121'
12'-6" 7'
9' 9' 5'
7'
7' 11'
J 7' F3 9' F5 9' F5 8' F8 7' F3 F3 10' F9 11' F7 F7 F5 Government of Kachin State
12' 7'
5'
7'
120' F 7' F3 F3
10'
12' 7'
17'
7'
5'
C 8' F4 9' F5 F5 F4
23'-3"
5' 6'
14"
14"
Mohyin, Kachin State
X X
Main reinf. : 8 - 18d ,
6'-0"
FOOTING DETAILS
Ground Floor Level ( + 2'-0" )
2'-0"
B1b
1/4" = 1'
S.3
25.8.2015
C2a
7'-0"
14"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
6'-0"
hard broken brick, etc. and sand
SECTION X -X
14"
14"
Mohyin, Kachin State
X X
Main reinf. : 8 - 18d ,
7'-0"
FOOTING DETAILS
Ground Floor Level ( + 2' - 0" )
2' - 0"
B3b
1/4" = 1'
S.4
25.8.2015
C2a
7'-0"
14"
3"
Footing Bed Level ( - 7' - 0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
7'-0"
hard broken brick, etc. and sand
SECTION X-X
14"
14"
Mohyin, Kachin State
X X
Main reinf. : 8 - 18d ,
8'-0"
FOOTING DETAILS
Ground Floor Level ( + 2' - 0" )
2' - 0"
1/4" = 1'
S.5
25.8.2015
C2a
7'-0"
14"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
8'-0"
hard broken brick, etc. and sand
SECTION X -X
14"
14" Mohyin, Kachin State
X X
Main reinf. : 12 - 18d ,
Ties: 10d ( 1 hoop ) per set
9'-0"
K
See more details in columns schedule. COMPOUND OFFICE
4-STOREYED R. C. BUILDING
FOOTING DETAILS
Ground Floor Level ( + 2'-0")
2'-0"
B3b B2
1/4" = 1'
S.6
25.8.2015
C2b
7'-0"
16"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
9'-0"
hard broken brick, etc. and sand
SECTION X-X
14"
14"
Mohyin, Kachin State
X X
Main reinf. : 8 - 18d ,
10'-0"
5'-A
BOTTOM STEEL ARRANGEMENT PLAN
Mohyin, Kachin State
FOOTING DETAILS
Ground Floor Level ( + 2'-0" )
B1b
2'-0"
1/4" = 1'
S.7
25.8.2015
C2a
7'-0"
18"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
10'-0"
hard broken brick, etc. and sand
SECTION X -X
11'-0"
See " Structural Specifications and
Parameters" for more information.
Type : C2a
Size : 14" x 14"
14"
14"
Mohyin, Kachin State
X X
Main reinf. : 8 - 18d ,
11'-0"
8-K
1/4" = 1'
C2b
S.8
25.8.2015
7'-0"
16"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
11'-0"
hard broken brick, etc. and sand
SECTION X-X
14"
14"
Mohyin, Kachin State
X X
Main reinf. : 8 - 18d ,
8'-0"
4-K
2'-0"
B2 B2
1/4" = 1'
C2b
S.9
25.8.2015
7'-0"
18"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
5'
hard broken brick, etc. and sand
SECTION X -X
14"
14"
Mohyin, Kachin State
X X
Main reinf. : 8 - 18d ,
10'-0"
4-K
2'-0"
B2 B2
1/4" = 1'
C2b
S.10
25.8.2015
7'-0"
22"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
7' chipping, broken concrete pieces,
hard broken brick, etc. and sand
SECTION X-X
14"
14" Mohyin, Kachin State
X X
E
7'
2-E 3-E
Mohyin, Kachin State
FOOTING DETAILS
Ground Floor Level ( + 2'-0")
2'-0"
1/4" = 1'
S.11
25.8.2015
C2b C2b
7'-0"
22"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
17' hard broken brick, etc. and sand
SECTION X-X
14"
E
14" Mohyin, Kachin State
4-D
X X
D
Mohyin, Kachin State
2'-0"
B1b B1b
1/4" = 1'
BOTTOM STEEL ARRANGEMENT PLAN C2b
S.12
25.8.2015
7'-0"
22"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
7' chipping, broken concrete pieces,
hard broken brick, etc. and sand
SECTION X-X
14"
C
14" Mohyin, Kachin State
5-B
X X
B
Mohyin, Kachin State
2'-0"
1/4" = 1'
C2b
BOTTOM STEEL ARRANGEMENT PLAN S.13
25.8.2015
7'-0"
22"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
11'
hard broken brick, etc. and sand
SECTION X -X
14"
14" Mohyin, Kachin State
X X
G
9'
2-G 3-G
Mohyin, Kachin State
FOOTING DETAILS
Ground Floor Level ( + 2'-0")
2'-0"
1/4" = 1'
S.14
25.8.2015
C2b C2b
7'-0"
22"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
19' hard broken brick, etc. and sand
SECTION X-X
14"
E
14" Mohyin, Kachin State
5-D
X X
D
Mohyin, Kachin State
2'-0"
B1b
1/4" = 1'
C2b
BOTTOM STEEL ARRANGEMENT PLAN S.15
