ITAIPU
re BINACIONAL
Itaipu Hidroelectric Development
The Project of the Century
ASESORIA DE COMUNICACION SOCIAL ? 0 0 0
DIRECCION GENERAL PARAGUAY2 THE PROJECT OF THE CENTURY 4” “Os.
Index
Statical Summary ..
General Features of the Itaipu Project....
Baekground
The ITAIPU Treaty ond creation of ITAIPU Binacional
The Parana river basin and the geology of the region
Reservoir
Navigation
Principal companies that took part in the conservation of the Project
Physical Description of the Project
Location
General layout of the Project
Diversion Channel and Diversion Structure
Main Dam
Right Bank Lateral Dam
Earthfill Dams:
Rockfill Dam
Spillway
Water Intakes and Penstocks
Powerhouse and Assembly Areas
Operation Building
Instrumentation and seismology
Construction
Expropriations and settlements
Physical and social infrastructure
Construction planning
Construction equipment
River diversion works
Dam works
Diversion closure and Reservoir filling
Coenerete production and casting
Permanent Equipment ...
Justires and Generators
Tr=somersge
ME We THE PROJECT OF THE CENTURY 3
Ausdlary services
Electrical
Mechanical
Gas insulated Substation - SFG
Distmibution of electric Power
Fight bank Substation
Transmission System ...
The Manintenance of Itaipu
Financial Summary .
Operation of the Itaipu Hydroelectric Complex .......
General aspects
Coordination of the interconnected operation
‘Supervision and control
Marketing the Power From It
The Treaty and terms for Power supply
Administration and operation of agreements
Bookkeeping and billing
Energy delivered to Paraguay and Brazil
Evolution of power demand billed to Entities,
Benefits and Ecological Issues ...
The changes produced by the Reservoir
Environmental Projects
Landscaping
Comparative Graphics...
Mejor hydroelectric plants of the world
installed capacity vs. annual energy production
Concrete volume
Major hydrogenerators of the world
Output in MVA
Comparisons and Other Information .