ANALISIS DE GASTOS GENERALES DE SUPERVISION

#REF!

#REF!

#REF!
PLAZO : 6.00 MESES

REPROGRAMADO
COD. DESCRIPCION
COEF UNIDAD C/UNIT CANTIDAD PARCIAL TOTAL

2.6.2.3.2.4 SERVICIOS NO PERSONALES 12,000.00


Supervisor de obra 1.00 Mes 6,000.00 2.00 12,000.00

2.6.2.3.2.6 OTROS SERVICIOS DE TERCEROS 624.50


Reproducción planos A1 1.00 Glb. 8.00 30.00 240.00
Copias fotostáticas 1.00 Glb. 100.00 1.00 100.00
Ensayos de concreto y geotecnia 1.00 Glb. 284.50 1.00 284.50

2.6.2.3.2.5 MATERIALES DE ESCRITORIO 375.50


Papel bond A4 80 gr. 1.00 Millar 30.00 3.00 90.00
Cuaderno 100 hojas A4 1.00 Und. 6.00 5.00 30.00
Archivador 1.00 Und. 15.00 5.00 75.00
Folder manila c/fastner 1.00 Und. 1.50 50.00 75.00
Sobre manila 1.00 Und. 0.70 25.00 17.50
Resaltador 1.00 Und. 2.00 4.00 8.00
Pegamento en barra 1.00 Und. 5.00 4.00 20.00
Lapicero Pilot 1.00 Und. 5.00 12.00 60.00

TOTAL S/. 13,000.00


DESAGREGADO DE FINANCIAMIENTO
#REF!
Aporte Solicitado al Cofinanciamiento
FUENTES MVCS Costo Total
USOS (a) Municipalidad (b) Beneficiarios (c). (a+b+c)
s/. % s/. % s/. % s/. %
1.- Costos Directos #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
-Mano de Obra
TOPOGRAFO #REF! #REF! - #REF! - #REF! - #REF!
OPERARIO #REF! #REF! - #REF! - #REF! - #REF!
OFICIAL #REF! #REF! - #REF! - #REF! - #REF!
PEON #REF! #REF! #REF! #REF! - #REF! #REF! #REF!
-Materiales #VALUE! #VALUE! #VALUE! #VALUE! #REF! #REF! #REF! #REF!
-Servicios #REF! #REF! #REF! #REF! - #REF! - #REF!
-Herramientas manuales - #REF! #REF! #REF! - #REF! #REF! #REF!
-Combustibles y lubricantes #REF! #REF! - #REF! - #REF! - #REF!
-Maquinarias y Equipos #VALUE! #VALUE! #REF! #REF! - #REF! #REF! #REF!

2.-Costos Indirectos 173,177.65 #REF! - #REF! - #REF! 173,177.65 #REF!


-Dirección Técnica, Administrativa, otros 173,177.65 #REF! - #REF! - #REF! 173,177.65 #REF!
3.-TOTAL S/ #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

S/. #REF! #REF! #REF! #REF!


RESUMEN DE PRESUPUESTO

#REF!

FINANCIAMIENTO
RUBROS TOTAL
MVCS MUNICIPALIDAD BENEFICIARIOS

MANO DE OBRA #REF! - #REF!


MATERIALES #REF! 34,679.05 #REF!
SERVICIOS #REF! #REF!
MAQUINARIAS Y EQUIPOS #REF! #REF!
HERRAMIENTAS MANUALES #REF! #REF!

COSTO DIRECTO #REF! #REF! - #REF!

GASTOS GENERALES (8%) #REF! #REF! - #REF!

UTILIDAD (7%) #REF! #REF! - #REF!

SUB TOTAL #REF! #REF! - #REF!

IGV (18%) #REF! #REF! - #REF!

GASTOS DE SUPERVISION 13,000.00 13,000.00

TOTAL S/. #REF! #REF! - #REF!


PORCENTAJE % #REF! #REF! #REF! #REF!
PRESUPUESTO TOTAL #REF!
INSUMOS GENERALES DESAGREGADO POR FINANCIANTES
#REF!

#REF!

#REF!
#REF!

MANO DE OBRA UND CANT. PRECIO PARCIAL


APORTE DE MVCS
TOPOGRAFO hh #REF! #REF! #REF!
OPERARIO hh #REF! #REF! #REF!
OFICIAL hh #REF! #REF! #REF!
PEON hh #REF! #REF! #REF!
#REF!
APORTE DE LOS BENEFICIARIOS
PEON hh #REF! #REF! 0.00

SUB TOTAL S/. #REF!

