MEMO No. 041 - 2017 / SS.GG.

MINE

TO : Ing. Jonathan Paredes Giancarlo Cucho


superintendent Mine

Of Ing. Alberto Vargas Ramirez


Chief General Services - Mina

Affair REPORT OF GENERAL SERVICES MINA - DECEMBER 2017

Date : Las Chilcas January 10, 2018

By present the results achieved during the month of December 2017 is reported.

During 15 work filled, making a total volume of 9,436.85m³ having operated a total of
252.50 hours. 22 partitions prepared whose total area was 267.22m2.

Datos Enero Febrero Marzo Abril Mayo Junio Julio Agosto Setiembre Octubre Noviembre Diciembre Total general
Volumen Mensual Operativo mᶟ 5,781.04 6,831.77 8,541.55 8,154.98 5,838.05 7,244.70 9,272.71 5,351.39 7,752.92 5,995.64 3,985.42 7,745.39 82,495.56
Volumen Mensual Pasivo mᶟ 6,866.71 2,972.55 3,605.75 5,956.10 7,961.48 6,513.63 4,892.14 3,128.91 2,286.69 3,690.80 3,727.28 1,691.46 53,293.50
Volumen Mensual Total mᶟ 12,647.75 9,804.32 12,147.30 14,111.08 13,799.53 13,758.33 14,164.85 8,480.30 10,039.61 9,686.44 7,712.70 9,436.85 135,789.06
Tiempo Relleno Hrs 339.58 263.50 325.08 377.92 370.08 368.00 379.83 227.08 268.58 259.33 204.25 252.50 3635.74
Volumen Acumulado Explotado mᶟ 1,312,833 1,305,242 1,569,232 1,790,006 2,015,798 1,848,124 1,817,637.64 1,588,224.34 1,373,772.60 1,385,991.59 1,474,083.57 1,481,591.40 ##########
Volumen Acumulado Relleno mᶟ 1,283,954.57 1,258,486.69 1,526,110.79 1,601,266.14 1,828,250.85 1,665,309.44 1,642,873.98 1,258,718.73 1,143,350.13 1,149,416.13 1,140,707.00 1,149,956.63 ##########
Volumen Acumulado Detritico mᶟ 17,997.28 18,941.07 19,994.48 152,153.32 153,301.41 154,179.24 155,143.46 154,978.90 105,456.53 106,303.94 113,370.30 114,189.33 1,266,009.26
Volumen Pasivo a Rellenar mᶟ 28,878.09 46,754.86 43,121.09 188,739.72 187,546.78 182,814.39 174,763.66 329,505.60 230,422.46 236,575.46 333,376.57 331,634.77 2,314,133.45
Volumen Purgado Aire Comprimido
Pulmón de Aire N° 05 11,744 11,529 10,493 3,093 25,989 30,186 31,837 37,348 33,099 30,415 20,147 27,616 273,497
Purgadores Pique Andres 3,134 2,840 3,106 18,795 22,618 16,968 13,318 13,888 12,775 15,550 14,572 16,742 154,306
Purgadores Pique Marsa 0 0 0 2,542 7,248 5,184 5,903 5,314 4,584 6,819 7,832 12,845 58,271