25.8.2015
7'-0"
22"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
10'
hard broken brick, etc. and sand
SECTION X -X
14"
14"
Mohyin, Kachin State
COMPOUND OFFICE
16'
X X
F
4-F 5-F 5'-F
Mohyin, Kachin State
FOOTING DETAILS
BOTTOM STEEL ARRANGEMENT PLAN Ground Floor Level ( + 2'-0")
2'-0"
B1b
1/4" = 1'
S.16
25.8.2015
C2b C2b
7'-0"
22"
3"
Footing Bed Level ( - 7'-0" )
3" thick (1:4:8) lean concrete
Well-compacted soil using gravels,
chipping, broken concrete pieces,
18' hard broken brick, etc. and sand
SECTION X -X
Daw Nan Kay Zar Wint
U Lin Htet Han
121'
G
C2a C2b C2a C2a C2a C2a C2a C2a C2b C2a
12' C2c C2c
120' F
C2a C2a C2a C2a C2a C2a
12'
C2a C2a C2a C2a C2a C2a C2a C2a C2a C2a C2a C2a
E
C2a C2a
Mohyin, Kachin State
10'
D
C2a C2a C2a C2a C2a C2b C2b C2a C2a C2a C2a C2a
COLUMN
12'
TYPES PLAN
C
C2a C2a C2a C2a C2a C2a
12'
3/64" = 1'
B
C2c C2c C2a C2a C2c C2c S.17
25.8.2015
12'-6"
A
C2a C2a C2a C2a C2a C2a C2a C2a C2a C2a
23'-3"
A'
C1a C1a C1a C1a
121'
G
C2a C2b C2a C2a C2a C2a C2a C2a C2b C2a
12' C2c C2c
120' F
C2a C2a C2a C2a C2a C2a
12'
C2a C2a C2a C2a C2a C2a C2a C2a C2a C2a C2a C2a
E
C2a C2a
Mohyin, Kachin State
10'
D
C2a C2a C2a C2a C2a C2b C2b C2a C2a C2a C2a C2a
COLUMN
12'
TYPES PLAN
C
C2a C2a C2a C2a C2a C2a
12'
3/64" = 1'
B
C2c C2c C2a C2a C2c C2c S.18
25.8.2015
12'-6"
A
C2a C2a C2a C2a C2a C2a C2a C2a C2a C2a
23'-3"
A'
C1a C1a C1a C1a
121'
G
C1a C1a C1a C1a C1a C1a C1a C1a C1a C1a
12' C2a C2a
120' F
C1a C1a C1a C1a C1a C1a
12'
E
C1a C1a C1a C1a C1aC1a C1aC1a C1a C1a C1a C1a
Mohyin, Kachin State
10'
D
C1a C1a C1a C1a C1a C1a C1a C1a C1a C1a
COLUMN
12'
TYPES PLAN
C
C1a C1a C1a C1a C1a C1a
12'
3/64" = 1'
B
C1a C1a C1a C1a C1a C1a S.19
25.8.2015
12'-6"
A
C1a C1a C1a C1a C1a C1a C1a C1a C1a C1a
23'-3"
A'
121'
G
C1a C1a C1a C1a C1a C1a C1a C1a C1a C1a
12' C2a C2a
120' F
C1a C1a C1a C1a C1a C1a
12'
E
C1a C1a C1a C1a C1aC1a C1aC1a C1a C1a C1a C1a
Mohyin, Kachin State
10'
D
C1a C1a C1a C1a C1a C1a C1a C1a C1a C1a
COLUMN
12'
TYPES PLAN
C
C1a C1a C1a C1a C1a C1a
12'
3/64" = 1'
B
C1a C1a C1a C1a C1a C1a S.20
25.8.2015
12'-6"
A
C1a C1a C1a C1a C1a C1a C1a C1a C1a C1a
23'-3"
A'
121'
G
C1a C1a C1a C1a C1a C1a C1a C1a C1a C1a
12' C1a C1a
120' F
C1a C1a C1a C1a C1a C1a
12'
E
C1a C1a C1a C1a C1aC1a C1aC1a C1a C1a C1a C1a
Mohyin, Kachin State
10'
D
COLUMN
12'
TYPES PLAN
C
C1a C1a C1a C1a C1a C1a
12'
3/64" = 1'
B
C1a C1a C1a C1a C1a C1a S.21
25.8.2015
12'-6"
A
C1a C1a C1a C1a C1a C1a C1a C1a C1a C1a
23'-3"
A'
121'
12'
H
COMPOUND OFFICE
12' 4-STOREYED R. C. BUILDING
12'
120' F
12'
E
COLUMN
12'
TYPES PLAN
C
12'
3/64" = 1'
B
S.22
25.8.2015
12'-6"
A
23'-3"
A'
8d@6"c/c
clear height /6
l0
l0 = 21" Type : C1a
fc' = 2500 psi
C2
18"
8d@12"c/c
fy = 40000 psi (Ties)
12"
Clear height
8d@6"c/c
C1/C2
10'-4"
Main reinf. : 8 - 16d ,
C1/C2 Ties: 8d ( 1 hoop ) per set
8d@12"c/c
clear height /6
l0
( 2 sets @3" c/c )
18"
l0 = 21"
2nd Floor Level ( + 27'-6" ) Mohyin, Kachin State
8d@6"c/c
clear height /6
Largest of
C1 or C2
l0
Type : C1a
18"
l0 = 21"
C1/C2 C1a Size : 12" x 12"
COMPOUND OFFICE
Splice length (34d b)
8d@12"c/c
C1/C2
4-STOREYED R. C. BUILDING
Clear height
12"
Splice length (34d b)
12"
8d@6"c/c
10'-4"
Main reinf. : 8 - 16d ,
Ties: 8d ( 1 hoop ) per set
8d@12"c/c
clear height /6
l0
special ties at bend
18"
8d@6"c/c
special ties at bend
l0 = 21"
( 2 sets @3" c/c )
1st Floor Level ( + 15'-6" )
clear height /6
l0
C1/C2
10d@6"c/c
18"
l0 = 25"
C1/C2 Type : C2a
Splice length (34d b)
C2a
14"
Splice length (34d )
b
14"
10d@6"c/c
12'-4"
l0
( 2 sets @3" c/c ) ( 2 sets @3" c/c )
18"
l0
18"
10d@6"c/c
Type : C2a
Size : 14" x 14"
C1/C2 C2a
Clear height
14"
C1/C2
7'-4"
14"
l0
See more details in columns schedule.
