You are on page 1of 248

INFORMACIÓN INGRESADA PARA VTP Y PEAJES

2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

AGROAURORA S.A.C. AGROAURORA S.A.C. PIURA OESTE 60 Libre


CELEPSA COELVISAC INDEPENDENCIA 60 Regulado
CELEPSA ELECTRO CENTRO AUCAYACU 22.9 Regulado
CELEPSA ELECTRO CENTRO CARHUAMAYO 138 Regulado
CELEPSA ELECTRO CENTRO COBRIZA I 69 Regulado
CELEPSA ELECTRO CENTRO COBRIZA II 10 Regulado
CELEPSA ELECTRO CENTRO COBRIZA II 69 Regulado
CELEPSA ELECTRO CENTRO CONDORCOCHA 44 Regulado
CELEPSA ELECTRO CENTRO HUALLANCA 66 Regulado
CELEPSA ELECTRO CENTRO HUANCAVE 10 Regulado
CELEPSA ELECTRO CENTRO HUANCAVE 60 Regulado
CELEPSA ELECTRO CENTRO HUANUCO 10 Regulado
CELEPSA ELECTRO CENTRO HUANUCO 22.9 Regulado
CELEPSA ELECTRO CENTRO HUAYUCACH 10 Regulado
CELEPSA ELECTRO CENTRO HUAYUCACH 60 Regulado
CELEPSA ELECTRO CENTRO OROYA NUEVA 50 Regulado
CELEPSA ELECTRO CENTRO PACHACHACA 220 Regulado
CELEPSA ELECTRO CENTRO PARAGSHA2 138 Regulado
CELEPSA ELECTRO CENTRO POMACOCHA 220 Regulado
CELEPSA ELECTRO CENTRO TINGO MARIA 10 Regulado
CELEPSA ELECTRO CENTRO YAUPI 13.8 Regulado
CELEPSA ELECTRO DUNAS ICA 10 Regulado
CELEPSA ELECTRO DUNAS ICA 60 Regulado
CELEPSA ELECTRO DUNAS ICA 60 Libre
CELEPSA ELECTRO DUNAS INDEPENDENCIA 10 Libre
CELEPSA ELECTRO DUNAS INDEPENDENCIA 10 Regulado
CELEPSA ELECTRO DUNAS INDEPENDENCIA 60 Libre
CELEPSA ELECTRO DUNAS INDEPENDENCIA 60 Regulado
CELEPSA ELECTRO DUNAS MARCONA 60 Regulado
CELEPSA ELECTRO DUNAS MARCONA 60 Libre
CELEPSA ELECTRO NOR OESTE MANCORA 10.5 Regulado
CELEPSA ELECTRO NOR OESTE MANCORA 22.9 Regulado
CELEPSA ELECTRO NOR OESTE Malacas 13.2 Regulado
CELEPSA ELECTRO NOR OESTE PIURA OESTE 10 Regulado
CELEPSA ELECTRO NOR OESTE PIURA OESTE 60 Regulado
CELEPSA ELECTRO NOR OESTE ZORRITOS 33 Regulado
CELEPSA ELECTRO NOR OESTE ZORRITOS 60 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

CELEPSA ELECTRO NORTE CARHUAQUERO 220 Regulado


CELEPSA ELECTRO NORTE CERRO CORONA 220 Regulado
CELEPSA ELECTRO NORTE CHICLAYO 60 Regulado
CELEPSA HIDRANDINA CAJAMARCA NORTE 60 Regulado
CELEPSA HIDRANDINA CHIMBOTE 13.8 Regulado
CELEPSA HIDRANDINA CHIMBOTE1 138 Regulado
CELEPSA HIDRANDINA CHIMBOTE2 138 Regulado
CELEPSA HIDRANDINA GUADALUPE 10 Regulado
CELEPSA HIDRANDINA GUADALUPE 60 Regulado
CELEPSA HIDRANDINA HUALLANCA 13.8 Regulado
CELEPSA HIDRANDINA HUALLANCA 138 Regulado
CELEPSA HIDRANDINA HUALLANCA 66 Regulado
CELEPSA HIDRANDINA HUARAZ OESTE 138 Regulado
CELEPSA HIDRANDINA KIMAN AYLLU 10 Regulado
CELEPSA HIDRANDINA LA PAJUELA 22.9 Regulado
CELEPSA HIDRANDINA PARAMONGA NUEVA 66 Regulado
CELEPSA HIDRANDINA PORCON 10 Regulado
CELEPSA HIDRANDINA TRUJILLO 138 Regulado
CELEPSA HIDRANDINA TRUJILLO NORTE 10 Regulado
Gran
CELEPSA MINERA ARES COTARUSE 220 Usuario
CELEPSA MINERA HORIZONTE HUALLANCA 138 Libre
CELEPSA MINERA HUARON CARHUAMAYO 138 Libre
CELEPSA MINERA HUARON PARAGSHA2 220 Libre
Gran
CELEPSA OPP FILM SAN JUAN 220 Usuario
CELEPSA SACOS PISCO INDEPENDENCIA 220 Libre
Gran
CELEPSA UNION ANDINA DE CEMENTO CARIPA 138 Usuario
Gran
CELEPSA UNION ANDINA DE CEMENTO SAN JUAN 220 Usuario
CHINANGO S.A.C. ELECTRO PUNO AYAVIRI 10 Regulado
CHINANGO S.A.C. ELECTRO PUNO AYAVIRI 22.9 Regulado
CHINANGO S.A.C. ELECTRO PUNO AZANGARO 22.9 Regulado
CHINANGO S.A.C. ELECTRO PUNO AZANGARO 60 Regulado
CHINANGO S.A.C. ELECTRO PUNO JULIACA 10 Regulado
CHINANGO S.A.C. ELECTRO PUNO JULIACA 22.9 Regulado
CHINANGO S.A.C. ELECTRO PUNO PUNO 22.9 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

CHINANGO S.A.C. ELECTRO PUNO PUNO 60 Regulado


CHINANGO S.A.C. ELECTRO PUNO SAN GABAN 13.8 Regulado
CHINANGO S.A.C. ELECTRO SUR ARICOTA1 10.5 Regulado
CHINANGO S.A.C. ELECTRO SUR ARICOTA2 10.5 Regulado
CHINANGO S.A.C. ELECTRO SUR HUAYTIRE 138 Regulado
CHINANGO S.A.C. ELECTRO SUR ILO ELP 138 Regulado
CHINANGO S.A.C. ELECTRO SUR MOQUEGUA 138 Regulado
CHINANGO S.A.C. ELECTRO SUR SARITA 33 Regulado
CHINANGO S.A.C. ELECTRO SUR SOCABAYA 33 Regulado
CHINANGO S.A.C. ELECTRO SUR TACNA 66 Regulado
CHINANGO S.A.C. ELECTRO SUR TOMASIRI 66 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE ABANCAY 138 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE CACHIMAYO 10 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE CACHIMAYO 23 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE CACHIMAYO 33 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE CACHIMAYO 60 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE COMBAPATA 24 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE COMBAPATA 60 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE DOLORESPATA 10.5 Libre
CHINANGO S.A.C. ELECTRO SUR ESTE MACHUPICCHU 10 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE MACHUPICCHU 60 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE QUENCORO 10.5 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE QUENCORO 33 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE SAN GABAN 138 Regulado
CHINANGO S.A.C. ELECTRO SUR ESTE TINTAYA 10 Regulado
Gran
CHINANGO S.A.C. ENEL DISTRIBUCION PERU CARABAYLLO 220 Usuario
CHINANGO S.A.C. ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
CHINANGO S.A.C. ENEL DISTRIBUCION PERU CARABAYLLO 220 Libre
CHINANGO S.A.C. ENEL DISTRIBUCION PERU CHAVARRIA 220 Libre
Gran
CHINANGO S.A.C. ENEL DISTRIBUCION PERU CHAVARRIA 220 Usuario
CHINANGO S.A.C. ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
Gran
CHINANGO S.A.C. ENEL DISTRIBUCION PERU HUACHO 66 Usuario
CHINANGO S.A.C. ENEL DISTRIBUCION PERU HUACHO 66 Libre
CHINANGO S.A.C. ENEL DISTRIBUCION PERU HUACHO 66 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

CHINANGO S.A.C. ENEL DISTRIBUCION PERU LOMERA 60 Libre


Gran
CHINANGO S.A.C. ENEL DISTRIBUCION PERU LOMERA 60 Usuario
CHINANGO S.A.C. ENEL DISTRIBUCION PERU LOMERA 60 Regulado
CHINANGO S.A.C. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Libre
CHINANGO S.A.C. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
Gran
CHINANGO S.A.C. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Usuario
Gran
CHINANGO S.A.C. ENEL DISTRIBUCION PERU SANTA ROSA 220 Usuario
CHINANGO S.A.C. ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
CHINANGO S.A.C. ENEL DISTRIBUCION PERU SANTA ROSA 220 Libre
Gran
CHINANGO S.A.C. ENEL DISTRIBUCION PERU SANTA ROSA 60 Usuario
CHINANGO S.A.C. ENEL DISTRIBUCION PERU SANTA ROSA 60 Libre
CHINANGO S.A.C. ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
CHINANGO S.A.C. ENEL DISTRIBUCION PERU VENTANILLA 220 Libre
Gran
CHINANGO S.A.C. ENEL DISTRIBUCION PERU VENTANILLA 220 Usuario
CHINANGO S.A.C. ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
CHINANGO S.A.C. ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
CHINANGO S.A.C. ENEL DISTRIBUCION PERU ZAPALLAL 220 Libre
Gran
CHINANGO S.A.C. ENEL DISTRIBUCION PERU ZAPALLAL 220 Usuario
CHINANGO S.A.C. HIDRANDINA CAJAMARCA NORTE 60 Regulado
CHINANGO S.A.C. HIDRANDINA CHIMBOTE 13.8 Regulado
CHINANGO S.A.C. HIDRANDINA CHIMBOTE1 138 Regulado
CHINANGO S.A.C. HIDRANDINA CHIMBOTE2 138 Regulado
CHINANGO S.A.C. HIDRANDINA GUADALUPE 10 Regulado
CHINANGO S.A.C. HIDRANDINA GUADALUPE 60 Regulado
CHINANGO S.A.C. HIDRANDINA HUALLANCA 13.8 Regulado
CHINANGO S.A.C. HIDRANDINA HUALLANCA 138 Regulado
CHINANGO S.A.C. HIDRANDINA HUALLANCA 66 Regulado
CHINANGO S.A.C. HIDRANDINA HUARAZ OESTE 138 Regulado
CHINANGO S.A.C. HIDRANDINA KIMAN AYLLU 10 Regulado
CHINANGO S.A.C. HIDRANDINA LA PAJUELA 22.9 Regulado
CHINANGO S.A.C. HIDRANDINA PARAMONGA NUEVA 66 Regulado
CHINANGO S.A.C. HIDRANDINA PORCON 10 Regulado
CHINANGO S.A.C. HIDRANDINA TRUJILLO 138 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

CHINANGO S.A.C. HIDRANDINA TRUJILLO NORTE 10 Regulado


CHINANGO S.A.C. LUZ DEL SUR CALLAHUANCA 10 Regulado
CHINANGO S.A.C. LUZ DEL SUR CANTERA 220 Regulado
Gran
CHINANGO S.A.C. LUZ DEL SUR CHILCA REP 220 Usuario
CHINANGO S.A.C. LUZ DEL SUR CHILCA REP 220 Libre
CHINANGO S.A.C. LUZ DEL SUR CHILCA REP 220 Regulado
CHINANGO S.A.C. LUZ DEL SUR CHOSICA 60 Regulado
CHINANGO S.A.C. LUZ DEL SUR HUACHIPA 60 Regulado
CHINANGO S.A.C. LUZ DEL SUR INDUSTRIALES 220 Libre
CHINANGO S.A.C. LUZ DEL SUR INDUSTRIALES 220 Regulado
CHINANGO S.A.C. LUZ DEL SUR SALAMANCA 60 Regulado
CHINANGO S.A.C. LUZ DEL SUR SAN JUAN 220 Regulado
CHINANGO S.A.C. LUZ DEL SUR SAN JUAN 220 Libre
Gran
CHINANGO S.A.C. LUZ DEL SUR SAN JUAN 220 Usuario
Gran
CHINANGO S.A.C. LUZ DEL SUR SANTA ROSA 220 Usuario
CHINANGO S.A.C. LUZ DEL SUR SANTA ROSA 220 Libre
CHINANGO S.A.C. LUZ DEL SUR SANTA ROSA 220 Regulado
CHINANGO S.A.C. LUZ DEL SUR ÑAÑA 60 Regulado
CHINANGO S.A.C. SEAL CALLALLI 138 Regulado
CHINANGO S.A.C. SEAL CHILINA 33 Regulado
CHINANGO S.A.C. SEAL CHILINA 33 Libre
CHINANGO S.A.C. SEAL MARCONA 60 Regulado
CHINANGO S.A.C. SEAL MARCONA 60 Libre
CHINANGO S.A.C. SEAL MOLLENDO 138 Regulado
CHINANGO S.A.C. SEAL MOLLENDO 138 Libre
CHINANGO S.A.C. SEAL REPARTICION 138 Libre
CHINANGO S.A.C. SEAL REPARTICION 138 Regulado
CHINANGO S.A.C. SEAL SANTUARIO 13.8 Regulado
CHINANGO S.A.C. SEAL SOCABAYA 33 Libre
CHINANGO S.A.C. SEAL SOCABAYA 33 Regulado
EGASA ELECTRO DUNAS CAUDALOSA 22 Regulado
EGASA ELECTRO ORIENTE TOCACHE 138 Regulado
EGASA ELECTRO PUNO AYAVIRI 10 Regulado
EGASA ELECTRO PUNO AYAVIRI 22.9 Regulado
EGASA ELECTRO PUNO AZANGARO 13.8 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EGASA ELECTRO PUNO AZANGARO 22.9 Regulado


EGASA ELECTRO PUNO AZANGARO 60 Regulado
EGASA ELECTRO PUNO AZANGARO 60 Regulado
EGASA ELECTRO PUNO JULIACA 10 Regulado
EGASA ELECTRO PUNO PUNO 22.9 Regulado
EGASA ELECTRO PUNO PUNO 60 Regulado
EGASA ELECTRO SUR ARICOTA1 10.5 Regulado
EGASA ELECTRO SUR ARICOTA2 10.5 Regulado
EGASA ELECTRO SUR HUAYTIRE 138 Regulado
EGASA ELECTRO SUR ILO ELP 138 Regulado
EGASA ELECTRO SUR MOQUEGUA 138 Regulado
EGASA ELECTRO SUR SARITA 33 Regulado
EGASA ELECTRO SUR SOCABAYA 33 Regulado
EGASA ELECTRO SUR TACNA 66 Regulado
EGASA ELECTRO SUR TOMASIRI 66 Regulado
EGASA ELECTRO SUR ESTE ABANCAY 138 Regulado
EGASA ELECTRO SUR ESTE CACHIMAYO 10 Regulado
EGASA ELECTRO SUR ESTE CACHIMAYO 23 Regulado
EGASA ELECTRO SUR ESTE CACHIMAYO 33 Regulado
EGASA ELECTRO SUR ESTE CACHIMAYO 60 Regulado
EGASA ELECTRO SUR ESTE COMBAPATA 24 Regulado
EGASA ELECTRO SUR ESTE COMBAPATA 60 Regulado
EGASA ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado
EGASA ELECTRO SUR ESTE MACHUPICCHU 10 Regulado
EGASA ELECTRO SUR ESTE MACHUPICCHU 60 Regulado
EGASA ELECTRO SUR ESTE QUENCORO 33 Regulado
EGASA ELECTRO SUR ESTE SAN GABAN 138 Regulado
EGASA ELECTRO SUR ESTE TINTAYA 10 Regulado
EGASA ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
EGASA ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
EGASA ENEL DISTRIBUCION PERU HUACHO 66 Regulado
EGASA ENEL DISTRIBUCION PERU LOMERA 60 Regulado
EGASA ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
EGASA ENEL DISTRIBUCION PERU RIO SECO 20 Regulado
EGASA ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
EGASA ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
EGASA ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EGASA ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado


EGASA LUZ DEL SUR CALLAHUANCA 10 Regulado
EGASA LUZ DEL SUR CANTERA 220 Regulado
EGASA LUZ DEL SUR CHILCA REP 220 Regulado
EGASA LUZ DEL SUR CHILCA REP 220 Libre
EGASA LUZ DEL SUR CHOSICA 60 Regulado
EGASA LUZ DEL SUR HUACHIPA 60 Regulado
EGASA LUZ DEL SUR INDUSTRIALES 220 Regulado
EGASA LUZ DEL SUR SALAMANCA 60 Regulado
EGASA LUZ DEL SUR SAN JUAN 220 Regulado
EGASA LUZ DEL SUR SAN JUAN 220 Libre
EGASA LUZ DEL SUR SANTA ROSA 220 Libre
EGASA LUZ DEL SUR SANTA ROSA 220 Regulado
EGASA LUZ DEL SUR ÑAÑA 60 Regulado
EGASA MICHELL Y CIA S.A. SOCABAYA 138 Libre
EGASA MICHELL Y CIA S.A. SOCABAYA 138 Libre
EGASA MICHELL Y CIA S.A. SOCABAYA 138 Libre
EGASA SEAL CALLALLI 138 Regulado
EGASA SEAL CHILINA 33 Libre
EGASA SEAL CHILINA 33 Regulado
EGASA SEAL JESUS 138 Regulado
EGASA SEAL JESUS 138 Libre
EGASA SEAL MARCONA 60 Libre
EGASA SEAL MARCONA 60 Regulado
EGASA SEAL MOLLENDO 138 Libre
EGASA SEAL MOLLENDO 138 Regulado
EGASA SEAL REPARTICION 138 Libre
EGASA SEAL REPARTICION 138 Regulado
EGASA SEAL SANTUARIO 13.8 Regulado
EGASA SEAL SOCABAYA 138 Libre
EGASA SEAL SOCABAYA 138 Regulado
EGASA SEAL SOCABAYA 33 Libre
EGASA SEAL SOCABAYA 33 Regulado
EGASA TERMINAL INTERNACIONAL DEL SUR MOLLENDO 138 Libre
EGEMSA CEMENTO SUR PERU JULIACA 138 Libre
EGEMSA CIA MINERA PLATA DORADA S.A. MARCONA 220 Libre
EGEMSA COELVISAC AGROLMOS 22.9 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EGEMSA COELVISAC ILLIMO 22.9 Regulado


EGEMSA COELVISAC INDEPENDENCIA 220 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Regulado
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Libre
EGEMSA COELVISAC INDEPENDENCIA 60 Regulado
EGEMSA COELVISAC LAS PRADERAS 22.9 Libre
CONDUCTORES ELÉCTRICOS PERUANOS SANTA ROSA 220
EGEMSA Libre
(CEPER)
EGEMSA ELECTRO CENTRO AUCAYACU 22.9 Regulado
EGEMSA ELECTRO CENTRO CARHUAMAYO 138 Regulado
EGEMSA ELECTRO CENTRO COBRIZA I 69 Regulado
EGEMSA ELECTRO CENTRO COBRIZA II 10 Regulado
EGEMSA ELECTRO CENTRO COBRIZA II 69 Regulado
EGEMSA ELECTRO CENTRO CONDORCOCHA 44 Regulado
EGEMSA ELECTRO CENTRO HUALLANCA 66 Regulado
EGEMSA ELECTRO CENTRO HUANCAVE 10 Regulado
EGEMSA ELECTRO CENTRO HUANCAVE 60 Regulado
EGEMSA ELECTRO CENTRO HUANUCO 10 Regulado
EGEMSA ELECTRO CENTRO HUANUCO 22.9 Regulado
EGEMSA ELECTRO CENTRO HUAYUCACH 10 Regulado
EGEMSA ELECTRO CENTRO HUAYUCACH 60 Regulado
EGEMSA ELECTRO CENTRO OROYA NUEVA 50 Regulado
EGEMSA ELECTRO CENTRO PACHACHACA 220 Regulado
EGEMSA ELECTRO CENTRO PARAGSHA2 138 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EGEMSA ELECTRO CENTRO POMACOCHA 220 Regulado


EGEMSA ELECTRO CENTRO TINGO MARIA 10 Regulado
EGEMSA ELECTRO CENTRO YAUPI 13.8 Regulado
EGEMSA ELECTRO DUNAS ICA 10 Regulado
EGEMSA ELECTRO DUNAS ICA 60 Regulado
EGEMSA ELECTRO DUNAS INDEPENDENCIA 10 Regulado
EGEMSA ELECTRO DUNAS INDEPENDENCIA 60 Regulado
EGEMSA ELECTRO DUNAS MARCONA 60 Regulado
EGEMSA ELECTRO NOR OESTE MANCORA 10.5 Regulado
EGEMSA ELECTRO NOR OESTE MANCORA 22.9 Regulado
EGEMSA ELECTRO NOR OESTE Malacas 13.2 Regulado
EGEMSA ELECTRO NOR OESTE PIURA OESTE 10 Regulado
EGEMSA ELECTRO NOR OESTE PIURA OESTE 60 Regulado
EGEMSA ELECTRO NOR OESTE ZORRITOS 33 Regulado
EGEMSA ELECTRO NOR OESTE ZORRITOS 60 Regulado
EGEMSA ELECTRO NORTE CARHUAQUERO 220 Regulado
EGEMSA ELECTRO NORTE CERRO CORONA 220 Regulado
EGEMSA ELECTRO NORTE CHICLAYO 60 Regulado
EGEMSA ELECTRO ORIENTE CAJAMARCA 220 Libre

EGEMSA ELECTRO ORIENTE CUTERVO 138 Libre

EGEMSA ELECTRO ORIENTE TOCACHE 138 Libre


EGEMSA ELECTRO SUR ESTE ABANCAY 138 Libre
EGEMSA ELECTRO SUR ESTE DOLORESPATA 10.5 Libre
EGEMSA ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado
EGEMSA ELECTRO SUR ESTE QUENCORO 138 Libre
EGEMSA ELECTROPUNO ANANEA 22.9 Libre
EMPRESA METAL MECANICA S A
EGEMSA SAN JUAN 220 Libre
EMEMSA
EGEMSA HIDRANDINA CAJAMARCA NORTE 60 Regulado
EGEMSA HIDRANDINA CHIMBOTE 13.8 Regulado
EGEMSA HIDRANDINA CHIMBOTE1 138 Regulado
EGEMSA HIDRANDINA CHIMBOTE2 138 Regulado
EGEMSA HIDRANDINA GUADALUPE 10 Regulado
EGEMSA HIDRANDINA GUADALUPE 60 Regulado
EGEMSA HIDRANDINA HUALLANCA 13.8 Regulado
EGEMSA HIDRANDINA HUALLANCA 138 Regulado
EGEMSA HIDRANDINA HUALLANCA 66 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EGEMSA HIDRANDINA HUARAZ OESTE 138 Regulado


EGEMSA HIDRANDINA PARAMONGA NUEVA 66 Regulado
EGEMSA HIDRANDINA PORCON 10 Regulado
EGEMSA HIDRANDINA TRUJILLO 138 Regulado
EGEMSA HIDRANDINA TRUJILLO NORTE 10 Regulado
EGEMSA ICATOM S.A. ICA 220 Libre
Gran
EGEMSA INDUSTRIA CACHIMAYO CACHIMAYO 138 Usuario
EGEMSA PIPING INDUSTRIAL S.A.C. SAN JUAN 220 Libre
EGEMSA SEAL CALLALLI 138 Libre
EGEMSA SEAL CHILINA 33 Libre
EGEMSA SEAL MARCONA 220 Libre
EGEMSA SEAL MOLLENDO 138 Libre
EGEMSA SEAL REPARTICION 138 Libre
EGEMSA SEAL SOCABAYA 138 Libre
EGEMSA SOCIEDAD AGRICOLA VIRU S.A. PIURA OESTE 220 Libre
CONSORCIO INDUSTRIAL DE AREQUIPA SOCABAYA 138
EGESUR Libre
SA
EGESUR EGEPSA SATIPO 22.9 Regulado
EGESUR ELECTRO DUNAS CAUDALOSA 22 Regulado
EGESUR ELECTRO ORIENTE TOCACHE 138 Regulado
EGESUR ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
EGESUR ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
EGESUR ENEL DISTRIBUCION PERU HUACHO 66 Regulado
EGESUR ENEL DISTRIBUCION PERU LOMERA 60 Regulado
EGESUR ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
EGESUR ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
EGESUR ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
EGESUR ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
EGESUR ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
EGESUR LUZ DEL SUR CALLAHUANCA 10 Regulado
EGESUR LUZ DEL SUR CANTERA 220 Regulado
EGESUR LUZ DEL SUR CHILCA REP 220 Regulado
EGESUR LUZ DEL SUR CHOSICA 60 Regulado
EGESUR LUZ DEL SUR HUACHIPA 60 Regulado
EGESUR LUZ DEL SUR INDUSTRIALES 220 Regulado
EGESUR LUZ DEL SUR SALAMANCA 60 Regulado
EGESUR LUZ DEL SUR SAN JUAN 220 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EGESUR LUZ DEL SUR SANTA ROSA 220 Regulado


