Group One - Roped Hydraulic

Group One Request


Quotation - Roped Hydraulic
/ Order Form
• Pit Depth: Quotation Request / Order Form
Date ____________ Date Required ____________ Ship Date Required ____________
- For speeds up to 150 fpm is 4’-0”.
Date ____________ Date Required ____________ Ship Date Required ____________
- For speeds between 151 to 200 fpm is 5’-0”. Company _____________________________________________ Contact _______________________________________________
Pit required clearances as required by ASME A17.1/CSA B44 Safety Code. Company
Address _____________________________________________ Contact
Phone _______________________________________________
_______________ Ext. ______ Fax ________________
Address
City _____________________________________________ Phone _______________
_______________________ .St. _____ Zip ________ Cell Phone Ext. ______ Fax ________________
_______________________________________________
• Clear Overhead:
City _______________________
Project Name _______________________ .St.
.St. _____ Zip ________ Cell Phone
Email _______________________________________________
(based on the standard 8’- 0” cab height):
- For speeds up to 150 fpm – 12’-6” is required. Project Name _______________________ .St. _____ Zip ________ Email _______________________________________________
Car Type Jack Unit Options & Accessories
- For speeds between 151-200 fpm – 13’-0” is required.
Overhead required clearances as required by ASME A17.1/CSA B44 Safety Code. #Car Type
of Cars _____  Dual Jacks  Cantilever Hoistway
 Single Piece Details
 Multi-Piece  Isolated Platform
Car
# of Speed ______
Cars _____ fpm
Dual Jacks  Cantilever No. of Sections
Overhead ______________
_________ or in
ft _________  Limit Switches
Hoistway __________
_________ qty
w _________ h
Longest
Floor Section
Travel ______________
_________ ft _________ in  Ad. Isolation Coupling __________
Platform _________ w _________ d qty
• Car Size:  Plans
 Plans // Specs  Fax
Specs  Fax Verbal
 Verbal  Ad. Shut Off ValveCapacity__________ qtylbs
Pit Depth
Cylinder _________
Joint Type ft _________ in __________
- All elevators comply with NEII and ADA space requirements for Wheelchair access.  Prewired Junction Box
 Passenger
 Passenger Seismic
 Seismic- -Zone
Zone____
____  Threaded No Cab Height
Weld _________ h
 Threaded Cab Weight __________ lbs
- 2100 lbs elevators must have Single Slide Handed doors to comply with NEII and ADA  Freight  Include Motor Control with Enclosure
 Freight  SlipNumber
Fit (Up toof16”)  Butt Weld
requirements for Wheelchairs access. Load Class  Landings _________ qty Power
Y-DeltaSupply
 ATL____ V _____
 Solid Ph _____ Hz
State
Load Class A  BB 
A  C1C1  C2 C3
C2  C3
- 3000 lbs and 3500 lbs elevators shown here comply with NEII and ADA requirements Total Openings _________ qty
 Seamless Pipe Coil Voltage ____ V  AC  DC ___ Hz
Ambulance Stretcher access, unless equipped with Center Parting doors. Code Requirements
Code Requirements  TankSpeed
Car Doors Mounted  Wall Mounted
 Epoxy Paint __________
 Front Coats
Openings _________ qty
 ASME
 ASME 17.1
17.1 -- ________
________Year
Year  Single  Two  Three
 Left  Center  Right  Adjustable
Notes:
 Local Code ________
 Local Code ________ EntranceLoad
Size Weighing
_______ wSwitch
_______ h
 Rear Openings _________ qty Low Pressure Switch
1. Adequate supports for main rails, as well as jack units and support posts are  Buy
 Buy American Requirement
American Requirement  Machine
 N.O. Room Adj. @ Lowest Level
 N.O./N.C.
Capacity __________ lbs  Left  Center  Right
required at vertical intervals in the elevator hoistway. Normal vertical spacing for these  Machine Room Remote ______ ft
supports is approximately 9’- 0”. As such, supports at floor levels only may not be Cab Weight __________ lbs Machine RoomLocation
 Side
Power Unit Openings _________ qty Oil Cooler Air  ______
Water Landing
adequate. Support locations are to be masonry or steel construction. If a block (CMU) Cab Height _________ h  Left  Center  Right Shared Machine Room
Scavenger Pump
hoistway is provided the block must be filled with mortar around the wall insert to  Submersible  Belt Drive
Hoistway Details  Use with Biodegradable Oil (Vegetable)
provide a rigid structure. Jack Unit Power Unit
 80 Starts/Hr  120 Starts/Hr Options & Accessories
Overhead _________ ft _________ in  Left Hand (Std)  Right Hand
2. A pit ladder is to be provided and installed by others, which is required in  Single
Floor Piece
Travel  Multi-Piece
_________ ft _________ in  Submersible  Belt Drive  Isolated Platform
accordance with ASME A17.1/CSA B44 Safety Code. Pit No. of Sections
Depth _________ ______________
ft _________ inor
Power Supply
 80 Starts/Hr
____ V _____ Ph _____ Hz
 120 Starts/Hr Special Requirements
Limit Switches
Longest Coil Voltage ____ V  AC  DC ___ Hz
3. Top of hoistway must be vented, in accordance with ASME A17.1/CSA B44 Safety Number of Section
Landings______________
_________ qty  Custom (Specify) ___________________  Isolation Coupling __________ qty
____________________________________
___________________________________  Shut Off Valve __________ qty
Code and local building code(s). Total Openings
Cylinder Joint_________
Type qty  Custom (Specify) __________________ ____________________________________
4. An 110V AC power GFI outlet is required in the pit.  Threaded No Weld  Threaded Other OEM Control Valve
___________________________________ ____________________________________
Include Motor Control with Enclosure
Car Fit
Doors ____________________________________
5. The hoist beam required for installation of elevator must be removed (by others) if  Slip (Up to 16”)  Butt Weld ______________
 Other OEM Control Valve
 Y-Delta  ATL  Solid State
 Single  Two  Three  Non-Constant Down Speed ____________________________________
minimum cab clearance is not available under the beam.  Seamless Pipe ______________  Tank Mounted  Wall Mounted
Entrance Size _______ w _______ h  EECO Dampener Upgrade ____________________________________
 Epoxy Paint __________ Coats  Non-Constant Down Speed
____________________________________
Valve Return Filter
Machine Room  Front Openings _________ qty  ValveOilReturn
Line Size
Filter __________ in _
 UseLeft
with
Biodegradable
Center  Right Oil (Vegetable) ____________________________________
Adjustable Load Weighing Switch
1. An area of 6’- 0” x 7’- 0” x 8”- 0” high is usually adequate for a single car installation, Grooved

