You are on page 1of 41

Ballast Rock Sources Location

Montevideo - Paso de los Toros


Railroad Track

Available Quarries and Rock Qualities

Noviembre del 2016


Montevideo – Paso de los Toros Railroad Track
Ballast Rock Sources Locations
Available Quarries and Rock Qualities

Ballast Rock Sources Location


Montevideo – Paso de los Toros Railroad Track

Introduction
This report compiles the available information about the ballast rock sources (quarries) for the Montevideo – Paso de
los Toros railroad track. It has been defined a 80km buffer both sides of the track and each open quarry was mapped,
classifying them according to the legal framework that allows to operate (see Map #1, #2 and #3).

There are two legal and administrative alternatives for rock exploitation in Uruguay: 1) according to the “Mining Law”
(Law #15.242) managed by the Dirección Nacional de Minería y Geología – DINAMIGE (the National Directorate of
Mining and Geology); and 2) according to the inventory of public works quarries manages by the Ministerio de
Transporte y Obras Públicas – MTOP (Ministry of Transport and Public Works).

There are several issues about the legal framework, operative, and primarily the destination of the quarry products for
each alternative. The DINAMIGE’s mining permits are granted to any person (individual or legal entity) local or foreigner
who demonstrate its financial capacity to develop the mining project, describe and quantifies the rock to be mined, and
obtains the environmental permits. Any requirement for the mining permission is listed in the 100th article of the “Mining
Law”. This kind of product (crushed stone) is classified as “Class III” underground materials that need to be transformed
before used. All products pay taxes (5 to 10% of its commercial value).

The usual deadlines for DINAMIGE’s permits are 12 to 18 months. Any open quarry in the buffer area has gone through
a long period of paperwork until their permits were granted. Also, each one has the required environmental permits
(previous environmental authorization and operation environmental authorization).

The MTOP’s quarries are not conditioned by the Mining Law. This permits are granted with the sole purpose of
supplying materials to state constructions (mainly roads) for a construction company that applies for a specific tender.
That company must process the environmental permits and define an operation & closure plan for the quarry. Usual
deadlines for MTOP’s quarries are 2 to 8 months.

Strategic Issues
For the railroad supplying of ballast in the Montevideo – Paso de los Toros track, could be 4 strategies:

1) Buy the specific needed rock (30-50mm in size) with the best properties from commercial open quarries;
2) Try to rent a commercial open quarry and produce the required materiales;
3) Apply for a new DINAMIGE’s mining permit (or the required mining permits) along the railroad track;
4) Use existing quarries in the MTOP’s inventory. Must process the change in destination and corresponding
new environmental permits.

Strategies 1 to 4 implies that geological, geotechnical and engineer test were conducted and the rock deposit, its
mineralogy and texture, reserves, and engineering properties satisfies the project requirements.

Each strategy has benefits and setbacks:

1) Buy the product: the benefit is the possibility of having ballast that meets all the project requirements without
being involved in the production. Obvious trouble is price.

2) Rent a quarry for self-production: the company could control the production rates and take a close look at
the quality of the product. Price for ballast should be lower than strategy #1. Main problems are: the rental

Lic. Alejandro Schipilov


GEOLOGO
Montevideo – Paso de los Toros Railroad Track
Ballast Rock Sources Locations
Available Quarries and Rock Qualities

must be approved by DINAMIGE (bureaucracy delays), the leasing company must obtain new environmental
permits. The company must be involved in quarry – crushing rock operative.

3) Apply for new DINAMIGE’s permit/permits: full control of the process, lower costs. The main problem is time
(mining and environmental permits require 12 to 18 months for each quarry until operative);

4) Using MTOP’s quarries: ballast don’t pay extraction taxes, final cost is blasting + crushing + transport to the
railroad. Change of target of the quarry product could be 6 to 8 months and needs to obtain new
environmental permits.

Commercial Quarries
Each commercial quarry has an DINAMIGE’s identifier and a specific area for mining development (a parcel, a portion
of a parcel or several ones). The listed quarries have crushed stone as authorized commercial product and could sell
the required particle size for the project. Some of the quarries do not meet some of the engineering specifications or
do not have the asked essays.

DINAMIGE As. 48/1984


This quarry is located in Canelones, at the east of Montevideo at 26.1km of paved road (R101, R102) from the +12.4km
of the railroad track (at the point where the railroad crosses the 102 Rd). Owner is STILER S.A. and the rock is non-
operative but has the mining permits up to date. Environmental permits need revision to increase production rates.
Main problem is the proximity of housing.

Flooded 48/1984 quarry.

Muscovite-garnet foliated micro-granite. Two-micas granitic gneiss (muscovite/biotite) with well-


developed foliation.

Lic. Alejandro Schipilov


GEOLOGO
Montevideo – Paso de los Toros Railroad Track
Ballast Rock Sources Locations
Available Quarries and Rock Qualities

Pegmatitic dikes cutting granitic-gneisses. Muscovite-gneiss.

The exploited rock is a very foliated granitic gneiss with high lateral variations in nature (texture, rock type). Crushed
stone were produced here for road construction (asphalt mix, cement mix). Old Los Angeles data is 32.3% and reserves
are higher than 200.000m3 of bulk rock.

DINAMIGE As. 3511/2013


The quarry is located in Canelones, at the South of Soca’s town at 61km from the point where the railroad crosses the
102 Rd (R8, R101, R102) at +12.4km in the railroad track. Owner is URALCOR S.A. and the quarry is operative (in the
first stage of development). The installed production rate is 100 ton/hour of crushed stone of several sizes.

Uralcor SA has mining and environmental permits up to date. Contact is Mr. Flavio García Repetto (cell phone:
099.840.080).

Provided essays are:

• Density (bulk): 2.691 g/cm3


• Micro Deval (humid, 14mm): 9.8
• Los Angeles (“B” grad.): 28.3%
• Magnesium sulphate durability: 1.7%

Kind of rock exploited for Uralcor SA at 3511/2013 permit.

Lic. Alejandro Schipilov


GEOLOGO
Montevideo – Paso de los Toros Railroad Track
Ballast Rock Sources Locations
Available Quarries and Rock Qualities

It is a gray granite with pertitic-microcline mega-crystals, with quarz and oligoclase in the matrix. Accessory minerals
are pyroxene, poikilitic amphibole, biotite, apatite and zircon.

Soca granite sample.

DINAMIGE As .1316/2011
Quarry (“Cantera San José”) located North of San José city at 6.5km (unpavemented road) and 38.4km (pavemented
road) from +63.6km of the railroad track in the 25 de Agosto town (R11). Owner is Mr. William Porley (phone 4340.2405,
williamporley@adinet.com.uy). He said the quarry is operative and have the mining and environmental permits up to
date.

Essays:
• Simple compression (5 samples): 650.1 kg/cm2, 614.9 kg/cm2, 648.9 kg/cm2, 655.8 kg/cm2, 713.0 kg/cm2
• Los Angeles (“B” grad.): 23.0%
• Relative density: 2.561 g/cm3
• Absortion: 0.64%

DINAMIGE As. 1240/2006


This quarry is located far away from the 80km buffer. It is 175.5km North of Paso de los Toros but it is included here
because it has a very low Los Angeles coefficient for basaltic crushed stone (12%). The commercial name is “Altos del
Sur S.A.” quarry and has straight access from 5th Rd and the possibility of railroad transport of ballast. Permits – mining
and environmental – are up to date. It has 200 m3/day of 30-50mm production rate already installed and was supplying
material for the railroad near Tacuarembó.

One of two crushers in this quarry.

Lic. Alejandro Schipilov


GEOLOGO
Montevideo – Paso de los Toros Railroad Track
Ballast Rock Sources Locations
Available Quarries and Rock Qualities

Quarry front near the top of the hill. Fresh massive-basaltic sample.

Different sizes of crushed basaltic stone in Altos del Sur S.A. quarry.

