Migas Pipeline Training Course 17th – 21st Feb 2003

Fundamentals of Submarine Pipeline Design,


Fabrication & Installation

Lesson 1
Overview of Submarine Pipeline Systems

Edwardus Ng

© 1999 Det Norske Veritas


Senior Principal Engineer
DNV Asia Pacific

DNV No. 1 DET NORSKE VERITAS DNV Submarine Pipeline


Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Task
‹ The task is to move a certain
z Volume
z Content
z Oil, gas, product, water, (liquid/gas)
‹ First what are the alternatives for transportation?
z Pipeline
z Shuttle
z Convert to e.g. electricity

© 1999 Det Norske Veritas


DNV No. 2 DET NORSKE VERITAS DNV Submarine Pipeline
Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Types of pipelines

‹ Flow lines
‹ Inter-field lines
‹ Export lines/trunk lines
‹ Water injection/Gas lift
‹ Product lines

© 1999 Det Norske Veritas


DNV No. 3 DET NORSKE VERITAS DNV Submarine Pipeline
Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Definition/terminology

‹ Pipeline
‹ Linepipe
‹ Piping
‹ Flowlines

© 1999 Det Norske Veritas


DNV No. 4 DET NORSKE VERITAS DNV Submarine Pipeline
Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Types
Types of
of “Cross
“Cross section”
section”

‹ “Pure” pipe
‹ Clad/lined
‹ Bundle
‹ Umbilical
‹ Piggy-back
‹ Flexible

© 1999 Det Norske Veritas


DNV No. 5 DET NORSKE VERITAS DNV Submarine Pipeline
Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Pipeline

‹ Buried/covered ‹ Exposed
z natural cover z frozen
z trenched z piled
z mechanical backfill z guided
z gravel dumping z snaked
z concrete or steel covers

© 1999 Det Norske Veritas


DNV No. 6 DET NORSKE VERITAS DNV Submarine Pipeline
Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Pipeline end
(first end, second end)
‹ Platform/Jacket/GBS ‹ Shore
z J-tube z Shore pull

z Rigid/Steel Riser z Trenched

z Flexible riser z Conductor/Casing/Tubing

z Conductor/Casing/Tubing z Caisson

z Caisson z Flexible riser

‹ Subsea structure ‹ To shuttle tanker


z Riser base z Steel ariculated

z Satellite z Flexible pipe

© 1999 Det Norske Veritas


DNV No. 7 DET NORSKE VERITAS DNV Submarine Pipeline
Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Pipeline terminations

‹ Deflect-connect
‹ J-tubepull-in
‹ Expansion loop
‹ Spool

© 1999 Det Norske Veritas


DNV No. 8 DET NORSKE VERITAS DNV Submarine Pipeline
Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Field layout

© 1999 Det Norske Veritas


DNV No. 9 DET NORSKE VERITAS DNV Submarine Pipeline
Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Installation
‹ S-lay
‹ J-lay
‹ Reeling
‹ Towing
‹ Shore pull

© 1999 Det Norske Veritas


DNV No. 10 DET NORSKE VERITAS DNV Submarine Pipeline
Course
Migas Pipeline Training Course 17th – 21st Feb 2003

S-lay Summary J-lay

J-lay (for deep water only)


S-lay
Reeling
Burried Exposed & concrete coated
Seamless Welded

© 1999 Det Norske Veritas


8” 10” 12” 14” 16” 18” 20”
(8 5/8) (10 3/4) (12 3/4) (14)

DNV No. 11 DET NORSKE VERITAS DNV Submarine Pipeline


Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Content

‹ Material selection (corrosion)


z Corrosion resistant
z Sweet/sour service
z Corrosion allowance
z Installation method
z Temperature
z Liner/clad

© 1999 Det Norske Veritas


z Inhibitor

DNV No. 12 DET NORSKE VERITAS DNV Submarine Pipeline


Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Volume

‹ Diameterversus pressure
‹ Temperature
z Insulation
z Heating

© 1999 Det Norske Veritas


DNV No. 13 DET NORSKE VERITAS DNV Submarine Pipeline
Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Design premise

‹ Concept
‹ Material type
‹ Material grade
‹ Pressure
‹ Temperature
‹ Installation method

© 1999 Det Norske Veritas


‹ Routing

DNV No. 14 DET NORSKE VERITAS DNV Submarine Pipeline


Course
Migas Pipeline Training Course 17th – 21st Feb 2003

Correct questions and answers


Philosophy of DNV pipeline code
‹ Q:How shall a pipeline be designed?
‹ A(wrong): So that it doesn’t fail
‹ A(wright): So that the risks are acceptable

R=P*Q

© 1999 Det Norske Veritas


DNV No. 15 DET NORSKE VERITAS DNV Submarine Pipeline
Course