National Iranian Oil CONT. No. : 1187/EB-GN/DBS-BD01-00 REF. No.

: 1187-SP-00-02 (0)
Engineering and
Construction Company DOCUMENT CODE PAGE 1 OF 5

Project : PLAN/PRJ UNIT PHASE DISC


DOC.
SER. NO.
REV.
DATE
TYPE NO.
Gurreh-Jask Pipeline & 1187 00 EB CE SP 0002 B0 22-Oct-2016
Facilities Basic Design

Project Specification For Site Preparation For


Earth Work & Sewers

B0 22-Oct-2016 AFD E. Tafazoli V. Vahedian S. Fazeli


A0 03-Sep-2016 IFA V. Vahedian S. Fazeli A. Babaei

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED


CONT. No. : 1187/EB-GN/DBS-BD01-00 REF. No.: 1187-SP-00-02 (0)

Project : Gurreh-Jask Pipeline & Facilities Basic Design PAGE 2 OF 5

TABULATION OF REVISED PAGES


Revisions Revisions
Sheet Sheet
A0 A1 A2 A3 A4 A5 A6 A7 A0 A1 A2 A3 A4 A5 A6 A7
1 X 39
2 X 40
3 X 41
4 X 42
5 X 43
6 44
7 45
8 46
9 47
10 48
11 49
12 50
13 51
14 52
15 53
16 54
17 55
18 56
19 57
20 58
21 59
22 60
23 61
24 62
25 63
26 64
27 65
28 66
29 67
30 68
31 69
32 70
33
34
35
36
37
38
CONT. No. : 1187/EB-GN/DBS-BD01-00 REF. No.: 1187-SP-00-02 (0)

Project : Gurreh-Jask Pipeline & Facilities Basic Design PAGE 3 OF 5

Contents
1. INTRODUCTION ..............................................................................................................................................4

2. MODIFICATION TO NIOEC SPECIFICATION ................................................................................................4


CONT. No. : 1187/EB-GN/DBS-BD01-00 REF. No.: 1187-SP-00-02 (0)

Project : Gurreh-Jask Pipeline & Facilities Basic Design PAGE 4 OF 5

1. INTRODUCTION

This Project specification is an addendum to the NIOEC Standard Specification NIOEC-SP-


00-02 (2) and is issued for Basic Design Phase of Gurreh - Jask Pipeline and Facilities project.
The following annotation, as specified hereunder, have been used to indicate the type of
change made to the equivalent clause of NIOEC Specification.

Substitution: The clause in NIOEC Specification shall be deleted and replaced by the new
clause in this Job Specification.

Deletion: The clause in NIOEC Specification shall be deleted without any replacement.

Addition: The new clause with the new number shall be added to the relevant section of
NIOEC Specification.

Modification: Part of the clause or paragraph in NIOEC Specification shall be modified


and/or the new description and/or statement shall be added to the clause or paragraph as
given in this Job Specification

The clause or section numbering of mentioned NIOEC Specification has been used
throughout this Job Specification.

The clauses which are not mentioned in the following amendments shall be considered
unaltered.

2. MODIFICATION TO NIOEC SPECIFICATION

This Job Specification is based on relevant NIOEC Specification NIOEC-SP-00-02 (2), with
the following modifications:

ARTICLE 2. REFERENCES (Modification)

The revision of AASHTO M 147-65 (2008) shall be modified as follows:


AASHTO M 147-65 (2012)
CONT. No. : 1187/EB-GN/DBS-BD01-00 REF. No.: 1187-SP-00-02 (0)

Project : Gurreh-Jask Pipeline & Facilities Basic Design PAGE 5 OF 5

The revision of AASHTO M 57-80 (2008) shall be modified as follows:


AASHTO M 57-80 (2012)

The revision of AASHTO T 180-10 shall be modified as follows:


AASHTO T 180-15

ARTICLE 6.2. Filling (Modification)


The revision of AASHTO M 57-80 (2008) shall be modified as follows:
AASHTO M 57-80 (2012)

ARTICLE 8.3. Sub-base (Modification)


The revision of AASHTO M 147-65 (2008) shall be modified as follows:
AASHTO M 147-65 (2012)

ARTICLE 8.7.2 (Modification)


At the end of the paragraph, the word (bound walls) shall be modified as follows:
(Bund walls)

ARTICLE 9. COMPACTION CONTROL (Modification)


The revision of AASHTO T 180-10 shall be modified as follows:
AASHTO T 180-15