MATERIALES UND CANT. PRECIO PARCIAL


APORTE DE MVCS
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF!
APORTE DE MUNICIPALIDAD DISTRITAL DE HUALLA

#REF! #REF! #REF! #REF! 1,920.73


INSUMOS GENERALES DESAGREGADO POR FINANCIANTES
#REF!

#REF!

#REF!
#REF!

#REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF!

#REF!

SUB TOTAL S/. #REF!


TERCEROS UND CANT. PRECIO PARCIAL
APORTE DE MVCS
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF!

SUB TOTAL S/. #REF!


MAQUINARIAS Y EQUIPOS UND CANT. PRECIO PARCIAL
APORTE DE MVCS
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF!

SUB TOTAL S/. #REF!


HERRAMIENTAS MANUALES UND CANT. PRECIO PARCIAL
APORTE DE MUNICIPALIDAD DISTRITAL DE HUALLA
HERRAMIENTAS MANUALES %MO #REF!
SUB TOTAL S/. #REF!
RESUMEN DE PRESUPUESTO
Proyecto: CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO SAN CRISTOBAL
DEL DISTRITO DE SOCOS-HUAMANGA-AYACUCHO

FINANCIAMIENTO
RUBROS TOTAL
MVCS MNICIPALIDAD BENEFICIARIOS

MANO DE OBRA #REF! #REF! - 199,274.30


MATERIALES #VALUE! #VALUE! #REF! 897,268.55
SERVICIOS #REF! #REF! -
MAQUINARIAS Y EQUIPOS #VALUE! #REF! - 222,745.69
COMBUSTIBLES Y LUBRICANTES #REF! - -
HERRAMIENTAS MANUALES - #REF! - 8,505.06

COSTO DIRECTO #REF! #REF! #REF! 1,302,087.59

GASTOS GENERALES (10%) #REF! 130,208.76

SUB TOTAL #REF! 1,432,296.35

GASTOS DE SUPERVISION (2.91%) #REF! 42,968.89

TOTAL S/. #REF! #REF! #REF! #REF!


PORCENTAJE % #REF! #REF! #REF! #REF!
PRESUPUESTO TOTAL 1,475,265.24
ANALISIS DE GASTOS GENERALES DE SUPERVISION

ENTIDAD : MUNICIPALIDAD DISTRITAL DE SOCOS


PROYECTO : CONSTRUCCION DE PISTAS Y VEREDAS EN EL BARRIO DE SAN MARTIN DEL DISTRITO DE SOCOS-HUAMANGA-AYACUCHO
MOD. EJEC. : ADMINISTRACION DIRECTA
PLAZO : 6.00 MESES

REPROGRAMADO
COD. DESCRIPCION
COEF UNIDAD C/UNIT CANTIDAD PARCIAL TOTAL

2.6.2.3.2.4 SERVICIOS NO PERSONALES 30,000.00


Supervisor de obra 1.00 Mes 5,000.00 6.00 30,000.00

2.6.2.3.2.6 PASAJES Y GASTOS DE TRANSPORTES 10,000.00


Alquiler camioneta 1.00 dias 250.00 40.00 10,000.00

2.6.2.3.2.6 OTROS SERVICIOS DE TERCEROS 2,841.84


Reproducción planos A1 1.00 Glb. 6.00 50.00 300.00
Copias fotostáticas 1.00 Glb. 700.00 1.00 700.00
Ensayos de concreto y geotecnia 1.00 Glb. 1,841.84 1.00 1,841.84

2.6.2.3.2.5 MATERIALES DE ESCRITORIO 843.90


Papel bond A4 80 gr. 1.00 Millar 30.00 10.00 300.00
Cuaderno 100 hojas A4 1.00 Und. 4.00 12.00 48.00
Archivador 1.00 Und. 11.00 12.00 132.00
Folder manila c/fastner 1.00 Und. 1.50 50.00 75.00
Sobre manila 1.00 Und. 0.50 25.00 12.50
Resaltador 1.00 Und. 2.00 4.00 8.00
Pegamento en barra 1.00 Und. 5.00 4.00 20.00
Lapicero Pilot 1.00 Und. 5.00 12.00 60.00
Lapiz con borrador 1.00 Und. 1.20 12.00 14.40
Cinta masking 1.00 Und. 3.50 10.00 35.00
Libretas de campo 1.00 Und. 10.00 6.00 60.00
Grapas 1.00 Caja 8.00 3.00 24.00
Papel carbón Pelikan A4 1.00 Ciento 5.00 2.00 10.00
Corrector 1.00 Und. 5.00 6.00 30.00
Clips 1.00 Caja 5.00 3.00 15.00