EGESUR LUZ DEL SUR ÑAÑA 60 Regulado
MUNICIPALIDAD DEL CENTRO
EGESUR ARES 22 Regulado
POBLADO DE UNIÓN CHACHAS

EGESUR PRODUCTOS PESQUEROS DEL SUR S.A. LOS HEROES 66 Libre

Gran
ELECTROPERU ACEROS AREQUIPA
INDEPENDENCIA 220 Usuario
Gran
ELECTROPERU CEMENTOS PACASMAYO Usuario
GUADALUPE 60
Gran
ELECTROPERU CEMENTOS PACASMAYO
PIURA OESTE 220 Usuario
ELECTROPERU COELVISAC FELAM 220 Libre
ELECTROPERU COELVISAC INDEPENDENCIA 60 Regulado
ELECTROPERU COELVISAC MALPASO 50 Libre
ELECTROPERU CORPORACIÓN MIYASATO SANTA CLARA 22.9 Libre
ELECTROPERU ELECTRO CENTRO AUCAYACU 22.9 Regulado
ELECTROPERU ELECTRO CENTRO CARHUAMAYO 138 Regulado
ELECTROPERU ELECTRO CENTRO COBRIZA I 69 Regulado
ELECTROPERU ELECTRO CENTRO COBRIZA II 10 Regulado
ELECTROPERU ELECTRO CENTRO COBRIZA II 69 Regulado
ELECTROPERU ELECTRO CENTRO CONDORCOCHA 44 Regulado
ELECTROPERU ELECTRO CENTRO HUALLANCA 66 Regulado
ELECTROPERU ELECTRO CENTRO HUANCAVE 10 Regulado
ELECTROPERU ELECTRO CENTRO HUANCAVE 60 Regulado
ELECTROPERU ELECTRO CENTRO HUANCAYOCCASA 33 Regulado
ELECTROPERU ELECTRO CENTRO HUANUCO 10 Regulado
ELECTROPERU ELECTRO CENTRO HUANUCO 22.9 Regulado
ELECTROPERU ELECTRO CENTRO HUAYUCACH 10 Regulado
ELECTROPERU ELECTRO CENTRO HUAYUCACH 60 Regulado
ELECTROPERU ELECTRO CENTRO OROYA NUEVA 50 Regulado
ELECTROPERU ELECTRO CENTRO PACHACHACA 220 Regulado
ELECTROPERU ELECTRO CENTRO PARAGSHA2 138 Regulado
ELECTROPERU ELECTRO CENTRO POMACOCHA 220 Regulado
ELECTROPERU ELECTRO CENTRO RESTITUCION 33 Regulado
ELECTROPERU ELECTRO CENTRO TABLACHACA 33 Regulado
ELECTROPERU ELECTRO CENTRO TINGO MARIA 10 Regulado
ELECTROPERU ELECTRO CENTRO YAUPI 13.8 Regulado
ELECTROPERU ELECTRO NOR OESTE Malacas 13.2 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ELECTROPERU ELECTRO NOR OESTE MANCORA 10.5 Regulado


ELECTROPERU ELECTRO NOR OESTE MANCORA 22.9 Regulado
ELECTROPERU ELECTRO NOR OESTE PIURA OESTE 10 Regulado
ELECTROPERU ELECTRO NOR OESTE PIURA OESTE 60 Libre
ELECTROPERU ELECTRO NOR OESTE PIURA OESTE 60 Regulado
ELECTROPERU ELECTRO NOR OESTE ZORRITOS 33 Regulado
ELECTROPERU ELECTRO NOR OESTE ZORRITOS 60 Regulado
ELECTROPERU ELECTRO NORTE CARHUAQUERO 220 Regulado
ELECTROPERU ELECTRO NORTE CERRO CORONA 220 Regulado
ELECTROPERU ELECTRO NORTE CHICLAYO 60 Regulado
ELECTROPERU ELECTRO PUNO AYAVIRI 10 Regulado
ELECTROPERU ELECTRO PUNO AYAVIRI 22.9 Regulado
ELECTROPERU ELECTRO PUNO AZANGARO 13.8 Regulado
ELECTROPERU ELECTRO PUNO AZANGARO 22.9 Regulado
ELECTROPERU ELECTRO PUNO AZANGARO 60 Regulado
ELECTROPERU ELECTRO PUNO JULIACA 10 Regulado
ELECTROPERU ELECTRO PUNO PUNO 22.9 Regulado
ELECTROPERU ELECTRO PUNO PUNO 60 Regulado
ELECTROPERU ELECTRO SUR ARICOTA1 10.5 Regulado
ELECTROPERU ELECTRO SUR ARICOTA2 10.5 Regulado
ELECTROPERU ELECTRO SUR HUAYTIRE 138 Regulado
ELECTROPERU ELECTRO SUR ILO ELP 138 Regulado
ELECTROPERU ELECTRO SUR MOQUEGUA 138 Regulado
ELECTROPERU ELECTRO SUR SARITA 33 Regulado
ELECTROPERU ELECTRO SUR SOCABAYA 33 Regulado
ELECTROPERU ELECTRO SUR TACNA 66 Regulado
ELECTROPERU ELECTRO SUR TOMASIRI 66 Regulado
ELECTROPERU ELECTRO SUR ESTE ABANCAY 138 Regulado
ELECTROPERU ELECTRO SUR ESTE CACHIMAYO 10 Regulado
ELECTROPERU ELECTRO SUR ESTE CACHIMAYO 23 Regulado
ELECTROPERU ELECTRO SUR ESTE CACHIMAYO 33 Regulado
ELECTROPERU ELECTRO SUR ESTE CACHIMAYO 60 Regulado
ELECTROPERU ELECTRO SUR ESTE COMBAPATA 24 Regulado
ELECTROPERU ELECTRO SUR ESTE COMBAPATA 60 Regulado
ELECTROPERU ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado
ELECTROPERU ELECTRO SUR ESTE MACHUPICCHU 10 Regulado
ELECTROPERU ELECTRO SUR ESTE MACHUPICCHU 60 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ELECTROPERU ELECTRO SUR ESTE QUENCORO 33 Regulado


ELECTROPERU ELECTRO SUR ESTE SAN GABAN 138 Regulado
ELECTROPERU ELECTRO SUR ESTE TINTAYA 10 Regulado
ELECTROPERU ELECTRO UCAYALI AGUAYTIA 22.9 Regulado
ELECTROPERU ELECTRO UCAYALI PUCALLPA 60 Regulado
EMPRESA ADMINISTRADORA CERRO Gran
ELECTROPERU S.A.C. CASA PIEDRA 12 Usuario
EMPRESA ADMINISTRADORA CERRO Gran
ELECTROPERU S.A.C. EXCELSIOR 2.4 Usuario
EMPRESA ADMINISTRADORA CERRO Gran
ELECTROPERU S.A.C. Usuario
HUICRA 2.4
EMPRESA ADMINISTRADORA CERRO Gran
ELECTROPERU S.A.C. PARAGSHA 12 Usuario
EMPRESA ADMINISTRADORA CERRO Gran
ELECTROPERU S.A.C. PARAGSHA 12 Usuario
EMPRESA ADMINISTRADORA CERRO Gran
ELECTROPERU S.A.C. SAN JUAN 11 Usuario
EMPRESA ADMINISTRADORA CERRO Gran
ELECTROPERU S.A.C. SAN JUAN 2.4 Usuario
EMPRESA ADMINISTRADORA
ELECTROPERU Libre
CHUNGAR SAC PARAGSHA2 220
EMPRESA ADMINISTRADORA
ELECTROPERU CHUNGAR SAC Libre
SHELBYCHU 50
ELECTROPERU ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
ELECTROPERU ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
ELECTROPERU ENEL DISTRIBUCION PERU HUACHO 66 Regulado
ELECTROPERU ENEL DISTRIBUCION PERU LOMERA 60 Regulado
ELECTROPERU ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
ELECTROPERU ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
ELECTROPERU ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
ELECTROPERU ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
ELECTROPERU ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
ELECTROPERU FABRICA DE TEJIDOS PISCO ALTO LA LUNA 10 Libre
ELECTROPERU FABRICA DE TEJIDOS PISCO PISCO 10 Libre
ELECTROPERU FOSFATOS DEL PACIFICO S.A. CONSTANTE 22.9 Libre
ELECTROPERU HIDRANDINA CAJAMARCA NORTE 60 Regulado
ELECTROPERU HIDRANDINA CHIMBOTE 13.8 Regulado
ELECTROPERU HIDRANDINA CHIMBOTE1 138 Regulado
ELECTROPERU HIDRANDINA CHIMBOTE2 138 Regulado
ELECTROPERU HIDRANDINA GUADALUPE 10 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ELECTROPERU HIDRANDINA GUADALUPE 60 Regulado


ELECTROPERU HIDRANDINA HUALLANCA 13.8 Regulado
ELECTROPERU HIDRANDINA HUALLANCA 138 Regulado
ELECTROPERU HIDRANDINA HUALLANCA 66 Regulado
ELECTROPERU HIDRANDINA HUARAZ OESTE 138 Regulado
ELECTROPERU HIDRANDINA KIMAN AYLLU 10 Regulado
ELECTROPERU HIDRANDINA LA PAJUELA 22.9 Regulado
ELECTROPERU HIDRANDINA PARAMONGA NUEVA 66 Regulado
ELECTROPERU HIDRANDINA PORCON 10 Regulado
ELECTROPERU HIDRANDINA TRUJILLO 138 Regulado
ELECTROPERU HIDRANDINA TRUJILLO NORTE 10 Regulado
ELECTROPERU LUZ DEL SUR CALLAHUANCA 10 Regulado
ELECTROPERU LUZ DEL SUR CANTERA 220 Regulado
ELECTROPERU LUZ DEL SUR CHILCA REP 220 Libre
ELECTROPERU LUZ DEL SUR CHILCA REP 220 Regulado
ELECTROPERU LUZ DEL SUR CHOSICA 60 Regulado
ELECTROPERU LUZ DEL SUR HUACHIPA 60 Regulado
ELECTROPERU LUZ DEL SUR INDUSTRIALES 220 Libre
ELECTROPERU LUZ DEL SUR INDUSTRIALES 220 Regulado
ELECTROPERU LUZ DEL SUR ÑAÑA 60 Regulado
ELECTROPERU LUZ DEL SUR SALAMANCA 60 Regulado
ELECTROPERU LUZ DEL SUR SAN JUAN 220 Libre
ELECTROPERU LUZ DEL SUR SAN JUAN 220 Regulado
ELECTROPERU LUZ DEL SUR SANTA ROSA 220 Libre
ELECTROPERU LUZ DEL SUR SANTA ROSA 220 Regulado
Gran
ELECTROPERU MINERA CERRO VERDE
SAN JOSE 500 Usuario
Gran
ELECTROPERU MINERA CERRO VERDE
SOCABAYA 220 Usuario
MINERA SAN IGNACIO DE Gran
ELECTROPERU MOROCOCHA CONDORCOCHA 138 Usuario
Gran
ELECTROPERU MINERA VOLCAN
ANDAYCHAGUA 4.16 Usuario
Gran
ELECTROPERU MINERA VOLCAN
ANDAYCHAGUA 50 Usuario
Gran
ELECTROPERU MINERA VOLCAN
MAHR TUNEL 2.4 Usuario
Gran
ELECTROPERU MINERA VOLCAN
MINA CARAHUACRA 50 Usuario
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

Gran
ELECTROPERU MINERA VOLCAN
PLANTA VICTORIA 50 Usuario
Gran
ELECTROPERU MINERA VOLCAN
POMACOCHA 220 Usuario
Gran
ELECTROPERU MINERA VOLCAN
SAN CRISTOBAL 2.4 Usuario
Gran
ELECTROPERU MINERA VOLCAN
SAN CRISTOBAL 4.16 Usuario
Gran
ELECTROPERU MINERA VOLCAN
TICLIO 50 Usuario
Gran
ELECTROPERU OXIDOS DE PASCO S.A.C.
OXIDOS CERRO 138 Usuario
ELECTROPERU PRAXAIR INDEPENDENCIA 220 Libre
ELECTROPERU PRAXAIR MARANGA 10 Libre
ELECTROPERU SEAL CALLALLI 138 Regulado
ELECTROPERU SEAL CHILINA 33 Libre
ELECTROPERU SEAL CHILINA 33 Regulado
ELECTROPERU SEAL JESUS 138 Regulado
ELECTROPERU SEAL MARCONA 60 Libre
ELECTROPERU SEAL MARCONA 60 Regulado
ELECTROPERU SEAL MOLLENDO 138 Libre
ELECTROPERU SEAL MOLLENDO 138 Regulado
ELECTROPERU SEAL REPARTICION 138 Libre
ELECTROPERU SEAL REPARTICION 138 Regulado
ELECTROPERU SEAL SANTUARIO 13.8 Regulado
ELECTROPERU SEAL SOCABAYA 138 Libre
ELECTROPERU SEAL SOCABAYA 138 Regulado
ELECTROPERU SEAL SOCABAYA 33 Libre
ELECTROPERU SEAL SOCABAYA 33 Regulado
Gran
ELECTROPERU SOUTHERN PERU CC
ILO3 138 Usuario
Gran
ELECTROPERU SOUTHERN PERU CC
MOQUEGUA 138 Usuario
ELECTROPERU VINCHOS ANTAGASHA 50 Libre

EMPRESA DE GENERACION HUALLAGA ELECTRO NOR OESTE PIURA OESTE 60 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO NOR OESTE PIURA OESTE 10 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO NOR OESTE PUERTO RICO 22.9 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EMPRESA DE GENERACION HUALLAGA ELECTRO NOR OESTE Malacas 13.2 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO NOR OESTE ZORRITOS 60 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO NOR OESTE MANCORA 22.9 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO NOR OESTE MANCORA 10.5 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO NOR OESTE ZORRITOS 33 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA GUADALUPE 60 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA GUADALUPE 10 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA TRUJILLO 138 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA TRUJILLO NORTE 10 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA CHIMBOTE1 138 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA CHIMBOTE 13.8 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA CHIMBOTE2 138 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA HUALLANCA 138 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA HUALLANCA 66 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA HUALLANCA 13.8 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA PARAMONGA NUEVA 66 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA PORCON 10 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA CAJAMARCA NORTE 60 Regulado

EMPRESA DE GENERACION HUALLAGA HIDRANDINA HUARAZ OESTE 138 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO NORTE CHICLAYO 60 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO NORTE CARHUAQUERO 220 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO NORTE CERRO CORONA 220 Regulado


INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO OROYA NUEVA 50 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO CARHUAMAYO 138 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO YAUPI 13.8 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO PARAGSHA2 138 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO CONDORCOCHA 44 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO COBRIZA II 69 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO COBRIZA II 10 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO COBRIZA I 69 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO HUAYUCACH 60 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO HUAYUCACH 10 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO HUANCAVE 60 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO HUANCAVE 10 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO PACHACHACA 220 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO POMACOCHA 220 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO TINGO MARIA 10 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO AUCAYACU 22.9 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO HUANUCO 10 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO HUANUCO 22.9 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO CENTRO HUALLANCA 66 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO UCAYALI AGUAYTIA 22.9 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO UCAYALI PUCALLPA 60 Regulado

EMPRESA DE GENERACION HUALLAGA SEAL SOCABAYA 33 Regulado


INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EMPRESA DE GENERACION HUALLAGA SEAL CHILINA 33 Regulado

EMPRESA DE GENERACION HUALLAGA SEAL MOLLENDO 138 Regulado

EMPRESA DE GENERACION HUALLAGA SEAL CALLALLI 138 Regulado

EMPRESA DE GENERACION HUALLAGA SEAL REPARTICION 138 Regulado

EMPRESA DE GENERACION HUALLAGA SEAL MARCONA 60 Regulado

EMPRESA DE GENERACION HUALLAGA SEAL SANTUARIO 13.8 Regulado

EMPRESA DE GENERACION HUALLAGA SEAL JESUS 138 Regulado

EMPRESA DE GENERACION HUALLAGA SEAL SOCABAYA 138 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO ORIENTE CUTERVO 138 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO ORIENTE MOYOBAMBA NUEVA 138 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE QUENCORO 10.5 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE ABANCAY 138 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE CACHIMAYO 10 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE CACHIMAYO 23 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE CACHIMAYO 60 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE COMBAPATA 24 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE TINTAYA 10 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE MACHUPICCHU 10 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE MACHUPICCHU 60 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE QUENCORO 33 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE SAN GABAN 138 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE CACHIMAYO 33 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO SUR ESTE COMBAPATA 60 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO PUNO PUNO 60 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO PUNO PUNO 22.9 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO PUNO JULIACA 22.9 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO PUNO JULIACA 10 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO PUNO AZANGARO 22.9 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO PUNO AZANGARO 60 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO PUNO AYAVIRI 22.9 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO PUNO AYAVIRI 10 Regulado

EMPRESA DE GENERACION HUALLAGA ELECTRO PUNO SAN GABAN 13.8 Regulado

EMPRESA DE GENERACION HUALLAGA ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado

EMPRESA DE GENERACION HUALLAGA ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado

EMPRESA DE GENERACION HUALLAGA ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado

EMPRESA DE GENERACION HUALLAGA ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado

EMPRESA DE GENERACION HUALLAGA ENEL DISTRIBUCION PERU HUACHO 66 Regulado

EMPRESA DE GENERACION HUALLAGA ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado

EMPRESA DE GENERACION HUALLAGA ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado

EMPRESA DE GENERACION HUALLAGA ENEL DISTRIBUCION PERU LOMERA 60 Regulado

EMPRESA DE GENERACION HUALLAGA LUZ DEL SUR SAN JUAN 220 Regulado

EMPRESA DE GENERACION HUALLAGA LUZ DEL SUR SANTA ROSA 220 Regulado

EMPRESA DE GENERACION HUALLAGA LUZ DEL SUR CHILCA REP 220 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EMPRESA DE GENERACION HUALLAGA LUZ DEL SUR ÑAÑA 60 Regulado

EMPRESA DE GENERACION HUALLAGA LUZ DEL SUR SALAMANCA 60 Regulado

EMPRESA DE GENERACION HUALLAGA LUZ DEL SUR CHOSICA 60 Regulado

EMPRESA DE GENERACION HUALLAGA LUZ DEL SUR CALLAHUANCA 10 Regulado

EMPRESA DE GENERACION HUALLAGA LUZ DEL SUR INDUSTRIALES 220 Regulado

EMPRESA DE GENERACION HUALLAGA ADINELSA ADN ICA 60 Regulado

EMPRESA DE GENERACION HUALLAGA ADINELSA ADN CHOSICA 60 Regulado

EMPRESA DE GENERACION HUALLAGA ADINELSA ADN MARCONA 60 Regulado

EMPRESA DE GENERACION HUALLAGA ADINELSA ADN INDEPENDENCIA 10 Regulado

EMPRESA DE GENERACION HUALLAGA ADINELSA ADN INDEPENDENCIA 60 Regulado

EMPRESA DE GENERACION HUALLAGA ADINELSA ADN PARAMONGA NUEVA 66 Regulado

EMPRESA DE GENERACION HUALLAGA ADINELSA ADN HUACHO 66 Regulado

EMPRESA DE GENERACION HUALLAGA ADINELSA ADN HUANCAVELICA 220 Regulado

EMPRESA DE GENERACION HUALLAGA ADINELSA ADN CHILCA REP 220 Regulado

EMPRESA DE GENERACION HUALLAGA MINERA VOLCAN PLANTA VICTORIA 50 Libre

EMPRESA DE GENERACION HUALLAGA MINERA VOLCAN MINA CARAHUACRA 50 Libre

EMPRESA DE GENERACION HUALLAGA MINERA VOLCAN TICLIO 50 Libre

EMPRESA DE GENERACION HUALLAGA MINERA VOLCAN MAHR TUNEL 2.4 Libre

EMPRESA DE GENERACION HUALLAGA MINERA VOLCAN ANDAYCHAGUA 4.16 Libre

EMPRESA DE GENERACION HUALLAGA MINERA VOLCAN SAN CRISTOBAL 4.16 Libre

EMPRESA DE GENERACION HUALLAGA MINERA VOLCAN SAN CRISTOBAL 2.4 Libre

EMPRESA DE GENERACION HUALLAGA MINERA VOLCAN ANDAYCHAGUA 50 Libre


INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

EMPRESA DE GENERACION HUALLAGA MINERA VOLCAN POMACOCHA 220 Libre

EMPRESA DE GENERACION HUALLAGA ACEROS AREQUIPA INDEPENDENCIA 220 Libre

Gran
EMPRESA DE GENERACION HUANZA EL BROCAL .S.A. CARHUAMAYO 138 Usuario
Gran
EMPRESA DE GENERACION HUANZA MINERA BUENAVENTURA CALLALLI 138 Usuario
EMPRESA DE GENERACION HUANZA MINERA BUENAVENTURA CALLALLI 138 Libre
Gran
EMPRESA DE GENERACION HUANZA MINERA BUENAVENTURA CALLALLI 138 Usuario
EMPRESA DE GENERACION HUANZA MINERA BUENAVENTURA HUANCAVELICA 220 Libre
Gran
EMPRESA DE GENERACION HUANZA MINERA BUENAVENTURA PARAGSHA2 138 Usuario
EMPRESA DE GENERACION HUANZA MINERA BUENAVENTURA PARAGSHA2 138 Libre
EMPRESA DE GENERACION HUANZA MINERA COIMOLACHE S.A. CAJAMARCA 220 Libre
EMPRESA DE GENERACION HUANZA MINERA LA ZANJA S.R.L GUADALUPE 60 Libre
MINES & METALS TRADING (PERU)
EMPRESA DE GENERACION HUANZA HUANCAVELICA 220 Libre
S.A.C. - MMTP
EMPRESA DE GENERACION HUANZA PESQUERA CENTINELA SAC INDEPENDENCIA 220 Libre

EMPRESA DE GENERACION HUANZA PROCESADORA INDUSTRIAL RIO SECO LOMERA 220 Libre

ENEL GENERACION PERU S.A.A. AGRICOLA JOSE JUAN S.A.C. PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. AGROINDUSTRIAS AIB S.A ICA 220 Libre
ENEL GENERACION PERU S.A.A. ALICORP SOCABAYA 138 Libre
ENEL GENERACION PERU S.A.A. ALICORP SOCABAYA 138 Libre
ENEL GENERACION PERU S.A.A. AMERICAN MOLDS S.A.C. SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. ANDALUCITA S.A. PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. ANDEAN POWER S.A. CALLAHUANCA 220 Libre
ENEL GENERACION PERU S.A.A. ANDINA DE RADIODIFUSION S.A.C. SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. ANDINA DE RADIODIFUSION S.A.C. SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. AUTOESPAR S A SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. BANCO FINANCIERO DEL PERU SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. BANCO RIPLEY PERU S.A. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. CALIZA CEMENTO INCA S.A. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. CALIZA CEMENTO INCA S.A. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. CALIZA CEMENTO INCA S.A. SANTA ROSA 220 Libre
CALZADO CHOSICA SOCIEDAD
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
ANONIMA CERRADA
ENEL GENERACION PERU S.A.A. CAMPOSOL S.A. PIURA OESTE 220 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PERU S.A.A. CAMPOSOL S.A. PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. CAMPOSOL S.A. TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. CAMPOSOL S.A. TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. CARLOS KOCH PRATTES S A SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. CARVIMSA SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. CELEC EP ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. CFG INVESTMENT SAC CHIMBOTE1 220 Libre
ENEL GENERACION PERU S.A.A. CFG INVESTMENT SAC CHIMBOTE1 220 Libre
ENEL GENERACION PERU S.A.A. CFG INVESTMENT SAC CHIMBOTE1 220 Libre
ENEL GENERACION PERU S.A.A. CFG INVESTMENT SAC INDEPENDENCIA 220 Libre
ENEL GENERACION PERU S.A.A. CFG INVESTMENT SAC INDEPENDENCIA 220 Libre
ENEL GENERACION PERU S.A.A. CFG INVESTMENT SAC TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. CLINICA GOOD HOPE SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. CLUB REGATAS LIMA ASIA 220 Libre
ENEL GENERACION PERU S.A.A. CLUB REGATAS LIMA SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. CLUB REGATAS LIMA SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. CLUB REGATAS LIMA SANTA ROSA 220 Libre

ENEL GENERACION PERU S.A.A. COMPLEJO AGROINDUSTRIAL BETA S.A. CHICLAYO 220 Libre

ENEL GENERACION PERU S.A.A. COMPLEJO AGROINDUSTRIAL BETA S.A. CHICLAYO 220 Libre

ENEL GENERACION PERU S.A.A. COMPLEJO AGROINDUSTRIAL BETA S.A. CHICLAYO 220 Libre

ENEL GENERACION PERU S.A.A. COMPLEJO AGROINDUSTRIAL BETA S.A. ICA 220 Libre

ENEL GENERACION PERU S.A.A. COMPLEJO AGROINDUSTRIAL BETA S.A. ICA 220 Libre

ENEL GENERACION PERU S.A.A. COMPLEJO AGROINDUSTRIAL BETA S.A. ICA 220 Libre

ENEL GENERACION PERU S.A.A. COMPLEJO AGROINDUSTRIAL BETA S.A. ICA 220 Libre

ENEL GENERACION PERU S.A.A. COMPLEJO AGROINDUSTRIAL BETA S.A. ICA 220 Libre

ENEL GENERACION PERU S.A.A. COMPLEJO AGROINDUSTRIAL BETA S.A. INDEPENDENCIA 220 Libre

ENEL GENERACION PERU S.A.A. COMPLEJO AGROINDUSTRIAL BETA S.A. INDEPENDENCIA 220 Libre

ENEL GENERACION PERU S.A.A. COMPLEJO AGROINDUSTRIAL BETA S.A. INDEPENDENCIA 220 Libre

ENEL GENERACION PERU S.A.A. CONCREMAX SAN JUAN 220 Libre


INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PERU S.A.A. CONCREMAX SAN JUAN 220 Libre


