SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 1B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 2B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 3B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
6.1.6. Test and inspection certificates as required in the Specification and the
applicable standards, shall be submitted immediately following their issue.
The certificates have to be original, signed by the Contractor, and contain
actual measured values.
The generation of certificates, including those generated by Subcontractors
and sub-Bidders, shall bear no extra cost to Purchaser.
6.1.7. Manufacturing shall not commence prior to respective drawing approval by
the Purchaser.
6.1.8. Changes in the Purchaser's approved design are normally unaccepted.
However, should such changes become necessary on an exceptional basis,
the Contractor shall obtain the Purchaser's approval prior to introducing any
change.
6.1.9. Any equipment which does not conform to drawings, specifications or other
purchase order requirements which never the less are considered by the
Contractor as "acceptable as is" or "for repair", shall be submitted to the
Purchaser for approval, with their recommended dispositions. All such non-
conformances shall be approved by the Purchaser, shall be documented
and a copy of the approval shall accompany each shipment.
6.2. Interchangeability
Power line carrier coupling equipment of the same type and ratings shall be
interchangeable both electrically and mechanically with each other, and
when so interchanged shall perform their function equally well in every
respect.
- 4B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 5B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
8. TECHNICAL DOCUMENTATION
8.1. General
- 6B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
8.2.4. A proposal not including the documents mentioned above can be rejected.
- 7B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 8B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
8.3.3. Purchaser reserves himself the right to require all necessary additional data,
descriptions, drawings, etc. that may contribute in completing information
supplied by Manufacturer about the equipment.
8.3.4. If the prints are returned by the Purchaser and stamped "approved except
as noted", Contractor shall make corrections per Purchaser's marking and
shall resubmit required copies of the correct documents as stated above.
8.3.5. Routine test reports shall be submitted for approval 1 (one) month before
delivery, in four (4) copies.
8.3.6. The shipment cannot be realized before test approval.
8.3.7. Commissioning program shall be supplied for approval in four (4) copies,
three (3) months before delivery.
8.3.8. Contractor is free to supply any additional information considered necessary
for clarifying various aspects of erection, operation, maintaining, checking,
etc.
8.3.9. All documents and drawings shall be provide with:
Purchaser name.
Project name.
Unit serial number.
Purchaser's order number.
Specification number.
Supplier's order number.
9. TECHNICAL REQUIREMENTS
- 9B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
Permissible humidity:
Low relative/absolute humidity: 4/0.003 %//g/ m³.
High relative/absolute humidity: 100/36 %//g/ m³.
Low/high air pressure: 70/106 KPa.
Rain intensity: 15 mm/min.
Keraunic level (thunderstorm):
Maximum keraunic level: 4 lightning / km² year
Minimum keraunic level: 0.1 lightning / km² year
Direct and continuous solar radiation for long period. Heating effects of
solar radiation: 1120 W/m².
Maximum wind velocity measured 10 m above ground (bare area) at 3
sec duration considering a 50 years mean return period: 44 m/sec.
9.1.2. Environmental conditions:
Environmental parameters according to IEC 60721, 3-4.
Severe atmospheric and industrial air pollution, dust, salt spray and
sandstorms.
Permissible altitude over the sea level: 1000 m.
Water from sources other than rain: spraying water and water jets with
water velocity 15 m/sec.
Chemically active substances according to IEC 60721, Table 4-4C3.
Mechanically active substances according to IEC 60721, Table 5-4S3.
Dust (suspension): 15 mg/ m³.
Dust (sedimentation): 40 mg/ m³.
Sand: 1000 mg/m³.
- 10B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 12B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 13B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
9.5.7. The Offeror shall specify the following for LTs (items1-4):
9.5.8.1. DC resistance at 20°C (Ohm)
9.5.8.2. Quality factor at 100 (kHz) at least 30 ©
9.5.8.3. Tapping (incretion) losses, (dB)
9.5.8.4. Total losses (DC resistance and eddy current
losses) at rated frequency current and 75°C (kW)
9.5.8.5. Self resonant frequency (kHz)
9.5.8.6. Self capacitance (pF)
9.5.8. The Offeror shall indicate Lightning arrestor specification
9.5.9.1. Manufacturer
9.5.9.2. Type designation
9.5.9.3. Rated voltage (kV)
9.5.9.4. Rated discharged current (kA)
9.5.10. The Offeror shall indicate Tuning pack specification
9.5.10.1. Manufacturer
9.5.10.2. Type designation
9.5.10.3. Rated impulse protective level (kV)
9.5.10.4. Device values
- 14B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
9.7.2. TERMINALS
9.7.2.1. Aluminum terminal on the line side shall be provided.
The primary terminal shall be connected directly to the LT
without any intermediate connection
9.7.2.2. Earth copper terminal marked with appropriate graphical
symbol shall be provided
9.7.2.3. The earthling connections shall be designed to withstand
a short circuit current during 1 sec.
