Professional Documents
Culture Documents
Jumlah H
No Uraian Pekerjaan
( Rp
(a) (b) (c)
D PEKERJAAN SALURAN
E PEKERJAAN PAGAR
F KELENGKAPAN KERJA
TOTAL
JUMLAH TOTAL 1
PPN 10 %
JUMLAH TOTAL 2
DIBULATKAN
Terbilang :
Satu Milyar Tiga Puluh Enam Juta Tiga Ratus Lima Puluh Lima Ribu Rupiah
Jumlah Harga
( Rp )
(c)
748,714,174.08
24,625,442.13
31,569,155.47
36,809,496.93
76,995,077.34
1,725,000.00
920,438,345.94
920,438,345.94
92,043,834.59
1,012,482,180.54
1,012,482,000.00
bu Rupiah
RENCANA ANGGARAN BIAYA (RAB)
Jumlah Harga
No Uraian Pekerjaan
( Rp )
(a) (b) (c)
JUMLAH A
Jumlah Harga
( Rp )
(c)
16,309,225.58
135,933,495.15
229,250,669.93
42,404,746.06
5,559,475.75
15,228,695.59
15,489,937.30
15,102,900.17
108,900,000.00
163,509,028.55
1,026,000.00
748,714,174.08
RENCANA ANGGARAN DAN BIAYA
Volume
No. Uraian Pekerjaan Satuan
Pekerjaan
1 PEKERJAAN TANAH
1 Anstamping 7.87 m3
2 Pasangan Batu Belah Camp 1 pc : 5 Ps 31.00 m3
3 Pasang batu bata merah 1 PC : 5 PS 163.78 m2
4 Plesteran 1PC : 4Ps, tebal 15 mm 338.74 m2
5 Acian 338.74 m2
6 Bak kontrol pas batu bata 1/2 bata 30x30 cm tinggi 35 cm 33.00 buah
7 Pasang Rooster beton 20 x 20 cm 3.12 m2
3 PEKERJAAN BETON
1 Beton
a Beton sloof K.175 (tulangan : 125 kg) 3.11 m3
b Beton kolom K.175 (tulangan : 150 kg) 1.89 m3
c Beton Ring Balk K.175 (tulangan : 125 kg) 3.27 m3
d Beton Plat Duiker K.175 (tulangan : 100 kg) 2.83 m3
2 Bekisting
a Bekesting sloof 32.48 m2
b Bekesting kolom 50.28 m2
c Bekesting Ring Balk 48.98 m2
d Bekesting Plat Duiker 34.64 m2
e Pembesian 10,745.67 kg
5 PEKERJAAN BESI
7 PEKERJAAN PLAFOND
1 Rangka plafond Hollow.40.40.1,2 m 67.44 m2
2 Pemasangan Gypsum 67.44 m2
8 PEKERJAAN CAT
11 PEKERJAAN LAIN-LAIN
87,312.50 7,341,988.73
64,625.00 2,683,361.35
379,445.00 4,656,767.22
38,225.00 1,627,108.29
16,309,225.58
521,594.70 4,104,272.22
926,900.70 28,733,921.70
300,735.60 49,254,175.83
76,490.70 25,910,536.21
44,687.50 15,137,488.44
333,311.00 10,999,263.00
574,948.00 1,793,837.76
135,933,495.15
1,128,605.50 3,514,477.53
1,128,605.50 2,127,985.67
1,128,605.50 3,690,137.07
1,128,605.50 3,197,294.24
176,013.75 5,716,926.60
332,378.75 16,712,003.55
343,887.50 16,844,503.86
414,878.75 14,371,814.78
14,910.50 160,223,338.57
90,488.20 2,852,188.06
229,250,669.93
71,326.75 13,382,396.16
94,270.00 17,687,031.67
431,942.50 7,407,813.88
114,504.50 3,927,504.35
42,404,746.06
1,316,535.00 3,176,535.65
119,147.00 2,382,940.10
5,559,475.75
270,036.25 1,728,232.00
985,184.20 1,576,294.72
270,036.25 864,116.00
985,184.20 1,576,294.72
465,399.00 321,125.31
270,036.25 2,268,304.50
465,399.00 642,250.62
465,399.00 130,311.72
145,502.50 1,885,712.40
145,502.50 1,955,553.60
286,000.00 1,930,500.00
350,000.00 350,000.00
15,228,695.59
183,865.00 12,400,407.20
45,809.50 3,089,530.11
15,489,937.30
43,719.50 14,809,587.15
42,757.00 293,313.02
15,102,900.17
2,500,000.00 2,500,000.00
250,000.00 3,000,000.00
45,000.00 45,000.00
35,000.00 175,000.00
35,000.00 70,000.00
250,000.00 250,000.00
20,000,000.00 20,000,000.00
22,500,000.00 22,500,000.00
22,180,000.00 44,360,000.00
500,000.00 1,000,000.00
15,000,000.00 15,000,000.00
108,900,000.00
276,661.00 2,050,058.01
260,986.00 313,183.20
1,016,851.00 161,145,787.34
163,509,028.55
2,250,000.00 1,026,000.00
1,026,000.00
RENCANA ANGGARAN BIAYA (RAB)
Jumlah Harga
No Uraian Pekerjaan
( Rp )
(a) (b) (c)
JUMLAH C
Jumlah Harga
( Rp )
(c)
2,932,718.81
16,982,726.55
4,709,996.77
24,625,442.13
RENCANA ANGGARAN DAN BIAYA
Volume
No. Uraian Pekerjaan Satuan
Pekerjaan
1 PEKERJAAN TANAH
2 PEKERJAAN BETON
3 PEKERJAAN LAIN-LAIN
87,312.50 823,562.93
64,625.00 13,377.38
379,445.00 1,929,614.43
38,225.00 166,164.08
2,932,718.81
931,205.00 192,759.44
1,128,605.50 934,485.35
1,128,605.50 643,305.14
398,997.50 6,719,117.90
14,910.50 8,493,058.72
16,982,726.55
350,000.00 700,000.00
80,366.00 1,509,996.77
2,500,000.00 2,500,000.00
4,709,996.77
RENCANA ANGGARAN DAN BIAYA
Volume
No. Uraian Pekerjaan Satuan
Pekerjaan
JUMLAH D
Harga Satuan Jumlah Harga
Pekerjaan
( Rp. ) ( Rp. )
(f) (g) = (d x f )
157,300.00 4,719,000.00
144,466.67 4,334,000.00
80,366.00 2,410,980.00
21,450.00 321,750.00
126,500.00 506,000.00
533,500.00 533,500.00
931,205.00 232,801.25
325,600.00 231,176.00
63,628.13 63,628.13
1,300,000.00 1,300,000.00
10,000.00 360,000.00
750,000.00 750,000.00
15,000.00 300,000.00
10,000.00 40,000.00
2,045,953.47 2,045,953.47
520,162.50 520,162.50
692,703.00 692,703.00
80,366.00 964,392.00
87,312.50 246,870.28
64,625.00 5,710.09
931,205.00 82,278.75
10,790,000.00 10,790,000.00
55,000.00 118,250.00
31,569,155.47
RENCANA ANGGARAN DAN BIAYA
Volume
No. Uraian Pekerjaan Satuan
Pekerjaan
E PEKERJAAN SALURAN
1 Saluran U.20 Keliling
a Pasang Buis U.20 69.52 m'
b Pas Batu Bata Merah di Saluran U 44.49 m2
c Plesteran Saluran U 115.40 m2
2 Saluran MD.40
a Galian tanah 14.86 m3
b Urugan pasir 0.78 m3
c Pasangan batu belah camp 1 pc : 5 ps 9.21 m3
d Plesteran 31.28 m2
e Acian 31.28 m2
JUMLAH E
Harga Satuan Jumlah Harga
Pekerjaan
( Rp. ) ( Rp. )
(f) (g) = (d x f )
35,100.00 2,440,152.00
300,735.60 13,380,568.90
75,348.90 8,695,504.18
87,312.50
64,625.00
926,900.70 8,538,053.11
75,348.90 2,357,214.99
44,687.50 1,398,003.75
36,809,496.93
ANA ANGGARAN BIAYA (RAB)
( a) (b) (c)
F PEKERJAAN PAGAR
1 Galian Tanah 10.57
2 Urugan Pasir 1.36
3 Pagar BRC 120 A2 25.00
4 Tiang GI 2" 35.00
5 Pasangan Batu belah camp 1 pc : 5 ps 39.92
6 Pasangan Batu bata merah 1 pc : 5 ps 14.21
Pekerjaan Beton
7 Beton Sloof (Tulangan 150 kg) 0.87
8 Beton Kolom (Tulangan 150 kg) 0.13
Pekerjaan Bekisting
9 Bekisting Sloof 18.11
10 Bekisting Kolom 2.79
11 Pembesian 150.51
12 Hole drain / suling-suling 36.23
13 Plesteran 28.43
14 Acian 28.43
JUMLAH F
Satuan Harga Satuan Jumlah Harga
Pekerjaan
( Rp. ) ( Rp. )
(d) (e) ( f) = (c x e)
m3 87,312.50 922,893.13
m3 64,625.00 87,890.00
lembar 420,000.00 10,500,000.00
m' 45,000.00 1,575,000.00
m3 926,900.70 37,001,875.94
m3 300,735.60 4,273,452.88
m3 1,128,605.50 981,886.79
m3 1,128,605.50 146,718.72
m2 176,013.75 3,187,609.01
m2 332,378.75 927,336.71
kg 14,910.50 2,244,179.36
m' 323,864.20 11,733,599.97
m2 75,348.90 2,142,169.23
m2 44,687.50 1,270,465.63
76,995,077.34
ANA ANGGARAN BIAYA (RAB)
( a) (b) (c)
G KELENGKAPAN KERJA
1 Pakaian Kerja (Wearpack) 3.00
2 Topi helm 3.00
3 Sepatu kerja Lapangan 3.00
4 Sarung Tangan 3.00
5 Cangkul biasa 3.00
6 Cangkul Garpu 3.00
JUMLAH G
Satuan Harga Satuan Jumlah Harga
Pekerjaan
( Rp. ) ( Rp. )
(d) (e) ( f) = (c x e)
1,725,000.00
ANALISA HARGA SATUAN PEKERJAAN
Harga Satuan
NO URAIAN SATUAN KOEFISIEN
(Rp.)