ENEL GENERACION PERU S.A.A. CONGELADOS Y FRESCOS ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. CONSERVERA DE LAS AMERICAS S. A PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. CONSERVERA DE LAS AMERICAS S. A PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. CONSERVERA DE LAS AMERICAS S. A PIURA OESTE 220 Libre
CORPORACION PESQUERA INCA ( EX
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
DEL MAR)
CORPORACION PESQUERA INCA ( EX
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
DEL MAR)
CORPORACION PESQUERA INCA ( EX
ENEL GENERACION PERU S.A.A. DEL MAR) SANTA ROSA 220 Libre

CORPORACION PESQUERA INCA ( EX


ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
DEL MAR)
CORPORACION PESQUERA INCA ( EX
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
DEL MAR)

ENEL GENERACION PERU S.A.A. CORPORACION REFRIGERADOS INY SA ZORRITOS 220 Libre

ENEL GENERACION PERU S.A.A. CORPORACION REFRIGERADOS INY SA ZORRITOS 220 Libre

ENEL GENERACION PERU S.A.A. CORPORACION REFRIGERADOS INY SA ZORRITOS 220 Libre

ENEL GENERACION PERU S.A.A. CORPORACION REFRIGERADOS INY SA ZORRITOS 220 Libre

CORPORACION SANTA MARGARITA


ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
S.A.C.
ENEL GENERACION PERU S.A.A. CORPORACIÓN LINDLEY S.A. CHILCA REP 220 Libre
ENEL GENERACION PERU S.A.A. CORPORACIÓN LINDLEY S.A. SOCABAYA 138 Libre
ENEL GENERACION PERU S.A.A. CORPORACIÓN LINDLEY S.A. TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. COTEXSUR S.A.C. SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. CREDITEX: CIA IND.TEXTIL CREDISA INDEPENDENCIA 220 Libre
ENEL GENERACION PERU S.A.A. CREDITEX: CIA IND.TEXTIL CREDISA SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. CREDITEX: CIA IND.TEXTIL CREDISA TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO AUCAYACU 22.9 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO CARHUAMAYO 138 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO COBRIZA I 69 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO COBRIZA II 10 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO COBRIZA II 69 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO CONDORCOCHA 44 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO HUALLANCA NUEVA 60 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO HUANCAVE 10 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PERU S.A.A. ELECTRO CENTRO HUANCAVE 60 Regulado


ENEL GENERACION PERU S.A.A. ELECTRO CENTRO HUANUCO 10 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO HUANUCO 22.9 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO HUAYUCACH 60 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO HUAYUCACH 60 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO OROYA NUEVA 50 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO PARAGSHA2 138 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO POMACOCHA 220 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO TINGO MARIA 10 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO CENTRO YAUPI 13.8 Regulado
ELECTRO CONDUCTORES PERUANOS
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
S.A.C.
ENEL GENERACION PERU S.A.A. ELECTRO NORTE CHICLAYO 220 Libre
ENEL GENERACION PERU S.A.A. ELECTRO PUNO AYAVIRI 10 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO PUNO AYAVIRI 22.9 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO PUNO AZANGARO 22.9 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO PUNO AZANGARO 60 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO PUNO JULIACA 10 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO PUNO JULIACA 22.9 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO PUNO PUNO 22.9 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO PUNO PUNO 60 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO PUNO SAN GABAN 13.8 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ARICOTA1 10.5 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ARICOTA2 10.5 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR HUAYTIRE 138 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ILO ELP 138 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR MOQUEGUA 138 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR SARITA 33 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR SOCABAYA 33 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR TACNA 66 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR TOMASIRI 66 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE ABANCAY 138 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE CACHIMAYO 10 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE CACHIMAYO 23 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE CACHIMAYO 23 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE CACHIMAYO 60 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE COMBAPATA 24 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE COMBAPATA 60 Regulado


ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE DOLORESPATA 10.5 Libre
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE MACHUPICCHU 10 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE MACHUPICCHU 60 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE QUENCORO 10.5 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE QUENCORO 33 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE SAN GABAN 138 Regulado
ENEL GENERACION PERU S.A.A. ELECTRO SUR ESTE TINTAYA 10 Regulado
ENEL GENERACION PERU S.A.A. EMPRESA ALGODONERA S A SANTA ROSA 220 Libre
Gran
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU CARABAYLLO 220 Usuario
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU CARABAYLLO 220 Libre
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU CHAVARRIA 220 Libre
Gran
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU CHAVARRIA 220 Usuario
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
Gran
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU HUACHO 66 Usuario
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU HUACHO 66 Regulado
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU HUACHO 66 Libre
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
Gran
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Usuario
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Libre
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU RIO SECO 60 Libre
Gran
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU RIO SECO 60 Usuario
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU RIO SECO 60 Regulado
Gran
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU SANTA ROSA 220 Usuario
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
Gran
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU SANTA ROSA 60 Usuario
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU SANTA ROSA 60 Libre
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU VENTANILLA 220 Libre
Gran
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU VENTANILLA 220 Usuario
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
Gran
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU ZAPALLAL 220 Usuario
ENEL GENERACION PERU S.A.A. ENEL DISTRIBUCION PERU ZAPALLAL 220 Libre
ENEL GENERACION PERU S.A.A. ENOTRIA S.A. INDUSTRIALES 220 Libre
ENEL GENERACION PERU S.A.A. FABRICA DE CUBIERTOS S.A.C. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. FABRICA DE CUBIERTOS S.A.C. SANTA ROSA 220 Libre
FUNDICION FERROSA SOCIEDAD
ENEL GENERACION PERU S.A.A. ANONIMA CERRADA SANTA ROSA 220 Libre

ENEL GENERACION PERU S.A.A. GLOBAL ALIMENTOS S.A.C. SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. GRIFOS ESPINOZA S A ICA 220 Libre
ENEL GENERACION PERU S.A.A. GRIFOS ESPINOZA S A SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. GRIFOS ESPINOZA S A SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. GRIFOS ESPINOZA S A SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. GRUPO PROFITEX S.A.C SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. GRUPO PROFITEX S.A.C SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. GRUPO PROFITEX S.A.C SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. GRUPO PROFITEX S.A.C SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. HERSIL S.A. LAB. IND.FARMAC. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. HERSIL S.A. LAB. IND.FARMAC. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. HIDRANDINA CAJAMARCA NORTE 60 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA CHIMBOTE 13.8 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA CHIMBOTE1 138 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA CHIMBOTE2 138 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA GUADALUPE 10 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA GUADALUPE 60 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA HUALLANCA 13.8 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA HUALLANCA 138 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA HUALLANCA 66 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA HUARAZ OESTE 138 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA KIMAN AYLLU 10 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA LA PAJUELA 22.9 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA PARAMONGA NUEVA 66 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA PORCON 10 Regulado
ENEL GENERACION PERU S.A.A. HIDRANDINA TRUJILLO 138 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PERU S.A.A. HIDRANDINA TRUJILLO NORTE 10 Regulado


HIPERMERCADOS TOTTUS ORIENTE
ENEL GENERACION PERU S.A.A. PUCALLPA 60 Libre
S.A.C.
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A CHICLAYO 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A CHICLAYO 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A CHICLAYO 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A CHIMBOTE1 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A GUADALUPE 60 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A GUADALUPE 60 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A ICA 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A ICA 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A INDUSTRIALES 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A SOCABAYA 138 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. HIPERMERCADOS TOTTUS S.A TRUJILLO 220 Libre
Gran
ENEL GENERACION PERU S.A.A. HUDBAY PERU S.A.C. TINTAYA NUEVA 220 Usuario
IMPORTACIONES EXPORTACIONES SAN SANTA ROSA 220
ENEL GENERACION PERU S.A.A. Libre
LUIS S A
ENEL GENERACION PERU S.A.A. INDUSTRIAL CROMOTEX S A INDUSTRIALES 220 Libre
ENEL GENERACION PERU S.A.A. INDUSTRIAS TEAL S A PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. INDUSTRIAS TEAL S A SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. INKABOR S.A.C. SOCABAYA 138 Libre
ENEL GENERACION PERU S.A.A. INMOBILIARIA AMERICAN GROUP CHILCA REP 220 Libre
ENEL GENERACION PERU S.A.A. INMOBILIARIA DOMEL S.A.C. PUCALLPA 60 Libre
ENEL GENERACION PERU S.A.A. INMOBILIARIA DOMEL S.A.C. SANTA ROSA 220 Libre
INSUMOS NO METALICOS Y QUIMICOS SANTA ROSA 220
ENEL GENERACION PERU S.A.A. Libre
DE EXPORTACION E I
ENEL GENERACION PERU S.A.A. INTERBANK SANTA ROSA 220 Libre
INVERSIONES COMINDUSTRIA
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
SOCIEDAD ANONIMA CERRADA
ENEL GENERACION PERU S.A.A. INVERSIONES LA RIOJA S.A. DOLORESPATA 138 Libre
ENEL GENERACION PERU S.A.A. INVERSIONES LA RIOJA S.A. SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. INVERSIONES LA RIOJA S.A. SAN JUAN 220 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PERU S.A.A. JANTEX S.A.C. INDEPENDENCIA 220 Libre


Gran
ENEL GENERACION PERU S.A.A. LA ARENA S.A. LA RAMADA 220 Usuario
ENEL GENERACION PERU S.A.A. LUZ DEL SUR CALLAHUANCA 10 Regulado
ENEL GENERACION PERU S.A.A. LUZ DEL SUR CANTERA 220 Regulado
Gran
ENEL GENERACION PERU S.A.A. LUZ DEL SUR CHILCA REP 220 Usuario
ENEL GENERACION PERU S.A.A. LUZ DEL SUR CHILCA REP 220 Libre
ENEL GENERACION PERU S.A.A. LUZ DEL SUR CHILCA REP 220 Regulado
ENEL GENERACION PERU S.A.A. LUZ DEL SUR CHOSICA 60 Regulado
ENEL GENERACION PERU S.A.A. LUZ DEL SUR HUACHIPA 60 Regulado
ENEL GENERACION PERU S.A.A. LUZ DEL SUR INDUSTRIALES 220 Libre
ENEL GENERACION PERU S.A.A. LUZ DEL SUR INDUSTRIALES 220 Regulado
ENEL GENERACION PERU S.A.A. LUZ DEL SUR SALAMANCA 60 Regulado
ENEL GENERACION PERU S.A.A. LUZ DEL SUR SAN JUAN 220 Regulado
ENEL GENERACION PERU S.A.A. LUZ DEL SUR SAN JUAN 220 Libre
Gran
ENEL GENERACION PERU S.A.A. LUZ DEL SUR SAN JUAN 220 Usuario
Gran
ENEL GENERACION PERU S.A.A. LUZ DEL SUR SANTA ROSA 220 Usuario
ENEL GENERACION PERU S.A.A. LUZ DEL SUR SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. LUZ DEL SUR SANTA ROSA 220 Regulado
ENEL GENERACION PERU S.A.A. LUZ DEL SUR ÑAÑA 60 Regulado
ENEL GENERACION PERU S.A.A. MADERERA BOZOVICH S.A.C. SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. MAI SHI GROUP S.A.C. PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. MAI SHI GROUP S.A.C. PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. MAKRO SUPERMAYORISTA S.A. CHICLAYO 220 Libre
ENEL GENERACION PERU S.A.A. MAKRO SUPERMAYORISTA S.A. PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. MAKRO SUPERMAYORISTA S.A. SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. MAKRO SUPERMAYORISTA S.A. SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. MAKRO SUPERMAYORISTA S.A. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. MAKRO SUPERMAYORISTA S.A. SOCABAYA 138 Libre
ENEL GENERACION PERU S.A.A. MAKRO SUPERMAYORISTA S.A. TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. MALL AVENTURA S.A. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre


ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
ENEL GENERACION PERU S.A.A. MARINAZUL S.A. ZORRITOS 220 Libre
MEGAPACK GROUP SOCIEDAD Gran
ENEL GENERACION PERU S.A.A. ANONIMA CERRADA CHILCA REP 220 Usuario
ENEL GENERACION PERU S.A.A. MEXICHEM INDUSTRIALES 220 Libre
ENEL GENERACION PERU S.A.A. MEXICHEM SOCABAYA 138 Libre
Gran
ENEL GENERACION PERU S.A.A. MINERA ARES CALLALLI 138 Usuario
Gran
ENEL GENERACION PERU S.A.A. MINERA CASAPALCA OROYA NUEVA 220 Usuario
Gran
ENEL GENERACION PERU S.A.A. MINERA CHINALCO PERÚ S.A. POMACOCHA 220 Usuario
ENEL GENERACION PERU S.A.A. MINERA CONFIANZA S.A.C. MARCONA 220 Libre
ENEL GENERACION PERU S.A.A. MINERA HUINAC S.A.C. HUALLANCA 138 Libre
ENEL GENERACION PERU S.A.A. MINERA LAS BAMBAS S.A. COTARUSE 220 Libre
ENEL GENERACION PERU S.A.A. MINERA SHOUXIN PERU S.A. MARCONA 220 Libre
ENEL GENERACION PERU S.A.A. MINERIA Y EXPORTACIONES S.A.C. MARCONA 220 Libre
ENEL GENERACION PERU S.A.A. MOLYCOP-ADESUR SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. MOLYCOP-ADESUR SOCABAYA 138 Libre
MOTORES DIESEL ANDINOS S.A.-
ENEL GENERACION PERU S.A.A. SAN JUAN 220 Libre
MODASA
MOTORES DIESEL ANDINOS S.A.-
ENEL GENERACION PERU S.A.A. SAN JUAN 220 Libre
MODASA
ENEL GENERACION PERU S.A.A. NORSAC S.A. TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. OPEN PLAZA CAJAMARCA 220 Libre
ENEL GENERACION PERU S.A.A. OPEN PLAZA CHICLAYO 220 Libre
ENEL GENERACION PERU S.A.A. OPEN PLAZA HUANUCO 138 Libre
ENEL GENERACION PERU S.A.A. OPEN PLAZA PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. OPEN PLAZA PUCALLPA 60 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PERU S.A.A. OPEN PLAZA SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. OPEN PLAZA TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. PACIFIC FREEZING COMPANY S.A.C. PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. PACIFIC FREEZING COMPANY S.A.C. PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA ABC S.A.C PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA DIAMANTE CHIMBOTE1 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA DIAMANTE INDEPENDENCIA 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA DIAMANTE INDEPENDENCIA 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA DIAMANTE MOLLENDO 138 Libre
ENEL GENERACION PERU S.A.A. PESQUERA DIAMANTE TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA DIAMANTE TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA EXALMAR S.A.A. CHIMBOTE1 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA EXALMAR S.A.A. ICA 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA EXALMAR S.A.A. ICA 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA EXALMAR S.A.A. ICA 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA EXALMAR S.A.A. ICA 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA EXALMAR S.A.A. PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA EXALMAR S.A.A. TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA EXALMAR S.A.A. TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. PESQUERA RUBI S.A. ILO2 220 Libre
ENEL GENERACION PERU S.A.A. PEVISA AUTO PARTS S.A. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. PRAXAIR CAJAMARQUILLA 220 Libre
ENEL GENERACION PERU S.A.A. PRECOTEX SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. PRODUCTOS TISSUE DEL PERU S.A. CANTERA 220 Libre
Gran
ENEL GENERACION PERU S.A.A. PRODUCTOS TISSUE DEL PERU S.A. SANTA ROSA 220 Usuario
ENEL GENERACION PERU S.A.A. SAGA FALABELLA CHICLAYO 220 Libre
ENEL GENERACION PERU S.A.A. SAGA FALABELLA CHILINA 138 Libre
ENEL GENERACION PERU S.A.A. SAGA FALABELLA CHIMBOTE1 220 Libre
ENEL GENERACION PERU S.A.A. SAGA FALABELLA ICA 220 Libre
ENEL GENERACION PERU S.A.A. SAGA FALABELLA PIURA OESTE 220 Libre
ENEL GENERACION PERU S.A.A. SAGA FALABELLA SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. SAGA FALABELLA SOCABAYA 138 Libre
ENEL GENERACION PERU S.A.A. SAGA FALABELLA TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. SAGA FALABELLA ORIENTE S.A.C. PUCALLPA 60 Libre
ENEL GENERACION PERU S.A.A. SEAL CALLALLI 138 Regulado
ENEL GENERACION PERU S.A.A. SEAL CHILINA 33 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PERU S.A.A. SEAL CHILINA 33 Regulado


ENEL GENERACION PERU S.A.A. SEAL MARCONA 60 Regulado
ENEL GENERACION PERU S.A.A. SEAL MARCONA 60 Libre
ENEL GENERACION PERU S.A.A. SEAL MOLLENDO 138 Regulado
ENEL GENERACION PERU S.A.A. SEAL MOLLENDO 138 Libre
ENEL GENERACION PERU S.A.A. SEAL REPARTICION 138 Regulado
ENEL GENERACION PERU S.A.A. SEAL REPARTICION 138 Libre
ENEL GENERACION PERU S.A.A. SEAL SANTUARIO 13.8 Regulado
ENEL GENERACION PERU S.A.A. SEAL SOCABAYA 33 Libre
ENEL GENERACION PERU S.A.A. SEAL SOCABAYA 33 Regulado
Gran
ENEL GENERACION PERU S.A.A. SIDER PERU CHIMBOTE2 138 Usuario

ENEL GENERACION PERU S.A.A. SIGNIA SOLUCIONES LOGISTICAS S.A.C. SANTA ROSA 220 Libre

ENEL GENERACION PERU S.A.A. SOCIEDAD ANONIMA PAPELSA SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. SODIMAC PERU ORIENTE S.A.C. PUCALLPA 60 Libre
ENEL GENERACION PERU S.A.A. SODIMAC PERU S.A. CHICLAYO 220 Libre
ENEL GENERACION PERU S.A.A. SODIMAC PERU S.A. CHICLAYO 220 Libre
ENEL GENERACION PERU S.A.A. SODIMAC PERU S.A. CHIMBOTE1 220 Libre
ENEL GENERACION PERU S.A.A. SODIMAC PERU S.A. ICA 220 Libre
ENEL GENERACION PERU S.A.A. SODIMAC PERU S.A. SOCABAYA 138 Libre
ENEL GENERACION PERU S.A.A. SODIMAC PERU S.A. TRUJILLO 220 Libre
ENEL GENERACION PERU S.A.A. SODIMAC PERU S.A. TRUJILLO 220 Libre
SOLUCIONES CONSTRUCTIVAS VOLCÁN SANTA ROSA 220
ENEL GENERACION PERU S.A.A. Libre
S.A.C.

ENEL GENERACION PERU S.A.A. T & T INGENIERIA Y CONSTRUCCION S.A SAN JUAN 220 Libre

ENEL GENERACION PERU S.A.A. TEJIDOS SAN JACINTO SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. TEXTIL LA MERCED S.A.C. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. TEXTIL OCEANO S.A.C. SANTA ROSA 220 Libre
THUNDERBIRD HOTELES LAS AMERICAS SAN JUAN 220
ENEL GENERACION PERU S.A.A. Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. AGUAYTIA 138 Libre
ORIENTE S.A.C.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. CAJAMARCA 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. CHICLAYO 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. CHIMBOTE1 220 Libre
S.A.
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

TIENDAS POR DEPARTAMENTO RIPLEY


ENEL GENERACION PERU S.A.A. HUAYUCACHI 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. ICA 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. JULIACA 138 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. PIURA OESTE 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. SAN JUAN 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. SAN JUAN 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. SANTA ROSA 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. SOCABAYA 138 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. TRUJILLO 220 Libre
S.A.
TIENDAS POR DEPARTAMENTO RIPLEY
ENEL GENERACION PERU S.A.A. TRUJILLO 220 Libre
S.A.
ENEL GENERACION PERU S.A.A. TUBERIAS Y GEOS S.A. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. UNION DE CONCRETERAS S.A SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. UNION DE CONCRETERAS S.A SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. UNIVERSIDAD PERUANA UNION SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. VIDRIERIA 28 DE JULIO S.A.C. INDUSTRIALES 220 Libre
ENEL GENERACION PERU S.A.A. VIDRIERIA 28 DE JULIO S.A.C. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. VITA PHARMA S.A.C SAN JUAN 220 Libre
ENEL GENERACION PERU S.A.A. VITAPRO S.A. TRUJILLO 220 Libre
Gran
ENEL GENERACION PERU S.A.A. VOTORANTIM METAIS CAJAMARQUILLA 220 Usuario
ENEL GENERACION PERU S.A.A. XIMESA S.A.C. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. XIMESA S.A.C. SANTA ROSA 220 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PERU S.A.A. XIMESA S.A.C. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. XIMESA S.A.C. SANTA ROSA 220 Libre
ENEL GENERACION PERU S.A.A. XIMESA S.A.C. SANTA ROSA 220 Libre
Gran
ENEL GENERACION PERU S.A.A. XIMESA S.A.C. SANTA ROSA 220 Usuario
ENEL GENERACION PIURA S.A. ELECTRO CENTRO OROYA NUEVA 50 Libre
ENEL GENERACION PIURA S.A. ELECTRO NOR OESTE PIURA OESTE 60 Libre
ENEL GENERACION PIURA S.A. ELECTRO NOR OESTE TALARA 13.2 Libre
ENEL GENERACION PIURA S.A. ELECTRO NORTE CHICLAYO 60 Libre
ENEL GENERACION PIURA S.A. ELECTRO PUNO AYAVIRI 10 Regulado
ENEL GENERACION PIURA S.A. ELECTRO PUNO AYAVIRI 22.9 Regulado
ENEL GENERACION PIURA S.A. ELECTRO PUNO AZANGARO 22.9 Regulado
ENEL GENERACION PIURA S.A. ELECTRO PUNO AZANGARO 60 Regulado
ENEL GENERACION PIURA S.A. ELECTRO PUNO JULIACA 10 Regulado
ENEL GENERACION PIURA S.A. ELECTRO PUNO JULIACA 22.9 Regulado
ENEL GENERACION PIURA S.A. ELECTRO PUNO PUNO 22.9 Regulado
ENEL GENERACION PIURA S.A. ELECTRO PUNO PUNO 60 Regulado
ENEL GENERACION PIURA S.A. ELECTRO PUNO SAN GABAN 13.8 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ARICOTA1 10.5 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ARICOTA2 10.5 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ILO ELP 138 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR MOQUEGUA 138 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR SARITA 33 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR SOCABAYA 33 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR TACNA 66 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR TOMASIRI 66 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR TOQUEPALA 138 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE ABANCAY 138 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE CACHIMAYO 10 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE CACHIMAYO 23 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE CACHIMAYO 60 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE COMBAPATA 24 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE COMBAPATA 60 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE DOLORESPATA 10.5 Libre
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE MACHUPICCHU 10 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE MACHUPICCHU 60 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE QUENCORO 10.5 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE QUENCORO 33 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE SAN GABAN 138 Regulado
ENEL GENERACION PIURA S.A. ELECTRO SUR ESTE TINTAYA 10 Regulado
Gran
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU CARABAYLLO 220 Usuario
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU CARABAYLLO 220 Libre
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU CHAVARRIA 220 Libre
Gran
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU CHAVARRIA 220 Usuario
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU HUACHO 66 Libre
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU HUACHO 66 Regulado
Gran
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU HUACHO 66 Usuario
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU LOMERA 60 Regulado
Gran
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU LOMERA 60 Usuario
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU LOMERA 60 Libre
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Libre
Gran
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Usuario
Gran
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU SANTA ROSA 220 Usuario
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU SANTA ROSA 220 Libre
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU SANTA ROSA 60 Libre
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
Gran
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU SANTA ROSA 60 Usuario
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU VENTANILLA 220 Libre
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
Gran
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU VENTANILLA 220 Usuario
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU ZAPALLAL 220 Libre
Gran
ENEL GENERACION PIURA S.A. ENEL DISTRIBUCION PERU ZAPALLAL 220 Usuario
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PIURA S.A. GRAÑA Y MONTERO Malacas 13.2 Libre