3"
18"
121'
B1b
B1b
B1b
B1b
B1b
B1b
12'-6" Parameters" for more information.
B1b B2 B2 B1b B1b B2 B2 B1b
J
B1b
B1b
B1b
B1b
B1b
B1b
13'
B1b B1b B1b B1b B1b B1b B1b B1b
I
B1b Mohyin, Kachin State
B1b
B1b
B1b
B1b
B1b
12'
H
B1b
B1b
B1b
B1b
B1b
B1b
12' COMPOUND OFFICE
B1b B1b B1b B1b B1b B1b B1b B1b 4-STOREYED R. C. BUILDING
G
B2
B1b
B1b
B1b
B1b
12'
120' F
B2
B2
B2
B1b
B1b
B1b
B1b
B1b
B1b
12'
B1b B1b B1b B1b B1b B3a B1b B1b B1b B1b B1b
B1b B1b
E
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
10' Mohyin, Kachin State
B1b B1b B1b B1b B3a B1b B1b B1b B1b
D
B1b B1b
B1b
B1b
B1b
B1b
B1b
B1b
12' BEAM TYPES
C PLAN
B1b
B1b
B1b
B1b
B1b
B1b
12'
B 3/64" = 1'
S.24
B1b
B1b
B1b
B1b
B1b
B1b
12'-6" 25.8.2015
B1b B1b B1b B1b B1b B1b B1b B1b
A
B3b
B3b
B3b
B3b
23'-3"
A'
B1a B1a B1a
121'
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B2
B2
Parameters" for more information.
B1b
12'-6"
B1b
B1b B2 B2 B1b B1b B2 B2 B1b
J
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
13'
B1b B1b B1b B1b B1b B1b B1b B1b
I
Mohyin, Kachin State
B1b
B1b
B1b
B1b
B1b
B1b
B3b
B3b
B3b
B3b
12'
B1b B1b B1b B1b B1b B1b B1b B1b
H
B3b
B3b
B1b
COMPOUND OFFICE
B1b
B1b
B1b
B1b
B1b
B3b
B3b
12'
B1b B1b B1b B1b B1b B1b B1b B1b 4-STOREYED R. C. BUILDING
G
B2
B3b
B1b
B3b
B1b
B3b
B1b
B1b
B1b
B3b
B1b
12'
120' F
B1b B1b B1b B1b B1b B1b B1b B1b
B2
B2
B3b
B3b
B3b
B3b
B1b
B1b
B1b
B1b
B1b
B1b
12'
B1b B1b B1b B1b B1b B3a B1b B1b B1b B1b B1b
B1b B1b
E
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
10' Mohyin, Kachin State
B1b B1b B1b B1b B3b B1b B1b B1b B1b
D
B1b B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
12' BEAM TYPES
B3b B3b B1b B1b B3b B1b B1b B3b B3b PLAN
C
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
12'
B3b B3b B1b B1b B3b B1b B1b B3b B3b 3/64" = 1'
B
S.25
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
12'-6" 25.8.2015
B1b B1b B1b B1b B3b B1b B1b B1b B1b
A
B3b
B3a
B3b
B3a
23'-3"
A'
B3a B3a B3a
121'
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B2
B2
B1b
12'-6"
B1b B2 B2 B1b B1b B2 B2 B1b
J
Government of Kachin State
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
13'
I
B1b B1b B1b B1b B1b B1b B1b B1b Mohyin, Kachin State
B1b
B1b
B1b
B1b
B1b
B1b
B3b
B3b
B3b
B3b
12'
B1b B1b B1b B1b B1b B1b B1b B1b
H
COMPOUND OFFICE
B3b
B3b
B1b
4-STOREYED R. C. BUILDING
B1b
B1b
B1b
B1b
B1b
B3b
B3b
12'
B1b B1b B1b B1b B1b B1b B1b B1b
G
B2
B3b
B3b
B1b
B3b
B3b
B1b
B1b
B1b
B1b
B1b
12'
120' F
B1b B1b B1b B1b B1b B1b B1b B1b
B2
B2
B3b
B3b
B3b
B3b
B1b
B1b
B1b
B1b
B1b
12'
B1b B1b B1b B1b B1b B3a B1b B1b B1b B1b B1b
E
Mohyin, Kachin State
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
10'
B1b B1b B1b B1b B3b B1b B1b B1b B1b
D
BEAM TYPES
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
12' PLAN
B3b B3b B1b B1b B3b B1b B1b B3b B3b
C
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
12'
3/64" = 1'
B3b B3b B1b B1b B3b B1b B1b B3b B3b
B S.26
25.8.2015
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
12'-6" B1b
23'-3"
A'
121'
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B2
B2
12'-6"
B1b B2 B2 B1b B1b B2 B2 B1b
J
Government of Kachin State
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
13'
I
B1b B1b B1b B1b B1b B1b B1b B1b Mohyin, Kachin State
B1b
B1b
B1b
B1b
B1b
B1b
B3b
B3b
B3b
B3b
12'
B1b B1b B1b B1b B1b B1b B1b B1b
H
B3b COMPOUND OFFICE
B3b
B1b
4-STOREYED R. C. BUILDING
B1b
B1b
B1b
B1b
B1b
B3b
B3b
12'
B1b B1b B1b B1b B1b B1b B1b B1b
G
B2
B3b
B3b
B1b
B3b
B3b
B1b
B1b
B1b
B1b
B1b
12'
120' F
B1b B1b B1b B1b B1b B1b B1b B1b
B2
B2
B3b
B3b
B3b
B3b
B1b
B1b
B1b
B1b
B1b
12'
B1b B1b B1b B1b B1b B3a B1b B1b B1b B1b B1b
E
Mohyin, Kachin State
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
10'
B1b B1b B1b B1b B3b B1b B1b B1b B1b
D
BEAM TYPES
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
12' PLAN
B3b B3b B1b B1b B3b B1b B1b B3b B3b
C
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
12'
3/64" = 1'
B3b
B
B3b B3b B1b B1b B1b B1b B3b B3b
S.27
25.8.2015
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
B1b
12'-6"
B1b B1b B1b B1b B3b B1b B1b B1b B1b
A
23'-3"
A'
Note : those shown as are cut off at levels indicated, otherwise at the upper end of the column segment.
