DIGITAL INPUT (DI)

EQUIPMENT RFI / COMMENT CONSULTANT'S COMMENT


WHERE TO CONNECT THE POINT ?
WHO SUPPLY THE SENSOR IF ANY?
REFRIGERANT GAS DETECTOR SENSOR Point not required
IF THE SENSOR UNDER CHILLER PACKAGE,
THIS POINT CAN BE HLI
RESISTANT TEMP DETECTOR FOR BEARING TEMPERATURE NORMALLY LOCATED AT AI
Point not required
(RTD) POINT
TEMPERATURE NORMALLY LOCATED AT AI
MOTOR STATOR WINDING TEMP DETECTOR Transferred to AI point
POINT
HIGH WATER LEVEL ALARM TO CONFIRM TOTAL HI/LO LEVEL SENSOR
LOW WATER LEVEL ALARM QTY To match cooling tower's basin quantities
TAKE FROM CHILLER HLI OR DIRECTLY TAP
MOTORIZED VALVE OPEN/CLOSE STATUS AT THE VALVE (NEED TO CONFIRM TOTAL Take from chiller HLI
MV INVOLVE) ?

ANALOG OUTPUT (AO)


EQUIPMENT RFI / COMMENT CONSULTANT'S COMMENT
CHILLED WATER SUPPLY TEMP COMMAND WHAT TEMP CMD REFER TO ? Point not required
CHILLED WATER RETURN TEMP COMMAND WHAT TEMP CMD REFER TO ? Point not required
CONDENSER WATER SUPPLY TEMP
WHAT TEMP CMD REFER TO ? Point not required
COMMAND
CONDENSER WATER RETURN TEMP
WHAT TEMP CMD REFER TO ? Point not required
COMMAND
VSD SPEED CONTROL COMMAND CHILLER & CT REMOVED No objection
CONDENSER WATER RETURN TEMP WHAT TEMP CMD REFER TO ? Point not required
COMMAND

ANALOG INPUT (AI)


EQUIPMENT RFI / COMMENT CONSULTANT'S COMMENT
PLEASE CLARIFY WHO SUPPLY AND
EQUIPMENT VIBRATION LEVEL Point not required
LOCATION IF ANY ?
CHILLED WATER FLOW TRANSMITTER (3 BASED ON NEW CONSTRUCTION DRAWING
Noted
CHLR & 1 HEADER) AHC76/PRSB/M/CHW-13
CONDENSER WATER FLOW TRANSMITTER BASED ON NEW CONSTRUCTION DRAWING
Noted
(HEADER) AHC76/PRSB/M/CHW-13
CONTROL VALVE POSITION STATUS REMOVED TO HLI (6 UNITS ABV) No objection
VSD SPEED STATUS REMOVED TO HLI No objection
CHILLER % FULL LOAD REMOVED TO HLI No objection
PLEASE CLARIFY WHO SUPPLY AND
LEVEL SWITCHES Point not required
LOCATION IF ANY ?
CHILLED WATER SUPPLY TEMPERATURE
ELEMENT WE DIDN’T DISCUSS ON THIS MATTER
CHILLED WATER RETURN TEMPERATURE YESTERDAY BUT AS I LOOK INTO THE
ELEMENT CONSTRUCTION DRAWING
Flow meter only taken out from chiller's
CONDENSER WATER SUPPLY TEMPERATURE AHC76/PRSB/M/CHW-13 , PLEASE CLARIFY
CDWR pipe. Total flow meter required inside
ELEMENT TOTAL QTY REQUIRED FOR CHILLER AND CT
chiller plant is 6 nos.
CONDENSER WATER RETURN SIDE. (EX : YOU MENTIONED YESTERDAY
TEMPERATURE ELEMENT FLOW METER TAKEN OUT FROM CHILLER
SUPPLY PRESSURE TRANSMITTER BUT ON THE DRAWING STILL AVAILABLE?)
RETURN PRESSURE TRANSMITTER

HLI
EQUIPMENT RFI / COMMENT CONSULTANT'S COMMENT
6 UNITS BASED ON NEW CONSTRUCTION
AUTOMATIC BALANCING VALVE No objection
DRAWING AHC76/PRSB/M/CHW-13
ALL HLI RELATED TO PUMPS AND CT NO OPTION FOR THAT ON ACTUAL
No objection
REMOVED EQUIPMENT
VSD SPEED STATUS NEW ITEM FROM AI POINT PREVIOUSLY No objection
CHILLER % FULL LOAD NEW ITEM FROM AI POINT PREVIOUSLY No objection