a b c d e
A. ANALISA PEKERJAAN PERSIAPAN
1 1 Ls Foto dokumentasi proyek dan pembuatan Laporan
A. BAHAN :
1 Sewa Alat / Kamera 1.0000 unit 150,000.00
2 Cuci cetak 90.0000 bh 2,000.00
3 Kertas A4 2.0000 rim 40,000.00
4 Kertas A3 2.0000 rim 80,000.00
5 Sewa Komputer 1.0000 unit 450,000.00
6 Sewa Printer A3 1.0000 unit 250,000.00
7 Sewa Printer A4 1.0000 unit 150,000.00
8 Cetak (poto copy) 2 x 1.0000 ls 2,400,000.00
9 Penjilidan 3.0000 buku 100,000.00
Jumlah Harga Bahan
B. TENAGA :
Page 25 of 343
ANALISA HARGA SATUAN PEKERJAAN
A. BAHAN :
1 Sewa Generator 30.0000 hr 250,000.00
2 Bahan bakar solar 182.0000 ltr 13,500.00
3 Pengkabelan 30% dari total biaya 1.0000 ls 2,250,000.00
Jumlah Harga Bahan
B. TENAGA :
1 Operator Listrik 30.0000 hr 124,000.00
Jumlah Harga Tenaga Kerja
C PERALATAN
Page 26 of 343
ANALISA HARGA SATUAN PEKERJAAN
4 Koral beton m3 0.0090 250,000.00
5 Kayu 5/7 m3 0.0720 1,690,000.00
6 Paku biasa 2” – 5” kg 0.0600 17,000.00
7 Residu ltr 0.4000 15,000.00
Jumlah Harga Bahan
C PERALATAN
Page 27 of 343
ANALISA HARGA SATUAN PEKERJAAN
B BAHAN
1 Dolken kayu 8-10/400 cm btg 1.0000 1,500.00
2 Semen portland kg 2.0000 65,000.00
3 kawat duri m' 25.0000 28,750.00
4 Pasir beton m3 0.0050 250,000.00
5 Koral beton m3 0.0090 250,000.00
6 Paku biasa 2” – 5” kg 0.0600 17,000.00
Jumlah Harga Bahan
C PERALATAN
Page 28 of 343
ANALISA HARGA SATUAN PEKERJAAN
1 Dolken kayu 8-10/400 cm btg 1.2500 25,000.00
2 Kayu m3 0.1800 1,750,000.00
3 Paku biasa kg 0.0800 15,000.00
4 Besi strip kg 1.1000 18,000.00
5 Semen portland kg 35.0000 1,500.00
6 Pasir pasang m3 0.1500 273,000.00
7 Pasir beton m3 0.1000 273,000.00
8 Koral beton m3 0.1500 261,000.00
9 Bata merah bh 30.0000 850.00
10 Seng plat lbr 0.2500 50,000.00
11 Jendela Nako bh 0.2000 450,000.00
12 Kaca polos m2 0.0800 95,000.00
13 Kunci tanam bh 0.1500 125,000.00
14 Plywood 4 mm lbr 0.0600 55,000.00
Jumlah Harga Bahan
C PERALATAN
Page 29 of 343
ANALISA HARGA SATUAN PEKERJAAN
A TENAGA KERJA
1 Pekerja OH 1.0000 100,000.00
2 Tukang Kayu OH 2.0000 125,000.00
3 Kepala Tukang OH 0.2000 150,000.00
4 Mandor OH 0.0500 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Dolken kayu 8-10/400 cm btg 1.7000 25,000.00
2 Kayu m3 0.2100 135,000.00
3 Paku biasa kg 0.3000 765,000.00
4 Semen portland kg 10.5000 1,500.00
5 pasir beton m3 0.0300 273,000.00
6 Koral beton m3 0.0500 261,000.00
7 seng gelombang lbr 1.5000 87,500.00
8 seng plat lbr 0.2500 87,500.00
Jumlah Harga Bahan
C PERALATAN
Page 30 of 343
ANALISA HARGA SATUAN PEKERJAAN
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
Page 31 of 343
ANALISA HARGA SATUAN PEKERJAAN
1 Kayu papam kelas III m3 0.0360 1,750,000.00
2 Kayu balok 5/7 kelas III m3 0.0140 1,500,000.00
3 Paku biasa kg 0.0800 15,000.00
Jumlah Harga Bahan
C PERALATAN
Page 32 of 343
ANALISA HARGA SATUAN PEKERJAAN
18 Pembongkaran 1m3 dinding tembok bata
A TENAGA KERJA
1 Pekerja OH 1.0001 100,000.00
2 Mandor OH 0.0500 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
Page 33 of 343
ANALISA HARGA SATUAN PEKERJAAN
3 semen PC kg 45.0000 1,500.00
4 pasir beton m3 0.0740 273,000.00
5 koral m3 0.1460 261,000.00
Page 34 of 343
ANALISA HARGA SATUAN PEKERJAAN
F Harga Satuan Pekerjaan ( D + E )
Page 35 of 343
ANALISA HARGA SATUAN PEKERJAAN
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
Page 36 of 343
ANALISA HARGA SATUAN PEKERJAAN
Page 37 of 343
ANALISA HARGA SATUAN PEKERJAAN
1 Pekerja OH 0.8000 100,000.00
2 tukang OH 0.4000 125,000.00
3 kepala tukang OH 0.0400 150,000.00
4 Mandor OH 0.0800 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Kapur padam m3 0.1350 85,000.00
2 Pasir pasang m3 0.4000 273,000.00
3 tanah liat m3 0.9480 22,000.00
Page 38 of 343
ANALISA HARGA SATUAN PEKERJAAN
Page 39 of 343
ANALISA HARGA SATUAN PEKERJAAN
F Harga Satuan Pekerjaan ( D + E )
Page 40 of 343
ANALISA HARGA SATUAN PEKERJAAN
2 Tukang batu OH 0.7500 125,000.00
3 Kepala tukang OH 0.0750 150,000.00
4 Mandor OH 0.0750 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Batu belah m3 1.2000 185,000.00
2 Semen portland kg 91.0000 1,500.00
3 Pasir pasang m3 0.5840 273,000.00
Jumlah Harga Bahan
C PERALATAN
Page 41 of 343
ANALISA HARGA SATUAN PEKERJAAN
B BAHAN
1 Batu belah m3 1.2000 185,000.00
2 Kapur m3 0.1470 85,000.00
3 Semen portland kg 61.0000 1,500.00
4 Pasir pasang m3 0.4920 273,000.00
Jumlah Harga Bahan
C PERALATAN
Page 42 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Bahan
C PERALATAN
10 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP:2PB:3Kr dan 40% batu belah
A TENAGA KERJA
1 Pekerja OH 3.4000 100,000.00
2 Tukang batu OH 0.8500 125,000.00
3 Kepala tukang OH 0.8500 150,000.00
4 Mandor OH 0.1700 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Batu belah m3 0.4800 185,000.00
2 Semen portland kg 194.0000 1,500.00
3 Pasir beton m3 0.3120 273,000.00
4 kerikil m3 0.4680 261,000.00
5 besi beton kg 126.0000 11,000.00
6 kawat beton kg 1.8000 17,000.00
Jumlah Harga Bahan
C PERALATAN
Page 43 of 343
ANALISA HARGA SATUAN PEKERJAAN
C PERALATAN
2 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K125), slump (12 +2) cm, w/c = 0,78
A TENAGA KERJA
1 Pekerja OH 1.6500 100,000.00
2 Tukang batu OH 0.2750 125,000.00
3 Kepala tukang OH 0.0280 150,000.00
4 Mandor OH 0.0830 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen portland kg 276.0000 1,500.00
2 Pasir beton kg 828.0000 195.00
3 Kerikil max. 30 m kg 1,012.0000 145.00
4 Air ltr 215.0000 100.00
Jumlah Harga Bahan
C PERALATAN
Page 44 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
3 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 +2) cm, w/c = 0,72
A TENAGA KERJA
1 Pekerja OH 1.6500 100,000.00
2 Tukang batu OH 0.2750 125,000.00
3 Kepala tukang OH 0.0280 150,000.00
4 Mandor OH 0.0830 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen portland kg 299.0000 1,500.00
2 Pasir beton kg 799.0000 195.00
3 Kerikil max. 30 m kg 1,017.0000 145.00
4 Air ltr 215.0000 100.00
Jumlah Harga Bahan
C PERALATAN
4 Membuat 1 m3 lantai kerja beton f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
A TENAGA KERJA
1 Pekerja OH 1.2000 100,000.00
2 Tukang batu OH 0.2000 125,000.00
3 Kepala tukang OH 0.0200 150,000.00
4 Mandor OH 0.0600 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen portland kg 230.0000 1,500.00
2 Pasir beton kg 893.0000 195.00
3 Kerikil max. 30 m kg 1,027.0000 145.00
4 Air lt 200.0000 100.00
Jumlah Harga Bahan
C PERALATAN
Page 45 of 343
ANALISA HARGA SATUAN PEKERJAAN
F Harga Satuan Pekerjaan ( D + E )
5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 +2) cm, w/c = 0,66
A TENAGA KERJA
1 Pekerja OH 1.6500 100,000.00
2 Tukang batu OH 0.2750 125,000.00
3 Kepala tukang OH 0.0280 150,000.00
4 Mandor OH 0.0830 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen portland kg 326.0000 1,500.00
2 Pasir beton kg 760.0000 195.00
3 Kerikil max. 30 m kg 1,029.0000 145.00
4 Air ltr 215.0000 100.00
Jumlah Harga Bahan
C PERALATAN
6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (K 200), slump (12 +2) cm, w/c = 0,61
A TENAGA KERJA
1 Pekerja OH 1.6500 100,000.00
2 Tukang batu OH 0.2750 125,000.00
3 Kepala tukang OH 0.0280 150,000.00
4 Mandor OH 0.0830 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen portland kg 352.0000 1,500.00
2 Pasir beton kg 731.0000 195.00
3 Kerikil max. 30 m kg 1,031.0000 145.00
4 Air ltr 215.0000 100.00
Jumlah Harga Bahan
C PERALATAN
7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 +2) cm, w/c = 0,58
Page 46 of 343
ANALISA HARGA SATUAN PEKERJAAN
A TENAGA KERJA
1 Pekerja OH 1.6500 100,000.00
2 Tukang batu OH 0.2750 125,000.00
3 Kepala tukang OH 0.0280 150,000.00
4 Mandor OH 0.0830 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen portland kg 371.0000 1,500.00
2 Pasir beton kg 698.0000 195.00
3 Kerikil max. 30 m kg 1,047.0000 145.00
4 Air ltr 215.0000 100.00
Jumlah Harga Bahan
C PERALATAN
12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 +2) cm, w/c = 0,48
A TENAGA KERJA
1 Pekerja OH 2.1000 100,000.00
2 Tukang batu OH 0.3500 125,000.00
3 Kepala tukang OH 0.0350 150,000.00
4 Mandor OH 0.1050 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen portland kg 448.0000 1,500.00
2 Pasir beton kg 667.0000 195.00
3 Kerikil max. 30 m kg 1,000.0000 145.00
4 Air lt 215.0000 100.00
Jumlah Harga Bahan
C PERALATAN
13 Membuat 1 m3 beton mutu f’c = 30 MPa, slump (12 +2) cm, w/c = 0,48
A TENAGA KERJA
1 Pekerja OH 1.0000 100,000.00
2 Tukang batu OH 0.2500 125,000.00
Page 47 of 343
ANALISA HARGA SATUAN PEKERJAAN
3 Kepala tukang OH 0.0250 150,000.00
4 Mandor OH 0.1000 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Ready Mix f'c-30 Mpa m3 1.0200 870,000.00
Jumlah Harga Bahan
C PERALATAN
1 Pompa dan Conveyor Beton Sewa-hari 0.1200 3,200,000.00
14 Membuat 1 m3 beton mutu f’c = 35 MPa, slump (12 +2) cm, w/c = 0,48
A TENAGA KERJA
1 Pekerja OH 1.0000 100,000.00
2 Tukang batu OH 0.2500 125,000.00
3 Kepala tukang OH 0.0250 150,000.00
4 Mandor OH 0.1000 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Ready Mix f'c-30 Mpa m3 1.0200 950,000.00
Jumlah Harga Bahan
C PERALATAN
1 Pompa dan Conveyor Beton Sewa-hari 0.1200 3,200,000.00
Page 48 of 343
ANALISA HARGA SATUAN PEKERJAAN
4 Strorox - 100 kg 1.2000 100.00
Jumlah Harga Bahan
C PERALATAN
Page 49 of 343
ANALISA HARGA SATUAN PEKERJAAN
F Harga Satuan Pekerjaan ( D + E )
Page 50 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Tenaga Kerja
B BAHAN
1 Beton Ready Mix K-350 m3 1.0000 880,000.00
Jumlah Harga Bahan
C PERALATAN
1 Alat bantu (pompa, selang, tes lab) ls 1.0000 50,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
Page 51 of 343
ANALISA HARGA SATUAN PEKERJAAN
D Overhead + Profit (Max 10%)
E Harga Satuan Pekerjaan ( D + E ) 10%
F 0
Page 52 of 343
ANALISA HARGA SATUAN PEKERJAAN
2 Tukang kayu OH 0.2600 125,000.00
3 Kepala tukang OH 0.0260 150,000.00
4 Mandor OH 0.0260 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Kayu kelas III (75%) m3 0.0300 1,750,000.00
2 Paku 5-10 cm kg 0.3000 15,000.00
3 Minyak bekisting ltr 0.1000 35,000.00
Jumlah Harga Bahan
C PERALATAN
Page 53 of 343
ANALISA HARGA SATUAN PEKERJAAN
1 Kayu kelas III (75%) m3 0.0300 1,750,000.00
2 Paku 5-10 cm kg 0.4000 15,000.00
3 Minyak bekisting ltr 0.2000 35,000.00
4 Balok kayu kelas II (75%) m3 0.0113 4,650,000.00
5 Plywood tebal 9 mm (75%) lbr 0.2625 110,000.00
6 Dolken kayu dia. 8-10cm –panjang 4 m (75%) btg 1.5000 25,000.00
Jumlah Harga Bahan