DINAMIGE As. 592/1948


Canteras Montevideo S.A. quarry is the biggest one of its kind in Uruguay. It has an installed production of 50.000
ton/month of granitic crushed stone of different sizes. It is located into Montevideo, at 32.7km of the point where the
railroad crosses the 102 Rd (Carrasco Rd, R101, R102). Mining and environmental permits are up to date. Reserves
are bigger than 1.200.000m3 of bulk rock.

Rock classification into the quarry.

Lic. Alejandro Schipilov


GEOLOGO
Montevideo – Paso de los Toros Railroad Track
Ballast Rock Sources Locations
Available Quarries and Rock Qualities

Discharge of bulk rock in the primary jaw crusher.

Tertiary circuit.

Tertiary circuit.

Tertiary circuit.

Lic. Alejandro Schipilov


GEOLOGO
Montevideo – Paso de los Toros Railroad Track
Ballast Rock Sources Locations
Available Quarries and Rock Qualities

The rock is a biotite-granodiorite of fine to medium grain size mixed with a leucocratic fine-grained granodiorite.

Biotitic granodiorite. Fine grained leucocratic granodiorite.

DINAMIGE As. 386/1999


This quarry is located in the border between Colonia and San José departments at 75.5km by pavemented road of 25
de Agosto town (R23, R11). The owner is TEBLIX S.A. and has mining and environmental permits up to date. Reserves
are bigger than 350.000m3 bulk rock and the quarry is operative.

Los Angeles essays shows 25% for grad. “B” (14-20mm) and 32% for grad “C” (5-14mm). Rock is a coarse grain
granite.

MTOP Quarries
Each described quarry has an identifier provided by the Ministery (MTOP). Not all of them were visited, nor have essays
data.

MTOP S-009
Located in Montevideo, near Canteras Montevideo S.A. at 32.7km of the +12.4km railroad track (102 Rd and railroad).
The quarry exploits the same rock as Canteras Montevideo SA (fine grained granodiorite) but it is at the end of its
resources, maybe there are less than 10.000m3 of bulk rock.

MTOP S-005
Quarry located in Montevideo, near the border with Canelones at the West of the railroad at 12.4km of 102 Rd and
railroad. There are no data about crushed stone production but its listed as a product. In this place the rock is a reddish
biotite granite of medium grain size. No other data provided.

MTOP S-004
Located near MTOP S-005 at near 6km of the 102 Rd and railroad. Same rock, no information about production.

MTOP R-017
Located near the 5th road in Tacuarembó, at 11.4km by pavement road (R5) from the end point of the railroad track. It
is an old quarry without fresh rock front unless it has crushed stone as a product.

Lic. Alejandro Schipilov


GEOLOGO
Montevideo – Paso de los Toros Railroad Track
Ballast Rock Sources Locations
Available Quarries and Rock Qualities

MTOP R-017 quarry looking at north. At left: road N° 5.

MTOP R-013
Old quarry near 5th Rd at 68.5km North of the end of railroad track. Decomposed basaltic rock. No data available.

MTOP R-012
Quarry located near 5th Rd at 29.5km North of the end of railroad track. No data available.

MTOP Q-008
Old quarry of basaltic ballast near the railroad track in the North of Durazno, near the border with Tacuarembó and
Paso de los Toros city. The quarry was used for ballast, has old discharge hoppers with railroad deviation. The quarry
is nearly exhausted, very close to the limits of the permit. Could be possible to expand the limits and use the same
basaltic rock in the surroundings or maybe explore the quality of the rock below the current floor. In this case, reserves
could be more than 150.000m3 of bulk rock.

Quarry MTOP Q-008, discharge hoppers, railroad and Paso de los Toros city.

Lic. Alejandro Schipilov


GEOLOGO
Montevideo – Paso de los Toros Railroad Track
Ballast Rock Sources Locations
Available Quarries and Rock Qualities

MTOP Q-007
Granitic rock quarry with more than 350.000m3 of bulk rock reserves. Located near route N°5 at 1.2km at the East of
the +199.4km of the railroad track. Los Angeles essay is 26.1%.

MTOP Q-007. Granitic rock quarry near 5th Rd.

MTOP O-008
Quarry located in the Florida department, 11.7km to the East of the +111.9km of the railroad track. The permit has big
reserves of a gray granodiorite of medium size grain with biotite and amphibole. Fresh rock. No other data.

MTOP N-014
Quarry located to the North of road N° 14 in Flores department at 34.6km to the West of the +206.5km of the railroad
track. No available data.

MTOP N-001
Big quarry located near route N° 3 in Flores, at 52.4km of +206.5km of the railroad track. It was used for construction
and reparation of pavement of several routes. Grayish biotite-granite of medium size grain.

MTOP M-004
Very old quarry at the North-west of San José city. Located at 38.4km of 25 de Agosto town. No data available.

MTOP A-036 & A-010


Two quarries located one next the other in Canelones, at 26.6km to the East of the +12.4km of the railroad track. Both
quarries in operation. No data available.

MTOP A-032
Located near DINAMIGE 3511/2013. Same rock, we can assume same essay values. Non-operative.

Lic. Alejandro Schipilov


GEOLOGO
Montevideo – Paso de los Toros Railroad Track
Ballast Rock Sources Locations
Available Quarries and Rock Qualities

MTOP A-031
Located near Soca’s town in Canelones, at 61.3km at the East of +12.4km of the railroad track. Crushed stone capable
rock is the floor of an old coarse arid quarry (base of weathering profile). No data available.

MTOP A-027
Located in Canelones, at 7.6km to the West of +18.4km of the railroad track. The quarry exploited the thick weathering
profile of a reddish biotite-granite and now is crushing the unweathering floor. No data about quality.

Summary Table
Distance
Railroad Reserves Los
Code UTMx UTMy to Rock type
progressive (m3) Angeles
railroad
DINAMIGE 48/1984 592410 6150315 27.0km +12.4km Granitic gneiss >200.000 32%
DINAMIGE 3511/2013 625340 6161800 62.5km +12.4km Granite >400.000 28%
DINAMIGE 1316/2011 520730 6206300 44.9km +63.6km Granite ± gneiss ±200.000 20-25% *
DINAMIGE 1240/2006 613750 6503740 175.5km +273.7km Basalt >100.000 12%
DINAMIGE 592/1948 583850 6142250 34.5km +12.4km Granite (granodiorite) >1.200.000 12%
DINAMIGE 386/1999 500000 6225500 75.5km +63.6km Granite >350.000 25%
MTOP S-009 583060 6142040 34.5km +12.4km Granite (granodiorite) <10.000 12-15% *
MTOP S-005 566350 6154700 12.4km +12.4km Granite ±150.000 20-25% *
MTOP S-004 568930 6153250 5.9km +12.4km Granite ±30.000 20-25% *
MTOP R-017 547060 6380720 11.4km +273.7km Basalt ±60.000 25-30% *
MTOP R-013 572670 6430440 68.5km +273.7km Basalt <30.000 >25% *
MTOP R-012 555700 6397140 29.5km +273.7km Basalt ±36.000 20-25% *
MTOP Q-008 545510 6367415 0.0km +271.2km Basalt ±150.000 15-20% *
MTOP Q-007 546960 6301620 1.7km +199.4km Granite (gneissic) >350.000 26%
MTOP O-008 578400 6219600 13.8km +111.9km Granodiorite >500.000 15-20% *
MTOP N-014 514740 6294780 35.1km +206.5km Granite ±120.000 20-25% *
MTOP N-001 512960 6281030 52.4km +206.5km Granite >400.000 15-20% *
MTOP M-004 519790 6208240 37.4km +63.6km Granite ±50.000 20-25% *
MTOP A-036 591800 6157700 29.4km +12.4km Granite <15.000 20-25% *
MTOP A-032 624770 6161900 62.5km +12.4km Granite ±300.000 25-30% *
MTOP A-031 625615 6161950 63.7km +12.4km Granite <70.000 25-30% *
MTOP A-027 566680 6155070 7.5km +12.4km Granite <50.000 20-25% *
MTOP A-010 591600 6157610 29.7km +12.4km Granite ±100.000 20-25% *
The asterisk near the “Los Angeles” shows probable values.

