chip spreader,
) :-":]: "ol
sweeping the surface to. unjform
Providing and laying of a stress absorbing
spreact of membrane overacracked road surface, with
a-ggregate-s and surfuce
finished to conform I
crack width 6 to mm afrer cleaning with a
) ro uEuse 902-
mechanical broom, using modified binder
complying with Clause 521, sprayed at the
Unit = sqm
) rate of 11 kg per 10 sqm and spreading 11.2
Taking output .t 05OO
= sqm mm crushed stone aggregates @ 0.12 cum
) a) Labour
per 10 sqm, sweeping the surface for uniform
spread ofaggregates and surface finished to
Male
, Mazdoor
day 0.24 conform to Clause 902.
day 6.00
) Unit = sqm
Taking output = 10500 sqm

) a) Labour
Mate day 0.24
) Mazdoor day 6.00

) 172

113
R6d Wo*r : tBts6 u{ Suf'c' ciotl.lt (Bioltrild,s)
Road Work : J-8.!6.Dd sutf.c. Cde (Bituminoa)

Unit Quantity Rate


DescriPtion
Sr, Reference to Descrlptlon Unit Quantity '9t. Reference to Rs.
No. MoRT&H TI No.
MoRT&H
Specifications Speclfications
b) Machlnory a) Laboul day o.24
Mechanical brodm @ 1250sqm per hour horr 6.00 Mate 6.00
day
Air compressor 250 cfm capacity hour 6.00 Mazdoor 2.00
day
Bitumen pressure distributor@ 1750 sqm hour 6.00 Mazdoorskilled
per hour
Hydraulic chip spreader hour 600 -' llachiner,
b)
'1250 sqm per hour hour 6.00
Srnooth wheeled road roller8-10 tonne hour 6.00 rrr""irni""r uoorn O
rui-coipr"s"or zso ctm capacity hour 6.00
6.00
sqm hour
c) ilaterlal eit;i pr"".u," oitttibutor@ 1750

Modified binder tonne '1L55 per hour


hour 6.00
Crushed stone chipping '11.2 mm size cum 105.00 ilvdEulic chiP spreader 6.00
8-10 tonne tpur
Smooth wheeled road roller
d) Overhead charges @ %on(a+b+c)
c) Materlal tonne 15.75
e) Contractor's profit @ %on(a+b+c+d) Modilied binder '126.00
'1'1'2 mm slze cum
Crushed stone aggregates
Cost for 10500 sqm = a+b+c+d+e
d) overhead charges @ %on(a+b+c)
Rale per sqm = (a+b+c+d+elll0500
e) Contractor's p'ofit @ %on(a+b+c+d)
Cass - lll : Stress absorblng membrane
(SAM) crack wldth above I mm and Cost for 1O5OO sqm = a+b+c+d+e
cracked area above 50 per cent
Rate Per sqm = (a+b+c+d+e)/10500
Providing and laying a single coatofa stress to be
absorbing membrane over a cracked road Note: ln case 2nd coat ls also required
p'ovided for the 2nd coat
surface, with crack width above I
mm and ororiauO n,"t"'i"f
cracked area above 50 per cent afler cleaning shallbe as PerTable 500 47
)
with a mechanical broom, using modified
case - lV: Bltumen imPregnated
binder complying with Claus€ 521, sprayed
atthe rate of 15 kg per 10 sqm and spreading geotextile )
11.2 mm crushed stone aggregates @ 0.12
cum per 10 sqm, sweeping the surface for Providrnq and laying a bitumen
impregnated )
layer afier deaning the lpad surlace'
unitorm spread of aggregates and surface oeotextih
of
llnished to conform to Clause 902. i""i"tiit" "o.t"'rn'ng to requirements1.05 )
Li*r" ioo.:, r"ia ou"r a tack coat with80-100
Unit = sqm io"o", ot p"uing srade bitumen
"0.
o-"n"t,"tion and constructed
to the
Taking output = 10500 sqm
;equirement of Clause 703'4'5'

t75
174
) Wo*! : 5-Bt!6 rnd Surfiotcour' (Biut"ioous)
Road wo*s : s_B's sd surf.@ cou* Gnuminou, Road

Unlt Quantity Rate


) DescriPtion
Reference to Rs.
S.. oescriptlon Unit Quantity Rale Reference to
Sr.
No. MoRT&H
) Rs.
No.
MoRT&H
Speclfications Speciflcations
) s.19. 520 Sand Asphalt Base Course cl Material
(450 tonne) ls
composltion of mix
) Prcviding, hying aM rolling saM€sphaltbase
assumed to be as under
o.nsiw 2'20tonne Per cum
)
course composed oI sand, mineralllller and :
Weiohl
450 tonne
bifuminous binder on a prepared sub{rade or 5 oer cent
Eitumen
sub-base to the lines, levels, grades and 2 Per cent
) cross-seclions as perthe drawings including
il;,
mixing in a planl ofsuitable type and capacity,
saio ot size l'zs to 93 PeI cent

, transporting, Iaying, cgmpacting and fi nishing. 0.075 mm tonne 22.50


Bitumen @5Percent tonne 9.00
Fiuer (lime) @ 2 Per
cent
) Unit. cum
Sand of size 4 75 to 0'075
mm - cum 28A.62
Taking output = 205 cum (450 tonne) '1/1 5
450 x 0.93 x
)
a) Labour on (alb+c)
d) Overhead charges @
%
) Mate day 084
Mazdoor day 16.00 * on (a+b+c+d)
Mazdoorskilled day 5.00 e) contractor's profit @
)
b) Machinery cost for 205 cum = a+b+cd+e
,)
Hot mix Plant of appropriate capacity hour 6.00
but not less than 75 tonne/hour Rate Per cum = (a+b+c+d+e)/205
, Electric generator set 250 KVA hour 6.00 and paid
Front end loader 1 cum bucket capacity hour 6.00 Note 1. Tack coat will be measured
) Tipper 10 tonne capacity tkm 450x1 seParatelY

) "JI,f:
Add '10 per cent of cosl of carriage to cover
cost of loading and unloading
" I'.I:J,'.'"T:::'ffi:"fiJifi
-same sile for slx
at
have to be available
) paver will
Paverfnisher hour 6.00
i",,,. ,.ii" not rn'' olant and
l-11-"" norr" to' and Pavrng the
) Smooth wheeled roller 8-1 0 tonne for hour 6.00 x 0.65- 'i'ing
tonne coosidered in
thrs
initial break down rolling
l,i"*
"ituo
I"Ir.'t t" "'t"t to"heidle period therr
) Vibratory rollerS tonne for intermediate hour 6.00 x 0.65' bY a
rolling ,t"1" ."t have been multiPlied
lactor of0'65'
Finish rollinq with 6-8 tonne smooth hour 6.00 x 0.65'
) wheeled tandom rollers

)
)

)
r69
t68
)
Road Wo*s : s-Bases rM Surfact Coue (BiluminoN) Rosd Wo*! : 5-Bt!6 snd Snfic' Collt @it'ni'rous) ,
Rate
DescriPtion
Unit Quantity
Rs.
)
Sr. Reference to Description Unit Quartity n"tI Reference to
No. MoRT&H ns. !
91.
MoRT&H )
Specificatlons No.
Specifications
5.20. 521 Modified Binde. Proposals to use
glass libre, PolYPropylene
in a
)
any other similar material
fibre s or
Supply of modified binder produced by mixing bitumino us mixture
should be substantiated,
testresults,
)
with all details including
bitumen with modifiersuch as naturalrubber complete tor addition
or crumb rubber or any other polymer found manufacturels recommendations )
ating th e libres,
compatible with bitumen and which allows or means of incorpor into
homogenequsly ,
without segregation, )
propediesgiven in Clause 521.3 and IRC:SP:
53 bleoding of rnodifier with bitumen to be done the fixture.
either at the refinery or central unit with all )
facilities by p.oper indust.ial process, is
essential. )
Unit = tonne [#"1'-]':*t*ffi )
The use of nEdified binder is expecled b result
*l#*l**t::""lllll1ff Ii;':"*"Y' )
in an extended service life of bituminous
be acceptable.
pavements subjecl to heavy traffic loads in
extreme clirEtic conditions, thus justirying the
)
entire cost ol adding modifiers/fibres. Other
advantages include lower temperature
)
susceptibility, higher resistance to aging, [TH:#$:"J[',J*::il#flx )
higherfatigue lifr-., higher resistance to q'acking of the fibre'

and betteradhesion between aggregates and


binder Note :
)
)
Detailed information and inductive dose level
on lhe use of polymer modified binder is ffi;'ffig;**"ilsS:
market. I
availabte in IRC:SP:53-2002. A number of
proprietary producG are now available in the
markeL For such proprietary products, test 2
reports and cost effectiveness should be the
basis for their selection in road works.

Themodifier, in the required quantity, shallbe


'*fi':}:ffi
blended at the refinery or centralunitwith all
lacilities by proper industrial process. is
essential. lf supplied in drums it shall be
agitated in n€lted clndition wittr suitable device
icr achieving homogeneity.

l7l
170
Rold Worts : s-B.ses
,rd Surf.c. Co$!c (Birlt,niloUs)

Road wod(l : s-llas€s ed Surfa.. Couls! (Bituminous)


S.. Reference to
Descrlption
No. MoRT&H Unlt Quantity Rate
Specifications 5r. Reference to Description Unlt Quantity Rate
Rs.
No MoRTEH Rs.
Unit = sqm Specifications
Taking output
= 3SOO sqm 519.3 Recipe cold Mixes
5.22
a) Labour
Providing and laying of prenix of crushed stone
Mate
day aggregates and emulsion binder. mixed in a
Mazdoor 0.56
day batch type cold mixing phnt, hid over prepared
Mazdoorskilled 12.00
day 2.00 surface, by paver finisher, rolled with a
pneumatic tyred roller initially and finished
b) U.chinery
with a smooth steel wheel foller, all as per
Mechanicalbroom
@ i25O sqm per hour hour Clause 519.3
2.80
ffi,,Ttrff ::iT j,'fl fj"6Y,,o 2.AO

"0",
H" 2.00 Unit = cum
pneumatic Taking output = 205cum (450lonnes)
roller
hour 2.OO
c) Material Case - l: 75 mm thlckness
paving grade
bitumen of BO_1OO
tonne 3.6e a) Labour
Penetration @ 1 OS kg persom
Mate day 1.00
ceotextile inctudrng iO percent
ovedaps
for sqm 3850.00 |tud$. day 12.00
Mazdoorskllled day 5.00
d) Overhead charges
@ % on (a+b+c) b) Machlnery
) e) Contractor,s profit Batch type cold mixing pbnt 100120 hour 6.00
@ % oo (a+6+616; TPH capacity producing an average
) Cost for 35OO sqm = a+b+c+d+e
outputofT5 tonne per hour
Eleckic generator 125 l(/A hour 6.00
) Rate Per sqm Front end loader 1 cum capacity hour 6.00
= (a +b+c+d+e)/35oo
Paver fi nisher with electpnic sensor, hour 6.00
Note 75 tonne per hour
) :
j:liil:tT.ilT::#:H""i:il,j,:: "t'ipper 10 tonne capacity t.km 450 x L

) Add 1 0 per cent of cost gf caniage to cover


:;'. #::"'i,:l ;: :h:: #"I, ff :i::: cost ol loading and unloading
) iT,:':""I l'j I #,:"xi:,"i[ff ff : Pneumatlc tyred roller 12-15 tonne hour 6.00 x 0.65'
orrumtntoiJs course
) in a day
Smooth wheeled steelrcller6{ tonne hour 6.00 r 0.65'
Water tanker 6 KL capacity hour 1.00
)

)
t16
)
t'77
I
)
5-88.s and Suiflct Cour& (Bittminou!)
Ro6d Wot*s :
ir Surf.cc Cours. (Bituminous)
Rond Woiks : 5'Bas.3
)
Unit QuantitY Rate
DescriPtion I
Sr. Reference to Description Unit Quantity Rate 9r.
Reference to Rs.
No. MoRT&H Rs. MoRT&H
No.
Specifications Specifications )

c) Matorial
bl Machlnery
plant lOG120 TPH hour 6.00 )
Batch typecold mixing
Bitumen emulsion @ 45 litres per tonne tonne 20.25 average output of
producing an
Crushed stone aggregates 40 mm cum 297.00
capacity
hour
)
75 tonne Per
nominalsize 6.00
Cost ot water KL 6.00
Electric generator 1 25 lCy'A
hour
hour 6.00
,)
Front end loaderl cum capacity 6.00
sensor' hour
Paver finisher with electronic
d) Overhead cha.ges @ % on (a+b+c)
75 tonne Perhour
)
TiPPer 1O tonne caPacity
t.km 450 x L
e) Con(ractor's profit @ % on (a+b+c+d) ,
carriage to
Add 1o;er cent of cost of
Cost for 205 cum = a+b+c+d+e
..ver cost ol loading and unloading )
Rate per cum = (a+b+c+d+e)/205 6.00 x 065'
Pneumatic tyred roller
'12-15 tonne hour )
hour 6.00 x 065'
Smooth wheeled steel roller 6-8 tonne
Note (Case-ltolll) hour 1.00
:
Water tanker 6 KL capacity )
These mixes are considered suitable for
minor repair work and temporary road
el M.terlal
' tonne tonne 31 50 ,
aitumen emutsion @ 70 litres Per 287 00
surface improvernent. mmnominal cum
2. ln case concrete mixtures are required to
lru"h"d stont "gg'egates'14 )
size 6.00
KL
be used for mixing, a number ofthese will
be needed to match the capacity oI road
cost of water )
rollers. d) Ovethead charges @ %on(a+b+c) )
3. Tack coat, where provided, will be
% on (a+b+c+d)
measured and paid separately. e) Contractor's prolit @ )
'4. Bolh he rollers have to be available at site Cost for 205 cum = a+b+c+d+e
to match with the output of batch mixing )
plant and paver finrsher. A rnultipving hclor Rate Per cum = (a+b+c+d+e)1205
of0.65 has b€en adopted to cater for the )
idling period ofroad rollers. Caso - lll : 25 mm thickness
)
Case - ll ;,(0 mm thickness a) Laboul 1.00
day
Mate
day 12.00 )
a) Laboul Mazdoor
day 5.0p
Mate day '1.00 Mazdoorskilled
Mazdoo. day 12.O0
Mazdoorskilled day 5.00

179
178
I
)
Rold Worl(! : 5-A8cs.od
Sll?6c. Cotl's. (Eitu
) rhous)

S.. Reference to
Descrlption
) No. MoRT&H Unit
Specificafions Quantity
n.d Chapter-6
) --
R.I
Cement Concrete Pavement
b) Machinery
)
) iii:;::fixr;t hour 6.00 amble:
ff,;:tT#f"ilH:
(eftctive output) has been considered in the rate
) _Electric
generator 125
r ronl end loac,er
KVA
hour
1. High capacity batch mix plants of 75 cun/hour
i cL i.n capacitv 600 analysis ofcement concrete pavement works.
r.dver fi nishea hour 600
) ,J
with eJectronic
per hou.
sensor.
hour 6.00 2- V\ihile tippers have been provided for transportation of dry lean cement concrete and rolled cement
'onne
fippe|lO tonne capacity concrete, transit truck mixers have been considered tor the cemenl concrete pavement.
) t.km 450 x L
3 Super plasticizer admixture has been provided to improve \,vorkabllity with reduced watercement ratio
) 111 ::;ffi?"",,1ffi fjf,;,"nu,o -,",
4. Cement 43 grade has been catered for the cement concrete pavement i.e., for pavement quality
) pneumatic
tyred rot,er concrete to get higherstrength. However. for dry lean cancrete, cementof33 grade may be prefened.
Smooth wheeled hour 6.00 x O 65.
steel roller
) water tankef 6 KL
capacity
hor.r 6.00 x O 65. 5. v\ihile a slip form paver has been catered for the lop layerolconctete pavement, a mechanical paver
hour ,.00 has been provided fordrylean and rolled cement concrete.
c) Material
) Bilumen erhulsron
@ g5 litrgs ps1196ra 6. The letter'L' represents lead in km one way. This will vary from project to project and is required to be
tonne
) ",uslleo stone aggregates 6 mm nomrna,
cum
38.25
270.00
ascertajned at site to provide torthe cost of caniage ot the mix to the work site.

) Costofwaier 7. Materials provided in the rate analysis are for estirnating purpose. Exact quantity of materials will bc
KL 600 determined from theiob mix rormula.
d) Overhead charges
) @ %on(a+b+c)
8. Fibre Reinlorced Concrete foa Pavements
e) contracto.,s profit
) @ % on (a+61sa61
Fibre reinforcement concrete is a recent development inthe field ol cement concrete pavements. ln
Cost for2OS cum industrialized countries, it has been in use for nearly 20 years now for cement concrete pavements and
= a+b+c+cl+e
) overlays. ln lndia, itis stillon ah experimenlal stage. IRC have already published a code, IRC:SP:46-
Rato per cum: (a+b+c+d+e)/2os 1997 tor'SteelFibre Reinbrced Conc.ete for Pavements'which specifies a fibre content of0.75 to '1.5
) per cent and brings out the design aspects, materialto be used. mix design and construction proce-
dure-

) Some firms have developed Polypropylene flbres to be used in place of steel fibres. These fibres
reduce permeability in concreleand prevent shrinkage cracks, which eliminate chances ofconosion of
) steel.

) The organizations concerned with the construction of cement concrete pavements and overlays on
roads and airfields who have experimented on fibre reinforcement should give a feed back to the
) Ministry of Road Transport and Highways so that this item can be included in the Specifications laid
down by the Ministry and eventually included in the Standard Data Book for Analysis of Rates.
) I80

l8r
Rod tyo,ks r 6-ccn.nr
concrcr. pav.merr
I
9. Uttra _ Thtn mrre Topplag Road Wdtu : ffrtMr Coodr{. Pavem.nr
--I
Chapter-6

d#:";#.i;xffi d*;-l;*liTltfl xil:;iri-*ti,Hrf#l Cement Concrete Pavements


; Reterence to Oescrlptlon Unit Quantity Rate
No. MoRT&H Rs,
Speclticatlons
)
6.1. 601 Dry Laan Com€nl Conc.elq Sub Base

Coostrudbn of dry lean cement corErete Sub-


base ovsr s prepared sub{rado with coarse
and fine aggregate conforming to lS:383, the
)
size of coars€ aggr€gale not exceeding 25
mm, aggregste c€ment ratio nol to exceed )
I 5: I , sggr€gate gradaion afier Uerlding to b€

as per Tat e 60G1 , cement coatenl not to be )


less thao 150 kg/cum, optimum moisture
content to b€ d€temlned dudng trial lengt: )
construction, coocr€t€ strgngft not lo be less
lhan 10 Mpa at 7 days, mlxed ln a balching )
dant, trarEpoded to site, laid wfi a paver wtfr
sl€ctrooic s€nsor, compac'tirE wih & l 0 tonn€ )
vibratory.oller, linishing and q.riog.

Unlt = cum )
Taking outpul =450 cum (990tonne)
)
a) Labour
Mate day 1.12
,
Mazdoorskilled day 6.00
Mszdoor ' 2..0O
day
)
b) machlnery
Frcnl end loader l cum buckot capacity hour 6.00 )
Cement concrete batch mix plant @ 75
cum p€rhour hour 6.00 )
Eleclric generator 1 00 KVA hour 6.00
Paverwlth eleclronlc sensor hour 6.00 )
Vibratory roll6r 8.1 0 t capactty hour 8.00
Water tranker 6 KL capacity hour
t.km
8.00
990x1
)
TppEr

Add I0 perc€nt of cost ot carriage to )


cover cost of loading and unloading
182
)
183
)
R6ad Works : Gccmcol Cotlcftl PwEmcnl
Rotd Wo*s : 6-Ccment Coo6!1c Pav.mqt

Unit QuantitY Rate


DescrlPtion
Sr. Reference to Descrlption Unit Quantity Rate Reference to Rs.
5r,
No. MoRT&H Rs. MoRT&H
No.
Specirications Speclfications

c) Materlal
Ylltiffi,t= roso
"" tzarsonn"t
) Crushed slone coarse agg regate of 25 mm
and 12.5 mm nominal sizes graded as
a) Labour day 2.00
) perTable 600-1 @ 0.90 curn/cumof
Mate
concrete conforming to Clause 602.2.4. cum 405 00
Mazdoorskllled
day 15.00
day 35.00
) Coarse Sand as per lsi383 @ 0.45 curd Mazdqor
cum of @ocrete cum 203.00
) Cement @ '1 50 kg,lcum of concrete tonne 67.50 bl Machinery
hour hour 2.80
Road sweeper @ 1250 sqrn Per 18.00
Cost of water KL 48.00 hour
budet capacrty
) Front end loadet 1 cum
u"t"h mL Plant @
'175
d) Overheads @ % on (a+b+c) cJn*ii*ncr"tt hour 6.00
outlrl)
) e) Contractor's profit
cum Per hour (eflec{ive
hqrr 6.00
@ % on (a+b+c+d) Electric generator 250
KVA
hour 6.O0
sensor
) Slip lorm paver with elec'trqric
Cost lor450 Cum : a+b+c+d+e hour 36.00
watertanker
capaclty t.km 2415, I
Transit truck agitator 5 culr
) Rate per cum = (a+b+c+dre)r450
of'aniage to
Add '10 Per cent of cost
Note: Quantity provided for aggregate is for
) .over cost ol loading and doadrng
estimating purpose. Exact quantity shdll be hour 12.00
as per mix design. Concrete ioint cuttlng madine hour '12.00
) Texturing machine
6.2. 602 Cement Concrete Pavement
) Construction of un-reinforced, dowel jointed,
cl Matorlal
or cum 945'00
crushed stone coa6e ag(Fgates
plain cement concrete pavement over a
) ,5 mm and '12.5 mm nofiial size
-d
prepared sub-base with 43 grade cement coniorming
o.go cunvc" ot
"oncrde
@ 400 kg percum, coarse and fine agiregate
) toClause602 2 4 cum 473.m
clnforming to lS:383, rnaximu m she of coaGe c''forming-to
sand as perls:383 and
aggregate not exceeding 25 mm, mixed in a 0 45 crdcum or
Cbuse602'2'4 @
) batching andmking plant as per approved mix
concrete 414.00
design, transported to site, laid with a tixed ol tonne
cement43 grade @ 40ots/cum
) form or slip form paver, spread, compacted
conc'tete 9.45
and fnished in acontinuous operation including !'rs of graoe tonne
32 mm mild steel dowel
) provision of contraction, expansion,
s 240 1.17
construction and longitudinal.ioints, joint ller, t'bars ol grade tonne
separatizn membrane, sealant primer, joint
fi
i"l.-. o"to,*"d
"t""t
) s 415 sqm 3675.00
sealant, debonding skip, dowel bar, tie rod,
ieoaratlon uemurane ofmpermeable
admixtures as approved, curing compound,
sheeting 125 mir'0
) thick
Plastic
tinishing to lines and grades as perdrawing.

)
t85
t84
)
Rord Wo*!:6-C.m. ConcrcG payerlcnr

Road Work! : 6-Ccment Concrele Pav.ment


Sr. Reference to Descrlpfion
No. MoRT&H Unit Quantity Rate
Speclflcations Rs. Reference tg Descrlption Unlt Quantlty Rate
MoRT&H Rs.
Pre-rnoulded Joint
filter,25 mm
Speclfications
expansionioint
lilck,or sqm 16.33
Jointsealant 6.3.
603 Rolled Cement Concrete Base
kg 875.00
Sealant'primer
Plaslic sheath, 1.2S kg 1'16.67 Construction of rolled cement concrete base
mm thick for dowel sqm course with coarse and fine aggregate
46.67
Curhg cornpound
conforming to lS:383, the size of coarse
liter 1850.00 aggregate not exceeding 25 mn with
ff#J:,'ffe#HJ;',ffi[T* kg 2070.o0 minimum, aggregate cement ratio 15:1 and
minimum cement content of 200 kg/cum,
Cost otwater aggregate gradation to be as perTable600-4
KL 216.00 after blending, mixing in batching plant at
.1.
Add p€r cent of materlal optimum moisture content,-transpodng to
,or cost o, site. laying with a paverwith eleclronic sensor,
mrsceflareous-materials
like tarpautine, compacling with 8-10 tonnes smoolh wheeled
desstan cloth, metat
cap. cottonl vibiatory roller to achieve, the designed iexural
compEsslble sponge
and cradle fordov/el
oac. wo* bddges Ibr strength, finishing and curing.
rnen lo apfloach
:.y.,: *i,r.ut watktng ovor tt,
".r,t"""
cuttng blades and bdes, nrinoreq,iipnrnf
Unit = cum
xe scabbling machine, Taking output = 450 cum (990 tonne)
threads, ropes,
gutdewires and any
other unforeseen a) Laboul
Male day 1.20
Mazdoorskilled day 7.00
d) overh€ad8 @ % on (a+g+q; Mazdoor day 23.00

el Contr.cao.,B prorit b) Machlnery


@ % on 1e+6+qa6;
Front endloade|I cum bucket capacity hour 6.00
Cost for l0S0 cum
= a+b+cad+e Cement concrete batch mix plant @ 75

Rale Pcr csm


cum per hour 1
hour 6.00
E (.+b+c+d+cylo5o Electdc aenerator 100 lO/A llolrr 6.00

Note Paver with electronic sensor @ 75 cun hr. tloJr 6.00


:
Vibratory roller 8-1 0 t capacity hour 8.00
Water tanker with 5 km lead 6 KL capacity hour 8.00

;llp;:##il;1""""",r;lx Tipper t.km 990x1

Add 10 per cent of cost of carriage to


covercostof loading and unloading

t86

t87
I
) Road Wo*s | 6_C'm'd Concrc' Psvcmenl
Road wo*r : 6{cm.nt Concrctc Plvcmcot

) Unit QuantltY Rate


it DescrlPtlon
Sr. Reference to Descrlptlon Un Quantity Rate Reference to Rs
) No. MoRT&H Rs.
Et.
MoRT&H
No.
Speclfications Specifications
) ol
c) Material Suggestlve construction of B'selsllb-Base
Flyash
) Crushed stone coarse aggregates ot cum 405 00
6.5. Pavsment with Lean Concteb '
25 mm and 12.5 mm nominal size @ 0.90
lEing cement
Construction of baseJsub-base
) cum/cum of cgncrete conforming to
Clause602.2.3. sand. flvash and coarse aggregales
Iiooirtion"o r" P"' r'ble 4 of nc:
74-1979
) Sand as perlS:383 and conlorming to cum 203.00
Ini *t,n ,"t", content ratio' slump and
Clause 602.2.3 @ 0.45 cuny'cum of concrste
Ioiloi".riu" .tt"ngttt - defin€d tn the said
) Cement @ 200 kg/cum of concrete
Cost ol water
tonne
KL
90.00
48.00 i-"Ut". ri, pr"p"t"a in abatching and mixing
I nlni with a viratory roller
) d) Overheads @ % on (ar r+c)
"no
[-]o tonn""
"o.pr"t"o *ihin the time limit laid
""p,"ity7 6 3 of IRC:
In*n rio" Cf"u"" 74-1979'
) e) Contractor's p.ofit @ % on (a+b+c+d)
lin"trr",ion jointt ptop"ay fonEd
atthe end

cured lor 14 daYS' all as


Cosl Ior 450 cum = a+b+c+d+e .i J"r'" *ort,
) I[iiuo ,n ,nc, ,o-ts'9 and asPer approved
Rate per cum = (a+b+c+d+e)/450 plan9.
)
Note: The quantities lor cement, coarse aggregate Unit = cum
and fine aggregates are for estimating only. 450 cum (990 Elne
) The exact quantities will be as per mix design.
Taking outPut =

) a) Labour 1.12
6.4. Transition Section between Rigid and day
Mate 6.00
Flexible Pavements day
Mazdoorskilled
) Mazdoor
day 22.00
Due to change in the properties ofmaterials

) and'type of construction, a gradual


changeover from rigid pavement to flexible bt irachlnory hour 6.00
pavement is desirable to avoid any dama(re Front end loader 1 cum budet capaclry
) 75
at the butting joint. After provision of an cement concrete batch mixplant @ 6.00
hour
expansion joint in the cement concrete slab, cum Per hour 6.00
K/A hour
) the lhickness ofslab should be tapered to 10 Electric generato 100 6.00
sensor hour
cm over a length of 3 m towards the flexible Paver linisher with electror' 8.00
hour
) pavement. The deficiency of thickness Vibratory roller 8-lO tcaP'ty 8.00
hour
caused due to tapeing ofthe slab should be Watet tanker 6 KL caPacit' 990x1
t.km
) made up by the asphaltic layers. TiPPer lOtcaPacitY

Add 1 O Per cent ol cost of


€riage to
) Thequantities ol items should be worked out
u'Sading
based on the approveddesign anddrawings cover cost of loading and
and priced as per rates given under respeclive
) clauses for cement concrete and asphaltic

)
r89
t88
)
Rold Worb : 6-Can.nt
Cor.ar. p.vch.,,

Sr. Rold Wo*s : 6.Cemcnt Con@le Pav.m.nt


Reference to
No. Descripuon
MoRT&H
Unit Quan ty
Specltications Reference to Description Unit Quantity Rate
5r.
MoRT&H Rs.
No.
c) Materiat Specifications
cum 4OS.OO 6,G. Suggestive Cement - Flyash Concrete Pavement
;"ffi,rTs#"T;fl^fffltr#r
Construction of un-reinforced, dowel jointed,
cum 110.96 plain cement concrete pavemenl over a
tonne prepared sub-base with 43 g.ade cement,
ff-{-1ff*i=*.r*;, cum
67.50
91.54 coarse and fine agqregate conforminq to
lS:383, maximum size of coarse aggregate
ffiil#,,lnrirfl;l,gxml not exceeding 25 mm, replacing cement by
flyash to the extent of 15 per cenl and sand
d, ovsrhord!
@ % on (e+5re; by 1 0 per cent mixed in a batching and mixing
plant as per app.oved mix design, tra,isported
.) Contractor,s proflt
@ % on (a+b+6+6; to site, laid with a fix€d form or slip form piver,
Cost for4go cum spread, compacted and finished in a
: a+b+c+d+e
continuous operation including provision of
Ratr por cum G (a+b+c+d+oI45o contraction, expansion, construction and
Note ;

'*$;"r;#ffi I
longitudinal joints, joint filler, separation
membrane, sealanl primer, joint sealant,
debonding strip, do\,velbar, tie rod, admixtures
as approved, curing compound,finishing to
I lines and grades as perdrawing.

' J,,'fi:"""J""J,:,3;,*",,*" "n * "", Unit = cum


Taking output = 1050 cum (2415 tonne)

' a) Labour
Mate day 2.00
Mazdoor skilled day 15.00
H'lt","ffi:[*]iffl:##rtr; Mazdoor day 35.00

. b) Machlnery
ft H,j,lil:;:Tffi ff,,,il.",,iJT Road sweeper @ 1250 sqm per hour hour 2.40
Front end loader 1 cum bucketcapacity hour '!8.00
Cement concrete batch mix plant @ '175 hour 6.00
cum per hour (effectjve output)
Electric generator 250 l(/A hour 6.00
Slip form paver wilh electronic sensor hour 6.00
Watertanker hour 36.00
Transit truck agitator 5 cum capacity t.km 2415 xL

190

l9t
Road Wo.ks : 6-Cem.!l Concftte Pav.mcnl
Rosd Works : 6"C€ment Concrcc Psvcmeol

Description Unlt Quantity Rale


Sr. Reference to Descriptlon Unit Quantity Rate sr.
Reterence to
Rs.
No. MoRT&H Rs, MoRT&H
l'lo'
Speclfications Specltlcations

Add 10 percent of cost of carriage to cover c) contrictor'! prollt @ % on (a+b+c+d)


cost of loading and unloading
Cost for 1050 cum: a+b+c+d+e
Concrete.ioint cutting machine hour '12.00
Texturing machine hour 12.O4
Rato prr cum o (a+b+c+d+G),1050

c) Material Note : 1. The quantities for cemenl, coarse


Crushed stone coarse aggregates of25 mm cum 945.00 aggregate and fine aggregates are for
and 12.5 mm nominal size @ 0.90 curdcum estimating only. The exact quantities will
ofconcrele conforming to Clause 602.2.4. be as Per mix design.
Sand as per lS:383 and conforming to . cum 425
2. IRC:68-1976 may be relbned br guide-
Clause602.2.4
lines on the design of cement-flyash
CeflEr{ 43 grade tonne 357'
conclEte for rigid pavement construction'
Flyash conforming to lS:3812-'1966 (Part:l) tonne 109'
32 mm mild steel dower bars ol qrade S 240 toone 9.45 ' calculatlon ol Goment' sand and f,yash
16 mm deformed steeltie bars of grade S 415 tonne 1.',t7
c6mqnt
SepaGtion Membrane ol impermeable plastic sqm 3675.00
sheeting 125 micron lhick Cement @ 4OO kg/cum = 1050 x 400 =
Pre-moulded joint tiller, 25 mm thick for sqm 16.33 420 tonne
1 5 per cent of cement
to be rsplaced by flyash
expansionjoint
Jointsealant kg 875.00
:63 tonne
Sealantprimer kg 1't6.67 Balance cement = 357 tonne
Ouantity of flyash = 63 x specitic
gravi9 of
Plastic sheath, 1-25 mm thick for dowel baIs sqm 46.67
fiyash/specific gravity of cernent = 63 x2'25l
Curind compound liter 1850.00
Super plasticizer admixture lS marked as per kg 2070.00 3.15:45 tonne
9103-1999 @ 0.5 per cent by weight ofcernent
Sand
Cost ofwater KL, 216.00
x
Sand @0.45 cuny'cum of concrete ='1050
Add 1 per cent of material for cost ot 0.45 = 472.50 x 1.6 = 756 tonne
) 1 O per cent to be replaced
bY frYash
miscellaneous materials like tarpauline,
Hessian cloth, metal cap, cotton/ Ealance sand = 756 x 0.9 = 680 4 tonne =
) compressible sponge and cradle for dowel 680.4/1.6 = 425 cum
bars, work bridges for men lo approach Quantity ol flyash = (756-680 4) x specific
gravity of iyash/specific gravity of sand = 76.4
) concrete surface without walking over it,
cutting blades and bites, minor equipments )z.zstz.6at = a3.gt tonne (say 64 tonne)
) like scabbling machine, lhreads, ropes,
Flyash
guidewires and any other unforeseen items.
Total llyash = 45 + 64 = I 09 tonne'
) d) Overheads @ % on (a+b+c)

)
193
) 192
)
)
ChaPter'7 ,
Chapter-7 )
Reinforced Earth
GeosYnthetic and
Quantity Rate
Geosynthetic and Reinforced Earth Unit
P€. )
DescriPtion
Reference lo
Sr.
Preamble: No
MoRT&H )
Specifications
with Gootgxtiles
702 Subsu ace Drain
1. The speciflcations for geosynthetjcs which includes geotextiles, geogrids, geonets, geomembranes 1.1.
and geocomposites shallbe as persection 700 of MoRT&H Specifications. )
2
3
The geotextile proposed for sub-surface drain shallsatisfy the requirements given in Clause 702.2.3

Care shall be taken to ensure that the geotextile or core material is not exposed to dry light for more
$ir**ffilf#*# )
)
than a cumulative totalof50 hours.
lml{l*nxx:"ffi1:"'l'""'""':; )
4. Bitumen overlay shallfollow on the same daywhere paving tabric is laid. backfilling
excavation and

5 The size of mesh opening forgabions and mattresses laid with geogrids and geonets shallbe between Unit = Running
metr€ )
one metr€
35 mm and 100 mm. Taking output =
)
a) Labour 0.04
day
6. The size ofthe bouldeE shallbe at least 100 mm ordouble the size ofthe aperture whichever is larger. 0.25
Mate day )
Mazdoor skilled 0.50
day
7. The boulders shallbe laid in crates as per the methodology given in Clause 2503-3.
Mazdoor )
8. The usual size of gabions in aprons is 1 m x 5 m with a height of 600 mm and baffles at 1 m centers.

'rflry"-wrqr,ffi )

geotextile'
1.00
)
sqm
G€onets 1.00
sqm I
G€olI€mbrane sqm 2.@
Geotextile

j; jfl ,T[#il"":,ffi :,:i::'


",ry,

@ % on (a+b)
q) ovcrhoads
('+b+c)
4 Contnctotls PrPfft @ % on

a+b+c+d
Rate P€r metrs =

195

t94
t
nb
) Road work! : 74'!sFlh'ric rd Rddor€d E
Rod Worf, : TccGynthctic cld R.inforo.d E nlt

) Unit Ouantlty Bats


DescriPtlon
Sr. Reference to Oescription Unit Quantity Rate sr.
Releronce to Rs.
) No. MoRT&H Rs. llo' MoBT&H
Speclfications Speclllcatlons
Laylng Psvlng Fabrlc Beneath
) a
7G3
Nole: Surplus excavated materialto be used at site. 7.3.
Pav€ment Oveday
) Hence separate cost for disposat nol added.
labric with physical
Providino ard laylng pavirE
tack
) 7 .2. 702.4 Nar.ow Filter Sub-Surface Oraln ,""r*rn"no p"t f"ble 7O+2 over
a
"" grade bltumEn 8o-1oo
.-.'* or ,uring
) Conslruction of a nano^/ filter suFsurface drain Denelration, laid at lhe rate
ol I kg per sqm
con sisting of porous or perforated pipe laid in ',rver rgpaired sunac€
tiprouqhly cleaned and
-o,o*
) nanow trench surounded by a geotextjle filter
,". *t"'t""istant membrane and
fabric, with a minimum of450 mm overlap of .ii"i "
,"iur.oinq r"v"t
pavlng labric to be kee
fabricand installed as perClauses 702.3and f"fOhS and to b€ laid betols
) "i*r,"r.rlio "na
309.3.5 including excavation and backfilling. orooming and rolling ol
"."u"" "tt"* -"'
.rrt""-" * tt pneumatlc roller b maximEe
) Unit= Running metre length pavem€nt sunac€'
paving taUrt contaa with
Taking output = one rnetre
)
Unit = sqm
a) Labour Taklng outpd = 2800 sqm
) Mate day 0.04
Mazdoorskilled day 0.25 a) Labour day 0.80
) Mazdoor day 0.50 Mate
day 20.00
Mazdoor
) b) Materlal
Perforated geosynthetic pipe 150 mmdia metae 1.00 b) Mschlnory hor 2.24
hour
Road sweeper t 250 sqm Per 1.40
) Geotextile fi lter labric sqm '14 2000 sqm tlour
Pneumatic roller tonne'
Add 2 per cent cost ofmaterial for miscell o€r hour '1.68
) aneous item like synthetic cord 1750 sqm hour
B umen pressure distributor
per hour
) c) Overheads @ % on (a+b)
c) Materlal sqm 2940.00
) d) Contractor'6 profit @ % on (a+b+c) Paving Fabric
tonne 2.80
Paving Bitumen 80-100

) Rate per metre = a+b+c+d


d) overhesds o % on (a+b+c)

)
Note: Surplus excavated mater'alto be used at site.
s) Contractol's Prollt O * on (6+b+crd)
Hence separate cost for disposalnot added.

) Cost lor 2800 sqm = a+b+c+dto

Rato ler aqm {r+b+c+d+eY2800


)

)
t9'7
196
)
,
Road Worls : 7-C.osynthelic d Reinlbrced Earth Rold Wofts : ?'Ceosvnlhdic tod R'infor'cd
Edh

Unit Ouantity Rate


Reference to oescrlptlon Unit Quantity Rate DescriPtion
Sr, Reference to Rs
No. MoRT&H Rs. MoRT&H
Speclfications
Specifications
7.4. 704 Laying Boulder Apron in Crates of q contractor's p.ofit @ % on (a+b+c)
Synthetic Geogrids
Cost for 3 cum = a+b+c+d
Providing, preparing and laying of geograd
crated apron'1 m x 5 m,600 mm thick Rate per cum = (a+b+c+d)/3
including excavation and backlilling with
baffles at '1
rnetre interval, rnade with geogrids 3100 Reinforced Earth Structures
1.5.
having characterislics as per Clause 704.2,
joining 6ides with connectors/ring staples, lop Reiniorced earlh structures
have bur rnain
comers to be tie tensioned, placing of suitable cgmponents as under:
cross interval ties in layers of 300 mm
connecling opposite side with lateral braces a) Excavation for foondation' loundatlon
grooved
and tiedwith polymerbraids to avoid bulging, concrete and cem€nt concrete
lacing
constructed as per Clause 7M.3 filled with seating ln the foundation for
stone with minimum size of 200 mm and elernenG (facia rnatedal)
specific gravity not less than 2.65, packed with placement
b) Facia niaterial and itE
stone spalls, keyed to thefoundation recess elements
in caseofsloping ground and laid overa layer
c) Assembling, joining with tacing
laying of the reinbrcing eletnents
and
ofgeotextile to prevent migration of fines, all
ls to
as per Clause 704 and laid as per Clause O Earthfillwith granular materialwhich
2503.3 and approved design. be retained bY the wall

separalely as
Unit = cum Each comPonent is analysed
Taking output = 3.00 cum under

ofwall= I m
al Labour Considering average height
Mate day 0.06
Mazdoor skilled day 0.50 Assombllng, lolnlng lnd llylng ol
7.5. (i) 3102
Mazdoor day 1.50 tolnforclng olsmeots

A. Wlth r€lnforclng element


of 6teell
b) Material
Geogrids sqm 21.00 aluminlum strlPs'PolYmedc sttlPs
Connectors/Staples Each 50.00
Unit = Running metre
Polymerbraids rnetre 20.00
Taking output = 450 m
Stones with minimum size of 200 mm cum 3.45
Stones spalllor filling voids cum 0.45 a) Labour
day 0.36
Mate 6.00
day
c) Overheads @ 7; on (a+b+c) Mazdoor 3.00
day
Mazdoorskilled

198 199
Rold Wo?b : ?-c.oryrdlcric
lrd R.inforc.d E rrh

Rord Worti : ?4.osynltldic tnd RcinforEcd tsnh


Sr, Reference to Descrlp0on
No. MoRT&H Unit Quantity Rate
Specifications Reference lo Description Unit Quantlty Rate
Rs. 5r.
MoRT&H Rs.
No.
b) Materiat specifications
mm w jde 5
*'i"i:'ff "J""ff :T;r'o mm
a) Labour
Mate day 0.36
1 Galvanised carbon
steel skips
m Mazdoor day 6.00
450
Mazdoorskilled day 3.00
2 Copperstrips
oa m 450
3. Alumia;urn sklr. b) Synthetic Geogrids as per Clause 3102.8 sqm 300
m and approved design and specifications
ol 450
4. Stajnless steel strips
m Add 10 percent ofthe cost of reinforcing
450
5. elements (synthelic Aeogrids) tor
Glass reinforced polymer/ribre
m accessories like tie-strips, nuts and bolts
450
*,yrorpo,ymenc srnps and loops/lu9s for joining reinforcing
I,llo*d
gl A,1y ofle of the above
attemative rEy elernents with the facia panrlels, overlaps
be adopted as perapproved
design. and other protective elements br syntheic
geogrijs.
,o our cent or rhe cosr
lf1
renJorcing strip or
tolvards accessories
xxe tle-shps, nuts c) Overheads @ % on (a+b)
and bolts and bops/
€s rorFining rejnforcing elenEnb wiUi
Ire racra pannels. overlaps. d) Cont..ctor's profit @ % on (alb+c)
heat
boDding or exlehslon
Cost of 300 sqm of synthetic geogrids =
c) Overhead @ % on (a+b)
a+b+c+d

d) Cont.actor,s prorit Rate per cum = (a+b+c+d)/300


@% on (a+6+61
Costof4OO m 7.5. ('i) 31M Facing Elements of RCC
=a+b+c+d

Rate per metre Unit = sqm


=(a+b+c+ol)/450
Taking outpul = 75 sqm

" I':;;;tt" ..'", otsvnthetic


"tements a) Labour
Mate day 0.18
Unit = sqm Mazdoor day 3.00
Taking output Mazdoorskilled day 1.50
= 300 sqm

b) Machlnery
Light crane with ming oapacly upb 3 tonne hour 6.00

200

201
Ro.d Wo*5 : 7-C*osrrti.tic ,nd Reitrfor@d
Eanh
nh
)
Road works : T4eosynihcriclDd Reinfor!.d E

Sr, Referertce to Description )


No. Un it Quantlty Rate
MoRT&H Unit
Reference to Oescription Quantity Rate
Speciflcations Rs. sr.
MoRT&H Rs.
,)
No,
Specifications
c) Matsrlal )
Ple-cast RCC M-35 hcil4g
elemeots of sze cum 5. The earthfill to be retai{Ed is not included
13.50
aslerdesign and 18 cm thick for 75
sqm in this analysis. The sane is to be worked )
HYSD steet@ S kg/sqm tonne 0.38
out and provided sep{ately complete as

Add 2 pe. cent of cost of


per Clause 305. )
hcia pannets, for
all necessary temporary formwork, 6.
scafiolding and provision of loopslugs
For compaction of eadrrrvork, attention is
invited to Clause 311F.5 of MoRT&H
t
frcr
lflng ot pannets and joinlng the reinforcing Specifications.
elernents )
7. Length ol reinforcing stips will vary with
d, Ovcrtc.ds @ % on (a+b) the height of wall and will be as per )
approved design and dErvings.
e) Contractor,a profit
@ % on (a+b+d) )
8. The type of reinforciru elements to be
Cost for 75 sqm a+b+cld+e
= adopted shallbe as pe.approved design )
and specifications.
Rate per cum = (a+b+c+d+q)rs
9. The market rate Ior supply of reinforcing
)
Note : 1. The specification and
cohsbuction details elements and their accEsories are to be
adoptd shafl be as per Sedbn
to be
31OO ascertained from reputed frrms in the freld
)
of MoRT&H Specifi cations.
ofearth reinforcement

2. Drainage arraogement
)
shall be made as 10. The earthfill material dlall be clean. free
perapproved design
and drawings. lth fric.tion and low
draining, granular wittl )
cohesion, nontonosi\rc, coarse gEined
3. The quantity of tiler media
shall be w[h not 10 per cent ofparlicles passing )
calculated as per approved
design and 75 micron sieve, free of any deleterious
spectficalions and shall
be priced matter, chlorides, salt!, acids, alkalies, )
IFlFry. Ile r*e tr sallE b be adoobd
trom Chap(e. 1S.
mineralo , fungus and microbes and shail
be of specilied PH value.
)
4 Excav-ation for foundation
including 11. Capping beam is to bepriced separately
roundafion concrele
and groove in the as per approved desiln. The rate for )
toundation for seating
of bottom most cement concrete shallbe laken from the
racra panel and capping
catculaled as per design
beam to be chapter of su b-structuc in bridge section. )
and priced
separately. The rates for
round€tion concrele
excavation and )
shall be..aken hom
rhe chapter 12 & 13
in bridge section-
)

202
)
203
)
Rord Wor*r: ?-ccosynheric ,rd Reinfor..d E.rtfi

Sr. Refetence to Descrlpfion


No. MoRT&H
Unlt Quantlty Rate Chapter-8
SpeclflcaUons Rs.

Traffic Signs, Markings and other Road Appurtenances


12. The cost of reinforced earlh retaining watl
shall include foltowinq.

(r) Excavalion for foundation


including Pream ble:
backfitting
1. Rate analysis for fencing has been done for two differ€nt heights, i.e., 1.20 m and l.80 m. Any of these
(ii) Foundation concrete as perapproved can be adopted depending upon a particuhr situalior and design.
h,r,o
design
(iii)Cost of faciat pannels Rate analysis for fencing prgvides for three types as under:
and their
erection
a) Ba.bed wirefencing
(iv) Cost ofreinforcing
elements includino b) Welded steelwire fabric wilh mesh size of 75 x 25 mm
their fixing and joining with
the facia] c) Welded steel wire fabric ! ,ith mesh size of 75 x 50 mm
pannels.

(v) Drahage arrangement 3. Kerbstone layingand road marking has been provided for laying by mechanicalmeans
rncluding fi[er
medE as per approved design
and
orawngs. 4. Back filling offoundation of boundary pillaE has been proposed with stone spalls, tightly packed and
compacted.
13. The compacted earth filling to be
retained
shall icrm part ofembankment 5 The item pertaining to road traffic signals has not been analysed as this ls a specialized work and
rates can be obtained from firms having specialization for design and installation ofthis work.

6 For metal beam crash barrier, a 'W shaped beam of size 311 x 83 mm flange width made with
skuctural sleel corrugated plate 3 mm thick and having a length of 4.5 m has been provided, over a
channelpostof150x75x5mmwithaspacerofchannelsection150x75x5mm,330mmlong.

7 Printing of letters and signs on item Nos. 18 to 21 is required to be measured and paid separately. A
separale rate analysis for lettering has been preparedand included in this chapter lorthis purpose.

8. Two supports have been provided tor direction and place identilication signs where size is more than
0.9 sqm. Only ohe support is provided for size upto 0.9 sqm.

I The kaffic signs proposed are of relro-reflectorised typii nEde ofencapsutated lens type reflective
sheelrng fixed overalmunium sheeting as per ClausdE0'1.3 and installation.

10. The size, localion oftraffic signs shall be as per lRc:67

11. The analysis forrigid, semi-rigidand flexible crash baniershave been included

Provision has been made fora cranefor installation otoverhead signs

204
205
Road Wo*s : 8-Trafiic si8.t, Muki!8s dd other Road Appurttnac's

13. Separate rate analysis have been made for Tubular steel railing with RCC posts and MS steel posls. ChaPter'8
Appurtenances
Traffic Signs, Markings & Other Road
14 The organization and financialaspects are required to be finalized in consultation with administrative
I
and traffic authorities. I

Unit Quantity Rate


Reterence to Descrlption
15 The rate for the message display board for gantry mounted variable message sign is required to be Sr. Rs.
MoRT&H
ascertained from the markel, this being a commercially produced item by specialised firms. No.
specifications
16. The rate analysis for traffic impact attenuators at abutments and piers have been included.
408 Castln-Situ Cement Concreta M 20 Kerb
8.1.
17 ln the case ci road sign s and direction boards the depth ol foundation and quantity of cement concrete top
Construction of cement concrete kerb with
provided in the rate analysis are indicative. These may be suitably increased in areas of higher wind respedively'
and botttm wilh I 1 5 and 165 rnrn
velocities like coastal areas. in M 20 grade PCC on M-10
250 mm high
orade foundation 150 mm lhick, foundation
18 Ducts for Utility Services Along and Ac.oss the Expressway/Highway :
50 mm projectron beyond kerb
iavino-stone stone
tert laid wlth kerb laying machine'
The running metre cost ot ducl along the mad including inspec{ion chambers (where applicable) or all complete
foundation concrete taid manualv'
across the road will depend upon the approved design. The various item involved are earthen work,
as perClause 408.
plain cement concrete, brick stone masonry, reinforcement cement concrete, form work, steel
reintorcement, laying of pipe line (whe.e duct is ot pipe) and cast kon/RCC cover for the inspection
Unit = Running metre
chamber. The rate for these items are available under respective clauses which can be applied and
Taking outPut = 360 metre
running metre cost of d uct wo*ed out as per the approved design and drawing for particular situations.
ln case cast iron coverfor the inspection chamber, the rate can be ascerlained from the market for the
A. Using Concrete Mixer
size provided in thedesign and approved drawings.

Gement Concreto
19. Noise Barrie6:
Cementconcrete ofgrade M20 = 12 60
cum
ofgrade M10 for base
Cementconcrete
Noise barrier can be provided form ofa brick wallol a suitable heightas per the site requirement
in the
= 11.61 cum
and approved design. The iterns involved ilr the construction of thE bar,ier like earthwork, brick masonry, Total concrete = 24.21 cum
plain cement concrete, etc. are available in the Data Book, which can be applied to arrive at the cost
ofnoise barrier based on the design adopted.
a) Labour o.12
day
Mate
Altematively, wherever space permits, cluster oftrees, shrubs and plants can be grown by the road day 2.00
Mason '16.00
side 6 m away from the edge ofthe roadway. This will intercept the annoying sound waves and fumes day
Mazdoor
from road vehicles.

b) Machln€ry 6.00
hour
Kerb casting machine @ 60 metre/hour
hoor 12.@
Concrete mixer 0.48/O'28 cum capacity
hour 5.00
Water tanker 6 KL capacity

20'l )
206
Road Wo*s : 8-Tnrlic Si8ns, Ma,kinSs sd o0.r Ro.d Appurloanccs
Rord Worts : t-T6rfic Sigru, Marri,$ ui olh., Rold ApFncrirc.s
Sr. Reference lo Oescription
No. Unit Quantity
MoRT&H Reference to Description Unit
Sr. Quantity Rate
Speclflcations MoRT&H
No. Rs.
Specifications
c) Material
Crushed slone aggregate2O
mm nomlnal cum 21.79
d) Overheads @ % on (a+b+c)
size 59%
Coarse sand 30%
e) Contractor's profit @* on (a+b+c+d)
cum 10.9
Cement 11olo
tonne cost for 360 melre = a*b+c+d+e
Cost ofwater
KL 30.00
Rate per me(re = (a+b+c+d+c)/360
d) Ove.heads @ % on (a+b+c)
e) Contractor,s prolit
48 Cast-in-Situ Cement Concrete M 20 Kerb
@ % on (a+b+c+d) with Channel
Cost tor 360 metre = a+b+c+d+e E
Construclion of cement concrete kerb with
Rate per metre : (a+b+c+d+ef36o I channel with top and bottom width 115 and
'165 mm respectively, 250 mm high in M 20
B. Uslng Concrete Batchlng and Mixing grade PCC on M 1 0 grade fou ndation 1 50 mm
Pl.nt thick, kerb channel 300 mmwide,50 mm lhick
in PCC M 20 grade. sloped torards the kerb,
Cement Concrete
kerb stone with channel laid lith kerb Iaying
Cementconcrete otgrade M2O 12.60
= cum machine, foundation concrete laid manually,
Cemenl concrete ofgrade MIO for base
allcomplete as per Clause 408.
TotalConcrete = 24.21 cum
A. Using Concrete Mixer
a) Labour
Unit = Running metre
Mate
day 0.12 Taking output= 300 metre length
Mason
day 1.00
Mazdoor Cemenl Concrcte
day 2.00
b) Machinery Cementconcrete of grade M20 = 17.48 cum
Kerbcasting machine Cementconcrete ofgrade M l0 forbase = 23.l8 cum
@ 60 metre/hour hour 6.00 Total Concrete = 40.66 cum
Concrete batching and mixing plant
@ 1S hour 1.60
curdhr.
a) Labour
Water tanker 6 KL capacity day
hour 5.00 Mate 0.72
Tipper 5.5 cum capacity
hour 6 Mason day 2.00
c) Mazdoor day 16.00
Material
Crushed sione aggregate 2O mm nominal
cum 21.79 b) Machlnery
size 59%
Kerb casting machine @ 50 m€rre/hour hour 6.00
Coarse sand 30%
cum 10.9 for laying kerb and channel
Cementll%
tonne Ccncrete mixer 0.48i/0.28 hour 16.00
Cost ofwater
KL 30.00 Water tanker 6 KL capacity hour 6.00

208
209
.,ld olhct Rold ApDudcn&c's
Roid Wo*s : 8-Tlafiio SiSns' M!'tmgs
Road Work : t-Tnttrc Si8". Mad<itrgs lnd oth.r Ro.d APPurtc,Enc€s

Unit Quantlty Rate


DescriPtion Rs.
Sr. Reference to Descrlptlon Unit Quantity Rate' Reference to
sr.
No MoRT&H MoRT&H
Rs. No.
Specifications SpecifiGations

cum 36.59
c) Materlal ") Ilutii$ 20 mm nominal
Crushed stone aggregate 20 mm nominal cum 36 59 "'on" "nnresate
size 60% cum 18.3
size 60% Coarse sand 30% 9.0'1
bnne
Coarsesand 30% cum 18.3 cement 10% 36.00
KL
Cement'10% tonne 9.01 cost ofwater
Costofwaler KL 36.00
@ % on (a+b+c)
d) overheads
d) Ovcrfteads @ % on (a+b+c)
% on (a+b+c+d)
e) contractor's profit @
e) Contr.ctor's proflt @ % on (.+b+c+d)
Cost for 3OO metre = a+b+c+d+e
Cost for 300 rretre = a+b+c+d+e
(a+b+c+d+e)'300
Rate Pet metre =
Rate por mstrc = (a+b+c+d+e)1300
and Figures ol any
801 Printing New Letters
B. Uslng Concrete Batching and Mixing Plant Shade

Unit= Running metre


Taking output = 300 metre length '-lH1[:lJ::Hil1,,:,ffi ;[,:l;:i"":
slrduc
gNe an even
approved colour to
Coment Concrets
Cement concrete of grade M 20 = '17.48 cum
Cement concrete ofgrade M10 for base = 23.18 cum
TotalConcrete = 40.66 cum
' i:"*$::T;:ffi?i;li:l'1H$:i
be counted as hal0

ie
a) Labour letters of 16 cm height
Details for 1oo
Mate day 0.12
Mason day 1.00 letter
ll6noito-jlr cm heisht Per
Mazdoor day 2.00

8) Labour day o.12


b) Machlnery Mate day 2.00
Kerb caslng machine @ 50 metre/hour hour 6.00 Painter day 1.00
for laying kerband channel Mazdoor
Conctete batching and mixing plant @ 1 5 hour 2.70
currhr. b) Material Litre 0.7
Water tanker 6 KL capacity hour 6.00 Paint
Tipper of5.5 cum capacity hour 6.00

2l I
2t0
t
E--------
Roa, Wo*!: E-TEmc Sitns, M.*ings ed olhcr Road Appurrcmnc.s
Road Work : 8-Trarlic Signr, Mrrkirp .nd odl.f Rord Appun reccs
Sr. Reference to Descrlption
No MoRT&H Unlt Quantity Rate
Speclflcations Reference to Description Unit Qua ntity Rate
Rs.
MoRT&H Rs
c) Overheads Speciflcations
@ % on (a+b)
801 Retro-Ref lectorised Traff ic Signs
d) Contractor's protit 81.
@ % on (a+!+sy
Providing and fixing of retro-reflectorised
Cost for J600 cm a+b+c+d
= cautionary, mandatory and informatory sign
as per IRC:67 made of high intensity grade
Rato per cm helght per letter E
(a+bac+d)/ sheeting vide Clause 801.3, fixed over
aluminium sheeting, 1.5 mm thick supported
on a mild steel angle iron post 75 mm x 75
li) Eoglish.nd Roman mm x 6 mm firmly fixed to the ground by
Hyphens and t}le like not
to be rneasured means of properly designed foundation with
and pald for
M 15 grade cement concrete 45 cm x45 cm
Detailfor .16 x 60 cm, 60 cm below ground level as per
1O0 letters of cm heiqht i.e
1600cm approved drawing.
Unit = percm height per
letter
Unit = Each
a) Labout Taking ouFut= one trafrc sign
Mate
Painler lst class
day 0.o7 i) Excavation for foundation cum 0.216
t azdoor
day ii) Cement concrete Ml5 grade cum 0.12
day 0.50 iii) Palnting angle iron post two coats sqm 0.43
b) Materiat
Painl a) Labour (For fixing at site)
Litre 0.5 l,4ate day 0.0'1

c) Overheads o/" on (a+bl day 0.25


@
d) Contractor's profit b) Materlal
@ % on(a+b+6; Mild steel angle iron 75 x 75 x 6 mm k9 19.00
Cost for 1600 cm a+b+c1d
= Aluminium sheeting fixed wath encapsulated
lens type reflective sheeting of size
Rate per cm helght per lofter including lettering and signs as applicable
= (a+b+c +d)/i600
Add 2 per cenl ofcostofangle irontowards
cost ofd.illing holes, nuts, bolts etc.

i) 90 cm equilateraltriangle sqm 0.35


OR

ii) 60cm equilateral triangle sqm 0 156


OR

212
213
Ro0d Wod(s : t-Taffic Sigrs, Mrrtios ,nd ottlct Road Appunmanc.s
Road work : 8-Tmflic Signs, M.rkin8! md othd Road Appuden.nc.s
S.. Reterence to Descrlption
No. MoRT&H Unit Quantity Rate Reference to Descriptlqn Unit Quantlty Rate
Specifications ir.
Rs. MoRT&H Rs.
lo.
Specifications
iii) 60 cm circular )
sqm 0.283
OR E.5.
80'1 Direction and Place ldentlficatiofl Signs
upto 0.9 sqm Size Board
iv) 80 mm x60 mm rectangula.
sqm 0.48
OR Providing and erecting direclion and place
identilication retro-rellectorised sign as per
t4 60 cm x 45 cm rectangular
sqm 0.27 IRC:67 made ofhigh intensity grade sheeting
Or vide Clause 801.3, fixed over aluminium
vr) 60 cm x 60 cm square sheeting, 2mmlhickwitharea notexceeding
sgm 0.36 0.9sqmsupported on a mild steelsi.gle angle
OR iron post 75 x 75 x 6 mm fnnly fixed to the
vnJ 90 cm high oclagon
sqm ground by means of properly designed
0.672
foundation wilh M 15 grade cement conc.ete
c) Machinery 45 x 45x60cm,60 cm belowground levelas
Tractor{rolley per approved drawing.
hour 0.01
d) Overtcads @ % on (a+b+c) Unit = sqm
Taking output = 0.9 sqm
o) Contr.ctorb profit
@ % on (a+b+c+d)
Rate per trafflc sign (l)+ll)+lll)+a+b+c+d+e)
l) Excavatlontortoundation cum 0.216
= ii) Coment concrete M 15 grade cum o.12
Note : 1. Any.one area ofaluminlum iii) Palnting angle lron post two coats sqm 0.43
sheeting given
ar (,) to (vii) may be
adoptea as pli site a) Labou. (for lixlng at site)
and in accordance with
fi:l':;-"" Mate day 0.01
Mazdoor day 0.20
2. Rate tor excavation, cement
concrete \
u tc and painling may be taken from b) Materl.l
respedive cfiapGrE. Mlld steel angle iron 75 mm x 75 mm x kg 19 00

3. 6 mm, 2.85 metres long


The depth of foundation
and quantity ot
cement concrete in tie
foundation are Aluminium sheeting fixed with sqm 0.90
hdtcative. Thes€ may
be increased,or encapsulated lens type refleclive sheeting
areas having higherwind
vebcities like in ofsize 0.9 sqm
coastalareas. This is appltcable
to a[ road
stgns and direclion boards.
Add 2 per cent of clst of matedals for
drilling holes, nuts. bolts, fabrication etc.

