You are on page 1of 28

SGO WP2 CONCENTRATOR PROJECT

PROGRAMA TRISEMANAL
DATA DATE:
October 26, 2018
PROGRESS PHYSICAL
Planificación 3 Semanas
CAST IN PLACE SEM 1 SEM 2 SEM 3
Hor
periodo Act Programadas 102 HOR Prog. 02-11 20,932 4,028 566 2,160
(m3)
RESUMEN DE AVANCE si Act Cumplidas 0 HOR Real 16-10 14,135
Fierro
(Kg)
172,048 178,385 178,385
% 0%
10,902
MTO WEEK 0 WEEK 1 WEEK 2 WEEK 3
LEAN MOLDAJ
Trisemanal anterior CUMPLIMIENTO FORECAST PRECAST REBAR INSERTS HORMIGÓN
CONC. E Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi

10-Nov

12-Nov
13-Nov
14-Nov
15-Nov
16-Nov
11-Nov
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct

27-Oct
28-Oct
29-Oct
30-Oct
31-Oct
1-Nov
2-Nov

3-Nov
4-Nov
5-Nov
6-Nov
7-Nov
8-Nov
9-Nov
QTY

QTY

QTY

QTY
ID ACTIVITIES IWP START FINISH DUR Progr SI/NO START FINISH DUR M3 M3 M2 Kg kg M3 RESTRICCIONES RESPONSABLES

PLANNED ACTIVITIES 31/Jul/18 19/Feb/19 204 31/Jul/18 19/Feb/19 204 2,734 1,044 6,938 3,320,864 44,448 29,959

2280 - Coarse Ore Reclaim 31/Jul/18 12/Jan/19 166 31/Jul/18 12/Jan/19 166 2,734 73 2,205 467,618 5,235 3,262

C Construction 31/Jul/18 12/Jan/19 166 31/Jul/18 12/Jan/19 166 2,734 73 2,205 467,618 5,235 3,262
00 Civil 14/Oct/18 21/Dec/18 14/Oct/18 21/Dec/18 0 0 0 0 0 0
Civil & Eatthwork-Emergency Tunnel- Preparación de la base (incluye limpieza con picoton) BESALCO 2140-36-00-001 14/Oct/18 19/Oct/18 6 si 14/Oct/18 19/Oct/18 6 0 0 0 0
Civil & Eatthwork-Emergency Tunnel- Relleno de base para Tunel Corrugado 20/Oct/18 27/Oct/18 8 si 20/Oct/18 27/Oct/18 8 0.13 0.13 0.13 0.13 0.13 0.13 0.13 1 0.13 0 0 0 Depende de construcción cámara de salida del Tunel de Emergecia. Construccion
Civil & Eatthwork-Emergency Tunnel- Install Emergency Tunnel (Corrugated) 2140-36-00-002 31/Oct/18 24/Nov/18 25 31/Oct/18 24/Nov/18 25 0 0.04 0.04 0.04 0 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0 Se requiere Camión Pluma, Retroexcavadora, Tolva, Rodillo Compactador Depto. Maquinaría
Civil & Eatthwork-Emergency Tunnel- Install Exit Tunnel (Corrugated) 2140-36-00-002 16/Nov/18 10/Dec/18 25 16/Nov/18 10/Dec/18 25 0 0 0 0.04 0
10 Concrete 31/Jul/18 12/Jan/19 166 31/Jul/18 12/Jan/19 166 2,734 73 2,205 467,618 5,235 3,262
Reclaim Tunnel 1/Aug/18 15/Nov/18 107 1/Aug/18 15/Nov/18 107 0 51 1,241 198,325 1,393 2,125
Concrete - Construct Reclaim Tunnel - Chamber Emergency Tunnel Lean Concrete 2140-04-10-008 13/Oct/18 14/Oct/18 2 si 13/Oct/18 14/Oct/18 2 2 0 0 0 0
Concrete - Construct Reclaim Tunnel - Chamber Emergency Tunnel - Foundation - Rebar Installation 2140-04-10-008 17/Oct/18 20/Oct/18 4 si 17/Oct/18 20/Oct/18 4 4,760 ### 1,190 0 0 0
Concrete - Construct Reclaim Tunnel - Chamber Emergency Tunnel - Foundation- Formwork Installation 2140-04-10-008 19/Oct/18 20/Oct/18 2 si 19/Oct/18 20/Oct/18 2 239 120 120 0 0 0
Concrete - Construct Reclaim Tunnel - Chamber Emergency Tunnel - Foundation - Concrete 2140-04-10-008 21/Oct/18 21/Oct/18 1 si 21/Oct/18 21/Oct/18 1 34 34 34 0 0 0
Concrete - Construct Reclaim Tunnel - Chamber Emergency Tunnel - Walls - Rebar 2140-04-10-012 22/Oct/18 29/Oct/18 8 si 22/Oct/18 29/Oct/18 8 7,141 893 893 893 893 893 4,463 893 893 893 2,678 0 0
Concrete - Construct Reclaim Tunnel - Chamber Emergency Tunnel - Walls- Formwork 2140-04-10-012 24/Oct/18 29/Oct/18 6 si 24/Oct/18 29/Oct/18 6 239 40 40 40 120 40 40 40 120 0 0
Concrete - Construct Reclaim Tunnel - Chamber Emergency Tunnel - Walls- Concrete 2140-04-10-012 30/Oct/18 30/Oct/18 1 30/Oct/18 30/Oct/18 1 23 0 ### 23 0 0
Concrete - Construct Reclaim Tunnel - West Wall Rebar 2140-04-10-009 30/Oct/18 13/Nov/18 15 30/Oct/18 13/Nov/18 15 17,348 0 ### ### ### ### 4,626 ### ### ### ### ### ### ### 8,096 ### ### ### ### 4,626 Pendiente de Ingenieria Ingenieria
Concrete - Construct Reclaim Tunnel - West Wall Inserts 2140-04-10-009 3/Nov/18 12/Nov/18 10 3/Nov/18 12/Nov/18 10 1 0 0 0.1 0.1 0.1 0.10 0.10 0.10 0.10 1 0.1 0.1 0.1 0
Concrete - Construct Reclaim Tunnel - West Wall Formwork 2140-04-10-009 6/Nov/18 13/Nov/18 8 6/Nov/18 13/Nov/18 8 1 0 0 0.13 0.13 0.13 0.13 1 0.13 0.13 0.13 0.13 1
Concrete - Construct Reclaim Tunnel - West Wall Concrete 2140-04-10-009 14/Nov/18 15/Nov/18 2 14/Nov/18 15/Nov/18 2 142 0 0 0 ### ### 142
Reclaim Tunnel 16/Oct/18 12/Jan/19 89 16/Oct/18 12/Jan/19 89 2,734 0 0 0 0 0 En Evaluación para generar nuevo plan por demoras en montaje de Muros Construccion
Stacker(Foundation+Walls) 31/Jul/18 30/Oct/18 92 31/Jul/18 30/Oct/18 92 0 22 965 269,293 3,842 1,138
Concrete - Construct Stacker Walls Concrete - Inserts 1nd Stage 2140-35-10-003 11/Oct/18 20/Oct/18 10 si 11/Oct/18 20/Oct/18 10 1,921 192 192 0 0 0 Realizar NCR por Insertos Stacker Calidad
Concrete - Construct Stacker Walls Concrete - Formwork Installation 1st Stage 2140-35-10-003 13/Oct/18 21/Oct/18 9 si 13/Oct/18 21/Oct/18 9 266 29.5 29.5 59 0 0 0
Concrete - Construct Stacker Walls Concrete - Concrete 1 st Stage 2140-35-10-003 22/Oct/18 22/Oct/18 1 si 22/Oct/18 22/Oct/18 1 275 275 275 0 0 0
Concrete - Construct Stacker Walls Concrete - Inserts 2nd Stage 2140-35-10-003 25/Oct/18 29/Oct/18 5 si 25/Oct/18 29/Oct/18 5 1,921 384 384 768 384 384 384 1,153 0 0
Concrete - Construct Stacker Walls Concrete - Formwork Installation 2st Stage 2140-35-10-003 28/Oct/18 29/Oct/18 2 28/Oct/18 29/Oct/18 2 266 0 133 133 266 0 0
Concrete - Construct Stacker Walls Concrete - Concrete 2st Stage 2140-35-10-003 30/Oct/18 30/Oct/18 1 30/Oct/18 30/Oct/18 1 275 0 ### 275 0 0
2210 - Grinding 6/Aug/18 19/Feb/19 198 6/Aug/18 19/Feb/19 198 0 249 3,212 1,561,559 37,776 19,197

C Construction 6/Aug/18 19/Feb/19 197 6/Aug/18 19/Feb/19 197 0 249 3,212 1,561,559 37,776 19,197
10 Concrete 7/Aug/18 19/Feb/19 197 7/Aug/18 19/Feb/19 197 0 249 3,212 1,561,559 37,776 19,197
BallMill 001 7/Aug/18 13/Dec/18 129 7/Aug/18 13/Dec/18 129 0 31 1,408 412,936 18,884 5,228
BallMill002(MAT+Wall1°Stage) 7/Aug/18 23/Dec/18 139 7/Aug/18 23/Dec/18 139 0 31 1,408 417,730 18,884 5,317
SagMill(MAT) 24/Aug/18 27/Dec/18 126 24/Aug/18 27/Dec/18 126 0 40 338 475,184 3 5,901
F-H(BallBin) 20/Sep/18 8/Dec/18 80 20/Sep/18 8/Dec/18 80 0 51 44 40,091 5 309
F-H(Building6-1)/(G-H)Fundation(FO-301) 18/Sep/18 3/Nov/18 47 18/Sep/18 3/Nov/18 47 0 21 1 34,285 0 327
Concrete - Construct MAT Foundation - Lean Concrete Installation 2210-01-10-001 17/Oct/18 17/Oct/18 1 si 17/Oct/18 17/Oct/18 1 21 0 0 0 0 ingenieria
Concrete - Construct MAT Foundation - Rebar Installation 2210-01-10-002 18/Oct/18 29/Oct/18 12 si 18/Oct/18 29/Oct/18 12 34,285 ### ### ### ### ### ### ### 19,999 ### ### ### 8,571 0 0 Impacto por definición trabajos muro de refuerzo y Shocret Ingeniería/Construcción
Concrete - Construct MAT Foundation - Formwork Installation 2210-01-10-002 23/Oct/18 30/Oct/18 8 si 23/Oct/18 30/Oct/18 8 1 0.13 0.13 0.13 0.13 1 0.13 0.13 0.13 0.13 1 0 0
Concrete - Construct MAT Foundation - Concrete Installation 2210-01-10-002 30/Oct/18 31/Oct/18 2 30/Oct/18 31/Oct/18 2 327 0 ### ### 327 0 0
Concrete - Construct MAT Foundation - Formwork Removal, Joint Treatment 2210-01-10-002 31/Oct/18 3/Nov/18 4 31/Oct/18 3/Nov/18 4 0 0.25 0.25 0.25 1 0.25 0 0
F-H(Building6-1)/(G-H)Walls(FO-301) 4/Nov/18 29/Nov/18 26 4/Nov/18 29/Nov/18 26 0 0 1 12,699 0 132

406589983.xlsx 1 DE 28
MTO WEEK 0 WEEK 1 WEEK 2 WEEK 3
LEAN MOLDAJ
Trisemanal anterior CUMPLIMIENTO FORECAST PRECAST REBAR INSERTS HORMIGÓN
CONC. E Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi

10-Nov

12-Nov
13-Nov
14-Nov
15-Nov
16-Nov
11-Nov
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct

27-Oct
28-Oct
29-Oct
30-Oct
31-Oct
1-Nov
2-Nov

3-Nov
4-Nov
5-Nov
6-Nov
7-Nov
8-Nov
9-Nov
QTY

QTY

QTY

QTY
ID ACTIVITIES IWP START FINISH DUR Progr SI/NO START FINISH DUR M3 M3 M2 Kg kg M3 RESTRICCIONES RESPONSABLES

Concrete - Construct Transformers Walls - Rebar Installation 2210-01-10-003 4/Nov/18 18/Nov/18 15 4/Nov/18 18/Nov/18 15 12,699 0 0 847 847 ### ### ### ### 5,080 847 847 847 ### ### ### ### 5,926
Concrete - Construct Transformers Walls - Formwork Installation 2210-01-10-003 14/Nov/18 23/Nov/18 10 14/Nov/18 23/Nov/18 10 1 0 0 0 0.10 0.10 0.10 0
F-H(Building6-1)/(G-H)Columnas(FO-301) 14/Nov/18 4/Dec/18 21 14/Nov/18 4/Dec/18 21 0 0 1 18,871 0 119
Concrete - Construct Transformers Columnas - Rebar Installation 2210-01-10-004 14/Nov/18 28/Nov/18 15 14/Nov/18 28/Nov/18 15 18,871 0 0 0 ### ### ### 3,774
F-H(Building11-6)/(G-H)Fundation(FO-301) 1/Nov/18 1/Dec/18 31 1/Nov/18 1/Dec/18 31 0 21 1 34,285 0 327
Concrete - Base Preparation Ball Pit Base Foundation (Limpieza) 2210-29-10-001 1/Nov/18 8/Nov/18 8 1/Nov/18 8/Nov/18 8 0 ### ### 162 81 81 81 ### ### ### 486 0
Concrete - Construct MAT Foundation - Lean Concrete 2210-01-10-001 9/Nov/18 10/Nov/18 2 9/Nov/18 10/Nov/18 2 21 0 0 ### 10 10 10
Concrete - Construct MAT Foundation - Rebar Installation 2210-01-10-002 11/Nov/18 28/Nov/18 18 11/Nov/18 28/Nov/18 18 34,285 0 0 0 ### ### ### ### ### ### 11,428
Concrete - Construct MAT Foundation - Formwork Installation 2210-01-10-002 16/Nov/18 27/Nov/18 12 16/Nov/18 27/Nov/18 12 1 0 0 0 0.08 0
Solución Refuerzo Talud 29/Nov/18 23/Dec/18 25 29/Nov/18 23/Dec/18 25 0 0 0 0 0 0
Shocret 6/Jan/19 19/Feb/19 45 6/Jan/19 19/Feb/19 45 0 0 0 0 0 0
F-H(Building 1-6)/(F2-F)(F0-302) 16/Oct/18 2/Dec/18 48 16/Oct/18 2/Dec/18 48 0 14 1 1 0 264
Concrete - Base Preparation MAT Foundation (Limpieza) & Relleno 2210-01-10-008 16/Oct/18 17/Oct/18 2 si 16/Oct/18 17/Oct/18 2 0 0 0 0 Pendiente liberación de ingeniería genera impacto en trabajos hormigón y rellenos Ingeniería
Concrete - Construct MAT Foundation - Lean Concrete Installation 2210-01-10-001 17/Oct/18 17/Oct/18 1 si 17/Oct/18 17/Oct/18 1 14 0 0 0 0
Concrete - Construct MAT Foundation - Rebar Installation 2210-01-10-002 16/Nov/18 27/Nov/18 12 16/Nov/18 27/Nov/18 12 1 0 0 0 0.08 0 Falta Ingeniería detallamiento - sin fecha de IFC ingenieria
General(MudColletionBox)Fundation(FO-206&FO-205) 12/Oct/18 6/Nov/18 26 12/Oct/18 6/Nov/18 26 0 18 2 46,229 0 430
F-B(Building Foundations)-(F0-202) 20/Sep/18 27/Nov/18 69 20/Sep/18 27/Nov/18 69 0 7 1 1 0 128
F-B(Building Foundations)-(F0-210) 18/Sep/18 20/Nov/18 64 18/Sep/18 20/Nov/18 64 0 4 1 1 73
Concrete - Construct MAT Foundation - Rebar Installation 2210-01-10-002 5/Nov/18 12/Nov/18 8 5/Nov/18 12/Nov/18 8 1 0 0 0.13 0.13 0.13 0.13 0.13 1 0.13 0.13 0.13 0 Inicio sujeto a llegada de la armadura (por ingeniería) Ingeniería
Concrete - Construct MAT Foundation - Formwork Installation 2210-01-10-002 12/Nov/18 15/Nov/18 4 12/Nov/18 15/Nov/18 4 1 0 0 0 0.25 0.25 0.25 0.25 1
Concrete - Construct MAT Foundation - Concrete Installation 2210-01-10-002 15/Nov/18 16/Nov/18 2 15/Nov/18 16/Nov/18 2 73 0 0 0 ### ### 73
F-B(Building Foundations)-(F0-209) 4/Oct/18 25/Nov/18 53 4/Oct/18 25/Nov/18 53 0 0 0 1 0
Concrete - Construct MAT Foundation - Rebar Installation 10/Nov/18 17/Nov/18 8 10/Nov/18 17/Nov/18 8 1 0 0 0 0.13 0.13 0.13 0.13 0.13 0.13 0.13 1 Inicio sujeto a llegada de la armadura (por ingeniería) Oficina Técnica
F-B(Building Foundations)-(F0-215) 4/Oct/18 23/Nov/18 51 4/Oct/18 23/Nov/18 51 0 0 1 1 0
Concrete - Construct MAT Foundation - Rebar Installation 10/Nov/18 15/Nov/18 6 10/Nov/18 15/Nov/18 6 1 0 0 0 0.17 0.17 0.17 0.17 0.17 0.17 1 Inicio sujeto a llegada de la armadura (por ingeniería) Oficina Técnica
Concrete - Construct MAT Foundation - Formwork Installation 16/Nov/18 18/Nov/18 3 16/Nov/18 18/Nov/18 3 1 0 0 0 0.33 0
50 Piping 24/Sep/18 15/Dec/18 83 24/Sep/18 15/Dec/18 83 0 0 0 0 0
Underground Sector Sur (Acceso a SAG 35 mt app) 24/Sep/18 5/Oct/18 8 24/Sep/18 5/Oct/18 8
Underground Sector Sur (Desde acceso SAG hasta Flotation) 7/Oct/18 25/Oct/18 13 7/Oct/18 25/Oct/18 13 0 0 0 0 0
2000-01-00-001
Piping - UG Excavation 7/Oct/18 19/Oct/18 13 si 7/Oct/18 19/Oct/18 13 0 0 0 0
Piping - Install Underground Pipes 2000-04-50-005 11/Oct/18 23/Oct/18 13 si 11/Oct/18 23/Oct/18 13 0.08 0.08 0.08 0.08 0 0 0 0
2000-01-00-001
Piping - UG Fill 15/Oct/18 25/Oct/18 11 si 15/Oct/18 25/Oct/18 11 0.09 0.09 0.09 0.09 0.09 0.09 1 0 0 0 Termino de relleno sujeto a resultado de Ensayo Proctor Construcción
60 Electrical 1/Dec/18 27/Dec/18 27 1/Dec/18 27/Dec/18 27 0 0 0 0 0 0
Grinding 1/Dec/18 27/Dec/18 27 1/Dec/18 27/Dec/18 27 0 0 0 0 0 0
2230 - Pebble Crushing 2/Aug/18 27/Dec/18 148 2/Aug/18 27/Dec/18 148 0 81 10 100,632 5 693

C Construction 2/Aug/18 27/Dec/18 148 2/Aug/18 27/Dec/18 148 0 81 10 100,632 5 693


