PHOTOVOLTAIC(PV) :
SOURCE OF ENERGY :
1.THERMAL,2.SOLAR,3.WIND,4.TIDAL,5.HYDRO,6.NECLEAR,7.GEOTHERMAL
1.CIRCUIT BREAKER
2.ISOLATOR
3.EARTH SWITCH
4.TRANSFORMER
5.ICT,CT,PT.
IED'S :
CIRCUIT BREAKER :
We can operate the breaker in both live and dead condition.Because it has the
medium to ionizing the break current.
DEPENDING UPON THE MEDIUM USED IN CIRCUIT BREAKER HAS CLASSIFIED AS,
1.AIR CIRCUIT BREAKER
2.VACUUM CIRCUIT BREAKER
3.SF6 CIRCUIT BREAKER.
ISOLATOR :
any medium to quinch the spark produced during the live condition.
FUTURE SAS :
1.PROCESS LEVEL,
2.BAY LEVEL,
3.STATION LEVEL.
1.PROCESS LEVEL :
2.BAY LEVEL :
3.STATION LEVEL :
OI SERVER,SMT,GATEWAY.
DATE : 27.08.13
DATE : 28.08.13
COMMUNICATION :
1.PHYSICAL MEDIUM,
2.CONNECTING PORT,
3.PROTOCOL,
4.NETWORK FORMATION.
1.PHYSICAL MEDIUM :
2.CONNECTING PORT :
HUB :
IT RECEIVE THE INFORMATION FROM ONE PORT AND DISTRIBUTE THE INFORMATION TO
OTHER PORTS.
SWITCHES :
ROUTER :
3.PROTOCOL :
HERE THE OI CLIENT GET THE INFORMATION FROM OI SERVER.OI CLIENT IS A IEC CLIENT.
BECAUSE,WHENEVER A QUERY RECEIVED FROM REMOTE END,THAT TIME ONLY THE RESPONSE WILL
TRANSMIT FROM GATEWAY TO REMOTE HMI.
DATE : 30.08.13
IEC-61850 :
APPLICATIONS :
PHYSICAL DEVICE :
LOGICAL DEVICE :
FUNCTIONALITY OF A DEVICE :
1.PROTECTION,2.CONTROL,3.MEASUREMENTS,4.RECORDS,5.SYSTEM
LOGICAL NODE :
THE FUNCTIONAL ELEMENTS ARE THE SMALLEST PARTS OF A FUNCTION CAN EXCHANGE
THE DATA IS CALLED AS LOGICAL NODES.
DATASET :
PREDEFINED DATA'S ARE TRANSMIT FROM ONE IED TO OTHER IED IS CALLED
GOOSE.
GOOSE SIGNALS ARE NOT REQUIRED A TIME STAMP.THESE SIGNALS ARE ONLY USED FOR
LOGIC PURPOSE.
3.ONE REPORT CONTROL BLOCK WILL REPORT TO ONLY ONE CLIENT AT A TIME,
BUT ONE GOOSE CONTROL BLOCK WILL REPORT TO MANY DEVICES AT A TIME.
SERVER INSTALLATION :
3.CREATE A TEAM FOR ETHERNET PORTS,SO THAT 2 PORTS CAN WORK AS A SINGLE IP ADDRESS.
IF WE HAVE THE INTEL DRIVER IN A PC MEANS,WE CAN MANUALLY CREATE A TEAM FOR THE
ETHERNET PORT.
7.AFTER COMPLETED ABOVE,WE HAVE TO CREATE HISTORIAN DATABASE FOR STORE THE EVENTS
FROM THE OI SERVER.
GIVE THE MEMORY FOR DATA STORAGE FILE & LOG FILE.20% & 10000MB FOR DATA FILE,
10 % & 5000MB FOR LOG FILE. AFTER DID THIS,FINISH IT WILL CREATE A HISTORIAN
DATABASE.