214
215
) Road Wotu : 8-Trlffic Sigru, M,kin8s d oth.r Road Appud.nancd 8-Tnfic Sig'rs' M"kingr md o$cr lotd Appurtcnmcts
Rord Wo*s :

Unit Quantlty Rate


Reference to Description Unit Quantity Rate DescrlPtion
Sr. Referenca to Rs,
Sr.
)Ho MoRT&H Rs. MORT&H
Specltications No.
Specillcatlons
cum 0.43
c) Machlnery Il Excavatlonforloundatlon
grade cum 0.24
) Tractor-trolley hour 0.02 li) Cement concrete M 15 sqm 0.86
angte lron post2 coats
iill Patnting
) d) Overheads @ % on (a+b+c) I
sltel
a) Labout (irfixlng at
day 001
) e) Contraclor's profit @ % on (a+b+c+d) Mate
day 0.3
Mazdoor
Cost ior 0.9 sqm = i)+ii)+iii)+a+b+c+d+e
) hl Material
Rate per sqm (for slgn havlng area upto
"' rr,,!il-"r""r"ngr" iton 75 mm
x 75 mm x kg 38.00

) 0.9 sqm) = l)+10+lio+a+b+c+d+e)/o.g 6 mm. 2 85 metre long,


2 nos

1.50
) Note : Lettering and anow marks on sign board Alumlnium sheeting fixed
with encapsu- sqm

Ialed lenstype reflective sheeting


to be provided separately as per actual
) .equiremenL Rates lor these ilems have
materials for
been analysed separately. Add 2 per cent ol cost ol
elc'
) Oriffing hof"", nuts'
bolts' fabrication

2. Rate for excavation, cement concrete


) M 15 and painting may be taken from c) Machinery hour 0.02
respective Chapters. Tractor_trolley

) o/o on (a+b+c)
801 Directioh ahd Place ldentification Signs d) Overheads @
) with slze more than 0.9 sqm size Board
1( on i)+ii)+iii)+
e) Contractor's prolit @
Providing and erecting direction and place (a+b+c+d)
) identilication retro-reflectorised sign as per
IRC:67 madeofhigh intensity grade sheeting Cost for 1 .5 sqm = i)+ii)+iii)+a+b+c+d+e
) vide Clause 801.3. lixed over aluminium
I
[*[:Jil,.").jill,tf."i:l;'fi ff I:"
sheeting,2 mm thick with area exceeding
) 0.9 sqm supported on a mild steelangle iron
post 75 mm x 75 mm x 6 mm, 2 Nos. firmly
) fixed to the ground by means of properly Note: 1' Lettering and anow rnarks
on sign board

designed foundation with M l5 grade cement separately as per aclual

) concrete 45 cm x 45 cm x 60 cm, 60 cm "i"iir""O


requirement Rates for hese items
have

below ground level as per approved drawing. been analysed sbparably


) conqete
Unit = sqm 2
- Rate ior exiavation' cement
taken rom
may be
) Taking output = 1.50 sqm M 15 and Painting
respec,tive chapters

)
)
2t6
I 211
)
App{ncn$"s
Signs' Mating' ud o$ct Rotd )
Rord Wo*! : 8'Tnfiic
Rold Workr : 8-Tnmc Si8N, Matki.gs 6d othe. Rotd APpurtcnuces
--7 DescrlPtlon
U ntt Quantity Rate
Rs.
)
Reference to Description unit Quantity -*- Reference to
Sr.
No. MoRT&H Rs.
5r.
'11o. MoRT&H )
Speclfications Specifications
d) Overhoads @ % on (a+b+c) )
802 Ove,head Signs
@ % on (8+blc+d)
o) conttacto"s Protlt )
Providing and erecting overhead signs with a 3 (a+b+c+d+€)
conosion resistant 2 mmthickaluminium alloy Rate Per tonno ,
Slgn
sheetwith high intensity grade retro-reflective Plate lor Ovsr Hcad
sheeting of encaosulated lens type ryith vertical B. Alumlnlum Alloy )
and lateralclearance given in Clauses 802.2
unit = sqm
and 802.3 and installed as per Clause 802.7
TakingoutPut=1sqm
)
over a designed support syslem of aluminium
alloy or galvanised steeltrestles and trusses
a) L.bour day 0.02 )
of seclions and typeas per structural design
Mate day 0.'1
requirernents and appfoved plans.
Bbcksmith day 0.15 )
A. Truss aod Vertical Support Mazdoo(
)
sqm 1.00
Unit = tonne
Taking output = 'l tonne ' I'#[h,*t l;"ffi ]]:ff JT'i' ,
a) Labour clause 80'1 3 )
Mate day 0.24
Blacksmith day 2.00 )
Mazdoor including for handling and fixing
at site
day 4.00
x"inrlr:nxl,",#:$JTH )
c) overhe.ds @ % on(8+b)
b) Matcrlal
@% on (8+b+c)
Aluminiumalloy/galvanised steel including tonne 1.05 O Cootractor's Prollt
5 per cent wastiage
' (a+b+c+d)
Rats por sqm
Add 1 per cent on cost of material br nub,
bolts and drilling and weHing consumables Note :
'
Add 15 per cent on cost of material for
fabrication of trusses as per approved #i****#*:*:,;:;j'lt
design

c) Machlnery
Crane 3 tonne capacity hour 3.00
Tn ck hour 0.50

219
218
Rord Wo*s : 8-Tnflic Si8o5,
Mt*ings utd olh'r Rotd A@un'n$c€3
no6d Worts : 8-Tr!m. Sigs, Markings lrd oihc' Road Appu^€mnc.s

U nit Quantity Rate


DescriPtion
Reference to Rs.
Sr. Reference to Descriptlon Unll Quantity Rate sr.
MoRT&H
No. MoRT&H Rs. No.
Specifications
Specitications
803 Palnting on Sleel Su"'ces
2. Lettering and arrow marks on sign board 8.9.
to be provided separately as per actual coats ol ready mix
) requirement. Rates for these items have
Providinq and apptying two
surface aner
oaintol approved brand on steel
been included separately in this chapter. togive an even
) ihorough cleaning of surlace
shade.
8:8 803 Palnting Two Coats on New Concrete
) SuIfaces Unit = sqm
I Taking output = 10 sqm
Painting two coats after filling the surface with
synthetic enamel paint in all shades on new a) Labour 0.03
) plastered crncrete surfaces. day
Mate 0.45
day
Painter 0.25
,) Unit = sqm Mazdoor
day
Taking output = 40 sqm
) bl lVlaterlal
a) "' brand litre 1.25
Labour ar"it"ro, .,t"0
) Mate day 0.12 "PProved
Painter day 200 Add @ 1 per cent on cost of materialfor
) Mazdoor day 1.00 scaffolding

b) Materlal @ % on (a+b)
,l Painl contorming to require[€nt ofolause Litre 6.00
c) Overheads

803.3. Contiactor'6 prolit @ % on (a+b+c)


) O
Add for scafiolding @ 1 per cent otlabour sqm = a+b+c+d
Cost lor 1O
) costwhere required
6qm = (a+b+c+d)'to
) c) Overheads @ % on (a+b)
Rate Per

803 Palnting on Wood Surfaces


) d) Contractor'6 profit @ % on (a+b+c) 8.10
ol ready mix
Providina and applying two coats
I Cost lor40 sqm = a+b+c+d ura"o on wood surface afler
""l"i"irrp.'"a
itroroughcteaning ot surface
to give an even

) Rate pe. sqm = (a+b+c+dy4o


shade.

) Unit = sqm
Taking outPut = 10 sqm
t)
,) ,'r l
220
)
I
Rod Wo*r : 8-Tnnic Sigs,
Markirs! .nd o6cr Road Appurr€,anc.s

Road Wo*s : 8-Tr!fiic Signs, Markings and ofi.r Road Appunenanes


Sr. Reference to
No. MoRT&H
Oescrlption
Unit Quantity
)
Rate
Specifica ons Reference to Descrlption Unit Quantity Rate
Rs. MoRT&H Rs, )
a) Labour specifications
Mate
,
day b) Materlal
Painter 0.03
day Road marking Paintas per lS :164 litre 148 )
Mazdoor 0.50
day o.2C c) Overheads @ % on (a+b)
bl M.te.trt )
Paint Eady mixed o;approved d) Contractor's prolit @ % on (a+b+c)
brand Lilre 1.50 )
Cost for 10 sqm = a+b+c+d

*k?;;' *" "' *"t or materiar'ror


Rate pe. sqm = {a+b+c+d)/10 )
c) Ovorhr.dr @ ./. cn (a+bl ii) LJpto l0 cm in width )
Unit = sqm
d) Codractor,s p.oflt
@ % on(a+b+c) Taking output = l0sqm
)
Cost for.lO sqm a+b+c+d
= a) Labou, ,
Mate day 0.07
Rate per sqm E (a+b+c+d)/10 Painter day 0.3s )
8.11. 803 Mazdoor day 1.35

;:}Tfl ilr;.T'ff ,rro,vs, ctc. 61


b) Materlal
)
Road marking paint litre 148
Painting lines, dashes,
arows, etc.. on roads
)
rn rwo @ats on new
wofi with ready mlxed c) Overheads @ % on (a+bl
road marking paint confo_ing
to tS,tS+ on
,
orrumrnous sudace, d) Contracto.'s prcfit @ % on (a+b+c)
including cleanino the
otrer.re.rr niner' Cost for 10 sqm = a+b+c+d
)
;:RT:i,:1i:H:"i::d
Rate per sqm = (a+b+c+d)/'10 )
l) Oyer .10
cm h wtdth
8.12. 803 Painting Lines, Dashes, Arrows, etc. on I
Unit = sqm Roads ln Two Coats on Old Work
Taking output
= 10 sqm
Painting lines, dashes, arrows, eic. on roads )
a) Labour in two coats on old vtork with ready mixed
Male road marking paint conforming to 15:164 on )
day 0.09
Painter bituminous surface, including cleaning the
Mazdoor day 0.55 surrace of all di( dust and other icreign matter, )
day 1.55 demarcation at site and trafficcontrol.
)

222
)'
I 223
)
,
) Rod Wo.*i : s-T'amc
s&ru, Mr.tinst .od ottcr
t--
Ro.d Appirrimu,c€s

) Sr. Reference to Rodd worb : 8-Tnf,ic Si8Ds, itutiDs3 .nd olt r Ro.d Ar?',n nuccs
No.
Description
MoRT&H Unlt
) Specifications
Quantity
SL Bolerence to Description Unit Ouantity Rate
)
i) Over lO cm in wldth
E l{o MoRT&H
Specillcatlons
Rs.

)
Unit = sqm 8Gl Road Marking wlth Hot Applled Thermo-
8.13
) Taking output
= 1O sqm plastlc Compound with Rerleclorislng
Glass Beads on Bltuminous Surlace
) a) Labour
Mate Providing and laying of hot applied
Painter lst class day 006 lhermoplastic compound 2.5 mm thick
) Mazdoor day 030 including reflectorising glass beads @ 250
day 1.25 gms per sqm area, lhickness o12.5 mm is
) b) MatErlal exclusive of surface applied glass beads as
Road marking paint per IBC:35. The finished surlace to be level,
) Litre 0.90 unifom andfrce from slreaks and holes.
c) Overheads
) @ % on (a+b)
Unit = sqm
d) Cortractor! prorit Taking outpul = 640 sqm
) @% on (a+b+c)
Cost for 1O sqm = a+b+c+d o) Labour
Mate day 0.50
-) Rate persqm = (arb+c+d)/10
Mazdoor day 2.&
) li) Upto lO cm ih width
b) Machinery
Unit = sqm Road marking machine @ 80 sqm per hour hour 8.00
') Taking output
= 1O sqm
Tractor-trolley lDur 8.00

) a) Labour c) Materlal
Mate Hot applied thermoplaslic compound Lilre 2000.00
) Painter lst class day o.o7 Ref lecto.ising glass beads kg 200.00
Mazdoor day 0.3s
) day d) Overheads @ % on (a+b+c)
b) Materiat
) Road marking paint e) Contractor's prorlt @ % on (a+b+c+d)
Litre 090
c) Cost lor 640 sqm = a+b+c+d+e
, Ovo.heads
@ oZ on (a+bl

d) Conlractor,s protit nate per sqm = (a+b+c+d+eY640


./o on (a+b+c)
_) @
Cost fo|lo sqm Nole: A sealinq primer may be applied in advanc€
= a+b+c+d
,, on cement concrele pavemenl to ensure
Rate pe. sqm (a+b+c+d)/tO propor bonding. Any lailanca andor curlng
=
) compound to be rsmoved where paint is
required to be applied on @ncrsle surfa@.
224
)
225
olhcr Rord Appun'narc's
'
Road Worts : 8'T6flic Si8 ' Mlrkiogs 'nd
Road Wo*s : 8-Trallic Si8n5, Mskinss md olhc. Road ApPunenances

Unit OuantltY Rate


DescriPtion Rs.
Reference to
Sr. Reference to Description Unit Quantity Ratd
MoRT&H
No MoRT&H Rs.
Specifications Specifications
stone (precast)
li) ordlnary kllomstre
2. Cost of painter is akeady included in hire
charges of road marking machine.
unit = Nos.
Nos
4.14. Taking outPut = 14
804 Kllometre Store
cum 3.77
Reinforced cement concrete M 15 grade k9 26.32
kilornetre stone of standard design as per cum 2.77
11.41
IRC:8-J930, fixing in positjon including painting
and printing etc. ilf{',ui*t-"'"'.'s**:."
r' Post (average
sqm
per cm 1680
Ii r.n
t-"tt"ang on
oacn)
per letter
i) sth kilometre stone (precast) lettoB ol lo cm holght

lixlng
LJnit = Nos. TransPortation tnd
Takingoutput=6Nos.
0 Labour day 0.32
a) M 15 g.ade of concrete cum 2.35 Mate day 1.00
b) steel reinrorcemen( @ 5 kg per 8qm kg 22.O8 Mason day 7.00
c) Excavalion ln soil for foundation cum 1.68 Mazdoor
d) Paintlng two coats on concrete su ace sqm 9.85
e) Lettering on km post (average 30 percm 1800 g) M.chln€ry hour 6.00
letterE of l0 cm helght e.ch) perletter Tractor-folley

Transportation and fixing


h) ovorfieads @ % on (f+g)
l) Labour
Cont actor's prolit @ % on (l+g+h)
Mate day 0.26
I
Mason day 0.60 km stone =
Costior'14 Nos ordinary
Mazdoor including loading/unloading day 6.00
(a+b+c+d+e+I+g+h+i)

g) Machinery Etone a
Rate lol aach ordlnary km
Traclor-t olley hou.s 6 00 )

1q+b+c+d+e+l+g+h+llll4
h) Overheads @ % on (f+g) (Prscast)
iil) Hectomotro stone
l) Contractor's profit @ % on (t+g+h)
Unit' Nos'
33 Nos'
Cost for 6 Nos. 5th km stone = Taking output =
a+b+c+d+e+f+g+h+i

Rato for each sth km stone =


(a+b+c+d+e+f+g+h+0t6

2?'l
226
)
Rord Worl(s : 8-Trit[o SigB,
tvfirtdrgs rnd olh!! Road Appuncmmes
)
Rold Wo*! : 8-Tnmc Si8ns, Markings lnd othcr Rold AppM.nlnccs

) Sr. Reference to Descrlption


Unlt Quantlty
No. MoRT&H Rate
Reference to Descriptlon Unit Quantlty Rate
) Speclfications Rs. sr.
MoRT&H Rs
No.
a) M 15 grade of concrete Specifications
) b) Steel rolnforcement 5 kg p6r
cum '1.58

@ sqm k9 Unit = Each


66.00
) c) Excavation in 6oll for foundation
cum 1.39
Takingoulput = 30 Nos.
d) Painting two coats on concrcte surface
sqm a) Labour
) e) Lettering on km post (average i tetter per cm
6.27
Male day 0.040
330.00
of t0 cm height oach) MazJoo. tor fixing day '1.00
per letler
)
Transportation and rixlng b) Materlal
) Costof approved type ol delineators trom Each 30.00
f) Labour ISI certified fim as perthe sbndard draring
Mate given in lRCi79
,,) day 0.34
Mason
day 1.5
Add 1 0 per cent cost of mate.ial for installation
) Mazdoat
day 7.00
g) Machinery c) Ovorteadr @ % on (a+b)
) Tractor -trolley
hour 6.00 d) Conu.ctor'. profit @ % on (r+blc)
) h) Overheads @ % on (f+g+h)
Rato per dslln€atora E (a+blc+d)
i) Contractor's profit
@ o/. on (t+gl
) Note: ln case of sofr ground, a proper foundation
Cost ror 33 Nos. Hectometre may be provided as per approved design. ln
stone =
) a+b+c+d+e+f+g+h+i case loundation is required to be provided, the
items ofexcavation and foundation concrete
Rate for cach Hectomctre 6tone
) (a+b+c+d+e+t+g+h+i)/33
=
are required to be measured and paid
separately.

) Note : Therale for excavatron, cement


concrete sleel
8.16. 806 Boundary Pillar
rernrorcement, painting and
lettering may be Reinicrced cement concrete M 15 grade
) taken from respective chaplers
boundary pillars of standard design as per
805 Road Delineators IRC:25-1967, fixed in position ancluding
,.1s
f nishing and lettering but excluding painting.
Supplyjng and instaltatron of
) delineators (road
way indicators, hazard markers.
Unit = Each
obtect Taking output = 57 Nos
markers), 80.'r00 cm high
) above ground levet,
parnted black and white
in .lS cm widestrips, a) M 15 grad€ otthe bound.ry 6tone cum 1-25
,lttedwith 80 x ,OO mm
rectangular or 75 mm b) Stosl rolnfor€sment kg 79.80
-t ora.crcular reflectorised panels
at the top. c) Ercavatlon ln 8oll cum 10.72
buried or pressed into the ground d) Lettering, oach 10 cm hlgh pei:etter 2280.00
and
) conforming to IRC:79 and the
drawings. Per cm high
Transporlation and fixing

228
229
)
tnd oitt€t Road Appll.tclt.bca3
Sistq Msrtingr
Road Worl€ : 8-Tnmc Sigff, M.,kinss lnd other Road Appu.t{ances Rotd works : 8'Trlffic )
Quantity Rate I
U ntt
OescriPtlon Rs. )
Sr. Reference to Description Unit Quantity Retelence to
No. MoRT&H
Specifications
kt MoRT&H
SPec ifications
a) Labout day 0.09
o) Labour
Mate day 0.25
Mate day 0.57
Bhcksmith day 2.00
Mazdoor day 14.25
Mazdoor
0 Machinory
Tractor{rolley hour 6.00 o' kg 31.42
rensth @ e 38 ks
g) Materlal
Illolll'* t'u
'""tre
per 100 metre
Stone spall cum 11.97 80.5
ks
h) Overheads @ % on (a+b+c+e+f+g)
i) contracto.'s protit @ /. on (a+b+c+
};;:;5'lfihu;;l#'*r
6+t+g+h)

Cost for 57 Nos. boundary pillar = a+b+c+d liH:';:f"iSlHHi:ffi:i"


+e+f+g+h+i
2.11
t' tfllflfl? expos€d sqm
Rata for gach boundary plllar = (a+b+c+d * -"" " pair{ins
oo

+e+f+g+h+l)r57 .urf"ca of angle tron Poss


Note ln case of sofr ground, a proper foundation % on (a+b)
may b€ provided as perapproved design. ln 4 oveths.d3 @
case foundation is required to be provided, the @ % on (arb+d)
items of excavation and foundation concrete G) Contnctot'5 Piofit
are required to be measured and paid fencing = a+b+c+d+e
separately. Cost lor 30 metre )
! (a+b+c+d+o)130
a.'l.7 . 807 G.l. Barbed Wire Fenclng 1,2 Motre High Rato i3r mstre )
Providing and fxing 1.2 metres high Glbarbed
wke fencing with 1.8 m angle iron posis 40 Note: )
mm x 40 mm x 6 mm placed every 3 metres
centerto center bunded in M I5 gEde cement
concrete, 0.6 metre below ground level, every
tlitt',*l***,'uri*
respective chaPteE'
15h post, last but one end post and comer
Hlsh
post shall be skutted on both sides and end Fenchg t'8 Metrc
807 G.l. Barb'd wl'o
post on one side only and provided with 9 8.18.
horizontal lines and 2 diagonals inlerwoven
wilh horizontal wires, fixed with Gl staples,
tum buckles etc. complete as per Clause 807.

Unit= per running metre


Taking output= 30 metre
$**ffi*"f"*I
23],
230
I
X.osd Worts : 8-Tnflic Sisrs, M!*ings &nd o0l.r Ro.d Appun n,nc.s
Road wo*s : t-T6fiic Sigrs, Mlrtig, .ad ooE Rold Appude.o@s

Sr. Reference to Description


No MoRT&H Unit Quantity Rate
Sr. Reference to Description Unit Quantlty Rate
Specifications Rs. MoRT&H Rs.
No.
Specifications
concrele, 0.6 rnet e below ground
level, every
1sn post, last but one end post
and corner Note : Cost of excavation lor foundation and
post shall be strutted foundation concrete to be added separately
on both sides and end
post on one side only in the cost estimale as per approred design.
and provded virith 12
horizontal lines and 2 diagonals The rate for these items may be taken fron
interwoven
with.horizonlal wires, fixed with respective chapters.
Gl staples,
lum buckles etc. comptete as perClause gO7.
8.19. Suggestive Fencing with Welded steol Wre Fabrlc
Unitr perrunning metre 75mmx50mm
Taking output = 30 rnetre
Providing 1.20 metre high fencingwith angle
I a) Labour iron posts 50 mm x 50 mm x 6 mmat 3 metre
Mate center to centerwith 0.rO rnetre embedded in
day o.12
Blacksmith M 1 5 grade cement conctete, cor.Er, end and
day 0.40
Mazooor every 10h post to be sbutted, prcvided with
day 2.50
welded sleel wire tabric of 75 rnrn x 50 mm
b) Materlal mesh or 75 mm x 25 mm mesh and lixed to
Barbedwire42S meke tength iron posts by flat iron 50 x 5 mm and bolts
@ 9.38 kg kg 40.15
per 100 rnetre etc. complete in all respects.

Ms-angle iron 50 mm x SO Unit= Running metre


mm x 6 mm, kg 1s2.00
33.8 metre in tength Taking output = 30 m
@ 4.5 kg per metre

Add for_ Gl_staple, bindrng


wire, drilling a) Labour
holes etc. @ 2 per cent of
fhe cost of
Mate day 0.12
materiel Welder day 1.00
Mazdoor day 2.00
c) Palnting
Applying two crats of painting
on exposed sqm
b) Material
sunace ofangle iron posls 3.96 i) Angle iron for posts 50 x 50 x 6 mm kg 106.00
ii) Runner flat 50 x 5 mm kg 26.00
d) Overheads @ % oh (a+b) iii) Welded steelwire fabric 75 x 50 mm kg 151.00
mesh @4 kg/sqm, 4 x 30x 1 2 + 5
) e) Contractor,6 protit ./. on (a+b+d) percentwastage
@
OR
) Cosl for30 metre fencing: Welded steelwke fabric 75 x25 mm kg 293.00
a+b+c+d+e
mesh @ 7.75 kg/sqm, 7.75 x30 x 1.2 + 5
) Rate per metre fencing
= (a+b+c+d+e)/30
percent wastage

)
) 232
233
M'rtings ond o6er Road ApntrEnanccs
Rosd wo*s : E-Tlr Iic SiFs, Markings ,nd olttcr Rotd Apputr€na.es Road Wo*s : 8-Trsffic Sisos'

Unit Quantity Rate


Sr. Reference lo Oescription Unit Quantity Rale Reference to
DescriPtion Rs.
sr.
No. MoRT&H Rs. MoRT&H
No.
Speclfications Speclfications
(6 Nos') cum 1.296
Add 2.5 per cent of cost of material for i) Excavatlon lorfoundation
drilling holes in angles, flats, splitting angle 6r0.6x0.6x0'6
at bottom, nuts and bolts and welded cum 0.648
li) Foundatlon concr€te M l5
gradE
consumables
PCC6x0.6x0'6x0'3
sqm 4.71
c) Machinery lll) Palntlng of PlPe
sqm 2.16
6 Nos
Tractor-trolley hour 0.10 ivl paln nq olchannel sectlon '
' t3 metie each 0'2 x 1'8 x 6 =
2'tG

d) Palntlng
at 6ite)
a) Labour (for flxlng
Painting two coats including priming sqm 8.00
t Mate
day
day
0.01
0.25
e) Overheads @ % on (a+b+c) Mazdoor
day 0.01
Pbmber
0 conlractor's prolil @ % on (a+b+c+e)
-'
bl Material
Per mk 30
Cost for 30 metre = a+b+c+d+e+f iJ p,pu so ,' "xternaldia
as

lS:1239
Rate per met.e = (a+b+c+d+e+0/30 99.36
(ISMC senes) kg
Medium weight steelchannel
metre length
Note : 1. Adopt any one type of welded steel wire 100 mm x 50 mm , 10.8
fabric 75 x 50 mm or 75 x 25 mm as per @ S.2 kg Per m
approved design.
per cent of cost
Add for drilling holes @ 2
2- The item of excavation and cement ofchannels
concrete in bundation shallbe measured
and paid separately. c) Machinery
hour 0.04
Tractor-trouey
1.20. 808 Tubular SteEl Railing on Medlum Welght
Stesl Channel (ISMC Seri.s) 100 mm x d) Overhoads @ % on (a+b+c)
50 mm
(a+b+c+d)
e) Contractor's profit @ % on
Providing, fixing and erecting 50 mm dia steel
pipe railing in 3 rows duly painted on medium
Cost for 1o metre = i)+ii)+iii)+iv)+a+b+c+d+e
weight steel clannels (ISMC series) 100 mm
x 50 mm, 1.2 metre high above ground, 2 m Rate por metre = (l)+li)+lii)+lv)+a+b+c+d+e)l'|0
centre to centre, compleie as per approved
drawings.

Unit = Running metre


Taking output = 10 metre

215
234

-
Road Wor*i : 8-Tmflic Sips, Msdd,rs anrt otller Ro&d Appun.narc.s
Road Wotu : E-Tnm. si8rs, M.*ings ad olhc. Ro.d Appun trsc.s

Sr. Referqnce lo Descriplion


No.
Unit Quantlty Rate
MoRT&H Reference lo Oescription Unit Quantity Rate
Sr.
Speciflcations Rs.
No. MoRT&H Rs.
8.2't. Specificatlons
808 Tubular Stoal Ralling on precast RCC
PosG, 1.2 m High Above cround Level E.22 809 Reinforced Cement Concrete Crash Ba.rier

Providing, tencing and erecting S0 mm Provision of an reinforced cement concrete


dia
painted steet pipe raiting in 3 rows crash barrier at the edges of the road,
on
precasl M 20 grade RCC vertical posts approaches to bridge stuclures and medians,
1.8
meke high (r.2 m above cL) with 3 holes constructed with M 20 grade concrete with
50 mm dia for pip€, tixed 2 metre centre to, HYSD reinforcement conlbrming to IRC:21 and
complete as per approved drawing. dowel bars 25 mm dia, 450 mm long at
expansion joinb f lled wih pre-fioulded asphalt
Unit= Running metre fillerboard, keyed to the structu.e on which it
Taking output = 10 metre is built 6nd rnstalled as per design given in
tle enclosure to MOSTCircuhrNo. RWNH -
i) Excrvetlon for toundation (6 Nos.) cum 1.296 33022/1/94-DO lll dated 24th June 1994 as
6x0.6x0.6x0.6 perdimensions in the approved drawing and
il) Foundatlon concreto M t5 grade pCC cum 0.648
a' locations directed by the Engineer, all as
6x0.6x0.6x0.3 specifed.
iil) RCC M20forprscast posts
) I Nos. o, cum 0.32 Unit = Linear metre
1.8 motrg rach
Taking output = 10 m
) iv) Palntlng ot plpe
sqm 4.71
a) M 20 grade conc.ete cum 300
) a) Labour
Mate
day 0.014 b) Labour
Mazdoor
) Plumber
day 0.35 Mate day 0.04
day 0.01 Mazdoor day 1.00
) b) Matorlat
c) iilalsrlal \
Steel pipe SO mm dia as per tS:1239
mtr 30.00 HYSD steel reinbrcernent including dor /el toone 0.28
)
bars
c) Machlhery
) Tractor-trolley
board
Pre-rnoulded asphalt filler sqm 0.32
hour 0.25
d) Overheads @ % on (b+c)
) d) Ovcrheads @ c/6 on (a+b+c)
e) Contractor's profit @ % on (b+c+d)
) o) Contnctor'a proflt @ % on (.+b+c+d)
cost for 10 metre = a+b+c+d+e
Cosl tor 1O me'Je i)+il)+iii)+iv)+a+b+c+d+e
) =
Rale per m6trs = (a+b+c+d+e)/10
Rate per mctro ! (i)+[)+lti)+lv)+a+b+c+d+eylo
)
)
237
Ms*inss md olhcr Road Appurt'Mnc's
Rold Wo*3 : 8-Tnmc Sir&s, Mr*in8s lrd oli.r Rold Appuri.rue{ Road Wo*! : 8'Tnflic Sigos,

--I U nit Quantity Rate


oesctiPtion
Sr. Reference to Descrlption Unit Quantity Rate St. Reference to Rs.
No. MoRT&H Rs. No.
MoRT&H
Specifications Specifications
Spacer '150 x 75 x 5 mm channel0
33 m kg 16 24
Note 1. Excavation and backfilling are incidental
4 kg m
tc work aM not to be rneasured separately.
bng, 3 Nos. @ 16 Per
20 00
kg
Nuts and bolts
2. Rate for RCC M 20 may be bken trom
of material for
Chapter on superstruclure. Add 25 per cent of the cost
etc'
tabrication, nuts, bolts, washeG'
.23. 810 Metal Beam Crash garlor
d) Ov€rhcads @ % on (a+b+c)
A. Type - A, "W" : Met lBeamCra€h % on (a+b+c+d)
Baf.iet e) Contnctor's profrt @
Cost ft'r ,1.5 r$etre = a+btc+d+e
Providing and ereding a 1 f rnetal beam crash
banier comprising of 3 mm thick conugated Rate Psr motre = ('+b+c+d+'Y'('5
sheet metal beam rail, 70 cm above road/
Be'm Crash
ground level, fixed on ISMC series channel B, Typq . B, "TrlRlE" : Metal
vertical post, 150 x 75 x 5 mm spaced 2 m Bat sr
centre-to-centre, 1.8 m high, 1.1 m below metal beam
ground/road level, allsteelparts and fitments Providing and erec{ng a'Thrie"
ul"i"tcomprising ol 3 mm thick
to be galvanised by hotdip process, allfittings "r".i
..rruoated stEet rEtal beam rail'
85 cm abo'e
to conform to 15:1367 and lS:1364. metal on lsMc series
."lJio.rna level, fixed
beam railto be fixed on the vertical post with
verticar post, r x 75 x 5 mm spaced
so
a spacer of cha nel section 150 x 75 x 5 mm, "ilnnir Z m high with 1 15 m
n

330 mm long complete as per Clause 810.


ii
-r',"tow
""nm-to-"tntt",
oround levet, att steel
paft and fitllrents
process' all fittrngs
Unit = Running metre io ue q-avanised by ha dip
ls:1364' metal
Taking output= 4.5 metre length . t" 151367 and
""iir.
i"", ."'f ,o be t'"0 on the vertical
post with
'l 50 x75 x 5 mm'
a) Laboul a soace of channel sectioo
-si6 per clause 810
day 0.06 mm bng comptetE as
Mate
Blacksmith day 0.50
Mazdoor day 1.00 Unit = Running metre
length
Taking ouhut= 4 5 meue
b) Machinery
Tractor-trolley hour 0.10
a) Labour day 0.06
MalB 0.50
day
c) Materlal Blacksmith 100
day
Mazdoor
Corrugated sheel, 3 mm thick,'\^/ beam kg 41.21
section railing,4.5 m in length
b) Machinery 0.10
Channel post 150 x 75 x 5 mlh, 1.8 kg m 88.56 Tractcr-trolleY
hour
long, 3 Nos. @ 16.4 k9 per mtr
)
239 )
I
t
) Wotu : 8-TEfiic ofi€r Road Appurrsnanc€s
Road Si8ns, Markings 0rd olh.r Road Appun.nanccs
Road wo*s : 8'Tr!fiic si8ru' Mukings lnd

) Unit Quantity Rate


Sr. Reference to Description Unit Quantity Rate DescriPtion
Sr.
Reference to Rs.
)ruo MoRT&H Rs. MoRT&H
Specificatlons No
Specifications
) Safety
c) Material
Suggestive Flexible Crash Barrior, Wire RoPe
I Corrugated sheet. 3 mm thick, "Thrie' kg 72.94 8.25.
Barrier
beam section railing, 4 5 m in lenglh
Channel post 150 x 75 x 5 mm, 2 m long, kg 98.40 Provdrm and ereclirE a wire rope safety barier
) RS Joist
3 Nos. @ '!6.4 kg per mk *itt ,"rt]."f p*t. ot m"dium weight
x 75 n'm ('t'1 so ks/
) Spacer 150 x 75 x 5 mm channel0.546 m kg 26.86 i'""t
'iao"*!i too " ground and
rn r""o, o as rn above
long, 3 Nos. -i split at the bonom
Nuts and bolts kg 30.00 0.65 m below ground level'
) i"t **, ,* Jrno"oo"a in M 1 5 grade cer€nt

50 mcentre'
Add 15 per cent of the cost of material for ..""*i""iio, oso,.ouo mm''1
) fabrication, nuts, bglts, washers. etc. to-centre and wittr I tiorEonlal steelwire
rope

oni. *" *"no"d atterminalposts 15M


) "io
d) Overheads @ % on (a+b+c) . "'"* i"^,", ,()o to be embedded-in
, alr*" *i"*
ioundation2400
"-"rete bY a
) e) Cont.acto.'s profit @ % on (a.b+crd) ,iio r a* .. to"otn)' strengthened
at4s0
i'5 mm' 2 m rons

) Cost loa4.S metre = a+b+C+Cl+e


".-"'.?ii.i'ilij.
t"-',*"" 'loo x 8 mm' 1 50 m long
;; ;i;;""0 ",n
all embedded in loundation
) Rate per metre = (a+b+c+d+e)/4,5 I.""*" * "roto'i* design and dra\'ving
cement
". i'*vation and
,"i"
Note ln thecase ofmedian crash barrier,'W metal "'"*ii"n'
concrete.
)
beam or thrie beam seclion should be provided
on both sides of the vertical posts fixed in
the Unit= Running metre
)
median Exlra provrsion for metal beam Taking output = 15 metre
railing and spacer is required to be rnade when
) fixed in the median depending on approved a) Labour 0.12
day
design. Mate 2.00
day
) Mazdoor
day 1.00
t4 811 Road Traftic Signals Elsctrlcally Blacksmith
Oporated
bl Materlal kg
'190.00
i) RS Joist loo x 75 mm - 16 5 m
) Note Since it is a ready made item commercially
metre
produced and erecled by specia[sed frm in @'11.5 kg Per
kg 46.00
) the eleclricaland electronicfield, rale may be posts' 2 m
ii) Struts - 2 Nos for terminal
taken based on market enquiry trom lirms
tongeach2x2xll'50
) specialised in this field and lsl
certified for 188.40
kg
the approved design and drav,/ings.
,'
) li"j J:l ;l :"H;,iill3,6 l;1,,
kg/sqm(2x15)
)

240 241
)
Ro'd Appunenan@s
Sisns' MarkiDss and othlr
Ro.d Work : 8'Tnffic
Ro.d Wo.k : 8-T.!rlic Si8rB, M&lings 0nd othcr Rotd APpu.'t nan@s

Unit OuantitY Rate


DescriPtlon Rs.
Sr. Reference to oescription Unit Quantity n"t"-' Reference to
5r.
No. MoRT&H MoRT&H
Re. No.
Specifications Specifications

iv) Steelwire rope 40 mm, iflcluding 7.50 kg


per cent extra icrfixing at ends 15 x 4
65.00 " il'H:ffi :ff lJ'ff :':x;"::"jj
vanes
lectangular
x 1.075 @ 1 kg per m
p..vidino and erecting an anti{lare screen
Add 5 per cent of cost of material for drilling, '*'" *" *n"jlpipes labricated and
iu tit.
gripping, fixing, fabrication and welding L,5 a. fo- of p,nels ol one rnetre length
consumables
,ii?u'" .u n"'nnt o'ed with circular vanex
i'li -- ai" at top recttngular vane 600
"no
c) Painting '"a"
-. -*" *oe out ol steel sheet
Applying 2 coats ofpainting on exposed sqm 16.5 "i""
ill'-,n,nb*n""", vertical pipes of the
"nd
surface

d) Mdchlnery
Tractor-tolley hour 0.25
ro*';,.ffig,mfii:i',Ln
and drawings

e) Ovorheads @ % on (a+b+d) Unit= Running metre


Taking output = one
mefe
0 Contractor's profit @ %on(a+b+d+o)
a) Labour day 0.004
Cost for 15 m = a+b+c+d+e+f Mate 0.'10
day
Mazdoor
Rate per m = (a+b+c+d+e+f)/i5
b) Material mk 16.0
Note: The items ofexcavatbns and cement concrete
i) 25 mm steelPIPe
works will be measured and included 4.32
separately as perthe approved designs and MS sheet for 600 x 300
x3 mm kg
ii) (@
drawings. rectangular v ane' one number
24 kg/sqm
8.26. Suggestive Anti-Glaro Devices in Median
kg 4.80
dra circular vane )
ii, r MS sheet {or 250 mm
A. Plantatlon 3 mm thrck 4 numbers @ 24 kg/sqm
Plantation ofshrubs and planls of approved
material for
species in the median. Apart from cutting off Add 5 Per cent cost of
nuts' bolts
glare from vehicle coming from opposite iili""tio". *"roi"s' u"nding
direction, lhese plants provide a pleasant etc'
envi.onment and are eco-friendly. The rate fcr
this item is available in the Chapter 11 on
hodiculture.

243
242
, _-....;I

)
Rold Wo.k : 8-Tdrfic Sisri Msi<ir8s tnd olh.r Rold APpurlcornccs
Wotll : t'Tnlfic SiSrLr M!*ings sdolhcrRold Appurt"onct3
Road

)
Sr. Reference to Descrlption Unit Quantity U nit Quantity Rate
Rate DescriPtion
) gr. Reference to Rs.
No. MoRT&H Rs.
MoRT&H
Specifications No.
) Specilications
c) Painting for
Add 5 per cent of cost ot malerial
) Applying 2 coats ofpainting on exposed sqm 't.83
fabrication, nuts, bolts etc
surface
) d) Overheads c) Machinery
@ % on (a+b) hour 0.'10
Tractor-trolley
) e) Contractor's prorit @ % on (a+b+d)
d) Palnting 0.85
) Rate per metae = a+b+c+d+e sqm
Applying 2 coats of Painting

) Note: The items ofexcavation and cement concrete


e) Overheads @ o, on (a+b+c)
as per approved design to be measured and
paid separately. (a+b+c+e)
) 0 Contractor's profit @ !( on

c. Anti-glar€ acreen with rectangular


) vane of MS sheet
Cost for 1.5 m = a+b+c+d+e+f

) Rate per metre = (a+b+c+d+c+0lt'50


Providing and erecting anti{lare screenwith
rectangularvanesofsize 750 x 500 mm made concrete
Note : The items ofexcavation and cement
.) from MS sheet, 3 mm thick and fixed on MS to be measured and
as per approved design
angle50 x 50 x6 mm atan angle of450to the been
paid separately. Rate of pahting has
) direction ot flow of traffic, '1.5 m center to
analysecl separately in this
Chapter
center, top edge olthe screen 1.75 m above
) ground level. verticAlpost frmly embedded in
Street Lighting
M 15 cement concrete toundation 0.60 m 8.27. suggestive

) below ground level, applying 2 coats ofpaint light mounted


Providinq and erecting streel
on exposed faces, all complete as per circutar hollov'/ pole of standard
on a stelel
) approved design and drawings.
soecincatio.ls for street lighting'
I
m high
m overhang on bolh
Unit= Running metre slaceo no m apart, 1 8
ad on one side lf
) Taking output = 1.50 metre
s'iaes itnxeo in ttre meOian
footpah; fitted wG sodium vapour
fixed on the
foundation'
) a) Labour lamp andfixed firmly in consete
Mate day 0.004
Unit = Each
) Mazdoor day 0.10
Taking output= one light

) b) Material
i) Angle kon post, 50 x 50 x 6 mm, kg 10.58 a) Labour day 0.03
length 2.35 m Mate
) Mazdoor
day 0.50
0.25
ii) MS sheet 3 mm thick @ 24 kg/sqm kg s.00 day
Electrician
)

) 244 245
Ro.d Wo*s : 8-Traffic Sigtrs, Markinss and orh.r Road Appude.ances
E-t Road wo*s : 8_Traffic Sign', Markings and
oih'r Road ApPuridtanc's

Unit QuantitY Rate


Reference to DescriPtion
Sr. Reference to Description Unit Quantity Rate Sr Rs.
No. MoRT&H Rs. No. MoRT&H
Speclfications Specifications

b) Material Suggestive Llghting on Bridges


8.2A.
i) Steel circular hollow pole of slandard Each 1.00
Providing and fixing lighting on
bridges'
specifcation for street lighting to mount poles of
mounteton steel hollow circular
light atg m height above road level high lixed on
standard specifications, 5 m
m apart
parapets with cement concrete' 20
ii) Sodiumvapour lamp- 250 Watt Each 1.00
lamp'
and fitted with sodium vapour

Add 5 per cent ol cost of material for holder,


Unit = Each
electric cable, insulation, ladder, scaffolding
Taking outPUt = one light
etc.
a) Labour 0.02
day
c) Palntlng Mate
day 0.40
For Flxlng ln Medlan Mazdoor
day 0.20
Electrician
Providing two coats of alluminium paint sqm 5.75
over steel circular hollow pipe with overiang bl
"' Material
on both sides i,''s*]i"n"rr"'nollowpoleo'standard
Each 1'00
mount
specifcaton for street lighting to
Fo, Fixlng ln Footpath lrght at 5 m above deck
level

- TO Watt Each 1'00


Providing two coats of alluminium paint sqm 4.63 ii) Sodium vapour lamp
over steel circular hollo,t/ pipe with oveftang holder'
Add 1 Der cent of cost of materialfor
on one side ladder'
electiic cable, insulation '
scalfolding, etc'
d) Overheads @ % on (a+b)

e) Contracto/s proflt @ % on (a+b+d)


cl Painting
sqm 2.76
Providing two coats of alluminiumpalm
Rate per llght - a+b+c+d+e over steel circular hollow PiPe

@ % on (a+b)
Note : The items ofexcavation and cementconcrete d) overheads
foundation will be measured and included % on (a+b+d)
o) Contractor's, Profit @
separately in the estimate as per approved
design and drawing. The rate for painting has
Rato Per llght
: a+b+c+d+e
been analysed in thisChapter.
The iterns of cernent concrete
b be measur€d
Note: desEn'
as per appioved
and paid sepa€tely
amfsed
iii
rate ror painting ttas already been

in this chapter.

24'l
246
F
SiSns' Markings ord o$cr Road
App'rdenonccs
Rosd Wo*s : 8'Tr!fic
Road Wotks :8-Trarrc SirB, Markiogr lod o(hcr Ro.d Appuncnsnccs

Unit QuantltY Rate


Rerelence to DescriPtion
Sr. Reference to Description Unit Ouantity Rate Sr. Rs.
No. MoRT&H No MoRT&H
Rs.
Speclfications Specifications
d) Machinery 0.50
8.29. Suggestive Cable OuctAcross the Road hour
Tractor-trolleY
Providing and laying ol a reinforced cement
concrete pipe duct, 300 mm dia, across the e) overheads @ % on (b+c+d)
road (new conslruction), exlendrng fromdrain
Contracto.'s profit @ % on (b+t+d+e)
todrain ofslope to toe of slope
in cuts and toe 0
in flls, constructing head walls at both ends,
providing a minimum fill of granular material Costfol20 metre = a+b+c+d+e+f
overtop and sides of RCC pip€ as per IRC:98-
'1997, bedded on a 0.3 m lhick layer of granular Rate per metre = (a+b+c+d+e+0120
material free ol rock pieces, outer to outer
disbnce of pipe atleast halfdia of pipe subject case - ll : Doublo tow for two utilitiy
to minimum 450 mm in case of double and 6ervices
triple row ducts,joints to be made leak proof,
invert level of duct to be above highgr than unit = Running rnett
ground levelto prevent entry ofwateranddirt, Taking output = 20 mere
all as per IRC: 9&i997 and approved drawings.
cum
.!' Random rubble maaontylbrlck
head
Case - I : Single row Ior one utility service masonry in cement mortar 1:6 for
wall bolh sides
Unit= Running metre
20 metre
Taking output = b) Laboul day 0.05
Mate 2.00
day
a) Random rubble m.sonrylbrick maaonry cum 2.36 Mazdoor
day 0.25
in cement mortar 1:6 for head wall both Skilled mazdoor
sides
c) Materlal nEtre 40.00
300 mm
b) Lbour Reinforced cement concrete PiPe
Mate day 0.05 dia 14.40
for cum
irtazdoor day 1.00 Granular soitwith Pl less than 6
bedding and sides ofpipe
(0 6x0 6x40 m)
Skilled rnazdoo. day 0.25 18.00
Nos.
Collar torjoints 300 mm dia 0.04
cum
c) Materlal Cementmortar 1:2 lorioints
Reinlorced cement concrete pipe 300 mm metre 20.00
-dh d) Machlnery
hour '1.00
Granular soilwith Plless than 6 tor cum Tractor-trolley
bedding and sides of pipe (0.6x0.6r20 m)
.Collar forjoints 300 mm dia Nos. 9.00 e) Overheads @ % on (b+c+d)
I Cern€nt mortar 1:2 foriolnts cum o.o2

)
249
248
)
Road works : 8-Tramc sisos, Markj,ss and orh.r Road
AppurleDan@s
Road Works : 8-TBffic Signs, Ma*irrs aod oth.r Rosd Appun.nanccs

Sr. Reference to Description Unit Quantity Rate


No. MoRT&H Reference to Description Unit
Rs. 5r. Quantity Rate
Specifications MoRT&H Rs.
t'lo.
Specifications
0 Contractor's profit @ % on (b+c+dre)
Note: lnspeclion chamber at both ends is the
Cost for 20 metre = a+b+c+d+e+f
responsibility ofihe agency who is laying
the ducl. Hence not included.
Rate pe. metre = (a+b+c+cl+e+0/20
2. The rates for stone masonry&rick masonry
Case - lll : Tripte.ow for three utititiy and cement mortar lo be adopted from
seruices respective Clauses.

Unit = Running metre


8.30. Suggestive Highway Patrolling and Trafric Aid Post
Taking output = 20 metre

It is proposed to locate one Traffic Aid Post


a) Random rubble masonryrbdck masonry cum
every 5060 km ofthe highway.
4.38
in cement mortar 1;6 forhead wallboth
sides
The organisation and llnancial aspects are
required to be finalised in consultation with
b) Labour
administrative and traffic a uthorities .

Mate
day 0.16
Mazdoor
day 3.00 8.31, Suggestive Items Related to Underpass/Subway/
Skilled mazdoor
day 1.00 Overhead Bridge/Ove.head Foot Bridge

c) ltlatertal The items involved for underpass/subway/


Reinforced cement concrete pipe 3OO
mm metre 60.00 overhead bridge/overhead foot bridge are
dia
earthwork, plain cement concrete, plastering,
Granular sollwith plless than 6 for painting, information sign etc. The rates for
cum 2 t.60
bedding and sides of pipe (O.6xO.6x6O
m) these items are availablein respeclive chapters
Collarforjoints 300 mm dia Nos. which can be adopted fo. lhe quantities derived
27.00
Cement mortar 1:2 forjoints
cum 0.06 from the approved designs and drawings.

d) Machinery 8.32. T,atfic Control System and


Suggestive
Tractor-trolley
hou|t.5O Communication system

e) Overheads @ % on (b+c+d) Providing a traffic control centre and


communication system including
0 Contractor's profit
@ % on (b+c+d+e) lelecommunlcalion facilities and related
accessories, CCTV, radar, vehicle detection
Cost for 20 metre: a+b+c+cl+e+f camera, central computer system.

Rate per metre = (a.b+c+d+e+f)/20

250
25t
t
) Road Work : 8-Trarnc Si8rr, lv!4kir8s and othcr Road APplrtclanc.s
Road Wo.16 : t-Trtffic Si$t!, Mrtirss md othcr Road Appuncmnccs

) -t'
Reference to Descrlptlon Unit Quantlty Rate
Unit Sr.
Sr. Reference to Descriptlon Quantity Ratq Rs.
No.
MoRT&H
No. MoRT&H Rs.
Specificatlons
Speclficatlons
b) Materlal
These are specialised item of Atluminiumalloy/galvanisedsteelincluding tonne 1.05
telecommunication system and are the 5 per cent wastage
comrnercial produclS. The designer is requted
to contacl the manufaclurers to ascerlain Add 15 per cent ot cost of material lor
markel prices. ln case of civilworks required tabrication and ereclion
lo be executed forthese installations, pricing
may be done as per rates in relevant Chapters Add 1 per cent ot co€t of nEterial for nuts'
brquantities derived as per approved design bolts and welding
and drawings.
c) Machinery
As regards fie locatbns where such devices hcur 1.00
Truck 10 tonne
are required to be installed, the haffic control
authority should be consulted to linalise the d) Overheads @ % on (a+b+c)
location.
e) Cont.actor's Profit @ % on (a+b+c+d)
8.33. Suggestlve Gantry Mounted Varlable Message Sign
Board Rate per tonne = a+b+c+d+e

Providing and erectjng gant y mounted variable ii) Message DisPlaY


message sign board electronically operated
capable offlashing the desired message over Message display board 6 sqm electronically
a designed support system ofaluminium alloy operated with complete eletronic fitments for
or galvanised steel, erected as perapproved fl ashing the preietermined messages'
design and drawings and with lateralclearahc€
as perClause 802.3 This is a specilised commerical product and
the lumpsum rate rncluding ereclion atsite is
i) Gantry Support System required to be ascertained from the market
and including in the rate analysls The size of
Unit = tonne the board will vary depending upon specific
Taking output = 1 tonne location.

a) Labour The rate for the gantry mounted variable sign


Mate day o.12 would bethe addition ot cost of gantry support
Mazdoor day 2.OO system as per approved design determined
Blacksmith day 1.00 at (i) above and the cost ofmessage display
board ascertained fiom the rnarkd at (ii) above

)
) 253
252
)
'- )
Rod Appurr€nan'€3
Signs' Mt*in8s tnd o$cr
Road Wolks : E-Tramc Sisc, Mdkitrss 6rd oth€. Ro.d APPud.nanc.s Rord Works I t-Tr'ms )
Unit OuantitY Rate
DescriPtion Rs. )
Sr. Reference to Description Unit Quantity Reference to
5r.
No. MoRT&H Rs.' MoRT&H )
No.
Specifications Specifications
Batrel' Filled with
8.34. Suggestive Traffic lmpact Attenuators at Abutments B. Using Plastic'Steol
and Pie6 SaIld
impact
A. Vyith Scrap Tyres o.^.i<idn and tnstallation of traffic
of f,yovers bridg€s
,n-"nu"a, ,,
"Or,."n'pier o'60 m dia andr 'o
Provision and installation of traffic attenuators
iil" r["oJ"i*'*""1s and
ai abutrnenupier of f,yovers b.idges using li'.il"iiJu"o "* "and inthree rows
as per
,'"J *t,ln * mm
scrap tyres of size 100 x 20 retrieved from steel wire rope
kucks laid in 2 rows and 4 tiers, one above approved design and
drawings'
the other and tied with 20 mm wire rope as
per approved design and diawings.
Unit = sqm
Taking outPut = 20 sqm
Unit : sqm
Taking output = 20 sqm
a) Labour day 0.'13
a) Labour Mate day 3.00
Mate day 0.08 Mazdoor day 0.25
Mazdoor day 150 Blacksmith
Blacksmith day 0.25
b) Material Nos. 50.00
b) M.terial Plastic barrels
Scrap tyres of size 900 x 20 Nos 80.00 OR 50.00
Nos.
20 mm steelwire rope k9 '150.00
Steel barrels cum 8.00
Sand kg 15.00
Add 1 per cent of cost of wire rope for 20 mm steelwire rope
clamps elc.
rope ior
Add I per cent of cost ol wire
c) Machlnery
clamps etc.
Tractor-trolley hour 3.00

d) Overheads @ % on (a+b+c) c) irachlnery houa 2.00


Tractcrtrolle)l
e) Contractor'e protit @ % on (a+b+c+d)
overheads @ % on ('+b+c)
O
Cost for20 sqm = a+b+c+d+e
% on (a+b+c+d)
e) contractor's ptofit @
Rate per 6qm : (a+b+s+{+e)120
Cost for 20 sqm = a+b+dd+e

(a+b+c+d+e)'l20
Rats Per sqm =

251
) _-=7

) Road Woria: t-Trdfic Signx Muting!.nd othe. Rosd AppurrcMncds Mt*ir8! dd dh" Rold Appud'narc's
Rold wo*s : &T6fic Si8trs,

) Rate
Un it Quantity
;r. Reference to Descrlption Unlt Quantity Rate
Reference to DescriPtion
) ,lo. MoRT&H Rs, I Sr.
MoRT&H
Rs.

Speclfications No
Specifications
)
Road Markets,Road Stud
wlth Lens
C. Wlth Hl - DRO Cell Sandwich Suggestive
) (Patented)
8.35. RellEctol

100 x 100
) (lnthis patented Hl- DRO cellsystem, water Providinq and fixing of road stud
resistant to
gets dischargedtrom plastictubes on impact
-- aii""st in aluminium'
grit ftted wirl Ens
over a preietermined tjme, thus absorbing conosive effect of salt and
) '
asphallic
theenergy). iJn.ciors. instarleo in concrete or
hore g0mm upto a depth of
ov orirring
) Hl- DRO "u*aie bituminous
Providing and instralling a patentend Ao mm and bedded in a suitable
cell syslem as a lratfic impact attenuators. mortar, all as Per Bs:873
ilori o, "oory
.) using plastlc tubes 50cmdia, 1.2 m in height, (Part4) 1973.
25 mm opening at the top, placed in three
) rows. filled with wat'er and tied with a 20 mm unit = Nos.
steel wire rope. Taking output = 50 Nos
)
Unit = sqm a) Labour
day 0.04
,) Taking output='10 sqm Mate 1.00
day
Mazdoor
) a) L.bour
Mate day 0.1 bl
"' Material Nos 50.00
.)
Mazdoor day 2.50 oirr*r.",'ot1oox1oommfilted
with lense reflectors
b) Materlal
) Plastic tubes 50 cm dia, 1.2 m high Nos 40.00 fixing
Add 1O per cent of cosl of malenalfor
Water KL 12.O0
and installation
) 20 mm steelwire rope kg 100.00

c) Ove.hoads @ % on (a+b) \
.) Add 1 pe. cent of cost of wite rope ior
clamps etc.
contractor's profit @ % on (a+b+cl
d)
) c) Machlnery
Traclor-holley hour 2.00 Cost for 50 studs = a+b+c+d
) Water tanker 6 KL capacity hour 2.00
Rate Perstuds = (a+b+c+d)150
) d) Overheads @ % on (a+b+c)

) e) Contractor's prolil @ % on (a+b+c+d)

Cost fo|l0 sqm = a+b+c+d+e


)
Rate per sqm = (a+b+c+d+e)/10

)
256 251
)
Rold Work : 8-T.amc Si8rs, Markings d
olfier Road Appunem.ccs
Road Wo*s : t-Traflic Srttrs. Ma*il8s ,nd oih.r Road Appllfr€nrnccs

Sr. Reference to Description


No. Unit Quantlty Rate
MoRT&H Reference lg Description Unlt
Sr' Quantity Rate
Specificalions Rs.
No. MoRT&H Rs.
8.36. Specifications
Suggestive Trafric Cone
Pricing may be done based on cunent plinth
Provision of red fluorescent wih white area rates approved by PWD/CPVID/MES for
refective )
sleeve traffic cone made of low density a particular zone. Area is required to be
polyethylene (LOPE) materialwith assessed for specific localion as per actual
a square )
base of 390 x 390 x 35 mm and a heiqht site conditions.
ot
770 m.j]., 4 kg in weight, placed at .1.5
m
interval, all as perBS:g73. B. Pa,klng areas and bus laybyes fot
trucks, bus6s and light vehlcle6
Unit = Running metre
Taking output = 68 Nos. Pricing ofparking areas may be done for the
quantities of various items based on the
a) Labour approved dimensions and pavement design
Mate fo. a partjcular tenain and soil. Rates for items
day 0.02
Mazdoot may be from respective chapters.
day 0.50
b) Material C. Lawn
T.affc cones with 1SO mm reflective sleeve Nos 68.00 Providing a lawn planted with grass and its
c) Machinery maintenance.
Tractor{rolley hour 0.10 Pricing of lawn may be done as per rates given

d) Overheads in the chapteron horticulture for the quantities


@ % on (a+b+c)
as per approved dimensions in the drawings.
e) ContEctor,s profit @ % on (a+b+c+d)
8,38. Suggestive Rumble Strips
Cost for 68 Nos = a+b+c+d+e Provision ol 15 nos rumble slnps coverd wilh
premix bituminous carpet, 15-20 mm high at
Rate per met.o = (a+b+c+d+e)/68
center,250 mm wide phced at 1 m centerto
8.37 center at approved locations to control speed,
Suggestive Roadside Amenlties
marked wilh white strips of road ma*ing paint.