EECO Dampener NPT
(Std)  Upgrade ____________
Low Pressure Switch
with a 3’-0” wide door opening for access.  Rear Openings _________ qty  Left Hand (Std)  Right Hand
Oil Line Size __________ in _  N.O.  N.O./N.C.
 Schedule 40  Schedule 80
2. Recommended location is adjacent to the hoistway at the bottom landing served.  Left  Center  Right  Grooved (Std)  NPT
Machine Special Requirements  Schedule 40  Schedule 80
Contact
 Viscosity Switch Sales for
 Side Openings _________ qty
Room can be remotely located at any landing or above the hoistway – please consult  Left  Center  Right  Viscosity Switch More Information
 Oil Heater
___________________________________________________________________________
the factory.  Oil Heater  Oil Cooler  Air  Water
___________________________________________________________________________
Hoistway _________ w _________ h
3. Machine room temperature (between 650 and 950 Fahrenheit) and humidity needs  Power Unit Hand Pump  PowerCall: (888)Pump
Unit Hand 577-EECO (3326)
___________________________________________________________________________
Platform _________ w _________ d

Group One Roped H ydraulic


to be maintained in accordance with ASME A17.1/CSA B44 Safety Code to allow proper  Scavenger Fax:
Pump(888) 577-3116
___________________________________________________________________________
operation of the equipment.  Machine Room Adj. @ Lowest Level Email: sales@eecomail.com
4. Machine room to be adequate lighted with an 110V AC power GFI outlet.  Machine Room Remote ______ ft
Visit: www.elevatorequipment.com