10.THEN,INSTALL THE S2K SERVER AFTER THAT INSTALL THE OI SERVER AND DO THE
DCOM(DISTRIBUTED COMMUNICATION) SETTINGS FOR ALL.DCOM SETTINGS USED FOR ALARM
INDICATIONS & SERVICES.
SQL SERVER :
WORKING PRINCIPLE :
IN THAT HISTORIAN,
IF THE DATA'S ARE STORED CONTINUOUSLY THEN THE MEMORY OF HISTORIAN WILL INCREASES
NORMALLY.SO IT WILL CONSUME THE WHOLE MEMORY OF HARD DISK.TO AVOID THIS,JOBS
ARE CREATED.THESE JOBS WILL PURGE THE EVENTS & VALUES IN A SPECIFIED PERIOD AS
WE ASSIGNING.
HISTORIAN DATABASE HAVE DATA'S FILE & THE LOG FILE.HISTORIAN LOG FILE
CONSISTS OF WHAT ARE THE TRANSACTIONS HAPPENED IN THE SERVER,THAT WILL STORED IN
THIS FILE.
TO DELETE THIS FILE,WE HAVE THE "CLEAN HISTORIAN LOG" (.BAT) FILE.IF WE RUN THIS
FILE IT WILL CREATED A JOBS FOR DELETING THE LOG FILE CREATED BY HISTORIAN.
PC HEALTHY STATUS :
DS-AGILE OI SERVER FETCH THE DATA FROM S-BUS AS " < 100BPS " (BITS PER SECOND).
Q-OVERFLOW :
TO AVOID THIS ERROR,WE HAVE TO CHANGE THE ANALOG PARAMETERS ATTRIBUTES VALUE.
BECAUSE THIS IS THE EASIEST WAY TO OVERCOME THE LIMIT.SPS & DPS DATA'S ARE NOT
CONTINOUSLY REPORTING TO OI.BECAUSE THESE ARE "EVENT DRIVEN".WHENEVER A STATE
CHANGES OCCUR IN A SUBSTATION AT THAT TIME ONLY IT WILL REPORTED TO A OI SERVER.
BUT ANALOG PARAMETERS ARE MEMORY DRIVEN.IT WILL UPDATED CONTINUOUSLY.
"5%" DEADBAND.
DATE :04:09:13
SYNCHROCHECK :
1.SYNCHRO LOCKING
2.SYNCHRO COUPLING
1.SYNCHRO LOCKING :
IN SYNCHRO LOCKING ONLY 2 PARAMETERS ARE TAKEN AS REFERENCE TO
CHARGING A LINE WITH BUS.
2.SYNCHRO COUPLING :
IN SYNCHRO COUPLING 3 PARAMETERES ARE TAKEN AS REFERENCE TO
CHARGING A LINE WITH BUS IN A SUBSTAION.
IN THIS 5 VT'S,
TERMINAL 21,22-->R PH
23,24-->Y PH RUNNING VOLTAGE (PRESENCE VOLTAGE)
25,26-->B PH
S-BUS AGENCY :
BCU---->TOP-DOWN APPROACH
RELAY-->DOWN-TOP APPROACH
TOP-DOWN APPROACH :
DATE:06:09:13
AUTO RECLOSER :
AUTO RECLOSER FUNCTION HAS PERFORMED BY OUR BCU.WE HAVE TO GIVEN A LOGIC TO
SATISFIES THE CONDITION,DEPENDING UPON THE BCU CAN PERFORM.
3.CB POSITION.
STATE 9 & 10 : A/R FAIL STATUS (AR MAX SHOT & AR LOCKOUT)
A/R MAXIMUM SHOT MEANS,DURING THE RECLAIMER TIME,IF ANY FAULT CONSIST BCU MEETS,
REPEATED CYCLE FOR AUTO RECLOSE CHECKING.IF IT CROSS THE LIMIT,BCU WILL GIVE THE
A/R LOCKOUT.