ENEL GENERACION PIURA S.A. GYM FERROVIAS SAN JUAN 60 Libre
ENEL GENERACION PIURA S.A. HIDRANDINA CHIMBOTE1 138 Libre
ENEL GENERACION PIURA S.A. HIDRANDINA GUADALUPE 60 Libre
ENEL GENERACION PIURA S.A. HIDRANDINA HUALLANCA 138 Libre
ENEL GENERACION PIURA S.A. HIDRANDINA HUARAZ OESTE 138 Libre
ENEL GENERACION PIURA S.A. HIDRANDINA TRUJILLO 138 Libre
ENEL GENERACION PIURA S.A. IMPALA PERU SANTA MARINA 20 Libre
ENEL GENERACION PIURA S.A. LUZ DEL SUR CALLAHUANCA 10 Regulado
ENEL GENERACION PIURA S.A. LUZ DEL SUR CANTERA 220 Regulado
ENEL GENERACION PIURA S.A. LUZ DEL SUR CHILCA REP 220 Regulado
Gran
ENEL GENERACION PIURA S.A. LUZ DEL SUR CHILCA REP 220 Usuario
ENEL GENERACION PIURA S.A. LUZ DEL SUR CHILCA REP 220 Libre
ENEL GENERACION PIURA S.A. LUZ DEL SUR CHOSICA 60 Regulado
ENEL GENERACION PIURA S.A. LUZ DEL SUR HUACHIPA 60 Regulado
ENEL GENERACION PIURA S.A. LUZ DEL SUR INDUSTRIALES 220 Libre
ENEL GENERACION PIURA S.A. LUZ DEL SUR INDUSTRIALES 220 Regulado
ENEL GENERACION PIURA S.A. LUZ DEL SUR SALAMANCA 60 Regulado
Gran
ENEL GENERACION PIURA S.A. LUZ DEL SUR SAN JUAN 220 Usuario
ENEL GENERACION PIURA S.A. LUZ DEL SUR SAN JUAN 220 Regulado
ENEL GENERACION PIURA S.A. LUZ DEL SUR SAN JUAN 220 Libre
ENEL GENERACION PIURA S.A. LUZ DEL SUR SANTA ROSA 220 Regulado
ENEL GENERACION PIURA S.A. LUZ DEL SUR SANTA ROSA 220 Libre
Gran
ENEL GENERACION PIURA S.A. LUZ DEL SUR SANTA ROSA 220 Usuario
ENEL GENERACION PIURA S.A. LUZ DEL SUR ÑAÑA 60 Regulado
ENEL GENERACION PIURA S.A. PETROPERU CHILCA REP 220 Libre
ENEL GENERACION PIURA S.A. PETROPERU Malacas 13.2 Libre
ENEL GENERACION PIURA S.A. PETROPERU SAN JUAN 60 Libre
ENEL GENERACION PIURA S.A. SEAL CALLALLI 138 Regulado
ENEL GENERACION PIURA S.A. SEAL CHILINA 33 Regulado
ENEL GENERACION PIURA S.A. SEAL CHILINA 33 Libre
ENEL GENERACION PIURA S.A. SEAL JESUS 138 Regulado
ENEL GENERACION PIURA S.A. SEAL JESUS 138 Libre
ENEL GENERACION PIURA S.A. SEAL MARCONA 60 Regulado
ENEL GENERACION PIURA S.A. SEAL MARCONA 60 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENEL GENERACION PIURA S.A. SEAL MOLLENDO 138 Regulado


ENEL GENERACION PIURA S.A. SEAL MOLLENDO 138 Libre
ENEL GENERACION PIURA S.A. SEAL REPARTICION 138 Libre
ENEL GENERACION PIURA S.A. SEAL REPARTICION 138 Regulado
ENEL GENERACION PIURA S.A. SEAL SANTUARIO 13.8 Regulado
ENEL GENERACION PIURA S.A. SEAL SOCABAYA 138 Regulado
ENEL GENERACION PIURA S.A. SEAL SOCABAYA 138 Libre
ENEL GENERACION PIURA S.A. SEAL SOCABAYA 33 Libre
ENEL GENERACION PIURA S.A. SEAL SOCABAYA 33 Regulado
ENEL GENERACION PIURA S.A. TRANSPORTADORA CALLAO SANTA MARINA 20 Libre
ENGIE ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
ENGIE ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
ENGIE ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
ENGIE ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
ENGIE ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
ENGIE ENEL DISTRIBUCION PERU HUACHO 66 Regulado
ENGIE ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
ENGIE ENEL DISTRIBUCION PERU LOMERA 60 Regulado
ENGIE ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
ENGIE ENEL DISTRIBUCION PERU CHAVARRIA 220 Libre
ENGIE ENEL DISTRIBUCION PERU SANTA ROSA 220 Libre
ENGIE ENEL DISTRIBUCION PERU SANTA ROSA 60 Libre
ENGIE ENEL DISTRIBUCION PERU VENTANILLA 220 Libre
ENGIE ENEL DISTRIBUCION PERU ZAPALLAL 220 Libre
ENGIE ENEL DISTRIBUCION PERU HUACHO 66 Libre
ENGIE ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Libre
ENGIE ENEL DISTRIBUCION PERU LOMERA 60 Libre
ENGIE ENEL DISTRIBUCION PERU CARABAYLLO 220 Libre
ENGIE LUZ DEL SUR SANTA ROSA 220 Regulado
ENGIE LUZ DEL SUR SAN JUAN 220 Regulado
ENGIE LUZ DEL SUR CHILCA REP 220 Regulado
ENGIE LUZ DEL SUR CALLAHUANCA 10 Regulado
ENGIE LUZ DEL SUR CHOSICA 60 Regulado
ENGIE LUZ DEL SUR HUACHIPA 60 Regulado
ENGIE LUZ DEL SUR ÑAÑA 60 Regulado
ENGIE LUZ DEL SUR SALAMANCA 60 Regulado
ENGIE LUZ DEL SUR INDUSTRIALES 220 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENGIE LUZ DEL SUR SANTA ROSA 220 Libre


ENGIE LUZ DEL SUR SAN JUAN 220 Libre
ENGIE LUZ DEL SUR CHILCA REP 220 Libre
ENGIE LUZ DEL SUR INDUSTRIALES 220 Libre
Gran
ENGIE LUZ DEL SUR SANTA ROSA 220 Usuario
Gran
ENGIE LUZ DEL SUR SAN JUAN 220 Usuario
ENGIE LUZ DEL SUR CANTERA 220 Regulado
ENGIE ELECTRO UCAYALI AGUAYTIA 22.9 Regulado
ENGIE ELECTRO UCAYALI PUCALLPA 60 Regulado
ENGIE ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado
ENGIE ELECTRO SUR ESTE QUENCORO 10.5 Regulado
ENGIE ELECTRO SUR ESTE QUENCORO 33 Regulado
ENGIE ELECTRO SUR ESTE COMBAPATA 60 Regulado
ENGIE ELECTRO SUR ESTE COMBAPATA 24 Regulado
ENGIE ELECTRO SUR ESTE TINTAYA 10 Regulado
ENGIE ELECTRO SUR ESTE CACHIMAYO 60 Regulado
ENGIE ELECTRO SUR ESTE CACHIMAYO 23 Regulado
ENGIE ELECTRO SUR ESTE CACHIMAYO 10 Regulado
ENGIE ELECTRO SUR ESTE ABANCAY 138 Regulado
ENGIE ELECTRO SUR ESTE MACHUPICCHU 60 Regulado
ENGIE ELECTRO SUR ESTE MACHUPICCHU 10 Regulado
ENGIE ELECTRO SUR ESTE MAZUCO 138 Regulado
PUERTO MALDONADO
ENGIE ELECTRO SUR ESTE Regulado
138
ENGIE ELECTRO SUR ESTE DOLORESPATA 10.5 Libre
ENGIE ELECTRO NOR OESTE PIURA OESTE 60 Regulado
ENGIE ELECTRO NOR OESTE PIURA OESTE 10 Regulado
ENGIE ELECTRO NOR OESTE Malacas 13.2 Regulado
ENGIE ELECTRO NOR OESTE ZORRITOS 60 Regulado
ENGIE ELECTRO NOR OESTE MANCORA 22.9 Regulado
ENGIE ELECTRO NOR OESTE MANCORA 10.5 Regulado
ENGIE ELECTRO NOR OESTE ZORRITOS 33 Regulado
ENGIE ELECTRO NOR OESTE PIURA OESTE 60 Libre
ENGIE COELVISAC VILLACURI 60 Regulado
ENGIE SEAL CALLALLI 138 Regulado
ENGIE SEAL CHILINA 33 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENGIE SEAL MARCONA 60 Regulado


ENGIE SEAL MOLLENDO 138 Regulado
ENGIE SEAL REPARTICION 138 Regulado
ENGIE SEAL SANTUARIO 13.8 Regulado
ENGIE SEAL SOCABAYA 33 Regulado
ENGIE SEAL SOCABAYA 138 Regulado
ENGIE SEAL JESUS 138 Regulado
ENGIE SEAL SOCABAYA 138 Libre
ENGIE SEAL SOCABAYA 33 Libre
ENGIE SEAL MOLLENDO 138 Libre
ENGIE SEAL REPARTICION 138 Libre
ENGIE SEAL CHILINA 33 Libre
ENGIE SEAL MARCONA 60 Libre
ENGIE SEAL JESUS 138 Libre
ENGIE ELECTRO SUR SOCABAYA 33 Regulado
ENGIE ELECTRO SUR MOQUEGUA 138 Regulado
ENGIE ELECTRO SUR ILO ELP 138 Regulado
ENGIE ELECTRO SUR ARICOTA1 10.5 Regulado
ENGIE ELECTRO SUR ARICOTA2 10.5 Regulado
ENGIE ELECTRO SUR SARITA 33 Regulado
ENGIE ELECTRO SUR TOMASIRI 66 Regulado
ENGIE ELECTRO SUR TACNA 66 Regulado
ENGIE ELECTRO SUR HUAYTIRE 138 Regulado
ENGIE ELECTRO SUR SOCABAYA 33 Libre
ENGIE ELECTRO SUR MOQUEGUA 138 Libre
ENGIE ELECTRO SUR ILO ELP 138 Libre
ENGIE ELECTRO SUR ARICOTA1 10.5 Libre
ENGIE ELECTRO SUR ARICOTA2 10.5 Libre
ENGIE ELECTRO SUR SARITA 33 Libre
ENGIE ELECTRO SUR TOMASIRI 66 Libre
ENGIE ELECTRO SUR TACNA 66 Libre
ENGIE ELECTRO NORTE MEDIO HUALLANCA 138 Regulado
ENGIE ELECTRO NORTE MEDIO HUALLANCA 66 Regulado
ENGIE ELECTRO NORTE MEDIO HUALLANCA 13.8 Regulado
ENGIE ELECTRO NORTE MEDIO HUARAZ OESTE 138 Regulado
ENGIE ELECTRO NORTE MEDIO TRUJILLO 138 Regulado
ENGIE ELECTRO NORTE MEDIO TRUJILLO NORTE 10 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENGIE ELECTRO NORTE MEDIO PORCON 10 Regulado


ENGIE ELECTRO NORTE MEDIO LA PAJUELA 22.9 Regulado
ENGIE ELECTRO NORTE MEDIO CHIMBOTE1 138 Regulado
ENGIE ELECTRO NORTE MEDIO CHIMBOTE2 138 Regulado
ENGIE ELECTRO NORTE MEDIO CHIMBOTE 13.8 Regulado
ENGIE ELECTRO NORTE MEDIO GUADALUPE 60 Regulado
ENGIE ELECTRO NORTE MEDIO GUADALUPE 10 Regulado
ENGIE ELECTRO NORTE MEDIO CAJAMARCA NORTE 60 Regulado
ENGIE ELECTRO NORTE MEDIO PARAMONGA NUEVA 66 Regulado
ENGIE ELECTRO NORTE MEDIO KIMAN AYLLU 10 Regulado
ENGIE ELECTRO CENTRO OROYA NUEVA 50 Regulado
ENGIE ELECTRO CENTRO CARHUAMAYO 138 Regulado
ENGIE ELECTRO CENTRO YAUPI 13.8 Regulado
ENGIE ELECTRO CENTRO PARAGSH1 138 Regulado
ENGIE ELECTRO CENTRO CONDORCOCHA 44 Regulado
ENGIE ELECTRO CENTRO COBRIZA II 69 Regulado
ENGIE ELECTRO CENTRO COBRIZA II 10 Regulado
ENGIE ELECTRO CENTRO COBRIZA I 69 Regulado
ENGIE ELECTRO CENTRO HUAYUCACH 60 Regulado
ENGIE ELECTRO CENTRO HUAYUCACH 10 Regulado
ENGIE ELECTRO CENTRO HUANCAVE 60 Regulado
ENGIE ELECTRO CENTRO HUANCAVE 10 Regulado
ENGIE ELECTRO CENTRO TINGO MARIA 10 Regulado
ENGIE ELECTRO CENTRO AUCAYACU 22.9 Regulado
ENGIE ELECTRO CENTRO HUANUCO 10 Regulado
ENGIE ELECTRO CENTRO HUANUCO 22.9 Regulado
ENGIE ELECTRO CENTRO HUALLANCA NUEVA 60 Regulado
ENGIE ELECTRO CENTRO POMACOCHA 220 Regulado
ENGIE ELECTRO CENTRO PACHACHACA 220 Regulado
ENGIE ELECTRO NORTE CHICLAYO 60 Regulado
ENGIE ELECTRO NORTE CARHUAQUERO 220 Regulado
ENGIE ELECTRO NORTE CERRO CORONA 220 Regulado
ENGIE ELECTROPUNO PUNO 60 Regulado
ENGIE ELECTROPUNO PUNO 22.9 Regulado
ENGIE ELECTROPUNO JULIACA 10 Regulado
ENGIE ELECTROPUNO JULIACA 22.9 Regulado
ENGIE ELECTROPUNO AZANGARO 60 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENGIE ELECTROPUNO AZANGARO 22.9 Regulado


ENGIE ELECTROPUNO AYAVIRI 22.9 Regulado
ENGIE ELECTROPUNO AYAVIRI 10 Regulado
ENGIE ELECTROPUNO SAN GABAN 13.8 Regulado
Gran
ENGIE MINERA ANTAMINA VIZCARRA 220 Usuario
Gran
ENGIE MINERA ANTAMINA HUARMEY 66 Usuario
Gran
ENGIE XSTRATA TINTAYA S.A. TINTAYA EXISTENTE 138 Usuario
Gran
ENGIE XSTRATA TINTAYA S.A. TINTAYA EXISTENTE 138 Usuario
Gran
ENGIE MINERA CERRO VERDE CERRO VERDE 138 Usuario
Gran
ENGIE VOTORANTIM METAIS CAJAMARQUILLA 220 Usuario
Gran
ENGIE MINERA YANACOCHA CAJAMARCA 220 Usuario
ENGIE COMPAÑÍA MINERA CHUNGAR SAC PARAGSHA2 220 Libre
ENGIE MINERA BATEAS CALLALLI 138 Libre
ENGIE MINERA SANTA LUISA VIZCARRA 220 Libre
ENGIE APUMAYO SAC CORACORA 22.9 Libre
ENGIE MINSUR INDEPENDENCIA 220 Libre
PARAMONGA EXISTENTE Gran
ENGIE QUIMPAC : QUIMICA PACIFICO 138 Usuario
PARAMONGA EXISTENTE Gran
ENGIE PAPELERA NACIONAL S.A. 138 Usuario
Gran
ENGIE QUIMPAC : QUIMICA PACIFICO CHAVARRIA 220 Usuario
Gran
ENGIE OWENS-ILLINOIS PERÚ S.A. CHAVARRIA 220 Usuario
Gran
ENGIE OWENS-ILLINOIS PERÚ S.A. SAN JUAN 220 Usuario
Gran
ENGIE CERAMICA LIMA S A CHILCA 220 Usuario
ENGIE UNIVERSIDAD DE LIMA SANTA ROSA 220 Libre
I. RECORD (MANUFACTURAS DE
ENGIE METALES Y ALU SANTA ROSA 220 Libre

ENGIE GRAFIPAPEL S.A. ÑAÑA 60 Libre


ENGIE PAPELERA DEL SUR INDEPENDENCIA 220 Libre
ENGIE LINDE GAS PERU S.A. CHAVARRIA 220 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENGIE ESMERALDA CORP SAN JUAN 220 Libre


ENGIE BANCO DE CREDITO SANTA ROSA 220 Libre
ENGIE MINERA ANABI COMBAPATA 138 Libre
ENGIE YURA CHARCANI I 33 Libre
ENGIE YURA SANTUARIO 138 Libre
ENGIE ORIGAN SANTA ROSA 220 Libre
ENGIE ALGODONERA CONTINENTAL S.A.C. SANTA ROSA 220 Libre
ENGIE INDUSTRIAS FIBRAFORTE S A CHILCA 220 Libre
ENGIE AUSTRAL GROUP INDEPENDENCIA 220 Libre
ENGIE INTURSA SAN JUAN 220 Libre
ENGIE INTURSA INDEPENDENCIA 220 Libre
ENGIE INTURSA CACHIMAYO 138 Libre
ENGIE INTURSA DOLORESPATA 138 Libre

ENGIE AGRICOLA HUARMEY S.A. PARAMONGA NUEVA 220 Libre

INVERSIONES ALAMEDA SUR S.A.C. -


ENGIE SAN JUAN 220 Libre
MEGAPLAZA
INMOBILIARIA BOTAFOGO S.A.C.-
ENGIE INDEPENDENCIA 220 Libre
MEGAPLAZA
INVERSIONES KANDOO S.A.C.-
ENGIE INDEPENDENCIA 220 Libre
MEGAPLAZA
INVERSIONES VILLA EL SALVADOR S.A.C. SAN JUAN 220
ENGIE Libre
- MEGAPLAZA
ENGIE INMOBILIARIA PISAC S.A.C. CANTERA 220 Libre
ENGIE PARQUE ARAUCO EL QUINDE INDEPENDENCIA 220 Libre
ENGIE PARQUE LAMBRAMANI SANTA ROSA 220 Libre
ENGIE PARQUE LAMBRAMANI SOCABAYA 138 Libre
ENGIE PISOPAK PERU S.A.C. SAN JUAN 220 Libre
ENGIE AMERICATEL PERU S.A. SANTA ROSA 220 Libre
CORPORACION DE INDUSTRIAS
ENGIE SANTA ROSA 220 Libre
PLASTICAS S A
ENGIE GLORIA SANTA ROSA 220 Libre
ENGIE TRUPAL S.A. SANTA ROSA 220 Libre
ENGIE TRUPAL S.A. TRUJILLO 220 Libre
ENGIE CASA GRANDE TRUJILLO 220 Libre
CARTAVIO SOCIEDAD ANONIMA
ENGIE TRUJILLO 220 Libre
ABIERTA
ENGIE AGROINDUSTRIAS SAN JACINTO S A A CHIMBOTE1 138 Libre
ENGIE GLORIA SOCABAYA 138 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENGIE FARMEX S A CHAVARRIA 220 Libre


ENGIE FERREYROS SOCIEDAD ANÓNIMA SANTA ROSA 220 Libre
ENGIE CMT DEL SUR SAC INDEPENDENCIA 220 Libre
ENGIE CLINICA INTERNACIONAL S A SANTA ROSA 220 Libre
ENGIE MINSUR SAN GABAN 138 Libre
ENGIE PARQUE LAMBRAMANI SAN JUAN 220 Libre
ENGIE ELECTRO NORTE MEDIO HUALLANCA 138 Libre
ENGIE ELECTRO NORTE MEDIO HUALLANCA 66 Libre
ENGIE ELECTRO NORTE MEDIO HUALLANCA 13.8 Libre
ENGIE ELECTRO NORTE MEDIO HUARAZ OESTE 138 Libre
ENGIE ELECTRO NORTE MEDIO TRUJILLO 138 Libre
ENGIE ELECTRO NORTE MEDIO TRUJILLO NORTE 10 Libre
ENGIE ELECTRO NORTE MEDIO PORCON 10 Libre
ENGIE ELECTRO NORTE MEDIO LA PAJUELA 22.9 Libre
ENGIE ELECTRO NORTE MEDIO CHIMBOTE1 138 Libre
ENGIE ELECTRO NORTE MEDIO CHIMBOTE2 138 Libre
ENGIE ELECTRO NORTE MEDIO CHIMBOTE 13.8 Libre
ENGIE ELECTRO NORTE MEDIO GUADALUPE 60 Libre
ENGIE ELECTRO NORTE MEDIO GUADALUPE 10 Libre
ENGIE ELECTRO NORTE MEDIO CAJAMARCA NORTE 60 Libre
ENGIE ELECTRO NORTE MEDIO PARAMONGA NUEVA 66 Libre
ENGIE ELECTRO NORTE MEDIO KIMAN AYLLU 10 Libre
ENGIE ELECTRO CENTRO OROYA NUEVA 50 Libre
ENGIE ELECTRO CENTRO CARHUAMAYO 138 Libre
ENGIE ELECTRO CENTRO YAUPI 13.8 Libre
ENGIE ELECTRO CENTRO PARAGSH1 138 Libre
ENGIE ELECTRO CENTRO CONDORCOCHA 44 Libre
ENGIE ELECTRO CENTRO COBRIZA II 69 Libre
ENGIE ELECTRO CENTRO COBRIZA II 10 Libre
ENGIE ELECTRO CENTRO COBRIZA I 69 Libre
ENGIE ELECTRO CENTRO HUAYUCACH 60 Libre
ENGIE ELECTRO CENTRO HUAYUCACH 10 Libre
ENGIE ELECTRO CENTRO HUANCAVE 60 Libre
ENGIE ELECTRO CENTRO HUANCAVE 10 Libre
ENGIE ELECTRO CENTRO TINGO MARIA 10 Libre
ENGIE ELECTRO CENTRO AUCAYACU 22.9 Libre
ENGIE ELECTRO CENTRO HUANUCO 10 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENGIE ELECTRO CENTRO HUANUCO 22.9 Libre


ENGIE ELECTRO CENTRO HUALLANCA NUEVA 60 Libre
ENGIE ELECTRO CENTRO POMACOCHA 220 Libre
ENGIE ELECTRO CENTRO PACHACHACA 220 Libre
ENGIE ELECTRO NORTE CHICLAYO 60 Libre
ENGIE ELECTRO NORTE CARHUAQUERO 220 Libre
ENGIE ELECTRO NORTE CERRO CORONA 220 Libre
ENGIE ELECTRO NOR OESTE PIURA OESTE 60 Libre
ENGIE ELECTRO NOR OESTE PIURA OESTE 10 Libre
ENGIE ELECTRO NOR OESTE Malacas 13.2 Libre
ENGIE ELECTRO NOR OESTE ZORRITOS 60 Libre
ENGIE ELECTRO NOR OESTE MANCORA 22.9 Libre
ENGIE ELECTRO NOR OESTE MANCORA 10.5 Libre
ENGIE ELECTRO NOR OESTE ZORRITOS 33 Libre
ENGIE ELECTRO NOR OESTE LA NIÑA 220 Libre
ENGIE VSI INDUSTRIAL S.A.C. SANTA ROSA 220 Libre
FENIX POWER PERÚ HIDRANDINA GUADALUPE 60 Regulado
FENIX POWER PERÚ HIDRANDINA GUADALUPE 10 Regulado
FENIX POWER PERÚ HIDRANDINA TRUJILLO 138 Regulado
FENIX POWER PERÚ HIDRANDINA TRUJILLO NORTE 10 Regulado
FENIX POWER PERÚ HIDRANDINA CHIMBOTE1 138 Regulado
FENIX POWER PERÚ HIDRANDINA CHIMBOTE 13.8 Regulado
FENIX POWER PERÚ HIDRANDINA CHIMBOTE2 138 Regulado
FENIX POWER PERÚ HIDRANDINA HUALLANCA 138 Regulado
FENIX POWER PERÚ HIDRANDINA HUALLANCA 66 Regulado
FENIX POWER PERÚ HIDRANDINA HUALLANCA 13.8 Regulado
FENIX POWER PERÚ HIDRANDINA PARAMONGA NUEVA 66 Regulado
FENIX POWER PERÚ HIDRANDINA KIMAN AYLLU 10 Regulado
FENIX POWER PERÚ HIDRANDINA PORCON 10 Regulado
FENIX POWER PERÚ HIDRANDINA LA PAJUELA 22.9 Regulado
FENIX POWER PERÚ HIDRANDINA CAJAMARCA NORTE 60 Regulado
FENIX POWER PERÚ HIDRANDINA HUARAZ OESTE 138 Regulado
FENIX POWER PERÚ ELECTRO NORTE CHICLAYO 60 Regulado
FENIX POWER PERÚ ELECTRO NORTE CARHUAQUERO 220 Regulado
FENIX POWER PERÚ ELECTRO NORTE CERRO CORONA 220 Regulado
FENIX POWER PERÚ ELECTRO NOR OESTE PIURA OESTE 60 Regulado
FENIX POWER PERÚ ELECTRO NOR OESTE PIURA OESTE 10 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

FENIX POWER PERÚ ELECTRO NOR OESTE Malacas 13.2 Regulado


FENIX POWER PERÚ ELECTRO NOR OESTE ZORRITOS 60 Regulado
FENIX POWER PERÚ ELECTRO NOR OESTE MANCORA 22.9 Regulado
FENIX POWER PERÚ ELECTRO NOR OESTE MANCORA 10.5 Regulado
FENIX POWER PERÚ ELECTRO NOR OESTE ZORRITOS 33 Regulado
FENIX POWER PERÚ ELECTRO CENTRO OROYA NUEVA 50 Regulado
FENIX POWER PERÚ ELECTRO CENTRO CARHUAMAYO 138 Regulado
FENIX POWER PERÚ ELECTRO CENTRO YAUPI 13.8 Regulado
FENIX POWER PERÚ ELECTRO CENTRO PARAGSHA2 138 Regulado
FENIX POWER PERÚ ELECTRO CENTRO CONDORCOCHA 44 Regulado
FENIX POWER PERÚ ELECTRO CENTRO COBRIZA II 69 Regulado
FENIX POWER PERÚ ELECTRO CENTRO COBRIZA II 10 Regulado
FENIX POWER PERÚ ELECTRO CENTRO COBRIZA I 69 Regulado
FENIX POWER PERÚ ELECTRO CENTRO HUAYUCACH 60 Regulado
FENIX POWER PERÚ ELECTRO CENTRO HUAYUCACH 10 Regulado
FENIX POWER PERÚ ELECTRO CENTRO HUANCAVE 60 Regulado
FENIX POWER PERÚ ELECTRO CENTRO HUANCAVE 10 Regulado
FENIX POWER PERÚ ELECTRO CENTRO TINGO MARIA 10 Regulado
FENIX POWER PERÚ ELECTRO CENTRO AUCAYACU 22.9 Regulado
FENIX POWER PERÚ ELECTRO CENTRO HUANUCO 10 Regulado
FENIX POWER PERÚ ELECTRO CENTRO HUANUCO 22.9 Regulado
FENIX POWER PERÚ ELECTRO CENTRO HUALLANCA 66 Regulado
FENIX POWER PERÚ ELECTRO CENTRO POMACOCHA 220 Regulado
FENIX POWER PERÚ ELECTRO CENTRO PACHACHACA 220 Regulado
FENIX POWER PERÚ COELVISAC INDEPENDENCIA 60 Regulado
FENIX POWER PERÚ LUZ DEL SUR SAN JUAN 220 Regulado
FENIX POWER PERÚ LUZ DEL SUR SANTA ROSA 220 Regulado
FENIX POWER PERÚ LUZ DEL SUR CHILCA REP 220 Regulado
FENIX POWER PERÚ LUZ DEL SUR ÑAÑA 60 Regulado
FENIX POWER PERÚ LUZ DEL SUR HUACHIPA 60 Regulado
FENIX POWER PERÚ LUZ DEL SUR SALAMANCA 60 Regulado
FENIX POWER PERÚ LUZ DEL SUR CHOSICA 60 Regulado
FENIX POWER PERÚ LUZ DEL SUR CALLAHUANCA 10 Regulado
FENIX POWER PERÚ LUZ DEL SUR INDUSTRIALES 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