10 Concrete 18/Sep/18 11/Dec/18 85 18/Sep/18 11/Dec/18 85 0 81 10 100,632 5 693
TransferTowerN°2Fundation(MA-004) 18/Sep/18 19/Oct/18 32 18/Sep/18 19/Oct/18 32 0 7 2 18,035 1 123
PebbleCrushingFundation(MA-005) 12/Oct/18 20/Nov/18 40 12/Oct/18 20/Nov/18 40 0 4 4 36,647 3 283
Concrete - Pebble Crushing Foundation - Lean Concrete Installation 2230-01-10-004 13/Oct/18 13/Oct/18 1 si 13/Oct/18 13/Oct/18 1 4 0 0 0 0
Concrete - Pebble Crushing Foundation - Rebar Concrete Installation 2230-01-10-005 12/Oct/18 13/Oct/18 2 si 12/Oct/18 13/Oct/18 2 8,849 0 0 0 0
Concrete - Pebble Crushing Foundation - Formwork Installation 2230-01-10-005 14/Oct/18 15/Oct/18 2 si 14/Oct/18 15/Oct/18 2 1 0 0 0 0
Concrete - Pebble Crushing Foundation - Concrete Installation 2230-01-10-005 16/Oct/18 16/Oct/18 1 si 16/Oct/18 16/Oct/18 1 130 0 0 0 0
Concrete - Pebble Crushing Walls - Rebar 2230-01-10-006 17/Oct/18 28/Oct/18 12 si 17/Oct/18 28/Oct/18 12 13,972 ### ### ### ### ### ### ### 8,150 ### ### 2,329 0 0
Concrete - Pebble Crushing Walls - Inserts Installation 2230-01-10-006 23/Oct/18 27/Oct/18 5 si 23/Oct/18 27/Oct/18 5 1 0.2 0.2 0.2 0.2 1 0.2 0 0 0
Concrete - Pebble Crushing Walls- Formwork 2230-01-10-006 21/Oct/18 28/Oct/18 8 si 21/Oct/18 28/Oct/18 8 1 0.13 0.13 0.13 0.13 0.13 0.13 1 0.13 0.13 0 0 0
Concrete - Pebble Crushing Walls - Concrete 2230-01-10-006 29/Oct/18 30/Oct/18 2 29/Oct/18 30/Oct/18 2 62 0 31 ### 62 0 0
Concrete - Pebble Crushing Columnas - Rebar 2230-01-10-007 21/Oct/18 24/Oct/18 4 si 21/Oct/18 24/Oct/18 4 432 108 108 108 108 432 0 0 0
Concrete - Pebble Crushing Columnas - Inserts Installation 2230-01-10-007 23/Oct/18 24/Oct/18 2 si 23/Oct/18 24/Oct/18 2 1 0.5 0.5 1 0 0 0
Concrete - Pebble Crushing Columnas - Formwork 2230-01-10-007 24/Oct/18 25/Oct/18 2 si 24/Oct/18 25/Oct/18 2 1 0.5 0.5 1 0 0 0
Concrete - Pebble Crushing Columnas - Concrete 2230-01-10-007 26/Oct/18 27/Oct/18 2 26/Oct/18 27/Oct/18 2 1 0.41 0 0.41 0 0 0
Concrete - Pebble Crushing Walls y Columnas - Formwork Removal, Joint Treatment 2230-01-10-007 31/Oct/18 1/Nov/18 2 31/Oct/18 1/Nov/18 2 0 0.50 0.50 1 0 0
Concrete - Pebble Crushing Slab - Rebar 2230-01-10-008 31/Oct/18 14/Nov/18 15 31/Oct/18 14/Nov/18 15 13,394 0 ### ### ### 2,679 893 893 893 ### ### ### ### 6,251 893 893 893 ### ### 4,465
Concrete - Pebble Crushing Slab - Insert 2230-01-10-008 8/Nov/18 13/Nov/18 6 8/Nov/18 13/Nov/18 6 1 0 0 0.17 0.17 0 0.17 0.17 0.17 0.17 1
Concrete - Pebble Crushing Slab - Formwork 2230-01-10-008 5/Nov/18 14/Nov/18 10 5/Nov/18 14/Nov/18 10 1 0 0 0.1 0.10 0.10 0.10 0.10 1 0.1 0.1 0.1 0.10 0.10 1
Concrete - Pebble Crushing Slab - Concrete 2230-01-10-008 15/Nov/18 16/Nov/18 2 15/Nov/18 16/Nov/18 2 90 0 0 0 ### ### 90
PebbleCrushingFundation(MA-006&MA-007) 20/Oct/18 1/Nov/18 13 20/Oct/18 1/Nov/18 13 0 0 2 7,218 0 49
Concrete - Pebble Crushing Foundation - Level Base Preparation 20/Oct/18 20/Oct/18 1 si 20/Oct/18 20/Oct/18 1 1 1 0 0 0 Fundación en sector camino acceso Stockpile, definir logistica para comenzar fundación Construcción
Concrete - Pebble Crushing Foundation - Lean Concrete Installation 2230-01-10-004 21/Oct/18 21/Oct/18 1 si 21/Oct/18 21/Oct/18 1 0 0 0.22 0 0 0 0
Concrete - Pebble Crushing Foundation - Rebar Concrete Installation 2230-01-10-005 22/Oct/18 24/Oct/18 3 si 22/Oct/18 24/Oct/18 3 6,052 ### ### ### 6,052 0 0 0
Concrete - Pebble Crushing Foundation - Formwork Installation 2230-01-10-005 23/Oct/18 24/Oct/18 2 si 23/Oct/18 24/Oct/18 2 1 0.5 0.5 1 0 0 0
Concrete - Pebble Crushing Foundation - Concrete Installation 2230-01-10-005 25/Oct/18 25/Oct/18 1 si 25/Oct/18 25/Oct/18 1 44 44 44 0 0 0
Concrete - Pebble Crushing Columnas - Rebar 2230-01-10-007 26/Oct/18 28/Oct/18 3 26/Oct/18 28/Oct/18 3 1,166 389 389 389 389 777 0 0
Concrete - Pebble Crushing Columnas - Formwork 2230-01-10-007 27/Oct/18 28/Oct/18 2 27/Oct/18 28/Oct/18 2 1 0 0.5 0.5 1 0 0
Concrete - Pebble Crushing Columnas - Concrete 2230-01-10-007 29/Oct/18 30/Oct/18 2 29/Oct/18 30/Oct/18 2 5 0 2.36 2.36 5 0 0
Concrete - Pebble Crushing Columnas - Formwork Removal, Joint Treatment 2230-01-10-011 31/Oct/18 1/Nov/18 2 31/Oct/18 1/Nov/18 2 0 0.50 0.50 1 0 0
Emergency Stock Pile 15/Oct/18 11/Dec/18 58 15/Oct/18 11/Dec/18 58 0 70 2 38,732 1 239
Concrete - Emergency Stokc Pile Foundation - Relleno (de adelantar a edificio Pebble) 2230-01-10-012 15/Oct/18 17/Oct/18 3 si 15/Oct/18 17/Oct/18 3 56 0 0 0 0 Se debe realizar limpieza en área para dar comienzo a trabajos Construcción
Concrete - Emergency Stokc Pile Foundation - Level Base Preparation 2230-01-10-016 20/Oct/18 21/Oct/18 2 si 20/Oct/18 21/Oct/18 2 0.5 0.5 1 0 0 0
Concrete - Emergency Stokc Pile Foundation - Lean Concrete Installation 2230-01-10-016 22/Oct/18 22/Oct/18 1 si 22/Oct/18 22/Oct/18 1 14 14 14 0 0 0
Concrete - Emergency Stokc Pile Foundation - Rebar Concrete Installation 2230-01-10-014 23/Oct/18 29/Oct/18 7 si 23/Oct/18 29/Oct/18 7 28,187 ### ### ### ### 16,107 ### ### ### 12,080 0 0
Concrete - Emergency Stokc Pile Foundation - Formwork Installation 2230-01-10-014 26/Oct/18 1/Nov/18 7 26/Oct/18 1/Nov/18 7 1 0.14 0 0.14 0.14 0.14 0.14 0.14 0.14 1 0 0
Concrete - Emergency Stokc Pile Foundation - Concrete Installation 2230-01-10-014 2/Nov/18 2/Nov/18 1 2/Nov/18 2/Nov/18 1 148 0 ### 148 0 0
Concrete - Emergency Stokc Pile Walls - Rebar 2230-01-10-015 3/Nov/18 22/Nov/18 20 3/Nov/18 22/Nov/18 20 10,545 0 0 527 527 527 ### ### ### ### 3,691 527 527 527 ### ### ### ### 3,691
Concrete - Emergency Stokc Pile Walls - Inserts Installation 2230-01-10-015 13/Nov/18 22/Nov/18 10 13/Nov/18 22/Nov/18 10 1 0 0 0 0.10 0.10 0.10 0.10 0
Concrete - Emergency Stokc Pile Walls- Formwork 2230-01-10-015 8/Nov/18 22/Nov/18 15 8/Nov/18 22/Nov/18 15 1 0 0 0.07 0.07 0 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0
Foundations correa 2230-CV-005 (FO-001-FO-002) 4/Oct/18 2/Dec/18 60 4/Oct/18 2/Dec/18 60 0 0 1 1 0
Concrete - Construct Foundation - Rebar Installation 10/Nov/18 19/Nov/18 10 10/Nov/18 19/Nov/18 10 1 0 0 0 0.1 0.1 0.1 0.10 0.10 0.10 0.10 1 Inicio sujeto a llegada de la armadura (por ingeniería) Oficina Técnica
Concrete - Construct Foundation - Formwork Installation 14/Nov/18 27/Nov/18 14 14/Nov/18 27/Nov/18 14 1 0 0 0 0.07 0.07 0.07 0
50 Piping 22/Oct/18 16/Nov/18 26 22/Oct/18 16/Nov/18 26 0 0 0 0 0 0
Underground 22/Oct/18 16/Nov/18 2 22/Oct/18 16/Nov/18 2 0 0 0 0 0 0
Piping - UG Excavation 2000-01-00-002 22/Oct/18 23/Oct/18 2 si 22/Oct/18 23/Oct/18 2 0.5 0.5 1 0 0 0 Inicio depende de la liberación de área Construcción
Piping - Install Underground Pipes 2000-04-50-005 24/Oct/18 13/Nov/18 21 si 24/Oct/18 13/Nov/18 21 0.05 0.05 0.05 0 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0 0.05 0.05 0.05 0.05 0
Piping - UG Fill 2000-01-00-002 14/Nov/18 16/Nov/18 3 14/Nov/18 16/Nov/18 3 0 0 0 0.33 0.33 0.33 1
60 Electrical 13/Nov/18 27/Dec/18 45 13/Nov/18 27/Dec/18 45 0 0 0 0 0 0
Pebble Area 13/Nov/18 27/Dec/18 45 13/Nov/18 27/Dec/18 45 0 0 0 0 0 0
Electrical- Pebble Area -Install Grounding Mesh 13/Nov/18 27/Dec/18 45 13/Nov/18 27/Dec/18 45 0 0 0 0.02 0.02 0.02 0.02 0 Inicio depende de la disponibilidad de equipos para movimiento de tierras Movimiento de Tierras

406589983.xlsx 2 DE 28
MTO WEEK 0 WEEK 1 WEEK 2 WEEK 3
LEAN MOLDAJ
Trisemanal anterior CUMPLIMIENTO FORECAST PRECAST REBAR INSERTS HORMIGÓN
CONC. E Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi

10-Nov

12-Nov
13-Nov
14-Nov
15-Nov
16-Nov
11-Nov
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct

27-Oct
28-Oct
29-Oct
30-Oct
31-Oct
1-Nov
2-Nov

3-Nov
4-Nov
5-Nov
6-Nov
7-Nov
8-Nov
9-Nov
QTY

QTY

QTY

QTY
ID ACTIVITIES IWP START FINISH DUR Progr SI/NO START FINISH DUR M3 M3 M2 Kg kg M3 RESTRICCIONES RESPONSABLES

2270 - Lime Plant 3/Oct/18 23/Nov/18 52 3/Oct/18 23/Nov/18 52 0 0 5 7 0 66

C Construction 3/Oct/18 23/Nov/18 51 3/Oct/18 23/Nov/18 51 0 0 5 7 0 66


Milestone 20/Oct/18 20/Oct/18 1 20/Oct/18 20/Oct/18 1
Área liberada para iniciar trabajo 20/Oct/18 20/Oct/18 1 si 20/Oct/18 20/Oct/18 1 1 1 0 0 0
00 Civil 3/Oct/18 14/Nov/18 43 3/Oct/18 14/Nov/18 43 0 0 0 0 0 0
Civil & Eatthwork - Duct Banks - DB-008/007/006 (2270-YDJ-004) - Excavation 2210-27-0S-010 3/Oct/18 20/Oct/18 18 si 3/Oct/18 20/Oct/18 18 0.06 0 0 0 0
Civil & Eatthwork - Duct Banks - DB-005 (2270-YJD-003) - Excavation 2210-27-0S-010 21/Oct/18 22/Oct/18 2 si 21/Oct/18 22/Oct/18 2 0.5 0.5 1 0 0 0
Civil & Eatthwork - Duct Banks - DB-004/003 (2270-YJD-002) - Excavation 2210-27-0S-010 5/Nov/18 9/Nov/18 5 5/Nov/18 9/Nov/18 5 0 0 0.2 0.20 0.20 0.20 0.20 1 0
Civil & Eatthwork - Duct Banks - DB-002/001 (2270-YJD-001) - Excavation 2210-27-0S-010 10/Nov/18 14/Nov/18 5 10/Nov/18 14/Nov/18 5 0 0 0 0.2 0.2 0.2 0.20 0.20 1
10 Concrete 30/Oct/18 23/Nov/18 25 30/Oct/18 23/Nov/18 25 0 0 5 7 0 66
LimePlant 30/Oct/18 23/Nov/18 25 30/Oct/18 23/Nov/18 25 0 0 0 0 0 0
Concrete - Lime Plant - Base Preparation for Foundation 2270-08-10-001 30/Oct/18 23/Nov/18 25 30/Oct/18 23/Nov/18 25 0 0.04 0.04 0.04 0.04 0 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0 Pendiente revisión de Ingeniería Ingeniería / Construcció
Duct Banck 21/Oct/18 22/Nov/18 33 21/Oct/18 22/Nov/18 33 0 0 5 7 0 66
Concrete - Duct banck - DB-008/007/006 (2270-YDJ-004)- Rebar Installation 2000-07-10-019 21/Oct/18 29/Oct/18 9 si 21/Oct/18 29/Oct/18 9 1 0.11 0.11 0.11 0.11 0.11 0.11 1 0.11 0.11 0.11 0 0 0 Esta pendiente la entrega de Sello Construcción
Concrete - Duct banck - DB-008/007/006(2270-YDJ-004) - Formwork 2000-07-10-019 30/Oct/18 3/Nov/18 5 30/Oct/18 3/Nov/18 5 1 0 0.20 0.20 0.20 0.20 1 0.2 0 0
Concrete - Duct banck - DB-008/007/006 (2270-YDJ-004) - Concrete 2000-07-10-019 5/Nov/18 6/Nov/18 2 5/Nov/18 6/Nov/18 2 43 0 0 21 ### 43 0
Concrete - Duct banck - DB-008/007/006 (2270-YDJ-004) - Camara (014/015) - (Precast) 2000-08-1C-002 7/Nov/18 8/Nov/18 2 7/Nov/18 8/Nov/18 2 1 0 0 0.50 0.50 1 0
Concrete - Duct banck - DB-005 (2270-YJD-003) - Rebar Installation 2000-07-10-020 30/Oct/18 3/Nov/18 5 30/Oct/18 3/Nov/18 5 1 0 0.20 0.20 0.20 0.20 1 0.2 0 0
Concrete - Duct banck - DB-005 (2270-YJD-003) - Formwork 2000-07-10-020 4/Nov/18 6/Nov/18 3 4/Nov/18 6/Nov/18 3 1 0 0 0.33 0.33 0.33 1 0
Concrete - Duct banck - DB-005 (2270-YJD-003) - Concrete 2000-07-10-020 8/Nov/18 8/Nov/18 1 8/Nov/18 8/Nov/18 1 20 0 0 ### 20 0
Concrete - Duct banck - DB-005 (2270-YJD-003) - Camara (016) - (Precast) 2000-08-1C-003 7/Nov/18 8/Nov/18 2 7/Nov/18 8/Nov/18 2 1 0 0 0.50 0.50 1 0
Concrete - Duct banck - DB-003/004 (2270-YJD-002) - Rebar Installation 2000-07-10-021 4/Nov/18 8/Nov/18 5 4/Nov/18 8/Nov/18 5 1 0 0 0.2 0.2 0.20 0.20 0.20 1 0
Concrete - Duct banck - DB-003/004 (2270-YJD-002) - Formwork 2000-07-10-021 9/Nov/18 11/Nov/18 3 9/Nov/18 11/Nov/18 3 1 0 0 0.33 0 0.33 0.33 1
Concrete - Duct banck - DB-003/004 (2270-YJD-002) - Concrete 2000-07-10-021 13/Nov/18 13/Nov/18 1 13/Nov/18 13/Nov/18 1 1 0 0 0 1.00 1
Concrete - Duct banck - DB-003/004 (2270-YJD-002) - Camara (016) - Rebar Installation 2000-07-10-026 12/Nov/18 13/Nov/18 2 12/Nov/18 13/Nov/18 2 1 0 0 0 0.5 0.50 1
Concrete - Duct banck - DB-003/004 (2270-YJD-002) - Foundation Camara (016) - Formwork 2000-07-10-026 9/Nov/18 10/Nov/18 2 9/Nov/18 10/Nov/18 2 1 0 0 0.50 1 0.5 1
Concrete - Duct banck - DB-003/004 (2270-YJD-002) - Foundation Camara (016) - Concrete 2000-07-10-026 12/Nov/18 12/Nov/18 1 12/Nov/18 12/Nov/18 1 1 0 0 0 1 1
Concrete - Duct banck - DB-003/004 (2270-YJD-002) - Walls Camara (016) - Rebar Installation 2000-07-10-026 14/Nov/18 16/Nov/18 3 14/Nov/18 16/Nov/18 3 1 0 0 0 0.33 0.33 0.33 1
Concrete - Duct banck - DB-001/002 (2270-YJD-001) - Rebar Installation 2000-07-10-022 13/Nov/18 17/Nov/18 5 13/Nov/18 17/Nov/18 5 1 0 0 0 0.20 0.20 0.20 0.20 1
2220 - Rougher Flotation & Regrind 2/Aug/18 11/Jan/19 163 2/Aug/18 11/Jan/19 163 0 482 580 319,262 626 2,360

