PEMBANGUNAN GARDU INDUK 150 KV AIMAS

PRICE SCHEDULE 1 : CIVIL WORK, INSTALLATION AND OTHER SERVICES


CIVIL WORKS
BILL NO. 4 : SECURITY POST

UNIT PRICE TOTAL PRICE


NO. DESCRIPTION UNIT QTY LOCAL CURRENCY LOCAL
PORTION
(RUPIAH) (RUPIAH)

A. EARTHWORK
1. Excavation work m3 19.20 120,400 2,311,680.00
2. Backfill filling with selected material m3 7.92 65,000 514,800.00
3. Sand layer ( compacted sand ) m3 1.68 47,800 80,304.00
4. Import Filling with selected Material m3 3.60 129,900 467,640.00

B. CONCRETE REINFORCEMENT AND INSTALATION WORK


1. Stone masonry ad 1 : 3 m3 9.60 1,535,750 14,743,200.00
2. A half brick wall ad 1 pc : 4 sand m2 66.00 160,800 10,612,800.00
3. Plaster ad 1 pc : 4 sand m2 111.00 69,000 7,659,000.00
4. Plaster ad 1 pc : 2 sand m2 21.00 77,560 1,628,760.00
5. Acian m2 132.00 47,125 6,220,500.00
6. Sloof work K 175 15/20 m3 0.72 1,854,500 1,335,240.00
7. Column work K 175 15/15 m3 0.61 1,854,500 1,131,245.00
8. Ring balk work K 175 15/20 m3 0.72 1,854,500 1,335,240.00
9. Concrete for Table K 175 (Meja Jaga) m3 0.32 1,854,500 593,440.00
10. Steel work 120 kg /m3 concrete kg 284.40 20,138 5,727,105.00
Concrete f'c = 7.4 MPa (K-100), slump (12±2)
11. m3 1.54 1,666,583 2,566,538.33
(selasar, carport, terrace) t=7 cm

C. FLOOR AND WALL TILING


1. Glazed ceramic floor tiles 400 x 400 mm m2 18.00 241,200 4,341,600.00
2. Glazed ceramic floor tiles 200 x 200 mm (toilet) m2 3.00 216,000 648,000.00
3. Glazed ceramic wall tiles 200 x 250 mm (toilet, table) m2 18.50 247,800 4,584,300.00
4. Glazed ceramic plint tiles 100 x 400 mm m' 30.00 121,300 3,639,000.00

D. SANITARY AND PLUMBING WORK


Supply and fix the following including all jointing,
materials for fixing and plugging and making good on
competion sanitary appliances are to be of high
quality
1. Kitchen sink stainless steel complete unit - 1,800,000 -
2. Bath basin complete unit 1.00 1,800,000 1,800,000.00
3. Squatting water closed complete unit 1.00 688,460 688,460.00
Installation of water supply pipe PVC AW and
fittings (include for all pipes, bends, tees, albows,
4. set 1.00 1,054,000 1,054,000.00
reducers, adaptors, taps and connections to
fittings, appliances, etc.)
Installation of water waste pipe PVC dia 3 inc and
fittings (include for all pipes, bends, tees, albows,
5. set 1.00 10,132,000 10,132,000.00
reducers, adaptors, metal grill and connections to
fittings, appliances, etc.)
6. Septictank cap 1.5 m3 included infiltrate cap 2 m3 complete
set with 1.00 8,224,554 8,224,554.49
palm fibre and sand stone

Name of Bidder : Signature : 1 dari GI 150 KV AIMAS


7. Control Box include cover unit 2.00 1,070,474 2,140,947.35

E. DOOR AND WINDOWS WORK


1. Glass door complete with aluminium frame and accessories:
- Type P1 (Single door) 890 x 2500 mm unit 1.00 2,550,000 2,550,000.00

2. Glass door and windows complete with aluminium frame and accessories:
- Type PB 1 unit 1.00 2,900,000 2,900,000.00

3. PVC door complete with aluminium frame and accessories:


- Type P2 unit 1.00 2,150,000 2,150,000.00

4. Glass windows & ventilation complete with aluminium frame and accessories::
- Type J1 unit 1.00 2,300,000 2,300,000.00
- Type BV1 unit 1.00 1,340,000 1,340,000.00
- Type BV2 unit 1.00 1,270,000 1,270,000.00

F. ROOF AND CELLING WORK


1. Atap Multiroof m2 30.00 453,700 13,611,000.00
2. Nok Atap Multiroof m' 15.00 396,000 5,940,000.00
3. Listplank super sheet (GRC) m' 28.00 85,500 2,394,000.00
4. Rangka atap baja ringan m2 30.00 447,600 13,428,000.00
5. Plafond gypsum board 9 mm complete with hanger, and
m2 frame 42.00 54,735 2,298,870.00
6. List profil gypsum m' - 54,450 -

G. PAINTING WORK
Prepare and apply one coat alkali resistant primer
1. and three coats vinyl acrylic emulsion (wall & m2 132.00 35,750 4,719,000.00
celling)
Prepared and apply two coats alkali resistant
2. primer and three coats exterior grade m2 - 35,750 -
weathershield

H. INSTALATION OF ELECTRICAL AND MECANICAL WORK


Installation of electric lighting to included for all
neccesary (cabling plugs, fittings, lights, exhaust fans,
etc.)
1. Downlight No 4.00 75,000 300,000.00
2. Price for capacity electrical ls 1.00 19,500,000 19,500,000.00
3. Stop contact No 2.00 300,000 600,000.00
4. Box Panel MCB No 1.00 2,000,000 2,000,000.00
5. Exhaus fan ceiling 40 W/220 Volt (10") very low noice No 1.00 400,000 400,000.00

TOTAL PRICE SECURITY POST 171,881,224.17

Gresik, .................. 2018

Dibuat oleh :
Kontraktor Pelaksana
PT. KARMATEK INDONESIA JAYA

Abdul Halim, ST.


Direktur

Name of Bidder : Signature : 2 dari GI 150 KV AIMAS