BOQ REFERENCE ITEM DESCRIPTION IN RFA KEYWORD REMARKS

d/7a/1/B Earthwork - Excavation for foundations: Maximum depth 2-5 Excavation


material other than top soil , rock or artificial hard material Inspection for the excavation, formation preparation and formwork setting out for blinding
concrete of pile cap at Pier __ Bridge __ followed by FDT.

d/7a/1/G Excavation ancillaries: Preparation of excavated surface to Formation


receive permanent works. Inspection for the excavation, formation preparation and formwork setting out for blinding preparation
concrete of pile cap at Pier __ Bridge __ followed by FDT.

d/7a/2/A Earthwork - Filling to structure Using Suitable excavated material. Inspection for the backfilling around pile cap in layer at Bridge MC6A Pier 3. backfilling

d/7/a/3/B Insitu Concrete: Provision concrete: concrete sulphate resisting Inspection for the laying of 2 layer polythene sheet followed by blinding concrete of pile cap blinding
class 15/20; SRPC at Pier __ Bridge ___. (Concrete Grade: 15/20 SRC). concrete
Insitu Concrete: Provision concrete: concrete sulphate resisting Inspection for the laying of 2 layer polythene sheet followed by blinding concrete of pile cap blinding
d/7/a/3/B&F class 15/20; SRPC. & Placing of concrete: blinding concrete SRC at Pier __ Bridge ___. (Concrete Grade: 15/20 SRC). concrete
not exceeding 150mm thick

d/7a/3/D Insitu Concrete: Provision concrete: concrete class 50/20 OPC . total for all 50/20

d/7a/3/E Insitu Concrete: Provision concrete: concrete class 60/20 OPC . total for 60/20

d/7a/3/D&H Insitu Concrete: Provision concrete: concrete class 50/20 OPC . Inspection for the shutter work of pile cap Pier __ at Bridge ____ followed by concrete shutter work of
& Placing of concrete: Pile caps thickness exceeding 500mm casting. (Concrete Grade : 50/20 OPC+MS). pile cap
Insitu Concrete: Provision concrete: concrete class 50/20 OPC .
d/7a/3-D&J Inspection for the shutter work of __ nos. pile extension at Abutment __ at Bridge pile extension
& Placing of concrete: Abutment column shaft -Cross sectional ____followed by concrete casting. (Concrete Grade : 50/20 OPC+MS).
Area : exceeding 1m2
Insitu Concrete: Provision concrete: concrete class 50/20 OPC . Inspection for the casting concrete of ___ stage of Pier Column ___ in Pier ___ at Bridge ____
d/7a/3-D&K & Placing of concrete: Pier -Cross sectional Area : exceeding stage of pier
(Concrete Grade : 50/20 OPC+MS).
1m2
Insitu Concrete: Provision concrete: & Placing of concrete: Inspection for the shutter work of pile cap Abutment __ at Bridge ___ followed by concrete shutter work of
d/7a/4-A &3-D Abutment Base (Concrete class 50/20): Thickness exceeding casting. (Concrete Grade : 50/20 OPC+MS). pile cap
500mm
Insitu Concrete :Provision concrete: & Placing of concrete:
d/7a/4/G & 3E Prestressed concrete : Prestressed post tensioned cast insitu box Inspection for falsework and formwork of bottom slab, webs and diaphragm beam at Bridge bottom
grider deck thickness exceeding 500mm ___________followed by concrete casting. _______. (Concrete Grade : 60/20 SRC). slab/deck slab don’t mind
chainage, only
quantity per
Inspection for the concrete casting of top slab at Bridge__________ between __________. top slab "POUR"
(Concrete Grade : 60/20 OPC+MS).

d/7a/5-A Concrete ancillaries - Formwork class F3: Horizontal soffit of Inspection for the setting out and formwork for bottom slab, webs and diaphragm for Pour __ bottom
bridge deck. at__________ between ___________ slab/deck slab
follow chainage

d/7a/5-B Concrete ancillaries-Formwork class F3: Edges of bridge deck; Inspection for the setting out and formwork for bottom slab, webs and diaphragm for Pour __ bottom
Width: 0.2-0.4m at__________ between ___________ slab/deck slab
follow chainage
Concrete ancillaries - Formwork class F3: Vertical sides of Inspection for the setting out and formwork for bottom slab, webs and diaphragm for Pour __
d/7a/5-D diaphragm
diaphram at pier/abutment; width: exceeding 1.22m at__________ between ___________
follow chainage
shutter
d/7a/5-E Concrete ancillaries:- Formwork Class F3 - Column Piers Inspection for the ____ stage setting out and shutter formwork of Pier Column ____ in Pier formwork of
including architectural grooves as detailed on drawings ___ at Bridge ____ pier

d/7a/5-F Concrete ancillaries-Formwork class F3: Curved and sloping Inspection for the setting out and formwork for bottom slab, webs and diaphragm for Pour __ webs
soffit of bridge deck at__________ between ___________
follow chainage
Concrete ancillaries:- Form work Class F4 : Voids in Bridge deck
d/7a/6-A varying in size, dimension approximately Min 2510x1530mm Inspection for the setting out and formwork of top slab at ______ top slab
varies upto max 3485x1530mm in size as shown on the drawing
for the Bridge MC6A follow chainage

d/7a/6-B Concrete ancillaries:- Form work Class F2 : Pile cap- Width Inspection for the setting out of pile cap and formwork for Pier ____ at ____. pile cap and
exceeding 1.22m formwork