C PERALATAN
Page 54 of 343
ANALISA HARGA SATUAN PEKERJAAN
B BAHAN
1 Kayu kelas III (75%) m3 0.0300 1,750,000.00
2 Paku 5-10 cm kg 0.4000 15,000.00
3 Minyak bekisting ltr 0.2000 35,000.00
4 Balok kayu kelas II (75%) m3 0.0113 4,650,000.00
5 Plywood tebal 9 mm (75%) lbr 0.2625 110,000.00
6 Dolken kayu dia. 8-10cm –panjang 4 m (75%) btg 4.5000 25,000.00
Jumlah Harga Bahan
C PERALATAN
Page 55 of 343
ANALISA HARGA SATUAN PEKERJAAN
4 Mandor OH 0.0330 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Kayu kelas III m3 0.0225 1,750,000.00
2 Paku 5-10 cm kg 0.4000 15,000.00
3 Minyak bekisting ltr 0.1500 35,000.00
4 Balok kayu kelas II (75%) m3 0.0113 4,650,000.00
5 Plywood tebal 9 mm (75%) lbr 0.2625 110,000.00
6 Dolken kayu dia. 8-10cm –panjang 4 m (75%) btg 1.5000 25,000.00
Jumlah Harga Bahan
C PERALATAN
Page 56 of 343
ANALISA HARGA SATUAN PEKERJAAN
6 Mandor OH 0.0090 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Kayu kelas III m3 0.0020 1,750,000.00
2 Paku 5-10 cm kg 0.0100 15,000.00
3 Minyak bekisting ltr - -
4 Besi beton polos kg 3.0000 11,000.00
5 Kawat beton kg 0.4500 17,000.00
6 Semen portland kg 4.0000 1,500.00
7 Pasir Beton m3 0.0060 273,000.00
8 Kerikil m3 0.0090 261,000.00
Jumlah Harga Bahan
C PERALATAN
Page 57 of 343
ANALISA HARGA SATUAN PEKERJAAN
F Tukang besi
Page 58 of 343
ANALISA HARGA SATUAN PEKERJAAN
B BAHAN
Page 59 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
Page 60 of 343
ANALISA HARGA SATUAN PEKERJAAN
3 Kepala tukang OH 0.0250 150,000.00
4 Mandor OH 0.0050 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
Page 61 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Peralatan
D Jumlah Harga Peralatan
E Jumlah Harga Peralatan 10%
F Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
Page 62 of 343
ANALISA HARGA SATUAN PEKERJAAN
1 Pekerja OH 0.0010 100,000.00
2 Tukang las konstruksi OH 0.0010 125,000.00
3 Kepala tukang OH 0.0000 150,000.00
4 Mandor OH 0.0001 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Solar ltr 0.0100 11,700.00
2 Minyak pelumas ltr 0.0010 50,000.00
Jumlah Harga Bahan
C PERALATAN
5 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
A TENAGA KERJA
1 Pekerja OH 1.0500 100,000.00
2 Tukang besi konstruksi OH 1.0500 125,000.00
3 Kepala tukang OH 0.1050 150,000.00
4 Mandor OH 0.0520 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Besi siku L 30,30,3 kg 15.0000 18,000.00
2 Besi plat baja kg 32.8000 18,000.00
3 kawat las kg 0.0500 195,000.00
Jumlah Harga Bahan
C PERALATAN
1 Sewa alat jam 0.0170 25,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 10%
F Harga Satuan Pekerjaan ( D + E )
Page 63 of 343
ANALISA HARGA SATUAN PEKERJAAN
1 Kawat las listrik kg 0.0400 45,000.00
2 Solar ltr 0.0300 11,700.00
3 Minyak pelumas ltr 0.0040 50,000.00
Jumlah Harga Bahan
C PERALATAN
1 Sewa alat jam 0.0170 25,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
Page 64 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
Page 65 of 343
ANALISA HARGA SATUAN PEKERJAAN
1 Pekerja OH 1.0000 100,000.00
2 Tukang besi konstruksi OH 1.0000 125,000.00
3 Kepala tukang OH 0.1000 150,000.00
4 Mandor OH 0.0500 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Sunscreen allumunium m2 1.0000 cek harga
Page 66 of 343
ANALISA HARGA SATUAN PEKERJAAN
B BAHAN
1 Profil alumunium m 4.4000 98,000.00
2 Alumunium strip m 14.6000 27,100.00
Page 67 of 343
ANALISA HARGA SATUAN PEKERJAAN
C PERALATAN
Page 68 of 343
ANALISA HARGA SATUAN PEKERJAAN
E Harga Satuan Pekerjaan ( D + E ) 10%
F Harga Satuan Pekerjaan ( D + E )
Page 69 of 343
ANALISA HARGA SATUAN PEKERJAAN
20 Pemasangan 1 m talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
A TENAGA KERJA
1 Pekerja OH 0.1500 100,000.00
2 Tukang besi konstruksi OH 0.3000 125,000.00
3 Kepala tukang OH 0.0300 150,000.00
4 Mandor OH 0.0080 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 seng plat m 1.0500 37,000.00
2 Paku 1 cm - 2,5 cm kg 0.0100 15,000.00
3 besi strip m3 0.5000 4,900,000.00
Page 70 of 343
ANALISA HARGA SATUAN PEKERJAAN
3 Kepala tukang OH 0.0250 150,000.00
4 Mandor OH 0.0130 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Metal Stud m 3.5000 26,000.00
2 assesories ls 1.0000 1,820.00
23 Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
A TENAGA KERJA
1 Pekerja OH 0.7340 100,000.00
2 Tukang besi konstruksi OH 0.7340 125,000.00
3 Kepala tukang OH 0.0730 150,000.00
4 Mandor OH 0.0370 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Baja ringan canai dingin C75 kg 3.0600 17,142.86
Page 71 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Bahan
C PERALATAN
1 Peralatan 10% 10.0000 5,245.71
24 Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
A TENAGA KERJA
1 Pekerja OH 0.7604 100,000.00
2 Tukang besi konstruksi OH 0.7604 125,000.00
3 Kepala tukang OH 0.0760 150,000.00
4 Mandor OH 0.0380 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Baja ringan canai dingin C75 kg 4.0500 17,142.86
Page 72 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 10%
F Harga Satuan Pekerjaan ( D + E )
2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
A TENAGA KERJA
1 Pekerja OH 0.6000 100,000.00
2 Tukang OH 0.2000 125,000.00
3 Kepala tukang OH 0.0200 150,000.00
4 Mandor OH 0.0300 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 140.0000 850.00
2 Semen Portlan kg 32.9500 1,500.00
3 Pasir Pasang m3 0.0910 273,000.00
Jumlah Harga Bahan
C PERALATAN
3 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
A TENAGA KERJA
1 Pekerja OH 0.6000 100,000.00
2 Tukang OH 0.2000 125,000.00
3 Kepala tukang OH 0.0200 150,000.00
4 Mandor OH 0.0300 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 140.0000 850.00
2 Semen Portlan kg 26.5500 1,500.00
3 Pasir Pasang m3 0.0930 273,000.00
Jumlah Harga Bahan
C PERALATAN
Page 73 of 343
ANALISA HARGA SATUAN PEKERJAAN
4 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
A TENAGA KERJA
1 Pekerja OH 0.6000 100,000.00
2 Tukang OH 0.2000 125,000.00
3 Kepala tukang OH 0.0200 150,000.00
4 Mandor OH 0.0300 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 140.0000 850.00
2 Semen Portlan kg 22.2000 1,500.00
3 Pasir Pasang m3 0.1020 273,000.00
Jumlah Harga Bahan
C PERALATAN
5 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
A TENAGA KERJA
1 Pekerja OH 0.6000 100,000.00
2 Tukang OH 0.2000 125,000.00
3 Kepala tukang OH 0.0200 150,000.00
4 Mandor OH 0.0300 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 140.0000 850.00
2 Semen Portlan kg 18.5000 1,500.00
3 Pasir Pasang m3 0.1220 273,000.00
Jumlah Harga Bahan
C PERALATAN
6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
A TENAGA KERJA
1 Pekerja OH 0.6000 100,000.00
2 Tukang OH 0.2000 125,000.00
3 Kepala tukang OH 0.0200 150,000.00
Page 74 of 343
ANALISA HARGA SATUAN PEKERJAAN
4 Mandor OH 0.0300 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 140.0000 850.00
2 Semen Portlan kg 10.0800 1,500.00
3 Kapur padam m3 0.0275 85,000.00
4 Pasir Pasang m3 0.0925 273,000.00
Jumlah Harga Bahan
C PERALATAN
7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 2PP
A TENAGA KERJA
1 Pekerja OH 0.3000 100,000.00
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0150 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 70.0000 850.00
2 Semen Portlan kg 18.9500 1,500.00
3 Pasir Pasang m3 0.0380 273,000.00
Jumlah Harga Bahan
C PERALATAN
8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 3PP
A TENAGA KERJA
1 Pekerja OH 0.3000 100,000.00
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0150 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 70.0000 850.00
Page 75 of 343
ANALISA HARGA SATUAN PEKERJAAN
2 Semen Portlan kg 14.3700 1,500.00
3 Pasir Pasang m3 0.0400 273,000.00
Jumlah Harga Bahan
C PERALATAN
9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 4PP
A TENAGA KERJA
1 Pekerja OH 0.3000 100,000.00
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0150 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 70.0000 850.00
2 Semen Portlan kg 11.5000 1,500.00
3 Pasir Pasang m3 0.0430 273,000.00
Jumlah Harga Bahan
C PERALATAN
10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 5PP
A TENAGA KERJA
1 Pekerja OH 0.3000 100,000.00
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0150 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 70.0000 850.00
2 Semen Portlan kg 9.6800 1,500.00
3 Pasir Pasang m3 0.0450 273,000.00
Jumlah Harga Bahan
C PERALATAN
Page 76 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 6PP
A TENAGA KERJA
1 Pekerja OH 0.3000 100,000.00
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0150 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 70.0000 850.00
2 Semen Portlan kg 8.3200 1,500.00
3 Pasir Pasang m3 0.0490 273,000.00
Jumlah Harga Bahan
C PERALATAN
12 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 8PP
A TENAGA KERJA
1 Pekerja OH 0.3000 100,000.00
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0150 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 70.0000 850.00
2 Semen Portlan kg 6.5000 1,500.00
3 Pasir Pasang m3 0.0500 273,000.00
Jumlah Harga Bahan
C PERALATAN
Page 77 of 343
ANALISA HARGA SATUAN PEKERJAAN
13 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 3KP : 10PP
A TENAGA KERJA
1 Pekerja OH 0.3000 100,000.00
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0150 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 70.0000 850.00
2 Semen Portlan kg 4.5000 1,500.00
3 Kapur padam m3 0.0150 1,500.00
4 Pasir Pasang m3 0.0500 273,000.00
Jumlah Harga Bahan
C PERALATAN
14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 1KP : 1PP
A TENAGA KERJA
1 Pekerja OH 0.3000 100,000.00
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0150 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 70.0000 850.00
2 Semen Portlan kg 0.0180 1,500.00
3 Kapur padam m3 0.0180 1,500.00
4 Pasir Pasang m3 0.0180 273,000.00
Jumlah Harga Bahan
C PERALATAN
15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 1KP : 2PP
A TENAGA KERJA
1 Pekerja OH 0.3000 100,000.00
Page 78 of 343
ANALISA HARGA SATUAN PEKERJAAN
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0150 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata merah bh 70.0000 850.00
2 Semen Portlan kg 0.0140 1,500.00
3 Kapur padam m3 0.0140 85,000.00
4 Pasir Pasang m3 0.0280 273,000.00
Jumlah Harga Bahan
C PERALATAN
Page 79 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Tenaga Kerja