Elevators
 Machine Room Location ______ Landing
 Shared Machine Room (duplex)
as well as many other applications
Email: sales@eecomail.com w Website: www.elevatorequipment.com w Telephone: (888) 577-3326 w Fax: (888) 577-3116
EECO Roped Dual Holeless EECO Roped Cantilever Holeless EECO Group One Components
Hydraulic Jacks Sling and Platform
EECO manufactures jack units with precision In addition to the Group One package, EECO
equipment, skilled and experienced can design and manufacture a car sling or
production personnel, and a knowledgeable platform to any size for any requirement
engineering staff to comply with the exacting that you may have. From home elevators to
standards required to produce a quality commercial passenger elevators, up to the
product. Additional equipment included with biggest freight elevators, EECO can handle the
jack units is described below per system type. job.
• Roped Hydraulic • Rail Guides
◦◦ Sheaves and Stabilizer ◦ Speed Up To 149 fpm Slide Guides
◦◦ Wire Rope and Shackles ◦ Speed 150 – 200 fpm Roller Guides with
Polyurethane Wheels
• Platform has two layers of (2) 1/2” plywood
subflooring with an undercoating of Fire
Power Units Retardant Paint or sheet metal if required.
EECO has manufactured hydraulic elevator • Tie Rods
equipment since 1946, and is one of the • Car Cam
• Toe Guard
leading suppliers in the industry fVor hydraulic • Strike Plate
elevator power units. We can provide power • Optional Limit Switches
units for any application, from small capacity • Isolated Platen Connection Plate
• Safeties and Slack Rope Switch
residential to the largest freight elevators.
• Governor
• Submersible or Belted (Horsepower Driven) ◦ Tension weight
◦◦ Tank ◦ Wire Rope
◦◦ Pump ◦ Mounting Bracket
◦◦ Motor
◦◦ EECO UV-5ATC or UV-7BC Control Valve
▪▪ Low Pressure Switch (if required) Rail and Rail Brackets
▪▪ 1/8” Pressure Gauge Fittings EECO provides the highest quality rail
▪▪ Down Speed Control
equipment, including seismic components
◦◦ Grooved Outlet (Threaded when required)
◦◦ Dampener or Muffler when required.
◦◦ Thermal Switch • 15 lb/ft Guide Rails
◦◦ Low Oil Switch • Fishplate and Hardware (Seismic when required)
◦◦ Oil Level Liquid Gauge • 12” wide Rail Brackets (9” wide for Telescopic
◦◦ Magnet when Piston Followers are required)
◦◦ Optional Pre-wired Junction Box
◦◦ Optional Motor Control

