You are on page 1of 4

PROJECT

TITLE
Client:
Tag No:-
…. 1 Equipment Description
…. 2 Quantity Required 1No
…. 3 Equipment Position Horizontal
…. 4 Diameter (OD) 2100 mm
…. 5 TL - TL Length 8200 mm
…. 6 Support Type Saddle Support -(2Nos)
…. 7 Design Code EN13445
…. 8 Basic Material of Construction P265GH
…. 9 Shell Thickness 8mm
…. 10 2:1 ellipsoidal Dish Thickness 6 Minimum, 8Nominal
…. 11 Capacity (useful/Total) 24900/30210 L
…. 12 Design Pressure 1 bar Internal / 0.2bar External
…. 13 Design Temperature 200 degree C
…. 14 Hydrotest Pressure 3.1 bar
…. 15 Corrosion Allowance 1 mm
…. 16 Radiography Considered as per Code and as per datasheet
…. 17 Joint Efficiency 0.7 for shell and dish
…. 18 Post weld heat treatment(PWHT) Not required as thickness is not more than 32 mm
…. 19 Impact Testing Not considered
…. 21 Weight Summary
…. 22 Fabricated Weight 5300 Kg (Approx)

…. 23
…. 24 Nozzle table
…. 25 Description Size Qty SCH/THK Flange Face Rating
…. 26 N01 508 1 10 WN RF 150#
…. 27 N03 114.3 1 8 WN RF 150#
…. 28 N04 139.7 1 8 WN RF 150#
…. 29 N05 114.3 1 8 WN RF 150#
…. 30 N08 76.1 1 5 WN RF 150#
…. 31 N09 114.3/168.3 1 8 WN RF 150#
…. 32 N10.3 114.3 1 8 WN RF 150#
…. 33 N13.1 60.3 1 5 WN RF 150#
…. 34 N13.2 60.3 1 5 WN RF 150#
…. 35 N13.4 60.3 1 5 WN RF 150#
…. 36 N14 60.3 1 5 WN RF 150#
…. 37 N15 60.3 1 5 WN RF 150#
…. 38 N16 60.3 1 5 WN RF 150#
…. 39 N17.2 900 1 10 WN RF 150#
…. 40 N30 60.3 1 5 WN RF 150#
…. 41 Material of Construction
…. 42 Shell / Head P265GH-1.0425
…. 43 Nozzle neck pipe P235GH-1.0345
…. 44 Nozzle flange / Blind flange P250GH-1.0460
…. 45 Re-inforcing pad P265GH-1.0425
…. 46 Saddle Support S235JR-1.0038
…. 47 Anchor bolt ASTM A 36 or Eq.
…. 48 Painting
…. 50 Primer DFT-40micron,Saddles abrasive blasting SA2 1/2, primer,Final coating ea
Painting (External Surface)
…. 52 film thk 80micron,Colour -RAL7001
…. 53 Additional Scope as per client requirement
…. 54 Accessories Required (Pr. Gauge, safety valve,etc)
…. 55 Statutory Certification Required. . Client to check.
…. 57 Safety Valve Required
…. 58 Manual Drain Required
…. 61 Hydro Test Required at testing pressure
…. 62 Foundation Bolt Required
…. 63 corrosion protection Required
…. 64 Ladder and vessel platform Required
…. 65 Approval of Drawing before Manufacturing Required
…. 66 Inspection before Dispatch Required
Dt: --/Nov/--

Rev 0A

datasheet

e than 32 mm

RF Pad Remark
Blind and davit

Blind
- -
- -
- -
-
-
-
-
-
Blind
-
-
Blind
on

ve blasting SA2 1/2, primer,Final coating each dry

, safety valve,etc)