B BAHAN
1 HB-20 bh 12.5000 7,000.00
2 Semen Portlan kg 24.2600 1,500.00
3 Pasir Pasang m3 0.7720 273,000.00
4 besi angker dia 8 kg 0.0280 11,000.00
Jumlah Harga Bahan
C PERALATAN
Page 80 of 343
ANALISA HARGA SATUAN PEKERJAAN
2 Semen Portlan kg 18.2000 1,500.00
3 Pasir Pasang m3 0.5820 273,000.00
4 besi angker dia 8 kg 0.0280 11,000.00
Jumlah Harga Bahan
C PERALATAN
Page 81 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Bahan
C PERALATAN
Page 82 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
25 Pemasangan 1m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
A TENAGA KERJA
1 Pekerja OH 0.6700 100,000.00
2 Tukang OH 1.3000 125,000.00
3 Kepala tukang OH 0.1300 150,000.00
4 Mandor OH 0.0030 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata ringan tebal 7,5 cm bh 8.4000 7,800.00
2 Mortar siap pakai kg 0.4730 3,000.00
Page 83 of 343
ANALISA HARGA SATUAN PEKERJAAN
26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
A TENAGA KERJA
1 Pekerja OH 0.6710 100,000.00
2 Tukang OH 1.3000 125,000.00
3 Kepala tukang OH 0.1300 150,000.00
4 Mandor OH 0.0030 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata ringan tebal 10 cm bh 8.4000 15,360.00
2 Mortar siap pakai kg 0.0630 3,000.00
27 Pemasangan 1m2 dinding bata tahan api tebal 6,5 cm dengan mortar tahan api siap pakai
A TENAGA KERJA
1 Pekerja OH 0.3000 100,000.00
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0150 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bata tahan api 23 cm x 11,4 cm x 6,5 cm bh 38.1000 11,800.00
2 Mortar siap pakai kg 0.0630 2,700.00
Page 84 of 343
ANALISA HARGA SATUAN PEKERJAAN
2 Tukang OH 0.1500 125,000.00
3 Kepala tukang OH 0.0150 150,000.00
4 Mandor OH 0.0150 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen Portlan kg 15.5040 1,500.00
2 Pasir Pasang m3 0.0160 273,000.00
Jumlah Harga Bahan
C PERALATAN
Page 85 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Bahan
C PERALATAN
Page 86 of 343
ANALISA HARGA SATUAN PEKERJAAN
7 Pemasangan 1 m2 acian
A TENAGA KERJA
1 Pekerja OH 0.2000 100,000.00
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0100 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen Portlan kg 3.2500 1,500.00
Jumlah Harga Bahan
C PERALATAN
Pemasangan 1 m2 Skimcoat
A TENAGA KERJA
1 Pekerja OH 0.2000 100,000.00
2 Tukang OH 0.1000 125,000.00
3 Kepala tukang OH 0.0100 150,000.00
4 Mandor OH 0.0100 175,000.00
Jumlah Harga Tenaga Kerja
Page 87 of 343
ANALISA HARGA SATUAN PEKERJAAN
B BAHAN
1 Semen Khusus kg 3.0000 2,750.00
Jumlah Harga Bahan
C PERALATAN
Page 88 of 343
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Harga Bahan
C PERALATAN
Page 89 of 343
ANALISA HARGA SATUAN PEKERJAAN
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
Page 90 of 343
ANALISA HARGA SATUAN PEKERJAAN
3 Kepala tukang OH 0.0350 150,000.00
4 Mandor OH 0.0350 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Batu paras bh 1.1000 200,000.00
2 Semen portland kg 11.7500 1,500.00
3 Pasir pasang m3 0.0035 273,000.00
Jumlah Harga Bahan
C PERALATAN
Page 91 of 343
ANALISA HARGA SATUAN PEKERJAAN
2 lem kg 0.2500 15,000.00
Page 92 of 343
ANALISA HARGA SATUAN PEKERJAAN
F Harga Satuan Pekerjaan ( D + E )
Page 93 of 343
ANALISA HARGA SATUAN PEKERJAAN
3 Kepala tukang OH 0.0500 150,000.00
4 Mandor OH 0.0013 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Paving block 8cm m2 1.0100 170,000.00
2 pasir beton m3 2.0700 273,000.00
Jumlah Harga Bahan
C PERALATAN
1 Peralatan 10%
Page 94 of 343
ANALISA HARGA SATUAN PEKERJAAN
2 pasir beton m3 2.0700 273,000.00
Jumlah Harga Bahan
C PERALATAN
1 Peralatan 10%
Page 95 of 343
ANALISA HARGA SATUAN PEKERJAAN
C PERALATAN
Page 96 of 343
ANALISA HARGA SATUAN PEKERJAAN
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
Page 97 of 343
ANALISA HARGA SATUAN PEKERJAAN
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
Page 98 of 343
ANALISA HARGA SATUAN PEKERJAAN
22 Pemasangan 1 m2 Lantai Natural Stone -- type Cobble Stone Finish Coating
A TENAGA KERJA
1 Pekerja OH 0.7000 100,000.00
2 Tukang OH 0.3500 125,000.00
3 Kepala tukang OH 0.0350 150,000.00
4 Mandor OH 0.0350 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Batu Coblestone m2 1.000 302,000.00
2 Semen Portland kg 11.7500 1,500.00
3 Pasir Pasang m3 0.0350 273,000.00
4 Cat Coating liter 0.1000 25,000.00
Jumlah Harga Bahan
C PERALATAN
Page 99 of 343
ANALISA HARGA SATUAN PEKERJAAN
1 Pekerja OH 0.1750 100,000.00
2 Tukang OH 0.1750 125,000.00
3 Kepala tukang OH 0.0175 150,000.00
4 Mandor OH 0.0088 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Rangka metal Furing m' 4.0000 15,000.00
2 Assesories (perkuatan, las, dll) ls 1.0000 10,000.00
Jumlah Harga Bahan
C PERALATAN
3 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
A TENAGA KERJA
1 Pekerja OH 6.0000 100,000.00
2 Tukang OH 18.0000 125,000.00
3 Kepala tukang OH 1.8000 150,000.00
4 Mandor OH 0.3000 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Balok kayu Meranti M3 1.2000 4,650,000.00
2 Paku 10 cm KG 1.2500 15,000.00
3 Lem kayu KG 1.0000 15,000.00
Jumlah Harga Bahan
C PERALATAN
5 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
A TENAGA KERJA
1 Pekerja OH 0.8000 100,000.00
2 Tukang OH 2.4000 125,000.00
3 Kepala tukang OH 0.2400 150,000.00
4 Mandor OH 0.0400 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Papan kayu M3 0.0240 4,900,000.00
2 Lem kayu KG 0.3000 15,000.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C )
E Overhead + Profit (Max 10%) 10%
F Harga Satuan Pekerjaan ( D + E )
8 Pemasangan 1 m2 Pintu Besi Plat Baja Tebal 2 mm Rangkap, Rangka Besi Siku
A TENAGA KERJA
1 Pekerja OH 1.0500 100,000.00
2 Tukang OH 1.0500 125,000.00
3 Kepala tukang OH 0.1050 150,000.00
4 Mandor OH 0.0520 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Besi siku L 30.30.3 Kg 15.0000 18,000.00
2 Besi plat baja Kg 32.8000 20,000.00
3 Kawat las Kg 0.0500 195,000.00
Jumlah Harga Bahan
C PERALATAN
4 1 m2 pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA KERJA
1 Pekerja OH 0.0700 100,000.00
2 Tukang OH 0.0090 125,000.00
3 Kepala tukang OH 0.0060 150,000.00
4 Mandor OH 0.0030 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Cat menie kg 0.2000 20,000.00
2 Plamuur kg 0.1500 15,000.00
3 Cat dasar kg 0.1700 35,000.00
4 Cat penutup kg 0.2600 60,000.00
5 Kuas bh 0.0100 12,000.00
6 Pengencer kg 0.0300 20,000.00
7 Ampelas lbr 0.2000 4,000.00
Jumlah Harga Bahan
C PERALATAN
5 Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
A TENAGA KERJA
1 Pekerja OH 0.0700 100,000.00
2 Tukang OH 0.1050 125,000.00
3 Kepala tukang OH 0.0040 150,000.00
4 Mandor OH 0.0030 175,000.00
10 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA KERJA
1 Pekerja OH 0.0200 100,000.00
2 Tukang OH 0.0630 125,000.00
3 Kepala tukang OH 0.0063 150,000.00
4 Mandor OH 0.0030 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Plamuur kg 0.1000 15,000.00
2 Cat dasar kg 0.1000 35,000.00
3 Cat penutup kg 0.2600 90,000.00
Jumlah Harga Bahan
C PERALATAN
21 Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
A TENAGA KERJA
T.15.a.6) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 100 m
P. HARGA SATUAN PEKERJAAN PIPA DI LUAR GEDUNG
1 (K3) Pemasangan 1 m pipa PVC dia 63mm
A TENAGA KERJA
1 Pekerja OH 0.0810 100,000.00
2 Tukang OH 0.0410 125,000.00
3 Mandor OH 0.0080 175,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Pipa PVC dia 63mm m 1.0000 cek harga
Analisa Taksir
150,000.00
180,000.00
80,000.00
160,000.00
450,000.00
250,000.00
150,000.00
2,400,000.00
300,000.00
4,120,000.00
4,120,000.00
412,000.00
4,532,000.00
Analisa Taksir
4,500,000.00
4,800,000.00
300,000.00
9,600,000.00
9,600,000.00
960,000.00
10,560,000.00
Analisa Taksir
7,500,000.00
2,457,000.00
2,250,000.00
12,207,000.00
3,720,000.00
3,720,000.00
15,927,000.00
1,592,700.00
17,519,700.00
Analisa Taksir
7,500,000.00
1,375,000.00
3,500,000.00
1,500,000.00
13,875,000.00
13,875,000.00
1,387,500.00
15,262,500.00
40,000.00
25,000.00
3,000.00
3,500.00
71,500.00
25,000.00
7,500.00
1,250.00
236,200.00
23,620.00
259,820.00
20,000.00
50,000.00
3,000.00
3,500.00
76,500.00
25,000.00
3,750.00
78,000.00
1,250.00
2,250.00
121,680.00
1,020.00
9,000.00
241,950.00
318,450.00
31,845.00
350,295.00
20,000.00
37,500.00
3,000.00
3,500.00
64,000.00
1,500.00
130,000.00
718,750.00
1,250.00
2,250.00
1,020.00
854,770.00
918,770.00
91,877.00
1,010,647.00
10,000.00
12,500.00
1,500.00
875.00
24,875.00
21,000.00
300.00
34,300.00
55,600.00
80,475.00
8,047.50
88,522.50
200,000.00
250,000.00
125,000.00
45,000.00
8,750.00
628,750.00
-
1,313,550.00
131,355.00
1,444,905.00
100,000.00
187,500.00
22,500.00
8,750.00
318,750.00
225,000.00
1,283,400.00
10,500.00
52,500.00
1,571,400.00
-
1,890,150.00
189,015.00
2,079,165.00
100,000.00
250,000.00
30,000.00
8,750.00
388,750.00
42,500.00
28,350.00
229,500.00
15,750.00
8,190.00
13,050.00
131,250.00
21,875.00
490,465.00
-
879,215.00
87,921.50
967,136.50
100,000.00
250,000.00
30,000.00
8,750.00
388,750.00
31,250.00
139,500.00
25,500.00
27,000.00
8,190.00
13,050.00
131,250.00
121,500.00
497,240.00
10,000.00
8,750.00
18,750.00
18,750.00
1,875.00
20,625.00
100,000.00
250,000.00
30,000.00
8,750.00
388,750.00
18,750.00
23,250.00
42,000.00
-
430,750.00
43,075.00
473,825.00
37,500.00
4,500.00
42,000.00
-
127,200.00
12,720.00
139,920.00
100,000.00
875.00
100,875.00
-
-
-
-
100,875.00
10,087.50
110,962.50
1,333,400.00
116,550.00
1,449,950.00
1,449,950.00
144,995.00
1,594,945.00
100,005.00
8,741.25
108,746.25
108,746.25
10,874.63
119,620.88
4,200.00
500.00
300.00
7,350.00
12,350.00
3,585.00
3,585.00
15,935.00
1,593.50
17,528.50
37,500.00
15,625.00
1,800.00
3,325.00
58,250.00
58,250.00
5,825.00
64,075.00
75,000.00
4,375.00
79,375.00
79,375.00
7,937.50
87,312.50
90,000.00
7,875.00
97,875.00
97,875.00
9,787.50
105,000.00
11,725.00
116,725.00
116,725.00
11,672.50
128,397.50
100,000.00
5,600.00
105,600.00
105,600.00
10,560.00
116,160.00
150,000.00
10,500.00
160,500.00
120,000.00
7,875.00
127,875.00
127,875.00
12,787.50
140,662.50
5,000.00
875.00
5,875.00
-
5,875.00
587.50
6,462.50
33,000.00
1,750.00
34,750.00
-
34,750.00
3,475.00
38,225.00
50,000.00
8,750.00
58,750.00
-
58,750.00
5,875.00
64,625.00
30,000.00
1,750.00
31,750.00
313,200.00
313,200.00
-
344,950.00
34,495.00
379,445.00
11,475.00
109,200.00
20,856.00
141,531.00
-
291,531.00
29,153.10
320,684.10
15,000.00
2,625.00
17,625.00
150,000.00
150,000.00
-