Total Litros de Agua Purgados 14,878 14,369 13,599 24,430 55,855 52,338 51,058 56,550 50,458 52,784 42,551 52,220 481,091
Volumen Reportado por Mes
Volumen Mensual 12,647.75 9,804.32 12,147.30 14,111.08 13,799.53 13,758.33 14,164.75 8,480.30 10,039.61 9,686.44 7,712.70 9,436.85 135,788.96
Tiempo Relleno 339.58 263.50 325.08 377.92 370.08 368.00 379.83 227.08 268.58 259.33 204.25 252.50 3,635.75
Num. Labores Mes
Total 19 19 18 26 20 21 16 13 16 20 11 15 214
Preparacion de Tabiques por Mes
Area Total 286.48 200.42 256.37 214.23 197.67 441.29 214.87 119.57 217.57 242.28 175.56 267.22 2833.53
Area Promedio 8.19 10.02 7.12 7.93 8.99 10.76 7.96 5.98 5.58 9.32 13.50 12.15 8.64
Numero de Tabiques 35 20 36 27 22 41 27 20 39 26 13 22 328
Distribucion de Tareas Relleno Hidraulico
Transporte de Materiales 100% Relave 13 15 3 14 16 11 5 13 3 19 2 2 116
Jefe de Guardia Comiluz 62 56 61 47 57 60 57 61 56 56 57 59 689
Tareas Total 2,138 1,908 2,165 1,988 2,173 2,060 2,008 2,134 1,992 1,873 1,138 1,488 23,065
Ratios Enero Febrero Marzo Total General
Volumen de Relleno m3 / Area de Tabique m2 44.15 48.92 47.38 65.87 69.81 31.18 65.92 70.92 46.14 39.98 43.93 35.31 47.92
Volumen de Relleno m3 / Tarea Directa 8.43 8.13 8.88 11.17 11.14 10.29 10.83 7.26 7.62 7.41 5.90 9.46 9.29
Volumen de Relleno m3 / Tarea Total 5.92 5.14 5.61 7.10 6.35 6.68 7.05 3.97 5.04 5.17 6.78 6.34 5.89
Volumen de Relleno m3 / Tabique 361.36 490.22 337.43 522.63 627.25 335.57 524.62 424.02 257.43 372.56 593.28 428.95 413.99
Volumen de Relleno m3 / Labor 665.67 516.02 674.85 542.73 689.98 655.16 885.30 652.33 627.48 484.32 701.15 629.12 634.53
Tarea Directa / Area de Tabiques m2 5.24 6.02 5.34 5.90 6.27 3.03 6.09 9.77 6.05 5.39 7.44 3.73 5.16
Tarea Directa / Tabique 42.89 60.30 38.00 46.78 56.32 32.61 48.44 58.40 33.77 50.27 100.54 45.36 44.57
Tarea Directa / Labor 79.00 63.47 76.00 48.58 61.95 63.67 81.75 89.85 82.31 65.35 118.82 66.53 68.32
Area de Tabiques m2 / Labor 15.08 10.55 14.24 8.24 9.88 21.01 13.43 9.20 13.60 12.11 15.96 17.81 13.24
Area de Tabiques m2 / Tabique 8.19 10.02 7.12 7.93 8.99 10.76 7.96 5.98 5.58 9.32 13.50 12.15 8.64
Tabiques / Labor 1.84 1.05 2.00 1.04 1.10 1.95 1.69 1.54 2.44 1.30 1.18 1.47 1.53