C Construction 2/Aug/18 11/Jan/19 163 2/Aug/18 11/Jan/19 163 0 482 580 319,262 626 2,360
10 Concrete 3/Aug/18 21/Nov/18 111 3/Aug/18 21/Nov/18 111 0 482 580 319,262 626 2,360
General 0 0 0 0 0 0
Piperacks(YDA-003) 19/Sep/18 3/Nov/18 46 19/Sep/18 3/Nov/18 46 0 7 170 11,010 255 139
Concrete - Piperack - 2220-YDA-003 - Relleno Elevacion 21/Sep/18 18/Oct/18 28 si 21/Sep/18 18/Oct/18 28 0 0 0 0 Queda pendiente verificación de impermeabilización de Fundación Grúa Torre Ingeniería
Concrete - Piperack - 2220-YDA-003 - Excavación y preparación base 18/Oct/18 19/Oct/18 2 si 18/Oct/18 19/Oct/18 2 0 0 0 0 Se puede iniciar, pero hay una FDN que esta comprometida con reparción de terreno Construcción
Concrete - Piperack - 2220-YDA-003 - Foundations - Lean Concrete 2220-01-10-004 / 007 / 20/Oct/18 21/Oct/18 2 si 20/Oct/18 21/Oct/18 2 7 3.35 3.35 7 0 0 0
Concrete - Piperack - 2220-YDA-003 - Foundations - Rebar Installation 2220-01-10-005 / 008 / 0 22/Oct/18 25/Oct/18 4 si 22/Oct/18 25/Oct/18 4 7,530 ### ### ### ### 7,530 0 0 0
Concrete - Piperack - 2220-YDA-003 - Foundations - Formwork Installation 2220-01-10-005 / 008 / 0 26/Oct/18 27/Oct/18 2 26/Oct/18 27/Oct/18 2 85 42 42 42 42 0 0
Concrete - Piperack - 2220-YDA-003 - Foundations - Concrete Installation 2220-01-10-005 / 008 / 0 28/Oct/18 29/Oct/18 2 28/Oct/18 29/Oct/18 2 128 0 64 64 128 0 0
Concrete - Piperack - 2220-YDA-003 - Pedestales - Rebar Installation 2220-01-10-006 / 009 / 0 24/Oct/18 26/Oct/18 3 si 24/Oct/18 26/Oct/18 3 3,480 ### ### ### 3,480 0 0 0
Concrete - Piperack - 2220-YDA-003 - Pedestales - Inserts Installation 2220-01-10-006 / 009 / 0 26/Oct/18 27/Oct/18 2 26/Oct/18 27/Oct/18 2 255 128 128 128 128 0 0
Concrete - Piperack - 2220-YDA-003 - Pedestales - Formwork Installation 2220-01-10-006 / 009 / 0 28/Oct/18 29/Oct/18 2 28/Oct/18 29/Oct/18 2 85 0 42 42 85 0 0
Concrete - Piperack - 2220-YDA-003 - Pedestales - Concrete Installation 2220-01-10-006 / 009 / 0 30/Oct/18 31/Oct/18 2 30/Oct/18 31/Oct/18 2 11 0 5.69 5.69 11 0 0
Concrete - Piperack - 2220-YDA-003 - Foundation y Pedestales - Formwork Removal, Joint Treatment 1/Nov/18 3/Nov/18 3 1/Nov/18 3/Nov/18 3 0 0.33 0.33 1 0.33 0 0
Piperacks(YDA-004) 19/Oct/18 4/Nov/18 17 19/Oct/18 4/Nov/18 17 0 8 255 10,796 365 151
Concrete - Piperack - 2220-YDA-004 - Excavación manual (Besalco) 19/Oct/18 22/Oct/18 4 si 19/Oct/18 22/Oct/18 4 0.25 0.25 0.25 1 0 0 0 Se incorpora cuadrilla de Besalco Construcción
Concrete - Piperack - 2220-YDA-004 - Foundations - Lean Concrete 2220-01-10-016 / 019 / 0 23/Oct/18 24/Oct/18 2 si 23/Oct/18 24/Oct/18 2 8 4.18 4.18 8 0 0 0
Concrete - Piperack - 2220-YDA-004 - Foundations - Rebar Installation 2220-01-10-017 / 020 / 0 25/Oct/18 30/Oct/18 6 si 25/Oct/18 30/Oct/18 6 6,133 ### ### 2,044 ### ### ### ### 4,089 0 0
Concrete - Piperack - 2220-YDA-004 - Foundations - Formwork Intallation 2220-01-10-017 / 020 / 0 26/Oct/18 30/Oct/18 5 26/Oct/18 30/Oct/18 5 170 34 34 34 34 34 ### 136 0 0
Concrete - Piperack - 2220-YDA-004 - Foundations - Concrete Intallation 2220-01-10-017 / 020 / 0 31/Oct/18 1/Nov/18 2 31/Oct/18 1/Nov/18 2 132 0 ### ### 132 0 0 Pendiente su inicio por ingeniería de armaduras por cambio de diseño (FDN completa) Ingeniería
Concrete - Piperack - 2220-YDA-004 - Pedestales - Rebar Installation 2220-01-10-018 / 021 / 0 27/Oct/18 30/Oct/18 4 27/Oct/18 30/Oct/18 4 4,663 0 ### ### ### ### 4,663 0 0
Concrete - Piperack - 2220-YDA-004 - Pedestales - Inserts Installation 2220-01-10-018 / 021 / 0 29/Oct/18 30/Oct/18 2 29/Oct/18 30/Oct/18 2 365 0 183 ### 365 0 0
Concrete - Piperack - 2220-YDA-004 - Pedestales - Formwork Installation 2220-01-10-018 / 021 / 0 28/Oct/18 30/Oct/18 3 28/Oct/18 30/Oct/18 3 85 0 28 28 ### 85 0 0
Concrete - Piperack - 2220-YDA-004 - Pedestales - Concrete Installation 2220-01-10-018 / 021 / 0 31/Oct/18 1/Nov/18 2 31/Oct/18 1/Nov/18 2 20 0 9.78 9.78 20 0 0
Concrete - Piperack - 2220-YDA-004 - Foundation y Pedestales - Formwork Removal, Joint Treatment 2220-01-10-017 @ 021 2/Nov/18 4/Nov/18 3 2/Nov/18 4/Nov/18 3 0 0.33 0 0.33 0.33 1 0
Piperacks(YDA-012) 1/Nov/18 13/Nov/18 13 1/Nov/18 13/Nov/18 13 0 24 2 2,931 1 36
Concrete - Piperack - 2220-YDA-012 - Relleno Elevacion 1/Nov/18 2/Nov/18 2 1/Nov/18 2/Nov/18 2 21 0 ### ### 21 0 0
Concrete - Piperack - 2220-YDA-012 - Foundations - Lean Concrete 2220-01-10-022 / 025 / 3/Nov/18 4/Nov/18 2 3/Nov/18 4/Nov/18 2 3 0 0 1.47 1.47 3 0
Concrete - Piperack - 2220-YDA-012 - Foundations - Rebar Installation 2220-01-10-023 / 026 / 5/Nov/18 8/Nov/18 4 5/Nov/18 8/Nov/18 4 2,000 0 0 500 ### ### ### 2,000 0
Concrete - Piperack - 2220-YDA-012 - Foundations - Formwork Intallation 2220-01-10-023 / 026 / 6/Nov/18 8/Nov/18 3 6/Nov/18 8/Nov/18 3 1 0 0 0.33 0.33 0.33 1 0
Concrete - Piperack - 2220-YDA-012 - Foundations - Concrete Intallation 2220-01-10-023 / 026 / 9/Nov/18 10/Nov/18 2 9/Nov/18 10/Nov/18 2 31 0 0 ### 16 16 16
Concrete - Piperack - 2220-YDA-012 - Pedestales - Rebar Installation 2220-01-10-024 / 027 / 7/Nov/18 8/Nov/18 2 7/Nov/18 8/Nov/18 2 931 0 0 ### ### 931 0
Concrete - Piperack - 2220-YDA-012 - Pedestales - Inserts Installation 2220-01-10-024 / 027 / 8/Nov/18 8/Nov/18 1 8/Nov/18 8/Nov/18 1 1 0 0 1.00 1 0
Concrete - Piperack - 2220-YDA-012 - Pedestales - Formwork Installation 2220-01-10-024 / 027 / 8/Nov/18 8/Nov/18 1 8/Nov/18 8/Nov/18 1 1 0 0 1.00 1 0
Concrete - Piperack - 2220-YDA-012 - Pedestales - Concrete Installation 2220-01-10-024 / 027 / 9/Nov/18 10/Nov/18 2 9/Nov/18 10/Nov/18 2 5 0 0 2.53 3 2.53 3
Concrete - Piperack - 2220-YDA-012 - Foundation y Pedestales - Formwork Removal, Joint Treatment 2220-01-10-023 @ 030 11/Nov/18 13/Nov/18 3 11/Nov/18 13/Nov/18 3 0 0 0 0.33 0.33 0.33 1
Trench Discharge (Rougher) 10/Sep/18 21/Nov/18 73 10/Sep/18 21/Nov/18 73 0 386 7 21,979 0 166
Concrete - Rougher Trench Discharge TR-001 - Walls - Concrete Installation 2220-02-10-005 15/Oct/18 17/Oct/18 3 si 15/Oct/18 17/Oct/18 3 10.61 0 0 0 0
Concrete - Rougher Trench Discharge TR-001 (relleno) En IWP Emplantillado Ce 18/Oct/18 22/Oct/18 5 si 18/Oct/18 22/Oct/18 5 124 25 25 25 74 0 0 0
Concrete - Rougher Trench Discharge TR-002 - Walls - Concrete Installation 2220-02-10-007 18/Oct/18 19/Oct/18 2 si 18/Oct/18 19/Oct/18 2 10.61 0 0 0 0
Concrete - Rougher Trench Discharge TR-002 (relleno) En IWP Emplantillado Ce 20/Oct/18 24/Oct/18 5 si 20/Oct/18 24/Oct/18 5 124 25 25 25 25 25 124 0 0 0
Concrete - Rougher Trench Discharge TR-003 - Walls - Concrete Installation 2220-02-10-006 18/Oct/18 19/Oct/18 2 si 18/Oct/18 19/Oct/18 2 11.82 0 0 0 0
Concrete - Rougher Trench Discharge TR-003 (relleno) En IWP Emplantillado Ce 20/Oct/18 24/Oct/18 5 si 20/Oct/18 24/Oct/18 5 129 26 26 26 26 26 129 0 0 0
Concrete - Rougher Trench Discharge TR-001/002/003 - Excavación de 6m a Trinch 4 En IWP Emplantillado Ce 19/Oct/18 20/Oct/18 2 si 19/Oct/18 20/Oct/18 2 0.5 1 0 0 0
Concrete - Rougher Trench Discharge TR-001 - Foundation (6m a Trinch 4)- Lean Concrete 2220-02-10-001 21/Oct/18 21/Oct/18 1 si 21/Oct/18 21/Oct/18 1 0 0.42 0 0 0 0
Concrete - Rougher Trench Discharge TR-001 - Foundation (6m a Trinch 4) - Rebar Installation 2220-02-10-002 22/Oct/18 24/Oct/18 3 si 22/Oct/18 24/Oct/18 3 611 204 204 204 611 0 0 0
Concrete - Rougher Trench Discharge TR-001 - Foundation (6m a Trinch 4) - Formwork 2220-02-10-002 24/Oct/18 26/Oct/18 3 si 24/Oct/18 26/Oct/18 3 1 0.33 0.33 0.33 1 0 0 0
Concrete - Rougher Trench Discharge TR-001 - Foundation (6m a Trinch 4) - Concrete Installation 2220-02-10-002 25/Oct/18 25/Oct/18 1 si 25/Oct/18 25/Oct/18 1 2.49 2.49 2 0 0 0
Concrete - Rougher Trench Discharge TR-001 - Walls (6m a Trinch 4) - Concrete Installation 2220-02-10-005 27/Oct/18 27/Oct/18 1 27/Oct/18 27/Oct/18 1 2.65 0 2.65 3 0 0
Concrete - Rougher Trench Discharge TR-002 - Foundation (6m a Trinch 4) - Lean Concrete 2220-02-10-001 21/Oct/18 21/Oct/18 1 si 21/Oct/18 21/Oct/18 1 0 0.42 0 0 0 0
Concrete - Rougher Trench Discharge TR-002 - Foundation (6m a Trinch 4)- Rebar Installation 2220-02-10-004 22/Oct/18 24/Oct/18 3 si 22/Oct/18 24/Oct/18 3 611 204 204 204 611 0 0 0
Concrete - Rougher Trench Discharge TR-002 - Foundation (6m a Trinch 4) - Formwork 2220-02-10-004 24/Oct/18 26/Oct/18 3 si 24/Oct/18 26/Oct/18 3 1 0.33 0.33 0.33 1 0 0 0
Concrete - Rougher Trench Discharge TR-002 - Foundation (6m a Trinch 4) - Concrete Installation 2220-02-10-004 25/Oct/18 25/Oct/18 1 si 25/Oct/18 25/Oct/18 1 2.49 2.49 2 0 0 0
Concrete - Rougher Trench Discharge TR-002 - Walls (6m a Trinch 4) - Concrete Installation 2220-02-10-007 27/Oct/18 27/Oct/18 1 27/Oct/18 27/Oct/18 1 2.65 0 2.65 3 0 0
Concrete - Rougher Trench Discharge TR-003 - Foundation (6m a Trinch 4) - Lean Concrete 2220-02-10-001 21/Oct/18 21/Oct/18 1 si 21/Oct/18 21/Oct/18 1 0 0.34 0 0 0 0
Concrete - Rougher Trench Discharge TR-003 - Foundation (6m a Trinch 4) - Rebar Installation 2220-02-10-003 22/Oct/18 24/Oct/18 3 si 22/Oct/18 24/Oct/18 3 662 221 221 221 662 0 0 0
Concrete - Rougher Trench Discharge TR-003 - Foundation (6m a Trinch 4) - Formwork 2220-02-10-003 24/Oct/18 26/Oct/18 3 si 24/Oct/18 26/Oct/18 3 1 0.33 0.33 0.33 1 0 0 0
Concrete - Rougher Trench Discharge TR-003 - Foundation (6m a Trinch 4) - Concrete Installation 2220-02-10-003 25/Oct/18 25/Oct/18 1 si 25/Oct/18 25/Oct/18 1 2.06 2.06 2 0 0 0
Concrete - Rougher Trench Discharge TR-003 - Walls (6m a Trinch 4) - Concrete Installation 2220-02-10-006 27/Oct/18 27/Oct/18 1 27/Oct/18 27/Oct/18 1 2.95 0 3 3 0 0
Concrete - Rougher Trench Discharge TR-004 (preparación base + relleno) En IWP Emplantillado Ce 2/Nov/18 4/Nov/18 3 2/Nov/18 4/Nov/18 3 0 0.33 0 0.33 0.33 1 0
Concrete - Rougher Trench Discharge TR-004 - Foundation - Lean Concrete 2220-02-10-008 5/Nov/18 10/Nov/18 6 5/Nov/18 10/Nov/18 6 4 0 0 0.17 0.17 0.17 0.17 0.17 1 0.17 0 Sector habilitado actualmente como único ingreso a sector de flotación Construcción
Concrete - Rougher Trench Discharge TR-004 - Foundation - Rebar Installation 2220-02-10-009 9/Nov/18 16/Nov/18 8 9/Nov/18 16/Nov/18 8 12,557 0 0 ### 1,570 ### ### ### ### ### ### ### 10,987
Concrete - Rougher Trench Discharge TR-004- Foundation - Formwork 2220-02-10-009 11/Nov/18 20/Nov/18 10 11/Nov/18 20/Nov/18 10 1 0 0 0 0.1 0.1 0.10 0.10 0.10 0.10 1
Concrete - Rougher Trench Discharge TR-004 - Foundation - Concrete Installation 2220-02-10-009 15/Nov/18 20/Nov/18 6 15/Nov/18 20/Nov/18 6 34 0 0 0 5.62 5.62 11
Concrete - Rougher Trench Discharge - Formwork Removal 2220-02-10-009 21/Oct/18 30/Oct/18 10 si 21/Oct/18 30/Oct/18 10 0.1 0.1 0.1 0.1 0.1 0.1 1 0.1 0.1 0.1 0.10 0 0 0

406589983.xlsx 3 DE 28
MTO WEEK 0 WEEK 1 WEEK 2 WEEK 3
LEAN MOLDAJ
Trisemanal anterior CUMPLIMIENTO FORECAST PRECAST REBAR INSERTS HORMIGÓN
CONC. E Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi

10-Nov

12-Nov
13-Nov
14-Nov
15-Nov
16-Nov
11-Nov
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct

27-Oct
28-Oct
29-Oct
30-Oct
31-Oct
1-Nov
2-Nov

3-Nov
4-Nov
5-Nov
6-Nov
7-Nov
8-Nov
9-Nov
QTY

QTY

QTY

QTY
ID ACTIVITIES IWP START FINISH DUR Progr SI/NO START FINISH DUR M3 M3 M2 Kg kg M3 RESTRICCIONES RESPONSABLES

Rougher 22/Oct/18 23/Dec/18 63 22/Oct/18 23/Dec/18 63 0 34 9 155,768 0 871


Concrete - Rougher - Base Preparation Foundation (Limpieza+ relleno) 2220-02-10-010 / 011 / 0 22/Oct/18 10/Nov/18 20 si 22/Oct/18 10/Nov/18 20 0.05 0.05 0.05 0.05 0.05 0 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0 0.05 0
Concrete - Rougher - 2220-FT-(317 & 316) - Foundation (MA-001) - Lean Concrete Foundation 2220-02-10-010 / 012 28/Oct/18 29/Oct/18 2 28/Oct/18 29/Oct/18 2 8 0 4 4 8 0 0
Concrete - Rougher - 2220-FT-(317 & 316) - Foundation (MA-001)- Rebar Installation 2220-02-10-011 / 013 30/Oct/18 3/Nov/18 5 30/Oct/18 3/Nov/18 5 16,253 0 ### ### ### ### 13,002 ### 3,251 0
Concrete - Rougher - 2220-FT-(317 & 316) - Foundation (MA-001) - Formwork 2220-02-10-011 / 013 4/Nov/18 5/Nov/18 2 4/Nov/18 5/Nov/18 2 1 0 0 0.5 0.5 1 0
Concrete - Rougher - 2220-FT-(317 & 316) - Foundation (MA-001)- Concrete 2220-02-10-011 / 013 6/Nov/18 7/Nov/18 2 6/Nov/18 7/Nov/18 2 113 0 0 ### ### 113 0
Concrete - Rougher - 2220-FT-(315 & 314 & 313)- Foundation (MA-002) - Lean Concrete Foundation 2220-02-10-020 / 024 / 8/Nov/18 9/Nov/18 2 8/Nov/18 9/Nov/18 2 2 0 0 0.95 0.95 2 0
Concrete - Rougher - 2220-FT-(315 & 314 & 313)- Foundation (MA-002)- Rebar Installation 2220-02-10-021 / 025 / 10/Nov/18 21/Nov/18 12 10/Nov/18 21/Nov/18 12 17,699 0 0 0 ### ### ### ### ### ### ### 10,324
Concrete - Rougher - 2220-FT-(315 & 314 & 313)- Foundation (MA-002) - Formwork 2220-02-10-021 / 025 / 14/Nov/18 23/Nov/18 10 14/Nov/18 23/Nov/18 10 1 0 0 0 0.10 0.10 0.10 0
Concrete - Rougher - 2220-FT-(336 & 335 & 334)- Foundation (MA-012) - Lean Concrete Foundation 2220-02-10-018 / 022 / 8/Nov/18 9/Nov/18 2 8/Nov/18 9/Nov/18 2 2 0 0 1.10 1.10 2 0
Concrete - Rougher - 2220-FT-(336 & 335 & 334)- Foundation (MA-012)- Rebar Installation 2220-02-10-019 / 023 / 10/Nov/18 21/Nov/18 12 10/Nov/18 21/Nov/18 12 18,424 0 0 0 ### ### ### ### ### ### ### 10,747
Concrete - Rougher - 2220-FT-(336 & 335 & 334)- Foundation (MA-012) - Formwork 2220-02-10-019 / 023 / 14/Nov/18 23/Nov/18 10 14/Nov/18 23/Nov/18 10 1 0 0 0 0.10 0.10 0.10 0
Concrete - Rougher - 2220-FT-(315 & 314 & 313)- Foundation (MA-016) - Lean Concrete Foundation 2220-02-10-020 / 024 / 8/Nov/18 9/Nov/18 2 8/Nov/18 9/Nov/18 2 2 0 0 0.95 0.95 2 0
Concrete - Rougher - 2220-FT-(315 & 314 & 313)- Foundation (MA-016)- Rebar Installation 2220-02-10-021 / 025 / 10/Nov/18 21/Nov/18 12 10/Nov/18 21/Nov/18 12 17,699 0 0 0 ### ### ### ### ### ### ### 10,324
Concrete - Rougher - 2220-FT-(315 & 314 & 313)- Foundation (MA-016) - Formwork 2220-02-10-021 / 025 / 14/Nov/18 23/Nov/18 10 14/Nov/18 23/Nov/18 10 1 0 0 0 0.10 0.10 0.10 0
Concrete - Rougher - 2220-FT-(345 & 344 & 343)- Foundation (MA-017) - Lean Concrete Foundation 2220-02-10-018 / 022 / 13/Nov/18 14/Nov/18 2 13/Nov/18 14/Nov/18 2 2 0 0 0 1.10 1.10 2
Concrete - Rougher - 2220-FT-(345 & 344 & 343)- Foundation (MA-017)- Rebar Installation 2220-02-10-019 / 023 / 15/Nov/18 26/Nov/18 12 15/Nov/18 26/Nov/18 12 18,343 0 0 0 ### ### 3,057
Concrete - Rougher - 2220-FT-(325 & 324 & 323)- Foundation (MA-007) - Lean Concrete Foundation 2220-02-10-020 / 024 / 13/Nov/18 14/Nov/18 2 13/Nov/18 14/Nov/18 2 2 0 0 0 0.94 0.94 2
Concrete - Rougher - 2220-FT-(325 & 324 & 323)- Foundation (MA-007)- Rebar Installation 2220-02-10-021 / 025 / 15/Nov/18 26/Nov/18 12 15/Nov/18 26/Nov/18 12 17,462 0 0 0 ### ### 2,910
Cleaner / Scavenger 15/Aug/18 12/Nov/18 90 15/Aug/18 12/Nov/18 90 0 7 4 4 2 84
Concrete - Cleaner/Scavenger - Base Preparation Foundation (Relleno) 2225-01-10-001 21/Oct/18 30/Oct/18 10 si 21/Oct/18 30/Oct/18 10 0.1 0.1 0.1 0.1 0.1 0.1 1 0.1 0.1 0.1 0.10 0 0 0
Concrete - Cleaner/Scavenger - Fundacion MA-005 Eje D - Lean 25/Oct/18 26/Oct/18 2 si 25/Oct/18 26/Oct/18 2 5 2.43 2.43 5 0 0 0
Concrete - Cleaner/Scavenger - Fundacion MA-005 Eje D- Rebar Installation 2225-01-10-002/005/008 27/Oct/18 30/Oct/18 4 27/Oct/18 30/Oct/18 4 1 0 0.25 0.25 0.25 0.25 1 0 0
Concrete - Cleaner/Scavenger - Fundacion MA-005 Eje D - Formwork 2225-01-10-002/005/008 29/Oct/18 31/Oct/18 3 29/Oct/18 31/Oct/18 3 1 0 0.33 0.33 0.33 1 0 0
Concrete - Cleaner/Scavenger - Fundacion MA-005 Eje D - Concrete 2225-01-10-002/005/008 1/Nov/18 2/Nov/18 2 1/Nov/18 2/Nov/18 2 44 0 ### ### 44 0 0
Concrete - Cleaner/Scavenger - Fundacion MA-005 Eje D - Pedestales - Rebar Installation 3/Nov/18 4/Nov/18 2 3/Nov/18 4/Nov/18 2 1 0 0 0.5 0.5 1 0
Concrete - Cleaner/Scavenger - Fundacion MA-005 Eje D - Pedestales - Inserts Installation 4/Nov/18 4/Nov/18 1 4/Nov/18 4/Nov/18 1 1 0 0 1 1 0
Concrete - Cleaner/Scavenger - Fundacion MA-005 Eje D - Pedestales - Formwork Installation 4/Nov/18 4/Nov/18 1 4/Nov/18 4/Nov/18 1 1 0 0 1 1 0
Concrete - Cleaner/Scavenger - Fundacion MA-005 Eje D - Pedestales - Concrete Installation 5/Nov/18 6/Nov/18 2 5/Nov/18 6/Nov/18 2 3 0 0 1.5 1.50 3 0
Concrete - Cleaner/Scavenger - Fundacion MA-001B Eje E Foundation - Lean 2/Nov/18 3/Nov/18 2 2/Nov/18 3/Nov/18 2 2 0 1.06 1 1.06 1 0
Concrete - Cleaner/Scavenger - Fundacion MA-001B Eje E- Rebar Installation 2220-04-10-026/029/032 1/Nov/18 4/Nov/18 4 1/Nov/18 4/Nov/18 4 1 0 0.25 0.25 1 0.25 0.25 1 0
Concrete - Cleaner/Scavenger - Fundacion MA-001B Eje E - Formwork 2220-04-10-026/029/032 3/Nov/18 5/Nov/18 3 3/Nov/18 5/Nov/18 3 1 0 0 0.33 0.33 0.33 1 0
Concrete - Cleaner/Scavenger - Fundacion MA-001B Eje E - Concrete 2220-04-10-026/029/032 6/Nov/18 7/Nov/18 2 6/Nov/18 7/Nov/18 2 34 0 0 ### ### 34 0
Concrete - Cleaner/Scavenger - Fundacion MA-001B Eje E - Pedestales - Rebar Installation 9/Nov/18 10/Nov/18 2 9/Nov/18 10/Nov/18 2 1 0 0 0.50 1 0.5 1
Concrete - Cleaner/Scavenger - Fundacion MA-001B Eje E - Pedestales - Inserts Installation 11/Nov/18 11/Nov/18 1 11/Nov/18 11/Nov/18 1 1 0 0 0 1 1
Concrete - Cleaner/Scavenger - Fundacion MA-001B Eje E - Pedestales - Formwork Installation 10/Nov/18 10/Nov/18 1 10/Nov/18 10/Nov/18 1 1 0 0 0 1 1
Concrete - Cleaner/Scavenger - Fundacion MA-001B Eje E - Pedestales - Concrete Installation 11/Nov/18 12/Nov/18 2 11/Nov/18 12/Nov/18 2 3 0 0 0 1.5 1.5 3
Regrind(HigMills) 18/Oct/18 11/Jan/19 86 18/Oct/18 11/Jan/19 86 0 11 78 93,332 3 678
Concrete - Entrega Besalco NA 18/Oct/18 18/Oct/18 1 si 18/Oct/18 18/Oct/18 1 0 0 0 0
Concrete - Hig Mills Regrind - Foundation - Base Preparation (Limpieza) 2220-04-10-001 19/Oct/18 20/Oct/18 2 si 19/Oct/18 20/Oct/18 2 324 324 0 0 0
Concrete - Hig Mills Regrind - Foundation - Lean Concrete Foundation 2220-04-10-001 21/Oct/18 21/Oct/18 1 si 21/Oct/18 21/Oct/18 1 11 11 11 0 0 0
Concrete - Hig Mills Regrind - Foundation - Rebar Installation 2220-04-10-002 22/Oct/18 25/Oct/18 4 si 22/Oct/18 25/Oct/18 4 31,121 ### ### ### ### 31,121 0 0 0
Concrete - Hig Mills Regrind - Foundation - Formwork Installation 2220-04-10-002 24/Oct/18 25/Oct/18 2 si 24/Oct/18 25/Oct/18 2 75 37.5 37.5 75 0 0 0
Concrete - Hig Mills Regrind - Foundation - Concrete Installation 2220-04-10-002 26/Oct/18 26/Oct/18 1 26/Oct/18 26/Oct/18 1 265 265 265 0 0 0
Concrete - Hig Mills Regrind - Walls West/East Side (WA-002/004/005)- Rebar Instalation 2220-04-10-003 28/Oct/18 16/Nov/18 20 28/Oct/18 16/Nov/18 20 19,067 0 953 953 ### ### ### ### 5,720 953 953 953 ### ### ### ### 6,673 953 953 953 ### ### ### ### 6,673
Concrete - Hig Mills Regrind - Walls West/East Side (WA-002/004/005) - Inserts Installation 2220-04-10-003 7/Nov/18 16/Nov/18 10 7/Nov/18 16/Nov/18 10 1 0 0 0.10 0.10 0.10 0 0.1 0.1 0.1 0.10 0.10 0.10 0.10 1
Concrete - Hig Mills Regrind - Walls West/East Side (WA-002/004/005) - Formwork Installation 2220-04-10-003 2/Nov/18 16/Nov/18 15 2/Nov/18 16/Nov/18 15 1 0 0.07 0 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0
40 Mechanical 26/Sep/18 21/Oct/18 26 26/Sep/18 21/Oct/18 26 0 0 0 0 0 0
GrúaTorre 26/Sep/18 21/Oct/18 26 26/Sep/18 21/Oct/18 26 0 0 0 0 0 0
50 Piping 24/Oct/18 9/Nov/18 17 24/Oct/18 9/Nov/18 17 0 0 0 0 0 0
Regrind Underground (Flotación Sur) 24/Oct/18 9/Nov/18 17 24/Oct/18 9/Nov/18 17 0 0 0 0 0 0
Piping - UG Excavation 2000-01-00-005 24/Oct/18 31/Oct/18 8 si 24/Oct/18 31/Oct/18 8 0.13 0.13 0.13 0 0.13 0.13 0.13 0.13 0.13 1 0 0 Inicio depende de liberación de Ing y la disponibilidad de equipos para movimiento de tierras Ingeniería/Mov Tierras
Piping - Install Underground Pipes 2000-04-50-005 29/Oct/18 7/Nov/18 10 29/Oct/18 7/Nov/18 10 0 0.1 0.10 0.10 0.10 0.10 1 0.1 0.1 0.1 0.10 0.10 1 0
Piping - UG Fill 2000-01-00-005 5/Nov/18 9/Nov/18 5 5/Nov/18 9/Nov/18 5 0 0 0.2 0.20 0.20 0.20 0.20 1 0
Regrind Underground (Flotación Norte) 17/Nov/18 3/Dec/18 17 17/Nov/18 3/Dec/18 17 0 0 0 0 0 0
60 Electrical 4/Nov/18 24/Nov/18 21 4/Nov/18 24/Nov/18 21 0 0 0 0 0 0
Regrind 4/Nov/18 24/Nov/18 21 4/Nov/18 24/Nov/18 21 0 0 0 0 0 0
Electrical- Regrind -Install Grounding Mesh 4/Nov/18 24/Nov/18 21 4/Nov/18 24/Nov/18 21 0 0 0.05 0.05 0.05 0.05 0.05 0.05 0 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0

406589983.xlsx 4 DE 28
MTO WEEK 0 WEEK 1 WEEK 2 WEEK 3
LEAN MOLDAJ
Trisemanal anterior CUMPLIMIENTO FORECAST PRECAST REBAR INSERTS HORMIGÓN
CONC. E Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi

10-Nov

12-Nov
13-Nov
14-Nov
15-Nov
16-Nov
11-Nov
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct

27-Oct
28-Oct
29-Oct
30-Oct
31-Oct
1-Nov
2-Nov

3-Nov
4-Nov
5-Nov
6-Nov
7-Nov
8-Nov
9-Nov
QTY

QTY

QTY

QTY
ID ACTIVITIES IWP START FINISH DUR Progr SI/NO START FINISH DUR M3 M3 M2 Kg kg M3 RESTRICCIONES RESPONSABLES

2240 - Copper - Moly Concentrate Thickening 25/Aug/18 7/Dec/18 105 25/Aug/18 7/Dec/18 105 0 159 230 579,058 2 3,030

C Construction 25/Aug/18 7/Dec/18 105 25/Aug/18 7/Dec/18 105 0 159 230 579,058 2 3,030
Milestone 13/Sep/18 1 13/Sep/18 1
00 Civil 15/Oct/18 13/Nov/18 15/Oct/18 13/Nov/18 0 0 0 0 0 0
Civil & Eatthwork - Duct Banks - DB-001 (2240-YJD-001) - Excavation 2210-27-0S-010 15/Oct/18 24/Oct/18 10 si 15/Oct/18 24/Oct/18 10 0.1 0.1 0.1 0.1 0.1 1 0 0 0 Inicio depende de la disponibilidad de equipos para movimiento de tierras Movimiento de Tierras
Civil & Eatthwork - Duct Banks - DB-002/003/004 (2240-YJD-002)- Excavation 2210-27-0S-010 25/Oct/18 3/Nov/18 10 si 25/Oct/18 3/Nov/18 10 0.1 0.1 0 0.1 0.1 0.1 0.10 0.10 0.10 0.10 1 0.1 0 0 Inicio depende de la disponibilidad de equipos para movimiento de tierras Movimiento de Tierras
Civil & Eatthwork - Duct Banks - DB-005 (2240-YJD-003)- Excavation 2210-27-0S-010 4/Nov/18 13/Nov/18 10 4/Nov/18 13/Nov/18 10 0 0 0.1 0.1 0.10 0.10 0.10 0.10 1 0.1 0.1 0.1 0.10 0
Civil & Eatthwork - Duct Banks - DB-006 (2240-YJD-004)- Excavation 2210-27-0S-010 14/Nov/18 23/Nov/18 10 14/Nov/18 23/Nov/18 10 0 0 0 0.10 0.10 0.10 0
General 13/Sep/18 16/Sep/18 13/Sep/18 16/Sep/18 0 0 0 0 0 0
10 Concrete 25/Aug/18 7/Dec/18 105 25/Aug/18 7/Dec/18 105 0 159 230 579,058 2 3,030
TH-001 (Cu y Molibdeno) 17/Sep/18 31/Oct/18 45 17/Sep/18 31/Oct/18 45 0 80 114 289,527 1 1,520
Concrete - Legs & Column (PI-002-003-004) - Rebar Installation FDN 2240-14-10-002 1/Oct/18 12/Oct/18 12 si 1/Oct/18 12/Oct/18 12 19,661 0 0 0 0
Concrete - Legs & Column - Formwork 2240-14-10-002 13/Oct/18 17/Oct/18 5 si 13/Oct/18 17/Oct/18 5 23 0 0 0 0 Pendiente Compra de nuevo tipo de moldaje Oficina Técnica
Concrete - Legs & Column - Inserts 2240-14-10-002 17/Oct/18 19/Oct/18 3 si 17/Oct/18 19/Oct/18 3 1 0 0 0 0
Concrete - Legs & Column - Concrete 2240-14-10-002 20/Oct/18 21/Oct/18 2 si 20/Oct/18 21/Oct/18 2 93 47 47 93 0 0 0 No se encuentra planos que indiquen detalle de pernos en unidad central Ingeniería
Civil & Eatthwork - TH-001 - Backfill 2240-14-10-004 22/Oct/18 26/Oct/18 5 si 22/Oct/18 26/Oct/18 5 0.2 0.2 0.2 0.2 0.2 1 0 0 0
Concrete - Slab on Grade/Spill Conteinment - Rebar 2240-16-10-001 27/Oct/18 29/Oct/18 3 27/Oct/18 29/Oct/18 3 1 0 0.33 0.33 0.33 1 0 0 Sin ingeniería enfierradura Ingeniería
Concrete - Slab on Grade/Spill Conteinment - Formwork 2240-16-10-001 28/Oct/18 29/Oct/18 2 28/Oct/18 29/Oct/18 2 1 0 0.5 0.5 1 0 0
Concrete - Slab on Grade/Spill Conteinment - Concrete 2240-16-10-001 30/Oct/18 31/Oct/18 2 30/Oct/18 31/Oct/18 2 155 0 ### ### 155 0 0
TH-006 (Cu) 24/Sep/18 17/Nov/18 55 24/Sep/18 17/Nov/18 55 0 80 114 289,527 1 1,508
Concrete - MAT - Concrete FDN 2240-15-10-003 16/Oct/18 17/Oct/18 2 si 16/Oct/18 17/Oct/18 2 1,272 0 0 0 0 Por problema de planta Ready Mix se retrasa vaciado concreto Construcción
Concrete - Legs & Column - Rebar Installation FDN 2240-15-10-002 18/Oct/18 29/Oct/18 12 si 18/Oct/18 29/Oct/18 12 19,661 ### ### ### ### ### ### ### 11,469 ### ### ### 4,915 0 0
Concrete - Legs & Column - Formwork 2240-15-10-002 30/Oct/18 3/Nov/18 5 30/Oct/18 3/Nov/18 5 23 0 4.52 4.52 4.52 4.52 18 4.52 5 0
Concrete - Legs & Column - Inserts 2240-15-10-002 3/Nov/18 5/Nov/18 3 3/Nov/18 5/Nov/18 3 1 0 0 0.33 0.33 0.33 1 0
Concrete - Legs & Column - Concrete 2240-15-10-002 6/Nov/18 7/Nov/18 2 6/Nov/18 7/Nov/18 2 81 0 0 ### ### 81 0 No se encuentra planos que indiquen detalle de pernos en unidad central Ingeniería
Civil & Eatthwork - TH-006 - Backfill 2240-15-10-004 8/Nov/18 12/Nov/18 5 8/Nov/18 12/Nov/18 5 0 0 0.20 0.20 0 0.2 0.2 0.2 1
Concrete - Slab on Grade/Spill Conteinment - Rebar 2240-16-10-001 13/Nov/18 15/Nov/18 3 13/Nov/18 15/Nov/18 3 1 0 0 0 0.33 0.33 0.33 1 Sin ingeniería enfierradura Ingeniería
Concrete - Slab on Grade/Spill Conteinment - Formwork 2240-16-10-001 14/Nov/18 15/Nov/18 2 14/Nov/18 15/Nov/18 2 1 0 0 0 0.50 0.50 1
Concrete - Slab on Grade/Spill Conteinment - Concrete 2240-16-10-001 16/Nov/18 17/Nov/18 2 16/Nov/18 17/Nov/18 2 155 0 0 0 ### 77
Duct Banck 25/Oct/18 21/Nov/18 28 25/Oct/18 21/Nov/18 28 0 0 2 4 0 2
50 Piping 2/Nov/18 14/Nov/18 13 2/Nov/18 14/Nov/18 13 0 0 0 0 0 0
Regrind Underground (Sector Espesadores de concentrado) 2/Nov/18 9/Nov/18 8 2/Nov/18 9/Nov/18 8 0 0 0 0 0 0
Piping - UG Excavation 2000-01-00-006 2/Nov/18 6/Nov/18 5 2/Nov/18 6/Nov/18 5 0 0.20 0 0.2 0.2 0.2 0.20 1 0 Inicio depende de la disponibilidad de equipos para movimiento de tierras Movimiento de Tierras
Piping - Install Underground Pipes 2000-04-50-005 4/Nov/18 9/Nov/18 6 4/Nov/18 9/Nov/18 6 0 0 0.17 0.17 0.17 0.17 0.17 0.17 1 0
Piping - UG Fill 2000-01-00-006 6/Nov/18 8/Nov/18 3 6/Nov/18 8/Nov/18 3 0 0 0.33 0.33 0.33 1 0
Regrind Underground (Plataforma Oriente Moli) 7/Nov/18 14/Nov/18 8 7/Nov/18 14/Nov/18 8 0 0 0 0 0 0
Piping - UG Excavation 2000-01-00-006 7/Nov/18 11/Nov/18 5 7/Nov/18 11/Nov/18 5 0 0 0.20 0.20 0.20 1 0.2 0.2 0
Piping - Install Underground Pipes 2000-04-50-005 9/Nov/18 14/Nov/18 6 9/Nov/18 14/Nov/18 6 0 0 0.17 0 0.17 0.17 0.17 0.17 0.17 1
Piping - UG Fill 2000-01-00-006 11/Nov/18 13/Nov/18 3 11/Nov/18 13/Nov/18 3 0 0 0 0.33 0.33 0.33 1
60 Electrical 25/Oct/18 14/Nov/18 21 25/Oct/18 14/Nov/18 21 0 0 0 0 0 0
TH-001 (Cu y Molibdeno) 25/Oct/18 14/Nov/18 21 25/Oct/18 14/Nov/18 21 0 0 0 0 0 0
Electrical- TH-001 -Install Grounding Mesh 25/Oct/18 14/Nov/18 21 si 25/Oct/18 14/Nov/18 21 0.05 0.05 0 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0 0.05 0.05 0.05 0.05 0.05 0
2610 - Tailing Thickener 25/Aug/18 23/Nov/18 91 25/Aug/18 23/Nov/18 91 0 0 696 292,728 804 1,350

C Construction 25/Aug/18 23/Nov/18 91 25/Aug/18 23/Nov/18 91 0 10 696 292,728 804 1,350