167,625.00
16,762.50
184,387.50
25,000.00
4,375.00
29,375.00
316,080.00
316,080.00
-
345,455.00
34,545.50
380,000.50
150,000.00
93,750.00
11,250.00
13,125.00
268,125.00
222,000.00
303,000.00
132,405.00
657,405.00
-
925,530.00
92,553.00
1,018,083.00
150,000.00
93,750.00
11,250.00
13,125.00
268,125.00
203,500.00
244,500.00
141,960.00
589,960.00
-
858,085.00
85,808.50
150,000.00
93,750.00
11,250.00
13,125.00
268,125.00
222,000.00
204,000.00
148,512.00
574,512.00
-
842,637.00
84,263.70
926,900.70
150,000.00
93,750.00
11,250.00
13,125.00
268,125.00
222,000.00
175,500.00
153,153.00
550,653.00
-
818,778.00
81,877.80
900,655.80
150,000.00
222,000.00
136,500.00
159,432.00
517,932.00
-
786,057.00
78,605.70
864,662.70
150,000.00
93,750.00
11,250.00
13,125.00
268,125.00
222,000.00
14,450.00
255.00
92,820.00
329,525.00
-
597,650.00
59,765.00
657,415.00
150,000.00
93,750.00
11,250.00
13,125.00
268,125.00
222,000.00
12,495.00
91,500.00
134,316.00
460,311.00
-
728,436.00
72,843.60
801,279.60
150,000.00
93,750.00
11,250.00
13,125.00
268,125.00
222,000.00
11,135.00
61,500.00
142,779.00
437,414.00
-
705,539.00
70,553.90
776,092.90
78,000.00
48,750.00
5,850.00
6,825.00
139,425.00
222,000.00
112,752.00
-
474,177.00
47,417.70
521,594.70
340,000.00
106,250.00
127,500.00
29,750.00
603,500.00
88,800.00
291,000.00
85,176.00
122,148.00
1,386,000.00
30,600.00
2,003,724.00
-
2,607,224.00
260,722.40
2,867,946.40
240,000.00
100,000.00
12,000.00
20,825.00
372,825.00
83,250.00
291,000.00
85,176.00
122,148.00
581,574.00
-
954,399.00
95,439.90
1,049,838.90
165,000.00
34,375.00
4,200.00
14,525.00
218,100.00
370,500.00
169,455.00
144,855.00
21,500.00
706,310.00
-
924,410.00
92,441.00
1,016,851.00
165,000.00
34,375.00
4,200.00
14,525.00
218,100.00
414,000.00
161,460.00
146,740.00
21,500.00
743,700.00
165,000.00
34,375.00
4,200.00
14,525.00
218,100.00
448,500.00
155,805.00
147,465.00
21,500.00
773,270.00
-
991,370.00
99,137.00
1,090,507.00
120,000.00
25,000.00
3,000.00
10,500.00
158,500.00
345,000.00
174,135.00
148,915.00
20,000.00
688,050.00
-
846,550.00
84,655.00
165,000.00
34,375.00
4,200.00
14,525.00
218,100.00
489,000.00
148,200.00
149,205.00
21,500.00
807,905.00
-
1,026,005.00
102,600.50
1,128,605.50
165,000.00
34,375.00
4,200.00
14,525.00
218,100.00
528,000.00
142,545.00
149,495.00
21,500.00
841,540.00
-
1,059,640.00
105,964.00
1,165,604.00
165,000.00
34,375.00
4,200.00
14,525.00
218,100.00
556,500.00
136,110.00
151,815.00
21,500.00
865,925.00
-
1,084,025.00
108,402.50
1,192,427.50
210,000.00
43,750.00
5,250.00
18,375.00
277,375.00
672,000.00
130,065.00
145,000.00
21,500.00
968,565.00
-
1,245,940.00
124,594.00
1,370,534.00
100,000.00
31,250.00
887,400.00
887,400.00
384,000.00
384,000.00
1,423,900.00
142,390.00
1,566,290.00
100,000.00
31,250.00
3,750.00
17,500.00
152,500.00
969,000.00
969,000.00
384,000.00
384,000.00
1,505,500.00
150,550.00
1,656,050.00
210,000.00
43,750.00
5,250.00
18,375.00
277,375.00
600,000.00
93.60
116.00
-
877,704.60
87,770.46
965,475.06
6,000.00
3,750.00
450.00
525.00
10,725.00
61,425.00
61,425.00
-
72,150.00
7,215.00
79,365.00
7,000.00
4,375.00
6,000.00
12,250.00
29,625.00
80,535.00
80,535.00
-
110,160.00
11,016.00
8,000.00
5,000.00
600.00
700.00
14,300.00
151,515.00
151,515.00
-
165,815.00
16,581.50
182,396.50
analisa taksir
165,000.00
34,375.00
4,200.00
14,525.00
218,100.00
860,000.00
860,000.00
50,000.00
50,000.00
1,128,100.00
112,810.00
1,240,910.00
analisa taksir
165,000.00
34,375.00
4,200.00
14,525.00
880,000.00
880,000.00
50,000.00
50,000.00
1,148,100.00
114,810.00
1,262,910.00
700.00
875.00
105.00
70.00
1,750.00
11,550.00
255.00
11,805.00
-
13,555.00
1,355.50
14,910.50
5,000.00
6,250.00
7,500.00
5,250.00
24,000.00
189,000.00
1,700.00
190,700.00
2,500.00
3,125.00
3,750.00
175.00
9,550.00
55,776.01
850.00
56,626.01
66,176.01
6,617.60
72,793.62
2,500.00
3,125.00
3,750.00
175.00
9,550.00
88,077.60
850.00
88,927.60
98,477.60
9,847.76
108,325.36
52,000.00
52,500.00
4,500.00
3,500.00
60,500.00
153,450.00
15,345.00
168,795.00
52,000.00
32,500.00
3,900.00
4,550.00
92,950.00
59,062.50
4,500.00
3,500.00
67,062.50
160,012.50
16,001.25
176,013.75
66,000.00
41,250.00
4,950.00
5,775.00
117,975.00
302,162.50
30,216.25
332,378.75
66,000.00
41,250.00
4,950.00
5,775.00
117,975.00
52,500.00
6,000.00
7,000.00
62,775.00
28,875.00
37,500.00
194,650.00
312,625.00
31,262.50
343,887.50
66,000.00
41,250.00
4,950.00
5,775.00
117,975.00
52,500.00
6,000.00
7,000.00
52,312.50
28,875.00
112,500.00
259,187.50
377,162.50
37,716.25
414,878.75
66,000.00
41,250.00
4,950.00
5,775.00
117,975.00
39,375.00
6,000.00
7,000.00
69,750.00
28,875.00
56,250.00
37,500.00
244,750.00
362,725.00
36,272.50
398,997.50
66,000.00
41,250.00
4,950.00
39,375.00
6,000.00
5,250.00
52,312.50
28,875.00
37,500.00
169,312.50
287,287.50
28,728.75
316,016.25
15,000.00
6,250.00
750.00
14,000.00
36,000.00
46,200.00
9,000.00
12,500.00
67,700.00
103,700.00
10,370.00
114,070.00
18,000.00
2,500.00
2,500.00
2,500.00
900.00
3,500.00
150.00
-
33,000.00
7,650.00
6,000.00
1,638.00
2,349.00
54,287.00
82,262.00
8,226.20
90,488.20
29,700.00
4,125.00
4,125.00
4,125.00
1,500.00
2,625.00
46,200.00
5,250.00
300.00
-
39,600.00
850.00
8,250.00
2,457.00
3,915.00
60,622.00
106,822.00
10,682.20
Analisa Taksir
2,500.00
6,250.00
750.00
437.50
9,937.50
21,000.00
21,000.00
30,937.50
3,093.75
34,031.25
Analisa Taksir
644,444.44
644,444.44
25,000.00
15,000.00
40,000.00
684,444.44
68,444.44
752,888.89
60,000.00
13,750.00
11,550.00
85,300.00
1,650.00
110,000.00
111,650.00
196,950.00
19,695.00
216,645.00
Analisa Taksir
10,000.00
12,500.00
7,500.00
8,750.00
38,750.00
88,312.50
97,500.00
185,812.50
5,000.00
5,000.00
229,562.50
22,956.25
252,518.75
Analisa Taksir
50,000.00
93,750.00
3,750.00
875.00
148,375.00
5,000.00
Analisa Taksir
793,500.00
793,500.00
25,000.00
15,000.00
40,000.00
833,500.00
83,350.00
916,850.00
60,000.00
12,500.00
11,550.00
84,050.00
1,500.00
100,000.00
101,500.00
185,550.00
18,555.00
204,105.00
Analisa Taksir
50,000.00
93,750.00
5,000.00
5,000.00
153,375.00
15,337.50
168,712.50
Analisa Taksir
159,500.00
159,500.00
25,000.00
15,000.00
40,000.00
199,500.00
19,950.00
219,450.00
48,000.00
10,000.00
8,400.00
66,400.00
1,200.00
80,000.00
6,000.00
7,500.00
900.00
525.00
14,925.00
12,075.00
12,075.00
27,000.00
2,700.00
29,700.00
6,000.00
7,500.00
900.00
525.00
14,925.00
20,700.00
20,700.00
35,625.00
3,562.50
39,187.50
117.00
50.00
167.00
402.25
40.23
442.48
105,000.00
131,250.00
15,750.00
9,100.00
261,100.00
270,000.00
590,400.00
9,750.00
870,150.00
425.00
425.00
1,131,675.00
113,167.50
1,244,842.50
400.00
250.00
30.00
35.00
715.00
425.00
425.00
3,491.00
349.10
3,840.10
65,000.00
81,250.00
9,750.00
5,600.00
161,600.00
47,600.00
22,610.00
76,802.00
147,012.00
-
308,612.00
30,861.20
339,473.20
120,000.00
150,000.00
18,000.00
1,050.00
289,050.00
#VALUE!
#VALUE!
44,000.00
55,000.00
6,600.00
3,850.00
109,450.00
#VALUE!
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
8,000.00
100,000.00
12,000.00
700.00
120,700.00
#VALUE!
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
4,300.00
5,375.00
645.00
367.50
10,687.50
107,800.00
2,000.00
1,500.00
111,300.00
-
121,987.50
12,198.75
134,186.25
8,500.00
10,625.00
1,275.00
735.00
21,135.00
431,200.00
395,660.00
826,860.00
-
847,995.00
84,799.50
932,794.50
8,500.00
10,625.00
1,350.00
875.00
21,350.00
431,200.00
88,200.00
6,750.00
526,150.00
-
547,500.00
54,750.00
602,250.00
35,000.00
43,750.00
5,250.00
3,150.00
87,150.00
#VALUE!
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
167,000.00
208,750.00
25,050.00
14,525.00
415,325.00
111,186.00
103,989.91
215,175.91
-
630,500.91
63,050.09
693,551.00
10,000.00
12,500.00
1,500.00
875.00
24,875.00
142,352.94
42,663.51
30,888.00
215,904.45
-
240,779.45
20,000.00
25,000.00
3,000.00
175.00
48,175.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
20,000.00
25,000.00
3,000.00
175.00
48,175.00
38,850.00
225.00
93,100.00
132,175.00
-
180,350.00
18,035.00
198,385.00
15,000.00
37,500.00
4,500.00
1,400.00
58,400.00
38,850.00
150.00
2,450,000.00
2,489,000.00
-
2,547,400.00
254,740.00
2,802,140.00
25,000.00
31,250.00
3,750.00
2,275.00
62,275.00
35,000.00
35,000.00
70,000.00
-
132,275.00
13,227.50
145,502.50
25,000.00
31,250.00
91,000.00
1,820.00
92,820.00
-
155,095.00
15,509.50
170,604.50
35,000.00
43,750.00
5,250.00
3,150.00
87,150.00
40,000.00
40,000.00
80,000.00
-
167,150.00
16,715.00
183,865.00
73,400.00
91,750.00
10,950.00
6,475.00
182,575.00
52,457.14
52,457.14
-
235,032.14
23,503.21
258,535.36
76,040.00
95,050.00
11,400.00
6,650.00
189,140.00
69,428.57
69,428.57
69,428.57
-
258,568.57
25,856.86
284,425.43
60,000.00
25,000.00
3,000.00
5,250.00
93,250.00
119,000.00
65,250.00
21,840.00
206,090.00
60,000.00
25,000.00
3,000.00
5,250.00
93,250.00
119,000.00
49,425.00
24,843.00
193,268.00
-
286,518.00
28,651.80
315,169.80
60,000.00
25,000.00
3,000.00
5,250.00
93,250.00
119,000.00
39,825.00
25,389.00
184,214.00
-
277,464.00
27,746.40
305,210.40
60,000.00
25,000.00
3,000.00
5,250.00
93,250.00
119,000.00
33,300.00
27,846.00
180,146.00
-
273,396.00
27,339.60
300,735.60
60,000.00
25,000.00
3,000.00
5,250.00
93,250.00
119,000.00
27,750.00
33,306.00
180,056.00
-
273,306.00
27,330.60
300,636.60
60,000.00
25,000.00
3,000.00
119,000.00
15,120.00
2,337.50
25,252.50
161,710.00
-
254,960.00
25,496.00
280,456.00
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
59,500.00
28,425.00
10,374.00
98,299.00
-
144,924.00
14,492.40
159,416.40
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
59,500.00
-
138,600.00
13,860.00
152,460.00
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
59,500.00
17,250.00
11,739.00
88,489.00
-
135,114.00
13,511.40
148,625.40
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
59,500.00
14,520.00
12,285.00
86,305.00
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
59,500.00
12,480.00
13,377.00
85,357.00
-
131,982.00
13,198.20
145,180.20
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
59,500.00
9,750.00
13,650.00
82,900.00
-
129,525.00
12,952.50
142,477.50
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
59,500.00
6,750.00
22.50
13,650.00
79,922.50
-
126,547.50
12,654.75
139,202.25
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
59,500.00
27.00
27.00
4,914.00
64,468.00
-
111,093.00
11,109.30
122,202.30
30,000.00
59,500.00
21.00
1,190.00
7,644.00