____________________________
Ing. Alberto Vargas Ramirez
Chief General Services - Mina
DC: Superintendent / Superintendent Mine / Mine Planning / Engineering / File.
1. SECURITY:

During the month of December, has had no accidents:


Page 1 of 10
1.1 Accident statistics:

2. FILLING HYDRAULIC

2.1 Filling plant 100% Relave:

filling volume : 9,436.85m³.


Total operated hours : 252.50Hrs.
Volume solids : 37.37m3 / Hr.
Water consumption : 25.81m3 / Hr.
Average pulp density : 1,831gr / lt.
Percent solids volume : 50.99%.
Percent solids by weight : 73.24%.

2.2 Filling Plant Journal report 100% Relave:

Page 2 of 10
Tie m po Caudal De ns idad Volum e n
Fecha Labores Observacion Hr m 3/Hr Kg/l m3
01/12/2017 Tj. 464 El tajo se relleno conforme.Quedo Topeado 1.50 74.30 1.832 56.56
Tj. 862 Daniela El tajo se relleno conforme 3.33 73.80 1.836 125.32
Xc 10089 Se corto por falta de Carga 3.50 73.50 1.836 131.18
02/12/2017 Tj. 554 El tajo se relleno conforme 1.50 73.70 1.813 54.82
Se inició tarde por instalacion de tuberia RH. 2.00 73.50 1.830 74.43
Tj. 765 Daniela El tajo se relleno conforme 1.67 73.70 1.829 61.87
Xc 10089 El crucero se relleno conforme. Quedo Topeado 1.50 74.00 1.813 55.04
03/12/2017 Tj. 554 El tajo se relleno conforme 2.50 73.80 1.830 93.55
Tj. 465 El tajo se relleno conforme 1.17 73.20 1.804 41.89
Tj. 765 Daniela El tajo se relleno conforme 1.50 73.70 1.826 55.76
04/12/2017 Tj. 554 El tajo se relleno conforme 1.83 75.00 1.817 69.04
06/12/2017 Tj. 11 El tajo se relleno conforme 6.83 73.00 1.844 256.69
5.50 73.20 1.841 206.54
Tj. 554 El tajo se relleno conforme 1.67 73.70 1.825 61.57
07/12/2017 Tj. 11 El tajo se relleno conforme 1.50 74.60 1.813 55.49
Tj. 10 El tajo se relleno conforme 3.00 73.00 1.828 110.61
2.33 73.80 1.834 87.48
08/12/2017 Tj. 11 El tajo se relleno conforme 3.00 73.70 1.830 111.94
Tj. 554 El tajo se relleno conforme 1.83 73.70 1.825 67.92
Tj. 10 El tajo se relleno conforme 2.17 73.50 1.834 80.77
09/12/2017 Tj. 554 El tajo se relleno conforme 2.00 73.30 1.828 74.04
Tj. 868 El tajo se relleno conforme 3.50 74.00 1.838 132.40
10/12/2017 Tj. 11 El tajo se relleno conforme.Quedo Topeado 1.50 73.50 1.815 54.81
Tj. 661 Se incio tarde por trabajos en el tajo 6.83 73.70 1.848 260.38
Tj. 10 El tajo se relleno conforme 2.33 72.60 1.825 85.12
11/12/2017 Tj. 661 El tajo se relleno confome 8.33 73.50 1.846 315.96
Tj. 868 El tajo se relleno confome 6.50 73.10 1.842 244.04
12/12/2017 Tj. 465 El tajo se relleno confome 1.00 73.70 1.821 36.91
Tj. 661 El tajo se relleno confome 2.67 73.80 1.836 100.11
Tj. 10 El tajo se relleno confome 2.00 73.00 1.820 73.02
Tj. 868 El tajo se relleno confome.Quedo Topeado 2.00 74.00 1.821 74.11
13/12/2017 Tj. 10 El tajo se relleno confome 1.83 73.70 1.825 67.87
Tj. 2005 El tajo se relleno confome 4.17 73.30 1.843 158.94
14/12/2017 Tj. 465 El tajo se relleno confome 1.00 74.00 1.815 36.78
Tj. 661 El tajo se relleno confome 2.67 73.50 1.828 98.74
Tj. 10 El tajo se relleno confome 1.83 73.70 1.828 68.12
Tj. 2005 El tajo se relleno confome 4.50 74.20 1.844 171.91
15/12/2017 Tj. 465 El tajo se relleno confome 1.50 74.00 1.821 55.58
Tj. 661 El tajo se relleno confome 2.00 73.60 1.827 74.25
Tj. 10 El tajo se relleno confome 1.67 73.70 1.825 61.85
Tj. 2005 El tajo se relleno confome 4.33 74.40 1.843 165.66
16/12/2017 Tj. 465 El tajo se relleno confome 2.00 74.00 1.826 74.57
Tj. 661 El tajo se relleno confome 2.50 73.50 1.833 93.36
Tj. 10 El tajo se relleno confome 1.83 73.80 1.829 68.30