FENIX POWER PERÚ ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado


FENIX POWER PERÚ ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU HUACHO 66 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU LOMERA 60 Regulado
FENIX POWER PERÚ ELECTRO DUNAS CAUDALOSA 22 Regulado
FENIX POWER PERÚ LUZ DEL SUR CANTERA 220 Regulado
FENIX POWER PERÚ ELECTRO ORIENTE TOCACHE 138 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU HUACHO 66 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU LOMERA 60 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU HUACHO 66 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
FENIX POWER PERÚ ENEL DISTRIBUCION PERU LOMERA 60 Regulado
FENIX POWER PERÚ HIDRANDINA HUALLANCA 66 Libre
FENIX POWER PERÚ HIDRANDINA HUALLANCA 138 Libre
FENIX POWER PERÚ HIDRANDINA TRUJILLO 138 Libre
FENIX POWER PERÚ ELECTRO NOR OESTE PIURA OESTE 60 Libre
FENIX POWER PERÚ ELECTRO NOR OESTE PIURA OESTE 10 Libre
FENIX POWER PERÚ ELECTRO NOR OESTE ZORRITOS 60 Libre
FENIX POWER PERÚ ELECTRO NORTE CHICLAYO 60 Libre
FENIX POWER PERÚ ELECTRO CENTRO HUAYUCACH 60 Libre
FENIX POWER PERÚ PERUANA DE MOLDEADOS CHAVARRIA 220 Libre
FENIX POWER PERÚ PERUANA DE MOLDEADOS CHAVARRIA 220 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

FENIX POWER PERÚ REPRIND S.A.C. SANTA ROSA 220 Libre


FENIX POWER PERÚ FRIGORIFICO SAN JORGE S.A.C. PIURA OESTE 220 Libre
FENIX POWER PERÚ FRUITXCHANGE S.A.C PIURA OESTE 220 Libre
FENIX POWER PERÚ AJEPER SANTA ROSA 220 Libre
FENIX POWER PERÚ RESINPLAST SANTA ROSA 220 Libre
COSTA MIRA SOCIEDAD ANONIMA
FENIX POWER PERÚ PIURA OESTE 220 Libre
CERRADA
PLASTICOS AGRICOLAS Y
FENIX POWER PERÚ PIURA OESTE 220 Libre
GEOMEMBRANAS S.A.C.
FENIX POWER PERÚ CLEAN ENERGY DEL PERU S.R.L. PIURA OESTE 220 Libre
FENIX POWER PERÚ GCZ INGENIEROS S.A.C. SAN JUAN 220 Libre
FENIX POWER PERÚ EL PEDREGAL S.A PIURA OESTE 220 Libre
FENIX POWER PERÚ EL PEDREGAL S.A ICA 220 Libre
FENIX POWER PERÚ MODAS DIVERSAS DEL PERU SAC SANTA ROSA 220 Libre
FENIX POWER PERÚ FILTROS LYS CHAVARRIA 220 Libre
FENIX POWER PERÚ NICOLL PERU SAN JUAN 220 Libre
FENIX POWER PERÚ NICOLL PERU SOCABAYA 220 Libre
FENIX POWER PERÚ NICOLL PERU CHICLAYO 220 Libre
FENIX POWER PERÚ EXPORTADORA CETUS S.A.C. PIURA OESTE 220 Libre
FENIX POWER PERÚ DEXIM SRL PIURA OESTE 220 Libre
FENIX POWER PERÚ FRINOR S.A.C. PIURA OESTE 220 Libre
FENIX POWER PERÚ TECNICA AVICOLA GUADALUPE 60 Libre
FENIX POWER PERÚ SOCIEDAD AGRICOLA VIRU S.A. PIURA OESTE 220 Libre
FENIX POWER PERÚ AVOCADO PACKING COMPANY S.A.C. TRUJILLO 220 Libre
FENIX POWER PERÚ CIA MINERA PLATA DORADA S.A. MARCONA 220 Libre
FENIX POWER PERÚ INDUSTRIA PERUANA DEL ACERO S.A. INDEPENDENCIA 220 Libre
FENIX POWER PERÚ FUNDO SAN LUIS S.A.C. ICA 220 Libre
FENIX POWER PERÚ PEAK QUALITY DEL PERU S.A. ICA 220 Libre
EMPACADORA Y PROCESADORA
FENIX POWER PERÚ INDEPENDENCIA 220 Libre
HUAMANI SAC
EMPRESA DE SERVICIOS DE LOS
FENIX POWER PERÚ AGRICULTORES DE LAN INDEPENDENCIA 220 Libre

FENIX POWER PERÚ ICASUR SOCIEDAD ANONIMA CERRADA MARCONA 220 Libre

FENIX POWER PERÚ MIK CARPE S.A.C. PIURA OESTE 220 Libre
FENIX POWER PERÚ BUENDIA PLOOG PABLO ANTONIO ICA 220 Libre
FENIX POWER PERÚ ENEL DISTRIBUCION PERU CHAVARRIA 220 Libre
FENIX POWER PERÚ ENEL DISTRIBUCION PERU SANTA ROSA 220 Libre
FENIX POWER PERÚ ENEL DISTRIBUCION PERU SANTA ROSA 60 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

FENIX POWER PERÚ ENEL DISTRIBUCION PERU VENTANILLA 220 Libre


FENIX POWER PERÚ ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Libre
FENIX POWER PERÚ ENEL DISTRIBUCION PERU HUACHO 66 Libre
FENIX POWER PERÚ ENEL DISTRIBUCION PERU ZAPALLAL 220 Libre
FENIX POWER PERÚ ENEL DISTRIBUCION PERU CARABAYLLO 220 Libre
FENIX POWER PERÚ ENEL DISTRIBUCION PERU LOMERA 60 Libre
FENIX POWER PERÚ MULTIMERCADOS ZONALES S.A. ICA 220 Libre

HIDROELECTRICA HUANCHOR S.A.C. ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado

HIDROELECTRICA HUANCHOR S.A.C. ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado

HIDROELECTRICA HUANCHOR S.A.C. ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado

HIDROELECTRICA HUANCHOR S.A.C. ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado

HIDROELECTRICA HUANCHOR S.A.C. ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado

HIDROELECTRICA HUANCHOR S.A.C. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado

HIDROELECTRICA HUANCHOR S.A.C. ENEL DISTRIBUCION PERU HUACHO 66 Regulado

HIDROELECTRICA HUANCHOR S.A.C. ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado

HIDROELECTRICA HUANCHOR S.A.C. ENEL DISTRIBUCION PERU LOMERA 60 Regulado

HIDROELECTRICA HUANCHOR S.A.C. LUZ DEL SUR SANTA ROSA 220 Regulado

HIDROELECTRICA HUANCHOR S.A.C. LUZ DEL SUR SAN JUAN 220 Regulado

HIDROELECTRICA HUANCHOR S.A.C. LUZ DEL SUR CHILCA REP 220 Regulado

HIDROELECTRICA HUANCHOR S.A.C. LUZ DEL SUR INDUSTRIALES 220 Regulado

HIDROELECTRICA HUANCHOR S.A.C. LUZ DEL SUR CHOSICA 60 Regulado

HIDROELECTRICA HUANCHOR S.A.C. LUZ DEL SUR HUACHIPA 60 Regulado

HIDROELECTRICA HUANCHOR S.A.C. LUZ DEL SUR ÑAÑA 60 Regulado

HIDROELECTRICA HUANCHOR S.A.C. LUZ DEL SUR SALAMANCA 60 Regulado

HIDROELECTRICA HUANCHOR S.A.C. LUZ DEL SUR CALLAHUANCA 10 Regulado


INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

HIDROELECTRICA HUANCHOR S.A.C. LUZ DEL SUR CANTERA 220 Regulado

HIDROELECTRICA HUANCHOR S.A.C. ELECTRO ORIENTE TOCACHE 138 Regulado

HIDROELECTRICA HUANCHOR S.A.C. ELECTRODUNAS CAUDALOSA 22 Regulado

HIDROELECTRICA HUANCHOR S.A.C. COMPAÑIA MINERA KOLPA HUANCAVELICA 220 Libre

HIDROELECTRICA HUANCHOR S.A.C. MINERA ARGENTUM ALPAMINA 50 Libre

HIDROELECTRICA HUANCHOR S.A.C. MINERA ARGENTUM MOROCOCHA 50 Libre

HIDROELECTRICA HUANCHOR S.A.C. MINERA ARGENTUM MOROCOCHA 2.4 Libre

HIDROELECTRICA HUANCHOR S.A.C. MINERA HUARON PARAGSHA2 220 Libre

HIDROELECTRICA HUANCHOR S.A.C. ENGIE SAN JUAN 220 Libre

HIDROELECTRICA HUANCHOR S.A.C. ENGIE CHILCA REP 220 Libre

HIDROELECTRICA HUANCHOR S.A.C. TREVALI PERU S.A.C. PARAGSHA2 220 Libre

KALLPA GENERACION S.A. AMCOR RIGID PLASTICS DEL PERU S.A. CHAVARRIA 220 Libre

KALLPA GENERACION S.A. ARUNTANI SAC AYAVIRI 138 Libre


KALLPA GENERACION S.A. FUNDICION CHILCA S.A. CHILCA REP 220 Libre
Gran
KALLPA GENERACION S.A. COELVISAC CHAVARRIA 220 Usuario
Gran
KALLPA GENERACION S.A. BACKUS SANTA ROSA 220 Usuario
Gran
KALLPA GENERACION S.A. MINERA GOLD FIELDS CAJAMARCA 220 Usuario
Gran
KALLPA GENERACION S.A. YURA SANTUARIO 138 Usuario
KALLPA GENERACION S.A. ARUNTANI SAC PUNO 138 Libre
KALLPA GENERACION S.A. CARVIMSA SANTA ROSA 220 Libre
KALLPA GENERACION S.A. CERAMICA SAN LORENZO S.A.C. SAN JUAN 220 Libre
KALLPA GENERACION S.A. COELVISAC SANTA ROSA 220 Libre
Gran
KALLPA GENERACION S.A. COMPAÑIA MINERA MISKI MAYO CHICLAYO 220 Usuario
Gran
KALLPA GENERACION S.A. MINERA CERRO VERDE SOCABAYA 220 Usuario
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

Gran
KALLPA GENERACION S.A. COMPAÑIA MINERA ANTAPACCAY S.A. TINTAYA NUEVA 220 Usuario
KALLPA GENERACION S.A. INDUSTRIAS ELECTRO QUIMICAS S.A. CHAVARRIA 220 Libre
KALLPA GENERACION S.A. INVERSIONES MAMAY E.I.R.L. SAN JUAN 220 Libre
KALLPA GENERACION S.A. MOLITALIA S.A. CHAVARRIA 220 Libre
Gran
KALLPA GENERACION S.A. QUIMPAC : QUIMICA PACIFICO CHAVARRIA 220 Usuario
Gran
KALLPA GENERACION S.A. SAN MIGUEL INDUSTRIAS PET S.A. CHAVARRIA 220 Usuario
Gran
KALLPA GENERACION S.A. JOCKEY PLAZA SAN JUAN 220 Usuario
KALLPA GENERACION S.A. BACKUS CHICLAYO 220 Libre
KALLPA GENERACION S.A. BACKUS DOLORESPATA 138 Libre
KALLPA GENERACION S.A. BACKUS SOCABAYA 138 Libre
Gran
KALLPA GENERACION S.A. MINERA MARSA HUALLANCA 138 Usuario
Gran
KALLPA GENERACION S.A. REFINERÍA LA PAMPILLA VENTANILLA 220 Usuario
KALLPA GENERACION S.A. BACKUS SANTA ROSA 220 Libre
KALLPA GENERACION S.A. BACKUS SANTA ROSA 220 Libre
KALLPA GENERACION S.A. CERVECERÍA SAN JUAN PUCALLPA 60 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. CHAVARRIA 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. REAL PLAZA S.R.L. CHAVARRIA 220 Libre
KALLPA GENERACION S.A. TIENDAS PERUANAS SA CHAVARRIA 220 Libre
KALLPA GENERACION S.A. HOMECENTERS PERUANOS CHAVARRIA 220 Libre
KALLPA GENERACION S.A. CINEPLEX S.A. CHAVARRIA 220 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. SANTA ROSA 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. TIENDAS PERUANAS SA SANTA ROSA 220 Libre
KALLPA GENERACION S.A. REAL PLAZA S.R.L. SANTA ROSA 220 Libre
KALLPA GENERACION S.A. CINEPLEX S.A. SANTA ROSA 220 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. ZAPALLAL 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. HUACHO 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. SAN JUAN 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. REAL PLAZA S.R.L. SAN JUAN 220 Libre
KALLPA GENERACION S.A. ECKERD PERU SAN JUAN 220 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

KALLPA GENERACION S.A. CINEPLEX S.A. SAN JUAN 220 Libre


SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. INDEPENDENCIA 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. ICA 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. TIENDAS PERUANAS SA ICA 220 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. TRUJILLO 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. REAL PLAZA S.R.L. TRUJILLO 220 Libre
KALLPA GENERACION S.A. TIENDAS PERUANAS SA TRUJILLO 220 Libre
KALLPA GENERACION S.A. HOMECENTERS PERUANOS TRUJILLO 220 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. CHIMBOTE1 138 Libre
SOCIEDAD ANONIMA O S.P.S.A.
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. CAJAMARCA 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. REAL PLAZA S.R.L. CAJAMARCA 220 Libre
KALLPA GENERACION S.A. TIENDAS PERUANAS SA CAJAMARCA 220 Libre
KALLPA GENERACION S.A. HOMECENTERS PERUANOS CAJAMARCA 220 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. TALARA 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. PIURA OESTE 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. REAL PLAZA S.R.L. PIURA OESTE 220 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. SOCIEDAD ANONIMA O S.P.S.A. CHICLAYO 220 Libre

KALLPA GENERACION S.A. REAL PLAZA S.R.L. CHICLAYO 220 Libre


KALLPA GENERACION S.A. CINEPLEX S.A. CHICLAYO 220 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. HUAYUCACHI 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. REAL PLAZA S.R.L. HUAYUCACHI 220 Libre
KALLPA GENERACION S.A. TIENDAS PERUANAS SA HUAYUCACHI 220 Libre
KALLPA GENERACION S.A. REAL PLAZA S.R.L. HUANUCO 138 Libre
KALLPA GENERACION S.A. HOMECENTERS PERUANOS HUANUCO 138 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. PUNO 138 Libre
SOCIEDAD ANONIMA O S.P.S.A.
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. JULIACA 138 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. REAL PLAZA S.R.L. JULIACA 138 Libre
KALLPA GENERACION S.A. TIENDAS PERUANAS SA JULIACA 138 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. SOCIEDAD ANONIMA O S.P.S.A. PUCALLPA 60 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

KALLPA GENERACION S.A. REAL PLAZA S.R.L. PUCALLPA 60 Libre


KALLPA GENERACION S.A. TIENDAS PERUANAS SA PUCALLPA 60 Libre
KALLPA GENERACION S.A. HOMECENTERS PERUANOS ORIENTE PUCALLPA 60 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. DOLORESPATA 138 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. REAL PLAZA S.R.L. DOLORESPATA 138 Libre
KALLPA GENERACION S.A. TIENDAS PERUANAS SA DOLORESPATA 138 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. SOCABAYA 138 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. REAL PLAZA S.R.L. SOCABAYA 138 Libre
KALLPA GENERACION S.A. TIENDAS PERUANAS SA SOCABAYA 138 Libre
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. TACNA 66 Libre
SOCIEDAD ANONIMA O S.P.S.A.
SUPERMERCADOS PERUANOS
KALLPA GENERACION S.A. INDUSTRIALES 220 Libre
SOCIEDAD ANONIMA O S.P.S.A.
KALLPA GENERACION S.A. LUZ DEL SUR CALLAHUANCA 10 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR INDUSTRIALES 220 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR CHILCA REP 220 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR CHILCA REP 220 Libre
KALLPA GENERACION S.A. LUZ DEL SUR CHOSICA 60 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR HUACHIPA 60 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR ÑAÑA 60 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR SALAMANCA 60 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR SAN JUAN 220 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR SAN JUAN 220 Libre
KALLPA GENERACION S.A. LUZ DEL SUR SANTA ROSA 220 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR SANTA ROSA 220 Libre
Gran
KALLPA GENERACION S.A. LUZ DEL SUR SANTA ROSA 220 Usuario
Gran
KALLPA GENERACION S.A. LUZ DEL SUR SAN JUAN 220 Usuario
Gran
KALLPA GENERACION S.A. LUZ DEL SUR CHILCA REP 220 Usuario
KALLPA GENERACION S.A. LUZ DEL SUR CANTERA 220 Regulado
KALLPA GENERACION S.A. HIDRANDINA CAJAMARCA NORTE 60 Regulado
KALLPA GENERACION S.A. HIDRANDINA CHIMBOTE 13.8 Regulado
KALLPA GENERACION S.A. HIDRANDINA CHIMBOTE1 138 Regulado
KALLPA GENERACION S.A. HIDRANDINA CHIMBOTE2 138 Regulado
KALLPA GENERACION S.A. HIDRANDINA GUADALUPE 10 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

KALLPA GENERACION S.A. HIDRANDINA GUADALUPE 60 Regulado


KALLPA GENERACION S.A. HIDRANDINA HUALLANCA 13.8 Regulado
KALLPA GENERACION S.A. HIDRANDINA HUALLANCA 138 Regulado
KALLPA GENERACION S.A. HIDRANDINA HUALLANCA 66 Regulado

KALLPA GENERACION S.A. HIDRANDINA PARAMONGA NUEVA 220 Regulado

KALLPA GENERACION S.A. HIDRANDINA PORCON 10 Regulado


KALLPA GENERACION S.A. HIDRANDINA TRUJILLO NORTE 10 Regulado
KALLPA GENERACION S.A. HIDRANDINA TRUJILLO 138 Regulado
KALLPA GENERACION S.A. HIDRANDINA HUARAZ OESTE 138 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU HUACHO 66 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU LOMERA 60 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ARICOTA1 10.5 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ARICOTA2 10.5 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ILO1 138 Regulado
KALLPA GENERACION S.A. ELECTRO SUR MOQUEGUA 138 Regulado
KALLPA GENERACION S.A. ELECTRO SUR SARITA 33 Regulado
KALLPA GENERACION S.A. ELECTRO SUR SOCABAYA 33 Regulado
KALLPA GENERACION S.A. ELECTRO SUR TACNA 66 Regulado
KALLPA GENERACION S.A. ELECTRO SUR TOMASIRI 66 Regulado
KALLPA GENERACION S.A. ELECTRO SUR TOQUEPALA 138 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE QUENCORO 10.5 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE QUENCORO 33 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE COMBAPATA 60 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE COMBAPATA 24 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE TINTAYA 10 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE CACHIMAYO 60 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE CACHIMAYO 23 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE CACHIMAYO 10 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

KALLPA GENERACION S.A. ELECTRO SUR ESTE ABANCAY 138 Regulado


KALLPA GENERACION S.A. ELECTRO SUR ESTE MACHUPICCHU 60 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE MACHUPICCHU 10 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE SAN GABAN 138 Regulado
KALLPA GENERACION S.A. SEAL CALLALLI 138 Regulado
KALLPA GENERACION S.A. SEAL CHILINA 33 Regulado
KALLPA GENERACION S.A. SEAL CHILINA 33 Libre
KALLPA GENERACION S.A. SEAL MARCONA 60 Regulado
KALLPA GENERACION S.A. SEAL MARCONA 60 Libre
KALLPA GENERACION S.A. SEAL MOLLENDO 138 Regulado
KALLPA GENERACION S.A. SEAL MOLLENDO 138 Libre
KALLPA GENERACION S.A. SEAL REPARTICION 138 Regulado
KALLPA GENERACION S.A. SEAL REPARTICION 138 Libre
KALLPA GENERACION S.A. SEAL SANTUARIO 13.8 Regulado
KALLPA GENERACION S.A. SEAL JESUS 138 Regulado
KALLPA GENERACION S.A. SEAL JESUS 138 Libre
KALLPA GENERACION S.A. SEAL SOCABAYA 138 Regulado
KALLPA GENERACION S.A. SEAL SOCABAYA 138 Libre
KALLPA GENERACION S.A. SEAL SOCABAYA 33 Regulado
KALLPA GENERACION S.A. SEAL SOCABAYA 33 Libre
KALLPA GENERACION S.A. SEAL CALLALLI 138 Libre
KALLPA GENERACION S.A. SEAL CHILINA 33 Libre
KALLPA GENERACION S.A. SEAL MARCONA 60 Libre
KALLPA GENERACION S.A. SEAL MOLLENDO 138 Libre
KALLPA GENERACION S.A. SEAL REPARTICION 138 Libre
KALLPA GENERACION S.A. SEAL SANTUARIO 13.8 Libre
KALLPA GENERACION S.A. SEAL JESUS 138 Libre
KALLPA GENERACION S.A. SEAL SOCABAYA 138 Libre
KALLPA GENERACION S.A. SEAL SOCABAYA 33 Libre
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU CHAVARRIA 220 Libre
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU HUACHO 66 Libre
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Libre
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU SANTA ROSA 220 Libre
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU SANTA ROSA 60 Libre
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU VENTANILLA 220 Libre
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU ZAPALLAL 220 Libre
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU CARABAYLLO 220 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU LOMERA 60 Libre


KALLPA GENERACION S.A. NYRSTAR OROYA NUEVA 50 Libre
Gran
KALLPA GENERACION S.A. SOUTHERN PERU CC ILO1 138 Usuario
Gran
KALLPA GENERACION S.A. SOUTHERN PERU CC REFINERIA SPCC 138 Usuario
Gran
KALLPA GENERACION S.A. SOUTHERN PERU CC QUEBRADA HONDA 138 Usuario
Gran
KALLPA GENERACION S.A. SOUTHERN PERU CC MILLSITE 138 Usuario
Gran
KALLPA GENERACION S.A. SOUTHERN PERU CC LIXIVIACION 138 Usuario
Gran
KALLPA GENERACION S.A. SOUTHERN PERU CC Push Back 138 Usuario
Gran
KALLPA GENERACION S.A. SOUTHERN PERU CC BOTIFLACA 138 Usuario
KALLPA GENERACION S.A. SOUTHERN PERU CC ILO1 138 Libre
KALLPA GENERACION S.A. SOUTHERN PERU CC REFINERIA SPCC 138 Libre
KALLPA GENERACION S.A. SOUTHERN PERU CC QUEBRADA HONDA 138 Libre
KALLPA GENERACION S.A. SOUTHERN PERU CC MILLSITE 138 Libre
KALLPA GENERACION S.A. SOUTHERN PERU CC LIXIVIACION 138 Libre
KALLPA GENERACION S.A. SOUTHERN PERU CC Push Back 138 Libre
KALLPA GENERACION S.A. SOUTHERN PERU CC BOTIFLACA 138 Libre
KALLPA GENERACION S.A. ELECTRO UCAYALI PUCALLPA 60 Regulado
KALLPA GENERACION S.A. ELECTRO UCAYALI AGUAYTIA 22.9 Regulado
KALLPA GENERACION S.A. ELECTROPUNO AZANGARO 22.9 Regulado
KALLPA GENERACION S.A. ELECTROPUNO PUNO 60 Regulado
KALLPA GENERACION S.A. ELECTROPUNO JULIACA 10 Regulado
KALLPA GENERACION S.A. ELECTROPUNO JULIACA 22.9 Regulado
KALLPA GENERACION S.A. ELECTROPUNO SAN GABAN 13.8 Regulado
KALLPA GENERACION S.A. ELECTROPUNO AZANGARO 60 Regulado
KALLPA GENERACION S.A. ELECTROPUNO PUNO 22.9 Regulado
KALLPA GENERACION S.A. ELECTROPUNO AYAVIRI 10 Regulado
KALLPA GENERACION S.A. ELECTROPUNO AYAVIRI 22.9 Regulado
KALLPA GENERACION S.A. SEAL SOCABAYA 33 Regulado
KALLPA GENERACION S.A. SEAL CHILINA 33 Regulado
KALLPA GENERACION S.A. SEAL SANTUARIO 13.8 Regulado
KALLPA GENERACION S.A. SEAL CALLALLI 138 Regulado
KALLPA GENERACION S.A. SEAL REPARTICION 138 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