TOTAL S/. 43,685.74


PRESUPUESTO ANALITICO DE GASTOS - MODIFICADO
EJECUTOR : MUNICIPALIDAD PROVINCIAL DE HUANTA
: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E. DE EDUCACION PRIMARIA Nº 38262/MX-P CARMEN SOTO FLORES DEL CENTRO POBLADO DE
PROYECTO UYUVIRCA, DISTRITO DE HUANTA, PROVINCIA DE HUANTA-AYACUCHO " - META 2015
: 00001 "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E. DE EDUCACION PRIMARIA Nº 38262/MX-P CARMEN SOTO FLORES DEL CENTRO POBLADO DE
SF/META UYUVIRCA, DISTRITO DE HUANTA, PROVINCIA DE HUANTA-AYACUCHO " - META 2015
MODALIDAD : ADMINISTRACION DIRECTA
FTE. DE FTO. : FONCOMUN, CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES COSTO DIRECTO : 140,920.31
RESIDENTE : ING. EDGAR ZEGARRA YANGALI COSTO INDIRECTO : 46,021.03
SUPERVISOR : ING. MARCO ANTONIO SANDOVAL ZEA COSTO TOTAL 186,941.34
ASIST. ADMI. : YANETH CANALES PEREZ

GASTOS GASTOS DE PRESUPUESTO


COD. DESCRIPCION UNIDAD CANTIDAD C.U. COSTO DIRECTO
GENERALES SUPERVISION TOTAL

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL


2.6.2.3.2.1 0.00
Retribuciones y Complementos de Contratos a Plazo -
Glb 1.00
PLLA. JORNALES

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES


110,732.54
MATERIALES 100,702.87
CLAVOS PARA MADERA C/C 2 1/2" kg 0.98 4.50 4.40
CLAVOS PARA MADERA C/C 3" kg 100.00 4.50 450.00
CLAVOS PARA MADERA C/C 4" kg 0.74 4.50 3.31
ALAMBRE NEGRO N°16 kg 90.00 4.50 405.00
ALAMBRE NEGRO N°8 kg 236.15 4.50 1,062.67
PERNO DE ANCLAJE PARA INODORO und 24.00 2.50 60.00
FIERRO LISO DE 1/2" m 4.93 3.50 17.25
ACERO DE REFUERZO FY=4200 GRADO 60 kg 1,041.83 3.50 3,646.40
ARCO C/TUBERIAS F°G° D=3" TABLERO + ACCESORIOS und 2.00 2,300.00 4,600.00
ARENA FINA m3 10.10 50.00 505.06
PIEDRA CHANCADA DE 1/2" m3 82.88 70.00 5,801.51
PIEDRA GRANDE (MAX 8") m3 7.67 40.00 306.68
ARENA GRUESA m3 129.25 40.00 5,169.91

