1 Trial run of Clarifier and flash mixer motors taken 2 3 4 5 6 7 8
S.No. Planning for today Remarks
1 Trial run of ID fan # 1B motor 2 Trial run of PA fan # 1A motor 3 Trial run of Clarifier agitator & scrapper and flash mixer 4 TG lube oil flushing through oil filters 5 6 7 8
S.No. Exceptions (Delays, if any) Remarks
1 2 3 4 5 6 7 8
S.No. Critical concerns Remarks
1. Feed water line flushing to be
completed before commencement of dry 1 Refractory dry out out. Agency for pre boiler system cleaning getting delayed. 2. Compressed air of 6kg/cm2 is required. 3. CCOE clearance for filling LDO in tanks is required 2 3 4 5 6 7 8