KALLPA GENERACION S.A. SEAL MOLLENDO 138 Regulado


KALLPA GENERACION S.A. SEAL MARCONA 60 Regulado
KALLPA GENERACION S.A. SEAL SOCABAYA 138 Regulado
KALLPA GENERACION S.A. SEAL JESUS 138 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE MACHUPICCHU 10 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE MACHUPICCHU 60 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE CACHIMAYO 60 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE CACHIMAYO 23 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE CACHIMAYO 10 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE ABANCAY 138 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE COMBAPATA 60 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE COMBAPATA 24 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE QUENCORO 33 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE QUENCORO 10.5 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE TINTAYA 10 Regulado
KALLPA GENERACION S.A. ELECTRO SUR ESTE SAN GABAN 138 Regulado
KALLPA GENERACION S.A. HIDRANDINA GUADALUPE 60 Regulado
KALLPA GENERACION S.A. HIDRANDINA GUADALUPE 10 Regulado
KALLPA GENERACION S.A. HIDRANDINA TRUJILLO 138 Regulado
KALLPA GENERACION S.A. HIDRANDINA TRUJILLO NORTE 10 Regulado
KALLPA GENERACION S.A. HIDRANDINA CHIMBOTE1 138 Regulado
KALLPA GENERACION S.A. HIDRANDINA CHIMBOTE 13.8 Regulado
KALLPA GENERACION S.A. HIDRANDINA CHIMBOTE2 138 Regulado
KALLPA GENERACION S.A. HIDRANDINA HUALLANCA 138 Regulado
KALLPA GENERACION S.A. HIDRANDINA HUALLANCA 66 Regulado
KALLPA GENERACION S.A. HIDRANDINA HUALLANCA 13.8 Regulado
KALLPA GENERACION S.A. HIDRANDINA PARAMONGA NUEVA 66 Regulado
KALLPA GENERACION S.A. HIDRANDINA CAJAMARCA NORTE 60 Regulado
KALLPA GENERACION S.A. HIDRANDINA PORCON 10 Regulado
KALLPA GENERACION S.A. HIDRANDINA HUARAZ OESTE 138 Regulado
KALLPA GENERACION S.A. ELECTRO NOR OESTE MANCORA 10.5 Regulado
KALLPA GENERACION S.A. ELECTRO NOR OESTE MANCORA 22.9 Regulado
KALLPA GENERACION S.A. ELECTRO NOR OESTE ZORRITOS 33 Regulado
KALLPA GENERACION S.A. ELECTRO NOR OESTE ZORRITOS 60 Regulado
KALLPA GENERACION S.A. ELECTRO NOR OESTE Malacas 13.2 Regulado
KALLPA GENERACION S.A. ELECTRO NOR OESTE PIURA OESTE 60 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

KALLPA GENERACION S.A. ELECTRO NOR OESTE PIURA OESTE 10 Regulado


KALLPA GENERACION S.A. ELECTRO NOR OESTE PUERTO RICO 22.9 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO HUAYUCACH 60 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO HUAYUCACH 10 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO HUANCAVE 60 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO HUANCAVE 10 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO HUANUCO 10 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO HUANUCO 22.9 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO TINGO MARIA 10 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO AUCAYACU 22.9 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO HUALLANCA 66 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO OROYA NUEVA 50 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO CARHUAMAYO 138 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO YAUPI 13.8 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO PARAGSHA2 138 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO CONDORCOCHA 44 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO COBRIZA II 69 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO COBRIZA II 10 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO COBRIZA I 69 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO POMACOCHA 220 Regulado
KALLPA GENERACION S.A. ELECTRO CENTRO PACHACHACA 220 Regulado
KALLPA GENERACION S.A. ELECTRO ORIENTE CUTERVO 138 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU HUACHO 66 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
KALLPA GENERACION S.A. ENEL DISTRIBUCION PERU LOMERA 60 Regulado
CORPORACIÓN ACEROS AREQUIPA Gran
KALLPA GENERACION S.A. INDEPENDENCIA 220
(AREQUIPA) Usuario
Gran
KALLPA GENERACION S.A. MINERA VOLCAN PLANTA VICTORIA 50 Usuario
Gran
KALLPA GENERACION S.A. MINERA VOLCAN MINA CARAHUACRA 50 Usuario
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

Gran
KALLPA GENERACION S.A. MINERA VOLCAN TICLIO 50 Usuario
Gran
KALLPA GENERACION S.A. MINERA VOLCAN MAHR TUNEL 2.4 Usuario
Gran
KALLPA GENERACION S.A. MINERA VOLCAN ANDAYCHAGUA 4.16 Usuario
Gran
KALLPA GENERACION S.A. MINERA VOLCAN SAN CRISTOBAL 4.16 Usuario
Gran
KALLPA GENERACION S.A. MINERA VOLCAN SAN CRISTOBAL 2.4 Usuario
Gran
KALLPA GENERACION S.A. MINERA VOLCAN ANDAYCHAGUA 50 Usuario
Gran
KALLPA GENERACION S.A. MINERA VOLCAN POMACOCHA 220 Usuario
KALLPA GENERACION S.A. ELECTRO NORTE CERRO CORONA 220 Regulado
KALLPA GENERACION S.A. ELECTRO NORTE CARHUAQUERO 220 Regulado
KALLPA GENERACION S.A. ELECTRO NORTE CHICLAYO 60 Regulado
KALLPA GENERACION S.A. ADINELSA ADN ICA 60 Regulado
KALLPA GENERACION S.A. ADINELSA ADN CHOSICA 60 Regulado
KALLPA GENERACION S.A. ADINELSA ADN MARCONA 60 Regulado
KALLPA GENERACION S.A. ADINELSA ADN INDEPENDENCIA 10 Regulado
KALLPA GENERACION S.A. ADINELSA ADN INDEPENDENCIA 60 Regulado
KALLPA GENERACION S.A. ADINELSA ADN PARAMONGA NUEVA 66 Regulado
KALLPA GENERACION S.A. ADINELSA ADN HUACHO 66 Regulado
KALLPA GENERACION S.A. ADINELSA ADN HUANCAVELICA 220 Regulado
KALLPA GENERACION S.A. ADINELSA ADN CHILCA 220 Regulado
KALLPA GENERACION S.A. PERUPLAST ALTO PRADERAS 220 Libre
KALLPA GENERACION S.A. LUZ DEL SUR CALLAHUANCA 10 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR INDUSTRIALES 220 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR CHILCA REP 220 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR CHOSICA 60 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR HUACHIPA 60 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR ÑAÑA 60 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR SALAMANCA 60 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR SAN JUAN 220 Regulado
KALLPA GENERACION S.A. LUZ DEL SUR SANTA ROSA 220 Regulado

KALLPA GENERACION S.A. ELECTRO ORIENTE MOYOBAMBA NUEVA 138 Regulado

LUZ DEL SUR 1818 S.A.C. INGENIEROS 22.9 Libre


INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ALIMENCORP SOCIEDAD ANONIMA


LUZ DEL SUR CHILCA 10 Libre
CERRADA
LUZ DEL SUR AMERICA MOVIL PERÚ S.A.C. LIMATAMBO 10 Libre
LUZ DEL SUR AMERICA MOVIL PERÚ S.A.C. VILLA EL SALVADOR 10 Libre
LUZ DEL SUR AMERICA MOVIL PERÚ S.A.C. VILLA MARIA 10 Libre
LUZ DEL SUR ANITA FOOD INGENIEROS 22.9 Libre
LUZ DEL SUR ARTESCO PUENTE 10 Libre
LUZ DEL SUR ARTESCO PUENTE 10 Libre
LUZ DEL SUR ARTESCO PUENTE 10 Libre
LUZ DEL SUR B.BRAUN MEDICAL PERU S.A. LAS PRADERAS 22.9 Libre
LUZ DEL SUR BOLPERTEX S.A.C LAS PRADERAS 22.9 Libre
LUZ DEL SUR BRATA S.R.L. SALAMANCA 10 Libre
LUZ DEL SUR BRYSON HILLS PERÚ S.A. HUACHIPA 22.9 Libre
LUZ DEL SUR COMERCIAL DEL ACERO S A HUACHIPA 22.9 Libre
LUZ DEL SUR COMPAÑIA CERVECERA AMBEV PERU HUACHIPA 10 Libre
LUZ DEL SUR COMPAÑIA MINERA LUREN S A CHORRILLOS 22.9 Libre
LUZ DEL SUR CONFECCIONES LANCASTER S.A. GALVEZ 10 Libre
LUZ DEL SUR CONFECCIONES LANCASTER S.A. SALAMANCA 10 Libre
LUZ DEL SUR CONGELADOS BUJAMA BUJAMA 10 Libre
LUZ DEL SUR CONSTRUCTORA EL ROBLE S.A.C. SAN ISIDRO 10 Libre
LUZ DEL SUR CONSTRUCTORA EL ROBLE S.A.C. SAN ISIDRO 10 Libre
LUZ DEL SUR CONSTRUCTORA EL ROBLE S.A.C. SAN ISIDRO 22.9 Libre
LUZ DEL SUR CORPORACION EL GOLF S.A. SAN ISIDRO 10 Libre
LUZ DEL SUR CORPORACION PRIMAX S.A. CHORRILLOS 10 Libre
LUZ DEL SUR CORPORACION PRIMAX S.A. CHORRILLOS 10 Libre
LUZ DEL SUR CORPORACION PRIMAX S.A. GALVEZ 10 Libre
LUZ DEL SUR CORPORACION PRIMAX S.A. LIMATAMBO 10 Libre
LUZ DEL SUR CORPORACION PRIMAX S.A. LIMATAMBO 10 Libre
LUZ DEL SUR CORPORACION PRIMAX S.A. MONTERRICO 10 Libre
LUZ DEL SUR CORPORACION PRIMAX S.A. ÑAÑA 10 Libre
LUZ DEL SUR CREDISCOTIA FINANCIERA S.A. CENTRAL 10 Libre
CRP MEDIOS Y ENTRETENIMIENTO
LUZ DEL SUR S.A.C. CHORRILLOS 10 Libre

LUZ DEL SUR DEPOSITOS S A SALAMANCA 10 Libre


DISTRIBUIDORA DE PRODUCTOS
LUZ DEL SUR LAS PRADERAS 22.9 Libre
PLASTICOS S.A.C.
LUZ DEL SUR EMUSA PERU S.A.C. CHORRILLOS 10 Libre
LUZ DEL SUR ENTEL PERU NEYRA 10 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

LUZ DEL SUR ENTEL PERU SALAMANCA 10 Libre


LUZ DEL SUR FABRILCO S.A.C. INGENIEROS 10 Libre
LUZ DEL SUR FIBRAFIL S.A. CHILCA 22.9 Libre
LUZ DEL SUR FIBRAFIL S.A. LURIN 22.9 Libre
LUZ DEL SUR FILTEX S.A.C. LAS PRADERAS 10 Libre
LUZ DEL SUR FITESA HUACHIPA 22.9 Libre
LUZ DEL SUR FUNDICION CENTRAL S A INGENIEROS 10 Libre
LUZ DEL SUR FUNDICION CENTRAL S A INGENIEROS 10 Libre
LUZ DEL SUR GAMARRA MODA PLAZA S.A.C. LIMATAMBO 22.9 Libre
LUZ DEL SUR GASBRA SAC BALNEARIOS 10 Libre
LUZ DEL SUR GASBRA SAC GALVEZ 10 Libre
LUZ DEL SUR GOLDEN GAMING S.A. BARRANCO 10 Libre
GRUPORPP SOCIEDAD ANONIMA
LUZ DEL SUR CERRADA CENTRAL 10 Libre

GRUPORPP SOCIEDAD ANONIMA


LUZ DEL SUR CHORRILLOS 10 Libre
CERRADA
LUZ DEL SUR HOTELERA COSTA DEL PACIFICO SAN ISIDRO 22.9 Libre
LUZ DEL SUR HOTELES SHERATON DEL PERU S.A.C. GALVEZ 10 Libre

LUZ DEL SUR HPD CONTRATISTAS GENERALES S.A.C. CHILCA 22.9 Libre

LUZ DEL SUR IBM DEL PERU S.A.C. CENTRAL 10 Libre


LUZ DEL SUR IBM DEL PERU S.A.C. INGENIEROS 22.9 Libre
LUZ DEL SUR IDEAS TEXTILES S.A.C. LAS PRADERAS 22.9 Libre
LUZ DEL SUR IDEAS TEXTILES S.A.C. LAS PRADERAS 22.9 Libre
LUZ DEL SUR IDEAS TEXTILES S.A.C. PUENTE 10 Libre
LUZ DEL SUR IDEAS TEXTILES S.A.C. PUENTE 10 Libre
LUZ DEL SUR IDEAS TEXTILES S.A.C. SALAMANCA 10 Libre
LUZ DEL SUR IDEAS TEXTILES S.A.C. SALAMANCA 10 Libre
LUZ DEL SUR INDUSTRIAL EL SOL S.A.C. SALAMANCA 10 Libre
INDUSTRIAS TEXTILES DE SUD AMERICA
LUZ DEL SUR S.A.C. INGENIEROS 10 Libre

LUZ DEL SUR INDUSTRIAS TEXTILES ENZO S.A SALAMANCA 10 Libre


LUZ DEL SUR INGREDION PERU HUACHIPA 22.9 Libre
LUZ DEL SUR INMOBIDEAS S.A.C. LAS PRADERAS 22.9 Libre
LUZ DEL SUR INMOBIDEAS S.A.C. LAS PRADERAS 22.9 Libre
LUZ DEL SUR INMOBIDEAS S.A.C. LAS PRADERAS 22.9 Libre
LUZ DEL SUR INVERSIONES LAMBORE S.A.C. CHORRILLOS 22.9 Libre
LUZ DEL SUR INVERSIONES NUEVA METROPOLI MONTERRICO 22.9 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

LUZ DEL SUR INVERSIONES NUEVA METROPOLI SAN ISIDRO 22.9 Libre
LUZ DEL SUR INVERSIONES SAN GABRIEL S A LAS PRADERAS 22.9 Libre
LUZ DEL SUR ITAL GRES INDUSTRIAL S.A.C. HUACHIPA 10 Libre
JUNTA DE PROPIETARIOS DE EDIFICIO
LUZ DEL SUR LIMATAMBO 10 Libre
WIESE
LUZ DEL SUR KURESA S A HUACHIPA 10 Libre

LUZ DEL SUR LA POSITIVA SEGUROS Y REASEGUROS LIMATAMBO 10 Libre

LUZ DEL SUR LABORATORIOS AC FARMA S.A. INGENIEROS 22.9 Libre


LUZ DEL SUR LABORATORIOS AC FARMA S.A. PUENTE 10 Libre
LUZ DEL SUR LAIVE S.A SANTA CLARA 22.9 Libre
LUZ DEL SUR LAIVE S.A SANTA CLARA 22.9 Libre
LUZ DEL SUR LAIVE S.A SANTA CLARA 22.9 Libre
LUZ DEL SUR LATERCER S.A.C. HUACHIPA 22.9 Libre
LUZ DEL SUR LIMA CAUCHO S A PUENTE 10 Libre
LUZ DEL SUR MEDIC SER S.A.C. NEYRA 10 Libre
LUZ DEL SUR METROCOLOR CHORRILLOS 10 Libre
LUZ DEL SUR METSO PERU S.A. INGENIEROS 22.9 Libre
LUZ DEL SUR MIXERCON S.A. CHORRILLOS 22.9 Libre
LUZ DEL SUR MNG TEXTILES S.A.C. LAS PRADERAS 22.9 Libre
LUZ DEL SUR MOLINERA DEL CENTRO SANTA CLARA 22.9 Libre
LUZ DEL SUR MOLITALIA S.A. HUACHIPA 22.9 Libre
LUZ DEL SUR MOVA INDUSTRIAL PUENTE 10 Libre
LUZ DEL SUR NEWPORT CAPITAL S.A.C. VILLA MARIA 10 Libre
LUZ DEL SUR NORTHING S.A.C. CENTRAL 22.9 Libre
LUZ DEL SUR ONCOCENTER PERU S.A.C. LIMATAMBO 10 Libre
LUZ DEL SUR OPEN PLAZA BALNEARIOS 22.9 Libre
PACIFICO COMPAÑIA DE SEGUROS Y
LUZ DEL SUR CENTRAL 22.9 Libre
REASEGUROS
PACIFICO COMPAÑIA DE SEGUROS Y
LUZ DEL SUR REASEGUROS SAN ISIDRO 10 Libre

PERUANA DE ESTACIONES DE
LUZ DEL SUR BALNEARIOS 10 Libre
SERVICIOS S.A.C
PERUANA DE ESTACIONES DE
LUZ DEL SUR BARRANCO 10 Libre
SERVICIOS S.A.C
LUZ DEL SUR PGN GASUR S.A.C. CHORRILLOS 10 Libre
LUZ DEL SUR PLASTICOS DEL CENTRO S.A.C. PUENTE 10 Libre
LUZ DEL SUR PROFUTURO AFP LIMATAMBO 10 Libre
LUZ DEL SUR QUAD/GRAPHICS PERU S.A. INGENIEROS 22.9 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

LUZ DEL SUR QUAD/GRAPHICS PERU S.A. PUENTE 10 Libre


LUZ DEL SUR QUAD/GRAPHICS PERU S.A. PUENTE 10 Libre
LUZ DEL SUR QUAD/GRAPHICS PERU S.A. PUENTE 10 Libre
LUZ DEL SUR REAL PLAZA S.R.L. GALVEZ 10 Libre
LUZ DEL SUR REENCAUCHADORA EL SOL S.A.C. SALAMANCA 10 Libre
LUZ DEL SUR SAGA FALABELLA CENTRAL 22.9 Libre
LUZ DEL SUR SCOTIABANK PERU S.A.A. LIMATAMBO 10 Libre
LUZ DEL SUR SCOTIABANK PERU S.A.A. SAN ISIDRO 10 Libre
SERVICIOS LOGISTICOS AUTOMOTRICES LAS PRADERAS 22.9
LUZ DEL SUR Libre
S.A.
SERVICIOS,COBRANZAS E INVERSIONES
LUZ DEL SUR S.A.C. GALVEZ 10 Libre

LUZ DEL SUR SOLDEX SA LURIN 22.9 Libre


LUZ DEL SUR TAMICORP SALAMANCA 10 Libre
TECNICAS METALICAS INGENIEROS
LUZ DEL SUR CHORRILLOS 22.9 Libre
S.A.C.
TECNICAS METALICAS INGENIEROS
LUZ DEL SUR SAN JUAN 11 Libre
S.A.C.
LUZ DEL SUR TEJIDOS JORGITO S.A.C. INGENIEROS 10 Libre
LUZ DEL SUR TEJIDOS JORGITO S.A.C. INGENIEROS 10 Libre
LUZ DEL SUR TEJIDOS JORGITO S.A.C. INGENIEROS 10 Libre
LUZ DEL SUR TEJIDOS JORGITO S.A.C. SANTA CLARA 10 Libre
LUZ DEL SUR TEJIDOS JORGITO S.A.C. SANTA CLARA 22.9 Libre
LUZ DEL SUR TEXTIL SAN RAMON S A SALAMANCA 10 Libre
LUZ DEL SUR TEXTIL SAN RAMON S A SALAMANCA 10 Libre
LUZ DEL SUR TM GESTION INMOBILIARIA S.A.C. SAN ISIDRO 22.9 Libre

LUZ DEL SUR UNIVERSIDAD TECNOLOGICA DEL PERU GALVEZ 10 Libre

LUZ DEL SUR UNIVERSIDAD TECNOLOGICA DEL PERU GALVEZ 10 Libre

LUZ DEL SUR UNIVERSIDAD TECNOLOGICA DEL PERU GALVEZ 10 Libre

LUZ DEL SUR UNIVERSIDAD TECNOLOGICA DEL PERU GALVEZ 10 Libre

LUZ DEL SUR UNIVERSIDAD TECNOLOGICA DEL PERU GALVEZ 10 Libre

Gran
ORAZUL ENERGY PERÚ MINERA BARRICK MISQUICHILCA HUALLANCA 138 Usuario
Gran
ORAZUL ENERGY PERÚ MINERA BARRICK MISQUICHILCA TRUJILLO 220 Usuario
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ORAZUL ENERGY PERÚ TECNOFIL CHAVARRIA 220 Libre


ORAZUL ENERGY PERÚ AGRICOLA LA CHIRA PIURA OESTE 220 Libre
ORAZUL ENERGY PERÚ AGRICOLA LA CHIRA PIURA OESTE 220 Libre
ORAZUL ENERGY PERÚ ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
ORAZUL ENERGY PERÚ ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
ORAZUL ENERGY PERÚ ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
ORAZUL ENERGY PERÚ ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
ORAZUL ENERGY PERÚ ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
ORAZUL ENERGY PERÚ ENEL DISTRIBUCION PERU HUACHO 66 Regulado
ORAZUL ENERGY PERÚ ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
ORAZUL ENERGY PERÚ ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
ORAZUL ENERGY PERÚ ENEL DISTRIBUCION PERU LOMERA 60 Regulado
ORAZUL ENERGY PERÚ LUZ DEL SUR SANTA ROSA 220 Regulado
ORAZUL ENERGY PERÚ LUZ DEL SUR SAN JUAN 220 Regulado
ORAZUL ENERGY PERÚ LUZ DEL SUR CHILCA REP 220 Regulado
ORAZUL ENERGY PERÚ LUZ DEL SUR CHOSICA 60 Regulado
ORAZUL ENERGY PERÚ LUZ DEL SUR HUACHIPA 60 Regulado
ORAZUL ENERGY PERÚ LUZ DEL SUR ÑAÑA 60 Regulado
ORAZUL ENERGY PERÚ LUZ DEL SUR SALAMANCA 60 Regulado
ORAZUL ENERGY PERÚ LUZ DEL SUR CALLAHUANCA 10 Regulado
ORAZUL ENERGY PERÚ LUZ DEL SUR INDUSTRIALES 220 Regulado
ORAZUL ENERGY PERÚ LUZ DEL SUR CANTERA 220 Regulado
ORAZUL ENERGY PERÚ ELECTRO NOR OESTE MANCORA 10.5 Regulado
ORAZUL ENERGY PERÚ ELECTRO NOR OESTE MANCORA 22.9 Regulado
ORAZUL ENERGY PERÚ ELECTRO NOR OESTE Malacas 13.2 Regulado
ORAZUL ENERGY PERÚ ELECTRO NOR OESTE PIURA OESTE 10 Regulado
ORAZUL ENERGY PERÚ ELECTRO NOR OESTE PIURA OESTE 60 Regulado
ORAZUL ENERGY PERÚ ELECTRO NOR OESTE ZORRITOS 33 Regulado
ORAZUL ENERGY PERÚ ELECTRO NOR OESTE ZORRITOS 60 Regulado
ORAZUL ENERGY PERÚ ELECTRO NORTE CHICLAYO 60 Regulado
ORAZUL ENERGY PERÚ ELECTRO NORTE CARHUAQUERO 220 Regulado
ORAZUL ENERGY PERÚ ELECTRO NORTE CERRO CORONA 220 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA CAJAMARCA NORTE 60 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA CHIMBOTE 13.8 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA CHIMBOTE1 138 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA CHIMBOTE2 138 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA GUADALUPE 10 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ORAZUL ENERGY PERÚ HIDRANDINA GUADALUPE 60 Regulado


ORAZUL ENERGY PERÚ HIDRANDINA HUALLANCA 13.8 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA HUALLANCA 138 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA HUALLANCA 138 Libre
ORAZUL ENERGY PERÚ HIDRANDINA HUALLANCA 66 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA HUARAZ OESTE 138 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA KIMAN AYLLU 10 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA LA PAJUELA 22.9 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA PARAMONGA NUEVA 66 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA PORCON 10 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA TRUJILLO 138 Regulado
ORAZUL ENERGY PERÚ HIDRANDINA TRUJILLO NORTE 10 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO AUCAYACU 22.9 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO CARHUAMAYO 138 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO COBRIZA I 69 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO COBRIZA II 10 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO COBRIZA II 69 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO CONDORCOCHA 44 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO HUALLANCA 66 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO HUANCAVE 10 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO HUANCAVE 60 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO HUANUCO 10 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO HUANUCO 22.9 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO HUAYUCACH 10 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO HUAYUCACH 60 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO OROYA NUEVA 50 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO PACHACHACA 220 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO PARAGSHA2 138 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO POMACOCHA 220 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO TINGO MARIA 10 Regulado
ORAZUL ENERGY PERÚ ELECTRO CENTRO YAUPI 13.8 Regulado
ORAZUL ENERGY PERÚ COELVISAC INDEPENDENCIA 60 Regulado
ORAZUL ENERGY PERÚ ELECTRO DUNAS CAUDALOSA 22 Regulado
ORAZUL ENERGY PERÚ ELECTRO ORIENTE TOCACHE 138 Regulado
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA CHAVARRIA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA SAN JUAN 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA SAN JUAN 220 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA SANTA ROSA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA SANTA ROSA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA SAN JUAN 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA SANTA ROSA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA SAN JUAN 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA CHAVARRIA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA CHAVARRIA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA CHAVARRIA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA CHAVARRIA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA CHAVARRIA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA CHAVARRIA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA ICA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA INDEPENDENCIA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA HUALLANCA 138 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA MARCONA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA CHAVARRIA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA CHAVARRIA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA SANTA ROSA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA SAN JUAN 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA INDEPENDENCIA 220 Libre
ORAZUL ENERGY PERÚ ELECTRICA SANTA ROSA PIURA OESTE 220 Libre
SAN GABAN MINERA IRL CHUMPE 12 Libre
SAN GABAN MINSUR LOS HEROES 66 Libre
SAN GABAN TECNOLOGICA DE ALIMENTOS OQUENDO 10 Libre
SAN GABAN TECNOLOGICA DE ALIMENTOS MALABRIGO 10 Libre
SAN GABAN TECNOLOGICA DE ALIMENTOS AGUA LIMA 33 Libre
SAN GABAN TECNOLOGICA DE ALIMENTOS PARACAS 10 Libre
SAN GABAN TECNOLOGICA DE ALIMENTOS PARACAS 10 Libre
SAN GABAN TECNOLOGICA DE ALIMENTOS VEGUETA 10 Libre
SAN GABAN TECNOLOGICA DE ALIMENTOS CHILCA 22.9 Libre
SAN GABAN TECNOLOGICA DE ALIMENTOS SUPE 10 Libre
SAN GABAN TECNOLOGICA DE ALIMENTOS CHIMBOTE 13.8 Libre
SAN GABAN TECNOLOGICA DE ALIMENTOS CHIMBOTE 13.8 Libre
SAN GABAN ELECTRO DUNAS CAUDALOSA 22 Regulado
SAN GABAN ELECTRO ORIENTE CUTERVO 138 Regulado