Oil Line Components


EECO’s Group One system provides the basic
components you need for your elevator
installation.
• Black Pipe
• Grooved Fittings (Threaded when required)
• Pipe Stands
• Shut Off Valve
• Isolation Coupling
• Pipe Rupture Valve (when required)
EECO Roped Dual Holeless EECO Roped Cantilever Holeless EECO Group One Components
Hydraulic Jacks Sling and Platform
EECO manufactures jack units with precision In addition to the Group One package, EECO
equipment, skilled and experienced can design and manufacture a car sling or
production personnel, and a knowledgeable platform to any size for any requirement
engineering staff to comply with the exacting that you may have. From home elevators to
standards required to produce a quality commercial passenger elevators, up to the
product. Additional equipment included with biggest freight elevators, EECO can handle the
jack units is described below per system type. job.
• Roped Hydraulic • Rail Guides
◦◦ Sheaves and Stabilizer ◦ Speed Up To 149 fpm Slide Guides
◦◦ Wire Rope and Shackles ◦ Speed 150 – 200 fpm Roller Guides with
Polyurethane Wheels
• Platform has two layers of (2) 1/2” plywood
subflooring with an undercoating of Fire
Power Units Retardant Paint or sheet metal if required.
EECO has manufactured hydraulic elevator • Tie Rods
equipment since 1946, and is one of the • Car Cam
• Toe Guard
leading suppliers in the industry fVor hydraulic • Strike Plate
elevator power units. We can provide power • Optional Limit Switches
units for any application, from small capacity • Isolated Platen Connection Plate
• Safeties and Slack Rope Switch
residential to the largest freight elevators.
• Governor
• Submersible or Belted (Horsepower Driven) ◦ Tension weight
◦◦ Tank ◦ Wire Rope
◦◦ Pump ◦ Mounting Bracket
◦◦ Motor
◦◦ EECO UV-5ATC or UV-7BC Control Valve
▪▪ Low Pressure Switch (if required) Rail and Rail Brackets
▪▪ 1/8” Pressure Gauge Fittings EECO provides the highest quality rail
▪▪ Down Speed Control
equipment, including seismic components
◦◦ Grooved Outlet (Threaded when required)
◦◦ Dampener or Muffler when required.
◦◦ Thermal Switch • 15 lb/ft Guide Rails
◦◦ Low Oil Switch • Fishplate and Hardware (Seismic when required)
◦◦ Oil Level Liquid Gauge • 12” wide Rail Brackets (9” wide for Telescopic
◦◦ Magnet when Piston Followers are required)
◦◦ Optional Pre-wired Junction Box
◦◦ Optional Motor Control

Oil Line Components


EECO’s Group One system provides the basic
components you need for your elevator
installation.
• Black Pipe
• Grooved Fittings (Threaded when required)
• Pipe Stands
• Shut Off Valve
• Isolation Coupling
• Pipe Rupture Valve (when required)
EECO Roped Dual Holeless EECO Roped Cantilever Holeless EECO Group One Components
Hydraulic Jacks Sling and Platform
EECO manufactures jack units with precision In addition to the Group One package, EECO
equipment, skilled and experienced can design and manufacture a car sling or
production personnel, and a knowledgeable platform to any size for any requirement
engineering staff to comply with the exacting that you may have. From home elevators to
standards required to produce a quality commercial passenger elevators, up to the
product. Additional equipment included with biggest freight elevators, EECO can handle the
jack units is described below per system type. job.
• Roped Hydraulic • Rail Guides
◦◦ Sheaves and Stabilizer ◦ Speed Up To 149 fpm Slide Guides
◦◦ Wire Rope and Shackles ◦ Speed 150 – 200 fpm Roller Guides with
Polyurethane Wheels
• Platform has two layers of (2) 1/2” plywood
subflooring with an undercoating of Fire
Power Units Retardant Paint or sheet metal if required.
EECO has manufactured hydraulic elevator • Tie Rods
equipment since 1946, and is one of the • Car Cam
• Toe Guard
leading suppliers in the industry fVor hydraulic • Strike Plate
elevator power units. We can provide power • Optional Limit Switches
units for any application, from small capacity • Isolated Platen Connection Plate
• Safeties and Slack Rope Switch
residential to the largest freight elevators.
• Governor
• Submersible or Belted (Horsepower Driven) ◦ Tension weight
◦◦ Tank ◦ Wire Rope
◦◦ Pump ◦ Mounting Bracket
◦◦ Motor
◦◦ EECO UV-5ATC or UV-7BC Control Valve
▪▪ Low Pressure Switch (if required) Rail and Rail Brackets
▪▪ 1/8” Pressure Gauge Fittings EECO provides the highest quality rail
▪▪ Down Speed Control
equipment, including seismic components
◦◦ Grooved Outlet (Threaded when required)
◦◦ Dampener or Muffler when required.
◦◦ Thermal Switch • 15 lb/ft Guide Rails
◦◦ Low Oil Switch • Fishplate and Hardware (Seismic when required)
◦◦ Oil Level Liquid Gauge • 12” wide Rail Brackets (9” wide for Telescopic
◦◦ Magnet when Piston Followers are required)
◦◦ Optional Pre-wired Junction Box
◦◦ Optional Motor Control