A. Rest areas Unit = sqm


Taking output = 100 sqm (including gaps)
Providing plainly fumished accomrnodation
for
rest rooms, dormitories, restaurants, The rate per sqm of premix carpet and road
stalls,
shops, petrotpump, telephone booth,
tirstaid marking may be adopted from Chapters 5 & I
room, kaffic aid post, police assistance respectively icr the quantities calculated from
booth,
including electricity, toilet and sewerage approved drawings.
system. I

258
E 259
) E______""""

Rord Wort(s : 8-Tnffc Sigrs,


M!r*irB! lnd o ,a Ro.d App,na't|c6
)
X,o!d Wo*s : 8-Trrlfic Sit rs, M'rLiEs.nd o.ncr Road Appun nltlccs
Sr. Reference to
) Description
No MoRT&H Unit Quantity Rate
Specitications Rs. 5r. Reference to Descrlption Un it Quantity Rate
) MoRT&H
8.39. Suggestive PolicemaD Umbrella
No. Rs.
Specifications
)
Provision ofa2 mhigh (floor to rooD c) Machinery
umbrela
rortraFlc policeman
) at road c.ossings, where Traclor-trolley hour 0.50
r€cessary, installecJ
on a raised platform, built
) on a cenlral support
of a steel pipe 1OO mm d) Ove,heads @ % on (a+btc)
ora, roof made of 25
mm dia st,eel pipe to
prcvde @vered
area of3 sqm, .ogfed
e) Cont,actor's profit @ % on (a+b+c+d)
) wiut CGI
sneets, all steel parts
to be given 2 coats of
palnt. Rate per policeman umbrella
) = a+b+c+d+e
Unil = each
) Taking output= one
number
8.40 Suggestive High irast Pole Lighting at l erchanges
and Flyovers
) Earthwork
Quanlities of these items Providing and ereclihg a high mast pole lighting
cement f to
with 30 m high hot dip galvanised mast
) concrete/brick , be calculated asperapproved
oaslone ( design and cost added
as Der
designed to withstand forces exerted with wind
rates of these items gjve; speeds of 180 km per hour wilh 3 seconds
) masonry I Chapters 3 and 13
in
gust, as perlS:875 (Part3)- 1978, fitted with
I a base flange, door at the base ot nESt with
) Painting
sqm heavy duty internal lock, lantern caniage,
a) Labou. suitable vi,inching arlangerEnt br sale working
) load of 750 kg and high powered electrically
Mate
day 0.09 driven power tools for raising and lowering of
) Mazdoor
Elacksmith day 1.00 I core electic cable,
lantern carriage, flexible
day 1.00 lightening conductor, earthing terminal, and
Wetder
) day 0.25 fixing2 nos. aviation obstructhn lights on top
b) Matorial of the mast, all complete as per approved
I Steet pipe iOO mm
design and drawings.
dia
m 3.50
Steetpipe 25 mm dia
) m 10.00
This ls a specialised work ad is generally
CGlsheets
kg done by firms who specialise in such jobs.
8.00
The detailed designs and estimates are
) cenr of cost of materiat
ll[:,t"i", for submitted by the firms along$th theirtender
for checks by the Department. The cost of
) this work is required to be wo,ked out based

l1l,:ffi il::l#J""'#:i"#, j:j,,0,, on approved design, drawirgs and eslimate


of the lowest tender. A sep-ate corltracl icr
thiswork is concluded as theContracto/s lor
) road and bridge works generally do not
undertake suchjobs.
) 260

261
tnd oth€r Road Appurien'nccs
Road Wo*s : 8-Tlamc Signs' Markings
Road Wod(s:8-Tnmc Sigrs, M&kings snd o(hq Road APPuden..ces

Unit QuantitY Rate


DescriPtion Rs.
Sr. Reference to Description Unit Quantity Rate Sr.
Relerence to
MoRT&H
No. MoRT&H Rs. No.
Specifications Specificatlons
Signs in Con struction
Safety Oevices and
8.41 Suggestive Toll Plaza 6.42.
Suggestive
Zones
The construction, operation and maintenance
pr.vision and fixing oftrafflc signsfor limited
of Toll Plaza can be broken into separate
items ofwork as underbased on the approved
::::l**llHrXr i:f :#:ill
design and drawings: '"1."'* 'r""". zone and terminal
""t*"g
a) Provision of toll collection service lane to
separate different categ,ories ofvehicles br i'ri:**ti:n:l'ilIHJl:"J:::l
purpo$e of toll collection. This involves

u*ff+:tffi
considerable increase in carriageway
width.
b) Povision of 2.5 m v/ide separators tor
different toll collection service lanes for design
saftty. Ili Ir"" ,"i per approved
of after
c) Tollbooths with integrated roof cover
**""0's and disposed
il'"^'"r"*""t"""n"0
urork' all as per
d) Banier gates for individual lanes ""roi"i"" "t "*"t'ctron
IRC:SP:5t2001'
e) Provision ol building to provide facility to
tollplaza personnel
Unit = each
D Tollplaza ofrice equipment and fumiture Taking output = one
sign Post
g) Water s.upply, electricity, sanitation,
septiclank system and drainage
h) Telephone, intercomes, wireless ;:::IT";'"ffi ,:j"'i:[11:]:;-1l,"*""
communication system
i) High mast llghting a) Dlvefsbn one km ahead
j) Pavementmarking b) TrafrcsEn ahead
k) Overhead signs c) Road ahead dosed
l) Flxed rnessage signs (Advance) O Men stwork
m) Variable rnessage signs e) Road nanoY{
n) Traffic cones and pylons
i singlefile tratrrc
o) First aid post g) Right lane diverted
p)Trafficaid post and security
h) Lefrlan€ diverted
The quantities fortheabove mentioned items i) Right hne cl6ed
may be calculated from the approved design i) Letlane chsed
and drawings and their rates adopted from k) Median closed
respective Chapters of the Standard Data cariageway
Book.
l) Diversion to other

261
262
Rotd Worl(l: t-Tr.flic Sigrs, Ma*ings snd otbcr Rold Appuncnanccs Lord wo*! : s-Trlmc Sigts' Mlrkints ud ods rotd Appurtdanc'g

Un it Quantity Rate
Sr. Reference to Description Unit Quantity Rate Reference to DescriPtion
Sr' Rs.
No MoRT&H Rs. MoRT&H
No.
Specifications Specifications

m) Traffic sig nal a head Unit= each


) Tating output = one steelportable barricad6
n) Two way traffic
o) Un+venrcad
a) Labour
) p) day 0.02
Slippery road Mate
q) day 0.25
Loosechippings
) Mazdoor
day 0.50
r) Dualcaniageway ends Painter
0.2s
day
l s) Diversion Welder
l) Do not enter
u) b) Material
) Road closed
Angle iron 45 x 45 x 5 mm
k9 25.00
'15.00
I Stop
MS sheet 3OO mm wide, 2 5 m long
and kg
) w) Slow 2.6 mm thick
litre 0.50
x) Oneway Paint
I y) Glve way
Add 2 per cenl of cost of steel
lorwelding
z) Ovedakingprohibited
) aa) Speed limit consumables nuts and bolts and ddlling
holes
bb) Weight limit
)
cc) Height and length limit % on (a+b)
c) Overheads @
dd) No stopping or standing
) on (a+b+c)
ee) Any otherwaming orregulatory safety sign d) Contractor's Profit @ %
) as per sile requirement and consistent
with IRC:SP:55-2001 and IRC:67 Rate per barricade = a+b+c+d
) in
The rate for trafiic signs are already worked
8,44. Suggestive Permanent TYPs Barrlcade
out and given elsewhere in thjs chapter. The Construction Zone
) same may be adopted.
A. Withstcelcomponents
I e.as. Suggestive Porlable Barricade in Construction Zone
barricade
construction of a permanent type
) lnstallalion ofa steel portable barricade with made of steel components' 1 5 m high from
200 mm
road level, ftted with 3 horzontd
horizontal rail 300 mm wide, 2.5 m in length rails
fitted on a'A'frame made with 45 x 45 x 5 5 mm angle
) wide and 4 m long on 50 x 50 x
mm angle iron section, 1.5 m in height, ton vertical support, painted wfi yellow and
at an angle of
) horizontal rail painted (2 coat9 with yellow *in" 150 mm in width
and white strips, 150 mm inwidth atan angle "u,0.,
450, complete as Per IRC:SPi5t2001
of 450, 'A f.ame painted with 2 coata of yellow
paint, complete as per IRC:SP:55-2001.

)
265
, 264
Road Wotu : 8-TnIfic SiSrrs, Markings rnd oth.r Road Appurtcrancca wo*! : 8-Tnfiio signs' Mltings &d olh'r Road ApPUn'Mc's
Rord

Unit Quantity Rate


Sr. Reference to Description Unit Quantity Rate Reference lo Oescription
Sr. Rs.
No. MoRT&H Rs. MoRT&H
No,
Specifications Specifications
Unit = each Unit = each
Taking output = one barricade one barricade
Taking outPut =

a) Labour a) Labour
Mate day 0.05 day 0.05
Mate
Mazdoor day 0.30 day 0.30
Mazdoor
Painter day 0.60 day 0.60
Painter
Welder day 0.30 day 0.60
Carpenter

b) Material b) Material
cum 018
Angle iron 50 x 50 x 5 mm, 2 m long, kg 15.00 Timber
2 Nos.
for nuts and
MS sheet of 12 SWG, 3 Nos. of 200 mm kg 50.00 Add 1 per cent of cost of timber
bolts, nails, etc.
widthand4mlength
Paint like 1.00
c) Overheads @ % on (a+b)
(a+b+c)
Add 1 pe. cent of cost ot steel for welding d) contractor's Profit @ % on
consumables, nuts and bolts and drilling
holes Rate per barricade = a+b+c+d

c) c. With bricks
Overheads @ % on (a+b)
banicade
Construction of a permanent type
d) Contraclor's profit @ % on (a+b+c) made with brick work in mud mortar'
1'5 m
plastered with
hioh. 4 m long, 600 mm thick
Rate per barricade = a+b+c+d with yellow and
ceiment mortar t:6, painted

white strips.
B. With wooden components
Unit = each
Construction ofa permanent type barricade Taking outPut= one barricade
made ofwooden components, 1 5 m high tom
road level, ntted with 3 hodzontalplanks 200 a) Laboul
mm wide and 3.66 m long on 100 x 100 mm day 0.24
Mate
day 3.00
wooden verticalpost, painted with yellow and Mazdoor
day 1.00
white strips, 150 mm in width at an angle of Painter
day 2.00
450, complete as per IRC:SP:55-2001. Mason

266 26'l )
Road Wo*s r 8-Tnflic Signs,
MarkinSs and ofier Rod Appurtenanccs
Road Work : 8-Traffic Sisns, M.rkinrs ad olncr Road Appunc,ines

Sr. Reference to Description Unlt Quantlty


No. MoRT&H
Specifications
Rdte
Rs.
E Reference to
MoRT&H
Description Un it Quantity Rate
Rs.
No.
Specifications
b) Material
Brick
Nos. r800.00 8.46. Suggestive Flagman
Cement
kg 22.00
Sand Positioning of a smarl flagmar with a yellow
cum 0.09
Paint vestand a yellow cap and a red frag 600 x 600
litre 1.25
mm securely fastened toa stafi t m in length
c) Ovsrheads @ % on (a+b) lor guiding the kaflic.
)
d) Contractor,s profit
@ % on (a+b+c) Unit = each
) Takirg output = one llagman
Rate por
, barlcads E a+b+c+d

l.ou. a) Labour
suggesrive Drum Dollnoato, ln Construclloo
Zonc Male day 0.04
) Mazdoor day 1.00
Provision of metaldrur empty bitumen drum
oerheator, 300 mm indiameter, b) Materlal
) SOOmmhgh,
filled with earth for stability, painled '1.00
in Flag of red colour cloth 600 x 600 mm each
crumrerential slrips of altemate Wooden staff for fastening of f,ag 25 mm each 1.00
) black and
wtite- 100 mm wide fitted
with refleclors 3 Nos. dia, one m long
or / c cm dia, allas per IRC:Sp;55-200r.
c) Ove.heads @ % on (a+b)
Unit = each
) Taking output r one drumdelineator d) contractor's profit @ % or (a+b+c)

) a) Labour Rate per llagman = a+b+c+d


Mate
day
) . Mazdoor
day
0.02
Painter 0.25
day 0.25
\
b) Material
Sleetdrum 3OO mm dra.t.2 m hjgh/empty
) bitumen drum
Nos 1.00
paint
) litre 0.50
c) Ove oads @ .6 on (a+b)
)
d) contracto/s proflt o/o
) @ oo (a+b+c)

Rale psr drum delho.lor


= a+b+c+dl
)

) 268
269
ChaPter-9
Chapter-9
Pipe Culverts
Pipe Culverts Unit OuantitY Rate
DescriPtion Rs.
Sr.
RefeGnce to
MoRT&H
No.
Preamble: Specllicatlons

408 PCC I:3:6 in Foundation


1 Pipe culverts ofsize 1000 mm and 1200 mm dia in single row and double row which are generaly 9.1.
used on roads, have been included. Only laying of pipe has been included in the rate. Auxilia.y 1:3:6 mix with crushed
Plain cement concrete
works such as excavation, backfilling, concrete and masonry shall be paid for separatety, as
provaded under the respective clauses. *:;:"ffi ;:;: ;:"ffi [:il]ir":::
curing for 4 1
o, including
ln case of RCC culverts, rates for various items of work involved such as excavation, backfilling, "".oro"i ''O"t'""
days.
masonry, cement concrete etc. have been provided underrespective clauses in the chapterson
foundations, sub-structures, super-structures and river training and proteclion works in bridge Unit = cum
section ol this book. Taking outPut = 15 cum

3 Any river lrainr.rg and protection work like stone pitching, aproh, rivetment, curtain wall etc. may a) Labout day 0.64
Mate day 1.00
be provided under the respective clauses included in Chapter 16 of bridge section.
Mason '15.00
day
Mazdoor
4 The choice belween first class bedding and cement cradle bedding will depend on paffcular
situations and the approved design.
b) Materlal cum '13.80
Aggregate at site cum 6.90
5 Thejointing of pipes is proposed by collarjoints Sand at site 3.30
tonne
Cement at site KL 18.00
6 Backfilling upto mm above top of the pipe shall be carefully done and the soil thoroughly
3OO Cost of water
rammed. tamped or vibrated in layers notexceeding 150 mm.
c) MachinerY hour 6.00
0 28 cum
7. Head walls and otherancillary works shatlbe costed under respective clauses Concrete mixer 0'4i hour 6.00
Generatorset 33 kVA 3.00
hour
I The height offilling above the top ofpipe shallnot be less than 600 mm Water tanker 6 KL capacity
('+b+c)
O Ovorheads @ % on

% on (a+b+c+d )
o) contracto/a Prollt @
15 qurn = a+b+c+d+e
"o",1or
(arb+c+d+e)ll5
Rats Pol cum =
T & P which is
vihrator is a pad of minor
Note : or the
lii""i, ,"","* *"rhead charges
contractor.
"

271

210
I
Road Work :9"PiPc Culvertu Road Works : 9-Pitc
Cuhcns
)
Unit QuantitY Rate
) Sr. Reference to Descrlptlon Unit Quantity Rati DescriPtion Rs.
No MoRT&H Sr.
Reference to
Rs:l
Specifications MORTH
) No.
Specifications
bedding'
) 9.2. 2900 Laying Reinforced Cement Concrete Pipe
Note: 1- ln case of cem ent craddle
be calculated
NP4/P,esteressed Concrete Pipe on First quantity ol PCC M'15 is to
Class Bedding in Single Row priced sepa'ately and
) as per design and
added.
Laying reinforced cementconcrete pipe NP4/
) include
prestessed concrete pipe for culverts on fi.st , The rate analysis does not ln
class bedding of granular material in single
worl(s
Av.avation. cemenumasonry
) rowincluding fixingcollarwithcementmortar *"-o*iit, i*on"s ootedion wo*s
and
to be
1:2 but excluding excavation, protection .rrro"t r"fft' The same are and
) yrorks, backfilling, concrete and masonry """lrir',"i o"t approved design
"" on*o on rater
works in head walls and parapets. i.*r"t ""0 "eparately
) availabte under respective
sedons
Unit = metre
) Taking output = 12.5 metre (5 pipes of2.5 m B. tzOO mm dia
length each )
) a) Labour day o.2A
A. {000 mm dla Mate day 1.00

) Mason day 6.00


a) Labour Mazdoor
Mate day 0.18
)
Mason day 0.50 b) Material cum 0.09
Mazdoor day 4.00 Sand at site 0.07
) tonne
12.50
concrete Pipe rnetre

)
b) Material iiliftiJ:o'r.""t'"ssed
Sand at site cum 007 includrnq collar at sile 5.00
mm sieve cum
Cem€nt at site tonne 0.05 o","*irl r","t''' o"*ing 56
) RCC pipe NP-4 /prestressed concrete mtr 12 50 for class bedding
pipe including collar at site
) 450 @ % on (a+b)
Granular material passing 5.6 mm sieve cum c) overheads
forbedding
@ % on (a+b+c)
) d) Conttactor's protit
c) Overtesd3 @ % (.+b)
a+b+c+d
) Cost for 12 5 metre =
d) contractor'e prolit @ % (.+b+c)
(a+b+c+d)'t2'5
Rate Per metle =
Cost for 12.5 melre = a+b+c+d

Rrto per metrs E (a+b+c+d)r12.5

2'72 211
Road Wo*s : 9'PiP€ Culvedr
Road Wolls : 9-Pipc Culvcrts

Unit Quantity Rate


DescriPtion
Sr. Reference to Description Unit Quantity Sr.
Reference to Rs
No MoRT&H Rs. MORTH
t'lo.
Specifications Specifications

b) Matsrlal cum 0.14


Note ln case of cement craddle bedding, Sand at site
tonne 0.10
quantjty of PCC M 15 is to be calculated
Cementat site 25.00
as per design and priced separately and concrete pipe metre
RCC pipe NP4/prestressod
added.
including collar at site 12.50
cum
Gronular materialpassing 5 6 mm sieve
2. The rate analysis does not include tor bedding
excavalion, cemenvmasonry works in
head\,lalls, backfilling, proteclion wolks and
c) Ov€rheads @ % (a+b)
parapet walls. The same are to be
% (a+brc)
O contractol's Prolit @
calculated as per approved design and
drawings and priced separately on rates
available under respec{ive sec,tions-
Cost for 12 5 (€tre = a+b+c+d
9.3. 2900 Laylng Reinforced Cement concrete Pipe
Rate Por molr€ (8+b+q+dlll2'5
E
NP4/Prestre6sed concrete Pipe on First
Class Bedding ln Double Row 1 ln case of cement craddle bedding '
Note:
.uantW of pCC fvf f5 ls to b€ calculated
Laying reinicrced cementconcrete pipe NP4/
]l-p", a""ign p'i"ed separately and
prestressed concrete pipelorculverts on first "no
added.
class bedding ofgranular materialin double
include
row including fi xing collar$rith cernent mortar
2. The rate analysis do€s not ln
1:2 but excluding excavation, protection worlG
excavation, cemenumasonry
works, backfilling, concrete and masonry w"rr", backfilling' pmtection
works
i""i are to be
works in head walls and parapets. watfs The sarne
oarapet
"ni
;il;,"d Per approved
design and
Unit = metre ""
and pacea separately on rates
,trawings
Taking output = 12.5 metre ( 10 pipes of2.5 :vailable under respective sections'
m length each in two rows)

B. l2oo mm dia
A. 1000 mm die
8) Labour day 0.56
a) Labour Mate
day 2.00
Mate day 0.36
Mason 12.00
Mason day 1.00 day
Mazdoor
Mazdoor day 8.00

)
)
214
215
)
Road Worts : 9-pip€ Cutv.ns

Sr. Reference lo Description


No MoRT&H Unit Quantity Rate
Specificaflons Ghapter-10
Rs.

b) Materiat Maintenance otRoads


Sand at site
cum 0.18
Cement at site mble:
tonne 0.14
RCC pipe Np-4 /prestressed
concrete metre
prpe includjng collar 25.00
at site
Grdnular mateial passjng
5-6 ftm sieve cum
1 ln lhe case ol rain cuts, il has been assumed thatsome materialcut by rain, approximately 25 per
torclass beddlng 13.75 ad re-used and the balance 75 percent is required
cent, willbe avaihbb at site which can be retrieved
to be provided as fresh material.
c) Overheads
@ % on (a+b)
2. For making up earthen shoulders, ithas been asrrned that on an average 150 mm fi ing will be
dl tohtractor,s profit required. Similarly, tor sfipping ol excess soiltrom,S ehoulder, an average depth of 75 mm has been
@ % on (a+b+c)
assumed-
Cosl for 12.5 metre: a+b+c+.t
) 3. ln the case of chocking ofdrain, it has been assuErd that half the deplh of drain has been filled with
Rate per metre = (a+b+c+d)/12.s earth/debris, which requires clearance

) Note i , of cement craddte bedding, 4. During the process of landslide clearance on hilrcads, it has been assumed that ea(h will be
_,."-:::"
quantity of pCC disposed off by the dozer on the valley side. In cae there is any objection to this arrangemenl due
M 1S is to be catculated
) as per destgn and priced to particular site conditions, resources like loaden rd
tipper will have to be provided for disposal of
separately and
adc,ed earth/debris forthe lead involved.
)
2. The rate analysis does
nol include 5 Pot-hole repair and patchwork are provided to be doe by mechanical means
I excavation, cernenUmasonry
works in
nead walls back,tlJing, protection
works
6. The items like slurry seal, log spray, crack prevdion courses, surface dressing for maintenance
ano parapel walls.The same works have already been included in Chapter-s airare notbeing repeated in this chapter.
are to be
calculated as per approved
desiqn and
orawings and pflced
separalely o; rates 7. The cost of other items like repair of ruts and unilation maintenance of earthen shoulders, cross
avaltable under respecljve
sections
drainage works, minor and major bridges and ricellaneous items like turfing and arboriculture,
painiing and letlering on km stones, repair to sirage, repair to footpath, street lighting, railing,
dividers, separators and underpasses for pedestr-rs has been given in the'Report ofthe Committee
on Normsfor Maintenance ofRoadsin lndia'publi$ed by IRC in January2001which may be refened
forguidance.

8. The repair items.elated to bridges have been givah Chapter-16

276

l
2'77
Road Wo*s : lo-MainGn c. ofRords

Chapter-10
Sr. Reference to Description Unit Quantity Rate
Maintenance of Roads No. MoRT&H Rs.
Specifications
Sr. Rererence to Description
No Unit Quantity Rate
MoRT&H Note: Only 75 per cent of fresh material has been
Specification6 Rs.
provided as 25 per cent can be retrieved at
site from earlh that is flown down lhe slope rn
10.1. 3002 Restoration ofRain Cuts the form ofslurry and deposited at the foot of
the rain culs
Restoration of rain cuts with soil,
moonrm,
gravel or a mixture of these, 3003 Malntenance of Earlhen Shoulder (filling
clearing the loose 10.2
soil, benching for 3OO mm width, laying withlresh soil)
fresh
materialin layers not exceedlng 2SO
mm and
compacling with plate compactor or power l\raking up loss of material/irregularities on
ramrners to restore the original alignment, shoulderto the design level by adding fresh
levels and slopes approved soil and compacting it with
appropriate equipment.
Unit = cum
Taking output = 10 cum Unit = sqm
Taking output = 100 sqm
a) Labour
Mate Assuming average thickness ot lilling to be
day 0.08
Mazdoor 150 mm
day 2.00
Ouantity of fresh material = '15 cum
b) Machinery
Excavator .1.0
cum bucket capacity
@ 60 hoqr 0.13
a) Labou.
cum per hour Mate day 0.18
Tipper ( L is average lead in km for Mazdoor day 4.50
borrow t.km 12xL
earth)
bl achlosry
Add 10 percent of cost of cariage Excavator 1.0 cum bucket capacity @ 60 hour 0.25
towards
loading and unloading charges cum p€r hour
Tipper (L is average lead in km for bonow t.km 24 xl
Plate compactor earrl)
hour 0.50

c) Overheads @ % on (a+b) Add 10 per cent ofcost of transpo(ataon


to cover cost of loading and unloading
d) Contractor,s profit
@ % on (a+b+c)
Plate compactor@ 25 sqm per hour hour 12 00
Cost tor 1O cum = a+b+c+d
c) Overheads @ % on (a+b)
Rate per cum = (a+b+c+d)/10

218
I 219
t
)
Rord Work, : tGMaid.nancc ofRoadr
Road Wo*s : lo-Mainlglane ofRoads
)
Sr. Reference to Description
) No MoRT&H Unit Quantity Rate 9r.
Reference to Oescription Unit Quantity Rate
Specifications Rs. MoRT&H Rs.
|lo.
) Specifications
d) Cont.actor,s p.ofit
@ % on (a+b+c) 3004.2 Filling Pot-holes and Patch Repairs with
) Open-Graded Premix Su.tacing, 20 mm
Cost for 100 sqm a+b+c+d
=
) Removal of all tailed material, trimming of
Rate per sqm on = (a+b+c+d)/lOO completed excavation to provide firm verlical
) 10.3.
faces, cleaning of suirace, painting ot tack coat
3003 Maintenance of Earthen Shoulder on the sides and base of excavation as per
) (stripping excess soil) Clause503, backfilling the pot-holes with hot
bituminous material as per Clause 511,
) Stripping excess soilfrom the
shouldersurface
loachieve U,rapprovedlevelandcompactng
compacling, trimming and finishing the surface
to form a smooth continuous surlace, all as
with platecompactor. perClause 3004.2.
)
Unit = sqm
Unit = sqm
) Taking output = 100 sqm
Taking out put = 10250 sqm (205 cum) (405
tonne)
) Assuming average depth ofskippjng a) Lrbour
as
/5 mm Mate Day 3.76
) Quantity ofearth cutting involved
= 7.5 cum Mazdoor Day 90
MazdoorSkilled Day 4
) a) Labour
Mate b) Machlnsry
day
) Mazdoor
day
0.10
2.50
Air compressor 250 cfm hoJr 6
HMP 100-110 TPH capacity hour 6

) b) Machlnery Tlpper 10 tonnes capacity


Smooth wheeled roller 8-10 tionne
hour
hour
45
Plate compactor
@ 25 sqm per hour hour 4.oO
) c)
c) Matorlal
Overheads @ % on (a+b) Crushed stone aggregates nominal size cum 184.5
) d) Contractor's profit
13.2 mm @ 0.18 cunv1o sqm.
@ % on (a+6+q1 Crushed stone aggregales nominal size cum 92.25

) Cosl for100 sqm a+b+c+d


11.2 mm @ 0.09 curv10 sqm.
Bilumen 80/100 @ 14.6 kg./10 sqm.
= lonne 14.97

) Rate per sqm = (a+b+c+d),/l0O


Bitumen emulsion ,or tack coat including
vertical sides of pot+ole
lonne 2.46

) Note i The earlh slripped from earthen


shoulders to
d) Ovsrheadr @ % on (a+blc)
be dumped on the side slopes
locally for e) Conlractor!5 proflt @ % on (a+b+crd)
,) disposal.
Cost for 10250 sqm = a+b+c+d+e
) Rate per aqm = (a+b+c+dre1fl0250

) 280
28t
Ro.d \ryo*s : Io-Maint nance ofRolds Rotd wo*s: lo'M.int nane ofRoads

Unit Ouantity Rate


Sr. Reference to Oescription Unit Quantity Rate Reference to DescrlPtion
Sr. Rs
No. MoRT&H Rs. No. MoRT&H
Specifications Speciflcations

10.5 3004.2 Filllng Pot-holes and Patch Repairs with Gndlng ll - t3 mm (Nominal sko)
cum 85.5
Bituminous Concrete, 40 mm 13.2-'lomm 30 Per cent
cum 71.25
1G5mm 25 Per cent
122.55
5 mm and b€low 43 Per cent cum
Removai of all failed material, trimming of
tonne 8.62
completed excavation to providelirm vertical Filler 2 Per cenl bY

faces, cleaning ofsurface, painting of tack coal wdight of aggregate

on the sides and base of excavation as per Add 5 per cent for wastage
Clause 503, backlilling the pot-holes with hot
bituminous material as per Clause 504, tuiv one of t€ above altematives o{ aggregate
compacling, trimming and fnishing the surface ie. 19 mm or 13 mm nominal size olay be
to form a smooth continuous surface, all as adopH as Per sPproved design'
perClause 3004.2
d) Ovorheads @ % on (a+b+c)
Unit = sqm
Taking out put = 4900 sqm (196 cum) (450 lo on
e) Contractor's Profit @
tonnes)
(a+b+c+d)
a) Labout
Mate Day 2.92 Cost for4goo sqm = a+b+c+d+e
Mazdoor Day 70
Rate pe. 5qm = (a+b+c+d+e)/4900
Mazdoorskilled Day 3

b) Machinery Nole: For detaited working of quantities of


5
Air compressor 250 cfrn hour 6 aggregates, refer item 5.8 ofChapter
HMP 100-1 10 TPH capacity hour 6
10.6 3004.3.3 Crack Filllng
Tipper 10 tonnes capacity hour 45
Srnooth wheeled roller 8-10 tonne hour 12 bitumen
Filling of c€ck using sl?" - curing
crusher dust in case
c) ilatorlil emulsion and applying
widerthan 3 mm'
i) Bitumen tonne 22.5 cracks are
ii) Biturnen emulsion for tack coat tonne 1.18
unit= RunninO metre
iii) Aggtegates
Taking out Put = 500 m
Gradlng l- lgmm (Nomlnalalze)
20-10mm 35 percent cum 99.75 a) Labout
day 0.04
10-5mm 23 per cent cum 65.55 Mate
day I
5 mm and below 40 per cent cum 114 Mazdoor
Filler 2 per c€nt by tonn€ 8.62
v€ightofaggregates
b) ]$aterl.l
kg
Slow{xring titurnen emulsion
Add 5 per cent forwastage cum 0.02
Stone crusher dust
OR

283
282
)
Rotd Work : tEMtinicntnc! of
Rotds
) Ro.d Wo*s : l0-Mainl.nec! of Roads

) Unlt QuantitY Rate


Refelence to DescrlPtion
Sr. Reference to Oescription Unit Quantity Rate 5r. Rs.
MoRT&H
) No MoRT&H Rs. No.
Specifications Specifications

3005.1 Repalr ol Jolnt Groovos wlth EPoxY


c) Overheads @ % on (a+b) 10.9.
Mortar
) e) Contractor's profit @ % on (a+b+c)
Repairof spallediointgrcovesolconkaction
) Cost for 500 sqm = a+b+c+d ioi;ts, longiludinal joints andexpansionjoints
inconcrete pavements using epoxy mortaror
) Rate per metre = (arb+c+d+e)/500 epoxy condete.

) '10.7 3004.4 Dusting unit= running metre


Taking outPut =10 metres

) Applying crusher dustto areas of road where


bleeding ofexcess bitumen has occuned a) Labour 0.04
day
Mate
) day 0.50
Unit = sqm Mazdoor
day 0.50
Taking output = 3500 sqm Chiseller
)
a) Labour b) Material kg 2.50
) Mate day 0.08 EPoxY Primer
lor kg 10.00
Mazdoor day 2 Epoxy compound with accessorres
) preParing ePoxy mortar
b) Material
) Stone crusher dust finer than 3 mm f,/ith cum 6.25 c) Machlnery
forcleaning hour
nol rnore than'10 per cent passing 0.075 Air compressor 250 cfm
) sieve
d) Overheads @ % on (a+b+c)

) c) Ovorfis.d8 @ % on (.+b)
@ % on (a+b+c+d)
e) Contractot's Proflt
) d) Contracto/B proltt @ 5! on (i+b+c)
cost lor 10 metre = a+b+c+d+e
Cost br 3500 sqm = a+b+cird
.l
Rate Per metre = (a+b+c+d+e)/10
R.te per sqm = (a+bac+d)6500
) The constituents ol epoxy mortary/epoxy
Fog Seal Note
10.8 3004.3.2 be as per the instruction and
) 3004.3.4 Crack Prevention Coursss ""*r* "*
manual of the manufacturer'
3004.5 Slurry Seal
) 3004.6 Surlace Dresslng for Malntenance Works

The above rnentioned items have already been


,l
included in Chapter5.

) 285
284
)
Road Workr : lo-Mai'rlenanc€ ofRoads ------r Road Wo*s : I o'Maintemnct of Roads

Unit Quantity Rate


Sr. Reference to Description Unit Quantity Rate ReferenGe to OescriPtion
Rs.
Sr.
No MoRT&H Rs. MoRT&H
No.
Specifications Speciflcations
10.10 3005.2 Repair of Old Joints Sealant a) Labour day 0.08
Mate 1.00
day
Removal of existing sealant and re-sealing Mazdoor
of contraction, longitudinal orexpansion joints
b) overheads @ % on (a)
in concrete pavement with fresh sealant
malerial. % ol' (a+b)
c) Conttactor's profit @
Unit = running metre
Cost for'10 metre = a+b+c
Taking output= 10 metre
Rate Per mette
: (a+b+c)/10
a) Labour
Mate day 0.04 3000 Landslide Clearance in Soil
40.'12.
Mazdoor day 0.50
and ordinary
Clearance of landslides in sorl
b) Material ioi* iv orrtaot"r. o 80 A-12' 180 HP and
" the valley srde
Primer kg 0.25 drsposal ofthe same on
Sealant kg 1.00
Unit = cum
c) Machinery
Taking outPut = 100 cum
Air compressor 250 cfm iorcleaning hour 0.05

a) Labour
d) ovorheads @ % on (a+b+c)
Mate
day 0.04
day 1.00
o) ConlBctoCs prorit @ %on(.+b+c+d) Mazdoor

Cosl I lO rn€tre = a+b+c+d+e b) Machinery 1.67


hou( hour
Dozer 180 HP @ 60cum Per
Rate por metre ! (a+b+c+d+c)/'10

@ % on (a+i)
10.11. 3000 Hill Side Draln Cloarance c) overheads
@ % on (a+b+c)
Removal ofearth kom the choked hill side d) Contractor's ptofit
drain and disposing it on the valley side
manually. Cost for 1OO cum = a+b+c+d

Unit= running metre Rate Pe. cum = (a+b+c+d)/100


Taking ouhut = 10 metre

Assuming muckcausing choking ofdrain to


be 0.2 cum permetre, quantity of earth to be
)
removed for 10 metre = 2 cum

1.86
781
)
E:---_------------

Ro.d Work : lGMainieoamc ofRolds


Roid Wo*s : lo-M.inta4.. ofRolds

Sr, Reference to Description Unit Quantity Rate


Reference to Description Unit Quantity Rate
No. MoRT&H Sr.
Rs. Rs
Speclfications No. MoRT&H
Specifications
Note: Slide clearance involves pushing of loose
earth slidedon the road surlace from hillface e) Contraclor's prolit @ % on (a+b+crd)
on the valley side. Since no cutting otoriginal
Cost tor 100 Cum = a+b+c+d+e
ground is involved, the output ol dozer has
been laken as 60 cum per hour br soil, ordinary R.te psr cum = (a+b+c+d+e)r100
rock and blasted hard rock. However, ifthere
are objection to disposing ol earth on valley Note: Credit for the rock if found acceptable as
side, additional resources for its disposalshall construction material shall be afforded.
be considered as per site conditions.
10.14 3000 Snow Clgarance gn Roads wlth Dozor
10.13. 3000 Landslide Clearance :h Hard Rock
Snow clearance from road surface by a
Roqulilng Blastlng
buldozer 165 HP and disposing iton the valley
sUe
Clearing of landslide in hard rock requiring
blasting for 50 per cent ot the boulders and Unit = cum
disposalofthe same on the valley side. Taking output = 5000 cum

Unit = cum a) Labour


Mate day 0.08
TakinE output = 100 cum
Mazdoor day 2.0

a) Labour
Mate
b) Machinery
day 0.09 588
Dozer D 80 A-12, 180 HP @ 850 cum hour
Mzdoo. day 1.50
' Drilhr day 0.75
perhour

Blaster day 0.07 c) Overheads @ % on (a+b)

b) Machinery d) Contraclor's profit @ % on (a+b+c)


Dozer D B0 A-12, 180 HP @ 60 cum per hour 't.67
hour cost for 5oo0 cum = a+b+c+d
Air compressor 250 ctm with two jack hour 2.50
Rato per cum = (a+b+c+d)/5000
hammer

Note : Labour provided will not be cutting the snow'


c) Materlals They willbe guiding the dozer operator on the
Gelatine 80 per cent @ 35 kg pe|100 cum kg '17.50 alignment of the road as enlre surface gets
Electric Detonators @ l Detonatorfor2 Nos. 70.00 covered with snow and theedges otthe road
Gelatine sticks of 125 gms each are not visible and for changing the blade
angte. AIso they will keep a watch on the hill
d) Overheads @ % on (a+b+c) side for any eventuality of avalanches, sllde
etc.

288
289
Road Worr(s:
l0,Mainba.ncc
ofRoad3

Sr. Reference to
No Descrlptio n
MoRT&H
Unit Quantity
Specifica ons Chapter-11
Rsl
10.15. 3o0O
Snow Clearance
on Roads with Horticulture
orowets Snow

amble:
;n:."::"J:ffi 'ff rfl
i1f;,f; i,,:-"- 1. The items ol turfing with sods and seeding and mulching have been included in the chapterofearthwork

Unit = cum
2 The analysis of rates for grassing of lawns and hedges has been included, as the same may be
Taking output
= 35616 needed for resting placeson highways.
"r,
a) Labour Five types of tree guards as under have been provued:
3
Mate
Mazdoor day 0.08 a) Half brick circular type
day 2.00
b) Machinery
b) Tree guards rnade from empty bitumen drums 1.30 m high

ii,li"o5;"'*"'"'t 140 HP
@ 600 hoirr O.OO c) Tree guards rnade from empty bitumen drums 2.00 m high

c) overheads
@ % on G+b) d) Tree guards wilh MS flat iron

d) Cohtractort profit
@% on (6+6+61 e) Tree guards with MS angle and 3 mm steel wire welded on MS f,at and bolted to angle iron
posts
Cost for 3600
cum (a+b+c+d)
Selection from above may be made as per actualsituation and design.
Rate per cum : (a+b+c+d)/3600
4 Analysis of rates for wrought iron and mib steel welded wo.k has been included to cater for any
miscellaneous work in connection with horticulture, fencing and trafflc sign

5 Though the estimate for compensatory afforestation is made by the forestdepartment, the rate for this
item has been analysed and included torthe purpose of estidration.

6 ln the rate analysis of some items, the quantities ofsub-items involved in that analysis, like. excavation
for foundation, loundation concrete, painting, lettering, etc. have been given. The rates for such items
may be taken from relevant chapters where the same have already been analysed.

7. As grass and plantation need more care, one mate has been provided for every 10 mazdoors in case
ofhorticulture.

290
)
29t
)
I l -Horticulturc
) Ro.d Wotu:

Unit Ouantity Rate


) DescrlPtion Rs,
Chapter-{'t sr.
Reterence to
) MoRT&H
No.
Horticulture Speciflcations
in either direcllon
q ln rows 15 cm aPart
Sr. Reference to Description Unit Quantity Rate
) No. MoRT&H Rs. a) Labour day 0.17
specifications Mate day 0.75
'1.00
ror 30 davs
dav
11.'1. 307 Spreadlng of Sludge Farm Yard Manure ["jj:I';l'ffiT:,"ce
) orland Good Earth
bl Machinery hour 0.50
Spreading gfsludge farm yard manure orland Water tanker 6 KL caPacity
)
good earth in required thickness (cost ol
sludge, farm-yard manure or/and good earth c) Material kg 100.00
) to be paid forseparately)
Doobgrass

@ % on (a+b+c)
) Unit = cum
d) ovorheads
Taking output = 5 cum @ % on (a+b+c+d)
) e) conttactor's profit
a) Labour Cost for '1OO sqm = a+b+c+d+e
) l,,1ate day 0.04
'1.00 (a+b+c+d+e)'I'100
Mazdoor day Rate Per 5qm =
) direction
b) Overheads @ % on (a) ii) ln rows 7'5 cm apart in either
)
c) Contractor's profit % on (a+b) a) Labour day o.22
Mate day 1.25
)
Cosl for 5 Cum = a+b+c day 1.00
ror 30 day s
il'"'.:."":l';:tffii::""ce
)
Rate per cum = (a+b+c)/s
b) Machinery hour 0.75
\.,. 307 Grassing wilh 'Doob' Grass Water tanker 6 KL capacty

)
Grassing with 'OooU grass including watering c) Material k9 200.00
and maintenance of the lawn icr 30 days or Doob grass
) more tillthe glass forms a thick lawn free from % on (a+b+c)
weeds and fit for rnoving including supplying O overheads @
) good earth ifneeded.
@ on (a+b+c+d)
e) Contractor's grolit '/o

) Unit = sqm '1Oo sqm = a+b+c+d+e


Cost for
Taking output = 100 sqm
) (a+b+c+d+c)1100
Rate Per sqm =

)
293
292
)
Road works , I l-Horliculiure Ro.d Works : I l 'Ho.riculture

Sr. Reference to Oescription Unit Unit QuantitY Rate


Quantity Rate Reference to OescriPtion
No, MoRT&H Sr. Rs.
Rs. MoRT&H
Specifications No.
Specifications
Note : ln thecase of horticulture one mate has been
307 Maintenance otLawns orTuding olSlopes
1.4.
provided for every 10 mazdoors as
maintenance ofgrass and plants require rnore Maintenance ot lawns or Turfing ot slopes
year
care. (rough grassing) for a period of one
including watering, etc.
11.3 307 Making Lawns including Ploughing and
Oragging with 'Swagha' breaking of Clod Unit = sqm
Taking outPut = 100 sqm
Making lawns including ploughing and
breaking ofclod, .emovalof rubbish, dressing a) Labour
day 10.00
and slpplying doobs grass roots and planting Llali
at 15 cm apa(, including supplying and
spreading offarm yard manure at rate of 0.18 b) Machlnery
cum per 100 sqm. Water tanker 6 KL capacity
hou6 15.00

Unit = sqm c) Matetlal 90.00


Taking output = ,l00 sqm Cost of water
KL

a) Labou. d) Ove.heads @ % on (a+b+c)


Mate day 0.15
Mazdoor for preparation of ground day 0.50 e) contractor's profit @ %on(a+b+c+d)
Malifor fetching doob grass roots and day 1.00
grassing at 15 cm apart Cost for '1OO sqm = a+b+c+d+e

b) Machlnery Rate Per sqm = (a+b+c+d+e)/'!00


Water tanker 6 KL capacity ho!r 0.50
Tractor with filler hour 0.01
't 1.5. 307 Turfing Lawns with Fine Grasslng
including Ploughlng, Dressing
c) t.terlal
Supply offarm yard manurc at site ofwork cum 0.18 Turfinq lawns with fine grassing including
Finegrass kg 100.00 ptoug;ing, dressing including breakrng
of
of rubbish' dressing and
clodi, removal
d) Overheads @ % on (a+b+c) supplying doob grass roots at 10 cm aparl'
of farmyard
incruoing supplying ano spreading
e) ContEctor's profit @ % on (a+b+c+d) 100 sqm'
manure at rate of 0.6 cum Per

Cost fo|l00 sqm = a+b+c+d+e Unit = sqm


Taking output = 100 sqm
Rate per sqm = (a+b+c+d+e)/i00

294 295
Rord worts : I t-Honiculr@

RoadWorks r I l -HorticultuE
Sr. Reterence to Description
No MoRT&H Unit Quantity Rata
Specifications arr. Reference to Description Unlt Quantlty Rate
Rs.
llo' MoRT&H Rs.
a) Labour Specifications
Mate c) Materlal
Mazdoor for preparaljon day 0.25
of oround Cost ofwater KL 60.00
Malifor retchrng doob gras; day 1.00
roots day
hedges and grassing 1.50 d) Ove.heads
at 1O cm apart @ % on (a+b+c)

b) Machinery e) Contractor's profit @ %on(a+b+c+d)


Water tanker 6 KL
capacitv
Tractor wtlh Uller hour 0.50 Cost for 100 sqm = a+b+c+d+e
hour 0.0 i

c) Material Rate per sqm = (a+b+c+d+e)/100


Supply of farmyard
manure at sile o, work cLrm 0.60
@ 0 6 cum per IOO som 11.7. 307 Planting and Malntainlng of Permanent
Finegrass Hedges
kg '100.00
d) Ove.heads @ % on (a+b+c) A) Planting permanent hodges lncluding
digging of trenches
6) Contractor,s profit
@ %on(a+b+c+d)
Planting permanent hedges including digging
Cost for lOO sqm a+b+c+d+e of kenches, 60 cm wide and 45 cm deep.
=
.efilling the excavated earth mixed with
Rate per sqm ! (a+b+c+d+e[iOO fa.myard manure, supplied at the rate of4.65
,1.6. cum per 100 metre and supplyingand planting
307
wfth Fire crassrns hedge plants at 30 cm apart.
#ff;i::"r:::"*s
Unit= Running metre

ilil:iffi ., Taking output = 100 mehe

""jf#ff
Jj'l,l,in: :r*,n
a) Labour
Unil = sqm Male day 1.4
Taking output 100
= sqm Mazdoor for digging oftrench 60 cm wide day 't0.00
and 45 cm deep
a) Labour l\,4azdoorforrefilling theexcavatedearth day 4.00
Mali mixed with cow dung, preparation of
day io.oo ground and digging of plant, from the
b) Machinery nursery carriage to site and planting in
Water tanker 6 KL capacity position
hour 2O.OO

b) M.chinery
Waterlanker 6 KL capacity hour 0.50

296
297
Road Works : I I -Uodiculture Road Wo*s: I l -Hodicultun

Unit Ouantity Rate


Sr. Reference to. Descriptlon Unit Quantity Ratel Reference to Oesc.iPtion
pr. Rs.
No. MoRT&H Rs. MoRT&H
Speciticatlons [o.
i Speciticatlons
c) Material
Plantlng and Malntalnlng ol Flow€tlng
Cost of hedge plants 2 rows at 30 cm each 2x340 it.s
307
Plants and Shrubs
apart
Supply offarmyard manure at slte ofwork cum 4.67
A) Plantlng flowerlng Plants and shrubs
Pesticide kg 0.25
ln central verge
Costofwater KL 3.00
plants and 800
Unit = Running metres 2OO
d) overheads @ % on (a+b+c)
rows in one km length of road
shrubs in b^ro
where width ofverge is 3m and above
e) Contractor's profit@ o/"
on (a+b+c+d)

Taking output = 1000 metre


Cost for 100 metre = a+b+c+d+e

a) Labour
Rate per metre = (a+b+c+d+e)/i00 day 1.20
Mate
day 12.00
Mazdoor
B) Maintenance of hedge for one yeat
b) Machlnery
Unit = Running metre
Water tanker 6 KL caPacity
hour 6.00
Taking output = 100 m

c) Material
a) Labour PIants
each 200.00
Mate day 3.00 each 800.00
Shrubs
Mazdoor day 30.00 cum 63.64
Manure sludge/farmyard manure
kg 0.50
Pesticide
b) litachlnery KL 36.00
Cost of water
Water tanker 6 KL capacity hour 5.00

d) Ovortead€ @ % on (a'b+c)
c) Materlal
Manure sludgeJramryard rnanure cum 2.00 (l+b+c+d)
Pesticide kg 0.50 r) Contracto/s profit @ % on

Cost of water KL 30.00


Cost of hedge plants @ l0% casualty each 68.00 Rate Per km = (a+b+c+d+s)

plants and
d) Overh€ads @ % on (a+brc+d) B) Maintenance of flowering
year
shtubs in centlal verge for one
e) Conttactor's prollt @ o/.
on (a+b+c+d)
Unit = km
CoSt for 100 metre = a+b+c+d+e Taking outi,.lt = one km

Rate por metrg = (a+b+c+d+e)rlOO

298 299
Rod Wo*s I I l-HoniorlttrE
Road Worfts : ll-Ilodiculture

Unlt OuantitY Rate


DescrlPtion Rs.
Sr. Reterence to Description Unlt Quantity Rate Reference to
sr,
No. MoRT&H Rs. MoRT&H
No.
Speciflcatlons Specilications

a) Labour bl Machlnery h(llr 2.00


Water tanker 6 KL capaqry
Mate day 36.00
)
Mazdoor day 365.00
cl Materlal each 10.00
25 mm dra
) SaPIrng 2 m high cum 0.94
b) i,lachlnery
Farmyard manure kg 0.50
Walertanker 6 KL capacity hour 90.00
) Presticide KL 12.00
Cost ofwater
c) Material
) Manure Sludge/farmyard manure al site cum '10.00 (a+b+c)
Costofwater KL 180.00 d) overheads @ '^ on
) Replacernent of casualties @ 10 per cent % on (a+b+c+d)
o) Cont6qtor's Proflt @
Plants each 20.00
) Shrubs each 80.00
Cost for 1O trees = a+b+c+d+e
Pesticides kg 1.50
) (a+b+c+d+9y10
Rate Pet trco =
d) Overheads @ % on (a+b+c)
)
a) Conlractor'a profit @ % on (a+b+c+d) 11.10. 308
l:ffif il":[ffi 'llit*]#'llll;
) Malntenance/year/km = (a+b+c+d+e) Forked Soil

) ,,r.r. 301 Plahting of Trees and their Maintenance


for One Year
i"i::::: lil"illi[' ;,i"flliJ:t':fl
)
Planting oftrees by the roadside (Avenue trees)
) in 0.60 m dia holes, 'l m deep dug in the

,
ground, mixing lhe soil wih decayed tarmyard/
sludge manure, planting the saplings, ffm$m,m*ru*
decayed farmyard
manure'
bacmlling the trench, walering, fixing the tre€ -
I guard and maintaining the plants for one year
Unit = sqm
sqm
Unit = Each Taking outPut = 100
)
Taking output= 10 trees
a) Labour day 0.12
) Mate day 3.00
a) Lebou.
Mazdoor
Mate day 1.70
)
Mazdoorfor planting day 2.00
Mazdoor for maintenance for one year day '15.00 bl Machlnery hour 0.50
) 111"161 b6tsr $ KL €PaqV

) 301
300
)
Rold Wo*r: r t-Honicultut!

Sr. Road Wo*s: I lllorticuliurc


Reference to
No.
Description
MoRTEH Unit Quantity Rate
Speclfications Sr' Reference to Description Un it Quantity Rate
Rs. I
No. MoRT&H Rs.
c) Material Specifications
Cost of water
KL 300 a) Cost, carlage, loading, unloading quintal 1.00
d) overheads and stacking in store/sile
@ % on (a+b+c)
e) Contractor,s profit b)Overheads@ %on(a)
@ % on (a+b+c+d)

Cost for 1OO sqm = a+b+c+d+e c) Contractor's profit % on (a+b)

Rate per sqm (a+b+c+d+e)/l0o Rate per quintal = a+b+c


=
11.11. 308.2 Supplying Sludge
.-. weI oecayed Farmyard
11.13. 308.2
;:::,.: "
Supplying sludge duly stacked at site/store

Unit = cum
Taking output = one cum
ii{;"1ffi:HT;;#rr# a) Cost ofsludge including caniage, loading, cum 't.00
Unit = cum unloading and stac*ing at site
Taking output
= one cum
b) overheads @ '/. on lal
") o_UIy o:*red farmyard manure
il.]l-.1_*",,
screened, loading, cum 1.00 c) contractor's profit@ % on (a+b)
caniage, unloadtng
and stacklng at site
Rate pea cum = a+b+c
b) ove.heads
@ o/.
on (a)
11.14. New Hal, Brick Clrcular Tree Guard, in 2nd
c) Contractor,s profit Class Brick, internal diamelre '1.25 metre,
@ % on (a+b)
and height 1.2 metre, above ground and
Rate per cum (a+b+c) 0.20 metre below ground
=
11.12 308.2
i"rjI,r"fl
.* of work/srore_Deoited Half brick circular tree guard, in 2nd class
brick, intemaldiamebe 1.25 metre, and height
1 .2 metre, above ground and 0.20 metre belo/v
-suplly at site of ground, bottom two clurses laid dry, andtop
worUstore-deoiled neem
rd'(e outy packed in used three courses in cement mortar 1:6 (1 cernent
gunny bags.

Unit = quintal
6 sand) and the intermediate courses being )
in dry honey comb masonry, as per design
Taking output onequintat complete-
=
)
302 )
303
)
Road Wo*s : ! l-Horiicultur. l{tonic'utr"!
Ro'd Wotts : I

Sr. Reference to Description Un it Quantity Rate DescriPtion Unit Quantity Rate


Sr. Reference to Rs.
No. MoRT&H Rs.
No MoRT&H
Specifications
Specilications
Unit = Each
@ % on (a+b+c)
d) Contractor's profit
) Taking output = one tree guard

Costfor 1O metrc = a+b+c+d


) a) Labou.
Mate day 0.05
Rate Per melre = (a+blc+d)/10
) Mason day 0.25
irtazdoor day 0.25 13m
New Maklng Tree Guard 53 cm Dia and
11.',|6
) High as p€r Deslgn from Empty Bitumen
b) Materlal
Orums
Brick 2nd class including carriage Nos. 230.00
) - Cementmortar 1i6 cum 0.025 1 3 m high
Making tree guard 63 cm dia and
) bitumen drum' slit
c) o/" o.ide"ign f,om
Overheads @ on (a+b) ""
suitablv to permit
"tpty
sun and air' (supplled by

) at stilck issue rate) including


d) contractor's prolit thede;artment
@ %on(a+b+c)
Drovidinq and fxing 2 nos' MS sheel
nngs

50, o.; mm with rivets, complete in all


) Rate per t.ee guard = a+b+c+d
respecl.

)'r'r.'rs. New Edglng with 2nd Class Brlcks, Lald Dry


LengthwiBe Unit = each
Taking outPut = one tree guard
)
Edging with 2nd class bricks, laid dry
a) Labour
) lengthwise, including excavation, refilling,
Mate
day 0.02
consolidation, with a hand packing and day 0.15
Bbcksmith 0.07
spreading nearly surplus earth within a lead
) Mazdoot
day
of 50 metre.

) b) Materlal
unit = melre each 1.00
EmPtY bitumen drum
Taking output = 10 metre kg 0.65
) MSsheet50x05mm 22.O0
mm in length each
Riveb 6 mm dia and 1 O
a) Labour
) Mate day 0.002
c) ovorhoads @ % on (a+b)
Mason day 0.05
) Mazdoor day 0.05
d) contlactor's Pront @ % on (a+b+c)

) b) Materlal r t+bi'c+d
Ralo lor each trec guald
Brick 2nd class including cariage Nos 50.00
)
c) Overheads @ % on (a+b)
)
304 305
)
1

Road wolt(s: II 'Ho'iiculfuIe


Road Wo*s : I I-Ho.licullure

U nit Quantity Rate


DescriPtion
$r. Reference to Descrlpllon Unit Quantity Rate 9r. Relerence to Rs.
No. MoRT&H Rs. MoRT&H
No.
Speciflcations Specifications
We lded
Wrought lron and Mild Steol
11.17 Maklng Tree Guard 53 cm Dia and 2 Metre 1t.'18
.
work
High as psr Design from Empty Bitumen
work
Drurns Wrouoht lron and mitd steel welded
tq,"'" tars' teesand channel
ir.-#rngt"r,
guards
Making tree guard 53 cm dia2 metre high as ir1i". qr"iing f,r."t, oates and tree
per design from empty bitumen drums, slit li""ii"" o"ttg" etc including cosl of
suitably lo permit sun and air, (supplied by ""0
.".eens anO wetOing rods or bolts and nuts
thedepartment at stock issue rate)including but wiliout the clst
coiptete txeO in position
providing and fixing four legs 40 cm long of ccuete for fixing which will
lili"aration ana
30 r 3 mm MS riveted to tree guard and b€ paid seParately '
providing and fixing 2 nos. MS sheet rings
50 x 0.5 mm with rivels complete in all Unit = quintal
respects. Taking output = onequintal

Unit = each r) l,tbour day 0.45


Taking output= one tree guard Mate
day 2.00
to desEfl
Blacksmith/weldsr br cutting
a) L.bour and shape and iioting 2.50
ior black' day
Mate day 0.04 Mazdoor for fixirB and helper
Elacksmith day 0.20 smith/Welder
Mazdoor day 0.20
b) Material quintal '1.05
b) Materlal Angte, tees, channels
etc
0.05
quintal
Empty biturnen drum each 1.50 Deduct the cost of scrap
MS sheet 50 r 0-5 mm kg
Add 5 p\:r cent of cost of
Rivets 6 mm dia and 10 mm in length each 50.00 material.for
MS plate 30 r 3 mm kg '1.30 rods and other weldlng
welding
accessories
c) Ove.heads @ % on (a+b)
c) ovsrhoads @ % on (a+b)
d) Contractor's profit@ o/. on (a+b+c)
% on (a+b+c)
O contractor's Prolit
Rate for each tree guard = a+b+c+d
E
Rate Per qulntal a+b+c+d I

307
306
_-........-l

Road wo*s: Il-llonidlt rc


R.,d Works r I l-Honiculturc

Unlt Quantity Rate


DescriPtion
Sr. Reference to Descrlption Unit Quantity Rate Sr.
Reference to Rs.
No. MoRT&H Rs. MoRT&H
No.
Specifications Specifications
to
Note : 1 The items of excavation and clncreting
11.19 Tree Guard with MS lron as per
be measured and paid separately
design
Providing andlixing MS iron tree guard 60 cm
dia and 2 metre high above ground level forned from the
2 Rate of painting may be adopted
of4 Nos. (25 x 6 mm)and I Nos. (25 x 3 mm) as traflic signs'
chapter
vertacal MS riveted to J Nos. (25 x 6 mm) iron
rings in two halves, bolted togetherwith I mm and Steel
Tree Guard with MS Angle lron
dia and 30 mm long bolts including painting 11-20. New
Wi.e
two coats with paint ofapproved brand overa
coat of priming, complete in all respects.
Providina and fixrng Itee guard 0 60
metre

i.oo ."t," t"gh fabricated with MS


.or",e.
Unit= each 25 3
,"or" iion so ' 30 ' 3 mm MS iron '
Taking output = one tree guard mm dia welded and
-,i ana steet wire 3
In two halves bolted
taUricateO as per Oesign
a) Labour
together-
Mate day 0.05
Blacksmith day 0.25
Unit = each
Mazdoor day o.25 guard
Taking outPut = one tree

b) trlaterlal
MS iron 25 r 6 mm a) Laboul day 0.05
kg 19.20
Mate
MS iron 25 t 3 mm kg 9.60 day 0.25
Blacksmith 0.25
day
Welder 0.25
Add 5 per cent of cost of material for day
Mazdoor
riveting, bolting and welding accesso.ies

b) Material
c) Machlnery kg 13.50
MS angle 30 r 30 3 mm
x
004 18.00
Tractortrolley hour t
MS iron 25 3 mm
kg
kg 6.00
Steelwire 3 mm dia
d) Painling
Painting two coats including priming sqm 1.77 riveting'
Add 5 percentofcostof materiallor
bolting and welding accessorles
e) Overheads @ % on (a+b+c)
c) Machinery O,M
) 0 Contractor'r profit @ % on (a+b+c+e)
Tractor-trolley
hour

Rate per tree guard = a+b+c+d+e+f


) dl Painting
pdming sqm 1.50
Painting two coats including

)
309
) 308
F ---7
)
Road Work : I l-Horticrltu.e
Rold Wotu : I l_Horiictlltue
)
Sr. Reference to Description Unit Quantity Rate Descriptlon Unit Quantity Rate
5r. Reference to )
No. MoRT&H Rs. Rs.
No. MoRT&H
Specifications
Specifications )
' e) Overheads @ % on (a+b+c)
c) Material )
Nos. 290.00
Sapling I to 1.5 m high 2 cm dia stem
f)contractor's profit@ % on (a+b+c+e) Nos. 29.00
Add 1o Per centofsaPling
Decayed farmyard/sludge manure
cum 60.90 )
Rate per tree guard = a+b+c+d+e+f
(planting)
Decayed farm Yard/sludge manure cum 4.00 )
11.21 Compensatory Afforestation
(maintenance)
PesticidesforPlanting kg 0.50 )
Planting trees as compensatory afforestation kg 1.50
Pesticides tor maintenance
spacing
at the rate of 290 trees per heclare at a
Cost ofwater KL 18.00 )
of 6 m by grubbing and levelling the ground
upto a deth oI 150 mm, digging holes 0.9 m
dia, 1 m deep, mixing iarm yadlsludge manure
d) Overh6ads @ % on (a+b+c) )
with soil, planting of sapling 2 m high with
25 cm dia stem, backfilling the hole and
e) Contractor's prolit @ %on(a+b+c+d) )
watering.
Ratg Per hostare = a+b+c+d+e )
Unit = hectare x per size of
Note : Cost of fencing to b€ provided as )
Taking output= one hectare paid
plot and approved design, nEasured and

a) Labou. separately.
)
i) Plantlng )
Mate day 2.50
Mazdoor day 25.00 )
ii) For Malntenance for one ye.r )
Mate day 5.00
Mazdoor day 50.00 )
b) Machinery
Dozer S0 HP @ 1000 sqn hour hour 't0 )
Water tankerO KL capacity (for planting) hour 3.00
Water tanker 6 KL capacity (for hour 25.00
)
maintenance)
,
')
t)

310 3ll t)
)

)-
,r&"
)
I

),

)
L

) I

)
)
l!
I
)

)
PART B
)
BRIDGE WORKS
)
,
)
)

)
)
)
t
I
, I

I
) I
1.