68,355.00
-
114,980.00
11,498.00
126,478.00
35,000.00
18,750.00
2,250.00
3,150.00
59,150.00
87,500.00
45,480.00
198,744.00
308.00
332,032.00
-
391,182.00
39,118.20
430,300.20
35,000.00
18,750.00
2,250.00
3,150.00
87,500.00
36,390.00
210,756.00
308.00
334,954.00
-
394,104.00
39,410.40
433,514.40
32,000.00
15,000.00
1,800.00
2,800.00
51,600.00
65,625.00
34,110.00
150,150.00
308.00
250,193.00
-
301,793.00
30,179.30
331,972.30
32,000.00
15,000.00
1,800.00
2,800.00
51,600.00
65,625.00
-
303,719.00
30,371.90
334,090.90
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
43,750.00
22,740.00
99,372.00
308.00
166,170.00
-
212,795.00
21,279.50
234,074.50
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
43,750.00
18,195.00
105,924.00
308.00
-
214,802.00
21,480.20
236,282.20
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
450,000.00
16,500.00
9,555.00
476,055.00
-
522,680.00
52,268.00
574,948.00
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
450,000.00
16,500.00
9,555.00
476,055.00
30,000.00
18,750.00
2,250.00
2,625.00
53,625.00
1,050,000.00
21,000.00
8,736.00
1,079,736.00
-
1,133,361.00
113,336.10
1,246,697.10
67,000.00
162,500.00
19,500.00
525.00
249,525.00
65,520.00
1,419.00
66,939.00
-
316,464.00
31,646.40
348,110.40
67,100.00
162,500.00
19,500.00
525.00
249,625.00
129,024.00
189.00
129,213.00
-
378,838.00
37,883.80
416,721.80
Analisa Taksir
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
449,580.00
170.10
449,750.10
-
496,375.10
49,637.51
546,012.61
30,000.00
23,256.00
4,368.00
27,624.00
81,249.00
8,124.90
89,373.90
30,000.00
18,750.00
2,250.00
2,625.00
53,625.00
15,336.00
5,460.00
20,796.00
74,421.00
7,442.10
81,863.10
30,000.00
18,750.00
2,250.00
2,625.00
53,625.00
11,664.00
6,279.00
71,568.00
7,156.80
78,724.80
30,000.00
18,750.00
2,250.00
2,625.00
53,625.00
9,360.00
6,552.00
15,912.00
-
69,537.00
6,953.70
76,490.70
30,000.00
18,750.00
2,250.00
2,625.00
53,625.00
7,776.00
7,098.00
14,874.00
-
68,499.00
6,849.90
75,348.90
30,000.00
12,500.00
1,500.00
2,625.00
46,625.00
6,480.00
1,638.00
8,118.00
-
54,743.00
5,474.30
60,217.30
20,000.00
12,500.00
1,500.00
1,750.00
35,750.00
4,875.00
4,875.00
-
40,625.00
4,062.50
44,687.50
20,000.00
12,500.00
1,500.00
1,750.00
35,750.00
8,250.00
8,250.00
-
44,000.00
4,400.00
48,400.00
70,000.00
43,750.00
5,250.00
6,125.00
125,125.00
78,750.00
15,600.00
12,285.00
5,500.00
112,135.00
-
237,260.00
23,726.00
260,986.00
70,000.00
43,750.00
5,250.00
6,125.00
125,125.00
93,600.00
15,000.00
12,285.00
5,500.00
-
251,510.00
25,151.00
276,661.00
90,000.00
56,250.00
6,750.00
7,875.00
160,875.00
94,000.00
13,950.00
4,914.00
21,340.00
134,204.00
-
295,079.00
29,507.90
324,586.90
17,000.00
21,250.00
2,550.00
1,575.00
42,375.00
262,500.00
5,250.00
267,750.00
-
310,125.00
12,000.00
15,000.00
1,800.00
1,050.00
29,850.00
52,500.00
5,250.00
52,500.00
-
82,350.00
8,235.00
90,585.00
70,000.00
43,750.00
5,250.00
6,125.00
125,125.00
262,500.00
9,000.00
262,500.00
-
387,625.00
38,762.50
426,387.50
70,000.00
43,750.00
220,000.00
17,625.00
955.50
220,000.00
-
345,125.00
34,512.50
379,637.50
15,000.00
18,750.00
2,250.00
1,400.00
37,400.00
534,150.00
5,250.00
534,150.00
-
571,550.00
57,155.00
628,705.00
35,000.00
21,875.00
2,550.00
350.00
59,775.00
220,000.00
223,750.00
-
283,525.00
28,352.50
311,877.50
12,000.00
15,000.00
1,800.00
1,050.00
29,850.00
28,100.00
28,100.00
-
57,950.00
5,795.00
63,745.00
8,000.00
10,000.00
1,200.00
700.00
19,900.00
79,200.00
1,200.00
80,400.00
-
100,300.00
10,030.00
12,000.00
15,000.00
1,800.00
1,050.00
29,850.00
28,200.00
750.00
28,950.00
-
58,800.00
5,880.00
64,680.00
25,000.00
62,500.00
7,500.00
227.50
95,227.50
156,550.00
13,650.00
170,200.00
-
265,427.50
26,542.75
291,970.25
50,000.00
62,500.00
171,700.00
565,110.00
736,810.00
-
857,037.50
85,703.75
942,741.25
25,000.00
62,500.00
7,500.00
227.50
95,227.50
156,550.00
13,650.00
170,200.00
-
265,427.50
26,542.75
291,970.25
50,000.00
62,500.00
7,500.00
227.50
120,227.50
156,550.00
-
841,887.50
84,188.75
926,076.25
25,000.00
15,625.00
1,950.00
2,275.00
44,850.00
197,280.00
14,700.00
14,300.00
12,285.00
238,565.00
283,415.00
28,341.50
311,756.50
25,000.00
15,625.00
1,950.00
2,275.00
44,850.00
248,400.00
14,700.00
14,300.00
12,285.00
289,685.00
334,535.00
33,453.50
367,988.50
70,000.00
43,750.00
5,250.00
6,125.00
125,125.00
85,470.00
12,285.00
5,500.00
12,285.00
115,540.00
240,665.00
24,066.50
264,731.50
9,000.00
11,250.00
5,250.00
6,125.00
31,625.00
8,547.00
1,710.00
275.00
8,190.00
18,722.00
Analisa Taksir
90,000.00
56,250.00
6,750.00
7,875.00
160,875.00
340,500.00
13,950.00
21,340.00
4,914.00
450.00
381,154.00
542,029.00
54,202.90
596,231.90
Analisa Taksir
90,000.00
56,250.00
6,750.00
7,875.00
160,875.00
925,000.00
13,950.00
21,340.00
4,914.00
450.00
965,654.00
1,126,529.00
6,500.00
4,062.50
487.50
568.75
11,618.75
86,940.00
86,940.00
98,558.75
9,855.88
108,414.63
30,000.00
75,000.00
9,000.00
10,500.00
124,500.00
83,333.33
125,000.00
26,041.67
300,000.00
100,000.00
925,000.00
1,559,375.00
1,683,875.00
168,387.50
1,852,262.50
70,000.00
43,750.00
5,250.00
6,125.00
125,125.00
302,000.00
17,625.00
9,555.00
2,500.00
331,680.00
456,805.00
45,680.50
502,485.50
Analisa Taksir
70,000.00
43,750.00
5,250.00
6,125.00
125,125.00
110,000.00
17,625.00
9,555.00
2,500.00
139,680.00
264,805.00
26,480.50
291,285.50
60,000.00
10,000.00
70,000.00
-
113,531.25
11,353.13
124,884.38
10,000.00
6,250.00
750.00
875.00
17,875.00
22,932.00
1,650.00
24,582.00
-
42,457.00
4,245.70
46,702.70
10,000.00
6,250.00
750.00
875.00
17,875.00
23,660.00
-
41,645.00
4,164.50
45,809.50
10,000.00
6,250.00
750.00
875.00
17,875.00
119,392.00
110.00
119,502.00
-
137,377.00
13,737.70
151,114.70
5,000.00
6,250.00
750.00
525.00
12,525.00
8,400.00
10.00
8,410.00
-
20,935.00
2,093.50
5,000.00
6,250.00
750.00
525.00
12,525.00
43,750.00
10.00
43,760.00
-
56,285.00
5,628.50
61,913.50
20,000.00
12,500.00
1,500.00
1,750.00
35,750.00
4,565.00
144.00
4,709.00
-
40,459.00
4,045.90
44,504.90
15,000.00
27,500.00
27,500.00
-
54,400.00
5,440.00
59,840.00
40,000.00
25,000.00
3,000.00
350.00
68,350.00
22,500.00
12,000.00
8,736.00
43,236.00
-
111,586.00
11,158.60
122,744.60
14,000.00
8,375.00
1,050.00
1,225.00
24,650.00
90,750.00
-
115,400.00
11,540.00
126,940.00
14,000.00
9,375.00
1,200.00
1,400.00
25,975.00
32,500.00
1,800.00
34,300.00
-
60,275.00
6,027.50
66,302.50
8,400.00
15,625.00
1,950.00
700.00
26,675.00
360,000.00
6,000.00
366,000.00
-
392,675.00
39,267.50
431,942.50
8,400.00
15,625.00
1,950.00
700.00
26,675.00
78,000.00
6,000.00
84,000.00
-
110,675.00
11,067.50
121,742.50
20,000.00
12,500.00
1,500.00
1,750.00
35,750.00
99,000.00
450.00
99,450.00
-
135,200.00
13,520.00
148,720.00
20,000.00
37,500.00
450.00
175.00
58,125.00
120,750.00
26,250.00
450.00
2,500.00
149,950.00
-
208,075.00
20,807.50
228,882.50
20,000.00
12,500.00
1,500.00
1,750.00
35,750.00
123,500.00
3,000.00
126,500.00
-
162,250.00
16,225.00
178,475.00
20,000.00
300,000.00
3,000.00
303,000.00
-
338,750.00
33,875.00
372,625.00
16,600.00
31,250.00
3,750.00
1,400.00
53,000.00
#VALUE!
-
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
40,000.00
25,000.00
3,000.00
3,500.00
71,500.00
-
-
-
71,500.00
7,150.00
78,650.00
12,500.00
31,250.00
3,750.00
1,050.00
48,550.00
#VALUE!
-
-
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
25,000.00
18,750.00
2,250.00
2,275.00
48,275.00
71,500.00
150,000.00
221,500.00
12,500.00
31,250.00
3,750.00
1,050.00
48,550.00
#VALUE!
-
-
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
12,000.00
7,500.00
900.00
1,050.00
21,450.00
61,250.00
3,000.00
64,250.00
-
85,700.00
8,570.00
94,270.00
15,000.00
8,750.00
1,050.00
1,050.00
25,850.00
11,100.00
600.00
11,700.00
-
37,550.00
3,755.00
41,305.00
15,000.00
93,750.00
12,000.00
1,050.00
121,800.00
157,500.00
300.00
157,800.00
-
279,600.00
27,960.00
307,560.00
10,000.00
125,000.00
78,000.00
600.00
78,600.00
-
237,350.00
23,735.00
261,085.00
15,000.00
6,250.00
750.00
1,400.00
23,400.00
12,600.00
12,600.00
-
36,000.00
3,600.00
39,600.00
8,100.00
16,875.00
2,025.00
717.50
27,717.50
37,125.00
-
64,842.50
6,484.25
71,326.75
8,100.00
16,875.00
2,025.00
717.50
27,717.50
104,500.00
33,250.00
137,750.00
-
165,467.50
16,546.75
182,014.25
4,300.00
5,375.00
645.00
367.50
10,687.50
220,000.00
10,000.00
4,800.00
234,800.00
-
245,487.50
42,000.00
52,500.00
6,300.00
3,640.00
104,440.00
252,000.00
9,750.00
261,750.00
-
366,190.00
36,619.00
402,809.00
600,000.00
2,250,000.00
270,000.00
52,500.00
3,172,500.00
5,580,000.00
18,750.00
15,000.00
5,613,750.00
-
8,786,250.00
878,625.00
9,664,875.00
100,000.00
196,000.00
7,500.00
203,500.00
-
732,250.00
73,225.00
805,475.00
80,000.00
300,000.00
36,000.00
7,000.00
423,000.00
117,600.00
4,500.00
122,100.00
-
545,100.00
54,510.00
599,610.00
70,000.00
262,500.00
31,500.00
6,125.00
370,125.00
147,500.00
450.00
7,500.00
-
615,575.00
61,557.50
677,132.50
10,000.00
25,000.00
3,000.00
875.00
38,875.00
63,720.00
1,500.00
65,220.00
-
104,095.00
10,409.50
114,504.50
10,000.00
25,000.00
3,000.00
875.00
38,875.00
649,000.00
750.00
649,750.00
-
688,625.00
68,862.50
757,487.50
100,000.00
375,000.00
45,000.00
8,750.00
528,750.00
313,600.00
7,500.00
321,100.00
-
849,850.00
84,985.00
934,835.00
105,000.00
131,250.00
15,750.00
9,100.00
261,100.00
270,000.00
656,000.00
9,750.00
935,750.00
-
1,196,850.00
119,685.00
1,316,535.00
1,000.00
62,500.00
7,500.00
875.00
125,000.00
125,000.00
-
196,875.00
19,687.50
216,562.50
1,000.00
62,500.00
7,500.00
875.00
71,875.00
125,000.00
125,000.00
-
196,875.00
19,687.50
216,562.50
1,500.00
18,750.00
2,250.00
140.00
22,640.00
20,000.00
20,000.00
-
42,640.00
4,264.00
1,000.00
12,500.00
1,500.00
87.50
15,087.50
17,500.00
17,500.00
-
32,587.50
3,258.75
35,846.25
2,000.00
25,000.00
3,000.00
175.00
30,175.00
50,000.00
50,000.00
-
80,175.00
8,017.50
88,192.50
1,000.00
12,500.00
1,500.00
87.50
15,087.50
35,000.00
35,000.00
-
50,087.50
5,008.75
55,096.25
1,500.00
18,750.00
2,250.00
140.00
22,640.00
#VALUE!
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
1,500.00
18,750.00
2,250.00
140.00
22,640.00
66,000.00
1,250.00
67,250.00
-
89,890.00
1,500.00
18,750.00
2,250.00
140.00
22,640.00
104,500.00
1,250.00
105,750.00
-
128,390.00
12,839.00
141,229.00
1,700.00
21,250.00
2,550.00
157.50
25,657.50
165,000.00
1,750.00
166,750.00
-
192,407.50
19,240.75
211,648.25
#VALUE!