MATERIAL AFIRMADO m3 127.10 40.00 5,084.16


LAVATORIO 17"x14" DE 1 LLAVE und 1.00 180.00 180.00
DUCHA CROMADA CON CABEZA GIRATORIA + LLAVE und 2.00 45.00 90.00
DESAGUE P/LAVAT. BLANCO 1 1/4" PVC und 1.00 6.00 6.00
TUBO DE ABASTO ALUMINIO TRENZADO 1/2"X7/8" und 6.00 25.00 150.00
TUBO DE ABASTO ALUMINIO TRENZADO 1/2"X1/2" und 1.00 35.00 35.00
REGISTRO DE BRONCE DE 4" und 6.00 8.00 48.00
SUMIDERO CROMADO ROSCADO DE 3" und 3.00 12.00 36.00
REJILLA-MARCO P/SUMIDERO SEGUN DISEÑO und 5.00 150.00 750.00
INODORO LOSA 1RA C/ASIENTO + TQE BAJO ADULTO und 6.00 250.00 1,500.00
FLUORESCENTE ARTICULO DE 3X36W SIM JOSEFEL C/ und 4.00 110.00 440.00
TOMACORRIENTE DOBLE C/LINEA DE TIERRA 15A pza 5.00 12.00 60.00
INTERRUPTOR 2 GOLPES 15A und 3.00 20.00 60.00
CAJA OCTOGONAL FIERRO GALVANIZADA LIVIANA 4"X2 1 und 5.00 1.50 7.50
CAJA RECTANGULAR GALVANIZADA PESADA 4"X2 1/8"X 2 und 8.00 8.00 64.00
ARTF. T/PLASTICO CUADRADO C/LAM FLUORESCENTE C und 2.00 103.00 206.00
CAJA DE MADERA P/VALVULAS pza 1.00 30.00 30.00
LADRILLO HUECO 15X30X30 CM und 449.40 3.20 1,438.08
CABLE NH-70 1X2.5 mm2 m 181.00 2.50 452.50
CEMENTO PORTLAND TIPO I (42.5KG) BOL 1,485.00 22.50 33,412.50
MAYOLICA O AZULEJO BLANCO 20X30 1RA m2 147.74 25.00 3,693.50
TORNILLO AUTOROSCANTE 1" und 3.00 9.00 27.00
BISAGRA CAPUCHINA ALUMINIZADA DE 4"X4" und 15.00 9.50 142.50
CERRADURA 2 GOLPES TIPO FORTE C/TIRADOR und 3.00 55.00 165.00
CERROJO DE 3" PARA PUERTA INTERIOR und 14.00 7.00 98.00
TORNILLO DE FIJACION 3 1/2"X1/4" und 79.97 3.20 255.90
TARUGO DE 1 1/2"X1/2" und 79.97 0.50 39.98
MANIJA DE BRONCE 4" pza 3.00 10.00 30.00
YESO EN BOLSAS DE 25 KG. BOL 51.26 7.80 399.84
CINTA AISLANTE und 3.58 1.00 3.58
CINTA TEFLON und 2.91 1.00 2.91
PORCELANATO ANTIDESLIZANTE 0.60X0.60 M m2 41.21 45.00 1,854.56
PORCELANA BLANCA kg 27.73 3.00 83.18
RODOPLAST 6MM m 104.11 2.75 286.30
SILICONA und 0.70 18.00 12.60
PEGAMENTO PARA TUBERIA PVC gln 8.68 90.00 781.10
FRAGUA kg 24.12 6.50 156.80
HORMIGON m3 22.01 45.00 990.34
COLA SINTETICA gln 0.91 21.50 19.57
LIJA PAPEL GRANATE ASA 80 plg 46.73 2.00 93.46
HOJA DE SIERRA und 11.64 5.00 58.18
PRESUPUESTO ANALITICO DE GASTOS - MODIFICADO
EJECUTOR : MUNICIPALIDAD PROVINCIAL DE HUANTA
: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E. DE EDUCACION PRIMARIA Nº 38262/MX-P CARMEN SOTO FLORES DEL CENTRO POBLADO DE
PROYECTO UYUVIRCA, DISTRITO DE HUANTA, PROVINCIA DE HUANTA-AYACUCHO " - META 2015
: 00001 "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E. DE EDUCACION PRIMARIA Nº 38262/MX-P CARMEN SOTO FLORES DEL CENTRO POBLADO DE
SF/META UYUVIRCA, DISTRITO DE HUANTA, PROVINCIA DE HUANTA-AYACUCHO " - META 2015
MODALIDAD : ADMINISTRACION DIRECTA
FTE. DE FTO. : FONCOMUN, CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES COSTO DIRECTO : 140,920.31
RESIDENTE : ING. EDGAR ZEGARRA YANGALI COSTO INDIRECTO : 46,021.03
SUPERVISOR : ING. MARCO ANTONIO SANDOVAL ZEA COSTO TOTAL 186,941.34
ASIST. ADMI. : YANETH CANALES PEREZ