P PIONEER Structural Design Group
For the correct position of columns with respect to grid lines, please consult the architect or refer to the latest architectural drawings. Ph. 01-652831 ; 651165-2425
BEAM TYPES PLAN
[ At Roof Level (+50') ]
121'
B1a
B1a
B2
B2
B1a
B1a
B1a
B1a
B2
B2
12'-6" Parameters" for more information.
B3b B3b B2 B1a B1a B2 B3b B3b B1a
J
B1a
B1a
B1a
B1a
B1a B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
13' Government of Kachin State
B2
B2
B1a B2 B2 B1a B1a B1a B1a B2 B2 B1a
I
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
12'
B1a B1a B1a B1a
H
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
12'
COMPOUND OFFICE
B1a B1a B1a B1a
G
B1a B1a B1a B1a B1a B1a 4-STOREYED R. C. BUILDING
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
12'
B1a
B1a
B1a
B1a
120' F
B1a B1a B1a B1a B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
12'
B1a B1a B1a B1a B1b B1a B1b B1a B1a B1a B1a
B1a B1a
E
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a B1a B1a B1a B1a B1a
B1a
B1a
10'
B1a
B1a
B1a
B1a
B1a
B1a
B1a B1a B1a B1a B1a B1a B1a B1a B1a Mohyin, Kachin State
D
B1a B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
12'
BEAM TYPES
B1a B1a
C
PLAN
B1a
B1a
B1a
B1a
B1a
B1a
B1a
B1a
12'
B1a B1a
B
3/64" = 1'
B1a
B1a
B1a
B1a
B1a
B1a
S.28
B1a
B1a
12'-6" B1a B1a B1a B1a B1a
25.8.2015
B1a
B1a
B1a
B1a
B1a
A
B1a B1a B1a B1a B1a B1a B1a B1a B1a
23'-3"
A'
121'
B1a
B1a
B1a
B1a
Parameters" for more information.
12'-6" C1a B1a C1a C1a B1a C1a
J
Government of Kachin State
13'
I Mohyin, Kachin State
12'
H
COMPOUND OFFICE
12' 4-STOREYED R. C. BUILDING
G
12'
120' F
12'
E
BEAM TYPES
12'
PLAN
C
12'
3/64" = 1'
B
S.29
25.8.2015
12'-6"
A
23'-3"
A'
121'
B3a
B3a
B3a
B3a
5'
12'-6" S2
J
B3a B3a
Government of Kachin State
13'
I Mohyin, Kachin State
12'
H
COMPOUND OFFICE
12' 4-STOREYED R. C. BUILDING
G
B3a
12'
B3a
B3a
S2 7'-6"
120' F
B3a
12'
E
BEAM TYPES
12'
PLAN
C
12'
3/64" = 1'
B
S.30
25.8.2015
12'-6"
A
23'-3"
A'
12'-0" 12'-0"
3-20d
1" Clear
X1 X2 2-20d
2-12d
4-8d hanger
1" Clear
X1 X2 stirrups 2-20d
(See Note) 3-20d
Mohyin, Kachin State
40" 40"
10d @ 4"
10d @ 3" 10d @ 3"
3/64" = 1'
S.31
25.8.2015
3-20d 3-20d
2-20d
4" 4"
20" 20"
2-12d 2-12d
2-20d 2-20d
3-20d 3-20d
10" 10"
X1 3-20d 3-20d
2-12d 2-12d
3/64" = 1'
3-20d 3-20d 3-20d 3-20d
4-18d 3-18d S.32
25.8.2015
3-20d
4"
20"
2-12d
3-20d
10"
Section X1-X1
Daw Nan Kay Zar Wint
U Lin Htet Han
B1b B1b B2
Mohyin, Kachin State
12'-6" 12'-0"
X1 4-18d X2 4-18d
4-18d 4-18d
4-18d 4-18d
R. C. FLOOR BEAM DETAILS
3/64" = 1'
S.33
4-18d 4-18d 25.8.2015
14" 16"
4-18d
4-18d
10"
10"
121'
S1 S1 S1 S1 S1 S1 S1 S1 COMPOUND OFFICE
12' 4-STOREYED R. C. BUILDING
S1 S1 S1 S1 S1 S1 S1 S1
12'
7'-6"
120' F
S1 S1 S1 S1 S1 S1 S1 S1
12'
E
S1 S1 S1 S1 S2
S2 S2
S1 S1 S1 S1 Mohyin, Kachin State
10'
D
S1 S1 S1 S1 S2 S1 S1 S1 S1 SLAB TYPES
12'
PLAN
C
S1 S1 S1 S1 S2 S1 S1 S1 S1
12'
3/64" = 1'
B
S.34
S1 S1 S1 S1 S2 S1 S1 S1 S1 25.8.2015
12'-6"
A
S1 S1 S1
23'-3"
A'
121'
S1 S1 S1 S1 S1 S1 S1 S1 COMPOUND OFFICE
12' 4-STOREYED R. C. BUILDING
S1 S1 S1 S1 S1 S1 S1 S1
12'
7'-6"
120' F
S1 S1 S1 S1 S1 S1 S1 S1
12'
E
S1 S1 S1 S1 S2
S2 S2
S1 S1 S1 S1 Mohyin, Kachin State