10 Concrete 10/Sep/18 23/Nov/18 75 10/Sep/18 23/Nov/18 75 0 10 696 292,728 804 1,350
TH-004 10/Sep/18 15/Nov/18 67 10/Sep/18 15/Nov/18 67 0 10 348 145,572 402 675
Civil & Eatthwork - TH-004 - Chamber Walls Backfill (Lower Section) 2/Oct/18 16/Oct/18 15 si 2/Oct/18 16/Oct/18 15 0 0 0 0
Concrete - Walls First Half Concrete (Under Slab) - Rebar Installation 1nd Stage (Include Dren 4") 2610-03-10-003 6/Oct/18 15/Oct/18 10 si 6/Oct/18 15/Oct/18 10 35,597 0 0 0 0
Concrete - Walls First Half Concrete (Under Slab) - Formwork Installation 1st Stage 2610-03-10-003 16/Oct/18 18/Oct/18 3 si 16/Oct/18 18/Oct/18 3 313 0 0 0 0
Concrete - Walls First Half Concrete (Under Slab) - Concrete 1st Stage 2610-03-10-003 19/Oct/18 20/Oct/18 2 si 19/Oct/18 20/Oct/18 2 291 145 145 0 0 0
Civil & Eatthwork - TH-004 - Install Corrugated Tunnel (Bottom Section) 2610-15-00 27/Oct/18 10/Nov/18 15 27/Oct/18 10/Nov/18 15 0 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0 0.07 0
Civil & Eatthwork - TH-004 - Tunnel Structural Backfill (Bottom Section) 2610-15-00 1/Nov/18 15/Nov/18 15 1/Nov/18 15/Nov/18 15 0 0.07 0.07 0 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0 0.07 0.07 0.07 0.07 0.07 0.07 0
Concrete - Formwork Removal, Joint Treatment 2610-03-10-003 21/Oct/18 22/Oct/18 2 si 21/Oct/18 22/Oct/18 2 0.5 0.5 1 0 0 0
Concrete - Chamber - Rebar Slab 1 Stage 2610-03-10-004 23/Oct/18 28/Oct/18 6 si 23/Oct/18 28/Oct/18 6 20,948 ### ### ### ### 13,965 ### ### 6,983 0 0
Concrete - Chamber - Inserts Slab 1 Stage 2610-03-10-004 26/Oct/18 27/Oct/18 2 26/Oct/18 27/Oct/18 2 1 0.5 1 0.5 1 0 0
Concrete - Chamber - Formwork Slab 1 Stage 2610-03-10-004 26/Oct/18 29/Oct/18 4 26/Oct/18 29/Oct/18 4 1 0.25 0 0.25 0.25 0.25 1 0 0
Concrete - Chamber - Concrete Slab 1 Stage 2610-03-10-004 30/Oct/18 31/Oct/18 2 30/Oct/18 31/Oct/18 2 135 0 ### ### 135 0 0
Concrete - Chamber - Rebar Slab 2 stage 2610-03-10-004 2/Nov/18 4/Nov/18 3 2/Nov/18 4/Nov/18 3 20,948 0 ### 6,983 ### ### 13,965 0
Concrete - Chamber - Inserts Slab 2 stage 2610-03-10-004 3/Nov/18 4/Nov/18 2 3/Nov/18 4/Nov/18 2 1 0 0 0.5 0.5 1 0 Sujeto de llegada de suministro (inserto) compras
Concrete - Chamber - Formwork Slab 2 stage 2610-03-10-004 5/Nov/18 6/Nov/18 2 5/Nov/18 6/Nov/18 2 1 0 0 0.5 0.50 1 0
Concrete - Chamber - Concrete Slab 2 stage 2610-03-10-004 7/Nov/18 7/Nov/18 1 7/Nov/18 7/Nov/18 1 58 0 0 ### 58 0
Concrete - Formwork Removal, Joint Treatment 2610-03-10-003 1/Nov/18 4/Nov/18 4 1/Nov/18 4/Nov/18 4 0 0.25 0.25 1 0.25 0.25 1 0
TH-005 11/Sep/18 23/Nov/18 74 11/Sep/18 23/Nov/18 74 0 0 348 147,156 402 675
Civil & Eatthwork - TH-005 - Chamber Walls Backfill (Lower Section) 10/Oct/18 17/Oct/18 8 si 10/Oct/18 17/Oct/18 8 0 0 0 0
Concrete - Walls First Half Concrete (Under Slab) - Rebar Installation 1nd Stage (Include Dren 4") 2610-03-10-003 14/Oct/18 23/Oct/18 10 si 14/Oct/18 23/Oct/18 10 35,597 ### ### ### ### 14,239 0 0 0
Concrete - Walls First Half Concrete (Under Slab) - Formwork Installation 1st Stage 2610-03-10-003 23/Oct/18 24/Oct/18 2 si 23/Oct/18 24/Oct/18 2 313 157 157 313 0 0 0
Concrete - Walls First Half Concrete (Under Slab) - Concrete 1st Stage 2610-03-10-003 25/Oct/18 26/Oct/18 2 si 25/Oct/18 26/Oct/18 2 291 145 145 291 0 0 0
Civil & Eatthwork - TH-005 -Install Corruged Tunnel (Bottom Section) 4/Nov/18 18/Nov/18 15 4/Nov/18 18/Nov/18 15 0 0 0.07 0.07 0.07 0.07 0.07 0.07 0 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0
Civil & Eatthwork - TH-005 - Tunnel Structural Backfill (Bottom Section) 9/Nov/18 23/Nov/18 15 9/Nov/18 23/Nov/18 15 0 0 0.07 0 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0
Concrete - Formwork Removal, Joint Treatment 2610-03-10-003 27/Oct/18 28/Oct/18 2 27/Oct/18 28/Oct/18 2 0 0.5 0.5 1 0 0
Concrete - Chamber - Rebar Slab 1Stage 29/Oct/18 3/Nov/18 6 29/Oct/18 3/Nov/18 6 21,740 0 ### ### ### ### ### 18,116 ### 3,623 0
Concrete - Chamber - Inserts Slab 1Stage 1/Nov/18 2/Nov/18 2 1/Nov/18 2/Nov/18 2 1 0 0.50 0.50 1 0 0
Concrete - Chamber - Formwork Slab 1Stage 1/Nov/18 4/Nov/18 4 1/Nov/18 4/Nov/18 4 1 0 0.25 0.25 1 0.25 0.25 1 0 Falta moldaje para losa Oficina Técnica
Concrete - Chamber - Concrete Slab 1Stage 5/Nov/18 6/Nov/18 2 5/Nov/18 6/Nov/18 2 135 0 0 67 ### 135 0
Concrete - Chamber - Rebar Slab 2 Stage 2610-03-10-004 8/Nov/18 10/Nov/18 3 8/Nov/18 10/Nov/18 3 21,740 0 0 ### ### 14,493 ### 7,247
Concrete - Chamber - Inserts Slab 2 Stage 2610-03-10-004 9/Nov/18 10/Nov/18 2 9/Nov/18 10/Nov/18 2 1 0 0 0.50 1 0.5 1
Concrete - Chamber - Formwork Slab 2 Stage 2610-03-10-004 11/Nov/18 12/Nov/18 2 11/Nov/18 12/Nov/18 2 1 0 0 0 0.5 0.5 1
Concrete - Chamber - Concrete Slab 2 Stage 2610-03-10-004 13/Nov/18 13/Nov/18 1 13/Nov/18 13/Nov/18 1 58 0 0 0 ### 58
Concrete - Formwork Removal, Joint Treatment 2610-03-10-003 7/Nov/18 10/Nov/18 4 7/Nov/18 10/Nov/18 4 0 0 0.25 0.25 0.25 1 0.25 0
2831 - Water Supply and Distribution 1/Nov/18 16/Nov/18 16 1/Nov/18 16/Nov/18 16 0 0 0 0 0 0

C Construction 1/Nov/18 16/Nov/18 16 1/Nov/18 16/Nov/18 16 0 0 0 0 0 10,613


00 Civil 1/Nov/18 16/Nov/18 1/Nov/18 16/Nov/18 0 0 0 0 0 10,613
Fresh Water Pond 1/Nov/18 16/Nov/18 16 1/Nov/18 16/Nov/18 16 0 0 0 0 0 0
Civil & Eatthwork - Fresh Water Ponds - Mass Excation 9/Nov/18 16/Nov/18 8 9/Nov/18 16/Nov/18 8 0 0 0.13 0 0.13 0.13 0.13 0.13 0.13 0.13 0.13 1 sujeto a termino de tronaduras Besalco
Civil & Eatthwork - Fresh Water Ponds - Rock Blasting (Pendiente tronadura) 1/Nov/18 8/Nov/18 8 1/Nov/18 8/Nov/18 8 0 0.13 0.13 0 0.13 0.13 0.13 0.13 0.13 0.13 1 0 Pendiente solución de contrato (Explosivo) contrato
Process Water Pond 1/Nov/18 16/Nov/18 16 1/Nov/18 16/Nov/18 16 0 0 0 0 0 0
Civil & Eatthwork - Process Water Ponds - Mass Excation 9/Nov/18 16/Nov/18 8 9/Nov/18 16/Nov/18 8 0 0 0.13 0 0.13 0.13 0.13 0.13 0.13 0.13 0.13 1 sujeto a termino de tronaduras Besalco
Civil & Eatthwork - Process Water Ponds - Rock Blasting (Pendiente tronadura) 1/Nov/18 8/Nov/18 8 1/Nov/18 8/Nov/18 8 0 0.13 0.13 0 0.13 0.13 0.13 0.13 0.13 0.13 1 0 Pendiente solución de contrato (Explosivo) contrato

406589983.xlsx 5 DE 28
SGO WP2 CONCENTRATOR PROJECT
PROGRAMA TRISEMANAL
DATA DATE: AREA STOCKPILE - PEBBLE - MOLIENDA - PLANTA DE CAL
November 23, 2018
PROGRESS PHYSICAL

CAST IN PLACE
periodo Act Programadas 55 Hormigón Proy al 30-Nov 20,843
RESUMEN DE AVANCE AREA N°1 si Act Cumplidas 35 Hormigón al 23-Nov (Real) 18,190
% 64%

WEEK 0 0 WEEK 1 WEEK 2 WEEK 3

Trisemanal anterior CUMPLIMIENTO FORECAST


Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi

17-Nov
18-Nov
19-Nov
20-Nov
21-Nov
22-Nov
23-Nov

24-Nov
25-Nov
26-Nov
27-Nov
28-Nov
29-Nov
30-Nov

10-Dec

12-Dec
13-Dec
14-Dec
11-Dec
1-Dec
2-Dec
3-Dec
4-Dec
5-Dec
6-Dec
7-Dec

8-Dec
9-Dec
RESPONSABLE

QTY

QTY

QTY

QTY
ID ACTIVITIES IWP START FINISH DUR Progr SI/NO START FINISH DUR RESTRICCIONES
S

Civil & Eatthwork-Emergency Tunnel- Install Emergency Tunnel (Corrugated) 2140-36-00-001 4/Nov/18 28/Nov/18 25 si si 4/Nov/18 28/Nov/18 25 0 0 0 0 0 0 0 0 0 0 0 ### 0.04 0 0 0
Civil & Earthwork-Emergency Tunnel- Relleno sobre Tunel Corrugado de Emergencia 2140-15-00-006 29/Nov/18 8/Dec/18 10 29/Nov/18 8/Dec/18 10 0 ### ### 0 0.1 0.1 0.1 ### ### ### ### 1 0.1 0
Civil & Eatthwork-Exit Tunnel- Excavación de Cuna para Tunel Corrugado de Salida 2140-15-00-002 10/Nov/18 20/Nov/18 11 si si 10/Nov/18 20/Nov/18 11 9.1 9.1 9.1 9.1 36 0 0 0
Civil & Eatthwork-Exit Tunnel- Install Exit Tunnel (Corrugated) 2140-14-00-001 22/Nov/18 16/Dec/18 25 si si 22/Nov/18 16/Dec/18 25 0 0 0 0 0 0 ### 0.04 ### ### 0 0 0 0 ### ### ### ### 0 0 0 0 ### ### ### ### 0
Civil & Eatthwork-Relleno para posicionamiento de grúa 750 montaje molinos 3/Nov/18 18/Nov/18 16 si si 3/Nov/18 18/Nov/18 16 0.1 0.1 0 0 0 0
Civil & Eatthwork-Rellenos ejes B-F 23/Nov/18 30/Nov/18 8 18/Dec/18 25/Dec/18 8 0 0 0 0 Se deben terminar fundaciones bombas y cajón alimen hidrococlones Construcción
Piping - UG Excavation - 2000-01-00-006 2000-01-00-006 19/Nov/18 24/Nov/18 6 29/Nov/18 1/Dec/18 3 0 ### ### 1 0.3 0 0
Piping - UG Excavation - 2000-02-00-001 (Tramo 8") 2000-02-00-001 9/Nov/18 16/Nov/18 8 31/Dec/18 1/Jan/19 2 0 0 0 0
Piping - UG Excavation - 2000-02-00-006 2000-02-00-006 11/Dec/18 18/Dec/18 8 12/Dec/18 16/Dec/18 5 0 0 0 ### ### ### 1
Piping - UG Excavation - 2000-02-00-002 2000-02-00-002 22/Nov/18 25/Nov/18 4 21/Dec/18 24/Dec/18 4 0 0 0 0
Eartkwork - Duct bank - DB-004 (2270-YDJ-002) Cruce Camino 2000-01-00-009 20/Nov/18 24/Nov/18 5 11/Dec/18 14/Dec/18 4 0 0 0 ### ### ### ### 1
Eartkwork - Duct bank - DB-003 (2270-YDJ-002) 2000-01-00-008 25/Nov/18 29/Nov/18 5 1/Dec/18 5/Dec/18 5 0 0 0.2 0.2 0.2 ### ### 1 0 Se solicita adelantar excavación ya que se dispone de todos los recursos para iniciar trabajos
Eartkwork - Duct bank - DB-002 (2270-YDJ-001) 2000-01-00-007 30/Nov/18 4/Dec/18 5 6/Dec/18 10/Dec/18 5 0 0 ### ### 0 0.2 0.2 0.2 1
Piping - UG Excavation - 2000-01-00-020 (Tramo con Roca) 2000-01-00-020 5/Dec/18 19/Dec/18 15 5/Dec/18 19/Dec/18 15 0 0 ### ### ### 0 0.1 0.1 0.1 ### ### ### ### 0

406589983.xlsx 6 DE 28
SGO WP2 CONCENTRATOR PROJECT

PROGRAMA TRISE
DATA DATE: FLOTACION - REMOLIENDA - ESPESADORES DE
November 23, 2018
PROGRESS PHYSICAL

periodo Act Programadas 27


RESUMEN DE AVANCE AREA N°2 si Act Cumplidas 22
% 81%

CUMPLIM
Trisemanal anterior
NTO

ID ACTIVITIES IWP START FINISH DUR Progr

Piping - UG Excavation - 2000-01-00-018 (Cruce camino) 2000-01-00-0 21/Nov/18 25/Nov/18 5


Piping - UG Excavation - 2000-01-00-005 (2000-04-50-041 Montaje) Tramo 1 2000-01-00-0 13/Nov/18 30/Nov/18 18 si
Piping - UG Excavation - 2000-01-00-005 (2000-04-50-041 Montaje) Tramo 2 2000-01-00-0 13/Nov/18 30/Nov/18 18
Piping - UG Excavation - 2000-01-00-021 (Tramo en Roca) 2000-01-00-0 3/Dec/18 18/Dec/18 16
Piping - UG Excavation - 2000-01-00-022A (Tramo en Roca) 2000-01-00-0 16/Nov/18 22/Nov/18 7 si
Piping - UG Excavation - 2000-01-00-022B (Tramo en Roca) 2000-01-00-0 29/Nov/18 6/Dec/18 8
Piping - UG Excavation - 2000-01-00-023 (Tramo en Roca) 2000-01-00-0 29/Nov/18 7/Dec/18 9
Excavation - Duct bank - DB-001 (2240-YDJ-001) 2000-07-10- 11/Nov/18 18/Nov/18 8 si
Excavation - Duct bank - DB-005 (2240-YDJ-003) 2000-07-10- 19/Nov/18 19/Nov/18 1 si
Excavation - Duct bank - DB-003 (2240-YDJ-002) 2000-07-10- 20/Nov/18 21/Nov/18 2 si
Excavation - Duct bank - DB-002 (2240-YDJ-002) 2000-07-10- 22/Nov/18 23/Nov/18 2 si
Excavation - Duct bank - DB-004 (2240-YDJ-002) 2000-07-10- 24/Nov/18 28/Nov/18 5
Civil & Eatthwork - TH-001 - Backfill 2240-16-10-0 6/Nov/18 17/Nov/18 12 si
Civil & Eatthwork - TH-006 Backfill 2240-16-10-0 5/Dec/18 11/Dec/18 7
COARSE MATERIAL SCREEN 13/Dec/18 27/Dec/18 15

406589983.xlsx 7 DE 28
SGO WP2 CONCENTRATOR PROJECT

PROGRAMA TRISE
DATA DATE: FLOTACION - REMOLIENDA - ESPESADORES DE
November 23, 2018
PROGRESS PHYSICAL

periodo Act Programadas 27


RESUMEN DE AVANCE AREA N°2 si Act Cumplidas 22
% 81%

CUMPLIM
Trisemanal anterior
NTO

ID ACTIVITIES IWP START FINISH DUR Progr

Piping - UG Excavation - 2000-01-00-019 (tramo en roca) 2000-01-00-0 14/Nov/18 21/Nov/18 8


Piping - UG Excavation - 2000-01-00-019 (tramo acceso TH-001) 2000-01-00-0 26/Nov/18 28/Nov/18 3
Civil & Eatthwork - Molybdeno Plant - Mass Excavation

406589983.xlsx 8 DE 28
SEMANAL
E CONCENTRADO - PLANTA MOLY - PLANTA REACTIVOS - PLANTA FLOCULANTES

CAST IN PLACE
Hormigón Proy al 30-Nov 4,105
Hormigón al 23-Nov (Real) 3,622

WEEK 0 0 WEEK 1 WEEK 2


LIMIE
FORECAST
O Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi

17-Nov
18-Nov
19-Nov
20-Nov
21-Nov
22-Nov
23-Nov

24-Nov
25-Nov
26-Nov
27-Nov
28-Nov
29-Nov
30-Nov

1-Dec
2-Dec
3-Dec
4-Dec
5-Dec
6-Dec
7-Dec
QTY

QTY

QTY
HH

HH
SI/NO START FINISH DUR

26/Nov/18 30/Nov/18 5 0 0 0.2 0.20 0.20 0.20 0.20 1 0 0


si 9/Nov/18 18/Nov/18 10 0.1 0.1 0 0 0 0 0
30/Nov/18 7/Dec/18 8 0 0 0.13 0 0 0.13 0.13 0.13 0.13 0.13 0.13 0.13 1
3/Dec/18 18/Dec/18 16 0 0 0 0 0.06 0.06 0.06 0.06 0.06 0
16/Nov/18 26/Nov/18 11 0.09 0.09 0.09 0.09 0.09 0.09 0.09 1 0 0.09 0.09 0.09 0 0 0
3/Dec/18 10/Dec/18 8 0 0 0 0 0.13 0.13 0.13 0.13 0.13 1
29/Nov/18 7/Dec/18 9 0 0 0.11 0.11 0 0 0.11 0.11 0.11 0.11 0.11 0.11 0.11 1
si 11/Nov/18 18/Nov/18 8 0.13 0.13 0 0 0 0 0
si 19/Nov/18 19/Nov/18 1 1 1 0 0 0 0
si 20/Nov/18 21/Nov/18 2 0.50 0.50 1 0 0 0 0
si 22/Nov/18 23/Nov/18 2 0.50 0.50 1 0 0 0 0
24/Nov/18 28/Nov/18 5 0 0 0.2 0.2 0.2 0.20 0.20 1 0 0
si 9/Nov/18 20/Nov/18 12 0.08 0.08 0.08 0.08 0 0 0 0 0
9/Dec/18 15/Dec/18 7 0 0 0 0 0
20/Jan/19 26/Jan/19 7 0 0 0 0 0

406589983.xlsx 9 DE 28
SEMANAL
E CONCENTRADO - PLANTA MOLY - PLANTA REACTIVOS - PLANTA FLOCULANTES

CAST IN PLACE
Hormigón Proy al 30-Nov 4,105
Hormigón al 23-Nov (Real) 3,622

WEEK 0 0 WEEK 1 WEEK 2


LIMIE
FORECAST
O Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi

17-Nov
18-Nov
19-Nov
20-Nov
21-Nov
22-Nov
23-Nov

24-Nov
25-Nov
26-Nov
27-Nov
28-Nov
29-Nov
30-Nov

1-Dec
2-Dec
3-Dec
4-Dec
5-Dec
6-Dec
7-Dec
QTY

QTY

QTY
HH

HH
SI/NO START FINISH DUR

29/Nov/18 6/Dec/18 8 0 0 0.13 0.13 0 0 0.13 0.13 0.13 0.13 0.13 0.13 1
11/Dec/18 13/Dec/18 3 0 0 0 0 0
9/Jan/19 20/Jan/19 12 0 0 0 0 0
2,844 5,983
### #DIV/0!
41 85
0 0

406589983.xlsx 10 DE 28
WEEK 3 WEEK 4 WEEK 5 WEEK 6

Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi
10-Dec

12-Dec
13-Dec
14-Dec

15-Dec
16-Dec
17-Dec
18-Dec
19-Dec
20-Dec
21-Dec

22-Dec
23-Dec
24-Dec
25-Dec
26-Dec
27-Dec
28-Dec

29-Dec
30-Dec
31-Dec
11-Dec
8-Dec
9-Dec

1-Jan
2-Jan
3-Jan
4-Jan
QTY

QTY

QTY

QTY
HH

HH

HH

HH
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0 0 0.06 0.06 0.06 0.06 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0.13 0.13 0.13 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0.14 0.14 0.14 0.14 0.14 0.14 1 0 0.14 0 0 0 0 0
0 0 0 0 0 0 0 0