SAN GABAN ELECTRO ORIENTE MOYOBAMBA NUEVA 138 Regulado


INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

SAN GABAN ELECTRO ORIENTE TOCACHE 138 Regulado


SAN GABAN ELECTRO ORIENTE TOCACHE 138 Regulado
SAN GABAN ELECTRO PANGOA S.A. YAUPI 138 Regulado
SAN GABAN ELECTRO PUNO PUNO 60 Regulado
SAN GABAN ELECTRO PUNO PUNO 22.9 Regulado
SAN GABAN ELECTRO PUNO JULIACA 10 Regulado
SAN GABAN ELECTRO PUNO JULIACA 22.9 Regulado
SAN GABAN ELECTRO PUNO AYAVIRI 10 Regulado
SAN GABAN ELECTRO PUNO AYAVIRI 22.9 Regulado
SAN GABAN ELECTRO PUNO AZANGARO 22.9 Regulado
SAN GABAN ELECTRO PUNO AZANGARO 60 Regulado
SAN GABAN ELECTRO PUNO SAN GABAN 13.8 Regulado
SAN GABAN ELECTRO TOCACHE TOCACHE 138 Regulado
SAN GABAN ELECTRO TOCACHE TARAPOTO 22.9 Regulado
SAN GABAN ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
SAN GABAN ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
SAN GABAN ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
SAN GABAN ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
SAN GABAN ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
SAN GABAN ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
SAN GABAN ENEL DISTRIBUCION PERU HUACHO 66 Regulado
SAN GABAN ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
SAN GABAN ENEL DISTRIBUCION PERU LOMERA 60 Regulado
SAN GABAN LUZ DEL SUR SANTA ROSA 220 Regulado
SAN GABAN LUZ DEL SUR SAN JUAN 220 Regulado
SAN GABAN LUZ DEL SUR CHILCA REP 220 Regulado
SAN GABAN LUZ DEL SUR CHOSICA 60 Regulado
SAN GABAN LUZ DEL SUR HUACHIPA 60 Regulado
SAN GABAN LUZ DEL SUR INDUSTRIALES 220 Regulado
SAN GABAN LUZ DEL SUR SALAMANCA 60 Regulado
SAN GABAN LUZ DEL SUR CALLAHUANCA 10 Regulado
SAN GABAN LUZ DEL SUR ÑAÑA 60 Regulado
SAN GABAN LUZ DEL SUR CANTERA 220 Regulado
SDF ENERGIA ACEROS CHILCA S.A.C. CHILCA REP 220 Libre
SDF ENERGIA COELVISAC INDEPENDENCIA 60 Regulado
SDF ENERGIA ELECTRO CENTRO AUCAYACU 22.9 Regulado
SDF ENERGIA ELECTRO CENTRO CARHUAMAYO 138 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

SDF ENERGIA ELECTRO CENTRO COBRIZA I 69 Regulado


SDF ENERGIA ELECTRO CENTRO COBRIZA II 10 Regulado
SDF ENERGIA ELECTRO CENTRO COBRIZA II 69 Regulado
SDF ENERGIA ELECTRO CENTRO CONDORCOCHA 44 Regulado
SDF ENERGIA ELECTRO CENTRO HUALLANCA NUEVA 60 Regulado
SDF ENERGIA ELECTRO CENTRO HUANCAVE 10 Regulado
SDF ENERGIA ELECTRO CENTRO HUANCAVE 60 Regulado
SDF ENERGIA ELECTRO CENTRO HUANUCO 10 Regulado
SDF ENERGIA ELECTRO CENTRO HUANUCO 22.9 Regulado
SDF ENERGIA ELECTRO CENTRO HUAYUCACH 10 Regulado
SDF ENERGIA ELECTRO CENTRO HUAYUCACH 60 Regulado
SDF ENERGIA ELECTRO CENTRO OROYA NUEVA 50 Regulado
SDF ENERGIA ELECTRO CENTRO PACHACHACA 220 Regulado
SDF ENERGIA ELECTRO CENTRO PARAGSHA2 138 Regulado
SDF ENERGIA ELECTRO CENTRO POMACOCHA 220 Regulado
SDF ENERGIA ELECTRO CENTRO TINGO MARIA 10 Regulado
SDF ENERGIA ELECTRO CENTRO YAUPI 13.8 Regulado
SDF ENERGIA ELECTRO NOR OESTE MANCORA 10.5 Regulado
SDF ENERGIA ELECTRO NOR OESTE MANCORA 22.9 Regulado
SDF ENERGIA ELECTRO NOR OESTE Malacas 13.2 Regulado
SDF ENERGIA ELECTRO NOR OESTE PIURA OESTE 10 Regulado
SDF ENERGIA ELECTRO NOR OESTE PIURA OESTE 60 Regulado
SDF ENERGIA ELECTRO NOR OESTE ZORRITOS 33 Regulado
SDF ENERGIA ELECTRO NOR OESTE ZORRITOS 60 Regulado
SDF ENERGIA ELECTRO NORTE CARHUAQUERO 220 Regulado
SDF ENERGIA ELECTRO NORTE CERRO CORONA 220 Regulado
SDF ENERGIA ELECTRO NORTE CHICLAYO 60 Regulado
SDF ENERGIA HIDRANDINA CAJAMARCA NORTE 60 Regulado
SDF ENERGIA HIDRANDINA CHIMBOTE 13.8 Regulado
SDF ENERGIA HIDRANDINA CHIMBOTE1 138 Regulado
SDF ENERGIA HIDRANDINA CHIMBOTE2 138 Regulado
SDF ENERGIA HIDRANDINA GUADALUPE 10 Regulado
SDF ENERGIA HIDRANDINA GUADALUPE 60 Regulado
SDF ENERGIA HIDRANDINA HUALLANCA 13.8 Regulado
SDF ENERGIA HIDRANDINA HUALLANCA 138 Regulado
SDF ENERGIA HIDRANDINA HUALLANCA 66 Regulado
SDF ENERGIA HIDRANDINA HUARAZ OESTE 138 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

SDF ENERGIA HIDRANDINA KIMAN AYLLU 10 Regulado


SDF ENERGIA HIDRANDINA LA PAJUELA 22.9 Regulado
SDF ENERGIA HIDRANDINA PARAMONGA NUEVA 66 Regulado
SDF ENERGIA HIDRANDINA PORCON 10 Regulado
SDF ENERGIA HIDRANDINA TRUJILLO 138 Regulado
SDF ENERGIA HIDRANDINA TRUJILLO NORTE 10 Regulado
Gran
SDF ENERGIA METALURGICA PERUANA SANTA ROSA 60 Usuario
Gran
SDF ENERGIA MINERA ARES COTARUSE 220 Usuario
SDF ENERGIA SUDAMERICANA DE FIBRAS CHAVARRIA 220 Libre
SHOUGESA MINERA SHOUXIN PERU S.A. MARCONA 220 Libre
SHOUGESA MUNICIPALIDAD DE MARCONA MARCONA 220 Regulado
Gran
SHOUGESA SHOUGANG HIERRO PERU MARCONA 220 Usuario
Gran
SHOUGESA SHOUGANG HIERRO PERU MARCONA 220 Usuario
Gran
SHOUGESA SHOUGANG HIERRO PERU MARCONA 220 Usuario
STATKRAFT MINERA CHINALCO PERÚ S.A. OROYA NUEVA 50 Libre
Gran
STATKRAFT MINERA MILPO DESIERTO 220 Usuario
PARAMONGA EXISTENTE
STATKRAFT ESEMPAT Regulado
13.8
STATKRAFT HUANCHAY CAHUA 10 Regulado
Gran
STATKRAFT COMPAÑIA MINERA CONDESTABLE S.A. CHILCA REP 220 Usuario
Gran
STATKRAFT MINERA MILPO PARAGSHA2 138 Usuario
STATKRAFT MINERA ATACOCHA PARAGSHA2 138 Libre
STATKRAFT MINERA LOS QUENUALES CASAPALCA 2.4 Libre
STATKRAFT MINERA LOS QUENUALES CARLOS FRANCISCO 50 Libre
STATKRAFT MINERA LOS QUENUALES CONCENTRADORA 50 Libre
STATKRAFT MINERA LOS QUENUALES SAN MATEO 50 Libre
STATKRAFT MINERA LOS QUENUALES ANTUQUITO 2.4 Libre
STATKRAFT MINERA LOS QUENUALES San Mateo 4.16 Libre
STATKRAFT MINERA LOS QUENUALES ROSAURA 50 Libre
STATKRAFT MINERA LOS QUENUALES PARAGSHA2 138 Libre
STATKRAFT ELECTRO CENTRO OROYA NUEVA 50 Regulado
STATKRAFT ELECTRO CENTRO CARHUAMAYO 138 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

STATKRAFT ELECTRO CENTRO YAUPI 13.8 Regulado


STATKRAFT ELECTRO CENTRO PARAGSHA2 138 Regulado
STATKRAFT ELECTRO CENTRO CONDORCOCHA 44 Regulado
STATKRAFT ELECTRO CENTRO COBRIZA II 69 Regulado
STATKRAFT ELECTRO CENTRO COBRIZA II 10 Regulado
STATKRAFT ELECTRO CENTRO COBRIZA I 69 Regulado
STATKRAFT ELECTRO CENTRO HUAYUCACH 60 Regulado
STATKRAFT ELECTRO CENTRO HUAYUCACH 10 Regulado
STATKRAFT ELECTRO CENTRO HUANCAVE 60 Regulado
STATKRAFT ELECTRO CENTRO HUANCAVE 10 Regulado
STATKRAFT ELECTRO CENTRO TINGO MARIA 10 Regulado
STATKRAFT ELECTRO CENTRO AUCAYACU 22.9 Regulado
STATKRAFT ELECTRO CENTRO HUANUCO 10 Regulado
STATKRAFT ELECTRO CENTRO HUANUCO 22.9 Regulado
STATKRAFT ELECTRO CENTRO HUALLANCA 66 Regulado
STATKRAFT ELECTRO CENTRO POMACOCHA 220 Regulado
STATKRAFT ELECTRO CENTRO PACHACHACA 220 Regulado
STATKRAFT HIDRANDINA GUADALUPE 60 Regulado
STATKRAFT HIDRANDINA GUADALUPE 10 Regulado
STATKRAFT HIDRANDINA TRUJILLO 138 Regulado
STATKRAFT HIDRANDINA TRUJILLO NORTE 10 Regulado
STATKRAFT HIDRANDINA CHIMBOTE1 138 Regulado
STATKRAFT HIDRANDINA CHIMBOTE 13.8 Regulado
STATKRAFT HIDRANDINA CHIMBOTE2 138 Regulado
STATKRAFT HIDRANDINA HUALLANCA 138 Regulado
STATKRAFT HIDRANDINA HUALLANCA 66 Regulado
STATKRAFT HIDRANDINA HUALLANCA 13.8 Regulado
STATKRAFT HIDRANDINA PARAMONGA NUEVA 66 Regulado
STATKRAFT HIDRANDINA LA PAJUELA 22.9 Regulado
STATKRAFT HIDRANDINA PORCON 10 Regulado
STATKRAFT HIDRANDINA CAJAMARCA NORTE 60 Regulado
STATKRAFT HIDRANDINA KIMAN AYLLU 10 Regulado
STATKRAFT HIDRANDINA HUARAZ OESTE 138 Regulado
STATKRAFT ELECTRO NOR OESTE PIURA OESTE 60 Regulado
STATKRAFT ELECTRO NOR OESTE PIURA OESTE 10 Regulado
STATKRAFT ELECTRO NOR OESTE Malacas 13.2 Regulado
STATKRAFT ELECTRO NOR OESTE ZORRITOS 60 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

STATKRAFT ELECTRO NOR OESTE MANCORA 22.9 Regulado


STATKRAFT ELECTRO NOR OESTE MANCORA 10.5 Regulado
STATKRAFT ELECTRO NOR OESTE ZORRITOS 33 Regulado
STATKRAFT ELECTRO NOR OESTE PUERTO RICO 22.9 Regulado
STATKRAFT ELECTRO NORTE CHICLAYO 60 Regulado
STATKRAFT ELECTRO NORTE CARHUAQUERO 220 Regulado
STATKRAFT ELECTRO NORTE CERRO CORONA 220 Regulado
STATKRAFT COELVISAC INDEPENDENCIA 60 Regulado
COMPAÑIA MINERALES SANTANDER CARHUAMAYO NUEVA
STATKRAFT Libre
S.A.C. 220
STATKRAFT MINERA CORONA OROYA NUEVA 50 Libre
STATKRAFT BANCO CONTINENTAL SANTA ROSA 220 Libre
STATKRAFT ADINELSA ADN CAHUA 10 Regulado
STATKRAFT PODER PANADERO SANTA ROSA 220 Libre
STATKRAFT TEVA PERU S.A. SANTA ROSA 220 Libre
STATKRAFT PERUBAR S.A. SANTA ROSA 220 Libre
Gran
STATKRAFT CENCOSUD RETAIL PERU SANTA ROSA 220 Usuario
Gran
STATKRAFT CENCOSUD RETAIL PERU SANTA ROSA 220 Usuario
Gran
STATKRAFT CENCOSUD RETAIL PERU TRUJILLO 220 Usuario
Gran
STATKRAFT CENCOSUD RETAIL PERU CHICLAYO 220 Usuario
Gran
STATKRAFT CENCOSUD RETAIL PERU PIURA OESTE 220 Usuario
Gran
STATKRAFT CENCOSUD RETAIL PERU SOCABAYA 138 Usuario
Gran
STATKRAFT CENCOSUD RETAIL PERU ICA 220 Usuario
Gran
STATKRAFT CENCOSUD RETAIL PERU CHIMBOTE1 138 Usuario
STATKRAFT TRES PALMERAS S A SANTA ROSA 220 Libre
STATKRAFT TRES PALMERAS S A SANTA ROSA 220 Libre
STATKRAFT TRES PALMERAS S A SOCABAYA 138 Libre
STATKRAFT CINCO ROBLES SANTA ROSA 220 Libre
STATKRAFT CINCO ROBLES SANTA ROSA 220 Libre
STATKRAFT INDUSTRIAS DEL PAPEL S A SANTA ROSA 220 Libre
STATKRAFT TECSUP SANTA ROSA 220 Libre
STATKRAFT EUROGROUP S.A.C. SANTA ROSA 220 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

STATKRAFT TDM GEOSINTETICOS S.A. SANTA ROSA 220 Libre


FROZEN PRODUCTS CORPORATION
STATKRAFT SANTA ROSA 220 Libre
SOCIEDAD ANONIMA CERRA
STATKRAFT ELECTRO CENTRO OROYA NUEVA 50 Regulado
STATKRAFT ELECTRO CENTRO CARHUAMAYO 138 Regulado
STATKRAFT ELECTRO CENTRO YAUPI 13.8 Regulado
STATKRAFT ELECTRO CENTRO PARAGSHA2 138 Regulado
STATKRAFT ELECTRO CENTRO CONDORCOCHA 44 Regulado
STATKRAFT ELECTRO CENTRO COBRIZA II 69 Regulado
STATKRAFT ELECTRO CENTRO COBRIZA II 10 Regulado
STATKRAFT ELECTRO CENTRO COBRIZA I 69 Regulado
STATKRAFT ELECTRO CENTRO HUAYUCACH 60 Regulado
STATKRAFT ELECTRO CENTRO HUAYUCACH 10 Regulado
STATKRAFT ELECTRO CENTRO HUANCAVE 60 Regulado
STATKRAFT ELECTRO CENTRO HUANCAVE 10 Regulado
STATKRAFT ELECTRO CENTRO TINGO MARIA 10 Regulado
STATKRAFT ELECTRO CENTRO AUCAYACU 22.9 Regulado
STATKRAFT ELECTRO CENTRO HUANUCO 10 Regulado
STATKRAFT ELECTRO CENTRO HUANUCO 22.9 Regulado
STATKRAFT ELECTRO CENTRO HUALLANCA 66 Regulado
STATKRAFT ELECTRO CENTRO POMACOCHA 220 Regulado
STATKRAFT ELECTRO CENTRO PACHACHACA 220 Regulado
STATKRAFT HIDRANDINA GUADALUPE 60 Regulado
STATKRAFT HIDRANDINA GUADALUPE 10 Regulado
STATKRAFT HIDRANDINA TRUJILLO 138 Regulado
STATKRAFT HIDRANDINA TRUJILLO NORTE 10 Regulado
STATKRAFT HIDRANDINA CHIMBOTE1 138 Regulado
STATKRAFT HIDRANDINA CHIMBOTE 13.8 Regulado
STATKRAFT HIDRANDINA CHIMBOTE2 138 Regulado
STATKRAFT HIDRANDINA HUALLANCA 138 Regulado
STATKRAFT HIDRANDINA HUALLANCA 66 Regulado
STATKRAFT HIDRANDINA HUALLANCA 13.8 Regulado
STATKRAFT HIDRANDINA PARAMONGA NUEVA 66 Regulado
STATKRAFT HIDRANDINA LA PAJUELA 22.9 Regulado
STATKRAFT HIDRANDINA PORCON 10 Regulado
STATKRAFT HIDRANDINA CAJAMARCA NORTE 60 Regulado
STATKRAFT HIDRANDINA KIMAN AYLLU 10 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

STATKRAFT HIDRANDINA HUARAZ OESTE 138 Regulado


STATKRAFT ELECTRO NOR OESTE PIURA OESTE 60 Regulado
STATKRAFT ELECTRO NOR OESTE PIURA OESTE 10 Regulado
STATKRAFT ELECTRO NOR OESTE Malacas 13.2 Regulado
STATKRAFT ELECTRO NOR OESTE ZORRITOS 60 Regulado
STATKRAFT ELECTRO NOR OESTE MANCORA 22.9 Regulado
STATKRAFT ELECTRO NOR OESTE MANCORA 10.5 Regulado
STATKRAFT ELECTRO NOR OESTE ZORRITOS 33 Regulado
STATKRAFT ELECTRO NOR OESTE PUERTO RICO 22.9 Regulado
STATKRAFT ELECTRO NORTE CHICLAYO 60 Regulado
STATKRAFT ELECTRO NORTE CARHUAQUERO 220 Regulado
STATKRAFT ELECTRO NORTE CERRO CORONA 220 Regulado
STATKRAFT ELECTROPUNO PUNO 60 Regulado
STATKRAFT ELECTROPUNO PUNO 22.9 Regulado
STATKRAFT ELECTROPUNO JULIACA 10 Regulado
STATKRAFT ELECTROPUNO JULIACA 22.9 Regulado
STATKRAFT ELECTROPUNO AYAVIRI 22.9 Regulado
STATKRAFT ELECTROPUNO AYAVIRI 10 Regulado
STATKRAFT ELECTROPUNO AZANGARO 22.9 Regulado
STATKRAFT ELECTROPUNO AZANGARO 60 Regulado
STATKRAFT ELECTROPUNO SAN GABAN 13.8 Regulado
STATKRAFT ELECTRO SUR TACNA 66 Regulado
STATKRAFT ELECTRO SUR TOQUEPALA 138 Regulado
STATKRAFT ELECTRO SUR ARICOTA1 10.5 Regulado
STATKRAFT ELECTRO SUR ARICOTA2 10.5 Regulado
STATKRAFT ELECTRO SUR SOCABAYA 33 Regulado
STATKRAFT ELECTRO SUR TOMASIRI 66 Regulado
STATKRAFT ELECTRO SUR SARITA 33 Regulado
STATKRAFT ELECTRO SUR MOQUEGUA 138 Regulado
STATKRAFT ELECTRO SUR ILO ELP 138 Regulado
STATKRAFT ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado
STATKRAFT ELECTRO SUR ESTE QUENCORO 33 Regulado
STATKRAFT ELECTRO SUR ESTE COMBAPATA 24 Regulado
STATKRAFT ELECTRO SUR ESTE COMBAPATA 60 Regulado
STATKRAFT ELECTRO SUR ESTE TINTAYA 10 Regulado
STATKRAFT ELECTRO SUR ESTE CACHIMAYO 10 Regulado
STATKRAFT ELECTRO SUR ESTE CACHIMAYO 23 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

STATKRAFT ELECTRO SUR ESTE CACHIMAYO 60 Regulado


STATKRAFT ELECTRO SUR ESTE MACHUPICCHU 10 Regulado
STATKRAFT ELECTRO SUR ESTE MACHUPICCHU 60 Regulado
STATKRAFT ELECTRO SUR ESTE ABANCAY 138 Regulado
STATKRAFT ELECTRO SUR ESTE SAN GABAN 138 Regulado
STATKRAFT SEAL SOCABAYA 33 Regulado
STATKRAFT SEAL SOCABAYA 138 Regulado
STATKRAFT SEAL CHILINA 138 Regulado
STATKRAFT SEAL SANTUARIO 138 Regulado
STATKRAFT SEAL CALLALLI 138 Regulado
STATKRAFT SEAL REPARTICION 138 Regulado
STATKRAFT SEAL MOLLENDO 138 Regulado
STATKRAFT SEAL MARCONA 220 Regulado
STATKRAFT SEAL JESUS 138 Regulado
STATKRAFT ELECTRO CENTRO CARHUAMAYO 138 Libre
STATKRAFT ELECTRO CENTRO HUANUCO 138 Libre
STATKRAFT HIDRANDINA TRUJILLO 138 Libre
STATKRAFT HIDRANDINA TRUJILLO NORTE 10 Libre
STATKRAFT HIDRANDINA GUADALUPE 60 Libre
STATKRAFT HIDRANDINA CHIMBOTE1 138 Libre
STATKRAFT HIDRANDINA CAJAMARCA NORTE 60 Libre
STATKRAFT HIDRANDINA HUALLANCA 66 Libre
STATKRAFT HIDRANDINA HUALLANCA 138 Libre
STATKRAFT ELECTRO NOR OESTE PIURA OESTE 60 Libre
STATKRAFT ELECTRO NOR OESTE PIURA OESTE 10 Libre
STATKRAFT ELECTRO NOR OESTE ZORRITOS 60 Libre
STATKRAFT ELECTRO NOR OESTE ZORRITOS 33 Libre
STATKRAFT ELECTRO NORTE CHICLAYO 60 Libre
PARAMONGA EXISTENTE Libre
TERMOCHILCA AGRO INDUSTRIAL PARAMONGA 138
TERMOCHILCA AGROEMPAQUES CHAVARRIA 220 Libre
TERMOCHILCA CATALINA HUANCA SOCIEDA MINERA CACHIMAYO 138 Libre
TERMOCHILCA CIA MINERA RAURA S A PARAGSHA2 138 Libre
TERMOCHILCA CONTICOPLAS SAC SANTA ROSA 220 Libre
TERMOCHILCA DOE RUN PERU CAMPO ARMIÑO 220 Libre
TERMOCHILCA DOE RUN PERU OROYA NUEVA 50 Libre
TERMOCHILCA ELECTRO PUNO AYAVIRI 10 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

TERMOCHILCA ELECTRO PUNO AYAVIRI 22.9 Regulado


TERMOCHILCA ELECTRO PUNO AZANGARO 22.9 Regulado
TERMOCHILCA ELECTRO PUNO AZANGARO 60 Regulado
TERMOCHILCA ELECTRO PUNO JULIACA 10 Regulado
TERMOCHILCA ELECTRO PUNO PUNO 22.9 Regulado
TERMOCHILCA ELECTRO PUNO PUNO 60 Regulado
TERMOCHILCA ELECTRO PUNO SAN GABAN 13.8 Regulado
TERMOCHILCA ELECTRO SUR ARICOTA1 10.5 Regulado
TERMOCHILCA ELECTRO SUR ARICOTA2 10.5 Regulado
TERMOCHILCA ELECTRO SUR ILO ELP 138 Regulado
TERMOCHILCA ELECTRO SUR MOQUEGUA 138 Regulado
TERMOCHILCA ELECTRO SUR SARITA 33 Regulado
TERMOCHILCA ELECTRO SUR SOCABAYA 33 Regulado
TERMOCHILCA ELECTRO SUR TACNA 66 Regulado
TERMOCHILCA ELECTRO SUR TOMASIRI 66 Regulado
TERMOCHILCA ELECTRO SUR TOQUEPALA 138 Regulado
TERMOCHILCA ELECTRO SUR ESTE ABANCAY 138 Regulado
TERMOCHILCA ELECTRO SUR ESTE CACHIMAYO 10 Regulado
TERMOCHILCA ELECTRO SUR ESTE CACHIMAYO 23 Regulado
TERMOCHILCA ELECTRO SUR ESTE CACHIMAYO 60 Regulado
TERMOCHILCA ELECTRO SUR ESTE COMBAPATA 24 Regulado
TERMOCHILCA ELECTRO SUR ESTE COMBAPATA 60 Regulado
TERMOCHILCA ELECTRO SUR ESTE DOLORESPATA 10.5 Regulado
TERMOCHILCA ELECTRO SUR ESTE DOLORESPATA 10.5 Libre
TERMOCHILCA ELECTRO SUR ESTE MACHUPICCHU 10 Regulado
TERMOCHILCA ELECTRO SUR ESTE MACHUPICCHU 60 Regulado
TERMOCHILCA ELECTRO SUR ESTE QUENCORO 10.5 Regulado
TERMOCHILCA ELECTRO SUR ESTE QUENCORO 33 Regulado
TERMOCHILCA ELECTRO SUR ESTE SAN GABAN 138 Regulado
TERMOCHILCA ELECTRO SUR ESTE TINTAYA 10 Regulado
PARAMONGA EXISTENTE Regulado
TERMOCHILCA EMSEMSA 13.8
TERMOCHILCA ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
TERMOCHILCA ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
TERMOCHILCA ENEL DISTRIBUCION PERU HUACHO 66 Regulado
TERMOCHILCA ENEL DISTRIBUCION PERU LOMERA 60 Regulado
TERMOCHILCA ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