Oil Line Components


EECO’s Group One system provides the basic
components you need for your elevator
installation.
• Black Pipe
• Grooved Fittings (Threaded when required)
• Pipe Stands
• Shut Off Valve
• Isolation Coupling
• Pipe Rupture Valve (when required)
Group One - Roped Hydraulic
Group One Request
Quotation - Roped Hydraulic
/ Order Form
• Pit Depth: Quotation Request / Order Form
Date ____________ Date Required ____________ Ship Date Required ____________
- For speeds up to 150 fpm is 4’-0”.
Date ____________ Date Required ____________ Ship Date Required ____________
- For speeds between 151 to 200 fpm is 5’-0”. Company _____________________________________________ Contact _______________________________________________
Pit required clearances as required by ASME A17.1/CSA B44 Safety Code. Company
Address _____________________________________________ Contact
Phone _______________________________________________
_______________ Ext. ______ Fax ________________
Address
City _____________________________________________ Phone _______________
_______________________ .St. _____ Zip ________ Cell Phone Ext. ______ Fax ________________
_______________________________________________
• Clear Overhead:
City _______________________
Project Name _______________________ .St.
.St. _____ Zip ________ Cell Phone
Email _______________________________________________
(based on the standard 8’- 0” cab height):
- For speeds up to 150 fpm – 12’-6” is required. Project Name _______________________ .St. _____ Zip ________ Email _______________________________________________
Car Type Jack Unit Options & Accessories
- For speeds between 151-200 fpm – 13’-0” is required.
Overhead required clearances as required by ASME A17.1/CSA B44 Safety Code. #Car Type
of Cars _____  Dual Jacks  Cantilever Hoistway
 Single Piece Details
 Multi-Piece  Isolated Platform
Car
# of Speed ______
Cars _____ fpm
Dual Jacks  Cantilever No. of Sections
Overhead ______________
_________ or in
ft _________  Limit Switches
Hoistway __________
_________ qty
w _________ h
Longest
Floor Section
Travel ______________
_________ ft _________ in  Ad. Isolation Coupling __________
Platform _________ w _________ d qty
• Car Size:  Plans
 Plans // Specs  Fax
Specs  Fax Verbal
 Verbal  Ad. Shut Off ValveCapacity__________ qtylbs
Pit Depth
Cylinder _________
Joint Type ft _________ in __________
- All elevators comply with NEII and ADA space requirements for Wheelchair access.  Prewired Junction Box __________ lbs
 Passenger
 Passenger Seismic
 Seismic- -Zone
Zone____
____  Threaded No Cab Height
Weld _________ h
 Threaded Cab Weight
- 2100 lbs elevators must have Single Slide Handed doors to comply with NEII and ADA  Freight  Include Motor Control with Enclosure
 Freight  SlipNumber
Fit (Up toof16”)  Butt Weld
requirements for Wheelchairs access. Load Class  Landings _________ qty Power
Y-DeltaSupply
 ATL____ V _____
 Solid Ph _____ Hz
State
Load Class A  BB 
A  C1C1  C2 C3
C2  C3
- 3000 lbs and 3500 lbs elevators shown here comply with NEII and ADA requirements Total Openings _________ qty
 Seamless Pipe Coil Voltage ____ V  AC  DC ___ Hz
Ambulance Stretcher access, unless equipped with Center Parting doors. Code Requirements
Code Requirements  TankSpeed
Car Doors Mounted  Wall Mounted
 Epoxy Paint __________
 Front Coats
Openings _________ qty
 ASME
 ASME 17.1
