FINAL INSPECTION CHECKLIST OF ESP UNIT # 1

FIELDS
SL NO. INSPECTION POINT REMARK's
8 7 6 5 4 3 2 1
1 INLET FUNNEL
a Guide Plate position with tacking.
b Inlet funnel wall in side completed welding with structure.
c Correct position of the Door

2 OUTLET FUNNEL
a Screen sheet Joint welding
b Sheet angle welding

3 ESP FIELD's
a Side seal plate welding & Middle vertical plate welding.
b Collecting Rapping Bracket Welding & Hammer Tacking,
c Guide Plate welding & Angle position.
d Spring Back Value. (Random 20 Pcs. / Fields.).
e Top insulator Dust cover 220 mm inside value.
Emitting Rapping shaft (Horizontal and Vertical) support welding & Hammer
f Tacking.

All structure in side welding, intermediate frame bracing connection welding.


g
h Scrap cutting.
i Diagonal stay Tacking.
j Tacking of collecting electrode with Bolting.
k Support Bearing freeness.
l As per Drawing Cashing wall & vertical Beam distance.
m Hopper welding (for AHP)
n Shock bar bolt welding
o Free movement of shock bar in guides
p Straightness of Collecting electrodes
q Distance between collecting electrodes and vertical beams
r Hammer hitting position on the shock pads of Collecting electrode
Lateral shift of hammer with refrence to shock pad centre. Allowable tolerance
s ±5 mm
t No fouling of hammers with gable, walls etc.
u Tension of emitting electrode
v Hammer hitting position on the shock pads of Emitting electrodes
w Axial play of shaft insulators. 10 mm Max.

ESP TOP
a Housing Bolting.
b Transformer (oil Level, Gauge,etc)
c Emitting Drive Motor Door.
d Condition of support insulators
e Heater location & fixing
NAME SIGN.& Date