Geological Availability of Ballast Rock


It was already submitted the document – in Spanish – about the availability of rocks that could be used as ballast
source. In this document the maps are exposed again to show the location of each quarry listed above over the geologic
map of Uruguay.

Recommended Rock Sources


Divided the railroad track in 3 or 4 segments, could be the same number of sources for ballast. At the south, rocks like
Canteras Montevideo’s are the best choice (DINAMIGE 592/1948). Unfortunately, there is no chance to open a new
quarry in the area. MTOP S-009 is located a few meters from this one, but it’s reserves are very low.

Lic. Alejandro Schipilov


GEOLOGO
Montevideo – Paso de los Toros Railroad Track
Ballast Rock Sources Locations
Available Quarries and Rock Qualities

In Florida, the best choice is MTOP O-008. It is a big and deep quarry of a gray fresh granite in a large surrounding
permit.

Near Durazno, best choice could be MTOP Q-007. It has high Los Angeles value (26%) but probably in a second level
– floor – this value could be reduced.

At the end of the track – near Paso de los Toros – the choice could be MTOP Q-008, adjacent to the railroad and
already used for ballast.

Lic. Alejandro Schipilov


GEOLOGO
p-50/CASS Consultores

Lic. Alejandro Schipilov


GEOLOGO
Map #1

p
!
N-019
!

SORIANO

R6
FLORES ! Jesús González Ltda
! 13000
0m h ico
M-019 cía C

!
u
hico Río S a nta L
!

Lu cí a C
ta
Sa n O-001
R ío

6240000
0m

!
0 00
12

O-022
R 56
R 77

R 5 00 00
11
! Lecatte
! M-007 FLORIDA O-018

m
!

O-017
R SA
! Teblix
! 23

C hico
ío
Ros
R

100
M-005
!
O-005

c ía
ari

000

a Lu
o

! Calmex SA
! o

m

O-014

6220000
nt
!

Sa
!
J

Sa
COLONIA O-008

R ío
!

n
os é
0
900 R4
! H. Vonrotz M-039 00 m O-021
R 53

! O-016
! O-011
!
O-009
!
R 12
O-015 jo

!
ie
Río V
!

R 45
cía O-010
a Lu
a
R 52

R 94 S
Río

nt
M-040
jo Río
!
Vie Sa R í o Vi
ej o

R3
Río nt a
L-034 L u c ía Río S ant a L
M-004 uc
M-030 80000 m R7 ía
6
L AVA L L E J A
!
r io

M-018 Porley
!
osa

!
M-031M-015
M-003 M-044
oR

M-020 A-008
! M-032
M-002 A-025

SAN JOSÉ M-017


M-001
61

52 M-027
R

R 77
R 53

6200000
M-037 Río R ío Santa 3 R 12
S an 7000 Lu R6

ía
J 0m cí a

Luc
L-042 M-041

osé

anta
!
M-023!
R 51

R 33
S
Río
M-016
!
R 63 R 65 A-001
A-058
!

R6
M-024 600 R 81 A-014
M-011 00 m
P-006

3
M-042

R3
!
R 81

R 45

R
M-022

80
R 78
A-026
!

R 108
M-006 !
A-022

R 79
4

m
R6

50000
R

R 78
í o S a n Jo

R 80
sé R 11

6180000
ía
uc A-057
M-028

8
L
R 0m

R8
36 0

ta
400 A-040

!
an
P-005

oS
!


A-046

R
Río R

36
S

R 82
10

R 46
an
Jo s
é
7
CANELONES

R 86
R 47
!
R1
A-052
!
30000 m A-027
A-038
!

M-010

R 32
9
R4
R8

R 69

R7
A-017
A-037
7

5
A-015 R A-009 A-030
A-041 A-034

R
!
A-011
A-028 A-031 B-053

67
!

48
A-012
A-032

R
A-061
!

R 66
R 84

6160000
A-044

R
20000 A-045 R9
!
m

48
A-033
M-013
MALDONADO
!
!

A-023 A-002 A-024


A-005

!
!
!
A-036 A-049 A-042
!
A-019 A-010

R 35
!
A-021 A-062
!
M-012

R 34
A-003 B-031
M-009 M-021 A-051 B-035

R 101
S-005
!
A-029
A-059 A-020 R 999
S-015
!
S-003
S-004
S-007

R 70
S-011

3
S-006 B-034
!

R 10
! Colier SA
! S-012 B-039 B-036
S-013
S-002 A-006/7
S-018 B-011 B-020
S-001 B-029
S-014
!
10000 m S-019 S-016
!
S-010
! !
!
B-059
Railroad track B-013
MONTEVIDEO B-051
B-002
80km buffer
Canteras
!!Colier
!!
S-009 SA Montevide SA
Unpaved road

6140000
B-001
Paved road 0m
!

!
! Commercial quarry
! MTOP quarry

Basaltic rock
Granitic rock

Other granular materials

m
0 5 000 10 000 15 000 20 000

480000 500000 520000 540000 560000 580000 600000 620000 640000 660000

CASS Consultores
Lic. Alejandro Schipilov Montevideo - Paso de los Toros Railroad Track
Ballast Rock Sources Locations
geologo@adinet.com.uy
consultores.CASS@gmail.com
2356.3589 / 099.197.321
Map
R G#2O

p
0
R2
CERRO LA

6360000
Ne


o
260

gr o
000
m
Río Negro

RÍO NEGRO

!
R

R ío
Ne
gr

ío N
eg o
r o R4

g ro
Río N e

2500
00 m
! !

!
!
!
!
00
R1

6340000

o 2400
R

Ne 00 m
3

gr o
J-019

!
Q-011
Q-013
DURAZNO
o
R ío N egr
k-045
k-041 9
ío B ra R1
oD
el R
!
!
R

ío Y
í
230000 m
Q-003

!
R ío Yí
R
14
Q-010

6320000
N-010(2)
!
Río
!

Y í 22000
!
N-010(1) 0m

!
Q-001
R Q-014
14

Q-005 Q-004
Q-006
!
!

21
00
00
Rí o

m
Yí Yí
Rí o
!

Q-015 O-013
R í o Yí
N-008 N-018
N-003
! Gobunel SA
!
! Emilio Díaz Alvarez SA
!
!
Q-007
!
R í o Yí

42

6300000
N-016 0m

R
!
0 00
20
R ío Y í

í
R ío Y R ío Y í
N-007
! N-014
O-019
!
!

m
Marlin SA
!!!
Rodríguez
!GracemarPietruzka
SA

000
!!

190

R 41
R5
O-002
!
!

FLORES N-012 00
m

!
00
18

R6
N-001

6280000
!
!

O-007
!
0 m
17000

!
N-006
!

P-007

FLORIDA
O-006
!
é
57

N-011
SORIANO
Jos
R

Rí o S an

!
m
00
00
16

N-005 !
R5
8
3
R2

R6
N-002
! N-009
! O-020
!
!

Railroad track 15000

6260000
0m
80km buffer
!

O-004
!
Unpaved road
!!

K-049
Paved road
Río S

M-038
Commercial quarry
an J

00 m
!
!
!
1400
!
os
é

! MTOP quarry

R7
N-019
Basaltic rock !

Granitic rock

Other granular materials R 12 ! Jesús González Ltda


! 13000
0m hi co
M-019 ucía C
L AVA L L E J A
!

Chico R ío S a n ta L
!
u cía
SAN JOSÉ
Río S a n J o sé

ta L
COLONIA R ío
S an
O-001

6240000
m
0 5 000 10 000 15 000 20 000 R 56
0m
!