17.1 -- ________
________Year
Year  Single  Two  Three
 Left  Center  Right  Adjustable
Notes:
 Local Code ________
 Local Code ________ EntranceLoad
Size Weighing
_______ wSwitch
_______ h
 Rear Openings _________ qty Low Pressure Switch
1. Adequate supports for main rails, as well as jack units and support posts are  Buy
 Buy American Requirement
American Requirement  Machine
 N.O. Room Adj. @ Lowest Level
 N.O./N.C.
Capacity __________ lbs  Left  Center  Right
required at vertical intervals in the elevator hoistway. Normal vertical spacing for these  Machine Room Remote ______ ft
supports is approximately 9’- 0”. As such, supports at floor levels only may not be Cab Weight __________ lbs Machine RoomLocation
 Side
Power Unit Openings _________ qty Oil Cooler Air  ______
Water Landing
adequate. Support locations are to be masonry or steel construction. If a block (CMU) Cab Height _________ h  Left  Center  Right Shared Machine Room
Scavenger Pump
hoistway is provided the block must be filled with mortar around the wall insert to  Submersible  Belt Drive
Hoistway Details  Use with Biodegradable Oil (Vegetable)
provide a rigid structure. Jack Unit Power Unit
 80 Starts/Hr  120 Starts/Hr Options & Accessories
Overhead _________ ft _________ in  Left Hand (Std)  Right Hand
2. A pit ladder is to be provided and installed by others, which is required in  Single
Floor Piece
Travel  Multi-Piece
_________ ft _________ in  Submersible  Belt Drive  Isolated Platform
accordance with ASME A17.1/CSA B44 Safety Code. Pit No. of Sections
Depth _________ ______________
ft _________ inor
Power Supply
 80 Starts/Hr
____ V _____ Ph _____ Hz
 120 Starts/Hr Special Requirements
Limit Switches
Longest Coil Voltage ____ V  AC  DC ___ Hz
3. Top of hoistway must be vented, in accordance with ASME A17.1/CSA B44 Safety Number of Section
Landings______________
_________ qty  Custom (Specify) ___________________  Isolation Coupling __________ qty
____________________________________
___________________________________  Shut Off Valve __________ qty
Code and local building code(s). Total Openings
Cylinder Joint_________
Type qty  Custom (Specify) __________________ ____________________________________
4. An 110V AC power GFI outlet is required in the pit.  Threaded No Weld  Threaded Other OEM Control Valve
___________________________________ ____________________________________
Include Motor Control with Enclosure
Car Fit
Doors ____________________________________
5. The hoist beam required for installation of elevator must be removed (by others) if  Slip (Up to 16”)  Butt Weld ______________
 Other OEM Control Valve
 Y-Delta  ATL  Solid State
 Single  Two  Three  Non-Constant Down Speed ____________________________________
minimum cab clearance is not available under the beam.  Seamless Pipe ______________  Tank Mounted  Wall Mounted
Entrance Size _______ w _______ h  EECO Dampener Upgrade ____________________________________
 Epoxy Paint __________ Coats  Non-Constant Down Speed
____________________________________
Valve Return Filter
Machine Room  Front Openings _________ qty  ValveOilReturn
Line Size
Filter __________ in _
 UseLeft
with
Biodegradable
Center  Right Oil (Vegetable) ____________________________________
Adjustable Load Weighing Switch
1. An area of 6’- 0” x 7’- 0” x 8”- 0” high is usually adequate for a single car installation, Grooved

