GOAL constraints: Method: simplex and geometric

Maximizing the profit from Land=50000m2


construction project FAR: 1,00
Villa (x)=625m2 Profit:10 million
Flat (y)=125m2 Profit:5 million
Budget: 60 billion
Construction cost: Villa: 800 million , Flat: 225 million

Answer: Max z= 10x+ 5y X=0 ; y=400 max z=2.000.000.000


Constraints
625x+125y≤ 50000
800x+ 225y ≤ 60000
x,y > 0
GOAL constraints: Method: simplex and geometric
Max z= 2x+0,5y 6x+5y ≤ 30 ,
4x+ y ≤ 12,
x,y ≥ 0

Answer: As the max z function and 4x+y=12 has the same slope, maximum value function overlaps with this
function. The intersection point of two constraints is ( 2,14 ; 3,43), x and y are greater than 0, All points between
point ( 2,14 ; 3,43) and point (3,0) can be solution. Thus, the solution is infinite.
Sample 1: Solve this problem with simplex and geometric methods.

Max z = 4 x + 4 y

Constraints:

2x + 7y ≤ 21

7x + 2y ≤ 49

x, y ≥ 0

Answer: X= 6,69 ; y=1,09 max z= 31,11


Sample 2:

GOAL constraints:
Max z = 6 x + 8 y 2x + 2y ≤ 240
4x + 8y ≤ 840
x, y ≥ 0

Answer: X=30 ; y=90 max z=900


GOAL constraints:
Max z = 9 x + 4 y 3x + 2y ≤ 12
x + 3y ≤ 9
x, y ≥ 0

Answer: X= 4; y=0 max z=36


GOAL constraints: Method: simplex and geometric
Max z = 40 x + 50 y x + 2y ≤ 40
3x + 2y ≤ 60
x, y ≥ 0

Answer: X=10 ; y=15 max z= 1150


GOAL constraints: Method: simplex and geometric
Max z = 12x + 8y 2x + 5y ≤ 10
3x + 6y ≤ 18
x,y ≥ 0

Answer: X= 5; y=0 max z=60


GOAL constraints: Method: simplex and geometric
Max z = 7x + 5y 3x + 3y ≤ 7
3x + 6y ≤ 12
x,y ≥ 0

Answer: X=2,33 ; y=0 max z=16,31


GOAL constraints: Method: simplex and geometric
Max z = 3x + 2y 4x + 2y ≤ 8
x + 4y ≤ 6
x,y ≥ 0

Answer: X=1,43 ; y=1,14 max z=6,57


GOAL constraints: Method: simplex and geometric
Max z = 3x + 7y 5x + 10y ≤ 18
2x + 4y ≤ 9
x,y ≥ 0

Answer: X=0; y=1,8 max z=12,6


GOAL constraints: Method: simplex and geometric
Max z = 10x + 6y 6x + 8y ≤ 24
4x + 12y ≤ 20
x,y ≥ 0

Answer: X=4 ; y=0 max z=40


GOAL constraints: Method: simplex and geometric
Maximizing the profit from Land=50000m2
construction project FAR: 1,00
Villa (x)=625m2 Profit:10 million
Flat (y)=125m2 Profit:5 million
Budget: 60 billion
Construction cost: Villa: 800 million , Flat: 225 million

Answer: Max z= 10x+ 5y X=4 ; y=0 max z=40


Constraints
625x+125y≤ 50000
800x+ 225y ≤ 60000
x,y > 0