Tj. 2005 El tajo se relleno confome 4.50 74.00 1.844 171.44
17/12/2017 Tj. 465 El tajo se relleno confome 1.50 74.60 1.821 56.04
Tj. 661 El tajo se relleno confome 1.50 73.60 1.820 55.22
Tj. 152 Se incio tarde por trabajos en el tajo 1.33 74.70 1.826 50.06
Tj. 2005 El tajo se relleno conforme 3.00 74.00 1.840 113.75
18/12/2017 Tj. 465 Se corto antes por fuga por la Ch. 13 1.33 74.00 1.808 48.50
Tj. 661 El tajo se relleno conforme 1.67 73.60 1.825 61.48
Tj. 10 El tajo se relleno conforme 1.17 73.70 1.819 42.72
Tj. 152 El tajo se relleno conforme 1.67 74.30 1.834 62.75
19/12/2017 Tj. 10 Se corto por fuga de fino 1.00 73.70 1.820 36.86
Tj. 152 Se corto por fuga de fino por el drenaje 1.33 74.60 1.826 49.99
Tj. 2005 El tajo se relleno conforme 2.50 73.60 1.825 92.59
20/12/2017 Tj. 554 El tajo se relleno conforme 1.50 73.70 1.826 55.70
Tj. 661 Se corto por fuga de fino 1.50 73.50 1.830 55.81
Tj. 10 El tajo se relleno conforme.Quedo Topeado 1.00 74.00 1.821 37.05
21/12/2017 Tj. 152 El tajo se relleno conforme 1.33 74.30 1.827 49.85
22/12/2017 Tj. 465 Se corto por picadura en el desviador (Nv.2950) 1.00 74.00 1.806 36.38
Tj. 661 El tajo se relleno conforme 1.50 73.50 1.815 54.81
23/12/2017 Tj. 554 El tajo se relleno conforme 4.00 73.40 1.836 149.72
Tj. 465 El tajo se relleno conforme 1.00 74.00 1.808 36.47
Tj. 661 El tajo se relleno conforme 1.17 73.00 1.804 41.53
Tj. 152 El tajo se relleno conforme 1.50 74.00 1.815 55.18
Tj. 2005 El tajo se relleno conforme.Quedo Topeado 1.00 74.00 1.821 37.05
24/12/2017 Tj. 554 El tajo se relleno conforme 3.50 73.70 1.835 131.38
Tj. 465 El tajo se relleno conforme 1.50 74.00 1.816 55.25
Tj. 661 El tajo se relleno conforme 1.50 73.50 1.815 54.81
Tj. 1160 CHI 10138-4AS El tajo se relleno conforme 2.00 74.00 1.820 74.02
25/12/2017 Tj. 554 El tajo se relleno conforme 3.00 73.70 1.832 112.21
Tj. 661 Se corto por falta de agua (3715) 1.50 73.00 1.815 54.43
Tj. 1161 El tajo se relleno conforme 2.50 74.20 1.830 93.91
26/12/2017 Tj. 465 El tajo se relleno conforme 1.50 73.40 1.815 54.81
Tj. 1161 El tajo se relleno conforme.Quedo Topeado 2.50 74.00 1.828 93.43
27/12/2017 Tj. 554 El tajo se relleno conforme 7.17 73.70 1.834 268.75
Tj. 465 El tajo se relleno conforme 2.17 74.00 1.826 80.79
Tj. 661 El tajo se relleno conforme 2.50 73.50 1.810 90.79
Tj. 1160 CHI 10138-4AS El tajo se relleno conforme. 3.00 74.00 1.815 110.37
28/12/2017 Tj. 554 El tajo se relleno conforme 2.67 73.70 1.828 99.01
Tj. 465 El tajo se relleno conforme 4.00 73.80 1.840 151.26
4.00 74.30 1.827 149.93
Tj. 661 El tajo se relleno conforme 1.67 73.50 1.815 60.97
Tj. 1160 CHI 10138-4AS El tajo se relleno conforme. 3.50 73.60 1.838 131.68
29/12/2017 Tj. 554 El tajo se relleno conforme 5.00 74.00 1.821 185.30
Tj. 465 El tajo se relleno conforme 3.00 73.80 1.833 112.50
Tj. 1160 CHI 10138-4AS El tajo se relleno conforme 3.50 73.70 1.837 131.70
30/12/2017 Tj. 465 El tajo se relleno conforme 3.00 74.00 1.830 112.40
Tj. 202 El tajo se relleno conforme 5.50 73.70 1.834 206.22
Tj. 661 El tajo se relleno conforme 5.50 73.90 1.835 207.02
Tj. 1160 CHI 10138-4AS El tajo se relleno conforme 4.50 74.30 1.832 169.69
31/12/2017 Tj. 202 El tajo se relleno conforme 3.50 73.50 1.834 130.87
Tj. 661 El tajo se relleno conforme 5.50 74.00 1.840 208.45
Tj. 1160 CHI 10138-4AS El tajo se relleno conforme . Queda topeado 4.00 73.40 1.830 148.65
Total 252.50 73.73 1.831 9436.85
m3/Hr 37.37
Q agua 25.81
%Sv 50.99%
%Sp 73.24%
Q pulpa 48.77