10'
D
S1 S1 S1 S1 S2 S1 S1 S1 S1 SLAB TYPES
12'
PLAN
C
S1 S1 S1 S1 S2 S1 S1 S1 S1
12'
3/64" = 1'
B
S.35
S1 S1 S1 S1 S2 S1 S1 S1 S1 25.8.2015
12'-6"
A
23'-3"
A'
S1 S1 S1 S1 S1 S1 S1 S1 COMPOUND OFFICE
12' 4-STOREYED R. C. BUILDING
S1 S1 S1 S1 S1 S1 S1 S1
12'
7'-6"
120' F
S1 S1 S1 S1 S1 S1 S1 S1
12'
E
S1 S1 S1 S1 S2
S2 S2
S1 S1 S1 S1 Mohyin, Kachin State
10'
D
S1 S1 S1 S1 S2 S1 S1 S1 S1 SLAB TYPES
12'
PLAN
C
S1 S1 S1 S1 S2 S1 S1 S1 S1
12'
3/64" = 1'
B
S.36
S1 S1 S1 S1 S2 S1 S1 S1 S1 25.8.2015
12'-6"
A
23'-3"
A'
S1 S1 S1 S1 S1 S1 S1 S1 COMPOUND OFFICE
12' 4-STOREYED R. C. BUILDING
S1 S1 S1 S1 S1 S1 S1 S1
12'
7'-6"
120' F
S1 S1 S1 S1 S1 S1 S1 S1
12'
E
S1 S1 S1 S1 S2 S1 S1 S1 S1 SLAB TYPES
12'
PLAN
C
S1 S1 S1 S1 S2 S1 S1 S1 S1
12'
3/64" = 1'
B
S.37
S1 S1 S1 S1 S2 S1 S1 S1 S1 25.8.2015
12'-6"
A
23'-3"
A'
121'
S2 S2 S2
13' S2
Government of Kachin State
S2 S2
Mohyin, Kachin State
12' S2
S2
12' S2 S2 S2
S2
COMPOUND OFFICE
G 4-STOREYED R. C. BUILDING
12' S2 S2
S2 S2 S2 S2
S2
S2
120' F
S2
S2 S2
12'
S2 S2 S2
E
S2
S2 S2 S2 S2 S2
10' S2
S2 S2 S2 S2
S2
S2 S2
12'
SLAB TYPES
C
S2
PLAN
12' S2
B
3/64" = 1'
12'-6" S2
S2
S.38
S2 S2
S2
S2 S2 S2 S2 S2 S2 S2
25.8.2015
A
23'-3"
A'
B1a
B1a
B1a
B1a
Parameters" for more information.
12'-6" C1a B1a C1a C1a B1a C1a
J
Government of Kachin State
13'
I Mohyin, Kachin State
12'
H
COMPOUND OFFICE
12' 4-STOREYED R. C. BUILDING
G
12'
120' F
12'
E
SLAB TYPES
12'
PLAN
C
12'
3/64" = 1'
B
S.39
25.8.2015
12'-6"
A
23'-3"
A'
K L M
Design specifications for slab;
f ' = 2500 psi
12'-0" 12'-0" f = 50000 psi (Main reinf.)
f = 50000 psi (Temp. shri. reinf.)
See " Structural Specifications and
10d@ 6" c/c 1 Parameters" for more information.
B1a B1a 0d
@
6"
7 10d@ 6" c/c c/c
6" 6"
c/c c /c 10 Mohyin, Kachin State
d@
6"
c/c
8 10d@ 6" c/c
10 10d@ 6" c/c
d@
6" COMPOUND OFFICE
B3a
B3a
c/c 4-STOREYED R. C. BUILDING
10d@ 6" c/c
12'-0"
1 1 1
6'-0" 12'-0"
9
B3a B3a
+15'-6" FIRST FLOOR LEVEL
UP STAIR DETAILS
STAIR PLAN
7'-0"
3/16" = 1'
K L M 4'-
10d@ 6" c/c
6" S.40
25.8.2015
10d@6" c/c
7'-0"
B3a B3a 13 10d@ 6" c/c
61
2"
'-2 13
16 "
7
11"
B3a
B3a
6'-0"
1 1
Government of Kachin State
X X
S2 S1 S2 S1 Mohyin, Kachin State
X X
2 2 COMPOUND OFFICE
4-STOREYED R. C. BUILDING
S2 S1 S2 S1
3 3
Mohyin, Kachin State
EXAMPLE OF STEEL
BOTTOM STEEL ARRANGEMENT PLAN TOP STEEL ARRANGEMENT PLAN
ARRANGEMENT IN SLAB
E F G H 3/64" = 1'
S.41
25.8.2015
2'-0" 2'-0" 2'-0"
4'-3" 4'-3"
5"
10d @ 8" bothways
SECTION X-X
Y
See " Structural Specifications and
Parameters" for more information.
S1 S1
S1 S1
S2 S2 S2 S2
EXAMPLE OF STEEL
ARRANGEMENT IN SLAB
Y
3/64" = 1'
BOTTOM STEEL ARRANGEMENT PLAN TOP STEEL ARRANGEMENT PLAN
25.8.2015
13
11 12
4"
10d @ 8" bothways 10d @ 8" bothways
Daw Nan Kay Zar Wint
U Lin Htet Han
SECTION X-X
P PIONEER Structural Design Group
121'
4' 4'
4'-9" 12'-6" 12' 12' 8' 24' 8' 12' 12' 12'-6" 4'-9" Design specifications for retaining wall;
fc' = 2500 psi
K
R. W. 2 R. W. 2 R. W. 2 R. W. 2 R. W. 2 R. W. 2 R. W. 2 R. W. 2 fy = 50000 psi (Main reinf.)
fy = 50000 psi (Temp. & shri. reinf.)
R. W. 2
R. W. 2
R. W. 2
R. W. 2
12'-6" See " Structural Specifications and
Parameters" for more information.
