Professional Documents
Culture Documents
Etabs Value
DL = 7658.3
LL = 1412.2
Other = 0.0
Total Weight = 9070.5
EQ = 229.1
Base Shear = 2.53%
Manual Check
Seismic Zone Co-eff, Z = 0.15
Importance Factor, I = 1
Ct = 0.073
Building Height, hn = 31.40
Time Period,T = 0.968
Soil Type, S = 1.5
C = 1.92
Response Modification Factor, R = 8
Base Shear, ZIC/R = 3.59%
If Etabs Base Shear varies in large number from Calculated Base shear, Then check
other problem.
UTUBE CHANNEL FOR IMPORTANT TUTORIALS.
Kip
Kip
Kip
Kip
Kip
number from Calculated Base shear, Then check the model for loading & any
other problem.
0.075
0.15
0.25
1.25
1
0.083
0.073
Allo
Lateral Load
Wx
Wy
H= Building Height in inch. Drift limit varies from
Allo
Occupancy Category, OC
Seismic Load
EQx
EQy
Allowable Drift for wind as per ASCE-02
Drift(Displacement) Check
ACI Code ASCE Code Min. Allowable
mic Load ∆max OC*hsx/Cd
(0.03hsx/R)<0.004hsx Drift
EQx 1.57 4.635 5.49 4.64
EQy 1.65 4.635 5.49 4.64
Story Drift
Floor ''X+1''
Disp 1= 0.55in
hsx=10f=120in
Floor ''X''
Disp2= 0.25in
Disp2= 0.25in
OK
OK
∆1=Lower Displacement Value at One node at Top story
∆2=Higher Displacement at another node at Top story