480000 500000 520000 540000 560000 0 580000 600000 620000 640000


00
12
CASS Consultores
Lic. Alejandro Schipilov Montevideo - Paso de los Toros Railroad Track
Ballast Rock Sources Locations
geologo@adinet.com.uy
110

consultores.CASS@gmail.com
00

2356.3589 / 099.197.321
0m

!
6460000
Map #3embó

co
Chi
ay
r

gu
ua
ac

Qu e
u eg Chico oT
o Q u ay y Gra n
de Rí

R ío
R

a
gu
ue
Río Q
R-023
e gu a y C
Río Q u h ic
o

ue guay
R ío Q Gr a

e
nde Rí o Q

r a nd
ueg
PAY S A N D Ú
uay
G r a n de

6440000
G
ay
I-019

e gu
Qu
Rí o

Río Queguay Grande

R-013

de
an
Rí o
Q u e gu a y

Gr

6420000
R2
5
TA C U A R E M B Ó

R-004

R5
R

R 59
43

J-004
J-012

N egro

Río

6400000
J-013
R-012

J-014 Río N e

o
gr
R-026

R 20
gr o
o Ne

R 43
RÍO NEGRO R-017

6380000
gro
Ne
R

ío
R ío
Ne
gr
R-018 Río Negro
o

Q-008
!
0 00 m
270

R4

6360000
DURAZNO
260
000
Railroad track m
Río Negro
80km buffer
!

R
R ío

Ne
55 gr
Unpaved road
ío N

R eg o
r o
Paved road
42
g ro R
Río N e
!
! Commercial quarry
2500
00 m
! MTOP quarry ! !
!

Basaltic rock !
!
Granitic rock
!
00
R1
Other granular materials Río

6340000
N egr
R

o
3

2400
00 m
J-019
!

SORIANO m R ío N egr
o FLORES R1 Q-013
Q-011
9
0 5 000 10 000 15 000 20 000
k-045
460000 480000 500000 520000 540000 560000 580000 600000 620000

CASS Consultores
!

Lic. Alejandro Schipilov Montevideo - Paso de2300los


00 m Toros Railroad Track
Ballast Rock Sources Locations
geologo@adinet.com.uy
!

consultores.CASS@gmail.com
2356.3589 / 099.197.321
p
m
00
!
280

6165000
7

R7
R
0m

5
0
!
260

R 32
24000 m
R 67

R 69
!

R6
8

22000 m
!

R6

6160000
R 84

R 66

6150500
CANELONES
R5

20000
m
!

R 48

R 33

R7
18000 m

4
!

6155000
R8
16000 m

5
!

8
R

14000 m

4
R8
!

6150000
12000 m 48/1984

6150000
!

R1
02
10000 m
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,
!

R 101
USDA, USGS, AeroGRID, IGN, and the GIS User Community
99
R9 592000 592500 593000
M800O0 mN T E V I D E O
Quarry ID: As. 48/1984 Closer railroad point: +12.4km
!

6145000
Location (UTM): 592410 - 6150315 PAV road distance: 26.1km + UPV
6000 m Location (geographic): Road N° 101 UNPAV road distance: 0.9km
!

Parcel: 11065 (10) - Canelones RailRoad distance: -


Lithology: Granitic gneiss

400
0m S-009 Quarry area: 101.170m2
!

6140000
Owner: Stiler S.A.
m
!

00
20
Los Angeles test data: 32.3%
0m Reserves: > 200.000m3 bulk rock
!

Permit issues: Need to update environmental permits

Railroad track
80km buffer
6135000

Unpaved road
Paved road
Quarry

0 5001 0001 5002 0002 500


m
Quarry parcel

570000 575000 580000 585000 590000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 DINAMIGE As. 48/1984
6195000
p
R 63 R 65

R 63

R6

6162500
6190000
R 81

3
R3
R 81

R
80

6185000
4
R6

R 11

6180000
8
R8

6162000
CANELONES

6175000
R 82
R
10
7
R 86
!

6170000
0m
!

m
!

m
000
!

6165000
m
R7

00
!

260
R 69
R 32

24000 m 7
R
!

3511/2013

6161500
R8
67

22000 m
R

R 66

R 84

6160000
!

20000
m
!

18000 m

R 35
R 87
!

R8 R 10
5

6155000
16000 m 3
!

14000 m
4
R3
!

624000 624500 625000 625500


12000 m

6150000
R1
!

10000 m
02 Quarry ID: As.3511/2013 Closer railroad point: +12.4km
R 101

9
99 Location (UTM): 625340 - 6161800 PAV road distance: 61.0km + UPV
!

R
8000 m
Location (geographic): Soca UNPAV road distance: 1.5km
!

6145000
6000 m
Parcel: 62984, 16855, 39056... (8) - CanelonesRailRoad distance: -
!

Lithology: Granite
0m
400 S-009
!

Quarry area: 588.300m2

6140000
0m
!

0
20 0m Owner: Uralcor S.A.
!

MONTEVIDEO
Los Angeles test data: 28.3% ("B" graduation)
6135000

Reserves: > 400.000m3 bulk rock


Permit issues: Up to date
6130000

Railroad track
80km buffer
Unpaved road
6125000

Paved road
Quarry

0 2 000 4 000 6 000 8 000


m
10 000
Quarry parcel
6120000

575000 580000 585000 590000 595000 600000 605000 610000 615000 620000 625000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 DINAMIGE As. 3511/2013
00
m
10

m
1120 00
80
00
106
!

m
000
!

104

m
6225000

000
!

m
!

102000 m

96000 m

100

!
R 45

98000 m
000
Rí o

m
San

6220000
Jo !

!

6206500
94000 m
!

!
92
00
0m
R 77
!
900
00 m

F L O R I D88A

6215000
!
000
m
R3

!
86000
m

!
8400
0m

6210000
!
82000 m
80000 m

!
1316/2011

6205000
00 m
780

!
760
00 m

77
R2

!R
R ío
3

Sa 74
00

6206000
n 0m
J os é

6200000
72000 m
SAN JOSÉ

!
7000
0m
Lucía
nta
Sa

!
68000 m

R ío
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,

6195000
!
66000 USDA, USGS, AeroGRID, IGN, and the GIS User Community
m
520500 521000

!
00
m
Quarry ID: As.1316/2011 Closer railroad point: +63.6km

!
R1 640
!
600
1 00 m
Location (UTM): PAV road distance:

m
520730 - 6206300 38.4km

6190000
00

3
620

R6
580
Location (geographic): San José UNPAV road distance: 6.5km

!
00
m
R 45

R 81 Parcel: 2936 (7) - San José RailRoad distance: -


é

!
R 78
os
nJ

Lithology: Granite
a
Río S

m
00
!

560
Quarry area:

m 6185000
146.181m2
R 79

Owner: William Porley


!
00 m

!
R 46
m
540

52000

50000 !

00 m
!

0m
cía
480

Lu Los Angeles
00
400
0 m test data: ND

!
46
4
6180000
R 78

ta

Reserves: ND
an

í
oS

m
00
420

!
R

Permit issues: Up to date


m
R 00
400
!
36

R ío Railroad track 0m
Sa 3800
6175000

!
ía
Lu c

80km buffer
R

an
nJ

36
ta

Río oS 0m
os

CANELONES
S Unpaved road 3600
é

an
Jo s

é
Paved road
R 47 00 m
340
!

Quarry
R1
Quarry parcel
6170000

m 0m
3200
!

0 2 000 4 000 6 000 8 000 10 000


30000 m
520000 525000 530000 535000 540000 545000 550000 555000
!

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov m
00
Ballast Rock Sources Locations
!

280
geologo@adinet.com.uy
consultores.CASS@gmail.com
DINAMIGE As. 1316/2011 00
m
!