J
R. W. 2
R. W. 2
R. W. 2
R. W. 2
13'
Government of Kachin State
I
R. W. 2
R. W. 2
R. W. 2
R. W. 2
12' Mohyin, Kachin State
R. W. 2
R. W. 2
R. W. 2
R. W. 2
12'
COMPOUND OFFICE
G
4-STOREYED R. C. BUILDING
R. W. 2
R. W. 2
R. W. 2
R. W. 2
R. W. 2
12'
R. W. 2
R. W. 2
120' F
R. W. 2
R. W. 2
R. W. 2
R. W. 2
12'
R. W. 2 R. W. 2
E
R. W. 2 R. W. 2
R. W. 2
R. W. 2
R. W. 2
R. W. 2
10'
D Mohyin, Kachin State
R. W. 2 R. W. 2
R. W. 2
R. W. 2
12'
REATINING WALL
C
LOCATION PLAN
R. W. 2
R. W. 2
12'
B
3/64" = 1'
R. W. 2
R. W. 2
12'-6" S.43
25.8.2015
A
R. W. 2 R. W. 2 R. W. 2 R. W. 2 R. W. 2 R. W. 2
R. W. 1
R. W. 1
23'-3"
A'
R. W. 1 R. W. 1 R. W. 1
121'
Design specifications for beams;
1' 1 2 3 4 5 5' 6' 6 7 8 9 10 10'
fc' = 2500 psi
fy = 50000 psi (Main reinf.)
4' 4' fy = 40000 psi (Stirrups)
4'-9" 12'-6" 12' 12' 8' 24' 8' 12' 12' 12'-6" 4'-9"
See " Structural Specifications and
K
6"
Parameters" for more information.
6"
S3 S2 S3 S3 S2
12'-6" 5'
S3 S2
S2 S2 S2
13' S2
S2 S2
12' S2
S2
H
COMPOUND OFFICE
4-STOREYED R. C. BUILDING
12' S2 S2 S2
S2
12' S2 S2
S2 S2 S2
S2
S2
120' F
S2
S2 S2
12'
S2 S2 S2
10' S2
S2 S2 S2
S2 S2 S2
S2
D
ROOF PLAN
S2 S2
12'
C
S2
3/64" = 1'
12' S2
S.46
B 25.8.2015
S2
12'-6" S2
S2
S2 S2 S2 S2 S2 S2 S2 S2 S2
23'-3"
A'
4' 4'
4'-9" 12'-6" 12' 12' 8' 24' 8' 12' 12' 12'-6" 4'-9" Design specifications for beams;
fc' = 2500 psi
K
fy = 50000 psi (Main reinf.)
fy = 40000 psi (Stirrups)
12'-6" See " Structural Specifications and
Truss - 9
Truss - 7
Truss - 8
Truss - 8
Truss - 7
Truss - 9
Tr Tr
us u
-3
-3
s ss Parameters" for more information.
s
J -3 -3
us
us
Tr
Tr
13'
Government of Kachin State
Truss - 1
I
H
Truss - 1
12'
Truss - 1 COMPOUND OFFICE
G
4-STOREYED R. C. BUILDING
12' Truss - 1
-3
ss
Tr
Truss - 7
120'
us
u
F
Tr
s
Truss - 1 Truss - 1
-3
Truss - 1 Truss - 1
12'
Truss - 1 Truss - 1
E Truss - 1 Truss - 1
Truss - 1 Truss - 1
10'
D
Truss - 1 Truss - 1
Truss - 1 Mohyin, Kachin State
Tr
-3
us
s
s
us
12'
-3
Tr
Truss - 5 ROOF TRUST
C
Truss - 1 Truss - 1 PLAN
Truss
12' - 4 Truss - 4
B
Truss - 6 Truss - 6
3/64" = 1'
12'-6" S.47
25.8.2015
-2
Tr
A
s
us
us
s
Tr
-2
Truss - 1
Truss - 1
Truss - 1
Truss - 1
Truss - 1
Truss - 1
Truss - 1
Truss - 1
Truss - 1
Truss - 1
23'-3"
A'
2 3 4
Detail - B
Mohyin, Kachin State
( +57'10" )
TU1
TU1
Detail - D
TU 1
TU1 COMPOUND OFFICE
19'1
0" 4-STOREYED R. C. BUILDING
1 "TU1
TU1
TU1
6'-716
TU2
TU2
TU
2
TU
TU1
TU 1
2
TU2
TU2
TU
2
TU
2
TU 2
TU2
TU2
2 TU TU1
TU1 TU2 2 "3
TU
2'-11 4
TU2
TU2
36'-0" ( +50'- 6" )
TU1 TU1 TU1 TU1 TU1 TU1 TU1 TU1 TU1 TU1 ( +50'- 0" ) ROOF FLOOR LEVEL
Mohyin, Kachin State
Detail - A
Detail - C
TRUSS SECTION
( +57'10" )
TU1
COMPOUND OFFICE
TU1 4-STOREYED R. C. BUILDING
3"
27'-
TU1
TU1
6'-741"
TU
2
TU2
TU 1
TU
TU
2
2 TU2
TU2
TU1 TU2
TU2
( +50'- 6" )
TU1 TU1 TU1 26'5" TU1 TU1 ( +50'- 0" ) ROOF FLOOR LEVEL
Mohyin, Kachin State
Truss 3
TRUSS SECTION
1/4" = 1'
S.49
25.8.2015
15
7 "
20'-
715"
( +57'- 10" ) Design specifications for steel truss;
20'- 16 16
1"
A 36 steel
16 "
11 1
11
2
6'-8"
9'-
6'-8"
6'- 16
7'-
5'-28"
2
13 "
7
5'-2
3'-93"
8
4'-
"
fy = 36 ksi
3"
16"
2'-315
3'-6 9
16 "
( +50'- 6" )
( +50'- 0" ) ROOF FLOOR LEVEL fu = 58 ksi
Truss-4 (more detail see in pg.43) E 70 Electric Welding
FEXX= 70 ksi
2 3 4 5 6 7 8 9
6'- 13
16 "
2
2"
5'-
2'-6"
( +50'- 6" )
( +50'- 0" ) ROOF FLOOR LEVEL Mohyin, Kachin State
Truss-5 (more detail see in pg.44)
2 3 4 5 6 7 8 9
8"
3'-93
( +50'- 6" )
( +50'- 0" ) ROOF FLOOR LEVEL
Truss-6 (more detail see in pg.45)
B C D E F G H I
8'-
10 8
1"
2"
5'-
2"
3'-71
( +50'- 6" )
( +50'- 0" ) ROOF FLOOR LEVEL TRUSS SECTION
Truss-7 (more detail see in pg.46)
B C D E F G H I
( +50'- 6" )