(Std)  Upgrade
EECO Dampener NPT ____________
Low Pressure Switch
with a 3’-0” wide door opening for access.  Rear Openings _________ qty  Left Hand (Std)  Right Hand
Oil Line Size __________ in _  N.O.  N.O./N.C.
 Schedule 40  Schedule 80
2. Recommended location is adjacent to the hoistway at the bottom landing served.  Left  Center  Right  Grooved (Std)  NPT
Machine Special Requirements  Schedule 40  Schedule 80
Contact
 Viscosity Switch Sales for
 Side Openings _________ qty
Room can be remotely located at any landing or above the hoistway – please consult  Left  Center  Right  Viscosity Switch More Information
 Oil Heater
___________________________________________________________________________
the factory.  Oil Heater  Oil Cooler  Air  Water
___________________________________________________________________________
Hoistway _________ w _________ h
3. Machine room temperature (between 650 and 950 Fahrenheit) and humidity needs  Power Unit Hand Pump  PowerCall: (888)Pump
Unit Hand 577-EECO (3326)
___________________________________________________________________________
Platform _________ w _________ d

Group One Roped H ydraulic


to be maintained in accordance with ASME A17.1/CSA B44 Safety Code to allow proper  Scavenger Fax:
Pump(888) 577-3116
___________________________________________________________________________
operation of the equipment.  Machine Room Adj. @ Lowest Level Email: sales@eecomail.com
4. Machine room to be adequate lighted with an 110V AC power GFI outlet.  Machine Room Remote ______ ft
Visit: www.elevatorequipment.com

Elevators
 Machine Room Location ______ Landing
 Shared Machine Room (duplex)
as well as many other applications
Email: sales@eecomail.com w Website: www.elevatorequipment.com w Telephone: (888) 577-3326 w Fax: (888) 577-3116
Group One - Roped Hydraulic
Quotation Request / Order Form
Date ____________ Date Required ____________ Ship Date Required ____________

Company _____________________________________________ Contact _______________________________________________


Address _____________________________________________ Phone _______________ Ext. ______ Fax ________________
City _______________________ .St. _____ Zip ________ Cell Phone _______________________________________________
Project Name _______________________ .St. _____ Zip ________ Email _______________________________________________

Car Type Jack Unit Options & Accessories


# of Cars _____  Dual Jacks  Cantilever  Single Piece  Multi-Piece  Isolated Platform
Car Speed ______ fpm No. of Sections ______________ or  Limit Switches __________ qty
Longest Section ______________  Ad. Isolation Coupling __________ qty
 Plans / Specs  Fax  Verbal
 Ad. Shut Off Valve __________ qty
Cylinder Joint Type
 Passenger  Seismic - Zone ____  Prewired Junction Box
 Threaded No Weld  Threaded
 Freight  Include Motor Control with Enclosure
 Slip Fit (Up to 16”)  Butt Weld
Load Class  A  B  C1  C2  C3  Y-Delta  ATL  Solid State

 Seamless Pipe
Code Requirements  Tank Mounted  Wall Mounted
 Epoxy Paint __________ Coats
 ASME 17.1 - ________ Year

 Local Code ________  Adjustable Load Weighing Switch


Low Pressure Switch
 Buy American Requirement
 N.O.  N.O./N.C.
Capacity __________ lbs
Cab Weight __________ lbs
Power Unit  Oil Cooler  Air  Water
Cab Height _________ h
 Scavenger Pump
 Submersible  Belt Drive
Hoistway Details  Use with Biodegradable Oil (Vegetable)
 80 Starts/Hr  120 Starts/Hr
Overhead _________ ft _________ in  Left Hand (Std)  Right Hand
Floor Travel _________ ft _________ in Power Supply ____ V _____ Ph _____ Hz Special Requirements
Pit Depth _________ ft _________ in Coil Voltage ____ V  AC  DC ___ Hz
Number of Landings _________ qty ____________________________________
Total Openings _________ qty  Custom (Specify) __________________ ____________________________________
___________________________________ ____________________________________
Car Doors ____________________________________
 Single  Two  Three  Other OEM Control Valve ____________________________________
Entrance Size _______ w _______ h ______________ ____________________________________
 Non-Constant Down Speed ____________________________________
 Front Openings _________ qty  Valve Return Filter ____________________________________
 Left  Center  Right  EECO Dampener Upgrade

____________________________________
 Rear Openings _________ qty Oil Line Size __________ in _
 Left  Center  Right  Grooved (Std)  NPT
 Side Openings _________ qty  Schedule 40  Schedule 80
 Left  Center  Right  Viscosity Switch Contact Sales for
 Oil Heater More Information
Hoistway _________ w _________ d
 Power Unit Hand Pump
Platform _________ w _________ d
Call: (888) 577-EECO (3326)
 Machine Room Adj. @ Lowest Level Fax: (888) 577-3116
 Machine Room Remote ______ ft Email: sales@eecomail.com
 Machine Room Location ______ Landing Visit: www.elevatorequipment.com
 Shared Machine Room (duplex) FS-019 1/5/16