BASIS OF DESIGN 
 
PROJECT  PROPOSED G+P+4 RESIDENTIAL APARTMENT 

PLOT NO.  JVT04AMRA002 AT AL BARSHA SOUTH‐5 

LOCATION  AL BARSHA SOUTH 5

CLIENT  MOHAMED MOHAMED MAHRAN AL BALOOSHI 

CONSULTANT  FREELINE ENGINEERING CONSULTANT

       

 
 

Contents 
 
1. PROJECT BRIEF – GENERAL 
2. LOAD CALCULATION 
3. SPECIALTY OCCUPANCIES   
4. HVAC & R SYSTEMS 
5. LIGHTING AND DAYLIGHTING CONTROLS 
6. DOMESTIC HOT WATER SYSTEMS 
7. VENTILATION 
8. PLUMBING 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

Project Brief:  General  
  
The  proposed  building  will  be  a  residential  development,  with  a  total  built‐up  area  of 
13663.57SQ.M.  
In  line  with  the  statutory  requirements,  the  energy  systems  are  being  designed  to  meet  the 
requirements  of  optimized  energy  and  water  usage,  better  indoor  environmental  quality.  The 
mechanical services design for the building is developed in consideration of the current standards 
and design principles.  
  
 
The following sections describe the individual systems:   
 
 

1. Reasons for System Selection: 
The Centralized district cooling model benefits building owner with reduced capital and operating 
costs, lower maintenance overheads and energy efficiency gains over traditional system. It also has 
a positive impact on the environment. Every ton of district cooling capacity can save one ton of CO2 
emissions compared to conventional air conditioning. 

2. Local calculations: 
 
Load calculation method: Thermal Load Calculation software. 
 

Load occurs at  .......................................................  Jul 1600   

OA DB / WB  .........................................................  46 / 29.4  °C 

Entering DB / WB  ..............................................  23.3 / 17.2  °C 

Leaving DB / WB  ...............................................  13.9 / 13.3  °C 

 
 

3. Occupancy 
‐ 247 People 

4. HVAC & R Systems  
 
District cooling system has been provided in this Project. 
 
 1.1 Design Conditions :  
 
All the indoor areas shall have the following design conditions :  
 
24o C±1⁰ C DB, RH to be less than 60 %  
Fresh air provisions will be :   
As per the requirements of ASHRAE 62.1.2010.  
 
 1.2 Design Standards to be followed:  
 
  The design and the material specification of the mechanical works are in accordance with the standards,   
    codes, and regulations issued by the following organizations, as applicable:‐   
 ANSI : American National Standards Institute  
 ASHRAE:  American Society of Heating, Refrigerating and Air‐ Conditioning Engineers.  
 ASME:  American Society of Mechanical Engineers.  
 ASTM:  American Society for Testing and Materials.  
 BSi:  British Standards Institution  
 FM:  Factory Mutual Engineering and Research  
 DM:   Dubai Municipality Buildings Regulations  
 DCD:  Dubai Civil Defense Authorities   
 NFPA:  National Fire Protection Association  
 SMACNA: Sheet Metal & Air Conditioning Contractors` National Association.  
 UL:  Underwriters Laboratories, USA.  
 
Fresh air intake and control: Energy Recovery FAHU will be installed on the respective floors. An air 
flow sensor will be located at the outdoor intake.   
  
Minimum Efficiency Reporting Value (MERV) 13 filters will be incorporated in the FAHU to improve 
the air quality of the air coming into the facility.   
  
  
 
 

 
 

1.3 Energy Efficiency   
  
The following are the energy‐efficiency features to be incorporated in the design:  
 
Air‐conditioning: District Cooling system.    
Glazing: Glass with low ‘U’ value shall be selected, expected to substantially reduce energy ingress   
Roof/Exterior wall Construction: Materials to be selected with low U factor, thus contributing to 
optimum heat gain/loss, High albedo roofing materials (SRI>78)  
Interior  Lighting:    The  lighting  design  has  been  chosen  as  to  limit  the  lighting  density.  Energy 
efficient CFL, metal halide type lighting has been specified for the project. Occupancy sensors are 
installed in the majority at spaces to reduce lighting energy consumption.  
Heat  recovery  wheel:  Heat  recovery  wheel  will  be  incorporated  in  the  design,  to  recover  heat 
from the exhaust air to the intake air, thus saving energy.  
 
All these measures make the energy performance of the building exceed that of the base building.  
 

5. Lighting and day lighting controls  
  
Lighting system will be an important factor in establishing a comfortable visual environment in the 
working  areas.  Therefore,  the  luminaries  implemented  in  public  areas  will  be  fitted  to  allow 
comfortable use.   
 Lighting levels for various areas will be calculated based on CIBSE (Chartered Institute of Building 
Services Engineers) code for interior lighting.  
  
  

6. Domestic Hot water systems  
Will be through individual Electric water heater. 
 
 
 

7. Ventilation 
Fresh air handling units shall be of sectionalized construction with pre‐filter, bag 
filter,  chilled  water  cooling  coil  and  supply  air  fan.  For  Fresh  Air  Recovery  AHU 
shall  be  additional  with  Heat  Recovery  wheel,  necessary  empty  sections  with 
access  doors,  liquid  coupled  heat  exchanger,  return  air  fan  FAHU  with  HEAT 
RECOVERY WHEEL,MERV FILTER.  
 
 
 
 

 
 

8. Plumbing 
 
Plumbing fixture units are selected as per green building norms.  
 
Flow rates suggested:  
 
 Water closet (dual flush) : 2/4 liters per flush  
 Lavatory Faucets : 0.5 gallons per minute at 60 psi  
 Kitchen Faucets : 1 gallon per minute at 60 psi  
 Showers : 2 gallons per minute at 80 psi  
 Urinals (if any) : 0.5 gpf or waterless 

  
 