2356.3589 / 099.197.321 260


24000 m
!
p

6505000
1240/2006

6504500
6500000
6495000
6490000

6504000
6485000
6480000
6475000

6503500
PAY S A N D Ú TA C U A R E M B Ó

6470000
613000 613500 614000 614500

6465000
Quarry ID: As.1240/2006 Closer railroad point: +273.7km
Location (UTM): 613750 - 6503740 PAV road distance: 175.5km

6460000
Location (geographic): Tacuarembó UNPAV road distance: -
Parcel: 810 (5) - Tacuarembó RailRoad distance: -
Lithology: Basalt

6455000
Quarry area: 528.249m2

6450000
Owner: Altos del Sur S.A.

Los Angeles test data: 12%


Reserves: >100.000m3 bulk rock
Permit issues: Up to date
6445000

Railroad track
80km buffer
R5 Unpaved road
6440000

Paved road
Quarry

0 2 000 4 000 6 000 8 000


m
10 000
Quarry parcel
6435000

575000 580000 585000 590000 595000 600000 605000 610000 615000 620000 625000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 DINAMIGE As. 1240/2006
6160000
R 84

p
R7

67

R 66
R

R6
20000
m

R 32
!
R 48

R 33

6143000
R7
18000 m

4
!

6155000
R8
16000 m

5
!

8
R

6142500
14000 m
!

84
R
12000 m
CANELONES

6150000
!

R1
02

6142000
10000 m

R 101
!

MONTEVIDEO
8000 m
!

6145000
6000 m

6141500
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,
!

USDA, USGS, AeroGRID, IGN, and the GIS User Community

582500 583000 583500 584000 584500


592/1948
0m Quarry ID: As.592/1948 Closer railroad point: +12.4km
400
!

Location (UTM): 583850 - 6142250 PAV road distance: 32.7km


Location (geographic): Montevideo (Pavia Rd.) UNPAV road distance: 1.8km

6140000
0m
!

0
20 Parcel: Several () - Montevideo RailRoad distance: -
Lithology: Granite
0m
Quarry area: 956.355m2
!

Owner: Canteras Montevideo S.A.

Los Angeles test data: 12% ("F" graduation)


Reserves: > 1.200.000m3 bulk rock
Permit issues: Up to date
6135000

Railroad track
80km buffer
Unpaved road
Paved road
Quarry

0 2 000 4 000 6 000 8 000


m
10 000
Quarry parcel

570000 575000 580000 585000 590000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 DINAMIGE As. 592/1948
!

1
00 m

00 m
1400

!

p
o

1420
Sa

6250000
nJ

6226000
os
!

m
m

00

!
00

80
FLORES
60

13
13 0 m
00

!
134

6245000
!

m
0m

00
121830000

20

!
13
00 m
12
40

!
00
m

6240000
!

! 000 m
!
122000 m

126
m

6235000
00

!
00 00 m
11280
1

6225500
!
R 77

0m
6230000
m

00
1140 00

6
11

!
110
00
!

10

0m
R 45

80

m
106

00

1120 00
!

000

m
104
!
386/1999

m
6225000

000
R
!
23

m
!

102000 m

1098
96000 m

000

!
000 m
0m
ío

6220000
Sa
R

n
! !
94000 m
!

92
FLORIDA

!
00
J os é

0m
900
00 m
!

6215000
880
00 m

6225000
86000

!
m

SAN JOSÉ
8400

!
0m

6210000
R3

!
82000 m
80000 m

!
499500 500000 500500

!
6205000
00 m
77860000 Quarry ID: As.386/1999 Closer railroad point: +63.6km

!
m
Rí o 74
Sa
n 00
0m Location (UTM): 500000 - 6225500 PAV road distance: 75.5km

!
J

R 77
Location (geographic): Mal Abrigo UNPAV road distance: -
o sé

6200000
!
72000 m
7000 Parcel: 13836, 13837, 19, 96... (5) - Colonia RailRoad distance: -
0m

!
R1
1 Lithology: Granite
!
68000 m
Quarry area: 461.200m2

6195000
!
66000
m
Owner: Teblix S.A.
!

m
006
!

640 0000 m
!

Los Angeles test data: 25% ("B" graduation - 14-20mm)


6190000
m

580
00

00
620
!

m
Reserves: > 350.000m3 bulk rock
R 45

Permit issues: Up to date


R 78

CANELONES 0 0m
!

560
6180000 52000 m6185000
R 79

!
! !

Railroad track
00 m

R1
m

!
540

50000

80km buffer
00 m


0m
R 78

o Sa n J o s m
00
480

é Unpaved road
!

440
00
46

í
n ta Luc m
Sa
a

Paved road 00
420
!
R ío

m
QuarryR 36 400
00
!

m
Quarry parcel 0m
3800
6175000

0 2 000 4 000 6 000 8 000 10 000


R
36

0m
500000 505000 510000 515000 520000 525000 530000 535000 540000 545000 550000 555000 3600
!

Montevideo - Paso de los Toros Railroad Track


CASS Consultores 00 m
340
!

Lic. Alejandro Schipilov 0m


Ballast Rock Sources Locations 330200000
!

geologo@adinet.com.uy
m
consultores.CASS@gmail.com
2356.3589 / 099.197.321 DINAMIGE As. 386/1999
!

m
00
!

280
18000 m

R 32

6155000
R6

R8
5
16000 m

R3
3
!

CANELONES

14000 m
!

84
R
12000 m

6150000
!

6142000
R8

10000 m
!

8000 m
MONTEVIDEO
!

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,


USDA, USGS, AeroGRID, IGN, and the GIS User Community

6145000
583000

Quarry ID: S-009 Closer railroad point: +12.4km


6000 m
Location (UTM): 583060 - 6142040 PAV road distance: 32.7km + UPV
!

Location (geographic): Cepeda Rd. UNPAV road distance: 1.8km


Parcel: 121930 (10) - Montevideo RailRoad distance: -
Lithology: Granite
Quarry area: 36.800m2
0m S-009
400
!

MTOP File: Exp.ND

Los Angeles test data: ND


m Reserves: Quarry at end of resources (< 10.000m3 bulk rock)
6140000
!

00
20
Permit issues: MTOP - Needs to change destination + Environmetal permits

Railroad track
0m 80km buffer
!

Unpaved road
Paved road
Quarry

0 500 1 000 1 500 2 000 2 500


m
Quarry parcel

575000 580000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / S-009
p
18000 m

!
CANELONES

6155000
R3
6

16000 m
S-005

!
14000 m

6154500
12000 m
!

6150000
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,
USDA, USGS, AeroGRID, IGN, and the GIS User Community

MONTEVIDEO 566000 566500

Quarry ID: S-005 Closer railroad point: +12.4km


Location (UTM): 566350 - 6154700 PAV road distance: 12.4km + UPV
Location (geographic): Melilla Rd. UNPAV road distance: -
10000 m Parcel: 141451 (9) - Montevideo RailRoad distance: -
!

Lithology: Granite
R5

Quarry area: 45.500m2


MTOP File: Exp.01/3/00509

Los Angeles test data: ND


Reserves: ND
8000 m Permit issues: MTOP - Needs to change destination + Environmetal permits
!

Railroad track
80km buffer
Unpaved road
6145000

Paved road
Quarry

0 500 1 000 1 500 2 000


m
2 500
Quarry parcel
6000 m
570000
!

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / S-005
m

!
p R4
8

18000 m

!
CANELONES

6155000
R3

16000 m
6

!
S-004

14000 m
!

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,


USDA, USGS, AeroGRID, IGN, and the GIS User Community

569000

Quarry ID: S-004 Closer railroad point: +12.4km


M O N T E V I D E120O00 m
Location (UTM): 568930 - 6153250 PAV road distance: 3.6km + UPV
!

6150000
Location (geographic): Aimara Rd. UNPAV road distance: 2.3km
Parcel: 4859 (9) - Montevideo RailRoad distance: -
Lithology: Granite
Quarry area: 46.900m2
MTOP File: Exp.01/3/00509 29/10/01

10000 m
Los Angeles test data: ND
!
R5

Reserves: ND
Permit issues: MTOP - Needs to change destination + Environmetal permits

Railroad track
80km buffer
Unpaved road
8000 m Paved road
!