GASTOS GASTOS DE PRESUPUESTO


COD. DESCRIPCION UNIDAD CANTIDAD C.U. COSTO DIRECTO
GENERALES SUPERVISION TOTAL
HIPOCLORITO DE CALCIO 70% kg 0.17 15.00 2.55
LIJA PARA MADERA plg 9.10 2.00 18.20
AGUA m3 57.49 1.00 57.49
PRUEBAS DE CALIDAD DE CONCRETO ROTURA und 70.00 30.00 2,100.00
GRIFO CROMADO DE 1/2" und 17.00 60.00 1,020.00
CONTRAZOCALO LOSETA VENEC.CLARA 10x30cm m 10.03 18.00 180.50
PIE DERECHO 4" L=3.0M und 205.16 7.50 1,538.70
MADERA TORNILLO p2 2,000.00 3.80 7,600.00
MADERA TORNILLO (ANDAMIO) p2 242.65 3.80 922.07
MADERA CEDRO p2 401.52 8.00 3,212.16
REGLA DE MADERA p2 18.69 4.00 74.75
REGLA DE ALUMINIO 1"X4"X10' und 0.29 120.00 35.33
TRIPLAY DE 1.20X2.40m X 9mm pln 9.03 73.00 659.19
CAJA DE DESAGUE DE 12"X24" und 7.00 50.00 350.00
TAPA C/MARCO FºFº DE DESAGUE 12" X 24" pza 7.00 30.00 210.00
THINNER gln 25.66 15.50 397.65
IMPRIMANTE gln 6.96 20.00 139.22
PINTURA LATEX gln 1.96 42.00 82.43
PINTURA ESMALTE ALTO TRANSITO gln 10.44 70.00 730.80
PINTURA ANTICORROSIVA gln 0.02 40.00 0.74
BARNIZ MARINO gln 0.91 40.00 36.40
PINTURA ESMALTE gln 0.02 42.00 0.78
PINTURA SATINADA gln 5.68 58.00 329.15
BARNIZ SELLADOR PARA MADERA gln 0.91 45.00 40.95
NET C/SOPORTE F°G° D=3" + ACCESORIOS SUMINISTR und 1.00 600.00 600.00
PLANCHA TIPO AGLOMERADO DE MELAMINE 6MM pln 5.36 150.00 803.88
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2" und 10.00 40.00 400.00
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3/4" und 2.00 60.00 120.00
TUBERIA DE FIERRO GALVANIZADO DE 1/2" m 3.00 3.00 9.00
CRUCETAS PVC 3MM P/CERAMICOS pza 584.05 0.05 29.20
NIPLE DE FIERRO GALVANIZADO DE 1/2"X1 1/2" und 10.00 4.00 40.00
NIPLE DE FIERRO GALVANIZADO DE 3/4"X1 1/2" und 2.00 4.00 8.00
ANILLO DE CERA PARA INODORO und 6.00 8.00 48.00
ABRAZADERA DE FIERRO GALVANIZADO DE 1/2" pza 0.33 7.00 2.32
CODO DE FIERRO GALVANIZADO DE 1" X 90° und 17.00 1.50 25.50
TUB. PVC SAP PRESION C-10 R. 1/2" m 34.91 2.50 87.28
TUBERIA PVC SAP C-10 C/R DE 1/2"X5 m m 25.50 2.50 63.75
TUBERIA PVC SAP C-10 DE 3/4"X5m m 164.01 2.90 475.63
CURVA PVC-P (ELECT.) 20MM und 46.00 0.50 23.00
TUB. PVC SAL P/DESAGUE DE 2" m 29.03 2.50 72.58
TUB. PVC SAL P/DESAGUE DE 4" m 78.65 3.16 248.52
REDUCCION PVC SAP C-10 R 3/4" A 1/2" und 3.00 3.50 10.50
RAMAL TEE DOBLE PVC SAL C/REDUCC 3" A 2" und 3.00 4.50 13.50
TEE SANITARIA SIMPLE PVC SAL DE 4" und 6.00 9.00 54.00
TRAMPA "P" PVC SAL DE 2" und 5.56 7.50 41.68
REDUCCION PVC SAL DE 3" A 2" und 1.56 5.00 7.79
SOMBRERO DE VENTILACION PVC SAL DE 2" und 5.00 5.50 27.50
YEE PVC SAL 2"X2" und 2.80 4.00 11.20
CODO PVC SAL 2" X 90° und 17.00 2.00 34.00
CODO PVC SAL 4" X 90° und 13.35 5.00 66.75
CODO PVC SAL 3"X90° und 3.00 5.00 15.00
CODO PVC SAP S/P 1/2"X90° und 17.00 2.00 34.00
CODO PVC SAP S/P 3/4"X90° und 12.50 2.00 24.99
TUBERIA PVC SAL 2"X3m m 19.90 3.50 69.65
TUBERIA PVC SAL 4"X3m m 4.20 7.50 31.50
TUBERIA PVC-P (ELEC.) 20MMX3MM m 79.00 3.50 276.50
TEE PVC SAP S/P 1/2" und 17.00 1.50 25.50
TEE PVC SAP S/P 3/4" und 6.25 2.00 12.50
REDUCCION PVC SAL 3" A 2" pza 3.00 5.00 15.00
UNION SIMPLE PVC-P (ELECT.) 20MM und 34.00 0.50 17.00
VALVULA COMPUERTA DE BRONCE DE 3/4" und 1.00 38.00 38.00
VALVULA GLOBO DE BRONCE DE 1/2" und 2.00 47.00 94.00
LLAVE DE LAVATORIO TIPO GALAXIA pza 1.00 60.00 60.00
VALVULA DE COMPUERTA 1/2" und 3.00 30.00 90.00
PRESUPUESTO ANALITICO DE GASTOS - MODIFICADO
EJECUTOR : MUNICIPALIDAD PROVINCIAL DE HUANTA
: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E. DE EDUCACION PRIMARIA Nº 38262/MX-P CARMEN SOTO FLORES DEL CENTRO POBLADO DE
PROYECTO UYUVIRCA, DISTRITO DE HUANTA, PROVINCIA DE HUANTA-AYACUCHO " - META 2015
: 00001 "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E. DE EDUCACION PRIMARIA Nº 38262/MX-P CARMEN SOTO FLORES DEL CENTRO POBLADO DE
SF/META UYUVIRCA, DISTRITO DE HUANTA, PROVINCIA DE HUANTA-AYACUCHO " - META 2015
MODALIDAD : ADMINISTRACION DIRECTA
FTE. DE FTO. : FONCOMUN, CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES COSTO DIRECTO : 140,920.31
RESIDENTE : ING. EDGAR ZEGARRA YANGALI COSTO INDIRECTO : 46,021.03
SUPERVISOR : ING. MARCO ANTONIO SANDOVAL ZEA COSTO TOTAL 186,941.34
ASIST. ADMI. : YANETH CANALES PEREZ

