c. ) Within the
contracting capacity
of the contractor;
e. ) Amount involved
does not exceed
the amount of the ongoing project;
f. ) Contractor has no
negative slippage/delay;
and
Negotiated Procurement
If negotiation fails, then with the third LCB at his original price
If the negotiation fails again, a short list of at least three (3) eligible contractors shall be invited
to submit their bids, and negotiation shall be made starting with the lowest calculated bidder.
Negotiated Procurement
TAKE OVER OF CONTRACTS
Contracts, which have been rescinded or terminated for causes provided for in the contract and
existing laws
Negotiated Procurement
EMERGENCY CASES
Definition
Negotiated Procurement
Mandatory review
of the terms, conditions, specifications, and cost estimates
Revision
of the minimum technical specifications, and if necessary, adjust the ABC, subject to the
required approvals. However, the ABC cannot be increased by more than twenty percent (20%)
of the ABC for the last failed bidding
Negotiated Procurement
- One (1) year from project completion up to final acceptance (defects liability period)
WARRANTIES
SUSPENSION OF WORK
Imposed when contractor refuses/fails to satisfactorily complete the work within the contract
specified time
Equivalent to 1/10 of 1% of the cost of the unperformed work for every day of delay
Procuring entity need not sustain actual damage to be entitled to liquidated damages
If delay exceeds 10% of the contract time or liquidated damages exceed 10% of total contract
price, contract may be rescinded
LIQUIDATED DAMAGES
May be substituted by irrevocable standby letters of credit, bank guarantees or surety bonds;
RETENTION MONEY
ADVANCE PAYMENT
Resolution 08-2011:
Such approval is valid on work done up to the point where the cumulative increase in value of
work on the project which has not yet been duly fully approved does not exceed five percent
(5%) of the adjusted original contract price.
For a Change Order or Extra Work Order involving a cumulative amount exceeding five percent
(5%) of the original contract price, no work thereon may be commenced unless approved by the
HOPE or his duly authorized representative.
VARIATION ORDER
Resolution 08-2011:
Procuring entity’s Representative or Project Engineer may, subject to the availability of funds,
allow the immediate start of work under any Change Order or Extra Work Order:
In the event of an emergency where the prosecution of the work is urgent to avoid detriment to
public service, or damage to life and/or property; and/or
VARIATION ORDER
CONTRACT IMPLEMENTATION
OF INFRASTRUCTURE PROJECTS
NOTICE TO PROCEED
When Issued:
The Procuring Entity shall issue the NTP together with a copy of the approved Contract to the
winning Bidder within 3 calendar days from the Contract’s Approval.
AWARD OF CONTRACT
PUBLIC BIDDING
POST QUALIFICATION
Circular 03-2012
Inspection and/or testing of the product and after-sales and/or maintenance capabilities.
Ascertainment of the sufficiency of the bid security as to type, amount, form and wording, and
validity period.
Verification of the bid price and, whenever applicable, the required CLC or NFCC.
PUBLIC BIDDING
POST QUALIFICATION
Circular 03-2012
Verification of any registration, license, certificate, permit, clearance, and agreements submitted
by the bidder.
Verification and validation of the bidder’s stated competence and experience, as well as that of
its key personnel assigned to the project.
PUBLIC BIDDING
POST QUALIFICATION
To Validate, Verify and Ascertain whether LCB complies with and is responsive to all the
requirements and conditions specified in the Bidding Documents.
PUBLIC BIDDING
Total calculated bid prices, as evaluated and corrected for computational errors, discounts and
other modifications, which exceed the ABC shall be disqualified.
PUBLIC BIDDING
PUBLIC BIDDING
Financial Bid duly accomplished in the prescribed FORM, and any other information/ documents
specified in the PBDs.
PUBLIC BIDDING
PUBLIC BIDDING
PUBLIC BIDDING
ELIGIBILITY REQUIREMENTS
Single Largest Contract
At least 50% of ABC
A contract shall be considered “similar” to the contract to be bid if it has the same major
categories of work.