9.7.3. INSULATOR
9.7.3.1. The insulator shall be porcelain type. Other types of the
insulator (for example: composite type, porcelain
protected by silicon rubber coatings) may be acceptable
9.7.3.2. Color of the insulator shall be Brown or grey.
9.7.3.3. The insulator shall be provided with hydrophobic
coating.
The hydrophobic coating shall be suitable for the service
conditions mentioned above.
9.7.3.4. The insulator shall be of the alternate sheds type or
normal sheds type permitting easy access for cleaning
to all surfaces.
- 15B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 16B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
RECOMMENDED FOR
CC\ Insulators
S-S1 > S1
P1-P2 ≥ 15 mm
S1/P1 ≥ 0.8
C = mm
a > 5°
P.F. > 0.7
Kd =1
Dm < 300 mm
l = 25 mm/kV
L = 4250 mm
C.F. (L/A) ≤4
ld1/ d1
ld2/ d2
- 17B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
RECOMMENDED FOR
CC\ Insulators
S/P ≥ 0.8
C = mm
a > 5°
P.F > 0.7
Kd =1
Dm < 300 mm
l = 25 mm/kV
L = 4250 mm
C.F. (L/A) ≤4
ld/ d
- 18B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
COMPOSITE INSULATOR
RECOMMENDED FOR
CC\ Insulators
- 19B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
9.7.4.1. Guaranteed mean value of failing load (120% F) not less 8000
than (N)
9.7.4.2. Service load (-40%F) (sum of all loads occurring 2700
simultaneously in service: conductor pull, conductor
weight and wind, short-circuit excepted) in any direction
in space not less than: ( N ).........
9.7.4.3. Short-time load (F*) (sum of all loads occurring 6700
simultaneously in case of short-circuit) in any direction
in space not less than ( N ):
9.7.4.4. Contractor shall indicate:
Torsional strength (Nm)
Testing load for 60 sec., applied to the midpoint of the
terminal, perpendicularly to the insulator axis (N)
Recommended rope pull ( N )
Wind load at wind velocity 44 m/sec
9.8. Commissioning
9.8.1. Contractor shall be responsible for the commissioning of all equipment
covered under his contract in case it will be requested by Purchaser.
9.8.2. Contractor shall prepare and submit three months prior to the start of
commissioning, a Commissioning Program for approval by Purchaser.
9.8.3. The Commissioning Program shall include indications for:
9.8.3.1. Commissioning inspection to detect faults which have occurred during
transportation, storing or assembly at its final location
9.8.3.2. Preparation for use and procedures to describe the activities required to
prepare systems for testing and operation.
9.8.3.3. Checking of rated data, connection, loading etc. of the equipment and
necessary interface with the equipment supplied by others.
9.8.3.4. Testing as detailed in tests on site program including:
the test objective- test intent
required performance data- prerequisites
sequence of activities
acceptance criteria
9.8.3.5. Putting the equipment into service.
9.8.3.6. Final check.
- 20B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
9.8.3.7. The critical limits of each criteria for which the equipment should be drawn
out from service.
9.8.4. Changes and modifications to the Commissioning Program shall also be
approved by Purchaser.
9.8.5. Commissioning results shall be witnessed by the Purchaser and
documented on forms to be agreed upon by the Contractor. The record shall
include other such as omissions or unsatisfactory test results.
9.8.6. The Contractor shall maintain an up to date record of all inspections and
tests, which shall be handed over to Purchaser at the completion of the site
testing and commissioning.
9.8.7. The Purchaser shall be responsible for connection and disconnection of the
equipment to and from system, including first energization, but with the
advice and technical assistance of the Contractor (if required).
9.8.8. The Contractor shall be responsible for supplying commissioning personnel
with a good knowledge in all relevant operations prior and for
commissioning and will be requested to submit a list giving name,
experience and proposed duration on site.