GASTOS GASTOS DE PRESUPUESTO


COD. DESCRIPCION UNIDAD CANTIDAD C.U. COSTO DIRECTO
GENERALES SUPERVISION TOTAL
CRISTAL TEMPLADO CRIS DE 6MM p2 63.13 13.00 820.64
SC VENTANAS DE ALUMINIO S/DISEÑO, INC. INSTALACI m2 5.59 25.00 139.75
LIMPIEZA GENERAL AL FINALIZAR LA OBRA GLB 1.00 600.00 600.00
TUBERIA CORRUGADA DE HDPE DN 100MM m 194.0000 15.00
PIEDRA DE RIO DE 6" @ 8" m3 36.7500 60.00 2,205.00
GASOLINA 84 gal 0.0500 14.80 0.74
ALAMBRE NEGRO RECOCIDO N° 8 kg 1.6320 4.94 8.06
ACERO CORRUGADO DE 3/8" kg 42.7140 3.26 139.25
CLAVOS PARA MADERA CON CABEZA DE 2" kg 1.6320 4.94 8.06
TUBERIA PVC-SAL 4" m 384.0000 5.00 1,920.00
PIEDRA CHANCADA 1/2" m3 0.5500 70.00 38.50
ARENA GRUESA m3 0.5200 46.61 24.24
GRAVA DE 3/4"-1/2" PARA DRENAJE m3 103.0470 60.00 6,182.82
HORMIGON m3 0.0600 40.00 2.40
GEOTEXTIL DE POLIPROPILENO 250 Gr/m2 m2 118.9100 10.00
CEMENTO PORTLAND TIPO I (42.5 kg) bol 10.7572 23.00 247.42
YESO BOLSA 25 kg bol 3.2200 7.00 22.54
PEGAMENTO PLASTICO P/PVC gal 6.4000 10.00 64.00
MADERA TORNILLO CEPILLADA p2 65.2800 4.24 276.79
ESTACAS DE MADERA p2 6.4400 0.50 3.22
AGUA und 0.1800 1.69 0.30
CARTEL DE OBRA DE 2.40x3.60m INC. INSTALACION Y glb 1.0000 450.00 450.00
TRANSP

HERRAMIENTAS MANUALES 1,796.00


ARPILLERA 2M ANCHO M 50.00 7.00 350.00
INFLADOR UND 1.00 14.00 14.00
PICO CON MANGO UND 12.00 25.00 300.00
RASTRILLO CON MANGO UND 2.00 15.00 30.00
FLEXOMETRO 5M STANLEY UND 2.00 25.00 50.00
CARRETILLAS BUGUI CON RODAJE, REFORZADAS UND 5.00 155.00 775.00
SOGA DE NYLON M 15.00 4.00 60.00
BALDES VACIOS DE PLASTICO UND 10.00 9.00 90.00
COMBA DE 18 LB unid 1.00 75.00 75.00
WINCHA DE 50M KAMAX UND 1.00 40.00 40.00
PINTURA SPRAY UND 1.00 12.00 12.00