L
)
)
B-Bridge Works
)
Basic Approach for the Preparation of
Standard Data Book )

basic approach forthe preparation of Standard Data Book for Bridge Works is indicated as underl
)
)
Doscription ot ltems
is giveo briefiy and linked with relevant claure of Ministry's Specifrcations for Road and
The desciption of items
Works, which may be referred fordetailed description, provisions and interpretation
)

ead charges )
The overhead charges include the following elements
)
I Site accomrnodation, setting up plant. access road, water supply, electricity and general site anangernents
)
2 Office f urniture, equipment and communications

3 Expenditure oni )
a) Corporate office ofcont.actor
)
b) Site supeNision

c) Documentation and "as built" drawings


)
4. Mobilasation/de-mobilisation of resourcss )
Labour camps wilh minimum amenities and transportatioo to work sites
)
6. Light vehicles for site supervision including administrative and managerial requirements

1. Laboratory equipmentand quality control including field and laboratory testing


)
8. Minor T&P and survey instruments and setting out works. ini:uding verification of line, dimensions, trial )
pits and bore holes, where requked
)
9. Watch and ward

10. Traffic management during construction )


11 Expenditure on safeguarding environment
)
12. Sundries

13. Financing Expenditure )


14. Sales/Turn overtax )
15. Work lnsurance/compensation
,

3r5 )
)

)
or the purpose of calculatjon olgverhF2d.charqes,
the bridge projects may be caregorized
)/pes depending upon width of caniageway, into three basic
le;liiof tne triogeano rtr;;;:;;",
: ,"a are readymade items commercia y produced by speciatized firms and in
l ategory-l l\rajor Bridges including State
ofArt Bridges and Minor ffJe,"J"b|"",,"0 "rransionjoints
Bridges 25vo bdarn cases using imported technology and parts. The rales ofthese items are to be obtained direcfly from
//
Minor Bridges included in lhe packages foferent manufacturers approved by the Ministry and shallbeadopted aftercomparison.
)ategory-2: Road
ZOo/.
I method ofcuring has been covered in the schedule. Analysis for steam curing has been included in the
)ategory-3: Rehabititation ofBridge,
; is of pre-cast concrete PSC beams.
the bridge having more than two
ir lanes, equivalent length and
costcan be adjusled accordingly. The testing of materials and finished items ofwork is covered under ove.head charges
ontlactor's profit
Lntractols profit has been taken uniformry arrangementsduring conskuc{on are covered under overhead charges. Provisions ofa temporary division,
as 1o per cent, over the cost of ilems jncrudjng
overhead charges. required shallbe govemed by Clause 112.3.
lsic tnputs
the items for well foundation, provision for nominal island/temporary protection, deep islands/cofferdams with
.lhe Standard Data Book only basic inor
resro,mare,,aranarli;;#ffi:|,fi:?#lil?l;i,llll,lll"Ti,Tl:11",,#[:T:;J:,,,1,,::"11" n ballies alld sheet piles has been made

Unt and Equipment Forinnovative type of struclures like cable stayed bridges, suspension bridges, arch bridges, bow sking gkder
e usage/hrre charges of machinery/equipmeflhave bridges, erected by innovative techniques where errection stage is as importantas the construction ofbridge
been worked out based upon presenr
!airs, POL and operational charqes cost of equipments, compone,rts in terms of input of machinery, manpower and materials, specialanalysis is called for.
as indrcaled in.Chapfer_r7.
The""
rr 2001-2002. For subsequent years. for the base
lhes are required to be escalated "**""'rr" "OO,,""bte
depending upon the market Fo. some of the items, certain size/specifications have been assumed. lf size/specifications other than the
, " situation.
the analysis of rales, for aoy same are adopted, conesponding modifications may be made in the inputs olanalysis.
ilems of work, capacity of equipment
lvith corresponding outpul has been
[1"i"lJ]:JJ:,ffi'.:ffi:il,Xf;*l-:i'r;'*"*.il;;';;ffii'Jl,;o0,0,n","n,"",u"n,
icated chapter-17 can be provided
in
The i{ems do not cover all components ofbridge projects for allsituations. There may be specialized items tor
for preparing the estimate. specific cases, which need to be analysed keeping in view the basic approach.
)terials
-. rates ofmalenalshould include Guide Bund
basic cos units costofcarriaqe incruding loadrng
'l or -"t"|.i"i";;;;;;;;;:";:t"'"rushins
hallbe determined through market
and unroading . The items for the guide bund are excavation, embankmentand protection works. The rates forthese items may
"t".r,ins enquiries betaken from the respective chapters.
lou,
ln case brjdge construction works are to be done on wide and deep water channels in major rivers or in sea
the generalclassification is
.labour, rnazd(-'or for unskired rabour
rur. and mason/fitter/bracksmith etc. for
skired
creeks etc., provlsion of f,oating barrages etc. for taking the construction materials and equipments inside
watershallalso be made separately
) mate has been provided for25labourers
Analysis for sinking of wells cover diameters trom 6 m to 12 and Twin D Type of size 12 m x 6 m. For other
shapes like rectangular orany other size, the rates ofsinking may be worked out on pro-rata basis.
,lage ot Materiats
unit forvehic,e forcarriage
has been taken as under:
The lift for casting of concrete in wellsteining may be 2 to 2.5 m restricting the free fall ofconcrete to I -5 m and
).) ln hours where lead is delined concreting layer to 450 mm.
including time required for
loading and un_loading.
) b) ln lonne kmwhere lead is
variable. The toa ding and un-loading ) The Standard Data Book is ior Oepartment use only. lt can not be produced in Couri of Law as .eference/
provided separately. forsuch case, are to be have been authority and this is a privilege documenl.
)
) 3t6
3t'7
B d8e Work: I2-Fourdrtien

Chapter-12 Pile driving rigs including vibratory hammers are assumed to be self contained with power units and
necessary ac@ssories required ior driving-
Foundation
l5 The quantity ofconcrete which is required to be shipped ofi upto a minimum height of600 mm above the
designed top levelofthe pile has been taken into account in the rate analysis.
'eamble:
i6. The amount indiczted fortesting ofpiles areforthe base year 2001-2002. For subsequent years, these
are required to be escalated depending upon market situation.
Excavation forstructures has been provided
both by manualand mechanical means.
a particular situation may be adopted. The rate relevant to
l7 The levelling course below the pile cap is proposed wilh M 15 grade concrete.

The ea(h excavated fromfoundation


has been proposedto be backfilled and
road work locally except formarshy soilwhere ---
balance quantjty utilized for 18. Steel reinforcement for cement concrete works are required to be provided separately. The rate for the
disposalhas been prouia"i. same has been analysed.

The rock foundations are required lo be preparedwhich


has been analysed. 19. Appendix-4 of IRC:78-2000 may be referred regarding pregautions to be taken during sinking of wells

ln case ofrocks, excavation has been


considered upto a depth of3 m only. 20. ln case of blasting during sinking ol wells the inner face of the curb is required to be protected with the
steel plates of thickness not less than 10 mm upto top levelof well curb. For height above top of curb,
Embedment offoundation in soft and hard
rocks has been provided as required by the thickness ofstFelplate may be reduced to 6 mm. This exka height of steellining should be limited to
the specifications.
Dewatering has been provided in excavation
3m.
for foundatjon. ln case dewatering rs not required
particular site condition, the same for a
may be omitted. 21- The concrete mix used in bottom plug shallhave a minimum cementcontent o1330 kg/cum and a slump
of about 150 mm to permit easy flow ofconcrete throogh tremie tofill-up allcavities.
Mixing ofcement concrete has been considered
both by using concrete mixer and batching plant.
rate can be adopted dep€nding upon The
avaitabltity ofequipmentlnJ a" 22. Necessary safety precautions shallbe taken forexcavation on open loundations forwhich guidance may
O-V',n" a^ni"""i..
"Opr*"i be taken hom 15:3764.
Concrete batching plant is generally placed
within one km of the b.idge site. ln case of longer
kansportation cost may be worked out based lead,
on tonne km_ 23. A levelling course of '100 mm thickness in M 10 ( 1:3i6) shall be provided before laying open foundations
The coarse and fine aggregate for cementconcrete
shallbe as per lS:3g3.
24. ln the case otopen foundation, dewateing shallnot be permitted trom the time of placing ofconrete upto
Descriplron of items has been qiven very
briefly. Relevant clauses of MoRT&H Specifications
24 hou.s afterplacernen,.
referred for detailed specillcation. may be ,
25. ln case of open foundations in rock, the trenches around the footing shall be filled-up with concrete of
The rate analysis for well foundatjon has M 15 grade upto a level of 0.6 m for hard rock and 1.5 m for soft rock above the ioundation level. The
been included fordiameter varying from 6
twin D type has also been included. m lo 12 m. Wellfor
portion above this may be filled by boulders groutedwith cement.

Pneumatic sinking is a speciarised job. Afl 26. w}en there are two or more compartments in a well, ihe lower edge of the cutting edge of the middte
safety precaution as per rs:4138 are required
Medical supervision forsuch works is considered to be taken.
very essential. Deptt, of pn"r."ti" stems of such wells shallbe kept about 300 mm above that of outer stems to prevent rocking.
restricted to 30 m below normalwater level. has been
"inting
27. The well curb shall be in RCC of mix not leaner than M 25 grade with mlnimum steel reinforcement of
Rate anarysis forvarious type of pires rike
bored caslin-situ, driven precast Rcc pire 72 kg/cum excluding bond rods.
piles ofH section have been included. and driven steer
lf the steelcasing in c€se ofdriven pile
is required to be retained,
the same ts required to be pnced separately.
28. The top of the bottom plug shall be atleast 300 mm above top of curb

318
3t9 I
)
)
Brid8c Wo*s : I2-Foundalio.
) (
29. No dewatering sha be canied out within 7 days ofcasting of bottom plug.
) Chapter-12
30. ln case ofcement concrete piles, the minimum grade of concrete shallbe M 35 with minimum
cemenl
) content of400 kg/cum. Foundation
)31. The top of the pile shallproject 50 mm into the pite cap and reinforcemeot o, pile shafl be tulty Reference to Description Quantity
anchord Sr. LJnit Rate
in pile cap.
No. MoRT&H P€.
) Specifications
32 The minimum thickness of pile cap should be afleast 0.6 m or 1.S times the diameter of
the pile
whichever is more.
) 12.',1. 304 Excavation for Structures

Guidance for piles is to be obtained from lS:2911_


,3 Earth work in excavation for foundation of
skuclures as per drawings and technical
Concrete in d.ive n caslin -situ piles shallbe cast uptoa minimum heightof600 mmabove
l4 the designed specifications, including setting out,
top levelof pile, which shallbe skipped oft to obtain sound concJete either before final set or after construction ofshoring and bracing, removal
3 days.

) of stumps and other deleterious matter,


dressing ofsides and bottom and backfilling
I with approved material.

)
l. Ordirary soll

Unit = cum
) Taking output = 10 cum

) A. Manual Means
(i) Depth upto 3m
)
a) Labour
) Mate day 0.'14
Mazdoor day 3.50

)
b) overheads @ % on (a)

)
c) Contractor's profit @ % on (a+b)

) Cost for 10 cum = a+b+c

) Rate per cum = {a+b+c)/10

) Note: Cost ot dewatering may be added whe.e


required upto 10 per cent d labour cost.
) Assessment icr dewatering shall be made
as per site conditions.
)

,l 320
321
E-__7
BridBc Wo*s : l2-Fo$dotioi Bridse wo*3 : l2'Foundarion

Sr. Reference to Description Unit Quantity U nit QuantitY Rate


Rate DescriPtlon
Sr. Reference to Rs.
No. MoRT&H Rs.
No. MoRT&H
Specifications
Specifications
2. The excavated earth can be used partially
c) Contractor's Profit @ % on (a+b)
for backfilling of foundation pit and partly
br road work exceptfor rnarshy soil. Hence
Cost fo. 10 cum = a+b+c
cost of disposal has not been added
except tor marshy soil. This remark is pet cum
Rate = (a+b+c)110
common lo all cases of item '12.1
excluding marshy soil. where
Note : Cost of dewatering may be added
20 per cent of labour cost'
required upto
3. The cost ofshoring and shuttering, where
Assessment for dewatering shallbe made as
needed, may be added @ 1 per cent on
per site conditions.
costof excavatron for open foundation.

B. Mechanical Means
(ii)3mto6mdepth
(i) Depth uPto 3 m
a) L.bout
Matey'Supervisor day 0.18
Unit = cum
[,tazdoor day 4.50
Taking output = 240 cum

b) Overheads @ % on (a) a) Labour 0.32


day
Mate I
c) Contractor's profit @ % on (a+b) Mazdoor
day

Cost for 10 cum =a+b+c bl Machlnery


hour 6
Hydraulicexcavator 1 O cum bucket
Rate per cum = (arb+c)/1o caPacity

Note : Cost of dewatering may be added where c) ovefioads @ % on (a+b) i


required upto 15 per cent of labour cost.
O contractor's Proflt @ %
on (e+b+c)
Assessment for dewatering shall be done as
per actual grouId conditions.
Cost for 240 cum = a+b+c+d
(iii)Above6mdepth
R.te Por cum = (a+b+c+d)1240
a) Labour per cent of (a+b)
Note: Cost ol dewatering upto 5
Mate./Supervisor day o.24 Assessment
mav oe added, where required
Mazdoor day 6.00 per site
for dewatering shall be made as
conditionE.
b) Overhcads @ % on (a)

)22 323 )
Bridsc Wo*s : l2-Foundslion

Bridgc Works r l2-Foundation

Sr. Reference to Description Unit Quantity Rate


No. MoRT&H Sr. Reference lo Description Unit Quantity Rate
Rs.
Specifications No. MoRT&H Rs.
Specifications
(ii)Depth3mto6m
d) Cont.actor's prolit @ % on (a+b+c)
Unit = cum
Taking output = 210 cum cost for 190 cum = a+b+c+d

a) Labour Rate per cum = (a+b+c+d)1180


Mate day 0.32
l\4azdoor day 8
Note: Cost of dewatering upto 10 per cent of
(a+b) may be added, where required.
b) Machlnery Assessment frcr dewatering shall be made
Hydraulrc excavator i.O cum bucket hour 6
as per site conditions.

c) Ovorheads @ % on (a+b) 2. Labour provided for excavation by


mechanical medns includes that required
d) Contractor's prolit forlrimming of bottom and side slopes
@ % on (a+b+c)

Costfor 210 cum = a+b+c+d ll. ordinary rock (not requi.ing blasting)

Rate per cum = (a+b+c+d)/210 A. Manual Means

) Note: Cost ofdewatering upto 7.5 per cent of (a+b)


Deplh upto 3 m

may be added, where.equired. Assessment Unit = cum


) for dewalering shall be made as per site Taking output =10 cum
conditions.
) a) Labour
(iii) Depth above 6 m Mate day 0.20
) Mazdoor day 500
Unit = cum
) Taking output = 180 cum b) overheads @ % oil (a)

) a) Labour c) Conlractor's profit @ % on (a+b)


Mate day 0.4
) Mazdoor day 10
Cost for 10 cum =a+b+c

b) Machlnery per cum = (a+b+c)/10


) Hydraulic excavator
Rate
1_O cum bucket hour 6
capacity Note : Cost of dewatering upto 10 per cent ol labour
) cost may be added, where required.
c) Overheads @ % on (a+b) Assessment for dryatering shall be made as
)
per site conditions-

) 324
325
Bridg. Work : l2"Foundation
T= Brids. Wo*s : l2'Foundarion

U nit QuantltY Rate


Sr. Reference to Description Un it Quantity Rate Reference to DescriPlion
Rs.
Sr.
No. MoRT&H Rs. MoRT&H
No
Specifications Speclfications
B. Mechanical Means bl Machinery ,1
hour
Air Compressor 250 cfm with
2 iack
Unit = cum hammericrdrilling
Taking output =180 cum
c) Material p.50
a) Labour
Blasting lUaterial
kg
Mate day 0.24 Nos. 14
Detonator electric
Mazdoor day 6

b) Machlnery
d) Overheads @ % on (a+b+c)

Hydlaulic excavato. 1.0 cum bucket 6


e) contractor's profit @ % on(a+b+c+d)
hour
capacity

c) Overheads @ % on (a+b) Cost for'10 cum = a+b+c+d+e

d) Contractor's p.orit @ % on (a+b+c) Rate Per cum = (a+b+c+d+e)l'10

per cent of (a+b)


cost fo|lg0 cum = a+b+c+d Note : Cost of dewatering @ 10
.av Oe aOaea, wttere requiled' Assessment
per sile
Rate per cum = (a+b+c+d)/'|80 ior'o"*"t"nng shall be made as
conditions.
Note Cost of dewatering upto 10 per cent of
(a+b), may be added, where required. lV. Hard rock ( blasting prohibited )

Assessmentlordewatering shall be made


as per site conditions. Ljnit = cum
Taking output=10 cum
2. ln caseofrock, icundatioo beyond 3mis
not dug and hence not included.
A. Mechanical Means
lll. Hard ,ock ( requlring blasting )
a) Labour
day 0.2
A- Manual Mate 5
Means day
Mazdoor
Unit =cum
Taking output =10 cum bl Machlnory
hour 6
leads of
lirCompressor ZSO cftn with 2
a) Labour pneumatic bfeaker
Mate day 0.35
@ % on ('+b)
Oriller day 0.5 c) Ovorhcads
Elaster day o.25
Mazdoor day 8.00

327 )
326
) E-:---_------
B.idgr Wo'ks : I 2-Foudarion
)
Bndsc worb : l2-Fo@d.tior
Sr. Reference to
) Descrlption
No MoRT&H Unit Quantlty Rate Felerence to Descriptlon LJnit
Specifications Sr. Quantity Rate
) Rs.
No. MoRT&H Rs.
d) Con tracto/s Specifications
p.orit @ % on 1q+b+ey

Cost for 10 cum a+b+c+d Note : Cost ol dewalering @ 30 per cent of (a),
=
may be added, wh6re required.
Rate per cum Assessment for dewateriog shall be mad€
= (a+b+c+d)/ro
as per site conditions.
Note: 1 Cost of dewatering upto
,O per cenl ot
(a+b), may be added, 2. Shoring and strutting 15percentol(a),
where required
AsSeSsmenl for dewatering where required rnay be added.
sha,lbe made
as per site conditions
3. ll is assumed thal Marshy soil will be
2. ln caseofrock, foundation beyond available upto 3 m depth only- Fordeeper
3mrs gxcavation below 3 m depth, refer analysis
notdug and hence not inctuded
in ilem'12.'l-lA(li) to (iii) lorordinarysoil.
V. Marshy soil
B. Mechanical Means
Unit = cum
Taking output: 1O cum a) Labour
irate day 0.08
Upto 3 m depth Mazdoor lordressing sides, bottom and day 2
backfilling
A. Manual Means
b) Machlnery
.) Labou. Hydraulic excavator 1.0cum bucket llour o.17
Matdsupervisor capaclty @ 60 cum perhour
day 0.4 Tippor5.5 cum capacity,4trips per hour hour 0.45
Mazdoor
day 10
b) Machinery c) Overheads @ o/. on (a+b)
Tractor-lrolley for removat
hour 2.67 d) Contractor's profit @ % on (a+b+c)
c) Overheads @ % on (a+b)
Cost to. 10 cum = a+b+c+d
d) Contractor's profit
@ % on(a+b+c) per cum
Rate = (a+b+c+d)/lo
Cost for 10 cum a+b+c+d
=
Nole: 1. Cost ofdewatering @ 20 per cent ol (a+b)
Rate per cum = (a+b+c+d)/lO may be added, where required.
)
2. Shoring and sruning @ 10 per cent ol
) (a+b), where required may be added.

,
328
329
BndScWo s: l2'tounditior
Brid& Wo.b : l2-Fouodrtion

Unit Quantity Rate


DescriPtion
Reference to
Sr.
No.
Reference to
MoRT&H
Description Unit Ouantity
G
Rs.
Sr'
No.
MoRT&H
Rs.

Specirications Speclfications
Trenches as
304 sand Filling in Foundation
3. lt is assumed that Marshy soil will be 12.3.
pe. Orawing & Technical Speclfication
available uptoS m depthonly. Fordeeper
excavation below 3 m depth, rereranalysis
Unit = cum
in items 12.1-IB(ii)to (iii) lor ordinary soil.
Takingoutput=1curi

Vl. BacHllling ln Marshy Foundation Pits a) Labour day 0.01


Mate 0.3
day
Unit = cum Mazdoor
Takingoutput=6cum
b| Material cum 1.2
Sand (assuming 2O Per
centvoids)
a) Labour
Mate day o.'t2
@ % on (a+b)
Mazdoor for dressing sides, bottom and day 3.00 c) overheads
bacmlling % on (a+b+c)
d) Contractor's prolit @
b) Machinery
Rate Per Gum = a+b+c+d
Tractor-trolley for transportation hour 2.00

PCC l:3:6 in Foundation


c) Overheads @ "/. on (a+b) 12.4. 2100
6 nominal mix in
Pbin cement concrete 1:3
d) Contraclor'a prolit @ % on (a+b+c) stone aggregale 40
"J"o"u"i"un "rutn"d mixed' placed
,ii.'iJminar m"ct'anicatlv
Cost lor 6 cum = a+b+c+d "i,e by vibraton
in tounOation and compacted
including curing to l4 days'
Rate per cum = (a+b+c+dy6
Unit = cum
12.2. 304 Filllng Annular Space Around Footlng ln Taking output = 15 cum
Rock
a) Labour day 0.64
Unit = cum Mate I
day
Taking output = l cum Mason day 15
Mazdoor
Lean cemenl concrete 1:3:6 nominal mix
Rate may be taken as per item 12.4. b) Matsrlal cum 13.50
Aggregate 40 mm 6.75
cum
coarse sand 3.45
tonne
Cement KL 18.00
Cost of water

331
330
Bridsc Wo*s : l2.Foundstion Bndr. Wo*s: | z-Foundllioa

Sr. Reference to Description DescriPtion Unit Quantity Rate


Unit Quantity Rate Reference to
Sr. Rs.
No. MoRT&H Rs. MoRT&H
No.
Specifications Specifications

c) Machlnery Sub-analysis Cement Mortar l:3 (l ccment : 3 sand)


12.6
Concrele mixer 0.4/0.28 cum hour 6.00
33 KVAgeneratorset houa 6.00 Unit = I cum
) Watertanker 6 KL capacity hour 2.00 Taking outPut = I cum

) d) Overheads @ % on (a+b+c) a) Materials


[4I 0.51
cement
cum 1.05
) e)Contractor's profit @ % on (a+b+c+d ) Sand

) cost for 15 cum = a+b+c+d+e b) Labour


Mate
day 0.04
day 0.90
per cum = (a+b+c+d+elll5
) Rate Mazdoor
Total Materialand Labour =
(a+b)
Note Vibrator is a partofminorT&P which akeady
) : is
l:3
included in overhead charges of the contractor. 12.7. 1400 Stone iiasonry Work in Cement i/lortar
in Foundation complete as per Drawing
I
12.5 1300 Brick Masonry Work ln Cement Mortarl:3 and Technlcal SPeclfi cations
in Foundalion complete oxclud ing
) Pointlng and Plastering, as per Orawing Unit = cum
and Technical Specifications Taking outPut = 5 cum
)
Unit = cum 1405.4 A. Squar. Rubble coursed Rubble
) Takingoutput=5cum Masonry (fi6t sort)

) a) Material a) Matorial
cum 5.50
Bricks lst class Nos 2500 Stone
Nos. 35.00
CementMortar 1:3 cum 1.2 Through and bond stone
) 0 79 cum)
(3sno.xo.24mx0.24mxo 39m =
'1.50
b) L.bour Cement rnortar 1:3
cum
) Mate day 0.48
Mason day 4 b) Labour
) Mazdoor day 8.00 Mate day 0.66
day 7.50
Mason
) c) Overhoad5 @ o/" on (a+b) Mazdoor
day 9

) d) Contractor's profit @ %on(a+b+c)


c) ovetheads @ % on (a+b)

cost for 5 cum = a+b+c+d


)
Rate per cum = (a+b+c+d)/s
)
I 333
332
)
Bndse Wo*s : l2-Foundation BridSc Wot*r : |2'Fot/dion

Sr. Reference to Description Unit Quantity Reference to Description LJ nlt Quantity Rate
Rate Sr.
No. MoRT&H Rs.
Rs. No MoRT&H
Specifications Specifications

d) Contractor's profit @ o/" on (a+b+c) 12.8. 1500, 1700 & 2100 PlainlRslnforced Csment Concrelo in
Open Foundation complete as Per
Cost for 5 cum = a+b+c+d Drawing and Technical Sp.cificatlons

Rate per cum = (a+b+c+d)/s


Pcc Grade M 15

Unit = cum
1405.3 B. Random Rubble Masonry
Taking output. 15 cum
(coursed/uncoursed)
a) Materlal
Unit = cum Cement lvlT 4.13
Takingoutf,ut=5cum Coarse sand cllm 6.75

40 mm aggregate cum 8.1


a) Matorial 20 mm aggregate cum 4.05
Stone cum 5.50 cum '1.35
10 mm aggregate
Through and bond stone Nos. 35.00
(35nos.x0.24mxo.24mxo.39m = 0.79 cum) b) Labour
Cement mortar 1:3 cum '1.55 day 0.86
Mate
day 1.5
Mason
b) Labour Mazdoor day 20
Mate day 0.62
Mason day 6 c) Machlnery
hour 6.00
Mazdoor day 9 Concrele mixer o.4ol0.28 cum capacity
hour 6.00
Generator 63 KVA
c) Overheads @ % on (a+b)
d) Formwork @ 4 Per cent on cost of
d) Contractor's prorit @ %on(a+b+c) concrete i.e. cost of matetial, labour and
machinery
cost for 5 cum : a+b+c+d
s) Ovorheads @ % on (a+b+crd)
Rate per cum = (a+b+c+d)/s
g contraqtor's proft @ !( on (a+b+c+d+e)
Note : The labour already considered in cement cum = a+b+c+d+e+f
CoSt for 15
mortar has been taken into accounl while
proposing labourfor masonry works. Rate psr qum
' (a+b+c+d+s+0/15

Note NeedleVibrator is an item orminorT&P which


is already included in overhead charges'
Hence not added in rate analysis of cement
concreteworks.

334 335
BridSc Wo*t : l2'Founddion
Bridec Wo*s: l2-Fou alion

Unit Quantity Rate


Relerence to DescriPtion Rs.
Sr, Reference to Descrlptioh Unit Quantity Rato 5r.
No. MoRT&H No. MoRT&H
Rs.
Speciricalions Specifications
a) M.torlal
MT 5.21
B. PCC Grade M 20 Cernent 6.75
cum
coa6esand 8.'l
Unit = cum
20 mm aggregate 5.4
Taking output = 15 cum cum
1O mm aggregate
a) Materlal
Cernent t'T 5.'16 b) Labour day 0.86
Coarsesand cum 6.75 Mate 1.5
day
40 mm aggregate cum 5.4 Mason 20
day
20 mmaggregate cum 5.4 Mazdoor
'l0mmaggregate cum 2.7
cl Machinery
hour 6.00
capaclty
Concrete mixer O'40/O'28 cum
bl Labour llorr 600
Generator 33 KVA
Mate day 0.86
Mason day 't.5
d) Formwork @ 4 Per cent on (a+b+c)
l\razdoor day 20

e) Overheads @ on (a+b+c+d)
c) Machln€ry
Conc.ete mix€r 0.40/0.28 cum capacity hoirr 6.00 Contractor's Ptofit @ on (a+b+c+d+e)
Generator 33 KVA hour 6.00
0
Cosl for 15 cum = a+b+c+d+e+l
d) Fo,mwork @ 4 per cent on cost of
concrete i.e. cost of rmterial, labour and Rate Per cum : ( a+b+c+d+e+f)h5
machinery
Transit
Case-ll: With Batching Plant'
e) Overheads Mixer and Concrete PumP
@ % on (a+b+c+d)

Contractor's prolit @ % on (a+b+c+d+e) Unit = cum


') Taking outPut = 120 cum

Cost for 15 cum = a+b+c+d+e+f


a) tlateri.l [,rT 41.66
Cement
Rate por cum (a+b+c+d+e+f)/15 cum 54.00
CoaEe sand 64.80
cum
20 mm aggregate 43.20
G.ade M 20 cum
J)aRcC lO mm aggtegate
Case.l : Uslng Concrete Mixer
b) Labour day 084
Unit = cum Mate 3.00
day
Taking output = 15 cum Mason 18.00
day
Mazdoor

j ]37
336 I

,
A.idg. Wotu: t 2-rbund.Ion

Bddgc Wolk : l2.roundslion

Sr. Reference lo Description Unlt


No. Quantity Rate )
MoRT&H Reference to Desc.iptio0 Unit Quantity Rate
Sr.
Specifications Rs.
MoRT&H Rs.
No.
Specitications
l c) iilachlnery
Batching ptant @ 20 curn/hr
hour 6.00 c) Machinory
Generator 100 KVA
holJr 6.00 Concrete mixe. (capacity 0.40/0.28 cum) hour 6.00
l-oader 1 cum capacity hour 6.00 Generator 33 KV hor.rr 6.00
Transit mixe.4.O cum capacity lead
houa 15.00
upto 1 km d) Formwo,k @ 3.75per cent of(a+b+c)
Lead beyond 1 km, L]ead in km
!km 3001
Concretepump
hour 6.00
e) Overhead.i @ % on (a+b+c+d)

d) Formwo.k @ 4 per cent on cost of 0 Contractor's protit @ % on (a+b+c+dre)


concrete i.e. cost of material, labour and
i anachinery Cost for 15 cum = a+b+c+d+e+f

e) Overheads @ % on (a+b+c+d) Rate percum = (.+b+c+d+e+0/15

0 Cont.actor,s profit @ % on (a+b+c+d+e) Case.ll: Wlth Brtchlng Plaht, Translt


Mirer and Concaeto Pump
Cost fo|l20 cum = a+b+c+d+e+f
Unit = cum
Rate per cum = (a+b+c+d+e+0/i20 Taking output = 120 cum

D. PCC Grade M 25 a) M.terlal


Cernent MT 47.95
Case-l : Using Concrete Mixer CoaGe sand cum v
40 mm aggregate cum 43.2
Unit cum 20 mm aggregate cum 43.2
=
Taking outpul = ,Scum 1 0 mm aggregate cum 215

a) Materlal b) Labour
Mate day 0.84
Cernent
MT 5.99 Mason day 3
I
Coarse sand
cum 6.75 Mazdoor day '18
40mm aggregate
cum 5.4
20mm aggregate
cum 5.4 c) lilachlno.Y
10mm aggregate gatching plant 6.00
cum 2.7 @ 20 cum/hr hour
Generato|I 00 l(/A hour 6.00
b) Labour 6.00
Loader 1 cum c46city hour
Mate
day 0.86 Transit mixer 4 orm capacity lead upto hour 15.00
Mason
day 1.5 1km
Mazdoor
day 20 Transit mixer 4 qm capacity lead beyond t km 300L
1 km.L-lead in ldometre
Concrete pump hour .6.00

ll8
319
I
) BndEc Wods : l2'Fo{ndation
Bridgc Wo*s r | 2-Foundltion

)
Unit OuantltY Rat€
Sr. Reference to Oescription Unlt Quantity Rate Reference to DescrlPtion
Sr. Rs.
) No MoRT&H Rs. No MoRT&H
Speclflcations Specilications
)
d) Formwork @ 3.75 per cent of cost of case-ll: With Batching Plant' Transit
) Mixot and concrele PumP
concrete i.e cost of material, labour and
machinery
Unit = cum
) 120cum
e) Overheads @ % on (a+b+c+d) Taking output =
) 0 Contractrr's protit @ % on (a+b+c+d+e) a) Materlel
i/fi 48.38
Cernent
Cost for 120 cum: a+b+c+d+e+f cum t4
) coarse sand
64.8
cum
Rate per curn = (a+b+c+d+e+0/120 20 mmaggregate
cum 43.2
) 1 O mm aggregate

E. acc Grade M 25
) b) Labour 0.84
Case-l: Using Concrete Mixer day
Mate
day 3.00
Mason
) Unit = cum day 18
Taking oulput = 15 cum Mazdoor

) .) llatorlal c) irachlnory 6.00


hour
C€rYEnt MT 6.05 Batchina Plant @20 curn/hr
hour 6.00
) Coa6esand cum 6.75 Generator'1 00 loy'A
hour 6.00
20 mmaggregate cum 8.1 Loader 1 cum caPacitY 1 cum 15.00
lead upto hour
) 10 mm aggregate cum 5.4 Transit mixer4 cum capacity
1km 3001
b) Labour beyond t km
fransit mixer a cum capacity lead
) Mate day 0.86 kilometre
1 km, Llead in
hour 600
)
Mason day 1.50 Concrete PumP
Mazdoor day 2D.00
cost of
d) Fo,mwork @ 3'75 Per cent on
) c) llachlnely ' cost of matenal labour and
. Concrete mixer 0.40/0.28 cum capacity hou 6.00 -ncrele,.e
machinery
Gene6tor 33 KVA hou 6.00
)
e) Overheads @ % on (a+b+c+d)
I d) Fornwork @ 3.75 per centofa+b+c
I (a+b+c+d+e)
I o) Ovorho.ds @ % on (a+b+c+d) 0 contractor's p.ofit @ % on
) f) Contr.ctor's prolit @ % on (a+b+c+d+e)
Cost fol 120 cum = a+b+c+d+e+f

) Cost tor 15 cum = a+b+c+d+e+f


Rate Per cum (a+b+c+d+e+0/120
R.t por cum = (.+b+crd+e+f)r15
)
) 340
141

)
BridBc Worl$ : l2-l_o!ndirion Bddg. Worlt : I 2'Foundltion

Sr. Reference to Descript!on Unit Quantity Description Unlt Quantity Rate


Rate
Sr.
Reference to
No MoRT&H Rs.
Rs.' MoRT&H
Specilications No.
Specifications

F. PCC Grade M 30 Casell: Using Batching Plant' Translt


Mixer and Concrete PumP
CaseJ: Using Concrcte Mixer
Unit = cum
Unit = cum Taking oulput = 120 cum

Taking output = 15 cum


.) Matorlal
48.60
MT
a) Material Cement
Cernent MT 6.08 Coarse sand
cum u
cum 43.2
Coarsesand cum 675 40 mmaggregate
cum 43.2
40 mm aggregate cum 5.4 20 mm aqgregate
cum 21.6
20 mm aggregate cum 5.4 'l 0 mm aggregate

10 mm aggregate c{rm
b) Labou.
day 0.84
b, Labour Mate
3.00
day
Mate day 0.86 Mason
day 't8
Mason day 1.50 Mazdoor
l\.4azdoor day 20.00
c) Machlnery
hour 6.00
c) Machlnery Batching Plant @ 20 cum/hr
hoJr 6.00
Concrete mixer 0.40/0.28 cum capacjty hour 6.00 Generator I 0O Kr'A
hour 6.00
Generator 33 t(VA hour 6.00 Loader I cum cspacity
hour 15.00
Transit mixer 4 cum capacity lead upto
d) Fomwork @ 3.50 pe. cent of cost of 1km
t km 300L
concrete i.e. cost of material, labour and Transit mixer 4 cum capacity lead beyond
machinery I km. L-lead in kilometre
6.00
concrete pump hour

e) Overheads @ % on (a+b+c+d)
d) Formwork @ 1.5 Per cent of cost ot
0 Contractor's profit @ % on (a+b+c+d+e) conq€te i e. cost of rnaterial, hbour and
ma€f nery
Cost for '15 cum = a+b+C+d+e+f
.) Ove.h.ads @ '/6 on (a+b+c+d)
Rale per cum = (alb+c+d+e+0115
% on (a+b+c+d+e)
0 Contr.ctol'! Prolit @

Cost for '120 cum = a+b+c+d+e+f

Rato per cum o (a+b+c+d€+0'120

342 313

t
)
E------------7
)
Bridsc wo*s : l2-Foundalion BridS€ Work! | l2'foundation

)
Descriptlon Unlt Ouantity Rate
Sr. Reference to Description Unlt Quantity Rate Sr. Reference to
) No. MoRT&H MoRT&H
Rs
Rs. No.
Specificatlons Specilications
)
Grado M a) Materlal
MT 48.80
) Cement
Coaase sand
cum 54
Case-l : Using Concrete Mixer
cum 64.8
20 mm aggregate
) 10mm aggregate
cum 43.2
Ljnit = cum

) Taking output = 15 cum


b) Labour
day 0.84
a) Mat.rl.l Mate
) CenEnt i,T 6.10 Mason
day 3.00
18
day
Coarse Eand cum 6.75 Mazdoor
) 20 mm aggregate cum 8.1
10 mm aggregate cum 5.4 c) Machinery
) cufi|/hI
Batching Plant @ 20
hour 6.00

b) L.bour Generator 1OOKVA hour 6.00


600
Loader 1 cum caPacity
hour
) Mate day 0.86
Transit mixer 4 cum capacity lead uPto hour '15
Masoo day '1.50
1km
) Mazdoor day 20.00
I Transit mixer 4 cum capacity lead beyond
t km 300L

1 km. L-lead in kilometre


c) llilachln€ry
) Concrete mixer 0.40/0-28 cum capacity hour 6.00 Concrete PUmP hour 6.00

Generator 33 KVA hour 6.00


) d) Formwork @ 3 5 Per cent of cosl of

d) Formwo.k @ 3.5 per cent on cost of concrete i.e. cost of material, labour and
,) concrete i.e. cost of material, labour and machinery
mehinery
e) Overheads @ % on (a+b+c+d)

e) Overheads @ % on {a+t +c+d)


0 Contractor's profit @ % on (a+b+c+d+e)
f) Contractor's proiit @ o/o
on (a+b+c+d+e)
Cost for '120 cum = alb+c+d+e+f
Cost for 15 cum = a+b+c+d+e+f
Rate p€r cum = (a+b+c+d+i+l)/120
Rate pe. cum = (a+b+c+d+o+t)/15
H- RCC Grade m 35
Case-ll: Uslhg Batching Plant, Transll
Mixer and Concrete Pump casel : Using Concrele Mixer

Unit Unit = cum


= cum
Taking output = 1 20 cum Taking output = 15 cum

145
344

)
t I
!
Blid8c Wo*!: t 2-foundarion
Bridsc Wo*r : l2-Folndatio.

Sr. Reference to Description


No. MoRT&H Un it Quantity Rate Reference lo Oescription unit Quantity Rate
Sr.
Specifications Rs, No MoRT&H Rs.
Specifications
)
a) Material
Cernent b) Labour
MT 6.33
Coarsesand
20mmaggregate
cum 6.75
Mate
Mason
day
day
0.84
3.00
,)
cum 8.1
10 mm aggregate Mazdoor day 18
l
I
cum 5.4 )
b) Labour c) Machinoty
Mate
day
cum/hr
Batching plant @20 hour 6.00 )
Mason
day
0.86
Generator1001(\y'A hour 6.00
Loader t cumcapscit
1.50
Mazdoor
day 20.00 upto
ho.r
hour
600
15.00
)
Transit mixer 4 cum capacity lead
c) Machlnory 1km
Concrele mir€r O.4Ol0.28 Transit mixer4 orn'capacity lead beyond t.km 3001
)
cum capacity hour
generato. 33 KVA 6.00
1 km. LJead in k{omet[e
tloua 6.0c
Concretepurp ho'' 600 )
d) Formwork @ 3 percenl on a+b+c
d) Formwork @ 3 per ceni on cost of )
e) Overhe.ds @ % on (a+b+c+d) concrete i.e- cost of material. labour and
machinery )
0 Contractor,s profit
@ % on (a+b+c+d+e)
e) Overheads @ % on (a+b+c+d)
)
Cost for '15
cum = a+b+c+d+e+f
0 Contractor's profit @ % on (a+b+c+d+e)
)
Rate per cum = (a+b+c+d+e+o/i5
Cost for 120 CUm = a+b+c+d+e+t
Case-ll: Uslng Batching plant, ,)
Transit
Mirdr and Cohcrete pump Rato per cum = (a+b+c+d+o+f)/120
)
Unit = cum Note : wherever concreto is carried out using
Takiog output
= 120 cum batcting plant, trand mixer, coicrete pump, )
admixtu.e @0.4 per cent ot weight of cement
a) lilate.ial may be added for adrieving desired slump of )
Cement @ncrete.
MT 50.64
Coarse sand
I
20mmaggregate
cum 54 )
cum 64.8
10mm aggregate
cum 43.2 )
)
)
346
141
)
FF.at--'- )
Bridse Wo*s i t 2-Founddion
Bddg. work: l2+dndatDr

Sr, Reference to Description


No. MoRT&H
Speciftcatlors
Un it Quantity
G
Rs. ,
Sr.
No
Reference to
MoRT&H
Description Unit Quantity Rate
ris.
Specificatlons
WELL FOUNDATION
a) ltlat.rlal
12.9. 1200 Earth (compacled) cum 904.32
Providing and Constructing Temporary
Sand bags Nos. 6000
lslahd 16 m dlameter for Construction of
Well Foundation tor 8 m dia Well. Wooden ballies 8" dia ad I m long Nos.
.190
wooden ballies 2" dia ft,t bracing Rm

A. Assuming depth ot water 1.0 m and


b) Labour
height of island to be 1.2S m
Mate day 5.60
Mazdoorfor piling 8" dia ballies day 18.00
Unit = 1 No.
Mazdoorfor bracing wih 2" dia ballies day 12.00
Taking output = I No.
Mazdoor for filling sand bags, stitching day 't10.00
and placing
a) Mate.lat
Eadh (compacted)
cum 251.20 c) Machlnory
Sand bags
Nos. 750.00 Cranewth grab 'l cum capacity hour 50.00

b) Labour
Consumables and other arangements tor
Mate
day 0.40 piling ballies @ 2.5 per cent of (alb+c).
Mazdoor for filling sand bags, stitching
day 15 00
and placing
d) Overheads @ % on (a+b+c)

c) Machinery.,
.l e) Contractor's profit @ % on (a+b+c+d)
Cranewith grab cum capacity hour 20.@
Consumables @ 2.S per cent of (c) above
Rate per No. = (a+b+c+d+e)
d) Overheads @ % on (a+b+c)
Note: For other well diameters rate can be worked
out on the basis of cross-sectional area of
e) Contractor,s protit @ %on(a+b+c+d)
) well. The diameter ofthe isbnd shall be in the
conformity with Clause '1203.2 of MoRT&H
Rate pe. No. = (a+b+c+d+e)
) Specifications.
Note: ll is assumed that earth will be available within
the worldng space ofcrane with grab bucket.
c. Provlding and constaucting one 6pan
aervice rcad to reach island locatioD
B, Assumlng deplh of water 4.0 m .nd from one piea locatlon to another Pier
height of island,t.5 m location

Unit = 1 No. Assuming span lenglh 30 m, width ot service


Takingoutput= 1No. road 10 mand depth ofwater 1 m

348
349

)
B.idgc Wo*s: Iz-Fou alion Bridge Wo*s : l2-Found.tioo

Descriptlon Unit Quantlty Rate


Sr. Reference to OescriFtion Unit Quantity Rate Sr. Reference to
Rs.
No. MoRT&H Rs. No. MoRT&H
Specifications Speclfications
b) Labour
Unit = I meke (for cuttlng, bonding, making holes,
Taking output = 30 meke joining, welding and erectlng in posltlon)
Mate day 1.32
.) Matorl.l Fitter day 5.50
Earth cum 450.00 day 5.50
Blacksmith
Sand bags Nos. 300.00 day
Welder
day 16.50
Mazdoor
b) Labour
Mate day 0.24 Electrodes, cutting gas and other
Mazdoo. fo. fillang sand bags, stitching day 6.00 coosrnables @ tO percentorc6t of(a) above
and placing
c) ovodra.ds @ % on 1r+'01
cl Machln.ry
Frontend Loader 1 cum capacity hour 27.O0 d) contractol'3 Ploft@ % on ('rblc)
Tipper5.5 cum capacity hour 28.00
t{ato prr t{T = (a+b+c+d)
d) Overhoads @ % on (a+b+c)
12.11. 1200. {500 & '1700 PlainlRelnforcod Cement Concreto, ln
.) Cont6ctor's protlt @ %on(a+b+c.d) Well Foundation complGte a5 per Orawing
and Tschnical SPeclficatlon$
Costfor30m=a+b+c+d+e
Unit = 1 cum
Rate per m = (a+b+c+d+e)/30 Takingoutput= 1 cum

12.10. '1200 & 1900 Provldlng.hd l.ylng cutllng edgs olmlld A. Well curb
steel welghlhg 40 kg per met,e fo. w€ll
foundation complele as per drawing and ll RCC ltl 20 Grade
technical specirication Sarne as for 12.8 {C) excePt for formwork
which shallbe @20 percentofthe ctst
Unit = I MT ol concrete instead of 4 Per cent'
Taking output = 1 MT
li) RCC M 25 G,ade
.) llatr .l Same as for '12.6 (E) excePt for formwork
i) Stuctural eteelin plates, angles, etc. MT 1.05 which shallbe @ 20 per centofthe cost
Lduding 5 psr cent wastage ofconcret€ instead of 3.75 per cent'
fi) Nuts and bolts kg 20.00
lll) RCc M 35 Grade
Same as for '12 E (H) except for lormwork

which shallbe @ 20 per cent ofthe cost


of concrete instead of3 Percent'

351
350

'---
t Bdd8c \ olis : I2-round.lion
BridSG wotk : l2'Fo'ndrion

) Unit QuantltY Rate


DescriPtion
S.. Reference to Description Unit Quantity Rate Sr.
Refelence to Rs.
) No. MoRT&H Rs. MoRT&H
No.
Speclfications Specilicatlons
Nole: lfcurb concrele is carfled outwrlhin sleellner. lviill RCC M 35 Grade
Same as 12'8 (H) except lor bnrwo*
br
cost oflormwork shall be excluded. of the cost
which shall be @ 10 per cent
) cent'
B. Well Steining ot conc.ete instead of 3 P€r

)
(i) PGC i, t5 Grade
Sameas for'12.8 (A) except for tormwort
t' lff lrt:""t"".]h hnt' rransn
Mrxer
) which shall be @ 10 per cent of the cost and concrote PumP
of concrete instead of4 per cent.
) Unit = cum
(ii) PCC [i 20 Grade Taking output = 1 20 cum
) Same as for 12.8 (B) except for-rormwork
which shallbe @ 10 per centof the cost a) iiaterial [4r si.60
) of concrete instead ol4 per cent. Cement
cum 54.00
coarse sand 64.80
cum
(iii) RCC i,l 20 Gr.de
) 20mmaggregates
cum 43.20
San€ as icr I 2.8 (C) excepl for tormwork 1O mmaggregates
206.00
kg
which shallbe @ 10 per c€nt ofthe cost Admixture
) of concrete inslead of4 per cent.
b) Laboui day 0.84
) (iv) PCC M 25 Grado Mate
day 3.00
Same as for 12.8 (D)except for formwork Maison
day 18.00
) which shall be @ 10 per cenl of the cost Mazdoot
of concrele instead of 3.75 per cenl.

,) c) Machinery
hour 6.00
(v) RCC lt'l 25 Grado
Batching Plant 6.00
Same as for 12.8 (E) except tor brmwork hour
Generator '1 00 KVa
) which shallbe @ l0 per cent ofthe cost hour 6.00
Loader 1 cum caPacity 15.00
ol concrete instead of 3.75 percent. for lead hour
Transit mixer4 cum capacity
uoto km
(vi) PCC l,
30 Gr.do
1
Transrl mrxer 4 cum capacity
for lead t.km 300.L
Same as for 12.8 (F) except for formwork
beyond I km 6.00
which lhallbe @ l0percentofthe cost hout
Concrete PumP
of concrete instead of3.5 per cent.

1O Per cent on cost of


(vli) RCC U 30 Grade dl Formwork @
' i.e. iost ot material' labour and
Same as{or 12 I
(G)except fcrformwork "on.rete
machinery
which shallbe @ 10 per cent of lhe cost
of concrete instead of3.5 per cent.

)57
352

)
Bridge worls : l2.Founddion Brids. Wo*s : I 2'F@nd'[on

Unit QuantitY Rate


DescriPtion
Sr. Reference to Description Unit Quantity Rato 5r. Relerence to Rs.
No. MoRT&H Rs.. MoRT&H
No.
Speclficatlons Specificatlons
% on (a+b+c)
e) Overheads @ % on (a+b+c+d) d) Overhoads @

t) % on (a+b+c+d)
Contractor's p.ofit @ % on (a+b+c+d+e) e) Conltactor's prolit @
.120
cosl for m = a+b+c+d+e+f Cost for 15 cum = a+b+c+d+e

Rate per m = (a+b+c+d+o+f)/120 Rate Per cum = (a+b+c+d+e)'15


C. Eottom Plug
case-ll: Ustng Batching Plant' Translt
Concrele lo be placed usinq tremie pipe Mixet and crane/Concrete
PuntP
(Note: 10 per cenl extra cement to be added
where underwater concreting is involved)
Unit = cum
Taking outPut = 120 cum
case-l : Using Concrete Mixer

(i) PCC Grade M 20 a) M.te.l.l N4T 444


L,nit = cum
Cernent
cum *
Coa6e sand 64.8
Taking output = 15 curh cum
20 mm aggr€ate 43.2
cllm
a) M.torial 1 mm aggregate
O 148.80
kg
Cernent [47 5.55 Admixture
Coarse sand cum 6.75
b) Labou. day 0.88
l 40mmaggregate cum 5.4
Mate 3.00
20 mrh aggregate cum 5.4 day
Mason 18
1
'l 0 mm aggregate cum day
Mazdoor
Admixture kg 18.60

b) Labour cl llachlnorY
hour 6.00
Batching Plant @ 20
cunt/hr
Mate day 0.9 ho{rr 6.00
't.50 Generator 1 00 Kr'A 6.00
l Mason day ilqlr
Loader 1 cum crpacity 15.00
Mazdoor day 20.00 lead upto hour
Traosit mixer 4 cum capacity
c) Machlnery 1km 300L
lead t.km
Concrete mixer0.40/0.2E cum capacity hour 6.00 Transit mixer4 cum capacity'
Generator33KvA hour 6.00 beyond 1 km, L - lead in kilometre
hour 6.00
Lightcrane 3 tonnes capacity for handling hour 6.00 Concrete PumP
tremb pipe labour
5 per cent of cost of
material and
Add
protec$ve
Add 5 pe.cent of cost ofmaterial and labour bwards cost of forming sump
towards cost of forming sump, protective amngenrents
i-uiis, cttterring ano making ppe'
tremle
bunds, chislling and making anangements for for under water concreting with
under waterconcreting with kemie pipe.

355
154

)
Arid8. Work : I2-Found&tion

Bri"'gc Worls : l2-Folndatjon


Sr. Refe.ence to Desctlp on
No. MoRT&H Unit Quantity Rate
Specificaflons Rs.
-Sr. Reference to Description Uhit Quantity Rate
No. MoRT&H Rs.
d) Overhead$ Specifications
@ % on (a+b+6;

e) Contractor,s profit@
d) Overheads @ % on (a+b+c)
% on (a+b+c+d)
e) Contractor's profit @ % on (a+b+c+d)
Cosl for 120 cum a+b+c+d+e
=
Cost tor 15 cum = a+Lr+c+d+e
Rate per cum (a+b+c+d+e)/l20
= por cum = (alb+c+d+eYl5
Rato
(il) PCC G.ade M 2s
Ceso-ll : Usirg B.tchlng Plart, Translt
mixe. and Cranerconcrete
Casej : Using Concreto Mixer
PumP

Unit = cum Unit = cum


Taking ouFut tS cum Taking outpul = 120 cum
=

a) Mat6d.t a) llaterlal
Cement CelIEnt MT 47.88
Coarse sand
i,I 5.99 Coarse sand cum
cum 6.75 cum 64.8
40 mm agg.egate 20 mm aggregate
cum 5.4 cum 43.2
20 mm aggregate 1 0 mm aggregate
cum 5.4 Admixture kg 172.80
10 mm aggregate
cum
Admixture
kg 2r.60 b) Labour
Mqte day 0.88
b) Labour
Mason day 3.00
Mate
day 0.9 Mazdoor day 18
Mason
day 1.50
Mazdoor
day 20.00 c) Machlnery
Satching plant @ 20 curr,/hr hour 6.00
c) ltachlnsry
Generator 100 KVA hour 6.00
Conc.ete mixer 0.40/0.28 cum
capacity hour 6.00 Loader 1 cum capacity hour 6.00
) Generator33 KVA
Transit mixer4 cum capacity, lead upto hour 15 00
hour 6.00
Lightcrane of 3 tonnes capaciv
br hour 6.00 1km
) handting lremie pipe
Transit mixer4 cum capacity, lead t.km 3001
beyond 1 km, L-lead in kilometre
Add 5 per cent ofcost pf rnaterial
and tabour Concretepump hour 6.00
lowards cosl of forming sump, protective
Dunds, diselling and making
an-angerEnb for Add 5 pre cent of cost of material and labour
underx/.ater concreling wih tremie pipe. towards cost of torming sump, protective
bunds, chiselling and making arrangements
for under water ccincreting with tremie pipe.

