A.

RENCANA ANGGARAN

No. Volume Harga Satuan Jumlah


I Material bahan
1.Batu belah 78 M 3 165,000 12,870,000
2.Semen (50 kg) 9735 Kg 1,360 13,239,600
3.Pasir Pasang 40 M 3 280,000 11,200,000
4.Pasir Urug 3M3 167,500 502,500
5. Bambu D2inc 17 M 12,465 211,905
Jumlah 38,024,005
I Upah Tenaga Kerja
1.Pekerja 142 HOK 60,000 8,520,000
2.Tukang 48 HOK 72,000 3,456,000
Jumlah 11,976,000
Jumlah Total 50,000,005

B. REALISASI ANGGARAN

No. Volume Harga Satuan Jumlah


I Material bahan
1.Batu belah 78 M 3 165,000 12,870,000
2.Semen (50 kg) 9735 Kg 1,360 13,239,600
3.Pasir Pasang 40 M 3 280,000 11,200,000
4.Pasir Urug 3M3 167,500 502,500
5. Bambu D2inc 17 M 12,465 211,900
Jumlah 38,024,000
I Upah Tenaga Kerja
1.Pekerja 142 HOK 60,000 8,520,000
2.Tukang 48 HOK 72,000 3,456,000
Jumlah 11,976,000
Jumlah Total 50,000,000