Page 3 of 10
2.3 Filling volume sections:

3
Seccion Tiempo Densidad Caudal Volumen (m ) Cumplimiento
Programado Ejecutado
Chilcas Bajo 73.50 1.834 73.60 2,600 2,753.67 105.91%
Valeria I 39.33 1.825 74.04 3,010 1,464.45 48.65%
Valeria II 53.67 1.833 73.63 2,107 2,005.75 95.18%
Valeria III 55.50 1.831 73.70 2,517 2,073.31 82.36%
Valeria IV 30.50 1.830 73.84 850 1,139.67 134.08%
Total 252.50 1.831 73.73 11,085 9,436.85 85.13%

2.4 Report Padding for Work:


Page 4 of 10
Tiempo Densidad Caudal Volumen
Seccion Nivel Labor
hrs Kgs/Lt m3/hr m3
Chilcas Bajo 3125 Tj. 202 9.00 1.834 73.62 337.09
3025 Tj. 2005 24.00 1.840 73.95 911.34
Sub Total 33.00 1.839 73.86 1,248.43
Valeria I 2820 Tj. 152 7.17 1.826 74.37 267.83
2770 Tj. 464 1.50 1.832 74.30 56.56
Tj. 465 30.67 1.824 73.95 1,140.06
Sub Total 39.33 1.825 74.04 1,464.45
Valeria II 2720 Tj. 661 50.50 1.833 73.62 1,888.12
2670 Tj. 765 Daniela 3.17 1.828 73.70 117.63
Sub Total 53.67 1.833 73.63 2,005.75
Valeria III 2620 Tj. 862 Daniela 3.33 1.836 73.80 125.32
Tj. 868 12.00 1.837 73.51 450.55
2520 Tj. 554 40.17 1.829 73.74 1,497.44
Sub Total 55.50 1.831 73.70 2,073.31
Valeria IV 2370 Tj. 1161 5.00 1.829 74.10 187.34
2320 Tj. 1160 CHI 10138-4AS 20.50 1.830 73.83 766.11
Sub Total 25.50 1.830 73.88 953.45
Total general 207.00 1.831 73.79 7,745.39

2.5 Stuffing report Liabilities:

Tiempo Densidad Caudal Volumen


Seccion Nivel Labor
hrs Kgs/Lt m3/hr m3
Chilcas Bajo 2950 Tj. 10 22.17 1.827 73.44 819.77
Tj. 11 18.33 1.836 73.35 685.47
Sub Total 40.50 1.831 73.40 1,505.24
Valeria IV 2370 Xc 10089 5.00 1.829 73.65 186.22
Sub Total 5.00 1.829 73.65 186.22
Total general 45.50 1.831 73.42 1,691.46

2.6 Volume Report compressed air purge:

Datos Enero Febrero Marzo Abril Mayo Junio Julio Agosto Setiembre Octubre NoviembreDiciembre Total
Pulmón de Aire N° 05 11,744 11,529 10,493 3,093 25,989 30,186 31,837 37,348 33,099 30,415 20,147 27,616 273,497
Purgadores Pique Andres 3,134 2,840 3,106 18,795 22,618 16,968 13,318 13,888 12,775 15,550 14,572 16,742 154,306
Purgadores Pique Marsa 0 0 0 2,542 7,248 5,184 5,903 5,314 4,584 6,819 7,832 12,845 58,271
Total Litros de Agua Purgados 14,878 14,369 13,599 24,430 55,855 52,338 51,058 56,550 50,458 52,784 42,551 52,220 481,091

3. Partitions report preparation:


Page 5 of 10
3.1 Tabiques area for work.

Area Numero Area


Seccion Nivel Labor
Promedio Tabiques total
Chilcas Bajo 3125 Tj. 202 9.51 5.00 47.53
3075 Tj. 2022 8.01 2.00 16.02
2950 Tj. 10 21.40 2.00 42.80
Sub Total 11.82 9.00 106.35
Valeria I 2820 Tj. 152 9.01 4.00 36.03
Sub Total 9.01 4.00 36.03
Valeria II 2720 Tj. 661 AVH 15.93 2.00 31.85
Sub Total 15.93 2.00 31.85
Valeria III 2620 Tj. 862 Daniela 9.85 2.00 19.70
Tj. 868 15.25 2.00 30.50
2520 Tj. 554 9.55 2.00 19.09
Sub Total 11.55 6.00 69.29
Valeria IV 2370 Xc 10089 23.70 1.00 23.70
Sub Total 23.70 1.00 23.70
Total general 12.15 22.00 267.22