356
357

I
,
arids. Wo.ks r l2-fouodalion BridgcWo t: l2'Foundalion

U nit Quantity Rate


Sr.
No.
Reference to
MoRT&H
Description Unlt Ouantity *d Sr.
Reference to oescriPtion
Rs
MoRT&H
No.
Specifications
Itr Specificatlons
d) Overheads @ % on (a+b+c)
dlOve,heads @ %on(a+b+c)

e) Contractor's profit @ % on (a+b+c+d) e) Contractor's profit @ %on(a+b+c+d)

Cost for 15 cum = a+b+c+d+e


cost for 120 cum = a+blc+d+e
Rate Per cum = (a+b+c+d+e)/'15
Rate per cum = (a+b+c+d+e)/120

(iii) PCC Grade M 30


Case-ll: Using Eatching Plant' Transit
Mixer and Crane/Concrete
PumP
Case.l : Uaing Concreto Mixer
Unit = cum
Unit = 1 cum Taking output = 120 cum
Taking output = 15 cum
.) ireterlal
MT 48.64
.) M.to.lal Cement
cum 54
Cement t\47 6.08 Coarse sand
cum 64.8
Coarse sand cum 6.75 20 mmaggregate
cum 43.2
40 mm aggregate cum 5.4 1o mm aggregate
kg 172.80
20mm aggregate cum 5.4 Admixture
10rnm aggregate 2.7
Admixture kg 2't.60 b) Labout 0.88
day
Mate
day 3.00
Mason
b) L.bou. day 18
Mazdoor
Mate day 0.9
Mason day 1.50
c) Machlnory 6.00
Mazdoor day 20.00 hour
Batching Plant @ 20 curY/hr
hour 6.00
Generato. 100 KVA
c) M.chln.ry hoJr i;.oo
Loader 1 cum caPaclty
concrete mixer 0.40/0.28 cum capacity hour 6.00 upto hout 15.00
Transit mixer4 cum capacity' lead
Generator 33 l(/A hoJr 6.00 't km
Light crane of 3 tonne capacity for hour 6.00 beyond tkm 3001
Transit mixer4 cum capacity' lead
l handlingtremie pipe 1 km, L-lead in kilome$e
l 6.00
hour
&ncrete PUmP
Add 5 per cent of cost of rnaterial and
labour
o{ cost of rnaterial and labour
towards cost of forming sump, proteclive Add 5 per cent
protective
bunds, chiselling and making arrangemenls towards cost of formlng sump'
for under water concreting with tremie pipe. bunds, chiselling and making
anangements
for under water concreting tr/fi femie Fp€
I

159
358
BidBe Wolks : l2-Fo!nd!lion Bridsc wofi s : I 2'Ioundari(to

Sr. Reference to Descrlption Unit Quantity Unit Quantity Rate


R.ta* Reference to DescriPtion
No. MoRT&H sr. Rs.
nsj MoRT&H
Specifications No.
Specifications
d) Overheads @ % on (a+b+c)
d) Ove.heads @ % on (a+b+c)

e) Contractor's profit @ %on(a+b+c+d)


e) Contractor's profit @ %on(a+b+c+d)
cost for 120 cum : a+b+c+d+e
Cost for 15 cum = a+b+c+d+e
Rate per cum = {a+b+c+d+e)/120 per cum = (a+b+c+d+e)h5
Rate

(iv)PCC Grade M 35 Case-ll : Uslng Batchlng Plant, Transll


Mixsr and Cran''concret6
Case-l : Using Concrete Mixer PumP

Unit = I cum Unit = cum


Taking output = 15 cum Taking oulPut = 120cum

a) Malerlal .) iratorial
50.28
MT
Cernent MT 6.29 Cernent
CoaGe sand
cum *
Coa6e sand cum 6.75 cum 64.8
40 mm aggregate cum 5.4 20 mm aggregate
cum 43.2
20 mm aggregate cum 5.4 10 mm aqqregate
kg 172.80
I 0 mm cum 2.7 Admixture
aggregate
Admixture kg 21.60
b) L.bour 0.88
day
Mate
b) Labour day 3.00
Mason
Mate day 0.9 day 18
Mazdoor
Mason day 1.50

) Mazdoor day 20.00


c) Machinery
6.00
hour
Batching Plant @ 20 curn/hr
c) Machin.ry hour 6.00
) Concrete mixer 0.40/0.28 cum capacity hour
is.oo Generator'100 KVA
hour 6.00
Loader 1 cum caPacity
Generator33 KVA hour 600 Transit mixer 4 cum capacity, lead upto hour 1s.00
Lighl crane of3 tonne capacjly for holJr 600 1km
handling tremie pipe 300L
Transit mixer 4 cum caPaclty,lead beyond t km
1 km, L-lead in kilomeue
Add 5 per cent ofcost of material and labour hour 6.00
ConcretePump
) lowards cost of forming sump, protective
bunds chrselhng and making arrangements and labour
Add 5 per cent of cost ol nraterial
) for underwater concreting with tremie pipe- towards cost ot forming sump,
protective
bunds, chiselling and making anangernents
pipe'
) tor under water concreting with tremie

) 360 161

)
Bridg. Wor*J : l2-Fouodltion B*lg.Wo*s : l2'tolnddion

Unit QuantitY Rate


Sr. Reference to Description Un lt Quantity DescriPtlon
Refetence to Rs.
No. MoRT&H 8r'
i"$ fto
MoRT&H
Specifications
l
Specifications
dlOverheads @ % on (a+b+c) F. Well CaP

e) Contractor's profit @ % on (a+b+c+d)


(i) RcC Grade M 20

cost for 120 cum: a+b+c+d+e case-l : Uslng Conctete Mixer

Rate per cum = (a+b+c+d+e)/120 Unit = cum


Taking outPut = 15 cum
D. Intermediate Plug
a) Materlal
MT
(i) Gr.d6 lit 20 PCC Cernent
t.75
Same as in bottom plug concaete, Coarse sand
cum 8.'l
excluding cost of furming sump, p.otective 20 mm aggregate
cum 5.4
bunds, chiselling etc. 1 0 mm aggregate

(ii) Grado M 25 PCC b) l.bour


day 0.86
Same as in bottom plug cohcrete Mate
excluding cost of forming sump, protective Mason
dq 1.5
day 20
bunds, chiselling etc. Mazdoor

(lii) Gr.do M 30 PCC cl llachlnory


hour 6
Concrete mrxer (capacity 0
40/0'28 cum)
Same as in bottom plug concrete 6
hour
excluding cost of formang sump, protectave Generator 33 KVA
bunds, chiselling etc. Formwork @ 4 Percent ofa+b+c

% on ('+b+c)
E. Top Plug d) Ove r.d3 @
(l) Grad. M tS PCC .) Contr ctol'3 ptofrt@ %on('+b+c+d)
Sarne as item 't2.8(A) excluding formwork
Cost tor 15 cum = a+b+c+d+e
lii) Grade
M 20 PCC
P€r cum (arb+c+d+')'15
Sameas item 12.8(B) excluding formwork RatE '
(lli) Gr.de M 25 PCC Ca6e-ll: Using Batchlng Plant' Transit
Sameas item 12.8 (D)excluding formwork Mixer and Concreto Pump

(iv) Grad. M 30 PCC Unit = cum


Sarne as item 12.8(F) excluding fo.mwork Taking outgut = 1 20 cum

362 363
B.idge Works : I2-f oundation Bddge WodG : l2-rondarion

Reference to Unit it Quantity Rate


Sr.
No. MoRT&H
Descrlptlon Quanllty
H F
Io.
Reference to
MoRT&H
Description Un
Rs.
Specifications Specifications

a) Material (ii) RCC Grade M 25


Cement tfT 40.92
Coarsesand cum 54 Case-l : Usinq Concrete Mirer
20mm aggregate cum 64.8
10 mm aggregate cum 43.2 Unit = cum
Taking output = 15 cum
b) Labour
Mate day 0.84 a) Material
Ivlason day 3 Cement i,T 6.05
Mazdoor day 18 coarcesand cum 6.75
20 mm aggregate cum 8.1
0 mm aggregate cum 5.4
c) Machinery 1

Batching plant (output 20 cum/hr) hour 6.00


Generator 100 KVA hour 6.00 b) Labour
Mate day 0.86
Loader (capacity 1 cum) hour 6.00
Mason day 1.5
Transit mixer (capacity 4.0 cum)
'15.00 Mazdoor day 20
Lead upto 1 km hour
Lead beyond 1 km, L-lead in kilometre t.km 3001
Concrete pump hour 6.00 c) Machlnery
Concrete mixer (capacity 0.40/0.28 cum) hour 6
Generator 33 l(VA hour 6
Formwork @ 4 per cent of (a+b+c)

Formwork @ 3 75 Per cenlofa+b+c


dlOverheads @ %on(a+b+c)

elContractor's piofit @ % on (a+b+c+d) d) Overheads @ %on(a+b+c+d)

cost for 120 cum = a+b+c+d+e e) Contactor's profit @ % on {a+b+c+d}

Rate per cum = (a+b+c+d+e)/120 cost for 15 cum = a+b+c+d+e

Note Wherever concrete is carried out using Rate per cum = (a+b+c+d+e)/'15
batching plant, transit mixe., concrete pump,
admixtures @ 0.4 per cent of weight of cement case-ll : Using Batching Plant, Transit
may be added forachieving desired slump of Mixer and concrcte PumP
concrete.
Unit = cum
Taking output= 120cum

364 365

)
Addgc Works : l2'Foundatioo Bridse\ olks: l2_Fou ation

Sr.
No.
Reterence lo
MoRT&H
Specifications
Oescriptlon Unit Ouantity
t 5r.
No.
Relerence to
MoRT&H
Specifications
DescriPtion Unit Quantity Rate
Rs

a) Material a) Materlal
Cement [47 48.40 Cement
i/T 6.10

Coarse sand cum 54 cum 6.75


coarsesand
cum cum 8.1
20 mmaggregate 64.8 20 mm aggregate
'l cum 5.4
0 mm aggregate cum 43.2 I 0 mm aggregate

b) Labou. b) Labour
Mate day 0.84 day 0.86
Mate
Mason day 3 day
Mason
day 20
Mazdoor day 18 Mazdoor

c) Jrl.chinery c) Machlnery
hour 6
Batching plant (ouFut 20 curMr) hour 6.00 Concrele mrxer (caPacrty 0 40/0 28 cum)
hour 6
Generator 1 00 KVA hour 6.00 Generator33l(VA
Loader (capacity I cum) hour 6 @
Formwork 3 5 Per cent of (a+b+c)
Transit mixer (capacity 4.0 cum)
d) Overheads @ % on (a+b+c)
Lead upto I km hour 15.00
Lead beyond 1 km L-lead in kilometre t.km 300 L % on (a+b+c+d)
e) Contraclot's profit @
Concrete pump hour 6.00
Cost for 15 cum = a+b+c+d+e
Formwork @ 4 per cent of(a+b+c)
Rate pet cum = (a+b+c+d+e)/15
d) Ove.heads @ % on (a+b+c)
Case-ll : LJsing Batching Plant' Transit
Mixer end concrcte PumP
e) Contractor'6 p,ofit @ % on (a+b+c+d)
Unit = cum
'
Cost for 120 cum = alb+c+d+e Taking output = 120 cum

Rate per cum = (a+b+c+d+ell120


.) Matorlal
[,lT 48.79
Cement
cum 54
Coa6e sand
(iiilRCC Grade M 30 cum 64.8
20 mm aggregate
cum 43.2
1 O mm aggregate
Case-l : using concrete Mixer
b) Labout 0.84
day
Unit = cum Mate
day 3
Taking output = '15 cum Mason
day 18
Mazdoor

366 36',7
Bridge Wo*. : l2-roundation B.idsc wo.lc : l2'Foudanon

Unit QuantitY Rate


Sr. Reference to Desc.iption Unit Quantity DescriPtion
Rr
Sr,
Retetence to Rs.
No MoRT&H
R MoRT&H
Specificatlons No.
Specitications
c) Machinery d) overheads @ % on (a+b+c)

Batching plant (output 20 cum/hr) hour 6.00


Generalor 100 KVA hour 6.00
e) Contractor's prolit @ %on(a+b+c+d)

Loader (capacity 1 cum) hour 6.00


Cost for 15 cum = a+b+c+d+e
Transit mixer (capacity 4.0 c!m)
Lead upto 1 km hour 15.00 Rate per cum = (a+b+c+d+e)/15
Lead beyond 1 km, L-lead in kilomeke t.km 300 L
T'ansit
Concrelepump hour 6.00 Case-ll : Using Batching Plant'
Mixer and Conctete PumP
Formwork@ 3.5 per cent of (a+b+c)
Unit = cum
d) Overheads @ % on (a+b+c+d)
Taking ouPut = 120 cum

e) contractor's proflt @ %on(a+b+c+d) a) Mate,lal MT 50.64


Cosl lor 120 cum = a+b+c+d+e
Cement
cum
g
Coarse sand
cum 64.8
Rate per cum = (a+b+c+d+e)f120 20 mm aggregate 43.2
cum
1 O mm aggregate
(iv)RCC Grade M 35
b) L.bout 0.84
day
Case-l : using Concrele Mixer Mate
day 3
Mason 18
Unit = cum day
Mazdoor
Taking output = 15 cum
cl Machinery
hour 6.00
a) Materlal cum/hr)
Batching Plant (outPut 2O 6.00
hour
Cement MT 633 Generator 100 KVA
llour 6.00
Coa6e sand cum 6.75 Loader(caPacity 1 cum)
20 mmaggregate cum 8.1 Transit mixer (capacity 4 0 cum)
hour 15.00
10 mm aggregate cum 5.4 '1
Lead uPto km
t.km 3001
in kilometre
Lead beyond 1 km Llead 6.00
b) Labou, hour
ConcretepumP
i,late day 0.86
Mason day @
Formwork 3 Per cent of (a+b+c)
Mazdoor day 20
d) Overheads @ % on (a+b+c)
c) Machlnery
% on (a+b+c+d)
Concrete mixer (capacity 0.40/0.28 cum) hour 6 e) contractor's profit@
Generator 33 KVA hour 6
Cosl for 120 cum = a+b+c+d+e
Formwork @ 3 per cent of (a+b+c)
Rate Per cum = (a+b+c+d+e)/120

368 169
E---------- ---r
Bridgc Wo*r : l2-Fourdatio,
Bndg. Wo*s : l2'hondalion

Sr. Reference to Descriptlon Unlt Ouantity naE Description Unit Quantity Rate
5r.
Reference to
No MoRT&H Rs€ Rs
o. MoRT&H
Speclflcatlons
Speclflcations
Note: Wherevea concrele is carried out using e) Overheads @ % on (a+b+c+d)
batching plant, transitmaxer, concrete pump,
admixtures @ 0.4 per cent of weight otc€ment contractor's prolit @ % on (a+blc+d+e)
0
may be added forachieving desired slump of
concrete. Cost for 120 cum = a+b+c+d+e+f

(v) RCC M 40 Grade Rate per cum = (a+b+c+d+e+0/'120

Using Batching Plant, Translt Mixer and Sinklnq of 6 m external diameter well
Cohcrete Pump
12.12 Section {200
(othetthan pneumatc method of sinking)
through all types of slrata hamely sandy
Unit = cum soll, clayey soil and aock as shown against
Taking output = 120 cum dr'wing and
each case, Gomplete as Pet
technlcal speclfic.lions' Depth of sinking
.) ilaterlal ls reckoned frcm bed level.
Cement lllT 52.20
Coarse sand cum 54.00 Unit = Running mette
20 mm aggregates cum 4t.80 Taking output = I m
I 0 mm aggregates cum 43.20
Admixture kg 206.00 Diametet of well = 6 m

b) Labour A. Sandy Soil


Mate day 0.84
Mason day 3.00 (i) Depth below bed level upto 3 0 m
Mazdoor day 18.00

Rate of siriking = 0.50 m per hour


c) Machlnory
Batchlog Plant hour 6.00
a) Labour
Generator 1 00 l(/A hour 6.00 Mate day 0.12
Loader I cum capacity hour 6.00 Sinker(skilled) day I
Transit Mixer 4 cum capaciv for lead hour 15.00
Sinking helPer (semi-skilled)
day
upto 1 km
TEnsit mixer 4 cum capacity for lead t.km 3001
b) irachlnory
beyond 1 km Hire & tunning cha.ges ofcGne with grab hours 2
Concreie pump hour 6.00 bucket ol0.75 cum caPacity and
accessodes
d) Formwork @ 3 per cent on cost of
conc.ete i-e. cost of.natErial. labour and Consumables in sinking @ 10 per cent of (b)
machinery

370
I
1 3't 1
rl Bridgc Wo*s : l2-Foundttion Bridg. Wo*r : l2-f ordrtion

Unit Quantlty Rate


Sr. Reterence to Description. Unit Quantlty Reference to oescription
Rs.
No MoRT&H MoRT&H
No.
Specifications
lq Specifications

Add 20 per cent of cost for Kentledge


c) Overheads @of %on(a+b)
including supports, loading arEngement

d) Cont,actor'6 profit @ % on (a+b+c)


and labour

(v) Boyond 30 m uPto 40 m


Rate pe. metre = la+b+c+d)
,i (ii) Eeyond 3 m upto 10 m depth Add ! O per cent lorevery additional
metre
for
depth of sinking over the rtle of sinking
lhe previous melre
Rate ofsinking = 0.33 m per hour

ti I
.) Labour
Add 20 per cent of cost for kentledge
including supports, loading amngement
Mate day 0.15
)l Sinker day 1.25
and labour

,i Siriking helper day


B. cl.YeY Soll (6 m di' Wolll

b) Machlnory Unit= Running metre


)l Hire & .unning charges ofcrane with grab hours 3 Taking output = I rEt e
bucket ot 0.75 cum capacity and
accessories (i) Depth bolow bed levol upto 3'0 m

Consumables in sinking 10 per cent of (b) Rate ofsinking = 0 33 m Per hour


rl @

c) Overheads @ % on la+b) a) Labou,


day 0.'15
Mate
day 1.50
d) Contraclo.'s profit @ % on (a+b+c) Sinker(skilled)
day 2.25
Sinking helPer (semi-skilled)
Rate per metre = (a+b+c+d)
bl achinery
(iii) Beyond l0 m upto 20 m uire & runninc charges of
q-ane with grab holrs 300

bucket of 0.75 cum capacity and


Add 5 per cent for every additional metre accessories
depth ofsinking overthe rate ofsinking for
'lo per cent of (b)
lhe previous metre Consumables in sinking @

(lv) Beyond 20 m upto 30 m c) overh€.ds @ % on (a+b)

d) contractot's Profit @ %on(a+blc)


i Add 7.5 per cent for every additional metre
depth olsinking overthe rateofsinking for
the previous metre Rate Pe. m€'rg = (a+b+c+d)
i
) 3',72
311

)
\,\,\-v\,\,t\,\, \r\rv'\/V\I/\r\r\
) !
Bridge Wo*s : l2-Foundrtion Didse Workr : l2-Foundrion
)
Sr. Reforence to Descrlption Unlt Quantlty Reference to Description Unlt Quant|ty Rate
) No. MoRT&H
Sr.
Rs.
R!. No. MoRT&H
Speclfications Speclflcatlons
)
(li) Beyond 3 m upto 10 m depth Add 5 per cent of cost ior devrateriog of
) the cost, if required
Rate ofsinking= 0.17 m per hour
) Add 25 per cent of cost foa kentledge
a) Labour including supports. loading trangement

) Mate
Sinker
day 0.30 and labour
day 300
(v) Beyond 30 m uPto40 m
Sinking helper day 4.50
):

)l
b) Machinery
Hire & running charges of crane with
bucket of 0.75 cum capacity and
grab hours 6.00
I Add 'lO percent for every addtonalmetre
depth of sinking over the rate of sinking for
the previous meke

)) accessories Add 5 per cent of 6ost for delvatering, if


requiled
Air cor,,pressor wjth pneumatic chisel hours 2.00
I sttachrnent for cutting hard clay Add 20 per cent of cost to. kentledge
inc'udang supPorts, loading rrangement
,l Consumables in sinking @ 10 percent of(b) and labour
I
I

c) Ovorheads @ % on (a+b) C. Soft Rock (6 m dia Well )


) I
Unit = Running metre
d) Contractor's profit @ %on(a+b+c)
) Takingoutput=1m
I
R.te per .hetre = (a+b+c+d)
) Depth ln soft rock sttata uPto3 m

(ill)Beyond 10 m upto 20 m Rate of sinking = 0.25 m Per hoor


)
Add 5 per c€nt for every additionalmetre a) Labou.
) depth of sinking over the rate of sin king for [4ate day
Sinker(skilled) day 3.00
lhe paevious metre
Sinking helPer (semi-skilled) day 20.00
) day 0.50
Add fordewatering @ 5 per cent of cost, Diver

) ifrequired
b) m.chlnory
Hire & running charges ofcEns v{ih grab hours 4.00
(iv) Beyond 20 m upto 30 m
) bucket o10.75 cum capacitY and
acc€ssories
Add 7.5 per cent for every additional rnetre
) depth ofsinkiog over lhe rate ot sinking br Air comp.essorwih pneunr a breakers hours 350
he previoiJs rneke
) Consumables in sinkhg @ 1 O Per cent o, (b)

) 374 3',15

,}
, L
B.idg. Wo*s : l2-Foundarion Bridge Work : l2-Foundation

Sr. Reference to Descriptlon Un it Ouantity Reference to Descrlptlofl Un it Quantity Rate


No, MoRT&H MoRT&H Rs.
Specifications i5 Specifications
Add for dewatering @ of5 per cent of (a+b), d) Ove.hsads @ % on (a+b+c)
ifrequked
e) Contractot's profit@ % on (a+b+c+d)
c) Overheads @ % on (a+b)
R.te p6r met.e = (a+b+c+d+e)
d) Contractor's profit @ % on (a+b+c)
12.13. Section 1200 Sinklng of 7 m extemal diameter wel!
Rato per metre = (a+b+c+d) (olherthan pneumatic method of sinking)
through all types ot 5t .ta namely sandy
D. H..d Rock (6 m dia Well ) soil,clayoy 60lland aock as shown against
each cas€, complete as per drawlng and
Unit = Running metre
technical spccifi cations. Oepth of sinking
Takingouiput=1m ls reckon.d fr6m bed lcvol.
Oepth ln hard rock stiata upto 3 m Unit= Running metre
'1 m
Taking output =
Rate ofsinking = 0.17 m per hour

.) M.terlal Di.meter of well = 7 m


Gelatine 80 per cent kg 4.00
Eleclric detonators No. 18.00 A. Sandy Soil

b) Labour (i) Depth below bed level uPto 3.0 m


Mate day 1.56
Rale ofsinking = 0.30 m per hour
D.iller day
Blaster day 0.25 r) Labour
Mazdoor day 12 Mate day 0.15
Mazdoor (skilled) day 4 day 1.25
Slnke.(skilled)
Sinking helper (semiskilled) day 2.5
c) Machinory

Hire & runoing charges olcrane with g.ab tpur 6


b) Machlnory \
Hire & running dtarges ofqane with grab hour 3.25
bucket of 0.75 cum capacity and
bucket of0.75 cum caPacity and
accessodes
accessories
Hire & running charges of compressor hour 2
consumables in sinking @ 10 per cent of (b)
with pneurnatic breaker/Jack hammer for
d.illing
c) Ovorhoa& @o, % on (a+b)

Dewatering @ 5 per cent of cost of(b+c) , if d) Contractor'. prolit @ % on (a+b+c)


aequared
R.to per motrs = (.+b+c+d)
Consumables in sinking @ 10 percentof cost
of(b).

376 3',77
)
B.idgeWo i: I2-Fotrndarion
) Bddgc wo*s : l2-FoulditiM

Sr. Reference to Oescription


) No. MoRT&H
Unit Quantity
.Sr. Reference to Oescription Unit Ouantlty Rate
Speclflcations No. MoRT&H Rs.
) Speclflcations
(li) Beyond 3 m upto lO m depth
) (v) Beyond 30 m upto 40 m
Rate ofsinking = 0.22 m perhour
Add 10 percent frcr every additionalmetre
) a) Labou, depth ofsinking overthe rate ofsinking for
Mate the previous metre
) Slnker
day
day
0.'18
1.5
Sinking hetper
day Add 20 per cent of cost for kentledge
3
) including suppods, loading arangement,
b) ll.chh.iy and labouretc.
) HirB & runnlng cha.ges ofqane wilh grab llorrr
brrckel of0.7S cum capacity and
4.5
B. Clayey Soil (7 m dia Well)
acceasorigs
)
Consumables in sinking Unit= Running rnetre
@ lOpercentof(b) Taking output = 1 cum
)
c) Overheads @ % on (a+b)
(i) Depth below bed level upto 3.0 m
)
d) Contractor,s proflt @ %on(a+b+c)
Rate ofsinking = 0.22 m per hour
) Rate per metre = (a+b+c+d)
a) Labour
) (iii) Beyond tO m upto 20 m Mate day 0.18
Sinker(skilled) d"y 1.50

) Add 5 percent forevery additionalmetre Sinking helper (semi-skilled) day 3.00

depth ofslnkrng over lhe rate of stnkrng


for b) Machinery
) lhe previous melre
Hire & running charges ofcranewilh hour 4.50
(iv) Beyond 20 m upto 30 m grab bucket of0.75 cum capacity and
) accessorles
Add 7.5 perc€ntforevery additional
) deplh ofsinktng over the rate of
metre
Consurnables in sinking @ 10 per cent of (b)
srnkrng lo.
lhe previous metre
c) OvoAe.dr @ % oo (a+b)

Add 20 per cent of cost for ken


edoe d) contactor'E prqtit @ %on(a+b+c)
includtng supporls, Ioading
ar.angeme-nt
and labour Rats por metro . (8.b+c+d)

(ll) Boyond 3 m upto 10 m depth

Rate otslnking = 0.17 m perhour

378
379
Bridg. wo*r : l2-foundrlio. wo*s : l2'Foutdatio'r
Bri.lg.

Sr, Reterence to Oescriplion Unit Quantity Unit Quantity Rate


No. MoRT&H
-Rqil Reference to DescriPtion
Rs.
MoRT&H
Speclflcations "l llo.
Specificatlons

a) Labour {v} Beyond 30 m uPto 40 m


Mate day 0.26
Add 1Oper ceot for every additionalmetre
Sinker day 2.00 over the rate of sinking for
depth ofsinking
Sinking helper day 400
the Previous metre

b) ll.chlnery if
grab Add 5 per cent of cost for dewatering'
Hire & running charges ol crane with hour 6.00
required
bucket of0.75 cum capacity and
accessories ol cost for kentledge
Add 20 per cenl
iocluding suPports, loading arrangement
Air compressor with pneumatic chisel hour
and lat]our
attachment for cutting hard clay

C. Soft Rock (7 m dia Well )


Consumables in sinking @ 10 per cenl of (b)

c) Overheads Unit= Running metre


I
@ % on (a+b)
Taking outplt = 1 m
I d) Contractor's profit @ % on (.+b+c)
Depth ln 3oft rock 6trata upto 3 m
Rate per met.e = (a+b+c+d)
Rate ofsinking = o'22 m Per hour
(iii) Eeyond 10 m upto 20 m
i
a) Labout
Add 5 per cent for every additionalmetre day 0.58
Male
depth ofsinking overthe rale ofsinking for day 4.00
Sinker(skilled)
lhe previous iietre day 10.00
Sinking helper (semi-skilled)
day 0.75
Add for dewatering @ 5 percentof cost, Diver

ifrequired.
bl iihchlnery
(iv) Beyohd 20 m upto 30 m of cranerwith grab
Hir€& tunning charge6
hour 4.50

bucket of 0.75 cum caPacity and


Add 7.5 per cent for every additional metre ac@ssodes
depth ofsinking overthe rate ofsinking for Air comp.essorwith Pneurnatic breakars lbur 3.75

the previous metre


consumables in sinking @ 1O Per centof(b)
Add 5 per cent o, cost for dewatering on
(a+b)'
the cost, if required Add lor dewaredng @ of 5 per cent of
ifrequired
Add 25 per cent ot cost for ken edge
including supports, loading arangement c) Overh..ds @ % on (a+b)
andlabour

.r80 381
)

)l
,l Bdd8. Wo*s : l2-Foll!d!ri@
BridgeWotu: l2-roudibn

)l I Sr.
No.
Reterence to
MoFT&H
Specltlca ons
Oescrlption Unit Ouan ty
5r.
Reference to Description Unit Quantity Rate
) llo' MoRT&H Rs.
Speciflcatlons
d) Contractor's profit @ ./. on (a+b+c,,
) Rate per metre (a+b+c+d) 2.14- Section 1200 Sinklng of 8 m exlernal diameter well
= (othe,than pneumatic methodotslnklng)
) D. Hard Rock (7 m dia We[) through .ll types ot 8tr.ta namoly sandy
soil, clayey 60ll and rock.s shown agalnst
Unil = Running meire
) Taking output .t
= m
each ca!e, complete as pEa drawlng and
technicalapeclfications. oeplhorsinklng
) Depth In hard rock strEta upto
3 ln is reckoned from bed level,
Eate ol Slnklng O.i7 m per hour Unit = Running melre
=
) a) Materlat Takingoutput=1m
Gclatine 80 per cenl
) Electric detonalors
kg 7.@ Diametor ol well = 8 m
No. 30.@
) b) tabour A. Sandy Soil
Mate
day 1.6
) Dd[er
&y 2
(i) Depth bolow b6d lovel upao 3.0 m
Blasier
day 0.25
l,h2door Rate ofsinking @ 0.25.n/hour
) Mazdoor (skj ed)
day
&y
t8
4 a) Labou.
oiver
day 0.5
) c)
Mate day 0.'18
Machinery Sinker (skilled) day 1.5
Hire & tunningcharges ol crane wilh grab
) buckel o,0.75 cum capacily and
llour 6 Sinking helper (semi-skilled) day 3

a@essories b) Machlnery
) Hire & runnjng charges ofcompressor grab
tpur 2
Hire & runninq charges ofcranewith hour 4
with pnoumatic breaker4ack hammer bucket 0f0.75 cum capacity and
for
ddllirE i accessoaies

Oewatering @ 5 per cenr ol cost of (b+c). rf Consumables in sinking @ 10 per cent of(b)
required

Consurnables in sinking @ 10 per


cent o, cost
c) Overheads @ of % on (a+b)
ol (b)
d) Contracto.'s profit @ * on (a+b+c)
O Ovorheads @ % on (a+b+c)

e) Contlactor's profit @ Rate per metre = (a+b+c+d)


% on (a+b+c+d)

Rate per metre (a+b+c+d+e) (ii) Beyond 3 m upto 10 mdepth


=

Rate ofsinking @ 0.20 n/hour

382
l8l
)
)
Bridg. Wo.k : l2-Foudarion BridF Wo*s : I2'round'lion

---? )
Unit Quantity Rate
Sr. Relerence to Descrlption Unit Quantlty Reference to DescriPtlon
No. MoRT&H iI
sr.
No. MoRT&H
Rs. )
Specifications Specifications
)
a) Labour Add 20 per cent ol cost for kentledge
Mate day 0.25 including supports, toading anangement )
Sinker day 1.75 and labour etc-
Sinking helper day 3.5 )
B. ClaYeY Soil (8 m dia woll)
b) lrachlnory
Hke & running charges ofcrane with grab hours 5 Unit= Running rnete
bucket of0.75 cum capacity and Taking output' 1 metre

a@essories
(t) &Pth trom bod hv'l upto 3'0 m
Consumables in sinking @ 10 per cent of (b) -
Rate of sinking @o.18ttrllour
c) Overhead @ % on (a+b)
.) Labour
day 0.22
d) Contractor'6 profi( @ % on (a+b+c) Mato
day 2.@
slnker (skilled)
day 3.50
Rate per metre = (a+b+c+d) Sinking helPer (semi-skilled)

(iii) Beyond l0 m upto 20 m bl Machinery


Hrre & running charges ofcrane
with grab hour 5.50

Add 5 per cent for every additionalmetre bucket of 0.75 cum capacity and
depth otsinking overthe rate of sinking for accessories
lhe previous meke
per cent ol (b)
Consumables in sinking @ 1o
(iv) Beyond 20 m up(o 30 m
c) Overheads @ % on (a+b)
Add 7.5 per cent for every additionalmetre
depth ofsinking overthe rate otsinking for d) Contractor's prolit @ % on (a+b+c)
the previous metre
Rate Per metre = (a+b+c+d)
Add 20 per cent of cost for kentledge
including supports. loading arrangement (ii) Beyond 3 m uPto tO m depth
and labour
Rate of sinking @ 0 17 m/hour
(v) Beyond 30 m upto 40 m
a) Lrbour 0.32
day
Addl0percentforeveryadditionalmetre Mate
day 2.50
depth of sinking over the rate of sinking icr Sinker
4.50
d1v
tlle previous mete SinkinghelPer

185
181
)
A.idse Wo*s : l2-Foutrdalion B dge Wo.k: l2-found.lid
)
Sr. Refe,ence to Desc.iptlon Unlt Quantity Reference tg Description Unit Quantity Rate
) No. MoRT&H
Sr.
Rs.
No. MoRT&H
Specifications Speclflcatlons
)
b) Machlnory (v) Beyond 30 m upto 40 m
) Hire & running chargB ofcrane with grab hour 6.00
bucket of0.75 cum capacity and Add 10 percent for every addi[onaltnetre
) ac@ssories depth ot sinking over the rate of sinking for
Air compressor with pneumatic chisel hour the previous melre
attachment for cuting hard clay
) Add 5 per cent of cost br dewateting, if
Consumables in sinkihg @ 10 per cent of(b) lBquircd
)
c) Ove.head @ % on (a+b) Add 20 per cent of cost tor kentledge
) including supports, loading arrangement
d) Contractor's prolit @ %on1a+u+s; and labour
)
Rate per metre = (a+b+c+d) C. Sofi Rock (8 m dia Well)
) (lii) Beyond l0 m upto 20 m Unit = Running metre
Takng output = 1 m
) Add 5 per cent for every additionalmetre
depth ofsinking over the rate ofsinking br Depth ln soft rock strata upto 3 m
) the previous mete
Rate ofsinking @ 0.20 m/hour
) Add fordewatering @ 5 percent of cost,
if required a) Labour
day 0.68
) Male
(lv) Beyond 20 m upto 30 m Sinker(skilled) day 4.00

) Add 7.5 per cent for every additional rnetre


Sinking helPer (semi-skilled)
'Oiver
day
day
12.O0
1.00
depth of sinking over the rate ol sinking ,or
) lhe previous me{re i b) lrachlnory
Hire & running charges ofcrane with grab hour 5.00
) Add 5 per cent of cost for dewatering on bucket of 0.75 cum cap&ity and
the cost, if required accessodes
) Air compressorwith pneumatic breaker6 hour 3.75
Add 25 per cent of cost for kentledge
) including supports, loading arrangerient
andlabour
Consumables in sinking @ 10 per cent oI (b)

Add fr,r dewatering @ of 5 p€r cent ot (a+b), if


)
r€quired

)
) 3E6 187

) I
BridB€ Wo.k : l2-Foundslion B.id8c wdt : l2-Fourdtli6

I Reference to Oescriptlon Unit Quantity Rate


Sr. Reference to Description Unit Quantity sr.
MoRT&H Rs
No. MoRT&H No.
Specifications Specificatlons

c) Overheads @ % on (a+b)
d) Ovorheads @ % on (a+b+c)

e) Contractol's proftt @ %on(a+b+c+d)


d) Contractor's profit @ %on(a+b+c)
R.te per met.e = (a+b+c+d+e)
Rate per metre = (a+b+c+d)

12,'15. Section 1200 Sinking of 9 m external diameter well


D. tlard Rock (8 m dia well) (otherthan poeumatic method of sinking)
through all types ot st.ata namely sandy
Unil = Running metre soil, clayey soil and rock as shown against
Takingoulput=1m each case, comPlete as per drawing and
tec h nlcal specifications. Dopth of6inkinf'-
Depth ln hard rock strata upto 3 m ls .eckoned from bed level.

Rate of sinking @ 0.'17 m/hour Unit= Running rnetre


Taking output = I m
.) M.torl.l
Gelatine 80 percent
Electric detonators
k9
No.
8.00
32.00
I Oiameter of well = 9 m

A, S.ndY Soil
b) Labo!.
Ma{e day 1.09
(i) Depth below bed leYel uPto 3.0 m
Driller day 2
Rate of sinking @ 0.25 m/hour
Blaster day 0.25
Mazdoor day 20 a) Labour
Mazdoor (Skilled) day 4 Mate day 0.19
day 1.5
Sinker(skilled)
c) Machlnsry Sinking helPer (semi-skilled) day 3.25
Hke & running ciarges of c€ne with grab hoJr 6
buclet ot 0.75 cum capacity and bl ti.chlncrY
Hire & runoing charges ofcEne wilh grab ho(lr 4
accessories
Hire & running charges of compressor with hour 2 bucket of 0.75 crlm capadty and
pneumatic breaker4ack hammer for drilling accEssories

Consumables in sinking @ l0 per cent of (b)


Oewatering @ 5 per cent of cost of (b+c), if
required.
c) Ovodreads @of %on (a+b)

Consumables in sinking @ 10 percent of cost d) Contractor's profit @ % on (a+b+c)


of (b)
Rate per metre = (a+b+c+d)

389
388
t
) Bnds! Wo*s : l2''outtdttion
Brids. Wo*r : l2-foundalion
Rate
) OescriPtion
Unit Quantlty
Rs.
Sr. Reference to Descrlptlon Unit Quantity Rq Reference to
sr.
) No. MoRT&H Rs. tlo'
MoRT&H
Speclfications Speclflcations
,om
) (v) Beyond 30 m upto
(ll) BoyondSm upto l0 mdepth
) [1
Rate olsinking @ 0.18 rn/hour t::,ff fl ii#"!J":fl ;[11"jffi
lhe Previols metre
) r) Labour
day 0.27
) Mate
Sinker day 1.75 i:ffi :#ffi"J":l#"'lJ#:$""1"7
Slnking h€lper day 4 and labouretc
)
ClaYeY Soil (9 m
da well)
b) ,iiachino.y B.
) ofcratE with-grab hotn
Hire & running charges
bucket or 0.75 cum capadity and unit= Running metre
) accessories TakingoutPtrt=1cum
uPto 3 0 m
) consumables in sinking @ 10 per cent of (b) (D DePth below bed lcvel

17 m/tpur
c) Overheads @ % on (.+b) Rate of sinking 0

d) Cont.actor's profit @ % on (a+b+c) a) Labour day 0.24


Mate day 2.25
Rate per molre = (a+b+c+d) Srnker(skrlled) day 3.75
(seni-skilled)
Sinking helPer
(iii) Beyond 10 m upto 20 m
) o' orcranewith grab hoir 5.75
Add 5 per cenl ,or every additional rnetre Iiill,"fl.n **es
Capacity ano
depth ofsinking overthe rate ofsinking tor buckel of 0.75 cum
)
the previous rnetre accessodes
percentof(b)
) (lv) Boyond 20 m upto 30 m Consumables in sinking
@'10

@ % on (a+b)
Add 7.5 percenttorevery additional metre c) overhe.ds
l deplh ofsinking overthe rate ofsinking for
d) Contractor's protit @ %on(a+b+c)
lhe previous meire
('+b+c+d)
1 R.te Per motre =
) Add 20 per cent o, cosl for kentledge
m d'Pth
including supports. loading arrangement (ii) Beyond 3 m upto 10
) ahd labour
15 rJhour
Rate ofsinking O

)
191
) 390

)
E_
B.id& Work : I2-[oundarion
Bridtc Wo*s : l2-foun&iion

Sr. Reference to Desc.iption Unit )


No. MoRT&H Quantity
Reference to Description Unit Quantity Rate
Specifications Rs. MoRT&H
tlo. Rs. )
Specifications
a) Labour
Mate Add 25 pe. cent of cost for kentledge
)
day 0.34
Sinker including supports, loading arrangernent
day
Sinking helper
day
2.50
5.00
and hbou. )
b) Machinory (v) Beyond 30 m upto 40 m )
Hrre &.runntng charges ofcrane
with grab hour 6 50
Ducket of0.75 cum capacity
and Add l0 per cent for every additional metre )
accessories depth ofsinking overthe rateofsinking for
Air compressoa with pneumatic
attachment fo. cutting hard clay
chisel hour 3.75
the previous metre
)
Add 5 per cent of cost for delvatering, if
Consumables in sinking per cent of (b) requktsd
)
@ 1O

c) Overheads @ % on (a+bl Add 20 per cent of cost tor kentledge )


including supports. loading anangenent
dl Contractor,s protit
@ yo on (a+b+cl and lebour )
Rate per metre (a+b+cid)
= C, Soft Rock (s m dia well) )
(iii) Beyond 1O m upto 20 m I Unit = Running metre
Takingoutput=1m
)
Add 5 per cenl for every additionalmetre
deplh ofsinking over the rate
of sinktng tor Depth in soft rock strata upto 3 m
)
lhe previous rneke
Rate of sinking 0.15 rn/hour )
Add fordewatering
@ 5 pe.cent of cost,
ifrequired. .) Lebou, )
Mate day 0.76
(iv) B6yond 20 m upto J0 m Sinker (skllled) day 4.Oi) )
Sinking helper (sernl-skilled) day 14.00
Add 7.5 per cent for every addrtronatmeke
deplh ofsinking over the rate
[I'iEr day 1.2
)
of sinkino for
the previous melre b) lrlachlnery
Hire & running chaqes ofcrane with grab horrc 6.50 )
Add 5 per cent ofcost for dewaterino bucket of 0.75 cum capaclty and
on
the cost, rl required accessories )
Air compressorwith pneumatic breakers hours 4.00
)
Consumables in sinking @ 10 percfntof(b)
)
392
393
)
)
E """""""

BridSe Works : I 2-Foundation


Bddsc Wo*s : l2-Fo'idioo

Sr. Reference to Description Unlt Quantity Reterence to oescrlption Unlt Quantity Rate
No. MoRT&H Sr.
Speciflcations hq tlo. MoRT&H Rs,
Specllicatlons
Add for dewate.ing @ of 5 per cent of (a+b).
Consumabl$ in sinking @ l0Pe,centof
ifrequired
cost ot (b)

c) Ove,heads @ % on (a+b) d) Overheads @ % on (a+b+c)

d) Contractor's profit @ % on (a+b+c) e) contr.cto.'s profit @ % on (a+b+c+d)

Rate per met.e = (a+b+c+d) Rate per motre = (a+b+c+d+e)

D. Ha.d Rock (9 m dia well) 12.16. 1200 Slnklng ol't0 m exlemal diameter woll
(otharthan pneumatic mettrod of slnking)
Unil= Running metre through alltypes of strata namely 6andy
Taking output = 1 m soll, clayey $olland rock as shown .gainst
each cas6, completo as per daawlng and
Depth ln hard rock strata upto 3 m technical spe -itications. Oepth ofslnklng
ls reckoned flom bed level.
Rate ofsinking 0.15 nvhour
Unit = Running metre
a) llalorl.l Takingou$ut=1m
) Gelatioe 80 per cent kg 10.00
Electric detonators No. 40.00 Diameter olwell - 10m
)
b) Labour A. Sandy Soil
Mate day 1.17
Driller
(i) Oepth below bed level upto 3.0 m
day 2
Blaster day 0.25 Rate of sinking 0.20 n/hour
Mazdoor day 2.
Mazdoor (skilled) day 4 .) Lrbour
Di\?er day I Mate day o.2
Sinker(skllled) day
c) Machlnery
Slnking helper (semi€killed) day
Hire& running charges of crane with grab hour 7
bucket ot0.75 cum capacity and
b) tl.chln.ry
accessories Hire & running charges ofcrane wih g€b hou. 5
Hire & running charges of @mprcssor with hour bucket or 0.75 cum capadty end
pneumalic breakerfFck hanxner fo. drilling
accessodes

Dewatering @ 5 per cent of cost of (b+c), if Consumables in sinking 10 per cent of (b)
/ tequiEd
@

t cl Overho.ds @ % or (.+b)

) 394
395
I
a.idgc Wo*s : lz-Foundation
Bddg. Wo*5 : l2-follnd.lion

Sr, Reference to Descrlption Unit Quantity R.d Unlt Ouantity Rate


No. MoRT&H sr. Reference to Description
Rs; Rs.
Specifications No. MoRT&H
Specifications
d) Contractor's profit @ % on (a+b+c)
(v) Beyond 30 m uPto 40 m
Rate per metre = (a+b+c+d)
Add 10 percent forevery additionalmetre
(ii) Beyond 3 m upto l0 m depth deplh ofsinkang overthe rate ofsinking for
the previous metre
Rate ofsinking 0 17 m/hour
Add 20 per cent of cosl for kentledge
a) Labour including supports, loading anangement
Mate day 0.31 and iabour etc.
Sinker day
Sinking helper day 4.25 B. Clayey Soil(10 m dla well)

b) Machinery Unit= Running metre


Hire & ruoning chaages ofcrane with grab hour Taking .utpul = 'l cum
bucket of0.75 cum capacity and
accessories (i) Oepth below bed level uPto 3'0 m

Consumables in sinkhg @ 10 per cent of (b) Rate ofsinking 0.18 ry'hour

c) Overheads @ % on (a+b) a) Laboul


Mate day 0.25
d) Cont.actor's protit @ %oh(a+b+c) Srnker(skilled) day 2.50
Sinking helPer (semi-skilled) day 5.50
Rate p6. metre = (a+b+c+d)
b) Machlnery
(iii) Beyond 10 m upto 20 m Hire & running charges ofcrane with grab hour 6.00
bucket 0f0.75 cum capacity and
Add 5 per cent for every additional metre accessodes
depth ofsinking over the rateofsinking for
the previous met e Consumables in sinking @ 10 per cent of (b)

(iv) Beyond 20 m upto 30 m


c) Ovorhoads @ % on (a+b)

Add 7.5 per cent for every additional metre


d) contBctot'8 Profit@ % on (a+blc)
deplh ofsinking overlhe rate ofsinkihg for
lhe previous metre
Rate per metro (a+b+c+d)
'
Add 20 per cent of cost for kentledge
including supports, loadang arrangement
and labour

396
197
t
,j
)l
I Bridg. Wo*5 : l2-Found.lion
Bridrc Wo*r : l2'Foundiidr

,l Sr. Reference to Descrlption Uolt Quantlty R Reference to Desc.lption Unlt Quantlty Rate

)l.l
No. MoRT&H Rs.
t MoRT&H
Specifications
Specifications
(ii) Beyond 3 m upto l0 m depth
r_ Add 5 p€r cent ol cost fo. d#atering on
) the cost, if required
Rate of sinking 0.15 ny'hour
Add 25 p€r cent of cost lor kenUedge
)
.) L.boul includirlg supports, loading rrangernent
Mate day 0.40 and labur
)
Sinker day 3.00 uPto 40 m
(v) B.yond 31, m
Sinking helper day 5.50
) Add 10 per cent tor every adflional metre
b) U.chln..y depth of sinking over the rate c'f sinking lor
) Hi.e & running cha.ges ot crane with grab ho0r 6-00 lhe prevbus nletre
bucket of 0.75 cum capacity and
Add 5 percent ofcost for dsiratering on
) ac@ssodes
the cost if required
Air comprEssor with pneumatic chisel hour 4.00
) attachment for cutting hard clay Add 20 per cent of cost for kentledge
including supports, loading anangernent
Consumables in sinking @ 10 percentot(b)
) and laboiir

c) Overhoads @ % on (a+b) C, Soft Rock (10 m dla woll)


)
d) Contractor'E p.ofit Unit= Running metre
@ % on (a+b+c)
Taking outPut = 1 m
)
Rate per metre = (a+b+c+d) oepth ln soft.ock strata upto 3 m
)
(iil) Beyond l0 m upto 20 m Ralo ofllnklng 0.'14 n hou,

Add 5 per cent for every additionalmetre


a) Labou,
Mate day 0.86
depth ofsinking oterthe rate ofsinking for 4.00
sinker(skilled) day
the previous metre 't6.00
Sinking helPer (semiskilled) day
day 1.4
Diver
Add for dewatering @ 5 percent of cost,
ifrequired. b) Machlnery
Hire & running charges of crane with grab hour 7.00
(iv) Beyond 20 m upto 30 m bucket ol0.75 cum capacity and
accessodes
Add 7.5 p€r cent for every additional rnetre Air compressorwith pneunratic breakers hour 4.25
depth ofsinking over the rate ofsinking for
the previous melre Consumables in sinking @ l0percentof(b)

Add tor deuatering @ S per cent of cost,


ifrequirsd

l9E t99

.)
k----.
Bridg. Wo.ks : l2-Founddion
&idgc Work I l2-Fomdation

Sr. Reference to Description


No Unit Quantity Reference to Description Unit
MoRT&H ;st. Quantity Rate
Specifications MoRT&H Rs.
{ No.
Specifications
c) Overheads @ % on (a+b)
d) Overhe.ds @ % on (a+b+c)
d) Contractor's protit @ % on (a+b+c)
e) Contractor's prolit @ % on (a+b+c+d)

Rate per metre = (a+b+c+d) Rato per met.o = (a+b+c+d+o)

D. Ha.d Rock (.tO m dia well) 12.17. 1200 Sinking of 11 m extemal diameter well
(otherlhan pneumatic method of sinking)
Unit= Running metre through alltypes of strata namely sandy
Takiog output = 1 m soil, clayey soil and rockas shown agalhst
each case, complete as per daawing and
Depth in h.rd rock Etrata uplo 3m tochnical 6pecifrcations. Depth of sinking
ls reckoned from bed levol,
Rate ofsinkihg 0.12 nvhour
Unit = Running metre
r) i'latqrlal Taking output = 0.50 m

Gelatine 80 per cent kg Diamele. of well = 1'l m


11
Electric detonators
Nos. 44.00
A. Sandy Soil
b) Labour
Mate (i) Depth from bed level upto 3.0 m
day 1.27
Driller
day 2.O0 Rate ofsinking @ 0 15 m/hour
Blaster
day 0.25
Mazdocra a) Labour
day 24.00
Mazdoor(skilted) Mate day o.21
day 4.00
Sinker (skilled) day 1.5
c) ilachln6ry Sinking helper (semi-skilled) day 3.3
Hire& running charges otcrane with grab
hour 8.5
buckel of0.75 cum capacity and b) Machlnory
accessoaies Hire & running charges otcrane with grab hour 6
Hire & running charges of compressor bucket of0.75 cum capacity and
hour 3
wilh pneumatic breaker4ack hammer ac@ssoaies
ordrill
consurnables in sinking @ lopercentof(b)
Oewatering @ 5 per cent of cost (c),
.equired c) Oveireads @ % ot! (.+b)

Consumables in sinking d) Contr.ctor'3 proft@ % on (a+b+c)


@ iO per cent of
cost of (b+c)
cost for 0.5 m = a+b+c+d

Rato per mgt s . (a+b+c+d)r0.50

400
401
BridscWo*s: |2-rouoda on Bfl .tg. wo*s : l2_kundaiion

)
U nit QuantitY Rate
Sr. Reference to Oescrlplion Unit Quantity Reference to DescrlPtion
sr. Rs.
) No, MoRT&H i"$ No.
MoRT&H
Specificatlons Speclficatlons
) (ii) Eeyond 3 m upto 10 m depth (v) Beyond 30 m uPto 40 m

) Rate of sinking @ 0.13 rnlhour Add '10


Per centforevery additionalmetre,
for
depth ol sinking over the rate of sinking
a) Labour
) Mate day 0.32
the Previous metre

Sinker day 2
) Add 20 per cenl of cost for kentledge
Sinking helper day 4.5
including supports, loading a(angement
and labouretc.
) b) Machincry
grab 4.00
Hire & running charges ofcrane with hour
B. ClaYeY Soll (1t m dit ?elu
) bucket of0.75 cum capacity and
accessories
Unit= Running metre
) Consumables in sinking @ 10 per cent of (b) Taking outPut = 0.50 metre

) c) Overheads @ % on (a+b) (l) Depth from bed level uPto 3'0 m

d) Contnctor's prolit @ %on(a+b+c)


Rate ofsinking @ 0.10 fiVhour
)
cost for 0.5 m = a+b+c+d
a) Labour
) Rate pe. metre (a+b+c+d)/0.50 Male
day 026
day 250
Sinker (skilled)
4.00
) (iii) Beyond'10 m uplo 20 m Sinking helPer lsemi-skilled)
day

Add 5 percent for every additiohalmetre bl Machin6ry


Hire E running charges ol crane
with grab hour 5.00
depth ofsinking overthe rate ofsinking for
bucket of 0 75 cum capacity and
) the previous metre
accessories
) (iv) Beyond 20 m upto 30 m
Consumabtes in sinking @ 10
per cent of (b)

Add 7.5 per cent for every additional metre


) deplh ofsinking over lhe rate ol sinking for c) Overheads @ % on (a+b)
he previous meLe
) d) Conttactor's P.ofit @ % or ('+b+c)
Add 20 per cent of cost for kentledge
i0cluding supports, loading arangement CostforO5m=a+b+cd
and labour

Rato Per metre = (a+b+Gld)'lo 50

402 403
)
I
j-_--7

I2'Fondltim
)
B.idg. Wo*s : I 2'Foundalion Bddscwork :

)
Sr. Reference to Description nit Reference to Description Unit Quantity Rate
LJ Quantity
No MoRT&H II
MoRT&H
Rs
)
Specifications Specifications
(li) Eeyond 3 m upto 10m depth Add 5 per centofcost for dewatering on
)
the cost, if required
Rate ofsinking @ 0.08 n/hour
,
Add 25 per cent of cost for kentledge
a) Laboul including supporls. loading anangement )
Mate day 0.43 and labour
Sinker day 3.50 )
Sinking helper day 5.75 (v) Beyond 30 m uPto 40 m
)
b) Machlnery Add every additionalmetre
1O per cent for

Hire & running charges ofcrane with grab tlqrr 6.00 depth ofsinking over the rate ofsinking for ,
bucket of0.75 cum capacity and the previous metre
accessories
Air compressor with pneumatic chisel ho(,r 425 Add 5 per cent of cost for dewatering on
)
attachment for cutting hard clay the cost, if required
)
Consumables in sinking @ 10 per cent ol(b) Add 20 per cent of cost ior kentledge
including supports, loading arrangement )
c) Ov€rheads @ % on (a+b) and hbour

(lt
)
d) Contractor's profit @ % on (a+b+c) C. Soft Rock m dia well)

costfor05m=a+b+c+d
)
LJnit Running metre
=
I
Taking output = 0.50 m
Rate per metre = (a+b+c+d)/0.50 ,
Depth ln sofl rockstrata uPto 3 m
(ili) Boyond l0 m upto 20 m )
Rate ofsinking @ 0.06 n hour
Add 5 per cent for every additional metre )
depth ofsinkjng overthe rate ofsinking for .) Labour
day 0.95
th6 prcvious,netre Mate
Sinker (skilled)
day 4.25 )
day 18.00
Add fordewatering @ 5 percent of cost, Sinking helPer (semiskilled)
I ifrequired Diver
day 1.50 )
(lv) Beyond 20 m upto 30 m b) Machlnery
grab hour 8.00
)
Hire E running charges ofcrane with
Add 7.5 percentforevery additonal rnetre
depth ofsinking over the rate ofsinking for
bucket ofO.75 cum capacity and ,
accessodes
I 4.50
the previous rnetre Air compressorwith pneumatic breakers hour
)
I

I
404 405 )

/ )
)
E-"------------

)
Bridg€ Works : l2-Foundrtion
Bridsc Work : l2-Fouod.ion
)
,l Sr.
No
Reference to
MoRT&H
Description Unit Quantity
Sr. Reference to
MoRT&H
Descriptlon U nit Quantity Rate
Rs.

,J Specifications

Consumables in sinking @ 10 percent of(b)


No.
Specifications

)l Add fordewatering @ 5 percenl ofcost,


Dewalering @ 5 pe. cent of cod (c)'
ifrequired

)l ifrequired Consumables in sinking @ 10 percent of


cost of (b+c)
c) Overheads @ % on (a+b)
d) Overheads @ % on (.'b+c)
d) Contractor's prolit @ %on(a+b+c)
e) Contractor's prolit @ % on (a+b+c+d)
costfor05m=a+b+c+d
Rate per met.e = (a+b+c+d+cY0.50
Rate p.r mctre = (a+b+c+d)/0.50
1214. '1200 Sinklng of 12 m exlo.nal diareter well
D. Hard Rock (11 m dia well) (otho.than pneumatic method ol6lnking)
through alltypes of strata nnrely 6andy
Unit= Running metre soil, clayey soll and rockas stB'vn egainst
Taking output:0.50 m each casa, complete as per daawing and
) techn lcel spociricatio ns. Deplhol6inking
oepth ln hard rock itrata upto 3 m ls rcckoned lrom b6d level.
) Unit = Running metre
Rate ofsinking @ 0.05 ny'hour
Taking oulput = 0.25 m
)
a) t aterlal
Diameter ot well = 12 m
Gelatine 80 per cent k9 12
) Electric detonators Nos. 48.00 A. Sandy Soil

) b) Labour (i) Dopth bolow bed level uplo 3.0 m


Mate day 1.35
q Rale ofsinking @ 0.05 ni/hour
Ddller 2.00
Blaster &y 0.25 .) Labour
Mazdoor day 26.00 Mate day o.22
Mazdoor (skilled) day 4.00 day 't.75
Sinker(skilled)
Sinking helper (semi-skilled) day 4
c) lirachlnery
Hire & running charges of cEne with t|our 10
b) tthchlnory
grab bucket of0.75 cum capacity and 6
Hire & running charges of o-ane with holJr
accessories grab bucket ofO.75 cum c4acity and
Hire & running charges ot compressor llour 3.5 a@essodes
with pneumatic breaker4ack hammer
ordrill Consumabi.'s in sinking @ l0percentof(b)

406 401
f,------f Bridg. Wo.k,: Iz-Fou atio.

Aidge Worl(': | 2-Fourdatioo

5r. Reference to Description Unit Quantity Rate


-No. MoRT&H
Sr. Reference to Description Unlt Quantity Rs
No. MoRT&H Speclfications
Rs.
Specifications (lv) Bsyond 20 m upto 30 m

c) Overheads @of %on(a+b)


Add 7.5 per cent for every additional metre
d) Cont,actor's profit @ % on (a+b+c) depth ofsinking overthe rate ol sinking for
the previous metre
Costfor025m=a+b+c+d
Add 20 per cent for kentledge including
Rate per metre = (a+b+c+d)/0.25 supports, loading arangement and labou.

(ii) Beyond 3 m upto l0 m depth (v) Beyond 30 m upto 40 m

Rate ofsinking @ 0.038 m/hour Add 10 per cent for every additionalmetre
depth of sinking over the rate of sin king for
r) L.bour lhe previous rnetre
Male day o.37
l
Sinker day 2.5 Add 20 per cent for kentledge including
Sinking helper day 4.75 supports, loading arangement and labour

bl Machlnery B. Clayey Soll (12 m dia well)


Hte & running charges ofcranewith gaab hoJr 65
bucket of 0.75 cum capacity and Unit = Running metre
accessories- Taking output = 0.25 metre

Consumables in sinking @ l0percentof(b) (i) Depth below bed level upto 3.0 m

I
c) Overheads @ % on (a+b) Rate ofsinking @ 0.04 n/hour

dl Cont,actor's prolit @ %on(a+b+cl a) Lrbour


Mate day 0.30
costfor025m:a+b+c+d Sinker(skilled) day 3.00
Sinking helper (semi-skilled) day 4.50
Rate per metr. = (a+b+c+d)/0.25
b) Machlnery
(iii) Beyond l0 m upto 20 m Hire and running charges ofcrane with hour 6.25
grab bucket of0.75 cum capacity and
Add 5 percent for every additionalmetre accessories
depth ofsinking over the rate ofsinking for
the previous mefe Consumables in sinking @ 10 percent of(b)

409

408
Bridf Wo*! : l2_Fo-dtlion

Bidt Workr : I2-FouDdatiotr


Unit Ouantity Rate
DescrlPtion
Reference lo Rs
Sr.
No.
Reterence to
MoRT&H
Descrlption Unlt Quantity R.t{
Rs.!
t MoRT&H
Speqlficatlons
Speciflcations Add lor dewatering @ 5 Frcentof cosl'
ifrequired.
c) Overhoads @ % on (e+bl

) (iv) Beyond 20 m uPto 30m


d) Contractor's p.otit @ % on (a+b+c)

Add 7 5 per cent tor every addnonalmetre


) costior0.25m=a+b+c+d ofsinkrng lor
depth ofsinking overthe late
the previous metre
) Rate per metre = (a+b+c+d)/0.25
on the cost
Add 5 per cent for dewatging
) (ii) Beyond 3m upto l0 m depth ifrequired
lncludlng
Rate ofsinking @ 0.03 m/hour Add 25 9er cent for ken(€dge
) supports. load lng afiang€T
lenl and labour
r) Lrbour
) Mate day 0..a (v) Beyond 30 m upto
ilo n
Sinker d.t melle
) Sinking helper day 6.00 Add 1O percentforeveryadditlonal
rate ofEinking lor
deplh ol sinklng over the
b) Machln.ry the Previous metre
)
Hi.e & running charges ol crane with hours 8.33 dewatering'
grab bucket of0.75 cum capacity and Add 5 per cent of cosl for
) accessories ifrequired
Air compressor wilh pneumatic chisel hours 4 50
Add 20 Per cent of cGt
tor kenlledge
) attachment for cutting hard clay
including supports, loading
anangement

and labour
) Consumables in sinking @ 10 per cent of (b)

c, Solt Rock (t2 m dl' li"ll)


) c) Overheads @ % on (a+b)
Unit = Running metre
d) Contractor's profit @ % on (a+b+c) Taking outsut = 0 25 m

Costfor025m=a+b+c+d Dopth ln soft rock !t"t' upto 3 m

Rate ofsinking @ 0.025 mihour


Rats per metre = (a+b+c+d)/0.25

(iii) Beyond't0 m upto 20 m


.) L.bour
day 1.06
Mate 4.50
day
Sinker(skilled) 20.00
Add 5 per cenl lor every addilional melre day
Sinking helPer (semi-skilled) 1.75
depth ofsinking over the rate ofsinking for day
Civer
lhe previous rnetre

4l I

410
t

)
B.idge Works : l2-Foundltion cI l2'Foundlion
Bridgc Wo

)
Sr. Reference to Oescriptlon Un it Quantaty Unit Quantity Rate
Reference to DescriPtion
No MoRT&H
Specifications
H
!
s..
No,
MoRT&H
Specilications
Rs. ,
hour
)
b) Machinsry Hire and running charges ofcompressor
Hire & running charges ofcrane with grab hammer or
bucket ol0-75 cum capaci9 and
houa 10.00 with pneumatic breaker/Jack )
dnll
accessories
Air compressor with pneumatic chisel hour 4.75 Dewatering @ 5 Per cent, if required
)
attachment for cutting hard clay. per centof (c)
Consumables in sinking @ 1O ,
Consumables in sinking @ 1O per cent of(b)
d) Overheads @ % on (a+b+c)
Add tor dewatering @ 5 pe. cent. if required
)
e) Contractor's profit @ % on (a+b+c+d)
c) Overheads @ % on (.+b) ,
Costfor 0.25 m = a+b+c+d+e
d) Contr.ctor's proflt@ ta or (a+b+c)
,
25
costfor025m=a+b+c+d Rate Per metre = (a+b+c+d+G)'o

(othet thtn
)
R.t por metre (.+b+c+d)O,25
12.19- 1200 Sinking of Twin D Typt well
oneum-atlc method ofsinklng) through all
soil'!layey )
D. H.rd Rock = (12 m dla woll) types of strata, namely, sandy
iolland rock as shown agalnst each case'
Unit= Running meke
comptete as per drawlng and
technical )
Taking output = 0.25 m
specifications. Oepth of sinklng ls
Depth in hard rock strata upto 3 m reckoned from bed level' )
Rate ofsinking @ 0.020 n/hour Unit= Running metre )
Taking outPut = 1m
r) Matorl.l )
Gelatine 80 per cent kg 14 Dimenslons ofwsll
Electric detonator Nos 56.00 Overall length = '12 m
)
b) L.bour
Overall wldth = 6m

Male day 1.44 A. Sandy Soll )


Driller day 2.O0
m
(i) DePth lrom bod levol uPto 3'0
Blaster
Mazdoor
day
day
0.25
28
)
Rate ol sinking @ 0. 1 8 m/hour
Mazdoor (skilled) day 4.5
)
c) irachhery .) Laboul
day 0.2
Hire and running charges ofcrane with hour 12.5
Mate
Sinker(skilled)
day 1.25 ,
grab bucket of0.75 cum capacity and day
Sinking helper (semi-skilled)
ac@ssories )
4t2 413 )

)
Bddec Wo.ks : l2-Foundation Bddtc Worl$ : lz'foundstion

Unit QuantltY Rate


Relerence to OescriPtion
Sr. Descriptlon Un it Ouantity Reference to Rs.
No. MoRT&H 5r.
MoRT&H
No.
Speclfications Specifications
b) Machlnery (iv) Beyond 20 m uPto 30 m
Hire & running chargesofcrane with hour 5.50
grab bucket o10.75 cum capacity and AddT 5percenl lorevery add ionalrnetre
rateofsinking to'
accessories depth ofslnkrng overthe
he Previous melrc
Consumables in sinking @ l0percentof(b)
for kentledge
Add 20 Per cent ol cosl
arrangement
c) Overheads @ % on (a+b) inciuaingsupports' toaaing
and labotlr
d) Contractor's profit @ % on (a+b+c)
(v) Beyond 30 m uPto 40 m
Rate per metre = (a+b+c+d)
Add 1O per cenl for every addtionalrleke
ofsinking for
(il) Beyond 3 m upto l0 mdepft aJpt oisint ing o'et tt'e rate
the Previous r0eke
Rate of sinking @ 0.17 rvhour
for kentledge
Add 20 per cent of cost
a) Labou. ro'oing arrangement
I Mate
Sinker
day
day
0.3
15
,n-"Lo,ng
and
"uppott"'
labour

)),
Sinking helper day 4 B. clayey Soil (Twin D TYPo Well)

) b) Machlnery Unit= Running metre


Hire & running charges ofcranewith hour 588 Taking output = 1 metre
) grab bucket of 0.75 cum capacity and
uPto 3 0 m
(i) DePth below bed level
)
Consumables in sinking @'10 percentof (b) Rate ofsinking @ 0 16 nvhour
) a) Laboul
c) Overheads @ % on (a+b)
Mate
day 0.26
day 2.50
profit Sinker (skilled) 4.00
t d) Contractor's @ % on (a+b+c)
Sinkinq helPer (semiskilled)
day

) Rate per metre = (a+b+c+d)


b) Machlnery hours 6'25
wltn
(iii) Beyond 10 m upto 20 m Hire & running charges ofcrane
) grab bucket ol O'75 cum caPacity and
Add 5 per cent for every additional metre depth accessories
) of sinking over the rate of sinking for the
1o cent of (b)
previous melre Consumables in sinking @ 'er
)
415
) 414

)
Bridgc wo*i : l2-Found.tior Bridt. Wotu: l2-honddion

Unit Quantity Rate


Sr. Reference to Description Unit Quantity DescrlPtlon
Reference to Rs.
Sr.
No. MoRT&H
Specifications H No.
MoRT&H
Speclflcations
c) Overheads @ % on (a+b) (lv) geyond 20 m upto 30 m

Add 7 5 per centfor Evety


additionalrtetr€
d) Contractor's protit @ '/o on (a+b+c)
over the rat€ of slnking lor
depth olsinking
Rate per melre = (a+b+c+d) tl€ PrBvious metre

il r€quircd
(ii) Beyond 3 m upto l0mdepth Add 5 per cent lor de$/atering'
for kBntledge
Add 25 per cent of cost
Rate of sinking @ 0.15 n hour to*ing ar'angement
in"*nn
",rr*'
and bbour
a) Labour
l r.ate day 0.45 m
(v) Boyond 30 m upto 'l0
Sinker day
Sinking helper day 6.00 Add 10 D€r cor(lor 6'ery sdditionalnEtre
orcr rate ol sinhng br
tr
alitr Lisrnr<ing
bl Machlnory ttle PrBvlous rlEte
Hire & running charges of crane with hour
grab bucket of0.75 cum capacity and Add 5 per cent ol cost
hr dqxab'ing' tl
accessories rcqulred
Air compressor with pneumatic chisel
induding
attachment for cutting hard clay hour 4.50 Add 20 p€r cent for kentledge
arangement and Llbour
suppotts, loading
Consumables in sinking @ 10 percentof(b)
c. son Rock (Twln D TYP€ Woll)
c) Overheads @ % on (a+b)
Units Runnlng metre
d) Contractor'5 protit @ % on (a+b+c) Taklng output' 1 m

Rate per metre = (a+b+c+d) .ofi rcck upto 3 m


Dopth ln
'lr'ir
(iii) Beyond l0 m upto 20 m Ra!8 ol sinking @ 0 12
m'/hour
)
Add 5 per centfor every additiooalmet.e al Llboul day 0.06
depth ofsinking over the rate of sinking for Mate
day 4.50
the previous melre Slnker(skilled) day 15.00
Sinking helper (semiakilH)
Add for dewaiering @ 5 per cent of cost day
Otver
(b), ifrequired.

