You are on page 1of 7

Performance – optimisation – planning 3 G

RAN KPI analysis

3G network KPI
customised seminar
Moscow
W-CDMA event 08/2009

issue 08/09 TECHCOM Consulting  TECHCOM.DE Copyright © All rights reserved - confidential issue

TA-TC 6272 KPI analysis Version 02 00 - 1


Content
1. The UMTS Network

1.1 Quality in UMTS networks


1.2 UMTS evolution
1.3 UMTS Protocols
• NAS Protocols
• UTRAN Protocol

1.4 Performance Data

1.5 Key Performance Indicators

issue 08/09 TECHCOM Consulting  TECHCOM.DE Copyright © All rights reserved - confidential issue

TA-TC 6272 KPI analysis Version 02 00 - 2


Content
2. Call/Connection Analyses

2.1 Procedure related KPI in UTRAN


• Service concept
• Call Establishment
• Paging
• RRC connection setup
• Signalling Connection Establishment
• Radio Link setup
• RAB assignment
• Call Setup Success Rate
• CallRelease
• RAB Release
• Signalling Connection Release
• RRC Release Radio Link Release
• Call/RAB drops

issue 08/09 TECHCOM Consulting  TECHCOM.DE Copyright © All rights reserved - confidential issue

TA-TC 6272 KPI analysis Version 02 00 - 3


Content
2.2 NAS procedures
• MM procedures
• Location Updates
• Authentication
• Ciphering initialization
• CC procedures
• Call setup
• Call Release
• GMM
• Location Updates
• Authentication
• Ciphering initialization
• SM
• PDP context activation/modification/ deactivation

issue 08/09 TECHCOM Consulting  TECHCOM.DE Copyright © All rights reserved - confidential issue

TA-TC 6272 KPI analysis Version 02 00 - 4


Content
2.3 Procedure related KPI in UTRAN for PS traffic
• Radio Bearer Control
• PS RAB assignment
• RRC States
• Transport Channel Reconfiguration

2.4 HSDPA Analyses

3. Mobility
3.1 Handover types
3.2 Measurements
3.3 Soft handover
3.4 Hard handover
3.5 SRNC relocation

issue 08/09 TECHCOM Consulting  TECHCOM.DE Copyright © All rights reserved - confidential issue

TA-TC 6272 KPI analysis Version 02 00 - 5


Content
4. Quality
4.1 Resources in UTRAN
4.2 ATM measurements
4.3 Throughput measurements
4.4 Radio Measurements
4.5 Codes
4.6 Quality/load related KPI

5. Optimizing UTRAN
5.1 General Aspects
5.2 Idle Mode
5.3 Connected Mode
5.4 Interworking with GSM

issue 08/09 TECHCOM Consulting  TECHCOM.DE Copyright © All rights reserved - confidential issue

TA-TC 6272 KPI analysis Version 02 00 - 6


3G/HSPA RAN parameter – definitions – performance

Thank you

issue 08/09 TECHCOM Consulting  TECHCOM.DE Copyright © All rights reserved - confidential issue

TA-TC 6272 KPI analysis Version 02 00 - 7

You might also like