9.8.9. The Contractor shall be responsible for safety of personnel, ours or his own,
involved in commissioning and shall take all possible precautions and be
fully aware of dangers involved in testing. Contractor's personnel should
also be ensured against death, personal accident and health while in Israel
and be covered by Employers Liability Insurance applicable in their country
of origin.
9.8.10. Major failure or damage to equipment will require either its return to the
factory or assignment of a special crew to carry out repairs.
9.8.11. Commissioning personnel shall repair minor failure.
9.8.12. All expensive (including transport to factory and return) in connection with
damages and repairs as described above shall be paid by Contractor.
9.8.13. If supervision of erection or commissioning by Contractor is necessary it has
to be indicated.
9.8.14. The validity of the warranty period shall be confirmed also in case that the
erection and commissioning will be performed by Purchaser without
Contractor supervision.
- 21B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
9.9.1. General
9.9.1.1. The CE shall be designed for live-washing (automatic and manual) taking
into account service conditions described under subcl. 9.4.
9.9.1.2. A complete set of tools for maintenance and repair work (if applicable) shall
be provided together with relevant drawings or photos and full instructions
for use in English.
9.9.1.3. Manufacturer shall ensure spare parts (if applicable) for the delivered
equipment for a period of life duration.
9.9.1.4. Manufacture shall ensure training course for IEC erection and operating
people.
- 22B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 23B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 24B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
11.3. The spare parts and special tools shall be packed separately and a detailed
packing list shall be sent.
11.4. All components or accessories shipped dismantled for field assembly shall
be suitably tagged to show its identification. Tags shall be exceptionally
durable and security tied to items by wire or other approved methods
11.5. Contractor shall include a Bill of Materials with a shipment to enable the
Purchaser to determine if all disassembled items have been received.
11.6. Contractor shall submit prior to erection a detailed tabulation of all field
mounted items with at least the following information:
Contractor's shop order number (if any).
Number of items.
Manufacturer and/or Supplier (if other than Contractor).
Type or catalog number, if listed.
Short description including service and on what device it is mounted.
Shipping date.
Shipping details.
11.7. A three direction shock indicator calibrated for 10g acceleration non-
resettable type shall be provided in each crate.
11.8. Contractor shall supply 3 (three) months before the shipment of the
equipment 5 (five) sets of the complete Bill of Materials to enable checking
and identifying of the equipment upon receipt of the same.
11.9. Each item shall be separately packed and the destination clearly marked.
11.10. Each packing crate shall have a packing list and in addition shall be marked
with following information:
Descriptive name(s) of equipment or supplies contained.
Quantity packed in a crate.
Serial numbers, if any, of the equipment contained.
Contract (order) number.
Contractor's name and address (city, state, and country).
Gross weight of container.
Complete destination marking.
Indication in which position (horizontal or vertical) the equipment has to
be transported.
- 25B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
12.1. With regard to the shipment and handling of all equipment to be provided by
the Contractor to the Purchaser, Contractor shall be responsible for
ensuring that shipment and handling shall be wholly in the conformance with
Article B of IECo General Conditions for Equipment and Material Purchases
attached to this Specification as Annexure "A"
12.2. Taking into account the specific climatic conditions described under clause
9.1 the Contractor shall indicate:
o The requirements for prolonged storage before erection.
o The maximum allowed storage time not energized without
equipment damage (months).
12.3. All items should have their lifting, jacking and haulage points.
13.1. Each LT shall be provide with corrosion proof and clearly legible nameplate of
suitable material including the data indicated in IEC 60353-1 section four(4).
13.2. Each CC shall be provide with corrosion proof and clearly legible nameplate
of suitable material including the data indicated in IEC 60358-1 cl.12.2 .
13.3. In addition the following data shall be provided:
Date of manufacture.
Name and number of standard.
13.4. The nameplate shall be subject to Purchaser's approval.
- 26B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
14. NOTES
- 27B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 28B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
- 29B -
THE ISRAEL ELECTRIC CORPORATION LTD. SPEC: STR-1377
ENGINEERING DIVISION ANNEXURE "B"
SUBSTATION PLANNING SECTOR
____________________________________________________________
Contractor hereby certifies that he agrees to all conditions of the cover letter
of THE ISRAEL ELECTRIC CORPORATION LIMITED, which accompanies
the Proposal Documents.
______________________ ______________________________
Signature of Contractor Date of Proposal
- 30B -