406589983.xlsx 11 DE 28
WEEK 3 WEEK 4 WEEK 5 WEEK 6

Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi
10-Dec

12-Dec
13-Dec
14-Dec

15-Dec
16-Dec
17-Dec
18-Dec
19-Dec
20-Dec
21-Dec

22-Dec
23-Dec
24-Dec
25-Dec
26-Dec
27-Dec
28-Dec

29-Dec
30-Dec
31-Dec
11-Dec
8-Dec
9-Dec

1-Jan
2-Jan
3-Jan
4-Jan
QTY

QTY

QTY

QTY
HH

HH

HH

HH
0 0 0 0 0 0 0 0
0 0.33 0.33 0.33 1 0 0 0 0 0 0
0 0 0 0 0 0 0 0
8,591 11,353 51 5,280
#DIV/0! #DIV/0!
123 162 1 75
0 0
###

406589983.xlsx 12 DE 28
HH

RESTRICCIONES RESPONSABLES

0 No hay ingniería rev. 0 Construcción


0
0
0 IWP PRE
0
0 sujeto a cierre de camino Construcción
0 IWP NST
0
0
0
0
0
0 termino sujeto a confirmación de cota ingenieria
0
0

406589983.xlsx 13 DE 28
HH

RESTRICCIONES RESPONSABLES

0
0 Restriccion por cierre al acceso a Espesador Th-001 Construcción
0
4,662

67

406589983.xlsx 14 DE 28
SGO WP2 CONCENTRATOR PROJ
PROG
DATA DATE: ESPESADORES DE RELAVE - PIS
November 23, 2018
PROGRESS PHYSICAL

periodo
RESUMEN DE AVANCE AREA N°3 si

Triseman

ID ACTIVITIES IWP START

Duct Bank
Civil & Earthwork - Fresh Water Ponds - Mass Excavation 16/Nov/18
Civil & Earthwork - Fresh Water Ponds - Remaining Mass Excavation after BESALCO dismiss (marinas y terminaciones)
Civil & Earthwork - Fresh Water Ponds - Rock Blasting (Pendiente tronadura) 14/Nov/18
Civil & Earthwork - Fresh Water Ponds - Terminaciones plataforma estación de bombeo
Civil & Earthwork - Process Water Ponds - Mass Excation 16/Nov/18
Civil & Earthwork - Process Water Ponds - Rock Blasting (Pendiente tronadura) 14/Nov/18
Civil & Earthwork - Process Water Ponds - Remaining Mass Excavation after BESALCO dismiss (marinas y terminaciones)

406589983.xlsx 15 DE 28
PROJECT
PROGRAMA TRISEMANAL
- PISCINAS AGUA FRESCA-PROCESOS - PLANTA FILTROS

CAST IN PLACE
Act Programadas 8 Hormigón Proy al 30-Nov 1,556
Act Cumplidas 7 Hormigón al 12-Nov (Real) 947
% 88%

WEEK 0 0 WEEK 1
isemanal anterior CUMPLIMIENTO FORECAST Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi

17-Nov
18-Nov
19-Nov
20-Nov
21-Nov
22-Nov
23-Nov

24-Nov
25-Nov
26-Nov
27-Nov
28-Nov
29-Nov
30-Nov
QTY

QTY
FINISH DUR Progr SI/NO START FINISH DUR

24/Nov/18 12/Dec/18
23/Nov/18 8 si si 16/Nov/18 23/Nov/18 8 0.13 0.13 0.13 0.13 0.13 0.13 0.13 1 0
24/Nov/18 1/Dec/18 8 0 0.13 0.13 0.13 0.13 0.13 0.13 0.13 1
15/Nov/18 2 si si 22/Nov/18 22/Nov/18 1 1.00 1 0
24/Nov/18 1/Dec/18 8 0 0.13 0.13 0.13 0.13 0.13 0.13 0.13 1
23/Nov/18 8 si si 16/Nov/18 23/Nov/18 8 0.13 0.13 0.13 0.13 0.13 0.13 0.13 1 0
15/Nov/18 2 si si 22/Nov/18 22/Nov/18 1 1.00 1 0
24/Nov/18 1/Dec/18 8 0 0.13 0.13 0.13 0.13 0.13 0.13 0.13 1

406589983.xlsx 16 DE 28
WEEK 2 WEEK 3

Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi
10-Dec

12-Dec
13-Dec
14-Dec
11-Dec
1-Dec
2-Dec
3-Dec
4-Dec
5-Dec
6-Dec
7-Dec

8-Dec
9-Dec
QTY

QTY
RESTRICCIONES RESPONSABLES

0 0 sujeto a termino de tronaduras Besalco / ICEM


0.13 0 0 Mov. De tierra (Marinas) y terminaciones por F-S Construcción
0 0 Tronaduras las ejecuta ICEM contrato
0.13 0 0 Mov. De tierra (Marinas) y terminaciones por F-S Construcción
0 0 sujeto a termino de tronaduras Besalco / ICEM
0 0 Tronaduras las ejecuta ICEM contrato
0.13 0 0 Mov. De tierra (Marinas) y terminaciones por F-S Construcción

406589983.xlsx 17 DE 28
SGO WP2 CONCENTRATOR PROJECT

DATA DATE:
November 13, 2018
WEEK 15 WEEK 16 WEEK 17 WEEK 18 WEEK 19 WEEK 20 WEEK 21 WEEK 22 WEEK 23 WEEK 24 WEEK 25 WEEK 26 WEEK 27
BASELINE PLANNED
LuMaMi Ju Vi SaDo LuMaMi Ju Vi SaDo LuMa Mi Ju Vi SaDo LuMaMi Ju Vi SaDo LuMaMi Ju Vi SaDo LuMaMi Ju Vi SaDo LuMa Mi Ju Vi SaDo LuMaMi Ju Vi SaDo LuMaMi Ju Vi SaDo LuMaMi Ju Vi SaDo LuMa Mi Ju Vi SaDo LuMaMi Ju Vi SaDo LuMaMi Ju Vi SaDo
ID ACTIVITIES

12-Nov
13-Nov
14-Nov
15-Nov
16-Nov
17-Nov
18-Nov
19-Nov
20-Nov
21-Nov
22-Nov
23-Nov
24-Nov
25-Nov
26-Nov
27-Nov
28-Nov
29-Nov
30-Nov

10-Dec

12-Dec
13-Dec
14-Dec
15-Dec
16-Dec
17-Dec
18-Dec
19-Dec
20-Dec
21-Dec
22-Dec
23-Dec
24-Dec
25-Dec
26-Dec
27-Dec
28-Dec
29-Dec
30-Dec
31-Dec

10-Feb
11-Dec

10-Jan

12-Jan
13-Jan
14-Jan
15-Jan
16-Jan
17-Jan
18-Jan
19-Jan
20-Jan
21-Jan
22-Jan
23-Jan
24-Jan
25-Jan
26-Jan
27-Jan
28-Jan
29-Jan
30-Jan
31-Jan
11-Jan
1-Dec
2-Dec
3-Dec
4-Dec
5-Dec
6-Dec
7-Dec
8-Dec
9-Dec

1-Feb
2-Feb
3-Feb
4-Feb
5-Feb
6-Feb
7-Feb
8-Feb
9-Feb
1-Jan
2-Jan
3-Jan
4-Jan
5-Jan
6-Jan
7-Jan
8-Jan
9-Jan
START FINISH DUR START FINISH DUR

PLANNED ACTIVITIES WALLS PRECAST TUNNEL RECLAIM 24/Sep/18 15/Jan/19 114 24/Sep/18 18/Jan/19 117 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 69 70 71 72 73 74 75 69 70 71 72 73 74 75 69 70 71 72 73 74 75 69 70 71 72 73 74 75 69 70 71 72 73 74 75 69 70 71 72 73 74 75 69 70 71 72 73 74 75

ACTIVIDADES DE APOYO 24/Sep/18 11/Nov/18 49 24/Sep/18 31/Oct/18 38


Actividades de Apoyo 24/Sep/18 11/Nov/18 49 24/Sep/18 31/Oct/18 38
ok Previas a Montaje 24/Sep/18 15/Oct/18 22 24/Sep/18 15/Oct/18 22 -4

ok Traslado y Acopio Materiales 24/Sep/18 5/Oct/18 12 24/Sep/18 5/Oct/18 12


ok Plataforma de Trabajo Grúa y Acopio 24/Sep/18 7/Oct/18 14 24/Sep/18 7/Oct/18 14
ok Traslado y Posicionamiento de Grúa en Plataforma 9/Oct/18 15/Oct/18 7 9/Oct/18 15/Oct/18 7
ok Área liberada para iniciar trabajos (East Wall 100%) 7/Oct/18 7/Oct/18 1 7/Oct/18 7/Oct/18 1 0

Durante el Montaje 15/Oct/18 11/Nov/18 28 15/Oct/18 31/Oct/18 17 #REF!

ok Tunel de Reclamo - Instalación de Armadura Muro Oeste 15/Oct/18 29/Oct/18 15 15/Oct/18 24/Oct/18 10 0

ok Tunel de Reclamo - Instalación de Insertos Muro Oeste 25/Oct/18 31/Oct/18 7 23/Oct/18 25/Oct/18 3 0

Tunel de Reclamo - Instalación de Moldajes Muro Oeste 1/Nov/18 8/Nov/18 8 26/Oct/18 29/Oct/18 4 0

Tunel de Reclamo - Hormigonado Muro Oeste 9/Nov/18 10/Nov/18 2 30/Oct/18 30/Oct/18 1 0

Área liberada para iniciar trabajos (West Wall 100%) 11/Nov/18 11/Nov/18 1 31/Oct/18 31/Oct/18 1 0

MONTAJE DE PREFABRICADOS Y EQUIPOS MECÁNICOS 16/Oct/18 15/Jan/19 92 16/Oct/18 18/Jan/19 95

Construcción y Montaje Muros 16/Oct/18 17/Nov/18 33 16/Oct/18 26/Nov/18 42 #REF!

Muros Prefabricados 1000/2000 16/Oct/18 17/Nov/18 33 16/Oct/18 26/Nov/18 42 #REF!

Muros Prefabricados Etapa 1 16/Oct/18 24/Oct/18 9 16/Oct/18 27/Oct/18 12 #REF!

ok PR01001@1003 - Posicionamiento de muro 16/Oct/18 17/Oct/18 2 16/Oct/18 17/Oct/18 2 -1

ok PR01001@1003 - Apuntalamiento de muros 16/Oct/18 17/Oct/18 2 16/Oct/18 17/Oct/18 2


ok PR02001@2003 - Posicionamiento de muro 18/Oct/18 19/Oct/18 2 18/Oct/18 19/Oct/18 2 -1

ok PR02001@2003 - Apuntalamiento de muros 18/Oct/18 19/Oct/18 2 18/Oct/18 19/Oct/18 2


ok Enfilado de cables PR02001@2003 20/Oct/18 20/Oct/18 1 19/Oct/18 20/Oct/18 2
ok Inyección de ductal PR02001@2003 20/Oct/18 20/Oct/18 1 21/Oct/18 21/Oct/18 1
ok PR02004 - Posicionamiento de muro 21/Oct/18 21/Oct/18 1 22/Oct/18 22/Oct/18 1 -1

ok PR02004 - Apuntalamiento de muros 21/Oct/18 21/Oct/18 1 22/Oct/18 22/Oct/18 1


ok Enfilado de cables PR01001@1003 21/Oct/18 21/Oct/18 1 19/Oct/18 21/Oct/18 3
ok Inyección de ductal PR01001@1003 21/Oct/18 21/Oct/18 1 22/Oct/18 22/Oct/18 1
ok Enfilado de cables PR02004 22/Oct/18 22/Oct/18 1 24/Oct/18 24/Oct/18 1
ok Inyección de ductal PR02004 22/Oct/18 22/Oct/18 1 25/Oct/18 25/Oct/18 1
ok Tensado parcial al 30% - PR02001@2003 22/Oct/18 22/Oct/18 1 25/Oct/18 26/Oct/18 2
Tensado total al 100% - PR02001@2003 23/Oct/18 23/Oct/18 1 27/Oct/18 27/Oct/18 1 -1

ok Tensado parcial al 30% - PR01001@1003 23/Oct/18 23/Oct/18 1 25/Oct/18 26/Oct/18 2


Tensado total al 100% - PR01001@1003 24/Oct/18 24/Oct/18 1 27/Oct/18 27/Oct/18 1 -1

Muros prefabricados Etapa 2 23/Oct/18 28/Oct/18 6 23/Oct/18 30/Oct/18 8 -10

ok PR02005@2006 - Posicionamiento de muro 23/Oct/18 23/Oct/18 1 23/Oct/18 25/Oct/18 3 -1

ok PR02005@2006 - Apuntalamiento de muros 23/Oct/18 23/Oct/18 1 23/Oct/18 25/Oct/18 3


ok Enfilado de cables PR02005@2006 23/Oct/18 23/Oct/18 1 24/Oct/18 26/Oct/18 3
ok Inyección de ductal PR02005@2006 23/Oct/18 23/Oct/18 1 25/Oct/18 26/Oct/18 2
Tensado parcial al 30% - PR02004@2006 25/Oct/18 25/Oct/18 1 28/Oct/18 28/Oct/18 1
Tensado total al 100% - PR02004@2006 26/Oct/18 26/Oct/18 1 29/Oct/18 29/Oct/18 1 -1

ok PR02007@2009 - Posicionamiento de muro 24/Oct/18 24/Oct/18 1 25/Oct/18 26/Oct/18 2 -1

ok PR02007@2009 - Apuntalamiento de muros 24/Oct/18 24/Oct/18 1 25/Oct/18 26/Oct/18 2


ok Enfilado de cables PR02007@2009 24/Oct/18 24/Oct/18 1 26/Oct/18 26/Oct/18 1
ok Inyección de ductal PR02007@2009 24/Oct/18 24/Oct/18 1 26/Oct/18 26/Oct/18 1
Tensado parcial al 30% - PR02007@2009 26/Oct/18 26/Oct/18 1 28/Oct/18 28/Oct/18 1
Tensado total al 100% - PR02007@2009 27/Oct/18 27/Oct/18 1 29/Oct/18 29/Oct/18 1 -1

PR02010@2012 - Posicionamiento de muro 25/Oct/18 25/Oct/18 1 26/Oct/18 27/Oct/18 2 -1

PR02010@2012 - Apuntalamiento de muros 25/Oct/18 25/Oct/18 1 26/Oct/18 27/Oct/18 2


Enfilado de cables PR02010@2012 25/Oct/18 25/Oct/18 1 27/Oct/18 27/Oct/18 1
Inyección de ductal PR02010@2012 25/Oct/18 25/Oct/18 1 27/Oct/18 27/Oct/18 1
Tensado parcial al 30% - PR02010@2012 27/Oct/18 27/Oct/18 1 29/Oct/18 29/Oct/18 1
Tensado total al 100% - PR02010@2012 28/Oct/18 28/Oct/18 1 30/Oct/18 30/Oct/18 1 -1

Muros prefabricados Etapa 3 26/Oct/18 31/Oct/18 6 22/Oct/18 31/Oct/18 10 #REF!

PR01004@1006 - Posicionamiento de muro 26/Oct/18 26/Oct/18 1 22/Oct/18 27/Oct/18 6 -1

PR01004@1006 - Apuntalamiento de muros 26/Oct/18 26/Oct/18 1 22/Oct/18 27/Oct/18 6


Enfilado de cables PR01004@1006 26/Oct/18 26/Oct/18 1 24/Oct/18 27/Oct/18 4
Inyección de ductal PR01004@1006 26/Oct/18 26/Oct/18 1 25/Oct/18 28/Oct/18 4
Tensado parcial al 30% - PR01004@1006 28/Oct/18 28/Oct/18 1 30/Oct/18 30/Oct/18 1
Tensado total al 100% - PR01004@1006 29/Oct/18 29/Oct/18 1 31/Oct/18 31/Oct/18 1 -1

PR01007@1009 - Posicionamiento de muro 27/Oct/18 27/Oct/18 1 27/Oct/18 28/Oct/18 2 -1

PR01007@1009 - Apuntalamiento de muros 27/Oct/18 27/Oct/18 1 27/Oct/18 28/Oct/18 2


Enfilado de cables PR01007@1009 27/Oct/18 27/Oct/18 1 28/Oct/18 28/Oct/18 1
Inyección de ductal PR01007@1009 27/Oct/18 27/Oct/18 1 28/Oct/18 28/Oct/18 1
Tensado parcial al 30% - PR01007@1009 29/Oct/18 29/Oct/18 1 30/Oct/18 30/Oct/18 1
Tensado total al 100% - PR01007@1009 30/Oct/18 30/Oct/18 1 31/Oct/18 31/Oct/18 1 -1

PR01010@1012 - Posicionamiento de muro 28/Oct/18 28/Oct/18 1 28/Oct/18 28/Oct/18 1 -1

PR01010@1012 - Apuntalamiento de muros 28/Oct/18 28/Oct/18 1 28/Oct/18 28/Oct/18 1


Enfilado de cables PR01010@1012 28/Oct/18 28/Oct/18 1 28/Oct/18 28/Oct/18 1
Inyección de ductal PR01010@1012 28/Oct/18 28/Oct/18 1 28/Oct/18 28/Oct/18 1
Tensado parcial al 30% - PR01010@1012 30/Oct/18 30/Oct/18 1 30/Oct/18 30/Oct/18 1
Tensado total al 100% - PR01010@1012 31/Oct/18 31/Oct/18 1 31/Oct/18 31/Oct/18 1 -1

Muros prefabricados Etapa 4 29/Oct/18 4/Nov/18 7 30/Oct/18 6/Nov/18 8 #REF!

PR01013@1015 - Posicionamiento de muro 29/Oct/18 29/Oct/18 1 2/Nov/18 2/Nov/18 1 -1

PR01013@1015 - Apuntalamiento de muros 29/Oct/18 29/Oct/18 1 2/Nov/18 2/Nov/18 1


Enfilado de cables PR01013@1015 29/Oct/18 29/Oct/18 1 2/Nov/18 2/Nov/18 1
Inyección de ductal PR01013@1015 29/Oct/18 29/Oct/18 1 2/Nov/18 2/Nov/18 1
406589983.xlsx 18 DE 28
Tensado parcial al 30% - PR01013@1015 31/Oct/18 31/Oct/18 1 4/Nov/18 4/Nov/18 1
Tensado total al 100% - PR01013@1015 1/Nov/18 1/Nov/18 1 5/Nov/18 5/Nov/18 1 -1

PR01016@1018 - Posicionamiento de muro 30/Oct/18 30/Oct/18 1 30/Oct/18 31/Oct/18 2 -1

PR01016@1018 - Apuntalamiento de muros 30/Oct/18 30/Oct/18 1 30/Oct/18 31/Oct/18 2


Enfilado de cables PR01016@1018 30/Oct/18 30/Oct/18 1 31/Oct/18 31/Oct/18 1
Inyección de ductal PR01016@1018 30/Oct/18 30/Oct/18 1 31/Oct/18 31/Oct/18 1
Tensado parcial al 30% - PR01016@1018 1/Nov/18 1/Nov/18 1 2/Nov/18 2/Nov/18 1
Tensado total al 100% - PR01016@1018 2/Nov/18 2/Nov/18 1 3/Nov/18 3/Nov/18 1 -1

PR01019@1021 - Posicionamiento de muro 31/Oct/18 31/Oct/18 1 1/Nov/18 2/Nov/18 2 -1

PR01019@1021 - Apuntalamiento de muros 31/Oct/18 31/Oct/18 1 1/Nov/18 2/Nov/18 2


Enfilado de cables PR01019@1021 31/Oct/18 31/Oct/18 1 2/Nov/18 2/Nov/18 1
Inyección de ductal PR01019@1021 31/Oct/18 31/Oct/18 1 2/Nov/18 2/Nov/18 1
Tensado parcial al 30% - PR01019@1021 2/Nov/18 2/Nov/18 1 4/Nov/18 4/Nov/18 1
Tensado total al 100% - PR01019@1021 3/Nov/18 3/Nov/18 1 5/Nov/18 5/Nov/18 1 -1

PR01022@1024 - Posicionamiento de muro 1/Nov/18 1/Nov/18 1 3/Nov/18 3/Nov/18 1 -1

PR01022@1024 - Apuntalamiento de muros 1/Nov/18 1/Nov/18 1 3/Nov/18 3/Nov/18 1


Enfilado de cables PR01022@1024 1/Nov/18 1/Nov/18 1 3/Nov/18 3/Nov/18 1
Inyección de ductal PR01022@1024 1/Nov/18 1/Nov/18 1 3/Nov/18 3/Nov/18 1
Tensado parcial al 30% - PR01022@1024 3/Nov/18 3/Nov/18 1 5/Nov/18 5/Nov/18 1
Tensado total al 100% - PR01022@1024 4/Nov/18 4/Nov/18 1 6/Nov/18 6/Nov/18 1 -1

Muros prefabricados Etapa 5 2/Nov/18 6/Nov/18 5 4/Nov/18 8/Nov/18 5 #REF!