3.2 Labor tasks.

Prep Tab Trans Mate Instala Tub Planta Recep


Sección Nivel Labor Total general
100% Rel 100% Rel 100% Rel 100% Rel 100% Rel

Chilcas Bajo 3125 Tj. 200 28 3 31


Tj. 202 107 6 8 3 124
3075 Tj. 2022 44 44
2950 Tj. 10 48 7 50 21 126
Tj. 11 23 15 38
Sub Total 227 16 81 39 363
Valeria I 2820 Tj. 152 44 10 21 9 84
2770 Tj. 464 8 3 11
Tj. 465 8 41 15 81
Sub Total 52 10 70 27 176
Valeria II 2720 Tj. 661 AVH 46 9 40 16 111
Sub Total 46 9 40 16 111
Valeria III 2620 Tj. 868 9 4 13
2570 Tj. 971 SN 2580-N 8 3 11
2520 Tj. 554 48 2 3 92 37 200
2370 Tj. 1160 SN 2385-N 18 42 14 74
Sub Total 74 2 6 143 55 298
Valeria IV 2370 Tj. 1160 SN 2385-N 15 15
Xc 10089 2 3 18 6 29
2320 Tj. 1360 2 2
Tj. 1361 2 2
Sub Total 21 3 18 6 48
Total general 420 2 44 352 143 996

Page 6 of 10
3.3 Material consumption by Labor.

Acoplamient Alambre Alambre Cemento Mangas de P.Rielero Puntal 8" Puntal 8" Saco Metalero Tablas de 2" Tubería de Tuberia Tuberia
Clavo de Clavo de Pita Rafia Pita Yute Tela Rafia Puntal 8" x
Seccion Nivel Labor o 995 Ф 4" Negro N°16 Negro N°8 Norte tela Rafia de 1/2"x3" x 3.0 m x 4.0 m de 20" x 30" x 8" x 10' Polietileno de drenaje 3" drenaje 4" Yeso (Klo)
4" (Klo) 5" (Klo) (Mto) (Mto) (Mto) 2.4 m (pza)
(pza) (Klo) (Klo) (bls) (Mto) (pza) (pza) (pza) (pza) (pza) 4" (Mto) (pza) (pza)

Chilcas 3220 Ch. 10050-0S 0


Sub Total 0
Gastos Generales 3815 Mantenimiento de Planta 100% Relave 0 0 600
Sub Total 0 0 600
Chilcas Bajo 3125 Tj. 200 0 0 0 0 0 28
Tj. 202 2 0 0 55 0 0 0 6 0 0 20 7 130 90 53 275
3075 Tj. 2022 0 20 0 0 0 9 30 58 20 4 10
2950 Tj. 10 1 0 0 10 0 0 0 0 0 7 40 25 40 100 30 50
Tj. 11 10 0 0 0 7 25 25 4 50
Sub Total 3 0 0 95 0 0 0 6 0 0 29 21 170 170 204 100 54 4 385
Valeria II 2720 Tj. 661 AVH 5 0 0 25 0 0 0 0 4 12 170 60 78 110
Sub Total 5 0 0 25 0 0 0 0 4 12 170 60 78 110
Valeria I 2870 Mantenimiento Troncales Aire 0
2820 Tj. 152 0 0 30 0 0 0 0 0 16 50 60 61 8 15
2770 Tj. 465 16
Instalación Trocales Aire 0
Mantenimiento de Camino 0
Sub Total 0 0 30 0 0 0 0 0 16 50 60 77 8 15
Valeria III 2620 Tj. 862 Daniela 14 6 25 2 7
Tj. 868 24 12 50 4 12
2570 Tj. 971 SN 2580-N 2 0 6
2520 Tj. 554 20 0 4 6 40 15 100
2370 Tj. 1160 SN 2385-N 2 0 0 0 0 0 6 0 0 70 24
Sub Total 4 0 0 58 0 0 0 12 0 0 4 24 70 115 24 21 119
Valeria IV 2370 Xc 10089 0 0 12 0 0 0 0 7 80 30 25 2 6
Tj. 1160 SN 2385-N 10 15 5 50 4
Sub Total 0 0 22 0 0 0 0 7 80 45 25 5 2 56 4
Total general 12 0 0 230 0 0 0 18 0 0 37 80 540 450 1008 100 59 35 685 4