( +50'- 0" ) ROOF FLOOR LEVEL
Truss-8 (more detail see in pg.47)
B C D E F G H I
( +57'- 10" )
3
3 "
12'- 8
( +50'- 6" )
( +50'- 0" ) ROOF FLOOR LEVEL Daw Nan Kay Zar Wint
Truss-9 (more detail see in pg.48) U Lin Htet Han
6 7 8 9
Government of Kachin State
( +57'- 10" )
20'- 15
7
16 "
(+50'-0")ROOF
FLOOR LEVEL TRUSS SECTION
( +50'- 6" )
3/16" = 1'
S.51
25.8.2015
Truss 4
( +57'- 10" )
2"
5'-
TRUSS SECTION
( +50'- 6" )
(+50'-0")ROOF
FLOOR LEVEL
3/16" = 1'
S.52
25.8.2015
Truss 5
For Detail E
see Page. no. 51
( +57'- 10" )
8"
3'-93
TRUSS SECTION
( +50'- 6" )
(+50'-0")ROOF
FLOOR LEVEL 3/16" = 1'
S.53
25.8.2015
Truss 6
COMPOUND OFFICE
4-STOREYED R. C. BUILDING
( +57'- 10" )
8'-
10 8
2"
5'- TRUSS SECTION
( +50'- 6" )
(+50'-0")ROOF
FLOOR LEVEL
3/16" = 1'
S.54
25.8.2015
Truss 7
B C D E
Government of Kachin State
( +57'- 10" )
8'-4 9
16 "
15
7 " Mohyin, Kachin State
20'- 16
6'-74"
1
TRUSS SECTION
( +50'- 6" )
(+50'-0")ROOF
3/16" = 1'
FLOOR LEVEL
S.55
25.8.2015
Truss 8
( +57'- 10" )
TRUSS SECTION
( +50'- 6" )
(+50'-0")ROOF
3/16" = 1'
FLOOR LEVEL
S.56
25.8.2015
Truss 9
TU1 Tube 75 x 50 75 50 4
STEEL SCHEDULE
3/4" = 1'
S.57
25.8.2015
Detail-A Detail-B
Ref. from page No. (39) Ref. from page No. (39)
TU1
COMPOUND OFFICE
4-STOREYED R. C. BUILDING
EXAMLE OF CONNECTION
DETAILS
TU1 25.8.2015
Cleat Angle
25 x 25 x 50 x 4 mm
2
TU
TU1
2
TU
TU1 TU1
TU2
Detail-E Detail-F
Ref. from page No. (44) Ref. from page No. (46)
TU2
TU
TU
2
TU1
COMPOUND OFFICE
4-STOREYED R. C. BUILDING
EXAMLE OF CONNECTION
DETAILS
Cleat Angle
25 x 25 x 50 x 4 mm
2
TU
TU1
1" = 1'
S.59
TU
2
TU1 25.8.2015
TU1
TU1 TU1
2
TU
TU
2
Cleat Angle
TU2
25 x 25 x 50 x 4 mm
Size Min :
Type Bottom Main Steel Distribution Steel Remark
L (ft) B (ft) H (in.) Cover
F1 5 5 12 16mm@6"c/c Spacing ( Shorter Dir) 16mm@6"c/c Spacing ( Longer Dir) 0'-2" Below Netural Axis
Design specifications for foundation;
fc' = 2500 psi
F2 6 6 14 16mm@6"c/c Spacing ( Shorter Dir) 16mm@6"c/c Spacing ( Longer Dir) 0'-2" Below Netural Axis fy = 50000 psi (Main reinf.)
fy = 50000 psi (Temp. & shri. reinf.)
See " Structural Specifications and
F3 7 7 14 16mm@6"c/c Spacing ( Shorter Dir) 16mm@6"c/c Spacing ( Longer Dir) 0'-2" Below Netural Axis Parameters" for more information.
F4 8 8 14 18mm@4"c/c Spacing ( Shorter Dir) 18mm@4"c/c Spacing ( Longer Dir) 0'-2" Below Netural Axis
Government of KaChin State
F5 9 9 16 18mm@4.5"c/c Spacing ( Shorter Dir) 18mm@4.5"c/c Spacing ( Longer Dir) 0'-2" Below Netural Axis
Mohyin State
F6 10 10 18 18mm@4.5"c/c Spacing ( Shorter Dir) 18mm@4.5"c/c Spacing ( Longer Dir) 0'-2" Below Netural Axis
F7 11 11 22 20mm@5"c/c Spacing ( Shorter Dir) 20mm@5"c/c Spacing ( Longer Dir) 0'-2" Below Netural Axis COMPOUND OFFICE
4-STOREYED R. C. BUILDING
F8 5 8 18 18mm@4.5"c/c Spacing ( Shorter Dir) 18mm@4.5"c/c Spacing ( Longer Dir) 0'-2" Below and Above NA
F9 7 10 22 20mm@5"c/c Spacing ( Shorter Dir) 20mm@5"c/c Spacing ( Longer Dir) 0'-2" Below and Above NA
F10 7 17 22 20mm@5"c/c Spacing ( Shorter Dir) 20mm@5"c/c Spacing ( Longer Dir) 0'-2" Below and Above NA
F12 11 17 22 20mm@4.5"c/c Spacing ( Shorter Dir) 20mm@4.5"c/c Spacing ( Longer Dir) 0'-2" Below and Above NA FOOTINGS SCHEDULE
F13 9 19 22 20mm@4"c/c Spacing ( Shorter Dir) 20mm@4"c/c Spacing ( Longer Dir) 0'-2" Below and Above NA
1/4" = 1'
F14 20 10 22 20mm@5"c/c Spacing ( Shorter Dir) 20mm@5"c/c Spacing ( Longer Dir) 0'-2" Below and Above NA S.60
25.8.2015
F15 18 16 22 20mm@5"c/c Spacing ( Shorter Dir) 20mm@5"c/c Spacing ( Longer Dir) 0'-2" Below and Above NA
Note ( 1 ) Please use only sandy soil as backfill material, if have, all water from foundation holes must be first.