PR02013@2017 - Posicionamiento de muro 2/Nov/18 2/Nov/18 1 4/Nov/18 4/Nov/18 1 -1

PR02013@2017 - Apuntalamiento de muros 2/Nov/18 2/Nov/18 1 4/Nov/18 4/Nov/18 1


Enfilado de cables PR02013@2017 2/Nov/18 2/Nov/18 1 4/Nov/18 4/Nov/18 1
Inyección de ductal PR02013@2017 2/Nov/18 2/Nov/18 1 4/Nov/18 4/Nov/18 1
Tensado parcial al 30% - PR02013@2017 4/Nov/18 4/Nov/18 1 6/Nov/18 6/Nov/18 1
Tensado total al 100% - PR02013@2017 5/Nov/18 5/Nov/18 1 7/Nov/18 7/Nov/18 1 -1

PR02018@2022 - Posicionamiento de muro 3/Nov/18 3/Nov/18 1 5/Nov/18 5/Nov/18 1 -1

PR02018@2022 - Apuntalamiento de muros 3/Nov/18 3/Nov/18 1 5/Nov/18 5/Nov/18 1


Enfilado de cables PR02018@2022 3/Nov/18 3/Nov/18 1 5/Nov/18 5/Nov/18 1
Inyección de ductal PR02018@2022 3/Nov/18 3/Nov/18 1 5/Nov/18 5/Nov/18 1
Tensado parcial al 30% - PR02018@2022 5/Nov/18 5/Nov/18 1 7/Nov/18 7/Nov/18 1
Tensado total al 100% - PR02018@2022 6/Nov/18 6/Nov/18 1 8/Nov/18 8/Nov/18 1 -1

Muros prefabricados Etapa 6 4/Nov/18 9/Nov/18 6 6/Nov/18 20/Nov/18 15 #REF!

ok PR02023@2027 - Posicionamiento de muro 4/Nov/18 4/Nov/18 1 6/Nov/18 6/Nov/18 1 -1

ok PR02023@2027 - Apuntalamiento de muros 4/Nov/18 4/Nov/18 1 6/Nov/18 6/Nov/18 1


ok Enfilado de cables PR02023@2027 4/Nov/18 4/Nov/18 1 6/Nov/18 6/Nov/18 1
ok Inyección de ductal PR02023@2027 4/Nov/18 4/Nov/18 1 6/Nov/18 6/Nov/18 1
ok Tensado parcial al 30% - PR02023@2027 6/Nov/18 6/Nov/18 1 8/Nov/18 8/Nov/18 1
ok Tensado total al 100% - PR02023@2027 7/Nov/18 7/Nov/18 1 9/Nov/18 9/Nov/18 1 -1

ok PR02028@2032 - Posicionamiento de muro 5/Nov/18 5/Nov/18 1 7/Nov/18 7/Nov/18 1 -1

ok PR02028@2032 - Apuntalamiento de muros 5/Nov/18 5/Nov/18 1 7/Nov/18 7/Nov/18 1


ok Enfilado de cables PR02028@2032 5/Nov/18 5/Nov/18 1 7/Nov/18 7/Nov/18 1
ok Inyección de ductal PR02028@2032 5/Nov/18 5/Nov/18 1 7/Nov/18 7/Nov/18 1
ok Tensado parcial al 30% - PR02028@2032 7/Nov/18 7/Nov/18 1 9/Nov/18 9/Nov/18 1
ok Tensado total al 100% - PR02028@2032 8/Nov/18 8/Nov/18 1 10/Nov/18 10/Nov/18 1 -1

PR02033@2037 - Posicionamiento de muro 6/Nov/18 6/Nov/18 1 17/Nov/18 17/Nov/18 1 ### -1

PR02033@2037 - Apuntalamiento de muros 6/Nov/18 6/Nov/18 1 17/Nov/18 17/Nov/18 1 ###

Enfilado de cables PR02033@2037 6/Nov/18 6/Nov/18 1 17/Nov/18 17/Nov/18 1 ###

Inyección de ductal PR02033@2037 6/Nov/18 6/Nov/18 1 17/Nov/18 17/Nov/18 1 ###

Tensado parcial al 30% - PR02033@2037 8/Nov/18 8/Nov/18 1 19/Nov/18 19/Nov/18 1 0

Tensado total al 100% - PR02033@2037 9/Nov/18 9/Nov/18 1 20/Nov/18 20/Nov/18 1 1 -1

Muros prefabricados Etapa 7 7/Nov/18 12/Nov/18 6 9/Nov/18 14/Nov/18 6 #REF!

PR01025@1029 - Posicionamiento de muro 7/Nov/18 7/Nov/18 1 9/Nov/18 9/Nov/18 1 -1

PR01025@1029 - Apuntalamiento de muros 7/Nov/18 7/Nov/18 1 9/Nov/18 9/Nov/18 1


Enfilado de cables PR01025@1029 7/Nov/18 7/Nov/18 1 9/Nov/18 9/Nov/18 1
Inyección de ductal PR01025@1029 7/Nov/18 7/Nov/18 1 9/Nov/18 9/Nov/18 1
Tensado parcial al 30% - PR01025@1029 9/Nov/18 9/Nov/18 1 11/Nov/18 11/Nov/18 1
Tensado total al 100% - PR01025@1029 10/Nov/18 10/Nov/18 1 12/Nov/18 12/Nov/18 1 1 -1

PR01030@1034 - Posicionamiento de muro 8/Nov/18 8/Nov/18 1 10/Nov/18 10/Nov/18 1 -1

PR01030@1034 - Apuntalamiento de muros 8/Nov/18 8/Nov/18 1 10/Nov/18 10/Nov/18 1


Enfilado de cables PR01030@1034 8/Nov/18 8/Nov/18 1 10/Nov/18 10/Nov/18 1
Inyección de ductal PR01030@1034 8/Nov/18 8/Nov/18 1 10/Nov/18 10/Nov/18 1
Tensado parcial al 30% - PR01035@1039 10/Nov/18 10/Nov/18 1 12/Nov/18 12/Nov/18 1 0

Tensado total al 100% - PR01035@1039 11/Nov/18 11/Nov/18 1 13/Nov/18 13/Nov/18 1 1 -1

PR01031@1033 - Posicionamiento de muro 9/Nov/18 9/Nov/18 1 11/Nov/18 11/Nov/18 1 -1

PR01031@1033 - Apuntalamiento de muros 9/Nov/18 9/Nov/18 1 11/Nov/18 11/Nov/18 1


Enfilado de cables PR01031@1033 9/Nov/18 9/Nov/18 1 11/Nov/18 11/Nov/18 1
Inyección de ductal PR01031@1033 9/Nov/18 9/Nov/18 1 11/Nov/18 11/Nov/18 1
Tensado parcial al 30% - PR01031@1033 11/Nov/18 11/Nov/18 1 13/Nov/18 13/Nov/18 1 0

Tensado total al 100% - PR01031@1033 12/Nov/18 12/Nov/18 1 14/Nov/18 14/Nov/18 1 1 -1

Muros prefabricados Etapa 8 10/Nov/18 15/Nov/18 6 19/Nov/18 24/Nov/18 6 #REF!

PR01034@1038 - Posicionamiento de muro 10/Nov/18 10/Nov/18 1 19/Nov/18 19/Nov/18 1 1 -1

PR01034@1038 - Apuntalamiento de muros 10/Nov/18 10/Nov/18 1 19/Nov/18 19/Nov/18 1 0

Enfilado de cables PR01034@1038 10/Nov/18 10/Nov/18 1 19/Nov/18 19/Nov/18 1 0

Inyección de ductal PR01034@1038 10/Nov/18 10/Nov/18 1 19/Nov/18 19/Nov/18 1 0

Tensado parcial al 30% - PR01034@1038 12/Nov/18 12/Nov/18 1 21/Nov/18 21/Nov/18 1 0

Tensado total al 100% - PR01034@1038 13/Nov/18 13/Nov/18 1 22/Nov/18 22/Nov/18 1 ### -1

PR01039@1043 - Posicionamiento de muro 11/Nov/18 11/Nov/18 1 20/Nov/18 20/Nov/18 1 1 -1

PR01039@1043 - Apuntalamiento de muros 11/Nov/18 11/Nov/18 1 20/Nov/18 20/Nov/18 1 0

Enfilado de cables PR01039@1043 11/Nov/18 11/Nov/18 1 20/Nov/18 20/Nov/18 1 0

Inyección de ductal PR01039@1043 11/Nov/18 11/Nov/18 1 20/Nov/18 20/Nov/18 1 0

Tensado parcial al 30% - PR01039@1043 13/Nov/18 13/Nov/18 1 22/Nov/18 22/Nov/18 1 ###

Tensado total al 100% - PR01039@1043 14/Nov/18 14/Nov/18 1 23/Nov/18 23/Nov/18 1 ### -1

PR01043@1047 - Posicionamiento de muro 12/Nov/18 12/Nov/18 1 21/Nov/18 21/Nov/18 1 1 -1

PR01043@1047 - Apuntalamiento de muros 12/Nov/18 12/Nov/18 1 21/Nov/18 21/Nov/18 1 0

Enfilado de cables PR01043@1047 12/Nov/18 12/Nov/18 1 21/Nov/18 21/Nov/18 1 0

Inyección de ductal PR01043@1047 12/Nov/18 12/Nov/18 1 21/Nov/18 21/Nov/18 1 0

Tensado parcial al 30% - PR01043@1047 14/Nov/18 14/Nov/18 1 23/Nov/18 23/Nov/18 1 ###

Tensado total al 100% - PR01043@1047 15/Nov/18 15/Nov/18 1 24/Nov/18 24/Nov/18 1 ### -1

406589983.xlsx 19 DE 28
Muros prefabricados Etapa 9 13/Nov/18 17/Nov/18 5 22/Nov/18 26/Nov/18 5 #REF!

PR02038@2042 - Posicionamiento de muro 13/Nov/18 13/Nov/18 1 22/Nov/18 22/Nov/18 1 ### -1

PR02038@2042 - Apuntalamiento de muros 13/Nov/18 13/Nov/18 1 22/Nov/18 22/Nov/18 1 ###

Enfilado de cables PR02038@2042 13/Nov/18 13/Nov/18 1 22/Nov/18 22/Nov/18 1 ###

Inyección de ductal PR02038@2042 13/Nov/18 13/Nov/18 1 22/Nov/18 22/Nov/18 1 ###

Tensado parcial al 30% - PR02038@2042 15/Nov/18 15/Nov/18 1 24/Nov/18 24/Nov/18 1 ###

Tensado total al 100% - PR02038@2042 16/Nov/18 16/Nov/18 1 25/Nov/18 25/Nov/18 1 ### -1

PR02043@2047 - Posicionamiento de muro 14/Nov/18 14/Nov/18 1 23/Nov/18 23/Nov/18 1 ### -1

PR02043@2047 - Apuntalamiento de muros 14/Nov/18 14/Nov/18 1 23/Nov/18 23/Nov/18 1 ###

Enfilado de cables PR02043@2047 14/Nov/18 14/Nov/18 1 23/Nov/18 23/Nov/18 1 ###

Inyección de ductal PR02043@2047 14/Nov/18 14/Nov/18 1 23/Nov/18 23/Nov/18 1 ###

Tensado parcial al 30% - PR02043@2047 16/Nov/18 16/Nov/18 1 25/Nov/18 25/Nov/18 1 ###

Tensado total al 100% - PR02043@2047 17/Nov/18 17/Nov/18 1 26/Nov/18 26/Nov/18 1 1 -1

Montaje Mecánico 1/Nov/18 19/Nov/18 19 2/Nov/18 7/Dec/18 36 #REF!

Mechanical 1/Nov/18 19/Nov/18 19 2/Nov/18 7/Dec/18 36 #REF!

Appron Feeder 2280-FE-251 1/Nov/18 7/Nov/18 7 2/Nov/18 19/Nov/18 18 #REF!

Soldadura de Consolas para Plataforma 2280-FE-251 1/Nov/18 4/Nov/18 4 2/Nov/18 16/Nov/18 15 0 0 0 ### ###

Posicionamiento de Módulos Correa Etapa 1 1/Nov/18 4/Nov/18 4 6/Nov/18 7/Nov/18 2


Instalación de Estructura Plataforma 2280-FE-251 5/Nov/18 6/Nov/18 2 17/Nov/18 18/Nov/18 2 ### ###

Montaje de Appron Feeder 2280-FE-251 7/Nov/18 7/Nov/18 1 19/Nov/18 19/Nov/18 1 0

Appron Feeder 2280-FE-252 5/Nov/18 11/Nov/18 7 17/Nov/18 25/Nov/18 9 #REF!

Soldadura de Consolas para Plataforma 2280-FE-252 5/Nov/18 8/Nov/18 4 17/Nov/18 22/Nov/18 6 ### ### 0 0 0 ###

Posicionamiento de Módulos Correa Etapa 2 5/Nov/18 8/Nov/18 4 17/Nov/18 20/Nov/18 4 ### ### 0 0

Instalación de Estructura Plataforma 2280-FE-252 9/Nov/18 10/Nov/18 2 23/Nov/18 24/Nov/18 2 ### ###

Montaje de Appron Feeder 2280-FE-252 11/Nov/18 11/Nov/18 1 25/Nov/18 25/Nov/18 1 ###

Appron Feeder 2280-FE-253 9/Nov/18 15/Nov/18 7 23/Nov/18 1/Dec/18 9 #REF!

Soldadura de Consolas para Plataforma 2280-FE-253 9/Nov/18 12/Nov/18 4 23/Nov/18 28/Nov/18 6 ### ### ### 0 0 0

Posicionamiento de Módulos Correa Etapa 3 9/Nov/18 12/Nov/18 4 23/Nov/18 26/Nov/18 4 ### ### ### 0

Instalación de Estructura Plataforma 2280-FE-253 13/Nov/18 14/Nov/18 2 29/Nov/18 30/Nov/18 2 ### ###

Montaje de Appron Feeder 2280-FE-253 15/Nov/18 15/Nov/18 1 1/Dec/18 1/Dec/18 1 ###

Appron Feeder 2280-FE-254 13/Nov/18 19/Nov/18 7 29/Nov/18 7/Dec/18 9 #REF!

Soldadura de Consolas para Plataforma 2280-FE-254 13/Nov/18 16/Nov/18 4 29/Nov/18 4/Dec/18 6 ### ### ### ### 0 0

Posicionamiento de Módulos Correa Etapa 4 13/Nov/18 16/Nov/18 4 29/Nov/18 2/Dec/18 4 ### ### ### ###

Instalación de Estructura Plataforma 2280-FE-254 17/Nov/18 18/Nov/18 2 5/Dec/18 6/Dec/18 2 0 ###

Montaje de Appron Feeder 2280-FE-254 19/Nov/18 19/Nov/18 1 7/Dec/18 7/Dec/18 1 ###

Montaje Losetas Prefabricadas 8/Nov/18 21/Dec/18 44 20/Nov/18 6/Jan/19 48 #REF!

Losetas Prefabricadas 8/Nov/18 21/Dec/18 44 20/Nov/18 6/Jan/19 48 #REF!

Etapa 1 (Primera mitad del Tunel) 8/Nov/18 13/Dec/18 36 20/Nov/18 25/Dec/18 36 #REF!

PR07001 - Instalación de Loseta 8/Nov/18 8/Nov/18 1 20/Nov/18 20/Nov/18 1 0

PR03001@3004 - Instalación de Losetas 8/Nov/18 9/Nov/18 2 20/Nov/18 21/Nov/18 2 0 0

PR03005 - Instalación de Loseta 9/Nov/18 9/Nov/18 1 21/Nov/18 21/Nov/18 1 0

PR04001@4003 - Instalación de Losetas 10/Nov/18 11/Nov/18 2 22/Nov/18 23/Nov/18 2 ### ###

PR06001@6003 - Instalación de Losetas 10/Nov/18 11/Nov/18 2 22/Nov/18 23/Nov/18 2 ### ###

PR05001 - Instalación de Loseta 12/Nov/18 12/Nov/18 1 24/Nov/18 24/Nov/18 1 ###

PR03006@3007 - Instalación de Losetas 13/Nov/18 14/Nov/18 2 25/Nov/18 26/Nov/18 2 ### 0

PR03008 - Instalación de Loseta 14/Nov/18 14/Nov/18 1 26/Nov/18 26/Nov/18 1 0

PR04004@4006 - Instalación de Losetas 15/Nov/18 16/Nov/18 2 27/Nov/18 28/Nov/18 2 0 0

PR06004@6006 - Instalación de Losetas 15/Nov/18 16/Nov/18 2 27/Nov/18 28/Nov/18 2 0 0

PR05002 - Instalación de Loseta 17/Nov/18 17/Nov/18 1 29/Nov/18 29/Nov/18 1 ###

Sellos SIKAFLEX en Losetas Etapa 1 18/Nov/18 19/Nov/18 2 30/Nov/18 1/Dec/18 2 ### ###

Instalación de Armadura inferior Etapa 1 20/Nov/18 23/Nov/18 4 2/Dec/18 5/Dec/18 4 ### 0 0 0

Instalación de Ductos Transversales Etapa 1 22/Nov/18 25/Nov/18 4 4/Dec/18 7/Dec/18 4 0 0 ### ###

Instalación de Ductos Longitudinales Etapa 1 26/Nov/18 27/Nov/18 2 8/Dec/18 9/Dec/18 2 ### ###

Instalación de Armadura Superior Etapa 1 28/Nov/18 1/Dec/18 4 10/Dec/18 13/Dec/18 4 0 0 0 ###

Instalación de Frame FR1 (Incluye insertos) Etapa 1 30/Nov/18 1/Dec/18 2 12/Dec/18 13/Dec/18 2 0 ###

Hormigonado Losa Etapa 1 2/Dec/18 3/Dec/18 2 14/Dec/18 15/Dec/18 2 ### ###

Post-Tensado Transversal de Losetas Etapa 1 8/Dec/18 10/Dec/18 3 20/Dec/18 22/Dec/18 3 ### ### ###

Post-Tensado Longitudinal de Losetas Etapa 1 11/Dec/18 13/Dec/18 3 23/Dec/18 25/Dec/18 3 ### 0 0

Etapa 2 (Segunda mitad del tunel) 16/Nov/18 21/Dec/18 36 2/Dec/18 6/Jan/19 36 #REF!

