You are on page 1of 2

CURRICULUM VITAE

Full Name: Daniel Martín Uriarte Rojas


Date of Birth: July 22th, 1981
Place of Birth: La Paz, Bolivia
Civil Status: Married
Address: Santa Cruz, Bolivia
Land phone: (591)-3-3223392
Cell phone: (591)- 78469969
E-mail:
danieluriarte1@hotmail.com

BACKGROUND
Petrobras Bolivia S.A. Drilling Engineer/ Night Drilling Company Man

- Currently working for the engineering team in exploratory wells.


- ITU-4D (ERD well); with MPD-UBD (Nitrogen Injection
Drilling). Saving operational time & cost. Deviated well with a
final inclination of: 90deg.
- Reentry SAL-X11 (DIRECTIONAL WELL); with MPD-UBD
(Nitrogen Injection Drilling). Saving operational time & cost.
Deviated well with a final inclination of: 75deg.
- SBL-8 Deviated Well, Saving operational time & cost. With a final
inclination of: 45deg.
- Update and Management of reports (Open Wells & Data Analyzer)
- Management & Control of Well Costs (AFE & Government
Relationship about tickets from contractors).
- End of Well Reports, Cost Control Report (SAP-basic level)
- QHSE implementation in every day’s work.

BG Bolivia Corporation. Subsurface’s Assistant.


- Nodal Analysis of BG’s Wells (using PROSPER). From April
2008 to March 2009.

Internship at BG Bolivia Corporation. Drilling & Production


- Production at “La Vertiente” dew point plant. Production
manifold, gathering systems, Separators, Compressors, Natural
Gas Dehydration, Cooling System, Stabilization & Hot Oil.

- Drilling. Daily Drilling Reports Analysis, Well’s check list (Asset


Integrity), Depth vs. Day & Cost vs. Day plots.
From January to March 2007.

EDUCATION
- U-Virtual, Certification of Operation & Maintenance on
Hydrocarbon Plants. (April to November 2009)
- Bachelor degree in Oil, Gas and Processes Engineer at Universidad
Mayor de San Andrés

LANGUAGES
- Spanish (Native)
- English (intermediate)
- German (basic)
- Portuguese (intermediate)

CERTIFICATIONS
- Directional Drilling Basics, Santa Cruz, November 2014.
- TURBINE-NEYRFOR, Santa Cruz, November 2014
- IADC Certificate of Stuck Pipe-June 2014.
- IADC Certificate of Drilling Supervisor.
Valid Date: March 2014 to March 2016.
- IADC Certificate of Completion. Supervisor – Underbalance
Drilling
Valid Date: December 2011 to December 2013.
- UNDERREAMERS- SMITH, Santa Cruz, May 2011
- IADC Certificate of Completion. Supervisor – Drilling-Workover
Valid Date: August 2010 to August 2012.
- Asset Integrity - BG Bolivia
Santa Cruz, September 2008

COMPUTER
SKILLS - Ms Office (Word, Excel, Power Point)
- Outlook
- Lotus Notes
- Open Wells
- Data Analyzer
- Casing Seat
- Stress Check (basic knowledge)
- Compass (basic knowledge)

You might also like