Quarry

0 500 1 000 1 500 2 000


m
2 500
Quarry parcel

570000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / S-004
6000 m
!
p

6400000
R 25

6382000
6390000
R 20

RÍO NEGRO

TA C U A R E M B Ó

R-017

6380000
R5

6380000
546000 548000

Quarry ID: R-017 Closer railroad point: +273.7km


Location (UTM): 547060 - 6380720 PAV road distance: 11.4km
Location (geographic): R5 - 262k000 UNPAV road distance: 1.2km + RR

6370000
Río Negro
Parcel: 2070 (10) - Tacuarembó RailRoad distance: 11.9km
e g ro Lithology: Basalt
oN
Quarry area: 20.000m2

m
700
00 MTOP File: Exp. 03/3/2592
!

Los Angeles test data: NA


Reserves: 60.000 m3 bulk rock
Permit issues: MTOP - Needs to change destination + Environmetal permits
DURAZNO
6360000

Railroad track
80km buffer
260 Unpaved road
000
m Paved road
Quarry
!

m
Quarry parcel
R4

0 2 000 4 000 6 000 8 000 10 000

530000 540000 550000 560000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / R-017
6440000
p
e
a
y Gr

nd
u egua
Río Q

de
Gr an
u ay
Qu eg R-013
R ío

PAY S A N D Ú

6420000
R 43

6430000
R2
5

TA C U A R E M B Ó

6400000
RÍO NEGRO
R5

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,


USDA, USGS, AeroGRID, IGN, and the GIS User Community

572000 574000
R 20

Quarry ID: R-013 Closer railroad point: +273.7km

Río Negro
Location (UTM): 572670 - 6430440 PAV road distance: 68.5km
Location (geographic): R5 - 319k500 UNPAV road distance: -
Parcel: 2524 (11) - Tacuarembó RailRoad distance: 81.5km

6380000
Lithology: Basalt
Quarry area: 20.000m2
gro
Ne

R
MTOP File: 22/6/00 Exp. 00/3/619
ío

Los Angeles test data: NA


eg
Río Negro Reserves: < 30.000 m3 bulk rock
ro

oN

Permit issues: MTOP - Needs to change destination + Environmetal permits
m
000
270
!

DURAZNO Railroad track


80km buffer
R4
Unpaved road
6360000

260
000
Paved road
m
Quarry
!

0 5 000 10 000 15 000 20 000


m
Quarry parcel

540000 560000 580000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy 2500
00 m
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / R-013
!
p

6398000
6400000
R 25

R-012
RÍO NEGRO

6390000
0
R2

TA C U A R E M B Ó

6396000
6380000
R5

556000 558000

Quarry ID: R-012 Closer railroad point: +273.7km


Location (UTM): 555700 - 6397140 PAV road distance: 29.5m
Location (geographic): R5 - 280k200 UNPAV road distance: -
Parcel: 12160 (10) - Tacuarembó RailRoad distance: -
Lithology: Basalt

6370000
Ne Quarry area: 40.000m2
Rí o

g ro Río Negro
MTOP File: Exp. 00/3/547

m
000
270 Los Angeles test data: NA
!

Reserves: 36.000 m3 bulk rock


Permit issues: MTOP - Needs to change destination + Environmetal permits

DURAZNO Railroad track


80km buffer
6360000

Unpaved road
Paved road
Quarry
260
0 2 000 4 000 6 000 8 000
m
10 000
000
m Quarry parcel
!

540000 550000 560000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / R-012
p

6368000
6380000
RÍO NEGRO

TA C U A R E M B Ó

6367000
6370000
Ne gro

o

Q-008

m
000
270
!

545000 546000

Río N egro
Quarry ID: Q-008 Closer railroad point: +271.2km
Location (UTM): 545510 - 6367415 PAV road distance: -
Location (geographic): R5 - 246k000 UNPAV road distance: -
Parcel: 7507 (11) - Durazno RailRoad distance: 0.0km
Lithology: Basalt
Quarry area: 104.100m2
DURAZNO 6360000
MTOP File: Exp. 2016/10/03/2875

Los Angeles test data: NA


Reserves: 150.000 m3 bulk rock
R5

Permit issues: MTOP - Needs to change destination + Environmetal permits

260
000
Railroad track
m
80km buffer
!

Unpaved road
Paved road
Quarry

0 2 000 4 000 6 000 8 000


m
10 000
Quarry parcel

540000 550000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / Q-008
p

6302000
R 14

6310000
21
00
00
m !

R í o Yí

Río

DURAZNO

6301000
546000 547000

Quarry ID: Q-007 Closer railroad point: +199.4km


Location (UTM): 546960 - 6301620 PAV road distance: 1.2km + UPV
Q-007 Location (geographic): R5 - 178k500 UNPAV road distance: 0.5km
Parcel: 8363 (1) - Durazno RailRoad distance: -
Lithology: Granite
0m Quarry area: 100.000m2

6300000
!

0
00
20
MTOP File: Exp. 2011/003/2614

FLORES Los Angeles test data: 26.1 %


Reserves: >350.000 m3 bulk rock
Permit issues: MTOP - Needs to change destination + Environmetal permits
R
5

Railroad track
80km buffer
Unpaved road
Paved road
Quarry

F L8 000
O R I D A10 000 Quarry parcel
m
0 2 000 4 000 6 000

540000 550000
!
m

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
000
190

Lic. Alejandro Schipilov


geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / Q-007
p nta
L ucía Chico

a
oS

m
00

!
00
12

o
C hic
ía
uc
t

aL

6220000
n
Sa
R ío
R5

6230000
110
00
0m
!

R 56

6219000
R1
FLORIDA
2
100
000

R1
m

2 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,

6220000
!
USDA, USGS, AeroGRID, IGN, and the GIS User Community
O-008
577000 578000 579000 580000

Quarry ID: O-008 Closer railroad point: +111.9km


Location (UTM): 578400 - 6219600 PAV road distance: 11.7km
Location (geographic): R12 - 4k200 UNPAV road distance: 2.1km
900
00 m
Parcel: 5482 (5) - Florida RailRoad distance: -
Lithology: Granite
!

Quarry area: 136.000m2


MTOP File: Exp. 2009/03/2139

Los Angeles test data: NA


Reserves: >500.000 m3 bulk rock
Permit issues: MTOP - Needs to change destination + Environmetal permits
6210000

Railroad track
80km buffer
R7 Unpaved road
6
Paved road
ico
!

Ch

Lu Quarry
c ía

C A N E LQuarry
O Nparcel
ES
m
nta

o
Sa

0 2 000 4 000 6 000 8 000 10 000


560000 570000 580000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / O-008
p
230000 m

6295000
6320000
R5

í 22000
0m

oY

!
DURAZNO

6310000
21
00
00
m
R ío

!