PR03009@3010 - Instalación de Losetas 16/Nov/18 17/Nov/18 2 2/Dec/18 3/Dec/18 2 ### 0

PR03011 - Instalación de Loseta 17/Nov/18 17/Nov/18 1 3/Dec/18 3/Dec/18 1 0

PR04007@4009 - Instalación de Losetas 18/Nov/18 19/Nov/18 2 4/Dec/18 5/Dec/18 2 0 0

PR06007@6009 - Instalación de Losetas 18/Nov/18 19/Nov/18 2 4/Dec/18 5/Dec/18 2 0 0

PR05003 - Instalación de Loseta 20/Nov/18 20/Nov/18 1 6/Dec/18 6/Dec/18 1 ###

PR03012@3013 - Instalación de Losetas 21/Nov/18 22/Nov/18 2 7/Dec/18 8/Dec/18 2 ### ###

PR03014@3019 - Instalación de Loseta 22/Nov/18 22/Nov/18 1 8/Dec/18 8/Dec/18 1 ###

PR04010@4012 - Instalación de Losetas 23/Nov/18 24/Nov/18 2 9/Dec/18 10/Dec/18 2 ### 0

PR06010@6012 - Instalación de Losetas 23/Nov/18 24/Nov/18 2 9/Dec/18 10/Dec/18 2 ### 0

PR05004 - Instalación de Loseta 25/Nov/18 25/Nov/18 1 11/Dec/18 11/Dec/18 1 0

PR07002 - Instalación de Loseta 25/Nov/18 25/Nov/18 1 11/Dec/18 11/Dec/18 1 0

Sellos SIKAFLEX en Losetas Etapa 2 26/Nov/18 27/Nov/18 2 12/Dec/18 13/Dec/18 2 0 ###

Instalación de Armadura Inferior Etapa 2 28/Nov/18 1/Dec/18 4 14/Dec/18 17/Dec/18 4 ### ### ### 0

Instalación de Ductos Transversales Etapa 2 30/Nov/18 3/Dec/18 4 16/Dec/18 19/Dec/18 4 ### 0 0 0

Instalación de Ductos Longitudinales Etapa 2 4/Dec/18 5/Dec/18 2 20/Dec/18 21/Dec/18 2 ### ###

Instalación de Armadura Superior Etapa 2 6/Dec/18 9/Dec/18 4 22/Dec/18 25/Dec/18 4 ### ### 0 0

Instalación de Frame FR1 (Incluye insertos) Etapa 2 8/Dec/18 9/Dec/18 2 24/Dec/18 25/Dec/18 2 0 0

Hormigonado Losa Etapa 2 10/Dec/18 11/Dec/18 2 26/Dec/18 27/Dec/18 2 0 ###

Post-Tensado Transversal de Losetas Etapa 2 16/Dec/18 18/Dec/18 3 1/Jan/19 3/Jan/19 3 0 0 ###

Post-Tensado Longitudinal de Losetas Etapa 2 19/Dec/18 21/Dec/18 3 4/Jan/19 6/Jan/19 3 ### ### ###

Rellenos 18/Nov/18 29/Dec/18 42 27/Nov/18 14/Jan/19 49 #REF!

Civil 18/Nov/18 29/Dec/18 42 27/Nov/18 14/Jan/19 49 #REF!

Relleno Lado Sur 18/Nov/18 29/Dec/18 42 27/Nov/18 14/Jan/19 49 0

Hormigonado 2da Etapa - Fase 1 (EL.1.673,0) 18/Nov/18 19/Nov/18 2 27/Nov/18 28/Nov/18 2 0 0

CLMS: Relleno Resistente No Controlado (RDC) - Fase 2 (EL.1.678,5) 22/Nov/18 29/Nov/18 8 1/Dec/18 8/Dec/18 8 ### ### 0 0 0 ### ### ###

CLMS: Relleno Resistente No Controlado (RDC) - Fase 3 (EL.1.685,0) 22/Dec/18 29/Dec/18 8 7/Jan/19 14/Jan/19 8 0 0 0 ### ### ### ### 0

Relleno Lado Norte 20/Nov/18 29/Dec/18 40 29/Nov/18 14/Jan/19 47 0

Hormigonado 2da Etapa - Fase 1 (EL.1.673,0) 20/Nov/18 21/Nov/18 2 29/Nov/18 30/Nov/18 2 ### ###

CLMS: Relleno Resistente No Controlado (RDC) - Fase 2 (EL.1.678,5) 30/Nov/18 7/Dec/18 8 9/Dec/18 16/Dec/18 8 ### 0 0 0 ### ### ### ###

RCM: Relleno Estructural - Fase 3 (EL.1.685,0) 22/Dec/18 29/Dec/18 8 7/Jan/19 14/Jan/19 8 0 0 0 ### ### ### ### 0

406589983.xlsx 20 DE 28
DOMO
MONTAJE
STOCKPILE
DE PREFABRICADOS
- MONTAJE DE YPREFABRICADOS
EQUIPOS MECÁNICOS 30/Dec/99 30/Dec/99 1 30/Dec/99 30/Dec/99 1

Montaje de Tunel Corrugado 14/Oct/18 15/Jan/19 94 14/Oct/18 18/Jan/19 97 #REF!

Civil 14/Oct/18 15/Jan/19 94 14/Oct/18 18/Jan/19 97 -8

Emergency & Exit Tunnel 14/Oct/18 15/Jan/19 94 14/Oct/18 18/Jan/19 97 #REF!

ok Preparación de la base (incluye limpieza con picoton) BESALCO 14/Oct/18 19/Oct/18 6 14/Oct/18 19/Oct/18 6 -1

Relleno de base para Tunel Corrugado 20/Oct/18 27/Oct/18 8 20/Oct/18 2/Nov/18 14


Install Emergency Tunnel (Corrugated) 31/Oct/18 24/Nov/18 25 3/Nov/18 27/Nov/18 25 0 0 0 ### ### ### ### 0 0 0 ### ### ### ### 0 0 -1

Install Exit Tunnel (Corrugated) 16/Nov/18 10/Dec/18 25 16/Nov/18 10/Dec/18 25 ### ### ### 0 0 0 ### ### ### ### 0 0 0 ### ### ### ### 0 0 0 ### ### ### ### 0

Relleno estructural sobre Tunel Corrugado (Emerency Tunnel & Exit Tunnel) 15/Nov/18 24/Dec/18 40 18/Nov/18 27/Dec/18 40 ### 0 0 0 ### ### ### ### 0 0 0 ### ### ### ### 0 0 0 ### ### ### ### 0 0 0 ### ### ### ### 0 0 0 ### ### ### ### 0 0 0 ###

Relleno estructural General 11/Dec/18 1/Jan/19 22 11/Dec/18 1/Jan/19 22 0 0 ### ### ### ### 0 0 0 ### ### ### ### 0 0 0 ### ### ### ### 0 0

Concrete 2/Jan/19 15/Jan/19 14 2/Jan/19 18/Jan/19 17 -6

Prefabricados PR01000 Etapa 1 2/Jan/19 15/Jan/19 14 2/Jan/19 18/Jan/19 17 #REF!

Montaje de Muro PR01071@PR01073 2/Jan/19 2/Jan/19 1 2/Jan/19 2/Jan/19 1 0

Montaje de Muro PR01074@PR01076 2/Jan/19 2/Jan/19 1 2/Jan/19 2/Jan/19 1 1 -1

Montaje de Muro PR01077@PR01079 3/Jan/19 3/Jan/19 1 3/Jan/19 3/Jan/19 1 ###

Montaje de Muro PR01080@PR01082 3/Jan/19 3/Jan/19 1 3/Jan/19 3/Jan/19 1 ###

Montaje de Muro PR01083@PR01085 4/Jan/19 4/Jan/19 1 4/Jan/19 4/Jan/19 1 ###

Montaje de Muro PR01086@PR01088 4/Jan/19 4/Jan/19 1 4/Jan/19 4/Jan/19 1 ###

Montaje de Muro PR01089@PR01091 5/Jan/19 5/Jan/19 1 5/Jan/19 5/Jan/19 1 ###

Montaje de Muro PR01092@PR01094 5/Jan/19 5/Jan/19 1 5/Jan/19 5/Jan/19 1 ###

Montaje de Muro PR01095@PR01097 6/Jan/19 6/Jan/19 1 6/Jan/19 6/Jan/19 1 ### -1

Montaje de Muro PR01098@PR01100 6/Jan/19 6/Jan/19 1 6/Jan/19 6/Jan/19 1 ###

Montaje de Muro PR01101@PR01103 7/Jan/19 7/Jan/19 1 7/Jan/19 7/Jan/19 1 0

Montaje de Muro PR01104@PR01106 7/Jan/19 7/Jan/19 1 7/Jan/19 7/Jan/19 1 1 -1

Montaje de Muro PR01107@PR01109 8/Jan/19 8/Jan/19 1 8/Jan/19 8/Jan/19 1 0

Montaje de Muro PR01110@PR01112 8/Jan/19 8/Jan/19 1 8/Jan/19 8/Jan/19 1 0

Montaje de Muro PR01101@PR01103 9/Jan/19 9/Jan/19 1 9/Jan/19 9/Jan/19 1 0

Montaje de Muro PR01104@PR01106 9/Jan/19 9/Jan/19 1 9/Jan/19 9/Jan/19 1 0

Montaje de Muro PR01107@PR01109 10/Jan/19 10/Jan/19 1 10/Jan/19 10/Jan/19 1 ###

Montaje de Muro PR01100@PR01102 10/Jan/19 10/Jan/19 1 10/Jan/19 10/Jan/19 1 ###

Montaje de Muro PR01103@PR01105 11/Jan/19 11/Jan/19 1 11/Jan/19 11/Jan/19 1 ### -1

Montaje de Muro PR01106@PR01109 11/Jan/19 11/Jan/19 1 11/Jan/19 11/Jan/19 1 ###

Fundación Acceso FO-002 5/Jan/19 15/Jan/19 11 8/Jan/19 18/Jan/19 11 #REF!

Nivelación de la Base 3/Jan/19 3/Jan/19 1 6/Jan/19 6/Jan/19 1 ###

Emplantillado 4/Jan/19 4/Jan/19 1 7/Jan/19 7/Jan/19 1 0

Instalación de Armadura 5/Jan/19 11/Jan/19 7 8/Jan/19 14/Jan/19 7 0 0 ### ### ### ### 0

Instalación de Insertos 9/Jan/19 12/Jan/19 4 12/Jan/19 15/Jan/19 4 ### ### 0.3 0.3 -1

Instalación de Moldajes 13/Jan/19 13/Jan/19 1 16/Jan/19 16/Jan/19 1 0

Hormigonado 14/Jan/19 14/Jan/19 1 17/Jan/19 17/Jan/19 1 ###

Prefabricados PR01000 Etapa 1 15/Jan/19 15/Jan/19 1 18/Jan/19 18/Jan/19 1 #REF!

Montaje de Muro PR01020@PR01022 15/Jan/19 15/Jan/19 1 18/Jan/19 18/Jan/19 1 ###

Montaje de Muro PR01023@PR01025 15/Jan/19 15/Jan/19 1 18/Jan/19 18/Jan/19 1 ### -1

Montaje de Muro PR01026@PR01029 15/Jan/19 15/Jan/19 1 18/Jan/19 18/Jan/19 1 ###

406589983.xlsx 21 DE 28
Area 1 SEMANA CONTROL SEMANA 1 SEMANA 2 SEMANA 3
Plan de Hormigón Unid
17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov 26-Nov 27-Nov 28-Nov 29-Nov 30-Nov 1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec
Concrete diario M3 0 439 24 0 0 184 209 78 0 118 561 98 1,303 495 0 378 261 162 6 23 150 267 0 247 7 166 589 114
Lean C diario M3 0 1 0 0 0 4 4 4 11 4 4 4 4 4 4 0 0 0 21 9 30 0 0 7 0 0 0 0
Concrete Semana M3 855 2,653 979 1,390
Lean C Semana M3 9 36 64 7

Area 2 SEMANA CONTROL SEMANA 1 SEMANA 2 SEMANA 3


Plan de Hormigón Unid
17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov 26-Nov 27-Nov 28-Nov 29-Nov 30-Nov 1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec
Concrete diario M3 0 50 5 5 18 18 18 87 32 0 36 82 206 41 71 45 74 0 49 200 85 139 45 56 51 84 108 137
Lean C diario M3 0 0 0 6 0 0 0 0 0 1 3 0 1 0 0 0 4 6 13 11 12 14 14 6 0 16 1 8
Concrete Semana M3 113 483 524 619
Lean C Semana M3 6 5 45 59

Area 3 SEMANA CONTROL SEMANA 1 SEMANA 2 SEMANA 3


Plan de Hormigón Unid
17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov 26-Nov 27-Nov 28-Nov 29-Nov 30-Nov 1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec
Concrete diario M3 0 0 0 0 0 0 0 0 0 164 164 0 135 145 0 0 0 0 0 8 0 0 0 0 52 64 0 0
Lean C diario M3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Concrete Semana M3 0 609 8 116
Lean C Semana M3 0 0 0 0

Consolidado SEMANA CONTROL SEMANA 1 SEMANA 2 SEMANA 3


Plan de Hormigón Unid
17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov 26-Nov 27-Nov 28-Nov 29-Nov 30-Nov 1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec
Concrete diario M3 0 488 29 5 18 202 227 165 32 282 762 179 1,644 681 71 423 335 162 54 231 235 406 45 304 110 314 697 251
Lean C diario M3 0 1 0 6 0 4 4 4 11 6 7 4 5 4 4 0 4 6 34 20 41 14 14 13 0 16 1 8
Concrete Semana M3 968 3,745 1,511 2,125
Lean C Semana M3 15 41 109 66

Unid. AREA 1 AREA 2 AREA 3 PARCIAL ACUMULADO


Hormigón al 31 Agosto M3 2,263 212 0 2,475 2,475
Hormigón al 30 Septiembre M3 6,437 1,295 192 7,923 10,398
Hormigón al 31 Octubre M3 6,548 1,673 464 8,685 19,082
Hormigón al 23-Nov (Real) M3 2,942 443 291 3,677 22,759
Hormigón Proy al 30-Nov M3 2,653 483 609 3,745 26,504
*Nota: Cubicaciones reales geométricas
REUNION TRISEMANAL
PROYECTO SGO-WP2
FECHA: 31-08-2018

FECHA FECHA FECHA STATUS


ITEM TAREA IWP PRIORIDAD RESP. COMENTARIO
CIERRE PROG REPROG
FECHA FECHA FECHA
1.0 Reclaim tunnel (FDN Reclaim Tunnel) IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
1.1 Se reprograma vaciado de concreto por verificación del montaje de los insertos y trabajos de moldajes 2140-04-10-002 ALTA 30/ago/18 7/sep/18 Marcos Emparam
1.2 Se adelanta el montaje de las armaduras de la segunda etapa del tunel 2140-04-10-002 ALTA 4/sep/18 3/ago/18
1.3
FECHA FECHA FECHA
2.0 Chamber Emergency Tunnel IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
2.1 Se incorpora al plan de Septiembre se indica fecha de entrega rebar en terreno al 05-09-2018 2140-04-10-002 ALTA 27/sep/18
2.2
2.3
FECHA FECHA FECHA
3.0 Stacker (Foundation + Walls) IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
3.1
3.2
3.3
3.4
FECHA FECHA FECHA
4.0 Ball Mill 001 IWP PRIORIDAD STATUS RESP.
CIERRE PROG REPROG
4.1
4.2
4.3
FECHA FECHA FECHA
5.0 Ball Mill 002 IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
5.1 Se reprograma Concrete - Ball Mill 02 - MAT Foundation - Rebar Installation 2210-05-10-002 ALTA 30/ago/18 7/sep/18
5.2 Se reprograma Concrete - Ball Mill 02 - MAT Foundation - Concrete 2210-05-10-002 ALTA 2/sep/18 11/sep/18
5.3
5.4
5.5
FECHA FECHA FECHA
6.0 Sag Mill IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
6.1 Se reprograma Concrete - Sag Mill - MAT Foundation - Rebar installation 1st stage 18/sep/18
6.2
6.3
6.4
FECHA FECHA FECHA
7.0 F-H (Ball Bin) IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
7.1
7.2
7.3
FECHA FECHA FECHA
8.0 Tower Crane IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
8.1 Se reprograma término de la segunda etapa, por visita del vendor para revisión de los insertos 2220-01-10-003 ALTA 31/ago/18 7/sep/18
8.2
8.3
FECHA FECHA FECHA
9.0 Piperacks (YDA 003/004) IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
9.1
9.2
9.3
9.4
FECHA FECHA FECHA
10.0 Regrind (Foundation Hig Mills) IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
10.1 Pendiente fecha de término de trabajos BESALCO para incorporar fecha definitiva ingreso al área Regrind (Found n/a ALTA 6/sep/18
10.2
10.3
10.4
FECHA FECHA FECHA
11.0 2240 - Copper - Moly Concentrate Thickening - TH-004 IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
11.1
11.2
11.3
11.4
FECHA FECHA FECHA
12.0 2610 - Tailing Thickener - TH-004 IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
12.1
12.2
12.3
12.4
FECHA FECHA FECHA
13.0 2610 - Tailing Thickener - TH-005 IWP PRIORIDAD STATUS RESP. COMENTARIO
CIERRE PROG REPROG
13.1
13.2
13.3
13.4
Reporte Diario
Construction Concrete Plan - 3 Week Look Ahead
Nombre de Proyecto SGO WP2 Concentrator and Filter Plant
Preparado por: Felipe Guzmán
Fecha de Control Joaquín Gonzalez

1. AVANCE FISICO
Comentarios avance
Project Budget Planned Labor Earned Labor Desviación Start Finish Forecast Var
Labor Units Units Units Units Baseline Baseline Días

RESUMEN AVANCE 248,675 0


CONSTRUCCIÓN
7/31/2018 9/30/2018 9/30/2018 0
100% 0.00% 0.00% 0.00%

1 Agosto Septiembre 12
Octubre
1
10
1

1
8
1

1 6

0
4
0

0
2
0

0 0
8 8 8 8 8 8 8 8 8 8 8 8
01 01 01 01 01 01 01 01 01 01 01 01
7-2 8 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2
- 0 -0 - 08 - 08 - 08 - 09 - 09 - 09 - 09 - 10 - 10 - 10
31 06 13 20 27 03 10 17 24 01 08 15
#REF!

31/Jul/18 1/Aug/18 2/Aug/18 3/Aug/18


HH Plan 223 309 223 817
HH Real
Plan Acum 223 532 755 1572
Plan Acum (%) #REF! #REF! #REF! #REF!
Real Acum 0 0 0 0
Real Acum (%) #REF! #REF! #REF! #REF!
Desviación #REF! #REF! #REF! #REF!

SEM 0 SEM 1 SEM 2 SEM 3

31-07-2018 06-08-2018 13-08-2018 20-08-2018

HH Plan #REF! #REF! #REF! #REF!


HH Real
Plan Acum #REF! #REF! #REF! #REF!
Real Acum 0 0 0 0
Plan Acum (%) #REF! #REF! #REF! #REF!
Activity Name

to Dec.2018 - Update 27.Jul.2018


Ore Reclaim

Área Stacker liberada para acceso (BESALCO)


Área Reclaim Tunnel liberada para iniciar trabajos (BESALCO)

Rebar Release for Fabrication- Coarse Ore Storage Stockpile & Reclaim Tunnel (MAT Reclaim tunel) - VSL
Rebar Release for Fabrication- Coarse Ore Storage Stockpile & Reclaim Tunnel (Reclaim tunel end walls ) - VSL
Rebar Release for Fabrication- Coarse Ore Storage Stockpile & Reclaim Tunnel (Reclain tunel upper slab)- VSL
Rebar Release for Fabrication - Coarse Ore Storage Stockpile & Reclaim Tunnel (Stock pile access)
IFC- Retaing walls & Sag ball feed system & Conveyor to SAG FDN
Rebar Release for Fabrication - Stacker Foundation - Design by WP01

Rebar at Site - Coarse Ore Storage Stockpile & Reclaim Tunnel (MAT Reclaim tunel) - VSL
Rebar at site - Stacker Foundation
Rebar at Site - Coarse Ore Storage Stockpile & Reclaim Tunnel (Reclaim tunnel end walls ) - VSL
Rebar at Site - Coarse Ore Storage Stockpile & Reclaim Tunnel (Reclaim tunnel upper slab)- VSL
Rebar at Site - Retaing walls & Sag ball feed system & Conveyor to SAG FDN

Apron Feeders delivery - FLS


Apron Feeders Support Platform delivery - FLS
Conveyor CV-0253 Modules (inside tunnel) delivery - FLS
Discharge Hoopers - delivery - FLS

VSL - Delivery at site precast walls 1st Stage


VSL - Delivery at site precast walls 2nd Stage
VSL - Delivery at site precast walls 3rd Stage
VSL - Delivery at site precast walls 4th Stage
VSL - Delivery at site precast beams reclaim
VSL - Delivery at site precast walls 5th Stage
Civil & Earthwork - 2140-13-0S - Coarse Ore Reclaim Massive Excavation
Pay item S8.1 S8.1 S26.1 S26.1 S26.1 S4.1 S4.1

2da etapa Molino


Tunel de Tunel de Bolas 2
recuperac emergencia (50%
ión Chamber final) SAG etapa 1 SAG etapa 2 PR003 PR004
Armadura 5.000 5.000 8.000 8.000 8.000 6.000 6.000
Moldaje 3.200 3.200 3.025 3.025 3.025 4.005 4.005
Hormigon 1.931 1.931 1.085 1.085 1.085 8.429 8.429
Andamios 0.492 0.492 0.592 0.592 0.592 0.904 0.904

You might also like