No Location Specific Location Inspection Date Inspection Time Weather Inspector


1 R3 Near PH / Marancar (Power House) STA : (1°31´0´´,99°8´14´´) 02/01/2019 10.49 - 11.10 Sunny M.Jufri Pratama
2 Bridge 6/ Marancar (Power House) STA : (1°30´56´´,99°7´55´´) 02/01/2019 11.19 - 11.39 Sunny M.Jufri Pratama
3 R3 (K13+600) / Marancar (Power House) STA : (1°31´21´´,99°8´33´´) 02/01/2019 14.09 - 14.18 Sunny M.Jufri Pratama
4 R3 (Near SB 9)/ Marancar (Power House) STA : (1°32´27´´,99°8´22´´) 02/01/2019 14.20 - 14.40 Sunny M.Jufri Pratama
5 SB 10/ Marancar (Power House) STA : (1°31'21'',99°8'24'') 02/01/2019 14.43 - 15.05 Sunny M.Jufri Pratama

PREPARED CHECKED APPROVED

SIGNATURE

Name Josua FM Perdinan Tarigan /Co - PM Lin Yi-Chuan


INSPECTORS QC DAILY REPORT
Name of Inspector: #REF!
Name of SH Site Engineer
Location: R10 / Marancar (Power House)
Specific Location STA : . . . (1°31'6'', 99°8'20'')
Date: #REF!
Time: 10.29 - 11.00
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Design Drawing x x x
Opencut Excavation v Construction Sequences x x x
Method Statement v x x
Design Calculation x x x
Design Drawing x x x
Drainage x
Construction Sequences x x x
Method Statement x x x
Design Calculation x x x
Design Drawing x x x
Slope Protection x
Construction Sequences x x x
Method Statement x x x

PICTURES
Actifity
Repair road

FINDINGS/ IMPORTANT NOTES


No Design Drawing

Reported
Name #REF!
Date #REF!
Time 10.29
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: #REF!
Name of SH Site Engineer -
Location: Spoil Bank 9 /Marancar (Power House)
Specific Location STA : . . . (1°32´46´´,99°8´40´´)
Date: #REF!
Time: 10.55 - 11.10
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Design Drawing x x x
Top Soil Excavation x Construction Sequences x x x
Method Statement x x x
Design Calculation x x x
Design Drawing x x x
Drainage x
Construction Sequences x x x
Method Statement X x x

PICTURES
No activity

FINDINGS/ IMPORTANT NOTES


No Method Statement/ No Design Drawing

Reported
Name #REF!
Date #REF!
Time 10.55
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: #REF!
Name of SH Site Engineer -
Location: R19 /Marancar (Power House)
Specific Location STA: (1°31´16´´,99°8´46´´)
Date: 27 Dec 2018
Time: 14.12 - 14.17
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Opencut Excavation x Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Drainage x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x
Slope Protection x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x

PICTURES
No Activity

FINDINGS/ IMPORTANT NOTES


No Design Drawing/No Construction Sequences

Reported
Name #REF!
Date 27 Dec 2018
Time 14.12
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: #REF!
Name of SH Site Engineer -
Location: R10 /Marancar (Power House)
Specific Location STA: …..(1°31´7´´,99°8´21´´ 236 , 3 m)
Date: 19 Dec 2018
Time: 13.38 - 13.50
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Opencut Excavation v Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Drainage x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x
Slope Protection x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x

PICTURES
Excavation Road

FINDINGS/ IMPORTANT NOTES


No Slope Protection/ No Design Drawing/No contruction sequences

Reported
Name #REF!
Date 19 Dec 2018
Time 13.38
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: Rahmat Hidayat, Sariadi
Name of SH Site Engineer -
Location: R4 /Marancar (Power House)
Specific Location STA: K 13 + 600 (1°32´37´´,99°8´28´´ 298 , 8 m )
Date: 19 Dec 2018
Time:
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Opencut Excavation x Design Drawing x x x
Construction Sequen x x x
Method Statement x x
Drainage x Design Calculation x x x
Design Drawing x x x
Construction Sequen x x x
Method Statement x x x
Slope Protection x Design Calculation x x x
Design Drawing x x x
Construction Sequen x x x
Method Statement x x x

PICTURES
Nothing Activity

FINDINGS/ IMPORTANT NOTES


No Slope Protection/ No Design Drawing/No contruction sequences

Reported
Name Rahmat Hidayat, Sariadi
Date 19 Dec 2018
Time
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: Akin Lubis, Sariadi, Paulus Saragih
Name of SH Site Engineer -
Location: R17 /Marancar (Power House)
Specific Location STA: (1°31´7´´,99°8´21´´)
Date: 27 Dec 2018
Time: 11.24 - 11.33
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Opencut Excavation x Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Drainage x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x
Slope Protection x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x