Page 7 of 10
3.4 Material consumption:

DESCRIPCION DE MATERIAL Total


Acoplamiento 995 Ф 4" (pza) 12
Alambre Negro N°16 (Klo) 0
Alambre Negro N°8 (Klo) 0
Cemento Norte pacasmayo(bls) 230
Clavo de 4" (Klo) 0
Clavo de 5" (Klo) 0
Mangas de tela Rafia (Mto) 0
P.Rielero de 1/2"x3" (pza) 18
Pita Rafia (Mto) 0
Pita Yute (Mto) 0
Puntal 8" x 2.4 m (pza) 4
Puntal 8" x 3.0 m (pza) 37
Puntal 8" x 4.0 m (pza) 80
Saco Metalero de 20" x 30" (pza) 540
Tablas de 2" x 8" x 10' (pza) 450
Tela Rafia (Mto) 408
Tubería de Polietileno de 4" (Mto) 100
Tuberia drenaje 3" (pza) 59
Tuberia drenaje 4" (pza) 35
Yeso (Klo) 685

3.5 Consumption of accessories and installation materials in water pipes


and compressed air:
P.Exagonales 1/2"
Acoplamiento 995

Acoplamiento 995

Acoplamiento 997
Acoplamiento 2"a

Acoplamiento 4"a

Acoplamiento 4"a

Niple o Empalme

Niple o Empalme
Grampas Grosby

Válvula 1" (pza)

Válvula 2" (pza)


Brida vitaulic 4"

Cable de acero

Mullembach 1"

Mullembach 2"

Total general
x 2½" (pza)
1/4" (pza)
1/4" (mto)
2" (pza)

2" (pza)

4" (pza)

2" (pza)

4" (pza)

4" (pza)

1" (pza)

2" (pza)
(pza)

(pza)

(pza)

Nivel

Chilcas 1 3 3 4 4 10 6 31
Chilcas Bajo 7 1 1 15 10 2 88 88 18 1 9 240
Valeria I 2 3 2 8 8 20 20 2 18 83
Valeria II 4 6 5 3 45 45 20 1 129
Valeria III 2 2 4 2 20 25 5 1 30 7 98
Taller Soldadura RH
Valeria IV
Valeria V 3 3 5 3 1 4 20 20 60 9 128
Total general 17 10 1 30 28 21 6 193 198 5 6 1 4 156 8 25 709

Page 8 of 10
4. Distribution of tasks

4.1 Plant operation 100% Relave

Tareas Total Tareas Hr. 25% Hr. 35%


Relleno Hidraulico 100% Relave 143 122 0
Recepción 100% Relave 352 294 0
Instalación Trocales Relleno 100% Relave 28 16 0
Preparacion Tabique 100% Relave 420 162 0
Instalacion de Tuberia 100% Relave 46 24 0
Limpieza de Carga 100% Relave 35 12 0
Mantenimiento de Planta 100% Relave
Mantenimiento Troncales Relleno 100% Relave
Transporte de Materiales 100% Relave 2 0 0
Total general 1026 630 0

4.2 General expenses


Tareas Total Tareas Hr. 25% Hr. 35%
Bodega 22 6 0
Taller 72 104 0
Supervisión 68 12 0
Inspector de Seguridad 62 27.5 0
Sedimentacion de Lodos (Floculantero) 58 2 0
Jefe de Guardia Comiluz 59 0 0
Total general 341 151.5 0

4.3 Compressed Air and Water:

Tareas Total Tareas Hr. 25% Hr. 35%


Mantenimiento Troncales Aire 28 12 0
Instalación Trocales Aire 34 24 0
Instalación Tubería de Agua - Mina 3 2 0
Total general 65 38 0

4.4 Others

Tareas Total Tareas Hr. 25% Hr. 35%


Mantenimiento de Caminos 56 10 0
Mantenimiento de vias Rampa Patrick
Total general 56 10 0

Page 9 of 10
5. Hydraulic Fill indicators:

Page 10 of 10