VESTUARIO 1,674.00
HERRAMIENTAS MANUALES %mo 323.24
CHALECO CON CINTA REFLEXTANTE pza 14.20 35.00 497.00
CASCO DE COLORES und 12.00 14.00 168.00
GUANTES DE CUERO PAR 17.00 12.00 204.00
LENTES DE PROTECCION UND 12.00 5.00 60.00
MASCARA RESPIRADOR CONTRA POLVO und 20.00 3.00 60.00
GUANTES DE JEBE pza 10.00 8.00 80.00
CASCO DE PROTECCIÓN BLANCO Und. 3.00 35.00 105.00
B OTAS DE JEBE UnId. 25.00 20.00 500.00
MATERIALES DE ESCRITORIO 901.50
PAPEL BOND A4 MILL 4.00 25.00 100.00
CUADERNO 100 HOJAS A4 CUADRICULADO UND 2.00 3.00 6.00
CUADERNO 50 HOJAS PQ. CUADRICULADO3 UND 3.00 1.00 3.00
CUADERNO DE CARGO A5 DE 50 HOJAS UND 2.00 4.50 9.00
VINIFAN GRANDE ROLL 2.00 10.00 20.00
REGLAS DE 30 CM UND 2.00 1.00 2.00
CORRECTOR UND 2.00 3.00 6.00
FOLDER MANILA UND 20.00 0.30 6.00
SOBRE MANILA UND 20.00 0.25 5.00
GOMA PEGAMENTO MEDIANO UND 1.00 3.00 3.00
FASTENER UND 20.00 0.20 4.00
CUTER UND 3.00 2.00 6.00
CD BLANCO UND 10.00 1.00 10.00
CINTA DE EMBALAJE UND 3.00 2.50 7.50
POS-IT PAQ 3.00 17.00 51.00
ENGRAPADOR UND 2.00 12.00 24.00
PERFORADOR UND 1.00 16.00 16.00
GRAPAS CJTAS 2.00 3.00 6.00
ARCHIVADOR UND 5.00 6.50 32.50
CUADERNO DE OBRA C/ AOUTOCALCA INCY LEGALIZAC UND 2.00 75.00 150.00
PRESUPUESTO ANALITICO DE GASTOS - MODIFICADO
EJECUTOR : MUNICIPALIDAD PROVINCIAL DE HUANTA
: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E. DE EDUCACION PRIMARIA Nº 38262/MX-P CARMEN SOTO FLORES DEL CENTRO POBLADO DE
PROYECTO UYUVIRCA, DISTRITO DE HUANTA, PROVINCIA DE HUANTA-AYACUCHO " - META 2015
: 00001 "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E. DE EDUCACION PRIMARIA Nº 38262/MX-P CARMEN SOTO FLORES DEL CENTRO POBLADO DE
SF/META UYUVIRCA, DISTRITO DE HUANTA, PROVINCIA DE HUANTA-AYACUCHO " - META 2015
MODALIDAD : ADMINISTRACION DIRECTA
FTE. DE FTO. : FONCOMUN, CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES COSTO DIRECTO : 140,920.31
RESIDENTE : ING. EDGAR ZEGARRA YANGALI COSTO INDIRECTO : 46,021.03
SUPERVISOR : ING. MARCO ANTONIO SANDOVAL ZEA COSTO TOTAL 186,941.34
ASIST. ADMI. : YANETH CANALES PEREZ

GASTOS GASTOS DE PRESUPUESTO


COD. DESCRIPCION UNIDAD CANTIDAD C.U. COSTO DIRECTO
GENERALES SUPERVISION TOTAL
BLOCK PARTE DIARIO AUTOCOPIATIVO 50 HOJAS UND 1.00 45.00 45.00
SELLOS TRODAP UND 3.00 20.00 60.00
SELLO DE MADERA UND 2.00 6.00 12.00
TAMPON 2K AZUL UND 1.00 5.00 5.00
THONER HP 85A UND 1.00 250.00 250.00
ANILLLADOS UND 10.00 4.00 40.00
CARDEX MILLAR 0.50 45.00 22.50

COMBUSTIBLE Y LUBRICANTES 5,658.17


PETROLEO Gln 417.24 11.00 4,589.65
GASOLINA 84 OCTANOS Gln 87.33 12.24 1,068.52
PRESUPUESTO ANALITICO DE GASTOS - MODIFICADO
EJECUTOR : MUNICIPALIDAD PROVINCIAL DE HUANTA
: "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E. DE EDUCACION PRIMARIA Nº 38262/MX-P CARMEN SOTO FLORES DEL CENTRO POBLADO DE
PROYECTO UYUVIRCA, DISTRITO DE HUANTA, PROVINCIA DE HUANTA-AYACUCHO " - META 2015
: 00001 "MEJORAMIENTO DEL SERVICIO EDUCATIVO EN LA I.E. DE EDUCACION PRIMARIA Nº 38262/MX-P CARMEN SOTO FLORES DEL CENTRO POBLADO DE
SF/META UYUVIRCA, DISTRITO DE HUANTA, PROVINCIA DE HUANTA-AYACUCHO " - META 2015
MODALIDAD : ADMINISTRACION DIRECTA
FTE. DE FTO. : FONCOMUN, CANON Y SOBRE CANON, REGALIAS, RENTA DE ADUANAS Y PARTICIPACIONES COSTO DIRECTO : 140,920.31
RESIDENTE : ING. EDGAR ZEGARRA YANGALI COSTO INDIRECTO : 46,021.03
SUPERVISOR : ING. MARCO ANTONIO SANDOVAL ZEA COSTO TOTAL 186,941.34
ASIST. ADMI. : YANETH CANALES PEREZ