-
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
2,500.00
31,250.00
3,750.00
227.50
37,727.50
1,485,000.00
1,750.00
1,486,750.00
-
1,524,477.50
152,447.75
1,676,925.25
1,500.00
18,750.00
2,250.00
1,400.00
23,900.00
148,500.00
148,500.00
-
172,400.00
17,240.00
189,640.00
15,000.00
525.00
15,525.00
1,000.00
1,000.00
-
16,525.00
1,652.50
18,177.50
15,000.00
525.00
15,525.00
500.00
500.00
-
16,025.00
1,602.50
17,627.50
15,000.00
1,400.00
16,400.00
500.00
500.00
-
16,900.00
1,690.00
18,590.00
7,000.00
1,125.00
900.00
525.00
9,550.00
4,000.00
2,250.00
5,950.00
15,600.00
120.00
600.00
800.00
29,320.00
-
38,870.00
3,887.00
42,757.00
7,000.00
13,125.00
600.00
525.00
4,000.00
2,250.00
5,950.00
21,000.00
120.00
600.00
800.00
34,720.00
-
55,970.00
5,597.00
61,567.00
4,000.00
7,875.00
9,450.00
525.00
21,850.00
21,600.00
21,600.00
-
43,450.00
4,345.00
47,795.00
4,000.00
7,500.00
2,400.00
525.00
14,425.00
9,750.00
-
24,175.00
2,417.50
26,592.50
10,000.00
1,050.00
11,050.00
2,625.00
2,625.00
-
13,675.00
1,367.50
15,042.50
16,000.00
20,000.00
2,400.00
525.00
38,925.00
3,750.00
1,250.00
400.00
3,750.00
-
42,675.00
4,267.50
46,942.50
2,000.00
7,875.00
945.00
525.00
11,345.00
1,500.00
3,500.00
23,400.00
28,400.00
-
39,745.00
3,974.50
43,719.50
25,000.00
31,250.00
3,750.00
227.50
60,227.50
2,000.00
2,000.00
4,800.00
120.00
8,920.00
-
69,147.50
6,914.75
76,062.25
10,500.00
200.00
10,700.00
-
152,200.00
15,220.00
167,420.00
330,000.00
137,500.00
1,500.00
28,000.00
497,000.00
5,980,000.00
358,800.00
6,338,800.00
-
6,835,800.00
683,580.00
7,519,380.00
100,000.00
187,500.00
22,500.00
28,000.00
338,000.00
280,000.00
9,000.00
2,730.00
291,730.00
-
629,730.00
62,973.00
692,703.00
100,000.00
125,000.00
15,000.00
8,750.00
248,750.00
2,960,000.00
9,000.00
2,730.00
891,519.00
2,960,000.00
-
3,208,750.00
320,875.00
3,529,625.00
120,000.00
181,250.00
22,500.00
10,500.00
334,250.00
1,421,000.00
9,000.00
-
1,755,250.00
175,525.00
1,930,775.00
1,000.00
12,500.00
1,500.00
875.00
15,875.00
457,000.00
457,000.00
-
472,875.00
47,287.50
520,162.50
320,000.00
143,750.00
1,650.00
2,800.00
468,200.00
104,550.00
171,000.00
50,232.00
32,760.00
6,105.00
53,350.00
973,760.70
-
1,859,957.70
185,995.77
2,045,953.47
1,000.00
50,000.00
6,000.00
875.00
57,875.00
1,400,000.00
125.00
1,400,125.00
-
1,458,000.00
145,800.00
1,603,800.00
1,000.00
12,500.00
1,500.00
875.00
15,875.00
289,000.00
289,000.00
-
304,875.00
30,487.50
335,362.50
3,600.00
7,500.00
900.00
350.00
12,350.00
9,000.00
3,150.00
12,150.00
-
24,500.00
2,450.00
26,950.00
8,100.00
16,875.00
2,025.00
700.00
27,700.00
33,600.00
11,760.00
45,360.00
-
73,060.00
7,306.00
80,366.00
TM.04.a.1 BM
2,041.25
356.56
2,397.81
5,902.40
5,902.40
8,300.21
830.02
9,130.23
21,703.26
9,495.17
31,198.43
3,143.30
-
414.69
4,680.34
1,054.22
500.00
9,792.55
40,990.98
4,099.10
45,090.08
21,703.26
9,495.17
31,198.43
120,000.00
3,143.30
3,401.84
414.69
4,680.34
1,054.22
500.00
13,194.40
164,392.83
16,439.28
180,832.11
8,100.00
5,125.00
1,400.00
14,625.00
#VALUE!
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
9,400.00
5,875.00
1,575.00
16,850.00
#VALUE!
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
10,500.00
6,625.00
1,925.00
19,050.00
#VALUE!
#VALUE!
-
#VALUE!
#VALUE!
#VALUE!
11,800.00
7,375.00
2,100.00
21,275.00
-
21,275.00
2,127.50
23,402.50
18,900.00
1,187.50
3,325.00
23,412.50
-
23,412.50
2,341.25
25,753.75
25,600.00
16,000.00
4,550.00
46,150.00
-
46,150.00
4,615.00
50,765.00
29,400.00
18,375.00
5,075.00
52,850.00
-
52,850.00
5,285.00
58,135.00
54,400.00
34,000.00
9,450.00
97,850.00
-
97,850.00
9,785.00
107,635.00
66,900.00
41,875.00
11,725.00
120,500.00
80,900.00
50,625.00
14,175.00
145,700.00
-
145,700.00
14,570.00
160,270.00
95,700.00
59,875.00
16,800.00
172,375.00
-
172,375.00
17,237.50
189,612.50
-
291,275.00
29,127.50
320,402.50
169,100.00
105,750.00
29,575.00
304,425.00
-
304,425.00
30,442.50
334,867.50
189,500.00
118,500.00
33,250.00
341,250.00
-
341,250.00
34,125.00
375,375.00
209,900.00
131,250.00
36,750.00
377,900.00
-
377,900.00
37,790.00
415,690.00
230,300.00
144,000.00
40,250.00
414,550.00
-
414,550.00
41,455.00
3,500.00
2,125.00
525.00
6,150.00
-
6,150.00
615.00
6,765.00
4,000.00
2,500.00
700.00
7,200.00
-
7,200.00
720.00
7,920.00
4,500.00
2,875.00
875.00
-
8,250.00
825.00
9,075.00
6,200.00
3,875.00
1,050.00
11,125.00
-
11,125.00
1,112.50
12,237.50
10,200.00
6,375.00
1,750.00
18,325.00
-
18,325.00
1,832.50
20,157.50
13,300.00
8,375.00
2,275.00
23,950.00
-
23,950.00
2,395.00
26,345.00
17,000.00
10,625.00
2,975.00
30,600.00
-
30,600.00
3,060.00
33,660.00
29,000.00
18,125.00
5,075.00
52,200.00
-
52,200.00
5,220.00
57,420.00
35,900.00
22,500.00
6,300.00
64,700.00
-
64,700.00
6,470.00
71,170.00
43,300.00
27,000.00
7,525.00
77,825.00
-
77,825.00
7,782.50
85,607.50
51,200.00
32,000.00
8,925.00
92,125.00
-
92,125.00
9,212.50
101,337.50
89,300.00
55,750.00
15,575.00
160,625.00
-
160,625.00
135,300.00
84,625.00
23,625.00
243,550.00
-
243,550.00
24,355.00
267,905.00
165,900.00
103,750.00
29,050.00
298,700.00
-
298,700.00
29,870.00
328,570.00
181,800.00
113,625.00
-
327,275.00
32,727.50
360,002.50
237,000.00
148,125.00
41,475.00
426,600.00
-
426,600.00
42,660.00
469,260.00
34,500.00
21,500.00
5,950.00
61,950.00
-
61,950.00
6,195.00
68,145.00
40,000.00
25,000.00
7,000.00
72,000.00
-
72,000.00
7,200.00
79,200.00
44,800.00
28,000.00
7,875.00
80,675.00
-
80,675.00
8,067.50
88,742.50
50,600.00
31,625.00
8,925.00
91,150.00
-
91,150.00
9,115.00
100,265.00
79,600.00
49,750.00
14,000.00
143,350.00
-
143,350.00
14,335.00
157,685.00
94,900.00
59,375.00
16,625.00
170,900.00
-
170,900.00
17,090.00
187,990.00
95,800.00
59,875.00
16,800.00
172,475.00
-
172,475.00
17,247.50
189,722.50
121,200.00
75,750.00
21,175.00
218,125.00
135,300.00
84,500.00
23,625.00
243,425.00
-
243,425.00
24,342.50
267,767.50
146,900.00
91,875.00
25,725.00
264,500.00
-
264,500.00
26,450.00
290,950.00
132,700.00
-
238,975.00
23,897.50
262,872.50
232,700.00
20,375.00
40,775.00
293,850.00
-
293,850.00
29,385.00
323,235.00
262,300.00
164,000.00
45,850.00
472,150.00
-
472,150.00
47,215.00
519,365.00
291,100.00
182,000.00
50,925.00
524,025.00
-
524,025.00
52,402.50
576,427.50
320,000.00
200,000.00
56,000.00
576,000.00
-
576,000.00
57,600.00
633,600.00
348,800.00
218,000.00
61,075.00
627,875.00
-
627,875.00
62,787.50
690,662.50
48,900.00
12,250.00
8,575.00
69,725.00
-
69,725.00
6,972.50
76,697.50
54,700.00
13,625.00
9,625.00
77,950.00
-
77,950.00
7,795.00
85,745.00
61,300.00
15,000.00
10,675.00
86,975.00
-
86,975.00
8,697.50
95,672.50
85,500.00
21,375.00
14,875.00
121,750.00
95,100.00
23,750.00
16,625.00
135,475.00
-
135,475.00
13,547.50
149,022.50
97,300.00
24,375.00
16,975.00
138,650.00
-
138,650.00
13,865.00
152,515.00
-
-
-
225,675.00
22,567.50
248,242.50
181,300.00
45,375.00
-
31,675.00
258,350.00
-
-
-
258,350.00
25,835.00
284,185.00
204,700.00
51,125.00
-
-
-
-
291,700.00
29,170.00
320,870.00
201,100.00
50,250.00
-
35,175.00
286,525.00
-
-
-
286,525.00
28,652.50
315,177.50
385,900.00
96,500.00
-
67,550.00
549,950.00
-
-
-
549,950.00
54,995.00
604,945.00
499,500.00
124,875.00
-
87,325.00
711,700.00
-
-
-
711,700.00
71,170.00
782,870.00
593,100.00
148,250.00
-
121,275.00
862,625.00
-
-
-
862,625.00
86,262.50
948,887.50
694,900.00
173,750.00
-
121,625.00
990,275.00
-
-
-
990,275.00
99,027.50
1,089,302.50
805,600.00
201,375.00
-
141,050.00
1,148,025.00
-
-
-
1,148,025.00
114,802.50
1,262,827.50
49,900.00
12,500.00
8,750.00
71,150.00
-
71,150.00
7,115.00
78,265.00
57,900.00
14,500.00
10,150.00
82,550.00
-
82,550.00
8,255.00
90,805.00
64,800.00
16,250.00
11,375.00
92,425.00
-
92,425.00
9,242.50
101,667.50
70,800.00
17,750.00
12,425.00
100,975.00
-
100,975.00
10,097.50
111,072.50
111,300.00
27,875.00
19,425.00
158,600.00
-
158,600.00
15,860.00
174,460.00
132,500.00
33,125.00
23,275.00
188,900.00
-
188,900.00
18,890.00
207,790.00
141,500.00
35,375.00
24,675.00
201,550.00
-
201,550.00
236,600.00
59,125.00
41,475.00
337,200.00
-
-
-
337,200.00
33,720.00
370,920.00
223,100.00
55,750.00
39,025.00
317,875.00
-
-
-
317,875.00
31,787.50