PICTURES
No Activities

FINDINGS/ IMPORTANT NOTES


No Design Drawing / No Contruction Sequences/ No Drainage

Reported
Name Akin Lubis, Sariadi, Paulus Saragih
Date 27 Dec 2018
Time 11.25
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: #REF!
Name of SH Site Engineer -
Location: R4 /Marancar (Power House)
Specific Location STA: (1°30´57´´,99°7´56´´ & 1°30´55´´,99°7´53´´)
Date: #REF!
Time:
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Opencut Excavation v Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Drainage x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x
Slope Protection x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x

PICTURES
Exacavation

FINDINGS/ IMPORTANT NOTES


No Design Drawing/ No Construction Sequence/ No slope protection

Reported
Name #REF!
Date #REF!
Time
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: Nanda Rf Nst, Rahmad, Akin Lubis
Name of SH Site Engineer
Location: SB-11/Marancar (Power House)
Specific Location STA: (1°30'58'',99°8'14'')
Date: 25 Oct 2018
Time: 10.10-10.15
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Opencut Excavation x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Drainage x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Slope Protection x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Disposal Material v Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
PICTURES
Dumping Soil from excavation R17 and Land Levelling

FINDINGS/ IMPORTANT NOTES

Reported
Name M.Jufri Pratama, M.Affandi, Sariadi
Date 24 Oct 2018
Time 10.14
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: Nanda Rf Nst, Rahmad, Akin Lubis
Name of SH Site Engineer Mr. Chuen
Location: Pioneer Road R3/Marancar (Power House)
Specific Location STA: (1°33'8'',99°8'58'')
Date: 25 Oct 2018
Time: 10.43-10.55
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Opencut Excavation v Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Drainage x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Slope Protection x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Disposal Material x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x

PICTURES

FINDINGS/ IMPORTANT NOTES


No Pipe Drainage

Reported
Name Nanda Rf Nst, Rahmad, Akin Lubis
Date 25 Oct 2018
Time 10.43/10.55
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: Akin Maulana , Nanda RF Nst , Sahala Ronitua
Name of SH Site Engineer Peng Yong
Location: R3 Pioneer/Marancar (Power House)
Specific Location STA:……………….. (1°33'3'',99°8'55''330.1 m)
Date: 31 Oct 2018
Time: 10.43-10.46
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Opencut Excavation v Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Drainage x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x
Slope Protection x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x

PICTURES
Actifity
Pioneer R3

FINDINGS/ IMPORTANT NOTES


The excavation of the soil is discharged down

Reported
Name Akin Maulana , Nanda RF Nst , Sahala Ronitua
Date 31 Oct 2018
Time 10.45
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: Akin Lubis, Sahala Ronitua, Nanda R.F Nst
Name of SH Site Engineer -
Location: SB-10 /Marancar (Power House)
Specific Location STA: (1°32'45'',99°8'40'')
Date: 5 Nov 2018
Time:
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Top Soil Excavation x Design Drawing x x x
Construction Sequences x x x
Method Statement x x x
Drainage x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement X x x

PICTURES
No Actifity

FINDINGS/ IMPORTANT NOTES


No Stacking Top Soil / No Drainage

Reported
Name Akin Lubis, Sahala Ronitua, Nanda R.F Nst
Date 5 Nov 2018
Time
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: Sariadi , Muhammad Jufri , Rahmad Hidayat
Name of SH Site Engineer Peng Yong
Location: R3 Near Camp F /Marancar (Power House)
Specific Location STA:……………….. (1°31'29'',99°8'30'')
Date: 29 Oct 2018
Time: 14.36-14.38
Weather: Rainy

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Opencut Excavation x Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Drainage x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x
Slope Protection x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement x x x

PICTURES
Actifity
-

FINDINGS/ IMPORTANT NOTES


Collapse Potencial/Not Protection Slope.

Reported
Name Sariadi , Muhammad Jufri , Rahmad Hidayat
Date 29 Oct 2018
Time 14.36
Signiture
INSPECTORS QC DAILY REPORT
Name of Inspector: Sariadi, M.Jufri Pratama, M.Affandi
Name of SH Site Engineer Mr. Liu
Location: Acces Road R5 /Marancar (Power House)
Specific Location STA:................. (1°29'14'',99°5'55'')
Date: 21 Oct 2018
Time: 14.48 - 15.10
Weather: Sunny

Activity Documents Compliance


Type of work required Yes No EE Inspector SH Site Engineer Yes No
Opencut Excavation v Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Drainage x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
Slope Protection x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x
DISPOSAL MATERIAL x Design Calculation x x x
Design Drawing x x x
Construction Sequences x x x
Method Statement v x x

PICTURES

FINDINGS/ IMPORTANT NOTES


Not Drainage / No Slopping Protetion/ Landslide potential

Reported
Name Sariadi, M.Jufri Pratama, M.Affandi
Date 21 Oct 2018
Time 14.31