The true cost

of building a house
An honest guide to the cost of building your own
home on your own land

@greencorehomes

www.greencoreconstruction.co.uk

E
TE
N
RA ice
A pr
U ld de
G i
u i
CE fl -b s gu
I e hi
PR
s
r t
ou in
ED er se
X v i
FI co o
is pr
m
D
How do you get value and cost
assurance when building a house?

By Ian Pritchett
Managing Director, Greencore Construction

I often get asked how much it really costs to in Oxfordshire, which is where we have most
build a house. experience and local knowledge.
It’s a difficult question to answer as every build Design
has its own requirements. However, there are
some common factors that will influence the The design of a house can have a big impact on
cost of any project. its cost. Ideally you should use an architect who
This guide aims to give you honest advice on has a track record of designing houses that suit
how to best approach these factors, how to get your budget.
maximum value at each stage of your project You should also employ a builder who can
and how to eliminate unexpected costs. target cost certainty for your project. Many
builders under-quote at the beginning of a
5 things to consider when costing project, but introduce costly alterations to the
your project design later on.
We believe it is essential that the design is
The cost of building a house depends on a
controlled from the outset and developed in
number of factors, including:
enough detail to provide a clear specification,
• Location including the quality of kitchens and bathrooms.

• Design At Greencore, when a clear specification


has been agreed, we can offer a fixed price
• Size
guarantee on most of our projects.
• Procurement route and project management
We make sure the design is right from the start.
• Construction type and quality This means that once the design is done we can
quote you an accurate price that won’t change
during the project, unless you change the
specification.
We strongly believe having the right design
from the beginning will save you money in the
long run.

Save money with our fixed price


guarantee. Contact us to find out more

Size
Location The cost of building a house is normally
measured in pounds per square metre of floor
Construction costs vary from one part of area. The larger the floor area, the higher the
the country to another, with central London total cost.
obviously being the most expensive. The
information in this guide is based on the costs Construction costs can vary from £1,000 to
£3,000 per square metre. Most new self-build At Greencore we work with our clients to prioritise
houses fall into the range of £1,500 to £2,000 per where money is spent in order to deliver the
square metre. best value.
We advise our clients to prioritise the fabric of the
Procurement route and building (external walls, windows and doors, roof,
project management foundations and floor slab).

The way you decide to build your house will also These are the elements of the building that
have a big impact on the cost. At one end of the provide the structure, insulation and air-tightness.
spectrum you could decide to do all the work They are the parts of the building that are going
yourself and save the cost of using a builder. At to be there for the whole life of the building.
the other end of the spectrum you may decide to Our unique building system has been developed
use a large main contractor. This makes life very and refined over the past few years to give you
easy, but has a higher cost. the best balance between performance, speed of
There are also numerous intermediate routes with construction and cost.
different price points. In general, you should get
what you pay for, but we have all heard stories Discover our unique construction
where this hasn’t happened. system at greencoreconstruction.co.uk
Whichever route you choose, someone has to
manage the project from the design right through Typical prices
to the construction. The project management role
is critical to a successful project. The table on the back of this guide shows typical
build costs for a high performance, comfortable
If you employ Greencore, we will ensure that your
and sustainable home built to premium quality by
project is properly managed by one of our expert
Greencore in the Oxfordshire area.
team. We offer a simple, low-risk solution to your
construction project. In addition to these costs you will need to allow
a further 10% of the construction costs to cover
your architect, engineer and other miscellaneous
Visit greencoreconstruction.co.uk to consultants that will be required.
learn more about our tailored design
and build services Please note that in some places – such as at
Graven Hill near Bicester – you can buy your plot
with the foundations, services and substructure
already in place. This is called a ‘Golden Brick’
Construction type and quality solution and the costs charged may vary from the
costs stated in this guide.

Unexpected costs
In addition to the costs shown in this guide,
further costs may occur due to abnormal
conditions on your site. These could be:
• Sloping ground
• Poor ground conditions
• Contamination
• Remote location
The choices you make about the type of If you’re facing these sorts of challenges, seek
construction – such as timber frame or masonry professional advice at an early stage.
– can have an impact on the final cost and the
speed of construction. However the difference is
not as large as you might think and need not be Make your self-build dream a reality
very different.
Building a house involves thousands of decisions Request a free consultation:
about design and specification. And each choice
has a cost impact. If you choose the most enquiries@greencoreconstruction.co.uk
www.greencoreconstruction.co.uk
expensive in every category, you will end up with
an expensive house.
Typical Typical % of
Item 100m2 2-3 bed 150m2 3-4 bed 200m2 3-4 bed 250m2 5-6 bed
£/m2 total budget
Pre-construction
Site investigation, £100 6% £10,000 £15,000 £20,000 £25,000
demolition, site clearance,
new utilities
Substructure
Foundations, drains, £120 6% £12,000 £18,000 £24,000 £30,000
insulation and floor slab
Superstructure
External walls, internal
walls, upper floors, roof £450 25% £45,000 £67,500 £90,000 £112,500
structure, insulation and
airtightness
External finishes
Roof tiles, doors and £280 16% £28,000 £42,000 £56,000 £70,000
windows, wall cladding,
gutters
Services and fit-out
Plumbing, heating,
ventilation, electrics,
plastering, decorations, £500 28% £50,000 £75,000 £100,000 £125,000
kitchen, bathrooms,
ceramic tiles, floor
finishes, doors and stairs
External works
Patios, paths, driveway, £100 6% £10,000 £15,000 £20,000 £25,000
planting, turfing
Prelims
Site management, £170 9% £17,000 £25,500 £34,000 £42,500
welfare, health and safety,
scaffolding and fencing
Contingency £80 4% £8,000 £12,000 £16,000 £20,000
Total £1,800 100% £180,000 £270,000 £360,000 £450,000
Typical prices for a turnkey Greencore project in Oxfordshire.
Contact us for a more detailed quote and details of our fixed price guarantee.