416
4t'l
) n-
Bridg! Wo*! : l2-Fouddation

) Bridg. Wo*s : I 2-Found.lion


Sr. Reference to Description
) No MoRT&H Unlt Quantity
Rah Reference lo Oescription
Specifications Sr' Unit Quantity Rate
F{.
) No. MoRT&H Rs.
b) Machinery Specitications
Hire & running charges
) ofcranewith ho!r 8.33 Oewatering @ 5 percentof costof(b+c),
orab bucketofO.TS cum capacity and
accessories itrequired
) Air compressor wjlh pneumatic
breakers hour 6.00 Consumables in sinking @ 10 per cent of (b)
) Consumabtes jn sinking
percent of(b)
@ 1O d) Overheads @ % on (a+b+c)

) Add for dewatering


@ 5 per cenl, ifrequired e) Contraclor's profit @ % on (a+b+c+d)

c) Overheads @ Rate per metro = (a+b.c+d+c)


) % on (a+b)
d) Cortr.clor,s protit Pneumalic sinking of wells wllh
) @ % on (a+b+c) 12.20 1200
equlpment of .pproved deslgn, drawing
Rat. per met.e (a+b+crd)
= and specirlcations worked by compotent
D. Hard Rock (Twih D Type and trained pe6onnel and coftp slng of
We ) compresslon and decompre3sion
Unit = Running metre chamber6, raduccrs, two al, locks
Taking output 1 m goparrtely for men and pl.nt and
=
matorials, anangement lor supply otllEsh
Depth In hard rocl st.ata upto 3 m alr to worklng chambeE, check valves,
oxhaust valves, shafts made from stesl
Rate ofsinking
@ O.1O m/hour plates ot rivetted construction not lesg than
6 mm thick to withstand an ai, pressure
.) Material
of 0.50 MPa, controlled blasting o, hard
Geletine gO per cent
kg 10 rock whero required| alaircasea and 1 m
Elecric detonators
Nos. 40.00 wide landlng platetorms \,yith talllng,
b) Labour araangement foa comr€s3lon and
Mate decompression, elect.lc lighting of 50 V
day 1.U maxlmum, paoper rooms tor test and
Oriller
day 2.00 modical exemlnations and compllanco
Blaster
day nlth satety precautionE .s por lS:4138,.11
Mazdoor
Mazdoor (sklled)
day 25.00 as per Clause1207.6 of t'loRT&H
day 4.25 Speclfications.
c) Machtnery
Hjre &.unning charges ofcrane Unit = 1 cum
wjth hour '10
l grab bucket ofO.7S
cum capacity and
Takingoutput=5cum
) accessodes
Hire & running charges
I of @mpressorwith hour
pneurnatic breaker/jack 3
) hammer or dril

) 4t8
419
)
B.ids. wo*! | l2-FoJ.dstion Dridge Vorkr : l2-Fou'dalion

Unit Quantlty Rate


Sr. Reference to Description Unit Quantity Rd Reference to DesctiPtion
5r. Rs
No MoRT&H Rq MoRT&H
Specifications llo.
I Speclfications
hour 6.00
a) Materlal Motorised barge ot 20 tonne capacity
hoir 6.00
M 35 grade RCC corbel provided for cum 8 Boat to cany atleast 20 Persons
hour 6.00
supporling of equipment(Dimensions as Elect lc generating 3et 33 loy'A
pei ground conditions). Rate may be hour 6.00
Tipper 'lO tonne capaqity
adopted vide item no.l2.8 (H)
@ on (a+b+c)
O Overheads '/6
HYSO bar reinforcernent in corbel MI 0.480
.) Contractor'8 protit @ % on (a+b+c+d)
Blasting material
(see notes below)
Gelatine 80 per cent kg 1.50 Cost for 5 cum = a+b+c+d+e
Electric detonators each 6.00
Rate p€r csm = (a+b+c+d+oYs
b) Labour
Medicaloffcer day 0.50 Note 1. The cost ol induc{ion, deinduc'tion and
by
Para medical personnel day 1.00 erec{ion of equiprnent shall bedivided
sinking for
Mate day 't.86 lhe total quantity ofpneumatic
to anive
Drillers day 1.00 all the wells of a particula' bridge
account of tlis item'
Elaster day 0.50 at the per cum rate on

Mazdoo. (forcutting, blasting, cleaning, day 30.00 per cum of


2- cost of pneumatic sinking
removal of mateial, elc-) be added to the cost
individual wetls YJill
Mazdoorskalled (fortixation and removal day 10.00
indicated at ) above to anive at lhe
(1
final
of adopter for air lock, carrying out sinking Percum'
rate of Pneumatic
mechanical and electrical operations and
will
repairs and other skilled jobs) 3 The cost of induction and deinduction
t ver day 4.00 deDend upon the distance involved
for
of equipment which may be
shifting
c) M.chlno.y in individualcases as
per actual
essess;d
of
ground conditions at the tirne of making
(i) lnduct on, dolniluction and eroctlon hour 600 cost estimates.
of plant and equipment lncludlng on a
all componenE and accsgaodes for 4. ln case pneumatic sinking is involved
boat
pnoumatic method of well tinklng dry bed. the provision of barge and
lnduc{on and deinduction Rs.1,00.000 may be omitted.
Erection at site and commissionjng Rs.'1,50,000
The nec4ssity and dirneoslons oftE
cobel
5.
Usage ofplant and equiprnent for hour 6.00 will be as per actualground condltions'
pneumatic method of well sinking
Air compressor 250 cfm, 2 nos. hour 2 \.6 6. Smalt equiPments, like, welding sets'
tools'
Hire and running chaages of crane of horr 6.00 PumPs, vibrators, Pneumatic
15 tonne capacity poriabte lamps. fre extinguishers' hose

420 421

!r
B.idtc Wor*r : l2-Fomdation Bridr. wo*, : l2-Fouod.rion
-7
Unit QuantitY Rate
Sr. Reference to Descrlptlon Unit Ouantlty Referense to De3crlption
Rater 5r. Rs.
No. MoRT&H Rs. I No. MoRT&H
Speclfications Specificatlons
pipes, etc., have not been included as the b) L$our
day 1.24
same are@vered as items ofminorT&P Mate
day 6.00
under overhead charyes. Fitter
day 500
Btacksmlth
7. Oepth ol sinking shall be restricted to 30 day 5.00
Wblder
day 10.00
m. . Mazdoot

12.21. 1207 Sand tilling in wells complete as per Electrodes, cutting gas and other
(a) above
drarvlng and technical spocilications consumables @ 5 per cent on cost

Unit = 1 currl c) Overhcads @ % on (a+bl


Taking output = 1 cum
d) Contractor'6 P.ofit @ % on (a+b+c)
.) .torl.l
Sand (assuming 20 percentvoids) cum 1.2 Rato Psr MT = (a+b+c+d)
pile
b) L.bour
12.23. 1100 & 1700 Bo.ed cast-ln-situ M 35 gr'dG R'c'c'
,1 p€r
Mate day 0.01
sxcludlng lolnforcem.nl comPlets as
Mazdoor day 0.3 drawlng and technlcal spGcilic'tlons'nd
)l removal of .xcavatsd e'rth wtth all lifts
c) Overheads @ % on (alb) and lead uPto 1000 m
)) d) Cont,acto.'s profit @ % on (a+blc) Pile diamet.r = 750 mm
I

Rate per cum = (a+b+c+d) Unit = metre


Taking output = 15 m
12.22. 1200 & 1900 P.oviding steel liner t0 mm thick forcurbs
and 6mm thick tor steining of wells .) MaGri.ls
6.62
including fabricatlng .nd aetling out as i Conc.ets Grade M 35
per d.tailed drawlng
Rate for concrete may be adopted
same

Unit = 1 MT as for bottom plug vide item no 12ll(C)

Taking output = 1 MT (M
pipe
Concrete to be cast with a tremie
a) Itiaterl.l
200 mmdia
l) S&uctural steel including 5 per cent MT 1.05
wastage

421
422
r-]
Bridge Wo*! : l2-foundalion Bridg. wo*s : l2-Foundation

oescription Unit Quantity Rate


S.. Reference to Oesc.iptlon Unit Quantity R.h] 5r. Reference to
MoRT&H Rs.
No. R.. MoRT&H
I No.
Specificatlons Speclficatlons
b) Machlnery (for borlng and a) l\[atorials
const uctloo) concrete Grade M 35 cllal 7.85

l-lire and running charg€s of hydraulic hour 6.00


piling rig with power unit and complete Rate for corErete may be adopted same
accessories including shning from one ss br bottom plug vide item no 12'11( C )
bore location io another M
Hire and running charges oi light crane for hour 0.s0
lowering reinicrcement cage Conqete to be cast with a tremie pipe 200 mm
Hire and running charges of Eentonite tEur 6.00 dia.
pump
b) rchlngry (tolborlng and conitruc$on)
Loader I cum bucketcapacity hour 0.30
Hir" and running dlarges of hydraulic holr 6.00
Tipper 5.5 cum ca-pacity br disposalof hqrr 0.30
piling dg wiul pcn{er unit snd comphte
muck fom pile bore hole
ac@ssories includlng shifling from one
Eenbnlte kg 3@
bol€ location to another
tlire and aunnino chaEes of light cran€ for hour
0.50
cl Labour
Matdsupervisor day o.14 lo\'Yeing relnturcenEnt cage
Hire and rvnning charges of Bentonite
hour 6.00
Mazdoor day 3.50
pump
d) Overfteads @ % on (b+c) Lgader I cum bucket epacity hour 0.40
disposalof llour 0.4
Tipper5.5 cum capacity fror

e) Contractor's profit @ % on (brc+d) muck ftom Pile bore hol€


kg 350
Bentonite
Cost for 15 m: a+b+c+cl+d+e
c) Laboul
Rale per metre = (a+b+c+d+e)/15 day 0.16
Mate/SuPervisor
day 4.00
't2.24. Mazdoor
1100,1600 & 1700 Bo,od cast.in€ltu M 35 gr.de R.C,C, pils
excluding relntorcoment complete as psr
d) Ovc.hs.ds @ '/| on (b+c)
drawlng and technlcal spoclilcatlons and
.emoval ot excavated earth wlth all litt6 % on (b+crd)
o) Contractor's Profit @
and lead upto 1000 m

Cost for 10 m = a+b+c+d+e


Pile diameter = 1000 mm

Unit = metre Rate Per metre = (a+b+c+d+e)/i0


Taking output = 10 m

4X4 425

)
BddSc Worls : l2-Foundation Wo*r : l2'Foundion
BridBc

Sr. ReferGnce to Descrlp0on Unit Quantity Description Unlt Quantity Rate


Rab s.. Referencc to
No. MoRT&H Rs
Rs. MoRT&H
Specitications No.
Specllicatlons
12.2s. 11OO a 17OO Bored c.stln€ltu M 35 grade R.C.C. pile c) Labour
oxcluding rclnforcemenl complete as per irateJSuPervisor day 0. t8
dtawing and tochnic.l specifications and day 4.50
Mazdoor
removal ol excavated earlh with ell lifts
and lead upto 1000 m d) Ovetheads @ % on (b+c)

Pile diameter = t200 mm e) Contractor's Profit @ f on (b+c+d)

Unit = metre Costforgm=a+b+c+d+e


Takingoutput=9m
gate por metre = (a+b+c+d+.)19
.) Mate.ials
Conc.ete Grade M 35 cum 10.17 t2-26- 1100 & 1700 orlvan cast-in-place vertical M 35 gndo
R.C.c. pllo ercludlng relnlorcement
Rate for concrete may be adopted same completo as per d.iwing and Technical
as ior bottom plug vide item no. l2.1'1( C ) Speclllc.tlons
m
Pile diemotre = 750 mm
Concrete to be cast with a tremle pipe
200 mm dia Unit = Running metre
Taking ou9ut = 40 metre
b) lrachinery (for boring .nd
17 66
const ucdon) .) RCC Gradc M 35
Hire and running charges ofhydraulic hour 600
piling .ig with power unit and complete Rate for concrete may be adopted same as
accessories including shifting from one ior bottom plug vide item no. 12 11( C )
(V)
bore location to another
Hlr€ and running charges of light crane for hour 0.50 b) M6tetlals
lowering reinforcement cage Pile ahoes
160
Hire and running charges ofBentonite hour 6.00 i) C.l.shoes ior the Pile kg
kg 70
pump li) M.S.clamPs ior shoe @ 35 kg Per
Loader lcum bucketcapacity. horr 0.50 pile of 15 m .
kg 50
Tipp€r5.5 cum capacity fordisposalof hour 0.5 iii) Steelhelmetand cushion block on
muck ftom pile bore hole top otcasing he€d during ddving
Bentonite kg 385
I c) lrl.chlnery
) Hire and running charges ot piling ri] hour 6

ircludirE double acling pae drMrE ham'ner


complete with power unit and accessories

) 426 421

)
t
Brid8e works : l2-Foutrddtio!
Bddge Wo*s r l2-toundation

Sr.
No.
Reference to
MoRT&H
Speclfications
Descriptlon Un it Quantity
$
rc.t
Sr'
No
Reference to
MoRT&H
Description Unlt Quantlty Rate
Rs
Speciflcations
Hiring and running charges forlightcrane hour 0.5
5 tonne liftang capacity for lowering a) RCC Grade M 35 cum

reinforcement and handling steel casing


Rate for concrete may be adopted same
as for bottom plug vide item no. 12.11(C )
d) Labour (M
Mate/Supervisor day o.12
Mazdoor day 3 b) Matedals
Pile shoes
e) Overheads @ % on (b+c+d) i) C.l.shoes for the Pile kg 160
ii) M.S.clamps for shoe @ 35 kg Pe. kg 70
0 Contractorl protlt @ % on (b+c+d+e) pile of 15 m
iii) Steelhelmetand cushion block on kg 50
cost for 40 m = a+b+c+d+e top of casing head during driving

Rate per metre = (a+b+c+d+o)rl0 c) Machlnery


Hireand running charges of Piling rig holr 6
Note : The quantity of concrete required to be tncluding double acting pile driving hamme'
removed above the designed top levelof complele with power unitand aclessories
concrete, ifany, willbe provided for in the Hiringand running chaEes for light crane hour 0.5
rate analysis. 5lonne lifting capacity for lowering
reinforcement and handling steel casing
2. ln case steellining is included in thedesign Hireand running charges for light crane hour 0.5
tor driven caslin-situ pile and is planned for lowering reinbrcement cage
to 6e retained, thesamemay beincluded
in the rate analysis. ln case the temporaay d) Labour
steel casing used during castrng is Matdsupervisor day 0.16
planned tobe removed, an additionalcost Mazdoor day 4
@ 0.50 per cent of cost of concrete may
be provided to coverits usage. r .) Ov.rheads @ % on (b+c+d)

'12.27, 1100&1700 O.iven cast-in-place vertical M 35 grade 0 Contractor's p.ofit @ % on (b+c+d+e)


R,C.C. piles excluding 16lntorcement
complete as per daawing and Technical Cost for 30 m = a+b+c+d+e
Speclfications
Rate por metre E (a+b+c+d+e)130
Pile dlamotsr € 1000 mm

Note : The quantity of concrete required to be


Unit= Running metre
removed above the designed top levelof
Taking output = 30 metre
concrete, ifany, willbe provided icr in the
rate analysis.

428
t 429
,
E:-----------l
)
Bridtc Wor*s : l2-Foudrtio, Bridrc Wo*, : l2-Fourdtid
)
Sr. Reference to Descriptlon Unlt Quantlty Ra6l Reference to Descriptlon Unlt Quantity Rate
Sr.
) No. MoRT&H Rs.
R!. I No. MoRT&H
Specifications Specifications
)
2. ln case steel lining as included in the design
d) Labour
) for driven cast-in-situ pile and is planned
Mate/Supervisor day 0.'18
to be retained, the same may be rncluded day 4.5
Mazdoor
i0 the rate analysis. ln case the temporary
)
steel casing used during casting is
planned to be removed. an additionalcost
e) Ov.rheads @ % on (b+c+d)
)
@ 0.50 per cent of cost of concrete may f) Contractor's profit @ % on (bac+d+e)
be provided to cover its usage.
) cost for 20 m = a+b+c+d+e
12.2A. {100 & 1700 Driven cast-ln-ptace verlical M 35 grade
) R.C.C. pilos excluding aoinforcement Rate p9r 1netr. = (a+b+c+d+oY20
complete as per d.awing and Technical
) Specificatlons
Note : 1. The quantity of concrete .equired !o be
removed above the designed lop levelof
Pile diameter
) = 1200 mm
concrete, itany, willbe provided icrin the
rate analYsis.
Unit= Running metre
) h he deslln
Taking output = 20 metre 2. ln case steel lining is induded
tor driven cast-in-situ pile and is planned
) a) RCC Grade M 35 cum 22.61 to be retained, the same may be induded
in lhe rate analysis. ln case the ternporary
Rate forconcrete may be adopted same
) as for botom plug vide item no. ,|2.11(C)
steel casing used during casting is
planned to be rernoved, an additionalcost
(M
) @ 0.50 per cent ot cost of concrete may
be provkled to cove. its usage.
b) Materials
Pile shoes
i) C.l.shoesforthe pile kg 160
12.29. 1100E 1700 Driven precasl v.rtical M 35 grade R'C.C.
plles excludlng aolnforcement complete
ii) M.S.clamps for shoe @ 35 kg per pile kg 70
of15m
as per drd,,vlng .nd Tochnlcal
Spocmcations
iii) Steelhelmet on top ofcasing head kg 50
duringdriving E
Pile diameior 500 mm

c) Machlnsry Unit= Running metre


Hire and running charges of piling rig hour 6 Taking output = 60 m
lnduding double acling pile driving hamrner
a) RCC Grade M 35 cum 11.78
completo with pofier unil and accessories
lightcrane
Hiring and running charges for hour 0.5
Rate for concrete rnay be adopted same
5lonng lifting capacity tor lowering
as br bottom plug vire item no. 12.11(F)
reinforc€ment and handling steel casing
(rv)

430 431

)
Brid8e !r'o*s : l2'roundltion
Bridg. wo.ls : l2-Foundttion

--r Unit QuantitY Rate


Sr.
No.
Reference to
MoRT&H
Specifications
Description Unit Quantity
I Sr.
No.
Reference to
MoRT&H
Specitications
OescrlPtlon

Unit= Running metre


Rs.

b) Uate.lnls
Taking output = 50 m
Pile shoes
a) C.lShoes kg 240 cLlm 22 08
a) RCC Grade M 35
b) M.S.shoes kg 105
c) Steelhelmet and cushion block on kg 30 adopted same
Rate for concrete may be
top of pile head during driving
bottom plug vide item no 12 1l (l )
as for

c) Machlnery (M
Crane 20 t capacity hour 6.00
Vibrating pile driving hammercomplete hour 6.00 b) Mate.lals
with power unit and accessories Pile shoes kg 160
a) C.l.shoes kg 70
d) Labou, b) M.s.shoes
block on kg 4
MatdSupervisor day o.12 c\ Steelhelmet and cushion
dnving
Mazdoor day 3 top of Pile head dudng

Add 1 per cent of(a+b+c) for caniage of piles c) Machlnery holJr 6.00
from casting yard to work site and stacking, crane 40 T caPaclty
hammer compele
and othe. imponderables during installation. Vibrating Pile driving hour 6.00
with Power unit and accessories

e) Overh.ads @ % on (b+c+d)
d) Laboul day 0.16
i/tateJSuPervisor 4
0 Contractor's profit @ %on(b+c+d+e) day
Mazdoor

Cost for60 m = a+b+c+d+e+l caniage of Piles


1 oer cent of (a+b+c) tcr
^.rd
r.Ii, y"to to *ork 6ite and stacking'
Rate per metro = (a+b+c+d.e+0/60 "L"tng insta arlon
ana ouer imponoeraocs dudng

Note : The quantity of concrete required to be r


@ % on (b+c+d)
o) oYetho.ds
.emoved above the designed top level of
concrete, it any, will be provided br in the rate @ % on (b+c+d+e)
0 cont.actot'3 Proft
analysis.
Costfor 50 m = a+b+c+d+€+f
12.30. 1{00& 1700 Driven precast verticalM 35 grade R.C.C
plles excluding relnforcement complete Rate Por m6tro = (a+b+c+d+e{Y50
as por daawing and Technlcal to be
Speciflcatlons Note
The ouantitv of concrete tequired
: of
;.i; rfu"
the designed top level
br ln the rate
,i,cteie. ir anv, wrrr oe provlded
Pil6 Dlamot.r = 750 mm
analySis.

433
432
Bridg. wo*i : l2-Foudltion
Bridg. wo*5 : I 2-rounddioD

Sr. Reference tc Desc.iptlon it


Un Quantity Reference to Description Unit
No MoRT&H Rato Sr. Quantity Rate
Specifications Rs, No. MoRT&H Rs.
Speclfications
,12.3.1. 1100 & 17oO 0dven precast verticalM 35 grade R.C.C
pil€3 excludlng relnforceme_nt complete Cost for 40 m = e+b+c+die+f
as per drawing and Technlcal
Speclficatlons Rate per metre = (a+b+c+d+o+0/40

Plle Diameter = l0OO mm Note: The quantity of concrete required to be


removed above the designed top level of
Unit= Running metre concrete, it any. will be provired fot in the rate
Taking output = 40 m analysis.

a) RCC Grade M 35 12.32. 1100 A 1700 Oriven precast vertical M 35 grade R.C.C
piles excludilg roinforcement comptete
Rate tor concrete may be adopted same cum 3'1.40 as per drawlng end Technlcal
as for bottom plug vide item no. 12.11(F) Spoclflcations
(M
Slze ot pile = 300 mm x 300 mm
b) iraterials
Pile shoes unit= Running metre
a) C.l. shoes for the pite kg 160 Taklng output = 60 m
b) M.S. shoes @ 35 kg per pite of 15 m kg 70
c) Steelhelmet and cushion block on top kg 50 a) RCC Grade M 35
ot pile head during drjvjng

Rate forconcrete may be adopted same cum 540


cl irachlnery as for bottom plug vide item no. 12.11(F)
Crane 50 t capacity hour 6.00 (tv)
Vibrating Pile driving hamrn€r complete hour 6.00
wlth powea unit and accessorias b) Materlal
Pile shoes
,i d) Labour a) C lshoes kg 240
lirate/Suprvisor day 0.2 b) M S shoes kg 105

) Mazdooa day c) Steelhelmet and cushion block on kg 30


lop ofpile head during driving
Add 1 percent of(a+b+c) for carriage ofpiles
) from casling yard to work site and stacking, c) Mechinery
and olher imponderables during installation Crane !0 tonne capacity hour 6.00
) Vibrating Pile driving hammer complete hour 6.00
o) Overhoads @ % on (b+c+d) with power unitand accessories.
)
d) Labou.
0 Contr.ctor's profit@ % on (b+c+d+e)
MateYsupervisor day o.12
) Mazdoor day 3

) 434
435

)
Bridge Wolk: I2-Fou ation B.idsc Works : l2-Foundation

Sr. Reference to Descriptlon Unlt Quantity Reference to Descrlption Unlt Quantity Rate
Rate Sr.
No. MoRT&H MoRT&H Rs.
Rs. No.
Speclfications Specifications

Add 1 per cent of(a+b+c) for carriage ofpiles c) Machlnery


Crane 20 tonne capacity hour 6.00
from casting yard to work site and
Vibrating Pile driving hammer complete hour 6.00
stacking,and other imponderables during
installation. with power unit and accessories

e) Ove.heads @ % on (b+c+d)
d) Labour
MateJSuPeNiso. day 0.16
Mazdoor day 4
0 Contraclor's profit @ % on (b+c+d+e)

Add I per c€nt of (a+b+c) for carriage of piles


Costfo.60 m = a+b+c+d+e+f
from casting yard to work site and stacking
and othe. imponderables durino installation
Rate por metre = (a+b+c+d+e+0/60

Note : The quantity of concrete required to be


G) Ove.hiads @ % on (b+c+d)

removed above the designed top level of


condete, ifany, will be provided for in the rate ! conlnctot'r Prcfft @ % bn (b+c+d+cl

analysis.
Cost br 50 m = a+b+c+d+e+l
r2.33. 1r00&1700 Drlven precastvorlical M 35 grade R.C.C Rate por matrr = (a+blc+d+et0l50
plles excluding reinforcement comptete
as pe, drawlng and Technical Note The quantity of concrete required to be
Specifications removod above the designed top level of
concrcte, lfany, willbe provijed br ln the rate
I
Slze of pilo = 500 mm x 500 mm analysis.

Unit = Running metre ven prccast vertical M 35 g.ade R.c'C'


12.34. 1100&1700 D
Taking output = 50 m piles excludlng relnforcemenl comPlete
as per drawing and Technlcal
a) RCC Grade M 35 Speclflcatlons

Rate ,or concr€te may be adopted same cum 12.50 Size of pile = 750 mm r 750 mm
asforbottomplugvideitemno. 12.11(F)
(M LJnit= Running metre
Taking output = 40 m
b) ilaterlll
a) RCC Grade M 35
Pllosho€a
a) C lshoes kg 160 Rate ror concrete may be adopted sarne cum 22.50
b) M. S shoes kg 70 as br bottom plug vide item no. 12.1 1 (F)
c) Steel helrn€t and cushlon block on kg 30 (M
topofpile head durlng d.ivlng

436 411
t
)
Bridse Wo.k : l2-Fou alio, Brid8c Works I l2-Foundstin

)
Reference to Unlt Unlt Quantity Rate
Sr. Descriptlon Quantlty Reference to Descrlption
i No. MoRT&H
Rate
Rs.
Sr.
No.
MoRT&H
Rs.
Specificatlons Specilicatlons
)
b) Material Unit = Running metre
) Pil. shoes Taking outPut = 70 m
a) C lshoes kg 160

) b) M. S shoes kg 70 a) Materials
tonne 6.04
c) Steelhelmet and cushion block on kg 30 structuGl steelincluding 5 pet cent
top of pile head during driving wastage @ 82.20 kg/m
)
c) Machinery b) Machinory
) Crane 20 tonne capacity hour 6.00 Crane 10 t caPacity
hour 6
Vibraling Pile driving hammer complete hour 6.00 hour 6.00
Vibrating pile driving hammercomplete
) with power unit and accessories with power unit and other acE6sories

d) Labour
) Mab./Supervisor day 0.18
c) L.boul
day o.12
j Mazdoor day 4.5
MadsuPervisor
Mazdoo.
day 3

I
Add 1 pe. cent of (a+b+c) for carriage of piles p€rcsotof(a+b+c)br Ptwldiry EEel
Add 0.5
t from casting yard to work site and stacking,
and olher imponderables during installation.
helmet on top of pile head duftg driving'
stEcking of Plles at 3ite, ptovlding anti-
) corosbn teatanent and oher impo'd€rables
e) Overheads @ % on (b+c+d) dudng installation.
)
f) Cont6ctor'6 prorit @ % on (b+c+d+e)
dl Ovotfio.&@ % on ("b+c)
) ('+b+c+d)
Costfo.40 m = a+b+c+d+e+f c) Cont".cto/8 proflt C, % on

) Rate per motro = (a+b+c+d+e+0/40 cost tor 70 m = a+b+c+d+e

) Note: The quantity of concrete required to be Rato po. metre = (a+b+c+d+'fi'0


Gmoved above the designed top level of
) conc.ete, ifany, willbe provided tor in the rate
D von vstllcal stool piles oomPlete ta
analysis.
12.36. 1100 &1900
per drawlng and Tochnic'l SPoclficatlons
) 12.35. 1100 & 1900 Driveh vortlcal steel piles completG as Section ol the Pils = H S'Gtlon 6to'l
perdr.wlng andTechnlcal Speclfications column 450 x 250 mm (ISHB So'te5)
)
Section ot the plle = H Sectlon steel Unit= Running metre
) column 400 r 250 mm (ISHB Serios) Taking output = 60 m

)
) 438 439

)
Ikids. Works :I 2-Foundltion Bridg. works : l2'Foundttio.

Unit Quantity Rate


Sr.
No
Reference to
MoRT&H
Specifications
Oescrlptlon Un it Ouantity
q Sr.
No.
Reference to
MoRT&H
Specllicatlons
Description
Rs

. l

a) Materlals t2.38. 1',100, 1500&1700 cement concaelo fot lelnforcsd conc'eto


Structural steel including 5 per cent tonne 5.83 in pile cap complste as per drawing tnd
wastage @ 92.50 kg/m Technic.l SPecllications

b) iliachlnery A. RCC G.ade M 20


Crane 10 t capacity hour 6.00
Vibrating pile driving hammercomplete hour Unit = cum
with power unit and accessories Taking output = 15 cum

cl Labour c.se-l : Using concrete Mixet


Mate/Supervisor day 0.14
Mazdoor day 3.5 .) Matorlal
MT 5.12
Cement
Add 0.5 per cent of(a+b+c) tur providing ste€l Coarse sand
cum
helmetand cushion block on top of pile head cum 8.1
20 mm aggregate
du.ing driving, sbcking of piles at site,providing cum 5.4
10 mm aggregate
anli-corrosive treatment and other
imponderables during installation. b) Labour
day 0.9
l\4ate
d) Oveiheads @ % on (.+b+c) Mason
day 1.5
day 20
Mazdoorfor concretng
el Contractor's profit @ %on(a+b+c+d) Mazdoor for breaking pile head, bending
day 1

bars, cleaning, etc.


Cost for 60 m = a+b+c+dle
c) Machlnory
Rate per metre = (a+b+c+d+el/60 hour 6
Concrete mixer (capacity 0'40/0'28 cum)
hour 6
Generator (capacity 33 KVA)
12.37 1'100 Plle load test on single veriical pile ln
accordence with lSi29l, (Part-lv) case-ll: Uslng iatchlng Plant, Trensit
Mixor .nd Concreto PumP
Unit = 'l MT
Takingoutput= 1MT
a) Mate,lal
MT 5.12
Cement
a) lnitial and routine load test MT 1 300 cum 6.75
Coalsesand
b) Lateral load test MI 1 5000 cum 8.1
20 mm aggregate
10 mm aggregate
cum
Note : Atthough, this item is incidentalto work and
I is not required to be included in BOO of
contract, the same is requiredto be added in
the estimate to assess cost of work

441
440

)
t
)
Bfid8c Wo*s: t 2-Fouodalion
Bridsc Worb : l2-Found.li@
)
Sr. Reference to Oesc.lption Unit Quantity
) No. MoRT&H Sr. Reference to Oescrlption Unit Quantity Rate
Speclfications ^a
R!. No MoRT&H Rs.
) Speclflcations
b) L.bour
) Mate day 0.16
case-l : Using coocrcte Mixer
Mason day 0.38 a) iiatsdal
Mazdoor for concreting
) day Cement MT 5.99
Ma2doorfor breaking pile head, bending day 1 Coarsesand cum 6.75
bars, cleaning. etc.
) 20 mm aggregate cum 8.1
l0mmaggregate cum 5.4
c) ilrchlnery
) Satching ptanl (output 20 curn/hr) b) Labour
hour 0.75
G€{Erah( 100 KVA hoJr 0.75 Mate day 0.9
) Loade. (capacity 1 cum) hour 0.75 Mason day 1.5
Transit mker (capacity 4. O cum) Mazdoor for concreting _ day 20
) Lead upto 'l km hour 200 i4azdooricr breaking pile head, bending day 1
Lead beyond ,t km, Ljead ln kilometre t.km bars, cleaning, etc.
) ConcEte Pump horr 0.75 c) iil.:hlnsry
Formwork @ 4 per cent on cost of concrete mixer (capacity 0.40/0.28 cum) hour
) concrete, i.e., cosl of a) Material, b) Labour Generator (capacity 33 K/A) hour 6
and c) Machinery Casg-ll: Uslng Batchlng Plant, Transit
) Mixea and concrele Pump
d) Overheads @ % oh (a+b+c)
) a) Matorlal
€l.Contractor,6 p.ofit CenEnt MT 5.99
@ % on (a+b+c+d)
) Coarse sand
20 mmaggregate
cum
cum
6.75
E.1
Cost for 15 cum = a+b+c+d+e
10 mm aggregate cum 5.4
Rate per metr6 = (alb+c+d+e)/ls
b) Labout
Note
Mate day 0.16
The value of a, b and c may be laken as
Mason i day 0.38
applicable, i.e., either using concrete mixer
Mazdooricrconcreting day 25
or batching plant.
Mazdoorfor breaking pile head, bending day 1

bars, cleaning, etc.


B. RCC Grade M 25
c) Machinery
Unit = cum Batching plant (output 20 orm/hr) hour 0.75
Taking output = 1S cum Generator 1 25 K\r'4 hor.ra 0.75
Loader (capaclty t qrm) hour 0.75
Transit mixer (capacity 4.0 cum)
Lead upto I km hour 2.00
Lead beyond 1 k n, L-lead h kilonebe krn
t. 37.51
Concrete pump hour 0.75

442
443
)
Bridgc Wo*s : l2'Forndalion
Brids€ Wo*s : l2'Fouodadon

Sr.
No.
Reference to
MoRT&H
Description Unit Quantity ild Sr, Reference to Oescription Unit Quantity Rate
Rs.
R!.1 MoRT&H
No.
Specifications
Specifications

Formwork @ 4 per cent on cost of concrete, Case-ll : Using Batching Plant, Transit
i.e., cost ot a) Material, b) Labour and Mixe. and Conrote PumP
c)Machinery
a) irate.ial
MT 6.10
d) OYerhoade @ % on (.+blc) cernent
Coarse sand
cum
qtm 8.1
el Contr.ctor'3 Frolit @ % on (.+hc+d) 20 mm aggregate
cum 5.4
10 mm aggregate
Cost tor 15 cum = a+b+c+d+e
b) Labour
day 0.16
Rate por mcttc r (.+b+c+d+6Y15 Mate
Mason
ey 0.38
t &y
Note : The value of a, b and c may be taken as Mazdoor ba concreting
Maz door tor breaking pile head, bending
day 1
applicable, i.e., either uslng conc.ete mixer
or batching plant. bars, cleaning, etc.

C. RCC Grade M 30 c) tlachlnory


trcur 0.75
Batching Plant (output 20 curYr/hr)
tlor.lr 0.7s
ljnit = cum Generator 100 l$/A
holJr 0.75
Taking output = 15 cum Loader (capacity 1 cum)
Transit mixer (capacity 4.0 cum)
hour 200
a) Material Lead upto 1 km
t-km 37.51
Cernent MT 610 Lead beyond I km' L-lead in kilorneke
hour 0.75
Coace sand cum 6.75 Condete PUmP

20 mm aggregate cum 8.1


Formwork @ 4 per cent on cost ol @ncrcte'
'l 0 mm aggregate cum 54
l.e-, cost of a) Matetial. b) Labour and
c) Madtinery
b) Lrbour
Mate day 0.9
d) Ovrrtoad. @ % on (a+b+c)
Masoo day 1.5
Mazdoo(forconqslng day 20
e) Contractol"s profit @ %on(a+b+c+d)
Mazdoor br b'raking dlehead, bending day 1

ba,s, cleaning, etc.


Co6t br 15 cum = a+b+c+d+e

c) Machlnery Rato per motrr = (a+b+c+d+G)'15


Concrete mixer (capacity 0.40/0.28 cum) ttoUr 6
Generator (capacity 33 KVA) hour 6 The value of a, b and c may be taken as
Note :
applicable, i.e., either using concrete mixer
oi Jatching Plant.

444 445
)
Bddge Works : l2-loundation
Brids. Wo*s : I 2-Foundtion
)

) Sr. Reference lo Oescription Un it Quantity Ril Reference to Descrlption Unit Quantity Rate
Sr.
No. MoRT&H Rr.l Rs.
No MoRT&H
) Specifications ; Specifications
D. RCC Grade M 35
c) Machinery
Batching plant (otiput 20 cun/ho flour 0.75
Unil = cum
llour 0.75
Generalor 125 KVA
Taking oLrtput = 15 cum
Loader(capacity 1 cum) hot]r 0.75
Transil mixer ( capacity 4.0 dlm )
a) Mate,ial Lead upto 1 km houI 2.00
Cement N4I 6.33
Lead beyond 1 km L{ead in kilometre t.km 37.51
Coarsesand cum 6.75 hour 0.75
Concrete pump
20 mm aggregate cum 8.1
l0mmaggregate cum 5.4 Formwork @ 4 per cent on cost of concrete
i-e., cost of a) Material, b) Labour a-nd
b) Labou. c) Machinery
Male day 0.9
Mason dey 1.5
d) Overheads @ % on (a+b+c)
lltazdoor for concreting day 20
Mazdoorfor breaking pile head, bending day I c) Conlractor's profit@ % on (a+b+c+d)
bars, cleaning, etc.
Cost for 't5 Cum = a+b+c+d+e
c) Machinory
Concrete mixer (capacity 0.40/0.28 cum) hour 6 Rate Per metre = (a+b+c+d+eYl5
Generator (capacity 33 KVA) hour 6
I 12.39. 1100 & 1700 Levelling CourseforPile Cap
L Case-ll : Using Batching Plant, Transit
) Mixer and Concrete Pump Providing and laying ofPcC M l5levelling
cou6e 100 mm thick below the pile cap
) a) Material
i Cement MT 6.33 Unit = cum
) Coarse sand cum Taking output = 15 cum
20 mm aggregate cum 8.1
aggregate cum 5.4 a) Materlal
) 10 mm
Cement MT 4.13
Coaase sand cum 6.75
b) Labout
) l\4ate day 0.16 40 mm aggregate cum 8.1
cum 4.05
Mason day 0.38 20 mm aggregate
) l\.4azdoor io. concreting day 2.5 10 mm aggregate cum 1.35

Mazdoor for breaking pile head, bending day 1

) b) Labour
bars, cleaning, etc.
Mate day 0.86
Mason day 1.5
) Mazdoor day 20

)
446 447

)
gridg. Wo*s : lz-roundation
Bddg. workl : l2-Fouddion

Sr. Reference to Descrlption Unit Quantity Oesc.iption U nit Quantity Rate


Rate
sr. Reference to
No. MoRT&H Rs.
No. MoRT&H
Specificatlons
Specifications
c) Machlnory 1600 Supplylng, fitting and placlng uncoated
1X .41
Concrele mixer 0.40/0.28 capacity hour 6 mild steel reintorcement comploto ln
Generator 33 KVA hour 6 foundation as per drawing and Technical
Specifications
d) Overheads @ % on (a+b+c)
Unit = 1 MT
e) Contractor's p.ofit @ %on(a+b+c+d) Taking outPut= I MT

Cost for 15 cum = a+b+c+d+e a) Material


MS bars including 5 per cent overlaps and MT 1.05
Rate pe. metre = (a+b+c+d+e)/'15 wastage
Binding wire kg 6.00
'12.40. 1600 Supplylng, litting and placing uhcoated
HYSD bar relnforcement in toundation b) L.bour lor stralghtenlng, cuttlng'
comptete as per drawing and Technical b€ndlng, rhifting to 31t., tylng rnd
Speciflcatlons placlng ln Po6ition
day 0.43
Mat€
Unit = 1 lvtT day 2.25
Blacksmith
Taking ouFut= 1 MT Mazdoor day 6.50

a) Materlal c) Overheads @ % on (a+b)


HYSD bars including 5 pe.centoverlaps IIT 1.05
and wastage d) Contractor's profit @ %on(a+b+c)
Bindingwire kg 6.00
Rate Per MT = (a+b+c+d)
b) Labou.forcutting, bending, shifting lo
site, tylng and placing ln position

Mate day 0.40


Blacksmith day 2.00
Mazdoor day 6.00

c) Ov.rh.ads @ % on (.+b)

d) Contractor'5 protit @ %on(a+b+c)

Rato por MT = (a+b+c+d)

448 449
Chapter-13 Chapter'13

Substructure Substructure
Relerence to Oescrlption Unit Ouanlity Bate
Preamble: Sr.
Rs.
No. MoRT&H
Spoclfications
1 . Although, Subslruclures are generally constructed in cement concrele, the rat€ analysis for brick
13.1. 1300 & 2200 Brlck masonry workh 1:3ln substructure
slone masonry in CM 1:3 have also b€on included which can be adopted if permitled bydesign.
complele excludlng Polnting and
plastering, as per dr.wing and Technlcal
2. The cosl ol lormwork willvary with the heighl of lhe subskucture. Provision has accordingly
made.
Specilication

Unit = cum
) 3. As the higher grade ofconcrels is cosllier, the provision made for formwork on percenlage basis
Taking outpd = 1 cum
been sualably adiusted to make it comparable with olher grades.

) 4. Bridge bearing, being commercial iloms produced by specialized firms with impoded technology and
.) Material
Bricks lsl class Nos 500.@
parts, the rales forlhe same are required to be ascertalned from the market torthe approved design
) and technical specilications.
Cement mortar 1:3 (Rate as in item 12 6) cum 0.24

5. Filter media and backlilling behlnd abltments aro required to be provided as per guidelines giveo
b) Labour
Male day 0.06
IBC:7&2()00. 0.8
Mason day
Mazdoor day 0.80
6. Weep holes shallbe provided as perClause 2706 o1l\,,loRT&H Specifications.

Add tor scatfolding @ 5 per cent of cost of


7. ln case o, roller-cum'rocker bearings, only tull ckcular rollers are to be provided
matedal and labour

8. All beadngs shall be sei lruly level so as lo have lull and even seating
@ % on (a+b)
c) Overheads
9. For elastomeric bearing pads, the concrgte surlace shall be levelled such thal the variation is not morc
@ % on (a+b+c)
d) Contractor'o Prolh
than 1.5 mm from a skaight edge placod in any direclion across the area.

Bate per cum = (a+b+c+d)


10. The bearing should be pro.ured only lrom lhose manufaclurers who have boen pre-qualified by llE
Minislry ot Road T.ansport and Highways.
13.2. ',1300 & 2200 Polntlng wlth cement mottar (1 :3 ) on brick
work in substtucturc as per Technlcal
11 . The botloms ol girders resling on lhe bearing shall be plane and truly horizonlal.
Speciticatlon
12. Forspans in grade, the bearing shalibe placed hoizonlalby using solo plales for suitably designd
Unit = 10 sqm
RCC pedeslals.
Taking oulput = 10 sqm

a) Materlal
Cement mortar 1:3 (Rate as in item 12.6) cum 0.03

450 451

lrrF-*
E ----l
Bridge Work I I 3-Substructue llsubstru'luE
Bddge Wodc :

Sr. Reference to Descriptlon Un it Quantity U nit Quantity Rate


Rate Reference to Description
Sr. Rs.
No. MoRT&H Rs.
No. MoRT&H
Specifications
Specifications
b) Labour
2. The nunmber of masons and mazdoors
l\4ate d ay 0.04 have
already catered in the cemenl mortar
lvlason d ay 0.50 providing
been taken into account while
Mazdoor d ay 0.50 masonry, pointing
these categories in bdck
and Plastering.
cl Overheads @ % on (a+b)

13.4. 1400 & 2200 stonemasonrywork ln cement morta' I:3


d) Contractor's profit @ %on(a+brc) per drawing
for substructure comploteas
and Technical SPecifications
Rate per l0 sqm = (a+b+c+d)

A. Random Rubble Masonry


Note : Scaffolding is akeady included in item no. 13.1 (couGed/uncoursed)

13.3. 1300 & 2200 Plasterlng with cement mortar (1:3 ) on


Unit = cum
brickwork in substructurc as po. Technlcal
Taking output = 1 cum
Specifications
a) Matsrlal
Unit = '10 sqm cum 1.00
Stone
Taking output = 10 sqm No 7.00
Through and bond stone
(7no.xo 24mxo 24mxo'39m= 0 16cum)
a) Material Cement modar 1:3 (Rate as in item'12
6) cum 0.33
Cementmortar 1:3 (Rate as in item 12.6) cum 0.144

b)'Labour
b) Labolr day 0.'1
Mate
Mate day 0.04 day
Mason
Mason day 0.50 day
Mazdoor
Mazdoor day 0.50

Add hr scafiolding @ 5 per cent of cost of a)


c) Overheads @ % on (a+b)
Material and b) Labour

d) Contractor's profit @ %on(a+b+c)


c) Ovetheads @ % on (a+b)

Rate pell0 sqm = (a+b+c+d) proflt@ % on (a+b+c)


d) contractor's
Note 1. Scafblding is already included in item no.
Rate per cum = (a+b+c+d)
't 3.1

452 453
!-

Bridgc Works : I 3-Subsh.t E


Brid8. Worts : l3-SubslrlcluE

Sr, Refe.ence to Oescrip on Unit


No. MoRT&H Quantity Ratli Reference to
Sr. Oescription Unlt Quantity Rale
Specificatione Rs. MoRT&H Rs.
No.
Specifications
B. Cou6ed rubble m.sonry (fi.stsort)
b) Labourtoa masonry work
Unit = cum Mate day
Taking output 1 cum Ivlason day
=
I\,'lazdoor day 25
) a) Materlal
Stone Add for scatfolding @ 5 per cent of cost ol
cum 1.'t0
) Through and bond slone
Nos. 7.00
a) Materialand b) Labour
(7no x0.24mxo.24mxo
39m = O.t6cum)
) Cement mortar 1:3 (Ra," ,,u,
".
. ,l.if cum 0.30
c) Overheads @ % on la+b)

b) Lebour d) contractor's prolit @ %on(a+b+c)


) I
Male
day 0.12
Mason Rat. per cum = (a+b+c+d)
) Mazdoor
&y 1.50
hy 150
Nole: The labour akeady considered in thecement
,t1 Add for sclffotding modar have been taken into account while
@ S per cent of cost ot
I
materialand labour providing these categories in the stone
,l cl
masonrywolks.
Overheads @ % on (a+b)
13.5 '1500,1700&2200 Plain/Reinforced cement concrete ln

I d) Contraclor's profit
@ % on (a+b+c, substructurc complete .3 per drawing end
Technical Speclf ications
) Rate percum = (a+b+c+d)
Unil = cum
C. Ashlarmasonry (filst sort) Takingoutput= I cum
I
I
l
Plain ashlar a) PCC Grade M 15
Same as item '12.8 (A) upto 5 m height
Unit = cum 1O pe;
except for formwork which shallbe
Takingoutput= 1 cum cent inslead of 4 per cent of cost of
mateaial, labour and machinery.
a) Materlat
SIone
cum -t.11 b) PCC Grade M 20
Ihrough and bond stohe Same as item 12.8 (B) upto 5 m height
Nos 7.00
(7no.x0 24mxo.24mxo.39m except for formwork which shallbe 1O pe;
= O. t6 cum)
Cement mortar i:3 (Rate as in item
12 6)
cent instead of 4 per cent of cost of
cum 033
mateaial, labour and machinery.

454
455
)
r
Aridt. Work r l3'Slbstructue ll-SubfirduE
Bridsc Wo*s :

Sr. Reference to Description Unit Quantity Rato Reference to oescription Unit Quantity Rate
St,
No. MoRT&H Rs. Rs.
No. MoRT&H
Specifications
Speclflcations
c) PCC GradE M 25 Same as item 12.8 (F)with the following
Same as item '12.8 (O) upto 5 m height changes: (i) Add 2 Per cent of cost of
with the only change that the provision of material, tabour and machinery excluding
formwork shall be 10 per cent anstead of tormwork to cater fcr extra lift. (ii) The
3.75 per cent of cost of material, labour povision of formwork shallbe 12 percent
and machinery. instead of 3.50 percent of cost of material,
labour and machinery.
Forheightabove 5 m and upto 10 m.
For height above 10 m.
Same as item 12.8 (D) with the following
changes: (i) Add 2 per cent of cost of Sarne as item 12.8 (F) with the tcllowing
matedal, labour and machinery excluding changes: (i) Add 4 Per cent of cost of
formwork to cater for extra lifr. (ii) The material, labourand machinery excluding
provision of formwork shall be 2 per cent
'1 iormwork to cate. for extra lift. (ii) The
instead of3.75 per cent ol cost ofrEterial, p.ovision of formwork shall be I 5 per cent
labourand machinery. instead of3.50 per cent of cost of material,
lebour and machinery.
For heightabove 10 m
e) RCC Gr.de M 20
Same as item 12.8 (D) with the following Same as item 12.8 (C) upto 5 m height,
changes: (i) Add 4 per cent of cost of except for formwork which shallbe 10per
mateaial, labour and machinery excluding cent instead of 4 Per cent of cost of
formwork lo cater for exka lift. (ii) The material, labour and machinerY'
provision of fonrlwork shallbe '15 percent
instead of 3.75 per c€nt of cost of material. For height, upto 10 m, add 2 Per cent of
cost as above excluding fofflwok' For @st
labourand machinery.
of formwork add 12 per cent of cost of

d) PCC G.ado iil 30 material, labour and machinery instead of


Same as item 12.8 (F) upto 5 m height 4 per cent.
with the only change thatthe provislon of
For hellht above 't 0 m.
fo.mwork shall be 10 per cent instead of
3.50 per cent of cosl of material, labour
Same as item 12.8 (C) with the following
and machinery.
changes: (i) Add 4 Per cent of cost of
material, labour and machiflery excluding
For height above 5 m and upto 1O m.
fomwork to cater for extra fn. (ii) The
provision of brmwork shall be '15 per cent
l
lnstead of 4 per cent ot cost of material,
labourand machinery.
I

456 451 )
)
:
)

I Bid8c Works r l3-Snbstructurc


Bid8c Works : l3-Sub$sturc
)
Sr. Reference to Oescription Unit Ouantity DescriPtion Unit Quantity Rate
natei Reference to
Sr. Rs'
I No MoRT&H
j Specifications
Rs.
No.
MoRT&H
Specifications
0 RCC Grade M 25
For height, upto 10 m, add 14
per cent of
Sarhe as item 12.8 (E) upto 5m height, forrn*ork For cosl
cost as above excluding
1 excluding fonnwork For cost of formwork, of rnaterial'
of formwork add I 1 per cent of cost
i add 10 per centof cost of material, labour
labourand machinery.
and machinery instead 0f3.75 percent.

For heqht. above 1 O m, add 3 per cent of cost


Forheighl. upto 10m, add'l.8percenlof
1 as above excluding form',rro ' For cost of
cost as above exclding formwork. For cost
lormwork add I3 per cent of cost of material'
of formwork add 11.8 per cent of cost of
I matedal, labour and machinery.
labour and machinery.
.)
Note: The basic components of thb analysis are
I
For height, above 10 m, add 4 percentof (Ato H) The
the same as those ol items I2 8
) cost as above excluding fomwork- For cost
only changes are as underl
of formwork add 15 per cent of cosl of
) material, labour and machinery.
a) Ramps/Stairs: Extra expenditure on
structures which are more than 5 m high
) g) RCC Grade M30 .a 2 Der cent ofcostfor height 10 m
'Jpto
Same as item 12.8 (G) upto 5m heighl a-no per cent for neignbabove 1o mwill
i
excludingformwork. Forcostof formwort, spot
) add 10 per cent of cost of malerial, labour
be involved for apProaching the work
use
by poviding higher ramp/shlr case for
and machinery instead of 3.5 per cent.
) by the working Parties

For height, upto 10 m, add 1.6 per cent of b) The above mentioned percentages have
) cost as above excluding formwork. For been suitably modrfied for different
cost of tormwork add 11.5percentof cost categories as cost forvadous categories
) of material, labourand machinery. varies, whereas, efiort for a@ess
icr same

heightwill be similar. As the cost of richer


) For height, above'10 m, add 3.5 percent concrete is comparatively more, the
ofcoslas above excluding formwork. For percenl,age to be added has been reducld
cost of formwork add 14 per cent of cost lie same costtor extra efrorts'
) to maintain
otmaterial, labourand machinery.

) {3-6. ',l600 & 2200 Supplying, fittlng and placlng HYSD


h) RCC Grade M 35 b.r reinlorcemGnt ln Subatruclurs
Sarne as item 12.8 (H) upto 5 m height complolo a5 por drawlng and Tochnlcal
) excluding furmwork. For cost ot tormwo*, Sp€cmcellonB
add '10 per cent of cost of materlal, labour
) and machinery instead of 3 percent. Output= MT
Taking output = I MT
)
) 458 I 459

)
t
I

add8c Works: l3-Subst ucturE


)
B d8. Wo <s: l3-Substrucluc

)
Reference to Descrlption Uh it Quantity Rats Sr. Reference to Description Unit Quantity Rate
No. MoRT&H Rs. No. MoRT&H Rs. )
Speclfications Specifications
)
I
.) Malerial t3.8. 2706&2200 Providing weep holes ln brick masonry/
HYSD bars including 5 percentoverlaps llll 1.05 plaln/reinforced concreto abutment, win g )
andwastage wall/return wall with 100 mm dla AC
Bindjngwire kg 600 pipe,erteoding th,ough the tull width ol
)
the stdcture with 6lope ol lV :20H towards
b) Labour for cutting, bendlng, shiftlng drawing toce, Complele as per drawing
to 6ite, tying and placing ln posltion and Techhlcal Spoclficalions )
Mate day 0.34
Blacksmith day 2.00 Unit = Nos. )
Mazdoor day 6.50 Taking output = 30 Nos
)
c) Ove.ftead6 @ % on (a+b) r) Meterl.l

d) Contractor's profit
AC pipe 100 mm dia. (induding wastage RIV
)
@ % on (a+b+c) @ 5 per cent)

Rate per MT ! (a+b+c+d) Average l€ngth ofweep hole is taken as one


)
metre lor the purpose ofestimating
13.7. 1600& 2200 Supplylng, fitting and placlng mild steel )
reinlorcement complete in substructure as MS clamp Nos. 30
per drawlng and Technical Speclfications Collor forAC pipe (average) Nos. 10 )
Cement mortar l:3 rate as in ltem 12.6 cum 0.05
Unit = MT )
Taking output = 'l MT b) Laboul
Mate day 0.03
)
a) Material Mason day 0.5
MS bars including 5 percentoveriaps [,lT '1.05 Mazdoor day o.23
andwastage
)
Binding wke kg 6.00 cl Overheads @ % on (a+b)
)
b) L.bour tor straightening, cutting, bending, d) Cont,aclo.'s protit @ % on (.+b+c)
shiiing to sile,tylng and placing in posilion )
Mate day o.28 Cost fo. 30 m : alb+c+d
Blacksmith day 1.50 )
Mazdoor day 5.50 Rate per m = (a+b+c+d)/30

c) Ove.heads @ % on (a+b)
Note: ln case ofstone masonry, the size ofthe
)
weep hole shall be 150 mm x 80 mm or
d) Contractor's profit @ % on (a+b+c)
circularwith 150 mm diameter.
,
I
Rate p.r MT = (a+b+c+d) t
460 461 )
)
t

Bridsc Wo*r: |3-S bstrucrlr


Brid&Work : ll-Sub6tnEle

Sr. Referenco to Descriptlon


No MoRT&H
Specifications
Unit Quantity
G
Rs.
Sr. Refarence to
MoRT&H
Description unlt Quantity Rate
Rs.
Ilo.
Speclficatlong
2 For structure in stone masonry. lhe weep
holes shall be deemed to be inctuded in b) Material
the llem ofstone masonry work and sha Sand cum 12.00
not bepaid separalely.
c) Machinety
13.9 710.'1.4. of IRC:78 Backfilling behind abutment, wlng wall Plate compactor/power rammer hour 2.50
& 22do and return wall complete as per drawing Water tanker hour 0.06
and Technical Specifications
d) Overheads @ % on (a+b+c)

Unit = cum
e) Contractor's profit @ % on la+b+c+d)
Taking output = 10 cum

Costfor 10 cumofsandy backfill= a+b+c+d+e


A. Granular material
Rate per cum = (a+b+c+d+e)/10
a) Labour
Mate day 0.28 13.10. 710.1.4, of IRC:78 Provlding and laying of Filte. media with
Mazdoor day 7.O0 and 2200 gaa n ula. materialsrslone ctushed
aggregates satisfylng the requlroments
b) Material
laid down in Clause 2504.2.2. of MoRT&H
Granular material 12.O0 Specifications to a thickness of not less
than 600 mm with smalle! ske towards
c) Machinery
the soiland bigger size towards the wall
Plale compactor/power rarnmer hour 250 and provided over lhe entire sudace
WaterTanker hour 0.05 behlnd abutment, wing lvall and tetum
wallto thetullheight compacted to a firm
d) Overheads @ % on (a+b+c)
condltion complete as per drawing and
Technical Spoclfications
e) Contractor's profil @ % on (a+b+c+d)
I llnit = cum
Cost for 10 cum ofgranular backfill= a+b+c+d+e Taking output = 10 cum
)
R.te per cum = (a+b+c+dle),[O a) Labour
Mate day 0.32
8. Sandy material Mazdoor for filling, watering, ramming, etc day 7.00
l Mazdoorskilled day 1.00
a) Labour
Mate day 0.28 b) Materlal
Mazdoorforfifling, watering, ramming, Filter media ot stone aggregde conbrming cum '12.00
etc day 7.00
to Clause 2504.2.2. of MoRT&H
Specifcations

462
463
Brid8. Wdk : I l-Substruciurc
Bridg€ Work: I l-Subrtructri!

