ROLLING & SYNCHRONIZATION Page: 1 of 2


CHECKLIST [https://www.blogger.com/null] Check List No …………………….

UNIT: DATE: SHIFT:


Reason of trip: Trip time & date:
Synch time & date:

TIME/
S. NO DESCRIPTION CHECK
REMARK
1 Ensure turbine BOP is running & EOP is in interlock, bearing oil header pressure is
>0.084 Mpa & Temperature 30-38◦C.
2 Ensure MOT level is normal, Oil vapor extractor fan is running & Lube oil cooler
is charged.
3 Ensure AC JOP-1 is running. AC JOP-2 & DC JOP is in standby. Jacking oil
header pressure is maintaining 10~16MPa.
4
Ensure instrument air supply to turbine valves and turning gear is normal.

5
Ensure turbine on turning gear and eccentricity <0.076 mm.

6 Ensure Air side & H2 side AC Seal oil pump is in service and DC pumps are in
interlock. Check Seal oil Vapor Extractor fan in service
7
Ensure H2 Pressure >280 kpa & H2 purity is more than 96%.

8 Ensure stator coil cooling water pump is running, other pump is in Interlock & tank
level normal, flow is adequate. Ensure stator water conductivity is <1.5 μs/cm.
9
Ensure vacuum pump running and vacuum is > -87 Kpa.

10
Ensure all MAL drains & extraction line drains are open

11 Ensure MS temp with FSMT and HRH temp with IPBDT for 56 0C degree
superheat
12
Ensure that startup steam parameters are achieved as follows

13
(a) For cold start (i.e. if HP shaft temperature < 204 0C)

MS - 5 Mpa & > 340 0C and HRH ≤ 0.828 Mpa & >320 0C
14
(b) For warm start (i.e. if HP shaft temperature 204<t<300 0C)

MS - 7 Mpa & > 360 0C and HRH ≤ 0.828 Mpa & >330 0C
15
(c) For hot start (i.e. if HP shaft temperature 300<t<400 0C )

1 of 5 11/6/2018, 9:25 AM
300 mw rolling | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/300-mw-rolling.html

TIME/
S. NO DESCRIPTION CHECK
REMARK
MS - 10 Mpa & > 490 0C and HRH ≤ 0.828 Mpa & >470 0C
16
(d) For super hot start (i.e. if HP shaft temperature > 400 0C)

MS - 10 Mpa & > 510 0C and HRH ≤ 0.828 Mpa & >480 0C
17 Start EH oil pump & keep other pump in interlock and ensure pressure is >11 Mpa
and temp is 30-45◦C.
18
Start HP sealing oil pump & pressure is about 8.8 ksc

19
Charge CCW for exciter and generator cooler.

20
If mill is in service, stop the feeder & restrict oil burners to 7.

21 Gradually close HP bypass valve & its spray valve. Once negative pressure is
achieved in HRH, close LP Bypass valve & its spray valve
22
Remove MSV trip link at GRP ch-1 & ch-2.

23
Select BP off mode

24
Reset the turbine near front pedestal with latching lever. Record AST pressure

Reset turbine from DEH screen LATCH button and observe RSV, GV and IV will
25
go for full open. If valve is not going for open, in DEH overview page press TM
PANEL icon, open GV valve and IV valve manually to 120%.
26
Reset generator protection relay by pressing silence button observe no trips persists

27
Reset Master trip relay by turning class a b c lever

28
Normalize MSV trip link at GRP ch-1 & ch-2. Ensure all inputs to ETS is reset.

29
Reset relay at 400 kV control room

In DEH Screen do the following , ensure barring gear in AUTO


30
Ø Control mode → auto mode → IN (check OA indication appears)
Ø OPC mode → OPC Test-out ; 103% INH → CANCEL ; 110% INH →CANCEL
In DEH overview, press LIMIT SET icon and set high load (HL) = 315 MW, low
31
load (LL) = 0 MW and valve position (VPL) = 120%. Indication for HL & LL is
OUT and VPL is IN.
32
For cold rolling

Ø Roll the turbine to 600 rpm @ 100rpm/min and hold for 15 mins. If turbine
reaches 3 rpm check turning gear is disengaged & turning gear motor stops
automatically.
Ø Raise the speed to 1970 rpm @ 250 rpm/min & soak for 3 hours. Soaking is not
necessary if turbine HP & IP rotor metal temp >121 0C.