PUBLIC BIDDING
PUBLIC BIDDING
The BAC or its Secretariat shall promptly issue the bidding documents to the prospective bidders
from the time the IAEB is first advertised until immediately before the deadline for submission
of bids.
The BAC shall issue the Bidding Documents upon payment of the corresponding cost.
PUBLIC BIDDING
1. Internet Posting
– Posted continuously in the website of the LGU concerned, if available, the website of the
LGU’s service provider, if any, and the PhilGEPS for seven (7) calendar days starting on date of
advertisement.
2. Posting in Conspicuous Place
- Posted at any conspicuous place reserved for this purpose in the premises of the LGU for seven
(7) calendar days, as certified by the head of the BAC Secretariat.
PUBLIC BIDDING
INFRASTRUCTURE PROJECTS
EMERGENCY CASES
Options: To Undertake the Project
By administration;
Negotiated Procurement
Other contractors not previously deemed eligible may also apply for eligibility.
Negotiated Procurement
ALTERNATIVE MODES
WARRANTIES
Granted only when the affected activities fall within the critical path of the PERT/CPM network
Procuring Entity has authority to suspend work wholly or partly by written order due to
following:
SUSPENSION OF WORK
PROGRESS PAYMENTS
Sanction on designer, consultant or official responsible for detailed engineering design for failing
to consider variation order beyond 10%
VARIATION ORDER
PERFORMANCE SECURITY
PUBLIC BIDDING
Bidder shall post PERFORMANCE SECURITY and enter into contract with the Procuring
Entity within 10 Calendar Days
PUBLIC BIDDING
POST QUALIFICATION
Circular 03-2012
If bidder with the LCB or HRB fails to comply with the criteria for post-qualification, BAC shall
immediately notify the bidder in writing of its post-disqualification.
The notice shall clearly state all the grounds for the post-disqualification pursuant to the
requirements or conditions in the Bidding Documents that the bidder failed to comply with.
PUBLIC BIDDING
POST QUALIFICATION
Circular 03-2012
Verification of availability and commitment of equipment units that will be used by the bidder in
the contract.
Checking of the bidder’s performance in its ongoing government and private contracts.
PUBLIC BIDDING
Tax Clearance;
Latest Income and Business Tax Returns;
Certificate of PhilGEPS Registration; and
Other appropriate licenses and permits required by law and stated in the Bidding Documents
PUBLIC BIDDING
PUBLIC BIDDING
Financial Bid duly accomplished in the prescribed FORM, and any other information/ documents
specified in the PBDs.
PUBLIC BIDDING
ELIGIBILITY REQUIREMENTS
Resolution 11-2012
BID SECURITY
PUBLIC BIDDING
ELIGIBILITY REQUIREMENTS
Class A Documents
Legal Documents:
(1.) SEC/ DTI/ CDA;
(2.) Mayor’s Permit
Technical Documents:
(3.) On-Going and Completed Contracts;
(4.) Valid PCAB license and registration for type and cost of the contract to be bid;
Financial Documents:
(5.) Audited FS stamped “Received” by BIR; (6.) NFCC/ Credit Line Certificate
Class B Documents
(7.) JVA, if applicable
PUBLIC BIDDING
PRE-BID CONFERENCE
MANDATORY for procurement of Infra with an ABC of One Million Pesos and above
A pre-bid conference is held before eligibility check and must be conducted at least twelve (12)
calendar days before the deadline for the submission and receipt of bids. This time period is
mandatory and cannot be shortened.
It is also prudent that it be held not earlier than seven (7) calendar days after newspaper
advertisement or the last day of posting the IAEB.
PUBLIC BIDDING
Internet Posting
Posting in Conspicuous Place
Newspaper Advertisement – Advertised at least once in one (1) newspaper of general nationwide
circulation which has been regularly published for at least two (2) years before the date of issue
of the advertisement
PUBLIC BIDDING
EXTRA WORK ORDER – covers new work necessary for the completion, improvement or
protection of the project which was not included as items of work in the original contract
CHANGE ORDER – covers any increase / decrease in quantities of original work items in the
contract
VARIATION ORDER
Take-over of contracts
Emergency Cases
When allowed:
Negotiated Procurement