Sr. Referehce to Descriptlon Unit Quantity


St. Reference to oesc,iption Unit Quantlty Rale
No MoRT&H l
Rs. MoRT&H Rs.
Specifications No.
Specifications
c) Machlnery
Water tanker of 6 KL capaclty hour 0.06
d) Contractor's ptofit @ % on (a+b+c)

I Cost for250 tonne capacity bearing = a+b+c+d


d) OverhEads @ % on (a+b+c)

e) Contracto/s profit Rate pe. tonne capacity = (a+b+c+d)/250


@ % on (a+b+c+d)

Cosl foll0 cum of Filter Media = a+b+c+d+e 13.12. 1000, 2000 & 2200 Supplying, fitting and fixing in position
true to lino and level forged steel tolle.
Rate per cum = (a+b+c+d+e)/10 boaring conlorming to lRc;83(Pt. 1)
Section lX and Clause 2003 of MoRT&H
13.11. 1000,2000 & 2200 Suppvlng, fitfing and fixtng tn post0oh Specifications complete including all
true to llno and lovol cast stssl aockgr accessodesasperdft|wingandTechnlcal
bearing conlormlng to IRC: 83(pt.,t) Specllicatlon
Section lX .nd Claus6 2003 ol MoRT&H
Sp.clflcatlons complsto lncludlng all Unit: one tonne capacity
accesaorlos aB pordrawlng and Tschnical Considering a 250 tonne capacity bearing for
Specmcafions this analysis

Unit one tonne capacity a) Labour


Consirerihg a 250 tonne capacity bearing br Mate day 0.06 I
this analysis Mazdoor day 1.00
Mazdoorskilled day 0.50
a) Llbout
Mate day 0.06 b) Matorlal
Mazdoor skilhd day 0.50 Forged steelroller bearing of250 tonne Nos 1.00

irazdoor day 1.00 design had capacity duly painted complete


with all it! components as per drawing and
b) Materlal specifications
Cast steel rocker bearing assembly of Nos 1.00
250 tonne design load capacity duly Add 1 per cent of aost of bearing asselnbly
painted complete with all its components for foundation ancholage bolts, llfting
as perdrawing ahd specifications arangements, grease and o$erconsumables.

Add I per cent of cost of bearing assembly c) Ovsrheads @ % on (a+b)


fo. foundalion anchorage bolls, lifting
arangements, grease and olher consumables d, Contractor'E protit @ %on(a+b+c)

c) Overh€ads Cost for 250 tonne bearing = alb+c+d


@ % on (a+b)
i

Rats por tonne capacity = (a+b+c.d)r250

464
465

if--
,
E-"------------

Brids.lro*i : | 3-Suh6lructrlr
B.idgcwo*5: l}submctle

Sr. Reference to Descriptlon Unlt Quantity Descrlptlon Unlt Quantity FaIG


Rau Sr. Reterence to
No MoRT&H Rs.
Rs. No. MonT&H
Specifications
Speclrications
r3.13. 2000& 2200 Supplying, fitting and lixing in position 13.14. 2@O&2200 Supplylng, litting snd llrlng ln posltion
true to line and levelsliding plate bearing true to line and level caltomeric bearing
with PTFE surfacesliding on stainless steel conlo.mlng to IRC:83P.rt'll), Seclion lX
rl complete including allaccossories as per and Clause 2U)5 ol MoEt&H Specincations
drawlng and Technical Specification and complete lncluding allEcoasodes as por
,,l BS:5400, Sections 9.1 & 9.2(fo.PTFE) and dmwlng .nd TschnlcC Spocllicatlons
Clause 2004 of MoRT&H Specilications
)l Unit l ono cubic centinxle
Unil one tonne capacity Considering an elastor.ric bearing ol size
,l Consdering a 80 tonne capacrty bea.ing fo'
lhis analysis
5Oo x 4oO x 96 mm lor Itis analysis.

Overall volume - 19200orcm


) a) Labour
Mate day 0.06 Volume ol 6 nos. 488 r 388 , 4 mm size
) Mazdoor day 1.00 reinlorcing sleel plates = 4545 cu.cm
Mazdoor skilled day 0.50
) Hence, volume ol elastoiEtor = 14655 cu cm'
b) Matorlal

i PTFE sliding plate beadng assembly


80 tonne design load capacity duly painted
complele wilh all ils componenls as per
of Nos 100 !) Labour
Mate
q
day
0.06
1.00
) d.awing and technical specifi cation
Mazdoor
Mazdoorskilled day 0.50

) Add 1 percentforbundation anchorage bolls b) Mat.rial


Nos. 1.00
andconsumables Elastomerjc bearing lssembly consisling
) ol T layers ol elastonErbonded to 6 nos
c) Overheads @ % on (a+b) lnlemal reinforcing st€€llaminatos by the
) proc€ss ol vulcanisatrn, comdete with all
d) Contractor's p.otit @ % on (a+b+c) co.nponents as per dawlng aid technlcal
) Cosl icr E0 tonne capacity bearing = a+b+c+d
specilications.

Add 1 per cent of cost d bearing assembry


) Rate par tonne capac,ty = (a+b+c+d)/80 lor loundation anchorag€ bolls and
consumables.
I O
c) OvGrheads ',( on (8+b)
)
O Contractor's Protlt O %on (a+b+c)
)
I ouu 46',7

),
B.idsc Wo*r: ! 3-Subslrucrurc

B.idg. Work: l3-Substdcluc


Sr, Reference lo Description Unit Quantity
No. MoRT&H Rato
Sr, Reference to Description Unit Quantity Rate
Epeciticafions Rs.
No. MoRT&H Rs.
Speclficalions
Cost for 1920occ ot elastome.ic bearing
=
a+b+c+d 13.16. 2000 & 2200 Supplylhg, fitting aod Iixing in positioo
true lo line and levd POT-PTFE bearing
Rate per cc of elastomedc bearlng consisting of a metalplston supported by
= {a+b+c+d)/'l92OO a disc or un,elnlorced elastomerconfined
wlthln a metal cylind.?, sealing rlngs, dust
,t3.15. 2000 &2200 Supplying, litting.nd tixing in position €eali, PTFE surface slidlng against
true to line and tevelsliding ptate bearing stalnless d6el maliEg 6urface, complete
with staiflless steel plate slidlng on asssmbly to be of cast ste.l/fabricated
stainless steel platewlth mlld steolmatrix 6tructural stool, matal and 6lastomer
complete includingall accossodos as per elcmenis to be as p.r IRC: 83 Parls l&ll
drewing and Technical Specifica on6 ,espectively and othrr p.rts conto.ming
to BS:5400, Soctions9.l &9.2and Clause
Unt: one tonne capacity 2006 ot ttioRT&HSpcltlcallons complete
Considering the stiding bearing of 80 bnne as per drawlng and approved Technlcal
design c.pacity .for this analysis. Specltication3

.) Labou. Unit: one tonne capeity


Mate day Considering a pot beahg assembly of 250
0.04
Mazdoor day lonne capacity fo. this analysis.
0.75
Mazdoor skilled day 0.3s
.) Labour
b) l,lat.rial Mate day 0.08
Supplyofsliding plate bearing of 80 tonne Nos. 1.00
Mazdoor day 1.50
design cap€city complete as pe[ drawings Mazdoo. skilled day 0.50
and lechnical specilications
b) Matsrl.l
Add 'l per cent of cost of bearing assembly Pot type bearing assembly consisting of Nos 100
for toundalion anchorage bolts and .. metalpiston supported by a disc. PTFE
consumables pads providing sliding surfaces against
stainless steel mating together with cast
c) Ovorhoad. @ % on (r+b) steel assemblies/fabdcated slructr.rral steel
assemblies duly painted with all
d) Contr.ctor,! prolit @ % on (.+b+c) components as per Clause 2006 and
complete as per drawings and Technical
CostforS0 tonne capacity bearing a+b+c+d Specilication.
=

Rate per tonne capacity be.ring


= (a+b+c+dy8O

468
469
)
Bddgc Wort! : l3-Sut6rrlcruE

) Sr. Reference to
No.
Descrlption Unlt Quantlty Rate Chapter-14
MoRT&H
Specifications Rs.
) Superstructure
Add 1 per cent of cost of bea.ing assembty
for foundation ancho.age bolts Pream ble:
and
consumables.
The rate for the wearing coat has beon analysed asunder
a) Cemenl concrete wearing coai
cl Overheads @ % on (a+b) b)
l dl Cortractor's profit @ or (a+b+c)
c)
Ashphaltic concrete wearing coal
Bitumen mastic wearing coat

l %

Cost for 250 tonne capactty l,earing


=
The item may be selected as per approved design. h case the thickness ofwearing coat is different
from that analysed. lhe rate forthe desired thickness may be worked out on pro-fata basis.
.l a+b+c+d
2. The rate analysis has beendone both for RCC RaililE and M.S. Railing, which can be adopted as per
) R.te p.. tonn6 c.p.city = (a.b+c+d)/250 approved design.

3. The length of drainage spout has been provided in such a way that it is connected to the drainage
) syslem on the ground in case of fyovers and there hno splashing ofwater on the st ucture in case of
bridges.
)
The rate tor anti-cofiosive treatment is .equired to be ascertained from frms specialised in this work. ln
this connection Ci.cular No. RWN H-34041/44191-S&R dated 21.3.2000 of Ministry ot Road Transport
) and Highways may be referred for furlher details.

) 5. Expansionjoints involving movements exceeding 40 rm are specialised readymade items commercially


produced by reputed flrms with imported technology and parts. The rates icr suchjoints are required to
be ascertained from the firms pre-qualilied by the lrhistry.
)
6. The rate analysis tor pre-cast and pre-tensioned girders has also been included.
) 7. The rateanalysis for prestressed cement concrete ofM 60 gEde has also been included whichcan be
adopted for bridges with innovative designlconskuctbn.
I
I MoRT&H letter No. RW/NH-34059/'l196 S&R dated 30.1 t.2000 and subsequent conigendum dated
) 25.'1.2001 may be refe.red for detailed specificatiqB and provisions br various types of expansion
ioints.
) 9. Supply of new type ot expansion joint may be oblained oh the basis of competitive bidding from
amongst the suppliers pre-qualitied by the Ministy of Road fransport and Highways. Further, a
) warranty of 10 years of houble free performance riay be insisted trom the suppliers.

10. For bridges having wide decly'span length of more 0lan 120 m orland involving complex movements/
) rotations in different directions/planes, provision ofspecialtype of modular expansion joinls such as
swiveljoistsjoints a.e requi.ed forwhich 1i.ms specblised in this field may be consulted. Such cases
) will require prior approval of Ministry.

)j
470 471
.)

F-
-"""':n
Bridge Wo*3 : I4_SuPe6utctu.e

Chapter-14 Sr. Refoaence fo Oesc.iption Unlt Quantity Rate


MoRT&H Rs.
No.
Superstructure Specifications
Sr. Reference to Description unit Quantity Rate il) For T-beam & slab, 25"35 per cent ol
NiJ MoRT&H Rs. (a+b+c)
Spociflcalions Height upto 5 m - 25 Percent
Heighl 5 m to 10 m- 30 Per cent
14.1, 1500, 1600&l?00 Furnlshlng and placlng relnforced/ Heightabove10m - 35 Percent
p106ttgsaod camont concteto ln
' superstructure as per drawlng and e) Overheads @ % on (a+b+c+d)
Technlcal Speclficatlons
0 Contractor's Profit @ !. on
A. RCC Grade M 20 (a+b+c+d+e)

Cost for 15 cum = a+b+c+d+e+f


Case-l : Ualng Concro:a Mixer
Rate per curn = (a+b+c+d+s+l),15
L/nit = 1 cum
Taking output = 15 cum
Caso-ll : U6lng Batchlng Plant, Transit
Mixer and Concrete Pump
r) Mat.ri.l
Cernent IT 5.12
Coa6e sand cum 6.75
Unit = cum
Taking outsut = 120 cum
20 mm aggregate cum 8.1
10 mm aggregate cum 5.4 a) Materlal
i,IT 40.92
Cement
bl Labour Coarsesand cum 54
Mate day 0.86
20 mmaggregate cum 64.8
Mason day 1.50 '10 mm aggregate cum 43.2
Mazdoor day 20.00
b) L.bour
c) Machlnery Mate day 0.84
Concrete mixer (cap,0.40/0.28 2um) hour 6.00 day 3.00
Mason
Generator 33 KVA hour 6.00 day 18
Mazdoor

d) For formwork and .t.glng add tho c) lrllchlnory


followlng: Batching Plant (assuming output hour 600
20 cun hr)
l) Fot solld slab suporstructure,2030 per Generator 1 00 loy'A hour 6.00
centot(a+b+c) L@der hour 6.00
Height upto 5 m - 20 percent Transit mixer (caPacity 4.0 cum)
rl1 -
Height 5 m to 10 25perc€nt Lead upto 1 km hour 15.00
Heightabove 10m - 30 percent Lead beyond '1 km, Llead in kilometre t.km 3001

Concrete pump hour 6.00

472 473
) ...--
)
B.ids. Work : I 4-Sup.rslrlc1urc
Wo*, : l+suptstnduE
) B.idge

Sr. Reference to Oescription Unlt Quantity Rate


) No MoRT&H Rs.
Sr. Reference to Oescription Unit Quantlty Rate
Speclfications No. MoRT&H Rs
) Speclficatlons
d) For formwork and staglng add tho
I followlng; c) lUlachlnory
concrete mixer (c?. 0.40/0.28 cum) hour 6.00

) l) For iolid .l.b sup.rstructuro, 20.30 per Generator 33 KVA hour 6.00
cont ot (.+b+c)
Hebhtupto5 m - 20 porcent
d) For lormwork .tld staglng .dd the
) Height 5 n, to l0 m - 25percent
tollowlng:
Height above 10 m - 30percent l) Forsolid slab supGtructuro,20-30 per
) cent of (a+b+c)
ll) Fo. T-b€tm & 3lab, 25-35 p.r csnt ol
Heightupto5m - 20percent
), (a+b+c)
m -
P-light upto 5 25 percent
Height 5 m to 10 m - 25percenl
Heightabove 10 m - 30percent
,)
m-
Height 5 m to 10 30percent
tlehhtabovel0m - 35 per cent iil For T-boam & rl.b, 25-35 por cont of
(r+b+cl
) .) Ov6rte.d. @ ./" on (.+b+c+d) Heighl upto 5 m - 25percent

0 Contractor's profit oh on Height5mto 10 m- 30percent


) (a+b+c+d+.)
@
Heightabove 10 m- 35percent

Sl Cosl for r20 cum = a+b+c+d+e+f e) Ovorheads @ % on (a+b+c+d)


I

))
Rate per cum = (a+b+c+d+e+lll121 0 Contractor's profit @ '/o oo
(a+b+c+d+e)
8. RCC Grade M 25
) Cosl for 15 cum = a+b+c+d+e+f
CaseJ : Using Concrete Mixer
) Rate peJ cum = (a+b+c+d+er0lt5
Unit = I cum
Takjng outf,ut = 15 cum C.se.ll : Uslng Batching PLnt, T,.nsit
Mixer and Concrete Pump
.) Materl.t
CenEnt [47 5.99 Unit = cum
Coa6e sand cum 6.75 Taking outpul = 120 cum
20mmaggregate cum 8.1
l0mmaggregate cum 5.4 a) triate,lal
Cement [,II 47.95
b) L.bour Coa6e sand cum .2
Mate day 0.86 20 mm aggregale cum at.8
) Mason day 1.50 '10 mmaggregate cum 43.2
Mazdoor day 20.00
)
) 474
4't 5

)
Blidgc Wo*s : l4-Sup.rslfl.1ure Bddge Work: I {-Sup.$lru.te

Sr. Reference to Descrlptlon Unit Quantity .*] Sr. Reference to Description Unit Quantity Rate
No MoRT&H Rs. No. MoRT&H Rs.
Specifications Speclfications

b) Labour C. RCC G.ade M 30


Mate day 0.84
Mason day 3.00 Case-l : lrsing Concrcte Mixer
Mazdoor day 18
Unit = 1 cum
c) Machlnery Taking output = 15 cum
Batching plant (assuming output hour 6.00
20cunvhr) .) Mate.lal
Generator 100 KVA hour 6.00 Cement lilr 6.10
Loader hour 6.00 Coarse sand cum 6.75
Transit mixer (capacity 4.0 cun) 20 mm aggregate cum 8.1
Lead upto 1 km hour 15.00 l0mmaggregate cum 5.4
Lead beyond 1 km, L-lead in kilometre t.km 3001
Concrete pump h.ur 6.00 b) Libour
Mate day 0.9
d) For formwork and staglng add the Mason day '1.50

,ollowlng: li,lazdoor day 21.00

l) Forsolld slab.upefstructura, 20-30 por c) Itl.chlncry


cent of cost ofconcrete Concrete mixe. (cap. 0.40/0.28 cum) hour 6.00
Height upto 5 m - 20percent Generator 33 KVA hour 600
Height 5 m to 10 m - 25percent
l-leightabove l0m - 30 percent d) For formwork and 6taging add the
following:
il) For T.bo.o e rhb, 25-35 por cont of
(a+b+c) l) Forsolid rlab supor5lructu.o,20-30 per
m -
Height upto 5 25percent cent of(a+b+c)
m-
Height 5 m to 10 30percent Height upto 5 m - 20percent
Heightabgve 1O m - 35 percent Heilrhts m to 10 m- 25 percent
Heirht above 10 m - 30percent
e) Ove.heads @ % on (a+b+c+d)
ll) For T-boam & slab, 25-35 per cent of
0 Contractor'6 p,ofit @ Y. on (.+b+c)
(.+b+c+d+e)
Height upto 5 m - 25percent
Cost for .120 cum = a+b+c+d+e+f Height 5 m to 10 m- 30percent
Height above 10 m - 35percent
R.ts pe, cu.n = l.+b+c+d+o+0/120
.) Overheads @ % on (a+blc+d)

476 477

I
Bddt Wo s: I4-Sup..strrd@
B.idgc Wo*! : l4'Suf,crlDcturt

Sr. Reference to Descrlptlon Un it Quantity -"J Sr. Reterence to Oescription Unit Quantlty Rate
No MoRT&H Rs. Rs
No MoRT&H
Speclfications
Specllicatlons

0 Contractor's prorit @
oh oA m-
Heighl5 m to'10 25Percent
(a+b+c+d+el Heightabove l0m - 30 Percent

Costfor 15 cum = a+b+c+d+e+f ii) For T'beam & slab,25-35 per cent of
costotconcrete
Rate per cum = (a+b+c+d+e+ohs Heighl upto 5 m - 25Percent
Height5mtol0m - 30 Percent
Case-ll: Using Batching Plant, Transit 10 m - 35Percent
Heightabove
) Mixer and Concrete PumP

Unit = cum e) Overheads @ % on (a+b+c+d)


Taking output = 120 cum
0 Contractor's P,ofit @ '/o on
a) ltl.t6rlel (a+b+c+d+e)
Cement MT 48.79
) CoaGesand cum 54.6 Costlor 120 cum = a+b+C+d+e+l
20 mm aggregate cum 64.8
'10 mm aggregate cum 43.2 Rat. per cum = (a+b+c+d+o+o/120
)
b) L.bour D. RCC/PSC Grade M 35
) Mate day 0.88
Mason day 3.00
Case-l: Uslng conc.ete Mlxer
) l\,4azdoor day 19

c) Machinery Unit = '1 cum


) Balching plant (assuming output hour 6.00 Taking output = 15 cum
20cum/hr)
) Gen-.ralor 100 KVA hour 6.00 a) Mate.lal
Cement MT
Loader hour 6.00
cum 6.75
) Transit mixer (capacity 4.0 cum) Coarse sand
20mm aggregate cum 8.1
Lead upto 1 km hour 15.00
'10 mm aggregate cum 5.4
Lead beyond 1 km, L-lead in kilometre t.km 3001
Concrete pump hour 6.00
b) Labour
) d) For formwork and 6laging add the Mate day 0.9
tollowlng: Mason day 1.50
) Mazdoor day 21.00
l) For solid slab su perslructure, 20-30 per
c6nl oI cost of concr.te
) c) Machlnery
6.00
Concrete mirer (caP. 0.40/0.28 cum) hoJr
Heightupto 5 m - 2lFercent Generator 33 KVA ho{rr 6.00
)
) 478
I
i 479

)
Bdd8. Wdk : I4-SuF6trucirr! Bridg. Wo*s: I fllupc$lructurc

Sr. Reference to Descrlption Unlt Ouantity Unit Quantity Rate


Ratq Sr. Reference to Oescription
No. MoRT&H Rs.
Rs. No. MoRT&H
Speclfications
Specifications

O Fo. ,oJmwork and staglng add the a) Mate al


lollowlng: Cernent MT 50.64
Coarse sand cum u
l) For Bolld slab 6uperstructure, 1&28 pe. 20 mmaggregate cum 64.8
ceht of cost o, concrete 10 mmaggregate cum 43.2
Height upto 5 - m 'lSpercent
m-
Heighl5 m to tO 23p€rcent b) Labour
Heighlabove'l0m - 2S per cent Mate day 0.88
Mason day 3.00
li) For T-bsam & slab,23-39 per cent of Ivlazdoor day
cosi ot concrete
Heighl upto 5 m - 23perc€nt c) llrchlntry
Height 5 m to l0m- 28p€rc:6nt Babhing plant (asscing o{tput hour 600
Height above 10m - 33 porcenl 20 cunvto
Gen€rato. 1 m KVA hour 6.00
lli) For box glrder and brtlnc€d Loeder hour 6.00
cantllsvor, 38-58 per cont ol cost o, Transit mixer (capadY 4.0 cum)
concreto Lead upto 1 km hour 15.00
Height upto 5 - m 3Spercent Lead beyond 1 km, t+ad in kilonEtre t.km 300L
Height5mto'l0m - 4Spercent Concrete pump hour 600
Heightabove 10 m - 5Spercent
d) For totmwork ard staglng add the
e) Overheads @ y. on (a+b+c+d) lollowlng:

0 Contrsctor'! proflt O on l) Fo,solid Elab 6up€lttructuro, 18'28 per


(a+b+c+d+r) cent of cost of corErste
Heaghtupto5m - 18Percent
Cost for 15 cum = a+b+c+d+€+f Height 5 m to 10 m- 23Percent
Heightabove 10m - 28 Pe.cent
Rate per cum = (a+b{.+d+e+tyls
Il) Fot T-boam & slaL 23-33 per cent of
Case-ll: Uslng Batching plant, Translt costofconcrete
Mlxer and Cohcrete pump Height upto 5 m - 23 Percefit
Height 5 m to 10 m- 28 Percenl
Unit = cum Heightabove l0m - 33 Percenl
Taking output
= , 20 cum

480 4fi

J
&idgc Works : l+Slp.rsttuctrE
B.idt Wo*s: I +Supcrsru.{r!

Sr. Reference to Description Unit Quantity Rate


No MoRT&H Sr. Reference lo Description Unit Quantity Rate
Rs.
Specifications No. MoRT&H Rs.
Specifications
lli)For box girder and balanced
cantilever, 38-58 per cen( of cost of d) For formwork and staglng add the
concrgte followlng:
HeightuptoSm - 38 percent i
Height S m to 10 m- 48pe.cent l) Fo.golld slab supeFtructurs,2030 p€r
Heightabove 10 m - 5Spercenl centor(a+b+c)
Heightupto5m - 20 percent
el Overheads @ % on (a+b+c+d) Height 5 m lo 10 m- 25percent
Heightabove 10 m- 30percent
,) Contractor's proflt @ o/o on
(a+b+c+d+e) Il) For T-boam & slab, 25-35 pe. cont of
(a+b+c)
Cost for 120 cum = a+b+c+d+e+f Heightupto5m 25 per cent-
Height 5 m to 10 m -
30 percent
Rate per cum = (a.rb+c+d+o10/120 -
Heightabove'l0m 35 Per cenl

E. PSC G,ade M 40 sl Ovorheads @ % on (a+b+c+d)

Case-l : Uslng Concr6ta Mixe. Contractor'6 profit @ Yo on


'} (a+b+c+d+o)
Unit = 1 cum
Taking output = 15 cum Cost for 15 cum = a+b+c+d+e+f

a) Mato.ial Rate per cum = (a+ b+c+ d +e+f)/l 5


Cerrlent [47 6.45
Coarsesand cum 6.7s Case-ll : Uslng Batching Plant, T,ansit
20 mmaggregate cum Mlrer and concreto PumP
10 mm aggregate cum 5.4
Admlxture @ 0.4 per centofcement kg 25.8 Ljnit = cum
Taklng output = '120 cum
b) Labour
Mate day 0.96 a) Material
day 2.O0 Cemenl lvIT 51.6
Mazdoor day 22.00 Coarse sand cum u
) c) Machlnory
20 mm aggregate
10 mm aggregate
cum
cum
64.8
43.2
Admixture @ 0-4 per cenl ofcemenl kg 2c6.4
) Concrete mixer (cap. 0-40/0.28 cum)
Generator 33 KVA
hour
hour
6.00
6.00

)
) 482
483

)
B.idgc works : l4-Sup€^rructue clw
Bridge Wo*s : l4_SuP6tfl

Sr. Relerence lo Description Unlt Ouantity Rate Description Unit Quantity Rate
Sr. Reference to
No. MoRT&H Rs. Rs,
No MoRT&H
Specifications
Specifications
I
b) Labour e) overheads @ % on (a+b+c+d)
Mate day 0.94
I
I
Mason day 3.50 0 Contractor's Profit @ % on
l\,,tazdoor day N (a+b+c+d+e)

c) Machinery Cost for 120 cum = a+b+c+d+e+f


Batching plant (assuming outpul hour 6.00
20 cunVh0 Rate per cum = (a+b+c+d+e+0/120
Generator 100 KVA hour 6.00
Loader hour 6.00 F. PSc Grade M 45
Transit mixer (capacity 4.0 cum)
Lead upto 1 km hour 15.00 Unit = 'l cum
I
Lead beyond'l km, L-lead in kilometre t.km 300L Taking output = 120 cum
Concrete pump hour 6.00
a) Mate,ial
d) For tormwork and staging add lhe Cement [4r 55.80
following: cum g
coarse sand
cum 64.8
20 mm aggregate
l) For rolld slab/voided slab super 10 mmaggregate cum
atructure, 18.28 per cenl o, cosl o; kg 223.2
Admixture @ 0.4 Per centof cement
concaete
Heighl upto 5 m - '18percent i
! b) Labout
Height 5 m to 10 m- 23 percenl Mate day 0.94
Height abovo 10m - 28 percent Mason day 3.50
day 20
Mazdoor
ii) For T-beam and slab lncluding
launchlng ol precast girders by c) Machinory
laurchlngtruss upto 40 m span,23-33 hour 600
Batching Plant (assuming output
percenl of cost ol concrele 20cum/ho
Height upto 5 m- 23 percent GeneratcrI o0 Kr'A hour 6.00
Height5mtol0m - 28 percent Loader hour 6.00

Hoight above l0m - 33percent Transit mixerlcaPacity 4.0 cum)


ho!r 15.00
Lead upto 1 km
iii) For cast-ln-sltu box girder, segmental t.km 3001
Lead beyond 1 km, Llead in kilometre
conslrucllon and balanced cantllever, hour 6.00
Concrete PumP
38-58 per cent ot cost olconcrete
Height upto 5 m - 38 percent
Height 5 m to '10 m- 48 percent
Heightabove 10 m - 58 percent

484 485
Brid8. Works : l4-SuFrhctrr. Bidge Wo*i : l,l-SuFlklcrw

Sr, Relerence to Description Unlt Quantity Rale Sl. Reference to Description Un it Quantlty Rate
No MoRT&H Rs. No MoRT&H Rs.
Specificalions Specifications
d) For formwork and staglng add the a) Material
followlng: Cement MT 58.80
Coarse sand cum
) l) For solid slab/voided slab auDgr. 20 mm aggregate cum 04.8
structuro, 16-26 per cent ol co3l o; 10 mm aggregate cum 43.2
) concrcte Admixture @ 0.4 Per cent ofcement kg
H€ightupto5m - 16 percenl
) Helghl5 m to 10 m- 2l percenl b) Labour
Height above 10m - 26percenl Mate day 0.94
Mason day 3.50

I ll) For t.boan and 8l.b lncludlng


launchlnq o, precast glrd.rs by
Mazdoor day 20

i launchlng truss upto 40 m 8pan,2l-3'l c) Machinery


per cent ol cosl of concrete Batching plant (assuming outPut hour 6.00
) -
Heightuplo5m 21 per csnt 20 curn/hr)
Hsjghi 5 m to 10 m- 26 perc€nl Generator l00lWA hour 6.00
H€lghtabove 10m - 3'l percent Loader hour 600
Transit mixer (capacity 4.0 cum)
lll) For c.st.ln-sltu box glrd6r, 8ogm.ntrl
) construcllon and balahced cantllove,,
Lead upto 1 km hour
t.km
15.00
3001
Lead beyond 1 km, L-lead in kilometre
3&56 per cent o, costofconcretc Concrete pump hour 6.00
) Hoighl upto 5 m - 36perconl
Height 5 m to lO m - 46percent d) For formwork and staglng 8dd tho
) Holght above 10m - 56porcenl following:

) e) Overheads @ % on (a+b+c+d) l) For castln.situ box girder, 6egmgntal


construction and balanced cantllover'
) 0 Contrlctor's prorit @ "A on 35.55 pet cont oI cost ofconcrote
(a+b+c+d+e) Height upto 5 m - 35 Percent
Height 5 m to 10 m- 45 Percent
)
Cosl for 120 cum = a+b+c+d+e+l Heightabove 10m - 55 Per cent

) Bale per cum = (a+b+c+d+e+fY120 e) Overheads @ % on {a}b+c+d)

) G. PSC Grade M 50 0 Contractor's Prolit @ I' on


(a+b+c+d+e)

) Unil = I cum
Cost for 120 cum = a+b+c+d+e+f
Taking oulput = 120 cum
Rate per cum = la+b+c+d+e+f)h20

) 486 4t7

)
r_
8ridg. Work5 : l4-Sup.rstuct!re
Bridg. Wo*s I l4-Supe6lrudur.

Sr. Reference to Description Unit Quantity Rato Sr. Reference to Descriplion Unit Ouantity Rate
No MoRT&H Rs. No. MoRT&H Rs.
Specifications
Speclticatlons
H. PSC Grade M 55 0 contractor's profit @ 'h on
(a+b+c+d+e)
Unit = 1 cum
Taking output = 120 cum Cost for 120 cum = alb+c+d+e+f

a) Material Rate per cum = (a+b+c+d+e+f)/i20


Cement MT 63 50
Coarse sand cum 54.00
Note: Vvherever concrele is canied out using
20 mm aggregate batching plant. transil mixer, concrete
64.80
'10 pump, admixtures conforming lS: 9103 @
mm aggregate cum 43.20
Admixture @ 0.4 per cent ofcement kg
0.4 per cent ofweight of cement may be
254.00
6dded for achieving desired slump of
b) Labou. conclete.
MaiJ day 0.94 2. Cefl€nt povided for various @mponents
Mason day 3.50 of the superstructur€ is for eslimating
Mazdoor day 20 purpose only. Aciual quantity of cemenl
will be as per approved mrx design
c) Machinery
Similarly, the p.ovision forcoarse and fne
Eatching plant (assuming outpUt hour 600 aggregates is fo. estimating purpose and
20cum/hr)
the exactquantty shallbe as perthe mix
Generalor 1 00 l(VA hour 6.00 design.
Loader hour 6.00
Transit mixer (capacity 4 0 cum) 3. The items, like. needle and surface
Lead upto 1 mm hour 15 00 vrbrators are parl of minor T&P whch is
Lead beyond 1 km, L-lead in kilomelre t.km 3001 already covered under the overhead
Concrete pump hour 600 charges As such these items have flot
been added separately in the rateanalysis
d) For tormwork.nd .taging add lho
tollowlng: '14.? 1600 Al Supplying, ,itting and placlng HYSD
bar reinforc6mant ln aupeGtructure
l) For ca6t-ln-6itu box glrder, segmental completo a6 p6r drawlng and
construction and balanced cantilever, Technlcal Speclflcations
35-55 percenl ot co6t ofconcrcte
Height upto 5 - m 35 percent Unil = 1 MT
Taking output = 1 MT
HeightSmtol0m - 45 percent
Heightabove 10m - 55 per cent
r) Matorlsl
e) Overheads HYSD bars including 5 per cert br laps MT r.05
@ % on (a+b+c+d)
€rd wastage
Bindingwire k9 8.00

488
489
)
Brids. Worlc : l4-Supc^lru.lrrc Bddge Worl(l : l4_Sup.rstructurc

S.. Reference to Desc,iptlon Unit Quantity Rate Reference to Description Unlt Quantity Rate
Sr.
No MoRT&H Rs MoRT&H Rs.
No
Specifications Specificatlons

b) Labour for cutting, bending, tying and b) L.bour


placing in position
Male day 0.44 i) For maklng and fixing cables'
Blacksmith day 3.00 anchotages
I
Mazdoor day 8.00 Mate day 0.16
day '!.00
) Blacksmith
c) Overheads @ % on (a+b) Mazdoor day 3.00

) d) Cont.acto.'s profit @ % on (a+b+c) ii) For P,estressing


day 0.05
Mat€y'SuPeNisor
) Rate per MT = {a+b+c+d) Prestres6ing oPerator/Filter day 0.25
day '1.00
Me2door
) 14.3. 1800 Hlgh tenslle Eteel wires/strands lncluding
all accGssodes tor stressing, stressing lii) Forgroutlng
) operationa and groutlng complete as per Male/SuPeNisgr day 0.05
d.awing and Technlcal Speclflcations Mason day 0.25
day 1.00

l Unit = 1 MT
Taking output = 0.377 MT
Mazdoor

c) il.chlnery
) Stressing jack with PumP hour 2.50
hour 1.00
Details of cost for 12T13 strand 40 m long G.outing pump with agitator
) cable (weight = 0.377 MT) Generator 33 l(VA hour 3.50

) r) Matorl.l d) Ove,heads @ % on (a+blc)


H.T. Strand @ 9.42 kg/m including t\4I 0.385
e) Contractor's profit @ % on (a+b+c+d)
) 2 per cent for wastage and extra length
forFcking
) Sheplhing duct lO 66 mm alongwih M 42.O0 cost for 0.377 MT = a+b+c+d+e
5 pdr cent extra length 40 x 1.05 = 42 m
Tube anchorage set complete with bearing Nos. 2.00 Rate per MT = (a+b+c+d+e)/0.377
) plate, permanent wedges, etc.
Cernent forgrouting lncluding 3 percenl MT 0.125 Nole: Cost of HT steelhas been taken fordelivery
) wastage @ 3.00 kg/m = 3 x'1.03 x 40. at site. Hence, carriage has not been
,|23.60k9 (say
125 kg) considered.
)
Add 0.50 percentcostof material for spacers,

) insulation tape and miscellaneous items

) 490 49t

)
J'
r-______________

Brid8. Wai, : l4-Srp.nr.E0E


Bridgc Wo*r : ll.Supc6tructue

Sr. nelerence to Descrlptlon Unit Ouanllty Bate Sr. Reterence to Oescription Unit Ouantlty Rate
No. MoRT&H
Rs. No MoRT&H Rs.
Speclfications
Specafications
14.4. 2702 Provlding and laying cement conc,ele 14,5. 515&2702 Mastic Asphalt
wearlng coat ir 30 grade lnctudlng
relnlorcement complete as per drawing Provlding and laying 12 mm thick mastic
and Technicat Speclllcation asphalt wearing cou6e on top of deck
slab excluding prime coat with paving
Unit = I cum grade bitumen meeting the requirements
Taking output = I cum givsn ln Table 500-29, prepared by using
mastic cooker and laid to required level
a) Material and slope after cloaning the surface,
inchdlng providing antl-skid surrace with
l) Coment Concrrte 30 Grade 1.00 bitumen precoated fine grained hard
(Rer€r relevant item of cancrele in ilem ston6 chlpping of9,5mm nominal size at
No. I4.1 , excluding formwork) the rate ot 0.005 cum pe. '10 sqm and at
an approximate spaclng ol 10 cm cen(e,
li) HYSD bar reinforcement A'T 0.075 to center Lr both dlaections, pressed inlo
(Rato as per item No 14.2) surface when the temp€Etule otsurfaces
nol less than 100'C, p.olruding t lnm to 4
b) Llbour lor cleanlng d6ck slab concrete day o.15 mm ove. mastic sudacs, ell complete as
su ace per Clause 515.

c) Overheads @ o/"
on (a+b) Unit = sqm
Takinq output= 72.46 sqm (2 tonnes)(0.869
d) Conlractor's prolit @ % on (a+b+c) cum) assuming a densily of2.3 tonnes/cum

Rale per cum = (a+b+c+d) .) Labou.


Mate day 0.49
Mazdoor day 1'i.00
Mazdoor skilled day

b) Machlnery
Mechanical broom @ 1250 sqm perhour hour 0.06
Aircompressor 250 cfrn hoJr 0.06
Mastic cooker 1 tonne capacity hour 6.00
Bitumen boiler 1500 litres capacity hour 6.00
Tractor for towing and positioning of hour 1.00
masticcooker and bitumen boiler

492 493
Bddg6 Wo*s : l4-Sup.Rtructurc
BridS€ Work : I4-SW.6huctuE

Sr. Rererence to Oescriptlon Unit


No Quantity R.tq Sr. Reference to Descrlptlon Unit Ouantity Rate
MoRT&H
Speclrica ons Rs, No, MoRT&H Rs
Specifications
c) li4ateriat
Ease maslic (without coarse aggregates) 2. Where tack coat is .equiBd lg be provided
before laying mastic asphalt, the same is
= 60 per cenl
Coarse aggregate (3.35mmlo 9.5 mm)= required to be measured and paid
40percent separately.
Proportion ol malerial required tormaslic 3. The quantities of binder, filler and
asphalt v/ith coarse aggregales (based aggregates are for estimating purpose.
on
mix design done by CRRI for a specitic Exact quanlities shall be as per mix
) case) design.

4. This rale analysis is based on design


) i) Bitum€n tJtvt OO or 6 OnO A rc.Zpot cent
, by yreight
tonne o.n4 made by CRRI for a specific case and is
o, mix Z x I O .2J1OO O.2U
= meant iff estifiEling plrposes only. A.tral
ii) Crusher slone dust @ gl.gperc6ntby cum
o39 design is cqui.ed to be done br erch c6e.
weigh of mix = 2 x 31.9/tOO 0.638
=
tonnes = 0.6A6/t .625 0.39
= 5. The quantity of bitumen works out 17 per
iii) Lim6 stone dust filler wlth calcium MT cent of the mastic asphalt blocks without
0.36
carbonate contont not less lhan gO per aggregates and ialls wihin lhe standards
c€nt by weight O I 7.92 p€r c€nt by laid down by MoRT&H Specifcations.
weight of mix 2 x 17.921100
= = 0.36
i!, Coarse aggregatos g.35 mm to 9.5 mm cum
14.6 2703,1500,1600 & Conslruction of precast Rcc railing of
0.55
@ 40 percent by weight ol mjx 1700 M 30 grade,aggregatoslze not ex;eeding
=
2 x 40/100 0.8 MT 0.8/1.456 12 mm, true to line and qrade, toleEnce
= = = 0.55
V Pre-coaled stone chlps of 13.2 mm
cum 0.036
of vedlcal RCC post not to exceed 1 in
) hominal size lor skid resislance 500, centre to centre apaclng bolween
=
72.46x0.00tr0 =0.036 verlical post not to exceed 2000 mm,
!0 Bitunen tor coating ol chips @ 2por leaving adoquate space between vertlcal
) c6nt by ,,veighl 0.036 x 1.456 x 2J1OO
kg 1.05
post for expanslon, complete as per
= =
0.00i048t!47
= t.Oskg appaoved drawings and Technical
) Speciricatlons
d) Overheads @ ./6 on (a+b+c)
) Unit = 1 RM
e) Contractor's protit @ o/.
on (a+b+c+d) Taking output = 2 x 24 m span :48 m
)
Cosl for TO sqm a+b+c+d+e
= a) Mate,ial
) Rale per sqm (a+b+c+d+e)ro l) M 30 G.ade Relnforced Cement cum 4.O92
=
Concrete
) Nole : 1. The rates for 6 mm or any other thickness No. of vertical posts = (12 + 2)2 = 28 Nos.
may be worked oul on prorata basis. Exlernalarea ofverticalpost 0.25 x 0.275
) = 0.069 sqm

) 491 495

)
BddSc worts : l4-Supc6t ucrurc

Bndt. Worts : l.l-Supe6truc$E

Sr. Reterence to Descrlption Unit Ouantity Rate


No. MoRT&H S.. Feference to Ilesc.iption Unit Ouantity Rate
Rs.
Specltications No. MoRT&H Rs.
Specllicatlons
Concret€ in verlical posts 0.069 x 20
= =
t.932 cum 14.7 2703,1500,r600 & Const.uction o, RCC railing o, M 30
Hand rail ln 3 tiers = 3 x 24 72 m 1700 grade In-situ wllh 20 mm nomlnal size
=
Extemalarea = 0.170 x 0.175 = O.O3 sqm .ggrogate, true lo llne and grade,
Concrete in hand rails O.Og x 72
= = lolerance ol vertlcal RCC post not to
2.16 cum erceed 1 ln 500, ccnlrc lo cenlro spacing
Total Concrote = 1.932 + 2.i6 4.092 cum
=
between vedlcal poal not to exceed 2G)0
(R€fer MoRT&H SD/202). mm, leaving adoquale space botween
(RalE as p€r item No. .l 4. 1 , excepl cost ol vertlcal post ,or expanslon, complete as
form rvofi) per approved drawings and Technlcal
Spgclficatlons
Add 5 per cent of above cost for tormwork for
casting in casting yard. Unii = I BM
Taking ouhut = 2 x 24 m spar = 48 m.
ll) HYSO bar reinrorcement MT 0.865
(Rate as per item No. 14.2 ) a) Material
ReferMoRT&H SD/2O2
i) M 30 Grade Reinlorced Cemenl 4.092
Add 5 per cenl ot (a) for handting and fixing of Concrcte
Precast panels in position
No. ofvedicalposts = (12 + 2)2 = 28 Nos.
Cosl lor 48 m = a Elitemal area ot verticalpost 0.25 x 0.275
= 0.069 sqm
Bate per metre (a)/40 Concrete in verticalposts = 0.069 x 28 =
=
1.932cum
Note i Ouantities of mat€riat have been adopted Hand rail in 3liers = 3.x 24 = 72 m
kom slandard plans ol MoBT&H vide Extemal area = 0. I 70 x 0.1 75 = 0.03 sqm
drawing No. SO/202. Concrete in hand rails = O.Og x 72 =
2.l6cum i
2. 48 m length is the lotal linear l€ngth adding Tolal Concrete = L932 + 2.1 6 = 4.092 cum
both sides ol24 m span. (R€fer iroRT&H SD202).

(Rate as por itom No.14.1, excopt cost of


tomwolk)

Add 1 2 per cent ol above cost for fomwork

496
497
Bridge Wo*r : l4-Sup6slruclG Bridgc Wo*r I l4'SupcEtruclur'

Sr. Reference to Descriptlon Unit Quantity Unit Quantity Rate


Rate Sr. Reference to oescriptlon
No. MoRT&H Rs.
Rs No. MoRT&H
Speclficalions specillcation3
ll) HYSD ba. reinlorcement MI 0.865
Add for electricity charges, welding and
drilling
(Raleas per item No. 14.2) eleclrodes and other consumables
equipn€nt,
ReterMoRT&H SD202 ofmaterial
@ 1 per centofcost

Cost for48 m=a b) Labour


day 2.A0
Mate
Rate per metre = (a)/48 day 30.00
Mazdoor (skilled)
day 40.00
Mazdoor
Note : 1. Quantlties ofmaterialhave been adopted
from standard plans of MoRT&H vide c) Overheads @ % on (a+b)
drawing No._SD202.
d) Contr.ctor's piofit @ % on (a+b+c)
2. 48 m length is the total linear length adding
both sides of24 m span. Cost for 1OO m steel railing = a+b+c+d

1,r.8. 2703.2 & {900 Provlding, fitting and firing mlld ste.l Rate per metre = (a+brc+d)/100
,ailing complele as per drawing and
14.9 2105 Olainago spouts completo as por d'awing
Technical Specilicatiohs
end Technical SP6cificatlons

Unil = l Running metre Unit = 1 No.


Taking outpul = 2 x 50 m span = 100 m '1 No
Taking output =

a) Mate,lal: a) Material
1) ISMC 100 = 2.806 x 1.05 = 2.946 MT kg 400
[47 2.946 Corrosion resistant structural steel
2) MS Flat:0.964 x 1.05 = 1.012 MT I\,7 1.012 including 5 Per cent wastage
3) MS bars = 0.17 x 1.05 = 0.180 MT MT 0.18 m 6.00
Gl pipe 't00 mm dia
4) MS bolts, nuts and washers [47 0.15 Nos. 6.00
Gl bolt 1 0 mm dia
Nos. 2.00
Galvanised MSfiatclamP
Add @ 5 pe. cent of c;st of material for
painting one shop coat with red oxide primer b) Labour
and three coats ofsynlhelic enamel paintand For fabrication
day 0.02
consumables lo safeguard against weathering Mate
day 0.02
andcorrosion. Skilled (Blacksmilh. welder etc )
day 0.02
N4a2door
Add for cost ot concrete br fxing vedioal posts
in the performed recess @ 1 percentofcost Fo,llxlng ln Positlon
day 0 01
of rnaterial Mat€
day 001
Mason
day 020
Mazdoor

498 499
--
f .idg. Wo*s : l+Supcrslruclui! Bddtc Wdts : l4'SlPe6trucru"

Unit Ouantity Rate


Sr. Reference to Descrlption Un it Ouantity Rate Sr. Reference lo DescriPtion
Rs.
No. MoRT&H Rs. No. MoRT&H
Specifications Specilicatlons

Add @ 5 per cent of cost of material and labour a) Malorlal 1.00


cum
for electrodes, culting gas, sealanl, anl- Comontconcrete RCC M 30Grade
corrosive bituminous paint, mild steel grating,
{Reter rclevanl ilEn ol concrote in item
may be
etc. No. 12.8 (G) exc€pt thal lormwoft
add€d at the .ate ot 2 per c€nt of cosl
c) Overheads @ % on (.+b) against 3 5 por cent providod in the
loundatlon concreto'
p,ofit c/"
d) Cont,actor'a @ on (a+b+c)
MT 0.05
HYSD bar reinforcement
Rate per metro = (a+b+c+d) (Rale as Per item No. 14 2)

Note : ln case of viaducts in urban areas, the Rate psr cum (.)
drainage spouts should be connected with
suitably located pipelines todischarge the may
Note The gtade ol reinlorc€d cemenl corlclete
sudace run-of, todrains provided at ground be adopted as M 30 for s€vere @nd ions ancl
level. M 25 tol moderat€ condilions.

2. ln case of bridges, sufficient length of G.l


'14.12. 1600 Provldlng anti-corroslve treatmenl to
Pipe shallbe provided to ensure thatthere HYSO rein(orcemenl wllh Fuslon Bonded
is no splashingofwater from the drainage EpoxY Coating (FBEC)
sporiton the skuclure.
unit = I MT
14.10. 2700 PCC M 15 Grade levelllng course below Taking outPut = 1MT
approach slab complete as per dlawing
and Technical Specifications To be laken as per the prevailing market lates

Unit = 'l cum Contractors generally do nol have expertise


Note :
Taking output = 1 cum got done
lor this item The iob is, therelore'
specjalis€d nms wtlo have th€ €xp€rlise
lrom
a) iratorlal in rhe lield ol construction chemicals The
Concrete, Rate as per item No. 12.8 (A) cum 1.00 prevaiftng rate in themaftst ls reguked to be
Less Formwork
ascenained lrom lh€ market and add€d in
rhe cost eslimale Detailed guidelines in
this
14.11. 1500,1600, Reinforced cement concrete approach lheir
regald have been is$ed by MoRT&H vide
1700 &2704 slab lncluding relnforcemonl and Ci;cuhr No. RWNH'3'(N1/44'€1-S&R
dared
fomwork complete as p€r drewlng and 21.3.2000.
Technlcal Specirications

Unit = 1 cum
Taking output = 1 cum

500 501

)
Bridgc Wod.s : l4-StrpcBtructuE Bddg. Wo*s : l4-SuPerslruciurc

Sr. Refeaence to Descrlptlon U nit Quantity Rate Sr, Refeaence to Oescription Unlt Quantity Rate
No MoRT&H Rs. No. MoRT&H Rs.
Specifications Specifications
14.13. 1800 & 2300 Precast-pretensioned Girders (ii) Cabl6cutting andthreading in position

) includlng blnding by insulatlon tapo


Providing, precasling, transporting and wlth HDPE Plposetc., p,EstresBlng and
placing in posltion precast-pretensioned cutllng ol extra lsngth of HT str.nd
)
conctete giaders as per drawing and .fterde-strosslng
Technical Speclfi cations Taking quantity ofHT strand 60 kg/cum
) Mate day o.02
Unit = 1 cum Mazdoorskilled day 0.14
) Takingoutput= l cum Mazdoor day 0.50
Grade of concrele - M 40
) {iii) Erection and disrnantling olshuttering
a) Material Taking shuttering area 10 sqm/cum of
) Cement [47 0.47 concrete
day o.12
Coarse sand cum 045 l\4ate
20 mm aggregate cum 0.54 Mazdoorskalled day 1.00
) day 2.00
10 mm aggregate cum 0.36 Mazdoor
Admixture @ 0.4 per cent of cement kg 1.88
) HYSo steel . [47 0.1 (ivlconcreting by batching plant and
HTstrand with 5 percent as wastage i,T 006 stationary concrete PumP
) and extra length foranchoring i.4ate day 0.03
LDOfor steam curing Litre 37.00 Mazdooaskilled day 005
day 0.60
) Mazdoor
Add consurnables such as binding wire, foam

) packing tape, shuttering oil, HDPE pipe tor (v) Steam curing and manual curing
unbonding of strand, bolt and nuts elc. @ 1 Mate day 0.01
per cent of materialcost Ivlazdoor day 0.35
)
b) Labour {vi} Handling ot precasl glrder, stacking
) (l) Cuttlng, bondlng, makli:g r.lntorc.. in stockyard and again loading in
rn€nt c.gg, plrclng ln polltlon, blndln; trallor
) otc. complct Mate day 0.01

Taking quantity of steol 100 kg/cum of lvlazdoor day 0.25


concrete including laps and wastage
Mate day 0.06 (vll)Placsment ot glrdors ln posltlon ovol
Mazdoor skillBd day 0.35 plorcap! lnctudlng placgmentolaand
) Mazdoor day 1.40 lacks, channel, lovelllng 6tc.
Mate day 0.01
) Mazdoorskllled daY 0.06
lrazdoor day 0.24

) 502 503

)
Brid8. Wo*s r l4-Sur.rsrructurc
Bridse works : I 1-sryeEructurc

Sr. Reference to Oescription Unit Quantity Rate Sr. Reference to Desc.lption Unit Quantity Rate
No. MoRT&H Rs. No. MoRT&H Rs.
Specifications
Specifications
c) Machihery
a) Material
Helicalpipes 600 mm diameter RM 1.00
l) Atcastlng y..d
Tie rods 20 mm diameter No 1.00
Generator 1 00 KVA hour 0.05
Consumables for sealing joints etc.
Batching plant@ 20 curdhour hour 0.05
@ 5 per cent of clst of material
Transit maxer4 cum capacity hour 0.10
Concrete pump s€tionary hour 0.05
b) Labour
Crane 35 ton,E capacity hour 0.10 Mate day 0.01
Trailor 30 tonne capacity hour 0.10 Fitter day 005
foader hour 0.05 Mazdoor day 0.20

lU For tr.nspod.tlon .nd placemsnt .t c) Overheads @ % on (a+b)


afte
Crane 35 tonne capacity hour 0.15 d) Contracto,is profit @ % on (a+b+c)
Trailer 30 tonne capacity fcr kansporting t. km 2.51
to site.
Rate per cum = (a+blc.d)
(L-Lead in kllomefe)
Trailor30 tonne capacity during hour 015 14.15. 800 Crash Baffiers
placerrent

The rate analysis for aigid crash barrier in


Cost of foamwoak, steamcuring araangemenl,
re,nforced cement concrete, semi-rigid crash
pretensioning arrangement etc. @ 5 percen,
banier wilh metal beam and fexible crash
ofcost mate al,labourand machinery baarierwith wire ropes have been made and
included in Chapter-8 on Traffic and
d) Ovorhoads @ % on (a+b+c) Transportation

o) Contdcto/a profit@ % on(a+b+c+d) '14.16 800 Painting on Conctota Surfaco I

Rats por cum = (a+b+cld+!l Providlng .nd .pplylng 2 coatB of watsr


based cement paint to unplarto,ed
14.14. 1700 & 1800 Provlding and Iiring helical pipes in concrete surfaco after cloanlng the
voided concrete slabs
.Urface of dirt, dust, oil, grease,
elflorescence and applying paint @ of 1
Unit =l Running metre lltre tor 2 sqm.
Taking oulput = I Running metre

Un{ = sqm
Taking output = 10 sqm

50.1
505
)
Bridg. Wo&s: |4-Supdst uduE Brid8e Wo*s : l4-Sup.rslructE

Sr. Reference to Description Unit Quantity Rate Sr. Relerence to oescription Unit Quantlty Rate
No MoRT&H Rs No. MoRT&H Rs
Speclflcations speclfications
a) Labout b) Materlal
Male day 0.01 Galvanised M.S. Plate 200 mmwide, kg 237.50
Painter day 0.25 '12 mm thick @ 94.20 kg/sqm including
Mazdoor (skilled) day 0.25 5 per cent wastage

) b) Material '1 per cent of cost of steel plate cutting,


Add
Water based paint ofapproved quality Litres 5.00 welding consumables and galvanised nails
) for cement concrete surface
c) Overheads @ % on (a+b)
) c) Overheads @ % on (a+b)
d) contractor's profit@ % on (a+b+c)

) d) Contractor's profit @ %on(a+b+c)


Cost for 12 m= a+b+c+d

) Cost lor 10 sqm = a+b+c+d Rate per metre = (a+b+c+d)/12

Rate persqm = (a+b+c+dll10 Guidelines lail down videt€ MoRT&H Circula.