Note ( 2 ) At least 3" of Sand and Chipping layer must be applied on soils. After compacting, hardcore crushed stone is 1 foot under 5"
lean concrete.
Note ( 3 ) Concrete quality control is critical because, in design, concrete strength is the most important property to prevent shear failure
in footing.
Note ( 4 ) Combined and Mat footings must be provided both below and above Neutral axis. Daw Nan Kay Zar Wint
U Lin Htet Han
C1a 12" x 12" 8-16d 1 hoop A-8d@6" + x-8d@12" + B-8d@6" Square Col. Government of Kachin State
C1b 12" x 12" 8-18d 1 hoop A-8d@6" + x-8d@12" + B-8d@6" Square Col.
Mohyin, Kachin State
C2a 14" x 14" 8-18d 1 hoop A-10d@6" + x-10d@12" + B-10d@6" Square Col.
COMPOUND OFFICE
C2b 14" x 14" 12-18d 1 hoop A-10d@6" + x-10d@12" + B-10d@6" Square Col.
4-STOREYED R. C. BUILDING
C2c 14" x 14" 16-18d 2 hoops A-10d@6" + x-10d@12" + B-10d@6" Square Col.
Prop 10" x 10" 4-16d 1 hoop A-8d@6" + x-8d@12" + B-8d@6" Square Col.
R. C. COLUMN
Note: For example, (1) A-10d@6" + x-10d@12" + B-10d@6" means A spaces of 10 mm diameter ties at 6 in. c/c for a length of l0 at the base and B spaces of 10 mm diameter ties at 6 in. c/c for a length of l0 at the top of the
unsupported column length and the remaining length of the column is to be filled up with x spaces of 10 mm diameter ties at 12 in. c/c where x is the variable. SCHEDULE
12"
14"
Government of Kachin State
12" 12"
14"
Mohyin, Kachin State
Main reinf. : 8 - 16d , Main reinf. : 8 - 18d ,
Ties: 8d ( 1 hoop ) per set Ties: 8d ( 1 hoop ) per set Main reinf. : 8 - 18d ,
Ties: 10d ( 1 hoop ) per set
See more details in columns schedule. See more details in columns schedule.
See more details in columns schedule.
COMPOUND OFFICE
4-STOREYED R. C. BUILDING
R. C. COLUMN
SECTION ( by Type )
Type : C2b
Type : C2c Type : Prop
Size : 14" x 14" 3/8" = 1'
Size : 14" x 14" Size : 10" x 10"
S.62
25.8.2015
14"
14"
10"
14" 10"
14"
Top Reinforcement (No. & Size) Bottom Reinforcement (No. & Size) Mid Steel Stirrup Spacing (in.)
Type Size (No. & Remarks
Size)
Left Mid Right Left Mid Right Left Mid Right
B1a 10" x 14" 3-18d 3-18d 3-18d 3-18d 3-18d 3-18d - 8d @ 3" 8d @ 4" 8d @ 3"
B1b 10" x 14" 4-18d 4-18d 4-18d 4-18d 4-18d 4-18d - 8d @ 3" 8d @ 4" 8d @ 3"
B2 10" x 16" 4-18d 4-18d 4-18d 4-18d 4-18d 4-18d - 10d @ 3" 10d @ 5" 10d @ 3"
B3a 10" x 20" 3-20d 3-20d 3-20d 3-20d 3-20d 3-20d 2-12d 10d @ 3" 10d @ 4" 10d @ 3" Government of Kachin State
B3b 10" x 20" 5-20d 3-20d 5-20d 5-20d 5-20d 5-20d 2-12d 10d @ 3" 10d @ 4" 10d @ 3"
Mohyin, Kachin State
COMPOUND OFFICE
4-STOREYED R. C. BUILDING
2 3 4 R. C. BEAM
SCHEDULE
B1a B1a
14"
3-18d X1 3-18d
3-18d
10"
28" 28" 28" 28"
8d @ 4" 8d @ 4"
8d @ 3" 8d @ 3" 8d @ 3" 8d @ 3"
Section X1-X1
Type Thickness
One-way/ Two-way/
Direction Remarks
See " Structural Specifications and
Cantilever Parameters" for more information.
Middle Strip Column Strip Middle Strip Column Strip Middle Strip Column Strip
Shorter 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c
Government of Kachin State
S1 4" Two-way
Longer 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c
Shorter 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c
COMPOUND OFFICE
S3 5" Two-way
4-STOREYED R. C. BUILDING
Longer 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c 10d @ 8" c/c
Type Thickness One-way / Cantilever Top Steel ( contd. edge ) Bottom Steel Top Steel ( discontd. edge ) Distribution Steel Remarks
3/64" = 1'
S.64
25.8.2015
ST-1 6.5" Oneway 10d @ 6" c/c 10d @ 6" c/c 10d @ 6" c/c 10d @ 6" c/c