2 of 5 11/6/2018, 9:25 AM
300 mw rolling | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/300-mw-rolling.html

TIME/
S. NO DESCRIPTION CHECK
REMARK
Ø During soaking period limit the throttle inlet steam temperature to 427 0C Max
and maintain reheat inlet steam temperature above 260 0C.
Ø Raise the speed to 2950 rpm @ 250 rpm/min. Ensure JOP stopped at 2600 rpm
& LP cylinder spray valve opens.
33
For warm, hot and super hot rolling

Ø Roll the turbine At 600 rpm @ 100rpm/min and hold for 4 mins. If turbine
reaches 3 rpm check turning gear is disengaged & turning gear motor stops
automatically.
Ø Raise the speed to 2950 rpm @ 250 rpm/min. Ensure JOP stopped at 2600 rpm
& LP cylinder spray valve opens.
34 Record casing & differential expansion, rotor position and turbine vibration are
normal.
35 Ensure lube oil bearing inlet < 45 0C, lube oil, sealing oil, H2 pressure, lube oil
level and seal oil /hydrogen DP are normal.
36
Ensure the Top and bottom temp difference of inner casing of HP&IP < 42 ◦C.

37
Ensure Bus side & Bay side isolators closed condition & breaker is ready for close.

Before TV-GV Transfer, Chest Metal Temperature should be not less than
38 corresponding saturated steam temperature for the throttle pressure. Calculation for
steam chest metal temperature (Tc) =Ts+1.36 (Td-Ts). Ts=SCSLT & SCSRT, Td=
SCDLT & SCDRT
39 Go to valve mode, ensure SIG/SEQ selection in SIG and press TV-GV transfer, GV
will go for Min position and TV will go for full open.
40
Stop Hp sealing oil pump & BOP and put in interlock.

41
Set the speed according to the grid frequency and set the rate of rise to 50 rpm/min.

42 On UCP select GT breaker selector switch to AUTO synchronization. If auto


synchronization is not available skip to point no. 54
43 In DCS, open Electrical main screen in which click Exciter icon, Switch off CH-1
& CH-2
44
Make CH-1 ON and CH-2 stand by

45
Close Field breaker

46
Make excitation ON & observe terminal voltage is around 15 kV

47
Again click excitation on button & observe terminal voltage is around 19 kV

48
Raise generator voltage to 20 kV by clicking excitation RAISE button.

49
Click synchronization icon in electrical main screen and select CB1 GT synch

3 of 5 11/6/2018, 9:25 AM
300 mw rolling | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/300-mw-rolling.html

TIME/
S. NO DESCRIPTION CHECK
REMARK
50 Engage auto synch- ON in UCP panel and DCS SYNCHRONIZATION
CONTROL.
51
Go to DEH Screen → control mode →auto synch IN

52 In synchronization screen press “ASS START SYNCH”. Check no auto


synchronizer fault.
53
After synchronization, quit auto synchronization in DCS. Skip to point no. 57

54
Switch selectors for synchronoscope LED and synch selection to ON in UCP panel.

55
Ensure in UCP panel, synchronization selection switch in manual position

Match the generator voltage & frequency from DCS. While Synchronoscope LED
56
is moving in clockwise direction, close GT breaker between 11~ 12 o’clock
position.
57
Go to DEH overview screen. Click feedback mode, select MW loop IN

58 Enter MW target -15MW and Rate – 1MW/min (cold), 3MW/min (Warm),


4MW/min (Hot), 6MW/min (Super Hot). Ensure load picks up.
Control room shift operator 1 ………………………… Signature ………………….
2 ………………………… Signature ………………….
· For major / critical activities, starting & ending times may be mentioned.
· The Shift charge engineer shall verify atleast 5 important / critical steps, at random.

Posted 25th October 2014 by kishorereddy kattukolu

View comments

4 of 5 11/6/2018, 9:25 AM
300 mw rolling | THERMAL POWER PLANT A-Z https://powerplanta2z.blogspot.com/2014/10/300-mw-rolling.html

5 of 5 11/6/2018, 9:25 AM

You might also like