) Note :

No. RW/N H-34059t 1/96-S&R dated


11.17 2604 Bunied joint 30-11.2000 and subsequent corrigendum
) dated 25.01.2001 may be reffered for
Providing and layinq a burrled expansion expansion ioints.
) jolnt, expansion gap being 20 mm,
covered with 12 mm thick,200 mm wide 14.18. 2605 Filler joint
) galvanlsed weldable structural steel plate
as per lS: 2052, placed symmetjical to (i) Providing and tixlng 2 mm thick
) centre lineoftheiolnt, rcsting f,soly ove. corrugated copper plate in expansion
the top surface of the deck concret€, Joint complete as Per drawing and
welding of I mm dla, t00 mm long Technical SPecific.tions
) galvanlsed nailsspaced 300 mmc/c along
thecentre line ofthe plate,.llas cpecified Unit = Running metre
) in Clause 2604. Taking output = 12 m

) Unit = Running metre a) Labour


Taking output = 12 m Cutting, bending, carrying & fixing etc
day 0.04
) .) Liboul
Mate
day 050
Mazdoor
Mate day o.o2 day 0.50
Mazdoor (skilled)
) Mazdoor day 040
Mazdoor (skilled) day 020
)
)
506 507
)
Bridge Wo*r : I 4-Supc6trucrurc
Bridge Works : I 4-Su!.6lnrclurc

Sr. Reference to Oescriptlon Unit Quantity Rate


No. MoRT&H Sr. Reference to Descriptlon Unit Quantity Rate
Rs
Specifications No MoRT&H Rs.
Specifications
b) Material
Copper plate, 12 m long x 250 mm wide kg 55.00 (m) Providing and tixingln position 20 mm
Area=12x0.25=3sqm thick premouldod joint filler ln
Weight = 3 x 0.002 r 8900 = 53 4 kg sxpanaion lolnt for flxed ends ot
Waslage @ 2.5 per cenl=1.33 kg/54.73 kS Elmply 6upported spanG not
say = 55 kg orceoding l0 m lo cater fo. a
horizontal movement upto 20 mm,
c) Overheads @ % on (a+b) covetod with sealant comPlete as
pe. drawlng and Technical
d) Contractor's profit @ %on(a+b+c) Spscific.tions
cost for 12 m = a+b+c+d Unit = Running metre
Taking output = 12 m
Rale per hetre = (.+b+c+d)/12
a) L.bour
(ii) Provlding and lixing 20 mm thtc:. Mate day 0.01
compre3sible ribr€ board In oxpan6ion Mazdoor day 0.20
lolnt complete .s
per drawlng and Mazdoor (skilled ) day 0.10
Tochnlcal Specific.tions
b) Matorlal
Unit = Running metre Premoulded.ioint fller 'l2 m long , 20 mm sqm 3.60
Takiog output = 12 m thick and 300 mm deep

a) Labour c) Overheads @ % on (a+b,

For carrying, placing & lixlng


dl Contractor's p.ofit @ %on(a+b+c)
Mate day 0.01
Mazdoor day 0.10 cost for 12 m = a+b+c+d
Maz door (skilled) day 0.10
Rate por met.e = (e+b+c+d)/12
b) Matorlal (lvlProviding and fllling loint sealing
20 mm hick compressible fibre board sqm 3.00 compound as per drawingr ahd
2 m long x 25 cm deep
1
Tochnlcal Spocilication with coa,se
sand and 6 percent bltumen by welght
Area = 12x0.25=3sqm
Unit = Running metre
c) Overhe.ds @ % on (a+b)
Taking output= 12 m
d) Contraclor's prolit @ %on(a+b+c) 12 m long 1100 mm wile x 10 mm deep recess

Cost for 12 m = a+b+c+d a) Labour


Mate day 0.02
Rate per metre = (a+b+c+d)/12 Mazdoor day 0.50
Mazdoor (skilled ) day 0.10

508
509
Sridee Worls : l4-Supe.sinctuc Bridg. Wo.ks : l+SuFsiructuE

S.. Reference to Descriptlon Un lt Quantity Rate Sr. Relerence to Description Unit Ouantity Rate
No. MoRT&H Rs, No. MoRT&H Rs.
Specifications Specifications

b) Material a) Labour
Sand cum 0 012 Mate day 0.052
)
Volume12x01,0.01 = 0.012 cum Mazdoor day 1.00
Weight= 0.012, 1400 = 16.8 kS Mazdoor (skilled) day 0.30
)
Bitumen
168t0.06=1ks tonne 0 001 b) Matertal
) Crushed slone aggregale r2.5 mm cum 0.75
c) Overheads @ % on (a+b) nominalsize
) Polymer modilied bilumen kg 77.50
d) Contractor's protit@ % on (alb+c) Galvanised slructural sleel plate 200 mm kg 113.00
) wide, 6 mm thick, '12 m long (2.4 sqm)
Cost for 12 m with 1 cm depth = a+b+c+d @ 47.10 kg/sqm including 5 per cent

) wastage
Rate per m with 1 cm depth = (a+b+c+d)/12

) Note: For ariving at the fnal .ate ot fllerjoints per m


Add 1 pe. cenl lor welding anu loam caulkingy'
backer rod and other incidentals
length and per cm depth of joint filling
) compound, the rates at Sr. No. i). ii), iii) & iv) c) li,lachinery
shallbe added Mini hol mix planl trcu. 0.50
) Smooth 3-wheeled sleel rollerS-10 hour 0.50
14.19. 2600 Asphaltic Plug Jolnt capacity
)
Providing and laying oI asphaltic plugJoint d) Ovorheads @ % on (a+b+c)
) to provide tor horlzontal movement of
25 mm and vertical movement of 2 mm, e) Contractor's protit @ o,4
on (a+b+c+d)
depth of ioint varying from 75 mm lo
) 100 mm, width verylng from 500 mm to Cost lor 12 m asphalt plugjoint= a+b+c+d+e
750 mm (ih traffic dlroctionl, covered with
) a closure plate of 200 mm x 6 mm of Rate por m€tre = (a+b+c+d+etl12
weldable structural 6t6el conforming to
) lS: 2062,.sphaltic plug to consist of Nole: The nominalsize ol aggregatos shallbe 12.5
polymer modified bltumen binder, mmfordepth oljoint upto 75mm and 20 mm
) carefully selected Eingle slze aggreg.te lorjoinis ol depth more than 75 mm.
ol 12,5 mm nomlnal size and a h6at
reslstanttoam caulklng/backe. rod, all as
) per approvod drawings and Speclfi cations

) Unil = Running metre


Taking output = 12 m
)

) 510 51r

)
Bridgc Wo*s : I1-Sup.Blru.rurc
B.idgc Worts : l4-suPesslctuE

Sr. Reference to Description Un it Quantl(y Rate Description Unlt Ouantity Rate


Sr. Relsrence to
No. MoRT&H Rs. Rs.
No. MoRT&H
Specifications
Speclticatlons
14.20 2606 Elastomeric Slab Seal Expanslon Joint d) Conl.actor's prorit @ %on(a+b+c)

P.oviding and laying of an ol.stome c


Costlor 12 m = a+b+c+d
right
slab seal expan6ionroint, cate.lng to
or skew (less than 20 dog., moderately Rate per metre = (a+b+c+dY12
cururd wlth maximum horlu ontal
movement upto 50 mm, complate as por 14.21. 2600 Comprcssion Seal Joint
approved drawings and atandard
specitications to be installsd by the Providing and laylng olcompGssion seal
manufacturedsupplier or lheia autho,ised lolntconsisting ot steel armouGd nosing
aepnesentative onsuiing compliance to the at ttvo edges ol the lolnt gap suitably
manufacfu reds in6tructions for inStallation anchored to lhe deck concrele and a
and Clause 2606 of MoRTtH Speclfcadons p.olormod chloaoprene elastomer or
for Road & Bridge Wor*g closed c€ll loam iolnt seale, clmpressed
and ffxed lnto the loint ga9 {ith special
Unil = Running metre adhesive blnder to cater tot e horizonlal
Taking output = 12 m movement uPto 40 mm and ve ical
movemont ol 3 mm
a) Labout
Mate day 0.06 Unit = Running metre
t{azdoor day 100 Taking ouFut = l2m
Mazdoor (skilled) day 0.50
a) Llbour
b) Materlal Mate hy o.036
Supply ofelastomeric slab sealexpansion M 12.00 lrazdoor day 0.60
joint assembly manufactured by using Mazdoor (skill6d) day 0.30
chlorop.ene, elaslomer for elastomeric
slab unit conforming to Clause-915.1 of b) Materlel
IRC: 83 (Pad ll), comphte as per apprcvd Galvanised angle sections 1 O0 mm x kg 446.@
drawings and standard specilication IOO mm ol 12 mm lhickness weldable
conforming to Clause 2606 of MoRT&H slrucluet sleol as psrlS:2062,2 Nos of
Specifications 12 m length each @ 17.7kglmand5Per
cent wastage
Add 5 percenl ofcost of materialfor anchorage
reintorcemenl, welding and other incidentals Add 5 per cent ot cost ol above lor
struc'tural steel lor anchorage, wolding and
c) Overheads @ % on {a+b) other incidentals

5t2 513

r
I)lidge Wo.ks : l4-SupeBtructurc
Bridgc Wo*s : l{-Supc6lructw

S,. Reference to Description unit Quantity Rate


No MoRT&H
Sr. Reference to Descrlptlon Unlt Quantity Rate
Rs.
No. MoRT&H Rs.
Specifications
Speclficatlons
Preformed contin uous chloroprene M 12.00
elaslomer or closed ceil foam sealing 14.22. 2607 Strlp Soal Expansloh Joint
element with high tear strenglh,
vulcanised in a single operation for the full Provlding and laylng ot. atrlp soal
) expansloh rolnt catering to maxlmum
length otajoint to ensure waterlightness
horlzontal movsment upto 70 mm,
) Add 1 per cent of cost ot sealing element for complete as per approved drawings and
lubricanl-cum-adhesive and other standard specitications to be lnstalled by
) consumables tho m.nut.cturor/6upplloa or tholl
aulhorlsed ropaosentallvo snsualng
) c) compllance lo the manulacluror's
Ove.fteads @ % on (a+b)
lnstruclions fo. lnstallation
) d) Contractor's protlt @ %on(a+b+c)
Unit = Running metre
Taking output = 'l 2 rn
) Cosl for J2 m = a+b+c+d

Rate per metre = (a+b+c+d)/I2 .) L.bgur


) Mate day 0.0s
Note: Mazdoor day 1.00
The installation shall be done by the
) manufacturer or his authorised Mazdoor(skilled) day 0.25

representative to the satisfaction of the


) Engineer b) ttl.tsrial
Supply of complete assembly of strip seal RM 12.00
expansion joint comprising of edge beams,
) 2. The concreting forjoining the expansion
anchorage, strip seal element and
jointassembly with the deck has not been
included in th,s analysis as the same ts @mplete accessories as per approved
) specmc€Ions and drawings
calered in the quantities of RCC deck.

) 3. The anchoring bars of the expansion joant


Add 5 per cent ofcost of rnatedal for andlo-age
reintorcement welding and other incidentals
assembly shall be welded to the main
) reinforcemenl of the deck.
c) Ov.rheads @ % on (a+b)

) d) Contractor's profil @ %on(a+b+c)

) cost for 12 m = a+b+c+d

) Rate per metre E (a+b+c+d)/12

) 5t4
515

)
Bnd8e worls : 14 SupeBElcturc Bndse Wotu : l4-Supcnbuctorc

S.. neterence to Description Unit Ouantlty Sr. Reference to Desc.lptlon lJnit Quantity Rate
R ate
No MoRT&H No MoRT&H Rs
Rs.
Speclrlcatlons Speclfications
Note : The installation shall be dooo by the
manulacturer or his authorised
c) Overheads @ % on (a+b)

reprosentative to th€ satisfacton of the


Engineer
d) Contractor's profit @ %on(a+b+c)

Cost for 12 m modular strip/box seal ioint =


2. The cucreting forioining lhe €xpansion
joinl assembly wilh the deck has not been
a+bic+d
included in lhis analysis as the samo is
Rate per metre = (a+b+c+d)ll2
cateGd in the quantities of RCC deck.

14.23. 2600
Note : The installation shall be done by the
Modular Strl/Box seal Joint
manufactuaer or his authorised
representative to the satisfactjon of the
Providing and taylng of a modular rtrip
Engineer.
box seal expanslon Joint lncludlng
anchorage cateaing to a ho,lzontal
2. The concreting forjoining the expansion
movement beyond 70 mm snd uplo joint assembly with lhe deck haj not been
140 mm, complete a6 per app.oved
included in this analysis as the same is
drawlngs and standard specillca ons
catered in the quantities ofRCC deck.
to be lnstalled by the manufacturer/
supplier or their authorlsed repaesenlatve 3. The anchoring bars dthe expansionjoint
ensurlng compliance to the assembly shall be welded to the main
manuf actuaer's lnstructions f or lnslalldtion reanforceanent of the deck.

Unit = Bunning metre


14.24. 2600 Modular Strip/Box Seal Joint
Taking output = 12 rn

a) Llbour Provlding and laylng of a modular strlp


Mate box 6eal expanslon ,oint catering to a
day 0.056
Mazdoor horlzonlal movament beyond l,l0 mm
day 1.00
Mazdoor (skilled) day 0.40
.nd upto 2r0 mm, comPlete.s per
aPproved drav/lngt and 6tandard
b) ltratertal spocifications to bo installed by the
Supply of a modutar strip/box seatjotnt RM 12.O0 manuf acturea/suppllo. or thelr authorlsed
assembly comprisang of edge beams, representative ensualng compliance to the
conhal beam,2 modulss cfjoroplen€ seal, manufactuaer's lnstructlonS tot
anchorage el€ments, suppod and control installatlon.
syst€m, all steel sections protected
againsl corrosion and installgd by the Unit = Rurning metre
manufacturer or his authorised Taking output = 12 m
rBprEsenlative.

5r6 5t7
)

Bridtc Wo*r: I l-Sup.rrlr|,crw

Sr. Referenco to Oescription


No. MoRT&H
Unlt Quantity Rate ChapE-l5
Rs.
Speclficatlons
River Tralning and Protection Works
r) Labou.
Mate day 0.07 Preamble:
Mazdoor day
Mazdoor(ski[ed) day 0.50
1. Three typss ol aprons on riv6.bed as und€r haytb€en catored.
b) Material
) Supply of a modular strip/box sealjoint RM 12.00 a) Boulderapron laid dry
assembly containing 3 modules/cells and b) Boulderapron laid in wkocrates
) compdsingofedge beams. two central beams. c) Apron laid in cement concreto blocks on M 15
chloroprene seal, aochorage elemenls.
) suppon and control system, all steelsections i. A loe walltor toe protection of pitching can bg easr in dry.ubbl6 masonry (uncoursed) or in nominal
protected against conosion and installed by mix cemenl concreto M 1 5, D€pending upon thrdeslgn, the .ates may be adopted under respectivo
) the manufacturer or his authorised clause6.
representatjve.

) 3. Flooring has bsen proposed in dry rubble stone, ii6lg stooo laid in C M 'l:3 aod with c€mont conctet€
cl Overho.ds @ % on (.+b) blocks M 15.

) d) Cont6ctor'B prorit 4.
@ %on(a+b+c) Curlain walls proposed are of lollowing two typ€s

) Cost for 12 m modular strip/box seal joint


= a) Course rubble slone masonry ('lst sort) in CM 1:3
a+b+c+d b) Cemonl concrete M 15 grade.
)
Rat. per metre = (a+b+c+d)/l2 5. The rate analysis for gabion struclures comprishg of stone bouldors laid in wire crales have been
) Note
included. Such struclures are suited as retainlng structures and lor eaosion conhol in river training
: The installation shalt be done by the works €specially for situalions whero som€ setll€mont ol loundation is anticipated. Those struclures
) manufacturer or his authorised can adjusl in minor settlements, beingflexible slructures, wilhoul losing their tunctional requirement.
representative to the satisfaction of the
Engineer.
)
2. The concreting torjoining the expansion
) joinl assembty with the deck has not
been
included in this analysis as the same is
) catered in the quantities oIRCC deck.

3. The anchoring bars ot the expansion joint


) assembly shall be welded to the main
reinforcement of the deck.
)
)
) 518
5t9
)
)
Bnds. wo*s : ls-RjwTEinins aid Precctio! Wo*s

Chapter-15 Sr Reference to Description Unit Quantity Rate


No, MoRTH Rs,
River Training and Protection Works Specifications
Sr. Reference to Dorcription Unit Quantity Rate 15.2_ 2503 BoulderApron L.ld ln Wire Crates
No. MoRT&H Rs.
Spocitications Providing and Iaying ofboulder apron laid in
wire crates made wilh 4 mm dia Gl wire
15.{. 2503 Providing and laylng boulders apron on conforming to lS:280& 15:4826 in ,00 mm x
river bed for protoclion agalnst scourwith 100 mm mesh (weaved diagonally) including
'10percent extra for laps andjoints laid wilh
stone boulders woighing not less than 40
kg each complcto as per drawing and stone boulders weighing not less than 40 kg
Technical Specifications each.

Boulder Laid Dry Without Wire Crates unit = cum


Taking output = 3 m x 1.5 m x 1-25 m =
5.63 cum
Unit = cum
Taking oulput = 1 cum
a) Mato.ial
4 mm Gl wire crales woven in mesh size sqm 22
a) Materlal of 100 mm x 100 mm
Stone cum 1.00 Slone cum 5.63
Slone spalls cum o.20 Stone spalls cum 1.13

b) Labour b) Labour
Mate day 0.04 Mate day 0.18
Mason day 0.35 Mazdoor (skilled) day 1.50
Mazdoor day 0.75', Mazdoot day '3.00

c) Overheads @ % (a+b) c) Ove.heads @ % on (a+b)

d) Contractor's ptofit @ % on (a+b+c)


d) Contractor's profit @ % (a+b+c)
Cost for 5.63 cum = a+b+c+d
Rate per cum = (a+b+c+d)
Rato p.r cum = (.+b.crd)r5.63
'lncluding excavation for trimming for
preparation ofbed. 'lncluding excavation for lrimming tor
preparaton of bed.

Note : Nominal ex6vation required for preparation


Note Readymade woven wire crate rolls have been
of bed has been taken into account while
considered in the rate analysis. ln case
making provision for labour.
readymade rolls are not available, Gl wire 4
mm dia. @ 32 kg per '10 sqm may be provided-
ln that case 2 per cent of the cost of Glwire
may be added forweaving the wire crates.

520 521
)

B.id8c Wo,k : ls-Riv.r Tniniog .trd Prct .lion Wo*5 Bddr. Wo*5: l5'RivcrTnini4 .rd Ptocdion Wo s

Sr. Reference to Descrlptlon Unlt Quantlty Rate Sl ReferGnce to Desc.iption Unlt Quantity Rate
No. MoRT&H Rs.
Rs. No. MORTH
Specifications Speciflcatlons

15.3 2503 Cement Concrete Blocks (siz6 0.5 x 0.5 x c) Ovetheads @ % on (a+b)
0.5 m)
d) Conttactor's Profit @ % on (a+b+c)
I Providing and laying of apron with cemenl
concrete blocks of size 0.5x0.5x0.5 m casl Rate Pet cum = (a+b+c+d)
I io-situ and made with nominal mix of M '15
grade cement concrete with a minimum B. G€mont Concret Blocks of slze 0'3 x
cement content of 250 kg/cum as per ol
I IRC:21-2000.
0.3 x 0.3 m cast ln cement concrete
grado M 15

I Unil = cum Unit = cum


) Taking output = 'l cum Taking ouFut= I cum

) Concrete grade M l5 cum 1.00


r) Concroto grade X l5
Rate as per item No. 12.E (A) cum 1.00
Rate as Per item No. 12.6 (A)
)
Add 2 per cent of cost lo account for
Add 2 per cent of codto account for nominal
excavalion ior preparation of bed, nomina!
) surface reinforcement and filling ofgranular
sudace teinforcement and filling of granular
material in recesses between blocks
material in recesses belween blocks
) Rate per cum = (a)
15.4 2504 Providing end laying pitching on slopes
) laid over prepared filte. media including
250/ P.ovldlng and laylng filtet material
boulder apron lald dry ln front of toe of 15.5.
embankment complete as p6r drawlng undeaneath pitching in slopes comPlete
) as Por drawlng and Tochnlcel
and Technlc.l Speclticatlons
Specilications
) A. Stone/Boulde,
Unit = cum
) lJnit = cum
Taking outpul = l cum
Taking output = 1 cum

) a) Materlal
e) M.tori.l
Graded stone aggfegate of required size cum 120
Stone weighing notless than 40 kg cum 1.00
) Stone spalls of minimum 25 mm size cum 0.20
b) Laboul
Mate day 0.05
b) Labour
) Mate day 0.04 Mazdoor (skilled) day 0.25
day 1'
Mason day 0.35 Mazdoor
) Ma2door for laying stones, filling of quarry day 0.75
spalls
)
522 523
)

)
B.idgc Wo ! : ls-River TBinint 6nd plotecdo, Worxs

B;dgc wol*l : l5-RjvaTraining tnd Poldtion Wo*s


Sr. Reterence to Oescription Unit Quantity Rat€
No. MoRT&H Sr Reference to Descrlption Unit Ouantity Rate
Speclfications Rs.
No. MoRTH Rs.
Specifications
c) Overheads @ % oh (a+b)
15.7 2504.4 Toe Protection
d) Cont.actor,s profit @ % on (a+b+c)
A toe wall for toe protection can either be in
Rate por cum = (a+b+c+d)
dry rubble masonry in case of dry rubble
pitching or pitching with stones in wire crates
'lncludes Mazdoor required foa trimming of or it can be in PCC M '15 nominal mix il
slope to proper profile and preparation of H. cernent concrete block have been used fo.
pitching. Rates for toe wall can be adopted
15.6. 700 & 2504 ceotoxflto Fttter from respective Clauses depending upo.
approved design. The rate for excavatron for
Laying of a geotextite fitter between pitching
foundation, dry rubble masonry and PCC
and embanknent slop€son whjch pitching is
M 15 have been analysed and given in
laid to prevent escape of the embankment
respeclive chaplers.
rEterial hrough he voids of the stooe pitdi,ngy'
cement @ncrete blocks as well as to allow 15.8. 2505 Provlding and laying floo,ing complete
hee movement ofwater wilhout caeating any
.s per drawing and Technical
uplift head on the pitchihg.
Specllicatlon lald ovea cement concrele
beddlng
Unit = sqm
Taking output = 1O sqm A. Rubble stone laid in cement mortar 1:3

.) Labour Unit = cum


Mate day 0.02 Taking ou$ut= 1 cum
Mazdoo. day 0.3
Mazdoor(ski ed) day .) Coment mort r(l:3)'
0.10
(for rate refer to item No.12-6) 033
b) Matorlat
Permeable synthetic geotextale including sqm cum
11.00 Add for cemenl concrete bedding
5 per cent for overlap and wastage (M '15 Nominal mix) vide item 12.8 (A)

c) Overheads @ % on (a+b) ' Quantity shall be adopted as per design

d) Contracto.'s profit @ % on (a+b+c) Add 1 per cent of cost lo accounl for


excavation for preparation ofbed.
Cosl for 10 sqm = a+b+c+d
b) Material
Rate per $qm = (a+b+c+d),/10 Stone cum 1.00
Stone spalls cum 020 )

524
)
525
)
Aridg. Wo*s : lJ-RivqT6ininE tld ProLction Wod<! Bridgc Wo*s I lstivcrTmining md Pml'olioo Wo*s

S.. Reference to Descriptlon Unit Reference to Descrlption Unit Quantity Rat,


Quantity Rate Sr
No MoRT&H Rs.
Rs. No. MORTH
Speclficatlons Specifications
) c) Labou. b) Labour
Mate day 0.08 Mate days 0.1

Mason day 0.50 Mason days 05


Mazdoor (for laying stones, fillingof day 1.50 Mazdoor days 15
quarry spalis)
Add 1 per cent ol (b) lor trimming and
d) Overheed6 @ % on (b+c) prepa.ation of base

e) Contractor's prorit @ %on(b+c+d)


c) Overheads @ % on (a+b)
)
Rate per cum = (a+b+c+d+el
d) Contractol'6 Profit @ 'tr on
(arb+c)
)
' lncludes cement riotar br laying and filling
ofjoints. Rato Pe, cum = (a+b+c+d)

B. Cemeht Concrete Blocks Grade M l5 2507.2 Curtaln wall compl6tG ta petdr'wing and
15.10.
.) Technlcat SP.ctfic.tlon3
Concreto grade M 15 block cum 1.00
) A. Stone masonry ln cement mortar (1:3)
Rate as per item No. 12.8 (A)
(lstsort) 1.00
) Add for cement concrele bedding cum
Coursed rubble nEsonrY

(M 15 Nominal mix). Rate same as Peritem No 12.7 (A)


)
OR
'Quantity shallbe adopted as perdesign
) B. Cement concEte grado M l5
Add I per cent of cost to accounl for
100
) excavation for preparation of bed.
Rate same as Per item No. 12'8(A)
cum

15.9. 2506 Ory rubble llooring \ Rale per cum s A or B


)
Construction of dry rubbb nooring at qoss
Other items like excavation lor ioundation,
) drainage works for relatively less important Note :
filling behind wall, flter rnedia, weep holes etc
shall be added separatety as per aPProved
) design.
Unit = cum
Taking output = 1 cum
) 15.11. 2507.2 Flexlble APron : Construction otflexible
a) iratorlal apron I m thlck comp.islng of loo6e stone
) Stone cum 1
boulders wglghing not less than '10 kg
Stone spalls cum o.2 boi ond curtaln wtll
)
) 526

)
B dtc Wo.&s | | 5-Rivc. Tminirg ,nd prorecdon Wo*5
Bridg. Worla : I5-Rivcr TdnioS .nd hol..iion Wo*s

Sr, Reference to Description Unit Quantity Rate


No. MoRT&H Sr Reference to Desc.iption Unit Quantity Rale
Specifications Rs.
No. MoRTH Rs.
Specifications
Unit = cum
Taking output = lcum e) Labour
Mate day 0.28
a) Materlal
Mazdoor day 5.00
Stone
cum Mazdoor(skilled) day 2.00
Stone spalls
cum 02
b) Labour b) Materlal
Galvanised steelwirc crates of mesh sze sqm 61.00
Mate
day 0.05 100 mm x 100 mm woven with 4 mm dia
Mason
day o.25 Glwire in rolls ofreqlired size.
Mazdoor
day 1.00 Stone boulders with least dimension of cum
200 mm
Add 1 percent of cost of (a+b) for trimming
Stone spalls of minimum size 25 mm cum
and peparation ofbed.

c) Overheads @ %on (a+b)


c) Ovorheads @ % on (a+b)

d) Cont.actor,s p.ofit @ % on (a+b+c)


d) Contractor's profit @ %on(.+b+c)

Cost for 12.60 cum : a+b+C+d


Rato pe. cum = (a+blc+d)

'15.12. 2503.3 cabian Structure for Retaining Earth


Rate per cum = (a+b+c+d)/l2.60

Note: Readymade woven wire crate rolls have been


Providing and conshuction ofa gabian
strucfure considerod in the rale analysrs. ln case
for retaining eadh wilh segmenb of wire
crates readyrnade rolls are not available, Gl wire
of size 7 m x 3 m x 0.6 m each divided into
4 mm dia. @ 32 kg p€r 10 sqm may be
1.5 m compartments by cross netting,
made provided. ln lhat case 2 per cent ofthe cost
from 4 mm galvanised steelwke
@ 32 kg per of Glwire may be added for weaving the wire
10 sqm having minimum tensile strehqth
o, crates.
3Oo Mpa c.nfcrming tc tS:280 and gaMa;izing
coating conformihg to tS:4826. woven into
mesh with double twist, mesh size not
exceeding ,l00 x 100 mm, filled with boulders
with least dimension of2OO mm. all toose
ends
to be tjed with 4 mm galvanised steelwke

Unit = cum
Taking oqtput = 7 x 3 x 0.6 12.60 cum
=

528
529

--
) _-.Es
Bri&. WodG : I5-Rivd T6jsitrE ud Prer.clio, Wo r Pts{cctifil oild
Brltgc Wo*i : l5-RivdTrnnS tnd

Si, Ilcterence to Oescriplion Unlt Quantlty BEte Sr Reference lo Description U nit Quantity Rate
No. MoRT&H Rs. No. MORTH Rs.
Specilications Speclflcations

15.13- 2503.3 Gabian Structurelor Eroslon Control, c) Overheads @ % on (a+b)


River Tralnlng Works and Protectlon
Works d lcontractor's profit@ % on (a+b+c)

Providing and constructing gabian slruclures CoSt for 6.00 cum = albrc+d
lor erosion control, rivor training works and
protection works u/ith wire crates ol size 2 m
R.te per cum = (a+b+cld)/6 00
x 1 m x 0.3 m each divided inlo 1 m
comparlmenls by cross netting, made lrom Note: Readymade woven wire atate rolls have been
4 mm galvanised steel wire @ 32 kg per considered in the rate analysis. ln case
10 sqm havlng mlnimum tensilo strengnh ol rcadymade rolls are not available, Gl wire
300 Mpa conforming to lS:280 and galvanizing 4 mm dia. @ 32 kg Por 10 sqm may be
coating conforming lo 15:4826, woven into provided. ln that case 2 per cent ol lhe cosl
mesh wilh double twisl. m€sh slze not of Glwire may be added 6r weaving lhe wire
) exceeding 100 mm x 100 mm, lillod wilh crates.
boulders with leasl dimonsion oi 200 mm, all
loose ends to be securely ti6d with 4 mm
) galvanised sleelwire.

)
Iaking outpul = 2 x 1 x 0.3 x 10 Nos. =
) 6.00 cum

) a) Llbour
Mat6 day 0.14
l,/|azdoor day 2.50
) 't.00
Mazdoor (skillod) day

) b) ltlrtrdal
Galvanlssd ste€l wlre crates of mesh slze sqm 65.00
) i00 mm x 10O mm woven with 4 mm dia
Gl wire ln rolls of r€quked size to cover
) 6-00 cum
Slone boulders wlth leasl dimension ol cum 6.00
) 200 mm
Slon6 spalls ot minimum slz6 25 mm cum 1.2

)
)
) 530 531

)
I
)
Chapter-l6 )
Chapter-16
Repair and Rehabilitation )
Repair and Rehabilitation
Preamble:
Sr. Refeaence to Desciption Unit Ouantity Rate
)
No. MoRT&H Rs.

Removalofcement conc@te wearing coatand asphalticwearing


Specifications
coal has been proposed wth pneumaljc
breakers
r 6.1. 2809 Removal of existlng cement concrete
2 The rate for
wearing coat including its disposal
e xte rna I preskessing has been ana{ysed for three diflerent
spans of25,50 and iO0 m complete as pe. technical specification
3 Sealing ofcracks has been proposed with cement grout,
wilhout causlng.ny deldmen(al cffoct to
cement mo(ar (1i.1)groutand epoxy grout any part ot the bridge Etructure and
injecting with grout pumpthrough nipples by
removal of dismantled material with all
4. Bonding of new concrete wih old conqete is proposed
lifts and lead upto 1000 m
with epoxy resin.
Unit = sqm ( Thickness 75 mm)
5. The repairand replacernentoficllo/ing struclures has
been included: Taking output = 10 sqm
(a) Bridgebearings
(b) Expansion Joints a) Labou.
(c) Mate day 0.06
Concrete Railing
(d) Mazdoor day 1.00
Mild steet railing
(e) Crash barier
b) Machlnery
Air Comp.essor 250 cfrn wilh pneumatic hour 1.00
breaker/jack hqmmer along with
ac@ssodes
Traclor-bolley hour 0.50

c) Overheads @ % on (a+b)

d) Contractor's profit @ %on(a+b+c)

Cost irr'10 sqm = a+b+c+d

Rate per sqm = (a+b+c+d)/'|0

't 6.2. 2809 Removal of existing asphaltic wearing


coatcomprislng of 50 mm thlck asphaltic
concrete lald over 12 mm thick mastic
asphalt lncluding dlsposalwith alllift and
lead upto 1000 m

532
533
!
B.idg. Workl : I6-R.pair ed Rchabilit.lion
AridSc Wo*i : l6Rcpd. ed Rehdbililation

Sr. Reference to Descriptlon Unlt Ouantlty Rate Sr. Reference to Description Unit Quantity Rate
No MoRT&H Rs. No. MoRT&H Rs
Speciricatlons Specifications
Unit = sqm
Add 2 per cenl of cosl of material for
Taking output = '10 sqm
miscellaneous consumables, like, nozzles,
wke brush, cotton waste. etc.
a) Labour
Mate day 0.03
b) Labour
Mazdoor day 0.75
Mate day 0.01
Mason day 0.04
b) Machinory
Mazdoor day 0.14
Air compressor 250 cfm wilh pneumatic hour 0.75
breaker
c) iI.chinory
Tracloa-trolley hour 0.40
Compressor with guniling equipment hour 0.10
along with accessories
c) Overheads @ % on (a+b)

d) contractor's profit
d) Overheads @ %on (a+b+c)
@ %oo(a+b+c)
e) Cont6ctot's pmlit @ %on(a+b+c+d)
Cost for 10 sqm = a+b+c+d

Rat. per sqm = (a+b+c+d+e)


Rate per $qm = (a+b+c+d)/10

16.4 2800 Providing and inser(ing nipples wlth


't 6.3. 2407 Guniting concre{e surlace with cement approved fixing compound after drilling
morla. applled with comp,essor alter holes for g.outing as pet Technical
cleanlng 6urtace and spEylngwith epoxy
Speciticatlon including subsequent
complete as per Technical Specificatlons I cutting/aemoval and 6ealing of the hole
I as necessary of hipples after completion
Unil = sqm I of grouling with cemenUEpoxy
Taking output = 'l sqm I
Assuming thickness 25 mm ljnil = Number
Takingoutput= 1 No.
.) Matorlal
Cement kg 16.00
a) Material
Graded sand cum 0.04
Nipples No. 1.00
Wire mesh 50 mm r 50 mm size of 3 mm kg 2.00 Cemenl, fxing compound and
consumables @ 15 per cent of cost
Epory kg 0.67 ofnipple
Accelerator compound forguniting @ 4 k9 0.64
per cent ofweight of cement

5)4 535
Bridgc Works I I 6-Rep!k od R.habilitbtion Bridge Wo*5 : l6_Reptu 6d R'hlbilitltion

Reference to Unit Quantity Rate


Sr. Description Unit Quantlty Rate Sr. Relerence lo DescrlPtlon
No. MoRT&H Rs.
Rs. No. MoRT&H
Speclflcatlons Specifications

b) Labour e) Contr.ctor's p.oflt @ %on(a+brc+d)


Mate day 0.01
Skilled labourfor drilling Rate Pet kg = (a+b+c+d+o)
day 0.08
Skilled labourforfixing nipple and sealing day 0.08
inlets B. Cement mortar (1:t) Groutlng
Mazdoorlor cutting and removing of day 004
nipples Unit = kg
Taking output = 1kg
Add 10 per cent of labour cost fordrilhng holes.
etc. a) Matorial
kg
I Cement including 1O per centwastage
kg 0.55
c) Overheads @ % on (.+b) I Sand including '10 Per c€nt wastage
I Admixtures (anti shrinkage compound)
!
d) Contractor's prolit @ % on (a+b+c) @ 20 Per cent of cost
of cement

Rate per No. E (a+b+c+d)


b) Lrbou.
day 0.08
16.5. 2806 Sealing of cracks/porous concaeto by Mate
day 0.10
Mazdoor (skilled)
lniectlon p.ocoss th.ough nlpples/ day 0.10
grouting complote as p6r Technical Mazdoor

Specilicatlons
c) Machinery
0.10
hour
A. Cement Grout Grout pump with agitator and accessories

d) Overheads @ % on (a+b+c)
Unit = kg
Taking output = 1kg % on(a+b+c+d)
e) Contractor's Profit@
a) I'Iaterlal
Cement including '10 per cent wastage kg 1 10
Rale Por kg = (a+b+c+d+e)
Admixtures (anti shrinkage compound)
16.6. 2800 Patching of damagod conctole sudace
@ 2C p€r cent of cost ofcemenl
with Potymer concreto 'nd curlng
b) L.bour compounds, lnlliator'nd promoter'
Mate day 0.08 avallable in pressnt toamulations, to be
MazdoorSkilled day 0.10 appllod as PeJ lnsttuctions of
Mazdoor day 0.10 manulacturer and as apptoved by the
Englneet.
c) llachlnery
Grout pump with agitator and a@essories hour 0.'1 Unit = sqm
Taking output = 10 sqm for an average
d) Ov.rheads @ % on (a+b+c) thlckness of 25 mm

536 537
&ids. Worrs : l6-R€p!ir rnd Rchlbililrtion Brids! \r'o*5 : l6lcplt td R'htbilil'tion

Unit Quantlty Rate


Reforence to DescriPtion
S,. Reference to Descrlplion Unlt Quantlty Rate Sr. Rs.
No MoRT&H Rs. No. MoRT&H
Speclfications Specifications

a) Labour b) Lrbout 0.08


day
Mate day 0.06 Mate
day 0.10
Mazdoor (skilled) day 0.75 Mazdoor (skilled)
day 0.10
Madoor day 0.75 Mazdoor

b) Mate.lal c) Machlnety
0.10
hotlr
EPoxY lnjection gun
Prepacked polymer concrete based on kg 315.00
epoxy system complete with curing
d) Ovorheads @ % on (a+b+c)
compound, initiator and pronpter including
5 per cent wastage
e) contracto.'6Prcfit@ %on(a+b+c+d)
c) Machinery
Groul pump with agitator and accessories hour 200 Rato Per kg = (a+blc+d+')

d) Ov.rheada Applylng epoxy morta' over letched'


@ % on (a+b+c) 16.8. 2AO4
honey combed .nd spalled concrete
e) Contractor's profit surfa;e and Gxpossd steel rcinforcemenl
@ % on (a+b+c+d)
complele as per Technical Specillcations
Cost for 10 sqm = a+b+c+d+e
Unit = sqm
Taking output = '10 sqm
Rate per sqm = (a+blc+d+e)/10
of epoxy
Note : This item is a proprietory item available in Assume average'10 mm lhickness
rnortar
market as pre-packed polymerconcrete and
is required to be applied as per instructionsof
the manufacturer
.l llatotl.l
kg 2.50
prime coat
Epoxy tesin-hardner mlx for
kg 2.20
Epory rnortar
16.7. 2803 Sealing of cracUporous concrete with l'or E€al coal kg 2.00
Epory G.out by lnjection through nlpples Epory r€sin - hadner mix
complete as per Clause 2803.1,
Add 3 per c€nt cost ol material for
other
like, acetcne, etc and to co'/er
consumables,
unit = kg
Taking output = 'l kg
wasEge
)
a) M.terlal b) L.boui 0.04
day
) Epoxy including 1 0 per cent wastage kg '1.10
Mate
0.50
day
Skilled labour
day 0.50
) Unskilled labour

)
s39
) 538

,)
&Rcpsit atd R'ltlbilit'tion
BndF Wo*r : l6R.pair .nd Rchrbilitstion B;d8.Wo 5:I

Unlt Quantity Rate


Sr, Reference to Description Unit Quantity DescllPtlon
Rate S.. Reference to Rs
No MoRT&H Rs. No. MoRT&H
Specifications Speciflcations

c) Overheads @ % on (a+b) c) Materlal kg 120.00


Cernent 0.15
Sand
d) Contracto.'s profit @ % on (a+b+c)
Coarseaggregale of size
4'75 mm cum 0.15
kg 2.50
Cost for 10 sqm = a+b+c+d Quick setting comPound KL 0.10

Rate per sqm = (a+b+c+d)/10


@ % on (a+b+c)
O Overheads
% on (a+b+c+d)
16.9 2807 Removal of dofectivo concrete, cleaning o) Cont.actol's prcfit@
the audace thoroughly, applying the
ahotcrete mlxtu,e mechanlcally wlth c ist br 10 6qm = a+b+c+d+e

comprea6ed alr under presrure,


Rato Psl sqm (a+b+G+d+c)'10
E
compilslng of cement,6and, coarEe
.ggregates, water and quick setting
compound in the propo lon as pe,
clauso 2807.1, sand and coarse
16.10 2800
::IH:'.#;H[lfi[il,:T:l
ortp'llod conctelo
layr ror reptacoment
aggrcgates conrormlng to lS: 383 and
Tablo I of lS: 9012 respectively, wate. l-lnit = sqm
cement ratio r.nging frcm 0.35 lo 0.50,
Taking output = 10 sqm
donsity of gunite not less than 2000 kg/ _ 10 mm
Assumed thickness
cum, strenglh not les6 than 25 Mpa
and workmanship contorming to a) Mate.ial lffe 1.4
Clause 2807.6. Acrvlic oolymer bonding coat 12.00
kg
ir"|o"J*"'o outed polvme- mortar
""rn"*
Unil = sqm ol strenqth 45 MPa at 28 days
Taking output = 10 sqm, 40 mm average lorwaslaqe
thickness. Add 3 per cent of (a ) above

.) Labour
b) L.bour day O,M
Mate day 050
Mate day 0.04
Skilled labour 0.50
Mazdoor day 0.50 day
Unskilledlabour
Mazdoor (skilled) day 0.50
@ % on (a+b)
c) overheads
b) ltlachlnery
Air compressor 250 cfm hour 1.00 d) Cont.actor's profit @ %on(a+b+c)
Shotcreting equipment hour 1.00
Watertanker 6 KL capacity hour 0.02 Cost for 1O sqm = a+b+c+d

R.to Per sqm = (a+b+c+d)'Ii0

541
540
I
) Bridt. Wo*r : l6-R.pair ud Rchabitir.tion
Bddg€ Wo*s : I 6-Repan dd R.habilibtion
)
Sr. Rete.ence to Description Uhlt Quantity Rate Sr, Reference to Descriptlon Unit Quantity Rate
No MoRT&H
) Rs, No MoRT&H Rs.
Specifications
Speclficatlons
) '16.11. 2805 Epoxy bonding of new cohcrete to old
Assume 12.7 mm dia. Strand in 12T13
conctete
) system. Weight 9.42 kg/m of cable.

Unit = sqm
) a) M.t.tlal
Taking output = 10 sqm
HTS strand including 5 per cent wastage MT 105
and extra lenglh foriacking
) .) ll.terl.l HDPE pipes 75mm dia including 5 per Rlr,,l 112
Epory resin with pot life not less than k9 8 cent wastage
) 60-90 minules and satisfying testing as
Cernent for grouting kg 400.00
perClause 2803.9
Tube anchorage set complete with Nos 8.00
) bearing plate, permanentwedges, Elc.
Add 3 per cent of (a ) above for wastage
Epory kg 6.00
) b) Lrbou.
MS plates for deviatq (where deviator MT 2.10
blocks are not provkled)
Mate
) Skified labour
day 0.04
day 0.50 Add 20 per cent cost ol material for other
tulazdoor
day 0.50
) rnatenals. like. lead sheel, sleeves. deviator
fixtures, etc.
c) Ovorheads @ % on (a+b)

b) Labour
d) Contr.ctor's p,olit @ % on (a+b+c)

Cost io|10 sqm = a+b+c+d


i) For making holes in the structure
Mate day o24
Semi-skilled day 300
Rate por 6qm = (a+b+c+d)/10
Mazdoor day 3.00
16.12. 2810 Providlng external prostress ing with higt
tonsll€ 6leel wlro6/strahds including
il) For making and fixlng anchorages for
cables and placemanl of cablcs
drllllng for passago ofprestressing stesl,
all accossorios forstaessing and strosslng
Mate day 0.44

oporatlon and grouting complete as per


Blacksmith day 3

drawing !nd Technical Speclfi cafl ons


Mazdoor day 8.00

ili) Fo. prost.osslng


Span a6sumed 25m Matdsupervisor day 0.13
No. ot c.bles 4 no.
Fitter day 0.70
No. ofanchomges I no. Mazdoor day 265
Unil = MT
Taking output = 1 MT

) 542 541

)
Briqc Wo*s: tGRep.i.md Rcn,bitirlrion
Bdd8c Wo*i : Ig..pdr.nd R.hlbilitalion
Sr. Reference to Descriptlon
No Unit Quantity Rate
MoRT&H Sr. Reference to Oescrlptbn Unit Quantity Rate
Specitications Rs, No. MoRT&H Rs.
Speclfications
iv) Forg.outing
Mate/Supervisor Epoxy kg 10 00
day 0.13
Mason MS plates for deEtor (where deviator MT 7.00
day 0.70
Mazdoor blocks are not prwided)
day 2.65
c) Machihery Add 20 per cent c6t ot material for other
Stressing jack wilh pump mate.ials, like, lead *reet, sreeves, deviator
hour 4.00
Grouting pump with agitator I fixtures. etc.
hour 1.35
d) Overhoad6 @ % on (a+b+c) bl Labour

ol Contr.c-tor,s p.oft@ % oh(arb+c+d) l) For meklng hoL. ln ths structuie


Mab day 0.08
Rate p.r liiT = (.+b+c+d+.) S€rri-skilled day 8.00
tlaz&or day 8.00
16.13. 2410 Provldlng erternal p,estros6lng with
high
t€nsllo Bteel wlresrstrands includlng li) For m.king .ndtung rnchorage. ,ol
ddlling for passage ofprestre!slhg !teet, c.bl€! rnd plac.lnont of c.bloa
illacccasories for 6kessing and st essing Mate by 1.28
opeEtlon and gaouting completo aa per Blacksmith &y 7
drawlng and Techhlcal Speclllcations Mazdoor day 25.00

Span assumed iii ) Fo. p.estresalng


50m
No. ofcables Mate/Supervisor day 0.2
4 no.
No. ofanchorages Fitter day 1.00
8 ho.
Mazdoor day 4
Unit = MT
Taking output= 3.10 MT lv) Forgrouting
Mate/Supe.visor day 0.26
AssunE 12.7 mmdia Strand in 19T13 Mdson day 1.50
system.
Weight '14.73 kg/m of cabte. Mazdoor day 5

a) Materlal c) Machlnery
Stressing jack wft pump hour 7.00
HTS strand inctuding 5 percentwastage MT 3.'l Groutng pump {,ir agitator tlolr 3
and exlra length forJackinq
HDPE pipes 90 mm dia inctuding 5 per d) Overh.ads
cent wasbge
RM 24 I
I
@ % on (a+b+c)

Cementlorgrouting I e) Cont.actor's profr @ % on (a+b+c+d)


tonne 1.01
Tube anchorage set complete with
Nos. 8.00 I costto.3.10 MT = a+t+c+d+e
bearing ptate, permanent wedges, I
etc
I
Rato p6r MT = (a+blc+dle)I3.10

544
I 545
Brilrc wo*r: I6-Rcp!ir Dd Rlhabilildion
Blidgcwo.l(s: I6-R!p!i!! R.habililslion

Sr. Reference to Descrlption Unlt Quantity Rate Sr. Referenqe to Description Unlt Quantlty Rate
No, MoRT&H Rs. Rs.
No. MoRT&H
Speclflcatlons Speclflcatlon6
16.14. 2810 Providing external prestressing with hlgh ii) For maklng and fixing anchorages for
tensilo iteel wlres/strands including cables and Placement of cablcs
drilling for passage of prostresslng 5teel, Mate day 4
all acc6sodes ror stresslng and strcsslng Blacksmith day 20

operatioh and grouting compteto a6 Pef Mazdoor by 80.00


drawing and Technical Specificatlons
lll) For preitresslng
Span.ssumed : 100 m MaHSupervisor day 0.3
No.ofcables : 6no. Fitter day 1.50
No. ol anchorages : l2no. Mazdoor day 6

Uni(= MT iv) Fo, groutlnq


Taking output = 9.28 MT MatdsupeNEor day 1

Mason day 5.00

Assume 12.7 mm dia. Strand in 19T13 Mazdoor day m


system. Weight 14.73 kg/m ofcable.
c) llrachlnory
a) Ma(erlal Stressing jack with PumP hour 10.00
hour 't0
HTS strand including 5 percentwastage MT 9.28 Grouting pump with agitator
and extra length torjacking
HDPE pipes 90 mm dia including 5 per RM 672 d) Overh6.ds @ % on (.+b+c)
centwastage
Ce.nent for grouting tonne 3.04 e) Conlracbds p,ofit @ %on(a+b+c+d)
Tube anchorage set complete with bearing Nos. 12.00
plate, permanent wedges, etc cost for 9.28 MT = a+b+c+d+e
Epory kg 14.00
MS plates for deviator (where deviator iIT 20.00 Rate per MT = (a+b+c+d+e)/9.28
blocks are not provided)
16.15. 2808 Replacomcnt of beatlnga cofipleto .s pe.
Add 20 per cent cost of material ior other Technlcal Spocltlc.tlonB
matedals, like, lead sheet sleeves, deviator
lixtures, etc. Unit = No
Taking output = 3 No
b) Labour
Lifting of superstructure span by iacking up
i) Formaklng holes ln lhe structu,o ftom below, i.e., by placing the iacks on pier/
Mate day 1.72 abutmentcaps iorspan length of 30 m
Semi-skilled day 18.00
Mazdoo{ day 25.00

546 541
)
B.ilg. Wdts : I tR.prir .nd R.hlbilibtion 8!ids! Wdli. : l&Rrr'nrd R't'bililadon
)
Unit Quantlty Rate
Sr. Reference to Descriptlon Unit Quantlty Rate Sr. Reference to DescrlPtlon
Rs. )
No. MoRT&H Rs. No. MoRT&H
Specifications Specifications
)
a) Llftlng ofspan for As per actuals
b) Cost of Parts to b' replaced
i) Hire charges forjack of40 tonne each 300
3 bearlngs
lifting capacity
ii) Mate day 0.64
c) overheads @ % on {a+b)
iii) Skilled labour day 4.00
iv) Unskilled labour day 12.00
d) Cont6ctor'6 P,ofit @ %on(a+b+cl
I Wooden packing cum 0.15

Costofrepair of3 bearings = a+b+c+d


b) Replacement of bearing
Cost of bearing No. 3 (a+b+c+d)/3
Rate of repalr per bearing =
c) Ovorho.ds @ % on (.+bl
induded in this
Note: The re.tification of 3 bearings
lh€ larE side of the span'
d) Contr.ctoC6 proltt @ %on(.+b+c) analysis are on

Cost i9r replacement of 3 bearings = a+bc+d


16.17- RoPlacemsnt ol ErPanslon lolnts
colrlPlete as Pet d'awlng6
Rato por No. = (r+b+cld)r3

Note:
Unit= l Running rnetrg
The vlork enlaib Epbce.nent of aI he bearings
Taking olQut = '12 Running rnetre
on one side of lhe span

16.16 2808 Rectlficatlon of bearings as perTechnical


al Material 9.6
old kg
Epory for bonding new concrete to
Specifications
concrete@08kg/sqm 3.6
Concrete M 30
Unit =1 No.
Takingoutput=3No
bt Llbour
a) Llftlng of supeGtructu.e span by Removal of old expansion joint including
lugs and
Iacklng up f.om below, I.e., by placlng breaking of concrete, cutting of
.

tho lacks on plerrabutftent cap5 tor shlfring ot broken rEterial, etc'


day 0.26
Epan length ot30m Male
day 6.00
Mazdoo.
day 0.50
i) Hlle charges foriack of40 tonne liffing each 3.00 Mazdoor (SkiH)
capa.ity
ii) Mate day 0.64 c) overhsad8 @ % on (a+b)

labour
iii) Skilled day 4.00
@ % on (a+b+c)
Unskilledhbour
iv) day '12.00
O contractot'r Prof[
I Woodenpacking qrm 0.'15 Co6t 60r replacenEnt of 12
RM = a+b+c+ d

Rsto Per RM B (.+b+c+d)'12


)
548
549 )
)
_i !( l:
I
Bidt. Worts : l6'R!ptir ud Rchabilit.tion Bridsc Wo*s I l6R pln lDd RehabiliLlion

Unlt Quantlty Rate


Sr. Reference to Descrlptlon Unlt Quantlty Rate Sr. Reference lo DescrlPtlon
Rs.
No. MoRT&H Rs. No. MoRT&H
Speciflcations Specificatlons

Note : The rate for the installation ofnewexpansion a) Labout


joints may be taken from lhe chapter on Labour for drsmantling old ralllng and
) superstructure. Broken concrete will have to disposal of dismantled material
day 0.40
be replaced which has been included in this (i) Mate
day 10.00
) analysis. (ii) Mazdoor

) 16.18. Replacament of Damaged Concrete b) Machlnery


hour 1.00
Ralling Tractor-trolley for disposal of drsmantled
material
)
Unit= Running rnetre
c; Overheads @ % on (a+b)
) Iaking ouFut ='10 Running metre

d) Contractor's proflt @ % on (a+b+c)


a) Ltbour
)
Labour for dismantling old railing and
disposal of dismantled material Cost for 10 m = a+b+c+d
) (i) Mate day 0.20
Rate Per melre = (a+b+c+d)r1o
(ii) Mazdoor day 5.00
) new qash
b) Machlnory Note : The rate {or the construction of
Chapler 8 on
balrier may be adopted lrom
) Tractor-bolley for disposal ol dismantled hour 1.00
Traffic and Transportation
material

) Replacement of Oamaged
Mild Steel
c) Ove.heads @ % on (a+bl 16.20
Railing
) d) Contrecto,'s profit@ % on (a+b+c)
Unit= Running metre
) Taking output = 10 m
Cost for 10 m = a+b+c+d

al Labour
) Rate per motre = (.+b+c+d)/10 Labour for dismantling old railing
and

disPosal of dismantled material


Note The rate lor the provision of new railing may day 0.,l6
) :
(i) Mate
be adopted from the chapter on superstructure day 4.00
(ii) Mazdoor
) 16.19 Replac€ment ot Clash Baraior bl itrchlnory hour '1.00
TBclor-{rolley bf dhposal of disBrantled
) Unit= Running metre matsrial
Taking ouFut = 't0 Running metre
) c) Ovefioads @ % on (a+b)

)
551
) 550

I
I
)

FRcplntDd R'hsiliBtion
Bridt Wo*s: l6-Repair and Rchabilit tion Bndg. worl6 : ,
il Ufllt Quantity Rate
)
Sr. Reference to Oescription il Reference to Desc.lg6on Rs.
Un Quantity Rate Sr.
No. MoRT&H Rs. No MoRT&H )
Speclfications Specilications

d) Contractor's profit@ % on (a+b+c) RBpalr of Rcc R{ing )


16.22.
Cost for 10 m = a+b+c+d
Carrying out repair
ot RCC railing
to bring it to i
Ra(e per metre the originalshaPe'
= (a+b+c+d,/lo
)
16.2'1. Repair of Crash Baffier Unit= Running m€le
Taking outPut = 10m )
Repairof concrete crash banierwilh cement
is to the extent of
concrete of M 30 grade by .utting and It is assumed thatlbmage )
trimming the damaged portion lo a regular 1O Per cent'

shape, cleaning the area to be repai.ed


.l MatGri.l
)
thorougly, applying cement concrete a:.er cum 0.1
M 30 qrade cer'nt
concrete
erection of proper formwork.
Rate as Per iteris 14
't )
Unit= Running metre MI 0 013
Taking output = '10 m HYSD reinforcsnent )
Rate as Per itstE 14'2
damage is to the extent of
It is assumed that
10 per cent of the volume of concrete. This
I

I
)
b) l,"abouf day 0.016
willrequire 0.30 cum of concrete. i
I
Mate
Mazdoor
day 0.2 )
.) Manpowor'
Mate day 0.04
' Fordrsmantlingandtrimmingthe
strriace )
iilaudoor day 1
*o t"moval ol damaged
a"u *"i"t "n+
Fordlsmant ing and trimming the surlace matedal. )
to a regular shape and Grnoval of damaged
rEterial.
I
c) overheads 6t % on (b) )
b) Iti.torlal d) Contr.ctor's Fofit @ %on(b+c)
)
M 30 grade concrete cum 0.3
This may be pdced based on the rate Cost for 1O m = a+blc+d
given ln the Chairter on Superstruclure. )
R.te Per mette =ts+b+c+d)''10
c) Ovorhoads @ o/" on (a)

d) Contr.ctodr p,otit @ % on (a+c)

Cost for 10 m = a+b+c+d

Rate per m = (a+b+c+d)flo

553
552 I
Bridsc Worts : t 6[r.prn .rd R.fi,bitii.lior

Sr. Reference to
Descrlption
No. MoRT&H Unlt Quantity Rate
Specifica ons ChaPter'l7
Rs.

't6.23.
Repalr o, Steet
Usage Rates of Plant and Machinery
R.iling
Sr. Descrlption of Output of Machlne Usage Rates ih Rs.
Repair o, steel railing Io
bring rt lo the oriornal No.
snape Machine Activity Unit Output Unit Rates

It is assumed that lhe 1 DozerO-50-A 15 Sp.eading c1lny'hour 200


damage lo the steel perhour
ra mg is lo the exlent of 10 per Cutting cum/hour 100 1423
cenl Cleadng curvhour 150

Unit= Runnjng metre


Taking output 1O m 2 Doze. D+o-A 12 Spreading cunvhour 300
=
Cutting cumlhour '150 perhour 24C0

a) ll.teri.l ClearirE 250


Mild sleel ISMC series
k9 29 3 MotorGrader 3.35 met e blade Clearing curdhour 200
Ftat iron
MS Eott and nuts
kg t0 Spreading cum/hour 2N perhour 1545

Add 5 per cent of cost of rhaleaial kg 1 GS8 cun hour 50


for cufivhour 50
pamting

4 Hydraulic Excavator of SoilOdinary curvhour 60


b) Lebour 1

cum bucket Soil [Iarshy cum/hour 60 perhour 840


Mate
day 0.016 SoilUnsuitable curvhout 60
Mazdoo. (ski[ed)
day 0.2
Mazdoor
day o.2 5 Front end loader 1 cum soilloading crrfirhour 60 perhour ..520
bucket capacity Aggregate loading curn/hou I
c) Overheads @ % on 1a+6y

d) Contractor's profit 6 Tipper-s cum Transpodation of Capacity in per km 15.6


@ % on 1a+6+6; soil, GSB, WMM, 5.5 per

Cost of repair for 1O Hotmix etc. tonne. km \ r.za


m = a+b+c+d perhour \ 200
Cost otmetro
= (a+b+6+d)/lO 7 Vibratory Roller I tonne Eadh/Soil currhour '!00
GSB curvhour 60 perhour g4
cunvlour 60

8 SmoothVvheeled Roller SoilCompaclion cunvhour 70 perhour \ 297


8 tonne BM Com'paclion curdhour

I Water Tanker Water Transport capacity 6 per km 15.6


in KL

5s4
555
i

Blilac work: l?-Ussse P.atB fGPk A Mlchinay Blillt.work: l?'U3TXtt!s for n! &Mtdincry

Sr. Description ol Output of Machlne Usage Rates in Rs. Output of Machine Us e Rates ln Rs
Sr. Descdption of
Unit Output Unit Rates I
No. Machine Activity Unit Output Unit Rates No Machine Activil
10. TEctor Pulling Capacity 50 perhour cufiVhour 30 per hollr 738 )
25. TandemRoad Roller Rollingd^sPalt
in HP
Surface
)
'11 Rotavalor cun hour 25 perhour 25
.\ 802
Scarifying 11
RollingrdAsphalt cun hour Perhour
Pneumatic Road Roller
26.
Surface
)
12 Ripper Scarifying cunvhour 60 Perhour 18

27 PoLHole RePairMachine Repair4ot-holes cufirhour 4 perhour 585


)
13 AirCompressor GeneralPurpose capacity 170t perhour 206
in cfm 250 1500 perhour 124
28 Bitumen BoiierOil Fired B itumefiSPraying caPacitY )
in htre
14. Wet NIix Plant 60 TPH cum/hour Perhour n7
cum/h.-Jr 40 perhour 670 ,
29 GSB Plant 50 cum Prod'rceGSB
15 Mechanical Broom Hydraulic SurfaceCleaning sqm/hour 1250 perhour 230
MasticEaring capacitY 1 perhour 40 )
30 MasticCooker
Eitumen Pressure Distriblrtor Applying bitunten sqrrhour 1750 per hour 692 Coat intonne
tack coat )
31 Batching and Mixing Plant
17 Emulsion Pressure Distributor &plying emulsion sqEvhour 1750 per hour 516
a) 30 cum capacity ConctEa Mixing curvhour 20 per hour 1440
1200
)
tack coat cu6vhour 13 per hour
b) 1 5-20 cum caPacity ConcreMixing

45 get hour m0 )
18 Hotmix Planl - 120 TPH DBI\,4/BM/SDC/ curnhour 40 perhour 15100 Transp.tation of cudrhour
32 Transit Mirer 550
capacity Premix Concr.El Mix to Site
3 Per hour
)
perhour 33 perhour 165
19. Hotmix Plant!100 TPH DBI\4/BM/SDC/ currhour 30 11167 Pumpi!ofCo cufiVhour
capacity
33 Concrete PumP of45 & 30
cunvhour 22 )
cum capaci9

20 Hotmix Plant-60 to 90 TPH DBM/BM/SDC/ cunvhour 25 pea houf 8930


34 Cranes
)
perhour 825
capacity Premix Lifting Arpose
a) 80 tonnes per hour 560
b) 35 tonnes Liftingtu.Pose )
21. Hotmix Plant-4o to 60 TPH DBM/BI\4/SDC/ 17 perhour 7150 perhour
c) 3 tonnes LifringturPose
capacity Premix )
perhour 10
Concrete Bucket For Pring capacity in 1

22. Paver Finisher Hydrostatic PavingofDBM/ CUflhOUT 40 perhour 1725 Conc.ra cum
with sensorcontrol 100 TPH EIWSDC/Premax
I
80 per hour 200
Kerb l&king Rrrl4lour
KerbCasting Machine
Paver Finisher Medranical Paving of W14 M currlhour 40 per hour 629
36 ,
lOOTPH Paving ofDLc cufivhour 30 per hour 629
37 conctete Mixer per hou. 150
ConcJrb Mixing c!filhour 2.5
a)0.4/0.28 cum 7.5 hour 150
24 Hydraulic Chip Spreader Surface Dressing sqnvhour 1500 perhour 1700 Concrtb Mixing CUftVhOUI Per
b) 0l cum
)
556 5s1

.-*E--rrIEEiaii;**
Brid8c Wo*, : l1.U,rg. R.lics for Plad & Mrchincry

Sr. Oeecriptlon of Output of Machine Usage Rates in Rs


No. Machlne Activity Unit Output Unit Rates

38 Pilng Rig with Baotonite 0.75 m dia to'1.2 m Rny'hour 2to3 Perhour \3525
Pump dia Boring
Attachment

I t a (La\-
39 Concrete Paver Finigherwith Paving of Concrete curwhour 20 perhour I
1850 ltzool I
)
40 HP Motor surface
I
40 lniegrated Slone Crushea Crushing ofSpalls TPH r00 per hour 5590
) Crushing ofSpalls TPH 2@ Perhour \ 11760

) 41 Prestressing Jack wilh Pump Stressing of Steel pea hour ,83


3 Access WIreJStands
) 42 Generator
ai 't 00 KVA per hour
-t
Geoeration of Electri 100 450
) b) 33 r(vA Energy 50 perhoor
]*ao
) Pft:umafic Sinking Plant Pneumatic Sinking cum/ 1.51o per houa 2690
of Wells hour 2.O0
)
44
I

I
Truck 5.5 cDm pgr '10 tonnes MateialTransport capecity/ 4.5 perkm \ 14.5
) per tonne klr 1.6

-_l Roird I\.42rkin! iUachine


i
perhour 60
) 45. Road lvlarking SqnVh OU 100

4ri. ,,4obile Slurry Seal Mixing and laying SqnVhour 2700 perhour *.,0*
) Equiprnent slurry seal I

) llote : Ihe usage rates given above are for the base year 2001-2002. Fo. subsequent years,
escelation is required to be added depending upon the market situation.
)
') i

)
;)
t)

')
558
,) 7
ry

\
\z \'. rV \. \rE

You might also like