GASTOS GASTOS DE PRESUPUESTO


COD. DESCRIPCION UNIDAD CANTIDAD C.U. COSTO DIRECTO
GENERALES SUPERVISION TOTAL

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS Y OTROS


54,490.68
SERVICIOS NO PERSONALES 37,200.00
RESIDENTE DE OBRA Mes 2.00 4,300.00 8,600.00
SUPERVISOR DE OBRA Mes 2.00 5,300.00 10,600.00
ASISTENTE TECNICO Mes 2.00 2,000.00 4,000.00
ASISTENTE ADMINISTRATIVO Mes 2.00 1,600.00 3,200.00
MAESTRO DE OBRA Mes 2.00 2,000.00 4,000.00
ALMACENERO Mes 2.00 1,200.00 2,400.00
GUARDIAN Mes 2.00 1,000.00 2,000.00
PRELIQUIDACION DE OBRA
INGENIERO SUPERVISOR Mes 0.50 2,650.00 1,325.00
RESIDENTE DE OBRA Mes 0.50 2,150.00 1,075.00

RESIDENTE DE OBRA 38 DIAS


SUPERVISOR DE OBRA 38DIAS 1,678.63
ASISTENTE TECNICO 38DIAS
ASISTENTE ADMINISTRATIVO 38DIAS 4,185.90

ALQUILER DE MAQUINARIAS Y EQUIPOS 13,140.68


MEZCLADORA DE CONCRETO DE 9 -11P3 día 35.32 45.00 1,589.25
CAMION VOLQUETE 10 M3 hm 10.00 220.00 2,200.00
SIERRA CIRCULAR hm 10.98 20.00 219.52
COMPACTADOR VIBR. TIPO PLANCHA 4 HP día 14.41 30.00 432.21
CARGADOR SOBRE LLANTAS 100-125 HP MAQUINA SEC hm 13.05 250.00 3,263.18
TEODOLITO día 2.97 40.00 118.93
VIBRADOR DE 3/4" - 2" CONCRETO día 9.14 25.00 228.40
NIVEL DE INGENIERO día 2.97 30.00 89.20
RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T. hm 10.00 250.00 2,500.00
MOTONIVELADORA DE 125 HP hm 10.00 220.00 2,200.00
MOTOBOMBA 10 HP 4" hm 20.00 15.00 300.00
NIVEL TOPOGRAFICO hm 5.1520 7.00 36.06
COMPACTADORA VIBRATORIA TIPO PLANCHA 4 HP hm 144.4710 4.00 577.88
RETROEXCAVADORA SOBRE LLANTAS 58 HP 1/2 y3 hm 18.5980 165.00 3,068.67
MEZCLADORA DE TROMPO 9 P3 (8 HP) hm 0.0800 5.00 0.40
VIBRADOR DE 3/4" - 2" CONCRETO hm 0.8000 5.00 4.00

OTROS SERVICIOS DE TERCEROS 2,450.00


ALQUILER DE ALMACEN mes 2.00 100.00 200.00
CARTEL DE IDENTIFICACION DE 4.50X3.60 M.(BANNER) und 1.00 300.00 300.00
PRUEBA DE DISEÑO DE MEZCLA und 3.00 170.00 510.00
PRUEBA DE DENSIDAD DE CAMPO und 2.00 100.00 200.00
PRUEBAS PROCTOR MODIFICADO DE CAMPO und 2.00 120.00 240.00
PRUEBA : ROTURA DE PROBETA und 20.00 25.00 500.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS-HER GLB 1.00 500.00 500.00

SERV. DE IMPRESIÓN, ENCUADERNACION Y EMPASTADO 700.00


REPRODUCCION DE PLANOS A-1 GLB 20.00 20.00 400.00
COPIAS FOTOSTATICAS GLB 300.00 1.00 300.00
SERVICIO DE PERFORACION Y VOLADURA GLB 50.00 5.00 250.00
ALQUILER DE BIENES MUEBLES 1,000.00
ALQUILER DE CAMIONETA Mes 0.25 4,000.00 1,000.00

TOTAL S/. 140,920.31 32,417.40 13,603.63 165,223.22


PORCENTAJE (%) 23.00% 9.65%
1638.11
1432.07 2557.26786 666.666667 667 366.85 40.7611111
206.04 208.121212 4.16666667 550 61.1111111

4.356
39.204
2.464
22.176
15.6

337 72

6.66666667 733.333333 tablones de 1"x8"x10" 100

3.33333333 133.333333 tablones de 1"x4"x10" 40

-274.383333

5 200 cuartones de 2"x3"x10´ 40


44.63 1.66666667 maderas de 1"x2"x10 40
73.3333333

6.73400673
17.08
68.32
28planchas
363.1815
308

24 96

2200

11101.25