349,662.50
-
-
-
346,475.00
34,647.50
381,122.50
220,800.00
55,250.00
38,675.00
314,725.00
-
-
-
314,725.00
31,472.50
346,197.50
389,700.00
97,375.00
68,250.00
555,325.00
-
-
-
555,325.00
55,532.50
610,857.50
440,300.00
10,125.00
77,000.00
527,425.00
-
-
-
527,425.00
52,742.50
580,167.50
489,500.00
122,375.00
85,575.00
697,450.00
-
697,450.00
69,745.00
767,195.00
538,700.00
134,625.00
94,325.00
767,650.00
-
-
-
767,650.00
76,765.00
844,415.00
589,700.00
147,000.00
102,900.00
839,600.00
-
-
-
839,600.00
83,960.00
800.00
140.00
940.00
-
-
-
-
940.00
94.00
1,034.00
800.00
140.00
940.00
-
-
-
-
940.00
94.00
1,034.00
A B C
D BAHAN KACA
1 Kaca Polos 3 mm m2
2 Kaca Polos 5 mm m2
3 Tebal 8 mm m2
3 Kaca Rayban 5 mm m2
4 Kaca Es 5 mm m2
5 Cermin tebal 6 mm m2
6 Kaca tempered 8 mm m2
7 Kaca tempered 10 mm m2
8 Kaca Patri 3mm m2
A B C
E BAHAN FINISHING/CAT
1 Cat tembok interior ex. Catylac kg
2 Cat tembok Interior ex. ICI Dulux kg
3 Cat tembok exterior weather coat ex. Mowilex kg
4 Alkali resisting primer (cat dasar) kg
5 Cat kayu ex. Seiv kg
6 Cat besi ex. Seiv kg
7 Minyak cat Thinner lt
8 Residu/Solignum kg
9 Dempul kayu cap kucing kg
10 Meni kayu/besi kg
11 Plamuur tembok lt
12 Pelumas bekisting lt
13 Pelitur lt
14 Vernis lt
G ALAT-ALAT LISTRIK
1 Instalasi Penerangan ttk
2 Instalasi Stop Kontak ttk
###
3 Saklar tunggal ttk
###
4 Saklar ganda ttk
###
5 Stop kontak ttk
6 Kabel NYY 3x4 mm2 m1
H PENUTUP ATAP
1 Genteng Metal roof m2
2 Nok / bubungan metal roof m'
1 Konstruksi kuda-kuda & rangka atap baja ringan lkp. Assesories m2
2 Genteng Metal setara Onduvilla m2
3 Nok Onduvilla uk. 100x50 cm m'
A B C
4 Screw 65 mm bh
5 Roofmesh m2
6 Glasswool m2
7 Aluminium foile single side m2
8 List Plank GRC lebar 20 cm m'
9 Genteng Bubung Morando glazuur bh
10 Talang Datar m'
11 Genteng Palentong bh
12 Genteng bubung jatiwangi bh
13 Genteng Beton bh
14 Nok Genteng Beton m
15 Nok Genteng Metal m
16 Atap Polycarbonate tbl. 5 mm m2
17 Atap Metal Sheet Zinc alume 0,4 mm m2
18 Atap Polycarbonate tbl. 6 mm m2
19 Asbes gelombang 2,4x1m lbr
20 Genteng aspal bh
K LAIN-LAIN
1 Ampelas lb
2 Kwas 1,2 - 3" bh
3 Rol cat bh
4 Lem kayu Fox kg
5 Minyak Bekisting ltr
6 Kawat duri m'
7 PVC Waterstop wsh 150 mm m'
8 PVC Waterstop wsh 200 mm m'
A B C
833.3333333333
GA BAHAN
HARGA SATUAN
Rp. 200,000.00
Rp. 225,000.00
Rp. 150,000.00
Rp. 105,000.00
Rp. 125,000.00
Rp. 185,000.00
Rp. 225,000.00 1,575,000.0000
Rp. 850.00
Rp. 1,500.00
Rp. 11,000.00
Rp. 5,900,000.00
Rp. 9,400,000.00
Rp. 8,900,000.00
Rp. 4,900,000.00
Rp. 4,650,000.00
Rp. 1,750,000.00
Rp. 1,500,000.00
Rp. 1,500,000.00
Rp. 25,000.00
Rp. 10,500.00
Rp. 4,000.00
Rp. 2,000.00
Rp. 993,000.00
Rp. 82,500.00
Rp. 50,500.00
Rp. 73,500.00
Rp. 825,000.00
Rp. 85,000.00
Rp. 22,000.00
Rp. 25,000.00
Rp. 3,500.00
Rp. 15,000.00
Rp. 10,000.00
Rp. 7,800.00
Rp. 750,000.00
Rp. 1,262.50
D
Rp. 9,800.00
Rp. 13,500.00
Rp. 18,000.00
Rp. 14,000.00
Rp. 15,000.00
Rp. 10,000.00
Rp. 8,000.00
Rp. 169,000.00
Rp. 242,000.00
Rp. 332,000.00
Rp. 455,000.00
Rp. 575,000.00
Rp. 750,000.00
Rp. 908,000.00
Rp. 1,313,000.00
Rp. 25,000.00
Rp. 87,500.00
Rp. 37,000.00
Rp. 25,000.00
Rp. 200,000.00
Rp. 200,000.00
Rp. 175,000.00
Rp. 27,100.00
Rp. 129,411.76
Rp. 85,000.00
Rp. 75,000.00
Rp. 93,600.00
Rp. 102,000.00
Rp. 350,000.00
Rp. 40,000.00
Rp. 102,000.00
Rp. 250,000.00
Rp. 200,000.00
Rp. 45,000.00
Rp. 100,000.00
Rp. 155,000.00
Rp. 170,000.00
Rp. 215,000.00
Rp. 5,620.00
Rp. 94,000.00
D
Rp. 25,000.00
Rp. 30,000.00
Rp. 35,000.00
Rp. 168,000.00
Rp. 60,000.00
Rp. 95,000.00
Rp. 135,000.00
Rp. 3,240,000.00
Rp. 4,290,000.00
Rp. 4,540,000.00
Rp. 3,170,000.00
Rp. 280,000.00
Rp. 3,870,000.00
Rp. 1,195,000.00
Rp. 4,800,000.00
Rp. 1,823,000.00
Rp. 2,250,000.00
Rp. 4,065,000.00
Rp. 3,560,000.00
Rp. 3,670,000.00
Rp. 397,000.00
Rp. 743,000.00
Rp. 1,490,000.00
Rp. 765,000.00
Rp. 1,560,000.00
Rp. 289,000.00
Rp. 389,000.00
Rp. 371,000.00
Rp. 289,000.00
Rp. 404,000.00
Rp. 750,000.00
Rp. 950,000.00 95000 7916.6667
Rp. 300,000.00 0.8916666667
Rp. 15,000.00
Rp. 60,000.00
Rp. 95,000.00
Rp. 150,000.00
Rp. 105,000.00
Rp. 95,000.00
Rp. 135,000.00
Rp. 450,000.00
Rp. 650,000.00
Rp. 2,000,000.00
D
Rp. 21,000.00
Rp. 90,000.00
Rp. 85,000.00
Rp. 35,000.00
Rp. 49,500.00
Rp. 49,500.00
Rp. 20,000.00
Rp. 7,500.00
Rp. 25,000.00
Rp. 20,000.00
Rp. 15,000.00
Rp. 15,000.00
Rp. 65,000.00
Rp. 25,000.00
Rp. 85,000.00
Rp. 125,000.00
Rp. 450,000.00
Rp. 150,000.00
Rp. 50,000.00
Rp. 125,000.00
Rp. 20,000.00
Rp. 17,500.00
Rp. 85,000.00
Rp. 25,000.00
Rp. 75,000.00
Rp. 50,000.00
Rp. 35,000.00
Rp. 200,000.00
Rp. 210,000.00
Rp. 30,000.00
Rp. 35,000.00
Rp. 35,000.00
Rp. 20,000.00
Rp. 1,100.00
Rp. 15,000.00
Rp. 21,000.00
Rp. 12,000.00
Rp. 25,000.00
Rp. 7,500.00
Rp. 95,000.00
Rp. 1,100.00
Rp. 4,500.00
Rp. 9,000.00
Rp. 75,000.00
Rp. 57,200.00
Rp. 125,000.00
Rp. 150,000.00
Rp. 150,000.00
Rp. 65,000.00
Rp. 17,500.00
Rp. 55,000.00
Rp. 65,000.00
Rp. 45,000.00
Rp. 55,000.00
Rp. 75,000.00
Rp. 110,000.00
Rp. 165,000.00
Rp. 90,000.00
Rp. 65,000.00
Rp. 75,000.00
Rp. 63,000.00
Rp. 10,000.00
Rp. 8,000.00
Rp. 100,000.00
Rp. 20,000.00
Rp. 4,000.00
Rp. 12,000.00
Rp. 25,000.00
Rp. 15,000.00
Rp. 35,000.00
Rp. 28,750.00
Rp. 58,500.00
Rp. 76,700.00
D
Rp. 88,400.00
Rp. 98,800.00
Rp. 144,300.00
Rp. 8,000.00
Rp. 25,000.00
Rp. 1,000.00
Rp. 50,000.00
Rp. 20,000.00
Rp. 10,000.00
Rp. 60,000.00
Rp. 690,000.00
Rp. 720,000.00
Rp. 740,000.00
Rp. 760,000.00
Rp. 780,000.00
Rp. 800,000.00
Rp. 820,000.00
Rp. 840,000.00
Rp. 860,000.00
Rp. 880,000.00
Rp. 920,000.00
Rp. 960,000.00
Rp. 1,000,000.00
SEGMEN SPESIFIKASI PANJANG LEBAR/D TINGGI JUMLAH
A. Persiapan pembersihan lahan
bouplank 1m dari pondasi 60.1
Kolom 2.8 6
3 12
1 12
2.8 5
2.5 2
TOTAL
kolom 2.8 6
3 12
1 12
2.8 5
2.5 2
TOTAL
TOTAL
pembesian sloof
kolom
ring balk
plat duiker
TOTAL
rooster
pembesian lantai
dinding
tutup
TOTAL
0.93735 7.4988
2.577713
2.577713
7.4988
1.546628
15.60688
5.6241
1.546628
14.06025
0.14 0.28
0.28
0.385
0.28
0.385
0.28
0.385
0.385
1.68
1.68
19.0485
0.482625
84.08863
84.08863
3.6979
7.8687
31
41.52203
2.6229
1.075
0.942
0.41565
0.741
2.30175
0.4845
0.4845
0.8595
1.134375
0.3021
0.1125
0.08823
0.61677
0.0918
12.27258
7.8687
0.4 24.98
0.14 6.02
31
0 0.812
0 0.84
0 0.812
3.4 3.88
5.4875 1.0925
2.2 5.08
0.2 8.35
3.2 5.35
0 3.92
2.2 6.35
0 7.8
0 1.7
2.36 6.19
2.16 6.39
0 3.92
2.2 6.35
0 7.8
0 1.7
2.2 6.35
0 3.92
2.2 6.35
0 3.12
0 1.7
2.2 6.35
0 3.92
2.2 6.35
0 9.36
0 1.7
2.2 6.35
2.2 6.35
0 4.2
0 2.85
5.2875 1.7625
2.2 5.6
0.28 3.47
1.64 2.11
0.12 3.63
163.779
0 2.156
0.08 2.44
0 2.114
3.32 1.02
0 2.156
7.6875 7.0125
5.16 44.0775
6.4 28.48
4.32 30.56
4.32 14.88
6.6 21.72
0 22.6
5.4875 11.5975
7.6875 8.6325
0 18.4
0 10.65
0 3.85
2.2 7.0125
11.6 35.92
10.2 39.0375
2.04 11.475
7.6875 12.95
338.741
0.03 0.504
0.1845
0.3645
0.3645
0.4545
0.054
0.234
0.093
0.255
0.33
0.09
0.186
3.114
0.0225 0.378
0.81
0.27
0.315
0.1125
1.8855
0.03 0.489
0.156
0.2445
0.4455
0.18
0.4455
0.09
0.108
0.0121 0.033638
0.05566
0.05687
0.77924
0.041261
0.076714
0.031944
0.035816
3.269643
1.74096
0.489
0.18
0.225
0.198
2.83296
6.72
2.46
4.86
4.86
6.06
0.72
1.04
1.24
0.34
1.1
0.6
2.48
32.48
0.6 10.08
21.6
7.2
8.4
3
50.28
0.4 6.52
2.08
3.26
5.94
2.4
5.94
1.2
1.44
0.22 0.6116
1.012
1.034
14.168
0.7502
1.3948
0.5808
0.6512
48.9826
1.3 20.956
0.18 0.36
0.7 5.705
0.06 0.12
0.225 0.45
0.3 0.3
6.75 6.75
34.641
2.78 2.78
4.6 4.6
2.35 2.35
6.44 6.44
3.41 3.41
6.34 6.34
2.64 2.64
2.96 2.96
31.52
2 187.621
187.621
17.15
2 34.3
2.4128
2 20
2.16 6.4
3.2 9.8
2.16 8.4
1.6
1.6
0.69
1.38
0.28 0.28
12.96
13.44
5.2875 6.75
1.64
0.04
7.41
10.27
16.8
15.15
2.75
12.243
2.82
67.443
67.443
10.9
7.41
1.2
15.6
13.60272
6.8
46.035
0.1575 7.5675
7.8375
7.8375
7.0125
56.2836 56.2836
5.499
158.4753
16 0.456
3.546 9.43236
0.207
4.14 5.08536
4.347
0.207
0.828
0.3
0.27
0.414
0.57
9.84
7
16.84
2.54
2.62
2.62
2.543
6.126
2.34
18.789
1.7671459 2.827433
1.7671459 0.088357
1.7671459 0.088357
44.4928
115.4032
14.8599
0.7821
0.28 9.2114
31.284
saluran md 16.12 0.9 0.85
saluran bui 30 0.54 0.34
30 0.24 0.1
Bekisting
Bekesting sloof
Bekesting kolom
Bekesting Ring Balk
Bekesting Plat Duiker
Pembesian
12.3318
5.508
0.72
0.7254