í
R ío Y

6294000
6300000
m
00

!
00
20

R 14

FLORES 514000 515000 516000


N-014
Quarry ID: N-014 Closer railroad point: +206.5km
!

m
Location (UTM): 514740 - 6294780 PAV road distance: 34.6km

000
190
R 57 Location (geographic): R14 - 141k000 UNPAV road distance: 0.5km

6290000
Parcel: 1278 (1) - Flores RailRoad distance: -
Lithology: Granite
Quarry area: 20.000m2
MTOP File: 00
m ND

!
00
18
R
23 FLORIDA
Los Angeles test data: NA
Reserves: 120.000 m3 bulk rock
Permit issues: MTOP - Needs to change destination + Environmetal permits
6280000
R3

0m
Railroad track 17000

!
80km buffer
Unpaved road
Paved road
Quarry

0 2 000 4 000 6 000 8 000


m
10 000
Quarry parcel

510000 520000 530000 540000 550000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
Ballast Rock Sources Locations
!
m

geologo@adinet.com.uy
00

MTOP / N-014
00

consultores.CASS@gmail.com
16

2356.3589 / 099.197.321
21
00
00
m
p
!
Río Y í
R ío Yí

6282000
R5
DURAZNO

6300000
m
00

!
00
20

6281000
R 14

m
000
190
R 57

6290000

6280000
FLORIDA m
00

!
00
18
23
R

FLORES
N-001

6280000

6279000
0m
17000

!
511000 512000 513000 514000 515000

Quarry ID: N-001 Closer railroad point: +206.5km


Location (UTM): 512960 - 6281030 PAV road distance: 52.4km
R3

Location (geographic): R3 - 178k700 UNPAV road distance: -


Río S
an J
o sé Parcel: 691 & 4628 (2) - Flores RailRoad distance: -

6270000
é
Lithology: Granite
s
n Jo
Sa

Quarry area: 50.000m2


!
R ío

m
00
MTOP File: Exp. 2010/3/1617

00
16
Los Angeles test data: NA
Reserves: >400.000 m3 bulk rock
Permit issues: MTOP - Needs to change destination + Environmetal permits
6260000

15000
0m
Railroad track

!
80km buffer
Unpaved road
Paved road
Río S an

Quarry
m SAN JOSÉ Quarry parcel
Jo

0 2 000 4 000 6 000 8 000 10 000


00 m
1400

!
510000 520000 530000 540000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / N-001
p

100
R 45

000
m
6220000
osé !

a
nJ

oS
900
00 m
FLORIDA

!
R3

R 77

6210000
M-004 80000 m

!
R 77
R
S an
ío

J os é

6200000
7000
SAN JOSÉ
0m
R1

ía
!
1

Luc
anta
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,

6208000
USDA, USGS, AeroGRID, IGN, and the GIS User Community

S
Río
519500 520000

Quarry ID: M-004 Closer railroad point: +63.6km


Location (UTM): 519790 - 6208240 PAV road distance: 38.4km + UPV
600
00 m Location (geographic): R3 - 92k700 UNPAV road distance: 9.0km

6190000
Parcel: 9773 (7) - San José RailRoad distance: -

!
3
R6
Lithology: Granite
R 45

Jo

Quarry area:
R 78

10.700m2
n
Sa
Rí o

MTOP File: Exp.NA


R 79

Los Angeles test data: ND


m
50000

Reserves: ±50.000 m3 bulk rock


Permit issues: MTOP - Needs to change destination + Environmetal permits
6180000
R 78

ucía
ta L Railroad track
n

R1
Río Sa

80km buffer 00
m
R
36 400 !
Unpaved road
R ío
Sa Paved road
a

Quarry
u cí

nt
nJ

36
aL

Sa
os

C A N E L OQuarry
N Eparcel
S
é

m
Rí o

0 2 000 4 000 6 000 8 000 10 000

520000 530000 540000 550000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
MTOP / M-004
consultores.CASS@gmail.com 30000 m
2356.3589 / 099.197.321
!
0m
3500
!

p
R
10
7

6158000
30000 m
R5

86
R
!

R 33
7

R7
R

5
m
R 32

00
!

250 R 67
R 69
R6

CANELONES
8

R6

6160000
R 84
R 66

20000
m
!

R 48
A-036

R7
4

6157500
R8
5

15000 m 8
R
!

4
R8

591500 592000

Quarry ID: A-036 Closer railroad point: +12.4km


Location (UTM): 591800 - 6157700 PAV road distance: 26.6km + UPV
R1 Location (geographic): Suárez - Pando Rd. UNPAV road distance: 3.1km
02
10000 m Parcel: 57415 (16) - Canelones RailRoad distance: -
!

R 101

Lithology: Granite
99
R9
MONTEVIDEO Quarry area: 40.000m2
MTOP File: Exp.2010/3/616

Los Angeles test data: ND

5000 m
Reserves: < 15.000m3 bulk rock
Permit issues: MTOP - Needs to change destination + Environmetal permits
!

R1

Railroad track
80km buffer
6140000

Unpaved road
Paved road
0m
Quarry
!

0 2 000 4 000 6 000 8 000


m
10 000
Quarry parcel

580000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / A-036
p
cía
t a Lu
S
R 94 Rí o

an
R7
6
jo R í o Vi
Vie e jo
Río
FLORIDA an
R 6 Río S ta Lu c í
a

R 12

0
R4

6200000
R5

3
R6
ía

Río S
Luc

a n
anta

6162000
ta Lu

R 33
S
Río
cía

R 63 R 65

R6
R 81
3
R3

R 81

R
80
4
R6

R 11

6180000
CANELONES

6161500
R8
!

R 82

R
m 10
5000 7
R 86
!

30000 m 624000 624500 625000 625500


!

Quarry ID: A-032 Closer railroad point: +12.4km


Location (UTM): 624770 - 6161900 PAV road distance: 61.0km + UPV
R7
R 69

m Location (geographic): R8 62k000 UNPAV road distance: 1.5km


R 32

00
5
!

250 7
R

R
68

R8
A-032 Parcel: 57837 (8) - Canelones RailRoad distance: -
67
R

R 66

R 84

6160000
20000 Lithology: Granite
m
Quarry area: 40.000m2
R4

!
8

R 35

R 87 MTOP File: Exp.2015/10/03/00160


R8 R 10
5 3
15000 m

Los Angeles test data: ND


!

4
R3

Reserves: ± 300.000m3 bulk rock


R
10
2 Permit issues: MTOP - Needs to change destination + Environmetal permits
10000 m
R 101

99
R9
!

Railroad track
80km buffer
5000 m
Unpaved road
!
R

Paved road
1

6140000

Quarry
0m
MONTEVIDEO Quarry parcel
m
!

0 2 000 4 000 6 000 8 000 10 000

580000 600000 620000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / A-032
m
!
!

p FLORIDA R 12

R 94 Río
Sa
a Lu
cía Río V
iejo

nt
V
R
ie jo ío S a
n ta
R ío V i
ej o
L AVA L L E J A
ío Luc
ía
R6

R
R7

0
R4
6

6162000
6200000
3 R 12
R6
ía
R5

Luc
anta

R 33
S
Río

R 63 R 65

08
R6

R1
R 81
3
R3

R 81

R
80
4
! R6

R 80
R 11
0m

6180000
00
45

8
m

R8
00
400
!

CANELONES
R 82

R
10

6161500
0m
3500 7
R 86
!

30000 m
!

R 32

625000 625500 626000


R 67
R8
R7

0 0m 7 Quarry ID: A-031 Closer railroad point: +12.4km


5
!

250 R A-031

R
R 69

9
Location (UTM): 625615 - 6161950 PAV road distance: 61.3km + UPV
R 66

R 84

6160000
R 36

20000
m Location (geographic): R8 63k000 UNPAV road distance: 2.4km
48

Parcel: 6090 (8) - Canelones RailRoad distance: -


R 35

R 87
R 10 Lithology: Granite
15000 m 3
Quarry area: 17.000m2
4
!

R3

MTOP File: Exp.17/10/01


1

10000 m
R 10

99
R9
!

Los Angeles test data: ND


Reserves: < 70.000m3 bulk rock
R1 5000 m
Permit issues: MTOP - Needs to change destination + Environmetal permits
!

6140000

0m Railroad track
!

80km buffer
MONTEVIDEO Unpaved road
Paved road
Quarry

0 2 000 4 000 6 000 8 000 10 000


m
Quarry parcel

580000 600000 620000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / A-031
p

6155500
R 69
R
68

22000 m
R
48

67
R

6160000
20000
m

!
CANELONES

6155000
18000 m

A-027
R5

6155000
R3

16000 m
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,
6

USDA, USGS, AeroGRID, IGN, and the GIS User Community

566500 567000

Quarry ID: A-027 Closer railroad point: +18.4km


Location (UTM): 566680 - 6155070 PAV road distance: 5.9km + UPV
Location (geographic): R5 & Fauquet Rd. UNPAV road distance: 1.6km
Parcel: 41107 (5) - Canelones RailRoad distance: -
14000 m
Lithology: Granite
!

