You are on page 1of 3

Project : Construction of Colombo City Centre - Colombo

Subject : MEP Activities to be quality checked

Sr. No System Activities


A MVAC
Lifting & Hoisting of the equipment
chillers water , condenser water and chilled
Installation of makeup
water Pumps.
Installation of Pressurization unit.
Installation of chemical Dosing Unit.
Installation of cooling tower
Installation of FRP Tanks.
Installation of FCU.
Installation of AHU / PAHU.
Installation of DX Type Air conditioners.
Fans. Water pipe with Insulation and
Installation of Chilled
cladings
Installation of condensate drain with insulation
valvesAir,
Installation of Fresh andAC
accessories
Supply and Return Air Duct
with Insulation.
Installation of non-insulated the exhaust and
pressurization ducts.
Installation of fire rated and
air inlets ducts
outlets ( Diffusers , louvers ,
grills ….ect)of start up control pannel for chillers , pumps
Installation
and fans ..ect.

B Fire Fighting System


Lifting and Hosting of the equipment.
Installation of Fire Pumps.
Installation of above ground Sprinkler pipes
Installation of above ground Hose Reel / wet riser pipes
Installation of under ground fire pipes
Installation of valves on fire pipes
Installation of sprinkler heads
Installation of fire hose reels and fire cabinets
Installation of landing valves and fire cabinets
Installation of gas fire suppression system
Installation of fire extinguishers
Installation of fire water storage tanks.
Installation of start up control pannel for pumps
C Water Supply System
Lifting and Hosting
Installation of the
of cold and hotequipment.
water transfer pumps , booster
pumps .
Installation of above ground / Under ground DI pipes
Installation of above ground / under ground PPR pipes
Installation of above ground / under ground uPVC pipes
Installation of valves on hot water and cold water pipes
Installation of water mixtures and faucets
Installation of water meters

1 of 3
Project : Construction of Colombo City Centre - Colombo
Subject : MEP Activities to be quality checked

Sr. No System Activities


Installation of GRP tanks
Installation of pressed steel tanks
Installation of heat pumps
Installation of water geysers
hot water
Installation of start pipes pannel
up control with insulation
for pumps , heat
pump systems

D Storm Water and Drainage System


Lifting and Hosting of the equipment.
Installation of sump pumps
Installation of sewage lifting pumps
Installation of ejector pits
Installation of oil interceptors
Installation of uPVC pipes for above ground drainage and
storm water pipes
Installation of uPVC pipes for under ground drainage and
storm waterof
Installation pipes
DI pipes for above ground drainage and
storm water pipes
Installation of DI pipes for under ground drainage and
storm waterofpipes
Installation Hume pipes for external under ground
storm water
manholes
Installation of floor covers
gullies , grating , rain water inlets and
out lets
sanitary
Installation of start fixturespannel for pumps , heat
up control
pump systems
E Swimming Pools
Lifting and Hosting of the equipment.
Installation of pipe work
Installation of swinming pool filters and pump sets
Installation of water inlets and outlets ( main drain ,
vaccum points , over fllor gutters … ect )
pool up
Installation of start lights
control pannel for pumps , heat
pump systems
F Gas System
Installation of gas pipes
Installation of valves on gas pipes
Installation of Gas banks
Installation of Gas meters
Installation of final distribution points

G Electrical Installation
Lifting & Hoisting of the equipment
(Generator,Transformer, MV switchgears)
Installation of transformer.
Installation of generator.

2 of 3
Project : Construction of Colombo City Centre - Colombo
Subject : MEP Activities to be quality checked

Sr. No System Activities


Installation of generator fresh air and exhaust system
Installation of generator diesel Pumps
Installation of under ground diesel tank.
Installation of MV Switchgear.
Installation of Cable tray and ladder MV, LV and ELV.
Installation of MV cables.
Installation of LV cable and small circuit wiring from
MDB to SDBs and SDBs to DBs
Installation of final wiring from DBs to lights , socket
outlets and final equipment.
Installation of final wiring retail Hotel Area Apartment.
Installation of vertical riser busbar and connection
between panel and busbar.
Installation of LV panel boards.
Installation of PVC conduit
Installation of GI Conduit.
Installation of switches and socket outlet (Weather proof).
Installation of Light fitting internal,landscape and façade
Installation of isolators.
Installation of lighting control pannels
Installation of lighting control cables
Installation of guest room control units
Installation of lightning protection cabels and conductors
Installation of earthing cables
Installation of earthing pits
H Fire Detection System
Installation of PVC conduits for ELV system ( Detection
and fire alarm , PA , Fireman Telephone system ..ect)
Installation of GI conduits for ELV system ( Detection
and fire alarm , PA , Fireman Telephone system ..ect)
Installation of ELV, Fire Cable ladder and Tray.
Installation of ELV and fire detection cable.
Installation of detectors and end equipments like smoke
detectors , heat detectors , sunders ..ect.
Installation of sub-fire alarm pannel
Installation Mimmic Pannels
Installation of main control pannel at the FCC room
I BMS
Installation of PVC conduits for BMS
Installation of GI conduits forBMS
Installation of Cable ladder and Tray.
Installation of DDC controlers and field divices
Installation of BMS room equipment