Concrete ancillaries:- Form work Class F2 :Side of abutment formwork of


d/7a/6-C Inspection for the setting out and formwork of abutment at ______
base Width exeeding 1.22m abutment

d/7a/6-D Concrete ancillaries:- Form work Class F2 : sides of column Inspection for the setting out of pile extension at ______ pile extension
shaft for abutment ,Width exceeding 1.22m

d/7a/8 -A to E Reinforcement: Deformed high yield steel bars to BS 4449 G500- Inspection for the _______ reinforcement of ______ at Bridge _______ reinforcement
Nominal size 12mm,16mm,20mm,25mm& 32mmor greater
Post tensioned prestressing; Prestressing steel; 15.2mm strand 7
d/7a/10 -A to E wire super low relaxation grade 270 confirming to ASTMA416 ; Inspection for the post tensioning duct profile for webs at ________ Ch. _____ duct profile
Main cables , Bridge MC6A follow chainage
Inspection for the water pressure test followed by grouting of 18 nos. of tendon at Bridge grouting
_____

Concrete ancillaries:-Post-tensioned prestressing - Jacking o


d/7a/11-C Inspection for the friction test followed by stressing at Bridge MC6A-3. friction test
prestressing tendons to the force show on dwg

Inspection for the slippage in 18 nos. of tendon after stressing followed by trimming at Bridge tendon
_____

d/7a/12-A Concrete accessories: Finishing of top surface of pile cap Inspection for the surface preparation followed by waterproofing (horizontal side including surface
,abutment slab and footing Class U4 finish upto pier termination on vertical side - Polyprime SB, Bitustick XL, Bituboard) at ____ preparation
Miscellaneous metal work:Stainless steel cover plate; 500mm
d/7a/15-C dia stainless steel plate for jack location for bearing replacement Installation of Jack Plate jack
(at Pier & Deck )including all as shown in drawing specification
Miscellaneous metal work:Stainless steel cover plate; 500mm
d/7a/15-D dia stainless steel plate for jack location for bearing replacement Installation of Jack Plate jack
(at Abutment & Deck )including all as shown in drawing
specification
pile casing
d/7a/15-E Piles : Number of piles 1200mm Inspection for the pile casing setting out at ____
setting out

d/7a/15-F Piles: Bored cast in place concrete pile using concrete grade Inspection for the lowering of 2 nos. pile cage at ______ followed by concrete pouring. lowering
40/20OPC-Concreted length (Concrete Grade : C40/20 OPC+MS Piling).

d/7a/15-G Piles: Bored cast in place concrete pile using concrete grade Inspection for the lowering of 2 nos. pile cage at ______ followed by concrete pouring. lowering
40/20OPC- Depth bored to maximum Length 20.50m (Concrete Grade : C40/20 OPC+MS Piling).

d/7a/16-B Piles Ancillaries- Cast in place concrete piles ; Cutting off surplus Inspection for the cutting of surplus length of pile 1200mm dia at _________ cutting
lengths 1200mm diameter

d/7a/16-C Piles Ancillaries- Cast in place concrete piles ; Preparing piles Inspection for the preparing of pile heads 1200mm dia at _________ preparing of
head 1200mm diameter. pile heads

Piling Ancillaries:Reinforcement-Deformed highyield strength steel


d/7a/16 -G,E & F Steel Reinforcement for pile ____ at Bridge _____
steel bars BS 4449 Nominal size 16mm,25mm& 32mm reinforcement

d/7a/16-K Piles test; Non destructive test by Ultrasonic method foe Inspection for integrity test of 8 nos. piles at _______ integrity test
1200mm dia pile

d/7a/16-L Pile test: Caliper logging of pile bore in accordance with the Inspection for the plie boring followed by caliper logging at Bridge __________ caliper logging
Particular specification for 1200mm pile

d/7a/16-M Piles test; Cross Hole Sonic Logging test in accordance with Inspection for the cross hole sonic logging testing of __ nos. piles at ____________ cross hole
particular specification for 1200mm dia pile

d/7a/17-G Water Proofing:Tanking self adhesive waterproofing membrane Inspection for the surface preparation followed by waterproofing (horizontal side including bitustick
to buried concrete upto pier termination on vertical side - Polyprime SB, Bitustick XL, Bituboard) at _______

Inspection for the surface preparation followed by waterproofing (Polyprime SB, Bitustick XL
bitustick
& Bituboard) only for vertical sides at ______

d/7a/17-H Water Proofing:2 layers of Polythene :150 Microns thick Inspection for the laying of 2 layer polythene sheet followed by blinding concrete of pile cap polythene
at Pier __ Bridge ___. (Concrete Grade: 15/20 SRC).

d/7a/17-J Water Proofing:Protection to waterproofing membrane not less Inspection for the surface preparation followed by waterproofing (horizontal side including bituboard
than 6mm thick. upto pier termination on vertical side - Polyprime SB, Bitustick XL, Bituboard) at _______

Inspection for the surface preparation followed by waterproofing (Polyprime SB, Bitustick XL bituboard
& Bituboard) only for vertical sides at ______

d/7a/17-K Water Proofing:50mm Screed for wateproofing membrane Inspection for the 50mm screed for waterproofing membrane on top of pile cap at ________ screed