Quarry area: 120.300m2


MTOP File: Exp.2001/03/00509

Los Angeles test data: ND


Reserves: ND
MONTE VIDEO
12000 m
Permit issues: MTOP - Needs to change destination + Environmetal permits
!

6150000

Railroad track
80km buffer
Unpaved road
Paved road
Quarry

0 500 1 000 1 500 2 000


m
2 500
Quarry parcel
10000 m
!

570000 575000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / A-027
p
0m
3500 R
!

10
7

R 86

R 82

6158000
30000 m
R5

R 33
7
R

R7
5
m
R 32

00
!

250 R 67
R 69
R6

6157500
8

CANELONES

6160000
R 84
R 66

20000
m
!

R 48
R6 A-010

R7
4
R8

6157000
5

15000 m 8
R
!

591000 591500 592000 592500


4
R8

Quarry ID: A-010 Closer railroad point: +12.4km


Location (UTM): 591600 - 6157610 PAV road distance: 26.6km + UPV
Location (geographic): Suárez - Pando Rd. UNPAV road distance: 3.1km
R1
02 Parcel: 11065 (16) - Canelones RailRoad distance: -
10000 m
Lithology: Granite
!

R 101

99 Quarry area: 15.000m2


MONTEVIDEO R9
MTOP File: Exp.2003/03/03305

Los Angeles test data: ND


Reserves: ± 100.000m3 bulk rock
5000 m Permit issues: MTOP - Needs to change destination + Environmetal permits
!

R1
Railroad track
80km buffer
6140000

Unpaved road
Paved road
0m Quarry
!

0 2 000 4 000 6 000 8 000


m
10 000
Quarry parcel

580000

Montevideo - Paso de los Toros Railroad Track


CASS Consultores
Lic. Alejandro Schipilov
geologo@adinet.com.uy
Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 MTOP / A-010
Sector 3
C h ico

p
ua

R5
g
ue

y
Q

R ío
oT
ac
R ío Q u uar

de
e gua

Gr an
y Gra nde Río Q ue bó

em
gua

6440000
yG gu

ay
ra n ue
de oQ

Río
Q

R5
ueg
uay
Gra
n de
a nd e
Rí y Gr
o Q ueg ua R013

6420000
bó em
R5
R90

Río Tacu ar
R43 R43 R43

R5
R4
3
R25

Río N e
g ro

6400000
R012
ro
Neg
Rí o

R43
5
R2

gr o
o Ne

R017

6380000
R3

Ne

g ro
R5
ío
R3

R
R5
R ío
Neg
R4

r o
Río N e g r

o
Q008

R3
R4

6360000
R5
Río Negro

Ne
g ro
o

R4

gr
Rí o N e o

R4 R5
Rí o N

eg
ro

6340000
R3
R55

R ío N e gro

ío B
r a z o De l R í o Y
R

í
R55

R ío

VF_MVD-PTO Quarry Basaltos (Fm. Arapey) Granitos Gneises graníticos
R5

R14
Buffer_80km Sienitas (Fm. Sierra de Ánimas) Granodioritas/Tonalitas
m D D D
0 5 000 10 000 15 000 20 000 R14 4 R1 D D D

460000 480000 500000 520000 540000 560000 580000 600000 620000 640000
D D D

CASS Consultores
Lic. Alejandro Schipilov Montevideo - Paso de los Toros Railroad Track
geologo@adinet.com.uy Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 Geologic Availability
Sector 2

p R3

R4
Río
Ne
gr o
R4

R5
gr
Río Ne o

R4
R55
Negro
R ío

6340000
R3
R ío N egro

ío B
r a z o Del Río Y

R
í
R55

R14
í
oY
R1 R
4

6320000
Rí o Y í

R5
Rí o Y í
R14
R14 R14
R14

R5

o Yí
R ío Y í

R ío Yí

Rí o

R6
Q007

6300000
R1
4

R ío Y í
R14

R5
R í o Yí R4
R14 R ío Yí 1
R3 N014
R14
R3

3
R2

R6
7
R5

N001 R7

6280000
R5
R7
R3

R4
R7
R3

1

Jo
7
R5

n
R ío Sa
3
R2

6260000
R7
R2
R57
Sa
Río n Salvador
7
Río S

R5
R2
a
n Jo

R12

R7
n

ic o
Ch
ua

u c ía
an J

nta L
ía Chi co R í o Sa
oS

a Luc
an t

R ío S
R ío S
R2

6240000
an José

R5

R2

R6
3 R56
VF_MVD-PTO Quarry Basaltos (Fm. Arapey) Granitos Gneises graníticos
Río R osa

R2
3

Buffer_80km Sienitas (Fm. Sierra de Ánimas) Granodioritas/Tonalitas


m D D D
R56

R7
0 5 000 10 000 15 000 20 000

R6
R5
rio

D D D

460000 480000 500000 520000 540000 560000 580000 600000 620000 640000
D D D

CASS Consultores
Lic. Alejandro Schipilov Montevideo - Paso de los Toros Railroad Track
geologo@adinet.com.uy Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 Geologic Availability
6260000
Sector 1

p
R23

R7
R5
R3
R57
7

Río S
R5
R2

R3
n Joa

R7
R1
2
ic o
Ch
u c ía
nta L
u c ía
Chi co R í o Sa
an ta L
R ío S
R2

6240000
R5

R6
R56

R3
R56

R5

R6

R7
R56

386/1999 R

i co
23

a Ch
Río
R2

Rí o

R12

u cí

6220000
Sa
O008

L
n
R os a

nta
Jo

Sa
rio

o
R2


Luc ía
Río Sa nta
3
io

R94
s ar

o
jo

R6
Vie Rí o V ie
R23
ío R

R Río jo

R3
R ío S c ía
o M004 a n ta Lu
3
R5

Río
R2

S
ri

1316/2011 R ant
osa

ío a Lucía
oR

R11 Sa 2
nJ R1

os

R7
R6
R12

R77
R11 R12

6200000
é
R1 o Sa n t a L

R1

ía
R12
ucía R63
2

Luc
R6
R5

R5
R1 5

R33
1

R6
anta
R8
0
R51

ri o

S
Río
R1 R65
Ros a

R63
1

R5

R6
R81
Rí o

1 R8
R8

R64
3
R6

R33
R81

R8
R81

R45

0
R78

R46
R1
R1 1 R81
Río R6
4
S an ía
L uc R11

R60
Jo

6180000
ta R11
S an

R8
R64
R3

R80
R10

o

7

R32
R5
Río R1
07
S

R3
an R1

6
Jo s

R46
5

R5
07
R4

R1
R47

1
R1

R33

R8

R60
0
R32
R67
R8

R69
8 R7
R4 A031
A032
R8 3511/2013

R75
7

R33
R6

6160000
R66
R1

R6
R9

R4
8

R34
A036
A010 R9

R1
1

R35
R87
R1
A027
S005

R6
S004

R34

0
48/1984
R8 R9

R10 1
R5

R93
R7
3
R1

7
R3
592/1948
S009

6140000
R10
VF_MVD-PTO Quarry Basaltos (Fm. Arapey) Granitos Gneises graníticos

Buffer_80km Sienitas (Fm. Sierra de Ánimas) Granodioritas/Tonalitas


m D D D
0 5 000 10 000 15 000 20 000 D D D

480000 500000 520000 540000 560000 580000 600000 620000 640000 660000
D D D

CASS Consultores
Lic. Alejandro Schipilov Montevideo - Paso de los Toros Railroad Track
geologo@adinet.com.uy Ballast Rock Sources Locations
consultores.CASS@gmail.com
2356.3589 / 099.197.321 Geologic Availability

You might also like