TERMOCHILCA ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado


TERMOCHILCA ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
TERMOCHILCA ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
TERMOCHILCA ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
TERMOCHILCA EXSA SAN JUAN 220 Libre
TERMOCHILCA INMUEBLES LIMATAMBO S.A. SANTA ROSA 220 Libre
TERMOCHILCA INMUEBLES LIMATAMBO S.A. SANTA ROSA 220 Libre
TERMOCHILCA INVERSIONES SAN BORJA SANTA ROSA 220 Libre
TERMOCHILCA LADRILLERA MAXX LOS HEROES 220 Libre
TERMOCHILCA LUZ DEL SUR CALLAHUANCA 10 Regulado
TERMOCHILCA LUZ DEL SUR CANTERA 220 Regulado
TERMOCHILCA LUZ DEL SUR CHILCA REP 220 Libre
TERMOCHILCA LUZ DEL SUR CHILCA REP 220 Regulado
TERMOCHILCA LUZ DEL SUR CHOSICA 60 Regulado
TERMOCHILCA LUZ DEL SUR HUACHIPA 60 Regulado
TERMOCHILCA LUZ DEL SUR INDUSTRIALES 220 Regulado
TERMOCHILCA LUZ DEL SUR INDUSTRIALES 220 Libre
TERMOCHILCA LUZ DEL SUR SALAMANCA 60 Regulado
TERMOCHILCA LUZ DEL SUR SAN JUAN 220 Regulado
TERMOCHILCA LUZ DEL SUR SAN JUAN 220 Libre
TERMOCHILCA LUZ DEL SUR SANTA ROSA 220 Libre
TERMOCHILCA LUZ DEL SUR SANTA ROSA 220 Regulado
TERMOCHILCA LUZ DEL SUR ÑAÑA 60 Regulado
TERMOCHILCA MEDIFARMA S A SANTA ROSA 220 Libre
TERMOCHILCA MINERA QUIRUVILCA TRUJILLO 220 Libre
PRODUCTO DE ACERO CASSADO
TERMOCHILCA CHAVARRIA 220 Libre
(PRODAC)
PROVEEDORA DE PRODUCTOS
TERMOCHILCA PIURA OESTE 220 Libre
MARINOS SAC
TERMOCHILCA SEAL CALLALLI 138 Libre
TERMOCHILCA SEAL CALLALLI 138 Regulado
TERMOCHILCA SEAL CHILINA 33 Regulado
TERMOCHILCA SEAL CHILINA 33 Libre
TERMOCHILCA SEAL JESUS 138 Regulado
TERMOCHILCA SEAL JESUS 138 Libre
TERMOCHILCA SEAL MARCONA 60 Libre
TERMOCHILCA SEAL MARCONA 60 Regulado
TERMOCHILCA SEAL MOLLENDO 138 Libre
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

TERMOCHILCA SEAL MOLLENDO 138 Regulado


TERMOCHILCA SEAL REPARTICION 138 Libre
TERMOCHILCA SEAL REPARTICION 138 Regulado
TERMOCHILCA SEAL SANTUARIO 13.8 Regulado
TERMOCHILCA SEAL SANTUARIO 13.8 Libre
TERMOCHILCA SEAL SOCABAYA 138 Libre
TERMOCHILCA SEAL SOCABAYA 138 Regulado
TERMOCHILCA SEAL SOCABAYA 33 Libre
TERMOCHILCA SEAL SOCABAYA 33 Regulado
TERMOCHILCA SOCIEDAD AGRICOLA VIRU S.A. ICA 220 Libre
TERMOCHILCA SOCIEDAD AGRICOLA VIRU S.A. TRUJILLO 220 Libre
TERMOCHILCA URBANIZADORA JARDIN S A SANTA ROSA 220 Libre
SOCIEDAD MINERA AUSTRIA DUVAZ
TERMOSELVA S.A.C AUSTRIA DUVAZ 50 Libre

Gran
TERMOSELVA TEXTIL PIURA PIURA OESTE 220 Usuario
Gran
TERMOSELVA ALICORP CHAVARRIA 220 Usuario
TERMOSELVA COMPAÑIA UNIVERSAL TEXTIL S.A CHAVARRIA 220 Libre
TERMOSELVA INDUSTRIA DEL ESPINO TINGO MARIA 138 Libre
TERMOSELVA ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
TERMOSELVA ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
TERMOSELVA ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
TERMOSELVA ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
TERMOSELVA ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
TERMOSELVA ENEL DISTRIBUCION PERU HUACHO 66 Regulado
TERMOSELVA ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
TERMOSELVA ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
TERMOSELVA ENEL DISTRIBUCION PERU LOMERA 60 Regulado
TERMOSELVA LUZ DEL SUR SANTA ROSA 220 Regulado
TERMOSELVA LUZ DEL SUR SAN JUAN 220 Regulado
TERMOSELVA LUZ DEL SUR CHILCA REP 220 Regulado
TERMOSELVA LUZ DEL SUR CHOSICA 60 Regulado
TERMOSELVA LUZ DEL SUR HUACHIPA 60 Regulado
TERMOSELVA LUZ DEL SUR ÑAÑA 60 Regulado
TERMOSELVA LUZ DEL SUR SALAMANCA 60 Regulado
TERMOSELVA LUZ DEL SUR CALLAHUANCA 10 Regulado
TERMOSELVA LUZ DEL SUR INDUSTRIALES 220 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

TERMOSELVA LUZ DEL SUR CANTERA 220 Regulado


TERMOSELVA ELECTRO NOR OESTE MANCORA 10.5 Regulado
TERMOSELVA ELECTRO NOR OESTE MANCORA 22.9 Regulado
TERMOSELVA ELECTRO NOR OESTE Malacas 13.2 Regulado
TERMOSELVA ELECTRO NOR OESTE PIURA OESTE 10 Regulado
TERMOSELVA ELECTRO NOR OESTE PIURA OESTE 60 Regulado
TERMOSELVA ELECTRO NOR OESTE ZORRITOS 33 Regulado
TERMOSELVA ELECTRO NOR OESTE ZORRITOS 60 Regulado
TERMOSELVA ELECTRO NORTE CHICLAYO 60 Regulado
TERMOSELVA ELECTRO NORTE CARHUAQUERO 220 Regulado
TERMOSELVA ELECTRO NORTE CERRO CORONA 220 Regulado
TERMOSELVA HIDRANDINA CAJAMARCA NORTE 60 Regulado
TERMOSELVA HIDRANDINA CHIMBOTE 13.8 Regulado
TERMOSELVA HIDRANDINA CHIMBOTE1 138 Regulado
TERMOSELVA HIDRANDINA CHIMBOTE2 138 Regulado
TERMOSELVA HIDRANDINA GUADALUPE 10 Regulado
TERMOSELVA HIDRANDINA GUADALUPE 60 Regulado
TERMOSELVA HIDRANDINA HUALLANCA 13.8 Regulado
TERMOSELVA HIDRANDINA HUALLANCA 138 Regulado
TERMOSELVA HIDRANDINA HUALLANCA 66 Regulado
TERMOSELVA HIDRANDINA HUARAZ OESTE 138 Regulado
TERMOSELVA HIDRANDINA KIMAN AYLLU 10 Regulado
TERMOSELVA HIDRANDINA LA PAJUELA 22.9 Regulado
TERMOSELVA HIDRANDINA PARAMONGA NUEVA 66 Regulado
TERMOSELVA HIDRANDINA PORCON 10 Regulado
TERMOSELVA HIDRANDINA TRUJILLO 138 Regulado
TERMOSELVA HIDRANDINA TRUJILLO NORTE 10 Regulado
TERMOSELVA ELECTRO CENTRO AUCAYACU 22.9 Regulado
TERMOSELVA ELECTRO CENTRO CARHUAMAYO 138 Regulado
TERMOSELVA ELECTRO CENTRO COBRIZA I 69 Regulado
TERMOSELVA ELECTRO CENTRO COBRIZA II 10 Regulado
TERMOSELVA ELECTRO CENTRO COBRIZA II 69 Regulado
TERMOSELVA ELECTRO CENTRO CONDORCOCHA 44 Regulado
TERMOSELVA ELECTRO CENTRO HUALLANCA 66 Regulado
TERMOSELVA ELECTRO CENTRO HUANCAVE 10 Regulado
TERMOSELVA ELECTRO CENTRO HUANCAVE 60 Regulado
TERMOSELVA ELECTRO CENTRO HUANUCO 10 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

TERMOSELVA ELECTRO CENTRO HUANUCO 22.9 Regulado


TERMOSELVA ELECTRO CENTRO HUAYUCACH 10 Regulado
TERMOSELVA ELECTRO CENTRO HUAYUCACH 60 Regulado
TERMOSELVA ELECTRO CENTRO OROYA NUEVA 50 Regulado
TERMOSELVA ELECTRO CENTRO PACHACHACA 220 Regulado
TERMOSELVA ELECTRO CENTRO PARAGSHA2 138 Regulado
TERMOSELVA ELECTRO CENTRO POMACOCHA 220 Regulado
TERMOSELVA ELECTRO CENTRO TINGO MARIA 10 Regulado
TERMOSELVA ELECTRO CENTRO YAUPI 13.8 Regulado
TERMOSELVA COELVISAC INDEPENDENCIA 60 Regulado
TERMOSELVA ELECTRO DUNAS CAUDALOSA 22 Regulado
TERMOSELVA ELECTRO ORIENTE TOCACHE 138 Regulado
ELECTRICA SANTA ROSA ELECTRICA SANTA ROSA SANTA ROSA 220 Libre
EMPRESA DE GENERACION ELECTRICA EMPRESA DE GENERACION ELECTRICA
RIO BAÑOS S.A.C. RIO BAÑOS S.A.C. SANTA ROSA 220 Libre

EMPRESA ELECTRICA AGUA AZUL EMPRESA ELECTRICA AGUA AZUL SANTA ROSA 220 Libre
HIDROMARAÑON HIDROMARAÑON SANTA ROSA 220 Libre
EMPRESA DE GENERACION ELECTRICA EMPRESA DE GENERACION ELECTRICA SANTA ROSA 220 Libre
DE JUNIN DE JUNIN
HIDROELECTRICA SANTA CRUZ HIDROELECTRICA SANTA CRUZ SANTA ROSA 220 Libre
ENGIE LUZ DEL SUR CHILCA 220 Regulado

SAN GABAN ELECTRO ORIENTE CUTERVO 138 Libre

ENEL GENERACION PERU S.A.A. SEAL JESUS 138 Regulado


ENEL GENERACION PERU S.A.A. SEAL SOCABAYA 138 Regulado
EGESUR ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
EGESUR ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
EGESUR ENEL DISTRIBUCION PERU HUACHO 66 Regulado
EGESUR ENEL DISTRIBUCION PERU LOMERA 60 Regulado
EGESUR ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
EGESUR ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
EGESUR ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
EGESUR ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
EGESUR ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado
ENGIE ENEL DISTRIBUCION PERU CHAVARRIA 220 Regulado
ENGIE ENEL DISTRIBUCION PERU SANTA ROSA 220 Regulado
ENGIE ENEL DISTRIBUCION PERU SANTA ROSA 60 Regulado
ENGIE ENEL DISTRIBUCION PERU VENTANILLA 220 Regulado
INFORMACIÓN INGRESADA PARA VTP Y PEAJES
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 5

TIPO
EMPRESA CLIENTE BARRA USUARIO

ENGIE ENEL DISTRIBUCION PERU ZAPALLAL 220 Regulado


ENGIE ENEL DISTRIBUCION PERU HUACHO 66 Regulado
ENGIE ENEL DISTRIBUCION PERU PARAMONGA NUEVA 66 Regulado
ENGIE ENEL DISTRIBUCION PERU LOMERA 60 Regulado
ENGIE ENEL DISTRIBUCION PERU CARABAYLLO 220 Regulado
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.21 2,053.80 2,053.80 2,053.80 36.206


Si 20.56 74.00 74.00 74.00 37.954
Si 20.84 20.73 20.73 20.73 39.130
Si 20.15 40.40 40.40 40.40 37.829
Si 20.25 22.56 22.56 22.56 38.018
Si 20.84 0.01 0.01 0.01 39.130
Si 20.75 304.16 304.16 304.16 38.953
Si 20.15 142.89 142.89 142.89 37.829
Si 20.51 32.85 32.85 32.85 38.018
Si 20.84 50.48 50.48 50.48 39.130
Si 20.25 33.79 33.79 33.79 38.018
Si 20.84 180.79 180.79 180.79 39.130
Si 20.84 73.33 73.33 73.33 39.130
Si 20.84 45.16 45.16 45.16 39.130
Si 20.25 598.50 598.50 598.50 38.018
Si 20.15 45.72 45.72 45.72 37.829
Si 20.15 1.83 1.83 1.83 37.829
Si 20.15 108.39 108.39 108.39 37.829
Si 20.15 4.24 4.24 4.24 37.829
Si 20.84 90.76 90.76 90.76 39.130
Si 20.84 204.95 204.95 204.95 39.130
No 20.64 6,270.32 6,270.32 6,270.32 38.752
No 20.22 20,439.06 20,439.06 20,439.06 37.954
No 20.22 456.77 456.77 456.77 37.954
No 20.64 3.38 3.38 3.38 38.752
No 20.64 1,012.71 1,012.71 1,012.71 38.752
No 20.22 136.01 136.01 136.01 37.954
No 20.22 36,933.34 36,933.34 36,933.34 37.954
No 20.22 12,061.33 12,061.33 12,061.33 37.954
No 20.22 428.96 428.96 428.96 37.954
Si 20.62 15.51 15.51 15.51 38.718
Si 20.62 24.18 24.18 24.18 38.718
Si 20.62 96.70 96.70 96.70 38.718
Si 20.62 64.15 64.15 64.15 38.718
Si 20.21 767.77 767.77 767.77 37.946
Si 20.57 42.94 42.94 42.94 38.608
Si 20.21 185.48 185.48 185.48 37.946
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 98.33 98.33 98.33 37.829


Si 20.22 92.38 92.38 92.38 37.961
Si 20.22 1,737.92 1,737.92 1,737.92 37.957
Si 20.32 111.71 111.71 111.71 38.139
Si 20.61 4.79 4.79 4.79 38.684
Si 20.15 507.67 507.67 507.67 37.829
Si 20.22 0.10 0.10 0.10 37.961
Si 20.44 26.70 26.70 26.70 38.366
Si 20.15 386.03 386.03 386.03 37.829
Si 20.61 6.16 6.16 6.16 38.684
Si 20.15 34.80 34.80 34.80 37.829
Si 20.32 72.56 72.56 72.56 38.139
Si 20.22 155.45 155.45 155.45 37.961
Si 20.61 0.00 0.00 0.00 38.684
Si 20.61 0.00 0.00 0.00 38.684
Si 20.27 25.25 25.25 25.25 38.052
Si 20.61 4.82 4.82 4.82 38.684
Si 20.32 1,015.80 1,015.80 1,015.80 38.139
Si 20.61 199.02 199.02 199.02 38.684

No 20.15 16,143.04 16,143.04 16,143.04 37.829

No 20.15 5,850.82 5,850.82 5,850.82 37.829


No 20.15 102.51 102.51 102.51 37.837
No 20.15 5,712.52 5,712.52 5,712.52 37.829

No 20.15 12,765.24 12,765.24 12,765.24 37.829

No 20.15 1,166.72 1,166.72 1,166.72 37.829

No 20.15 19,222.23 19,222.23 19,222.23 37.829

No 20.15 5,706.94 5,706.94 5,706.94 37.829

Si 20.28 67.88 67.88 67.88 38.067


Si 20.28 66.72 66.72 66.72 38.067
Si 20.24 516.33 516.33 516.33 38.007
Si 20.24 174.69 174.69 174.69 38.007
Si 20.28 1,364.08 1,364.08 1,364.08 38.067
Si 20.28 0.00 0.00 0.00 38.067
Si 20.24 113.91 113.91 113.91 38.007
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.24 1,075.27 1,075.27 1,075.27 38.007


Si 20.28 35.28 35.28 35.28 38.067
Si 20.26 0.15 0.15 0.15 38.045
Si 20.26 3.78 3.78 3.78 38.045
Si 20.15 0.04 0.04 0.04 37.829
Si 20.15 202.25 202.25 202.25 37.829
Si 20.15 158.29 158.29 158.29 37.829
Si 20.39 23.22 23.22 23.22 38.287
Si 20.25 19.15 19.15 19.15 38.018
Si 20.15 661.29 661.29 661.29 37.829
Si 20.39 23.83 23.83 23.83 38.287
Si 20.28 698.92 698.92 698.92 38.075
Si 20.69 105.74 105.74 105.74 38.839
Si 20.69 78.45 78.45 78.45 38.839
Si 20.69 0.00 0.00 0.00 38.839
Si 20.36 372.94 372.94 372.94 38.222
Si 20.69 109.82 109.82 109.82 38.839
Si 20.36 199.47 199.47 199.47 38.222
Si 20.69 2,266.51 2,266.51 2,266.51 38.839
Si 20.69 0.00 0.00 0.00 38.839
Si 20.69 68.14 68.14 68.14 38.839
Si 20.36 326.10 326.10 326.10 38.222
Si 20.69 0.00 0.00 0.00 38.839
Si 20.36 171.58 171.58 171.58 38.222
Si 20.15 885.24 885.24 885.24 37.829
Si 20.69 198.31 198.31 198.31 38.839

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 8,715.48 8,715.48 8,715.48 37.829


Si 20.15 0.00 0.00 0.00 37.829
Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 14,669.04 14,669.04 14,669.04 37.829

Si 20.24 0.00 0.00 0.00 37.999

Si 20.24 0.00 0.00 0.00 37.999


Si 20.24 958.03 958.03 958.03 37.999
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.24 0.00 0.00 0.00 37.999

Si 20.24 0.00 0.00 0.00 37.999

Si 20.24 911.77 911.77 911.77 37.999


Si 20.24 0.00 0.00 0.00 37.999
Si 20.24 571.56 571.56 571.56 37.999

Si 20.24 0.00 0.00 0.00 37.999

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 7,672.25 7,672.25 7,672.25 37.829


Si 20.15 0.00 0.00 0.00 37.829

Si 20.24 0.00 0.00 0.00 37.999

Si 20.24 0.00 0.00 0.00 37.999


Si 20.24 -656.02 -656.02 -656.02 37.999
Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 4,568.15 4,568.15 4,568.15 37.829


Si 20.15 2,633.03 2,633.03 2,633.03 37.829
Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.32 214.42 214.42 214.42 38.139


Si 20.61 9.20 9.20 9.20 38.684
Si 20.15 974.44 974.44 974.44 37.829
Si 20.22 0.19 0.19 0.19 37.961
Si 20.44 51.26 51.26 51.26 38.366
Si 20.15 740.96 740.96 740.96 37.829
Si 20.61 11.82 11.82 11.82 38.684
Si 20.15 66.79 66.79 66.79 37.829
Si 20.32 139.28 139.28 139.28 38.139
Si 20.22 298.38 298.38 298.38 37.961
Si 20.61 0.00 0.00 0.00 38.684
Si 20.61 0.00 0.00 0.00 38.684
Si 20.27 48.47 48.47 48.47 38.052
Si 20.61 9.26 9.26 9.26 38.684
Si 20.32 1,949.79 1,949.79 1,949.79 38.139
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.61 345.03 345.03 345.03 38.684


Si 20.61 8.11 8.11 8.11 38.699
Si 20.15 117.87 117.87 117.87 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 24.32 24.32 24.32 37.829


Si 20.15 2,833.83 2,833.83 2,833.83 37.829
Si 20.50 502.52 502.52 502.52 38.483
Si 20.50 - 0.24 - 0.24 - 0.24 38.483
Si 20.15 - - - 37.829
Si 20.15 5,368.30 5,368.30 5,368.30 37.829
Si 20.50 478.62 478.62 478.62 38.483
Si 20.15 17,851.51 17,851.51 17,851.51 37.829
Si 20.15 439.59 439.59 439.59 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 336.03 336.03 336.03 37.829


Si 20.15 3,165.33 3,165.33 3,165.33 37.829
Si 20.50 1,485.30 1,485.30 1,485.30 38.483
Si 20.15 157.64 157.64 157.64 37.829
Si 20.54 2,463.80 2,463.80 2,463.80 38.563
Si 20.54 0.00 0.00 0.00 38.563
Si 20.56 225.07 225.07 225.07 38.605
Si 20.56 1.43 1.43 1.43 38.605
Si 20.15 315.32 315.32 315.32 37.829
Si 20.15 0.98 0.98 0.98 37.829
Si 20.15 0.00 0.00 0.00 37.829
Si 20.15 982.21 982.21 982.21 37.829
Si 20.64 0.23 0.23 0.23 38.741
Si 20.54 0.00 0.00 0.00 38.563
Si 20.54 975.04 975.04 975.04 38.563
Si 20.85 134.38 134.38 134.39 37.837
Si 20.15 2,414.70 2,414.70 2,414.70 37.837
Si 20.28 42.44 42.44 42.43 37.837
Si 20.28 41.72 41.72 41.72 37.837
Si 20.28 22.06 22.06 22.07 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.24 109.23 109.23 109.23 37.837


Si 20.24 322.84 322.84 322.84 37.837
Si 20.24 - - - 37.837
Si 20.28 852.89 852.89 852.91 37.837
Si 20.24 71.22 71.22 71.22 37.837
Si 20.24 672.31 672.31 672.31 37.837
Si 20.26 7.28 7.28 7.28 37.837
Si 20.51 41.87 41.87 41.88 37.837
Si 20.15 0.08 0.08 0.08 37.837
Si 20.15 391.24 391.24 391.26 37.837
Si 20.15 321.88 321.88 321.89 37.837
Si 20.39 47.48 47.48 47.49 37.837
Si 20.30 38.22 38.22 38.21 37.837
Si 20.26 0.30 0.30 0.30 37.837
Si 20.15 1,361.52 1,361.52 1,361.51 37.837
Si 20.28 299.71 299.71 299.70 37.837
Si 20.69 45.34 45.34 45.36 37.837
Si 20.69 33.64 33.64 33.66 37.837
Si 20.36 - - - 37.837
Si 20.36 159.92 159.92 159.91 37.837
Si 20.69 47.09 47.09 47.09 37.837
Si 20.36 85.54 85.54 85.52 37.837
Si 20.69 971.91 971.91 971.90 37.837
Si 20.69 29.22 29.22 29.22 37.837
Si 20.36 139.84 139.84 139.85 37.837
Si 20.36 73.58 73.58 73.59 37.837
Si 20.15 379.61 379.61 379.61 37.837
Si 20.69 85.04 85.04 85.02 37.837
Si 20.15 4,954.08 4,954.08 4,954.08 37.837
Si 20.15 8,439.51 8,439.51 8,439.51 37.837
Si 20.24 595.58 595.58 595.58 37.837
Si 20.24 578.96 578.96 578.96 37.837
Si 20.24 328.54 328.54 328.54 37.837
Si 20.50 - - - 37.837
Si 20.15 4,021.02 4,021.02 4,021.02 37.837
Si 20.24 - 15.74 - 15.74 - 15.74 37.837
Si 20.15 2,674.83 2,674.83 2,674.83 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 1,565.40 1,565.40 1,565.40 37.837


Si 20.61 18.88 18.88 18.88 37.837
Si 20.15 1,202.08 1,202.08 1,202.09 37.837
Si 20.15 6,594.98 6,594.98 6,594.98 37.837
Si 20.15 13.40 13.40 13.40 37.837
Si 20.50 1,169.48 1,169.48 1,169.48 37.837
Si 20.50 - 0.55 - 0.55 - 0.55 37.837
Si 20.15 12,493.25 12,493.25 12,493.25 37.837
Si 20.50 1,113.86 1,113.86 1,113.86 37.837
Si 20.15 41,544.54 41,544.54 41,544.54 37.837
Si 20.15 242.25 242.25 242.25 37.837
Si 20.15 185.19 185.19 185.19 37.837
Si 20.15 7,366.45 7,366.45 7,366.45 37.837
Si 20.50 3,456.64 3,456.64 3,456.64 37.837
No 20.15 504.79 504.79 504.79 37.837
No 20.15 732.72 732.72 732.72 37.837
No 20.15 979.50 979.50 979.50 37.837
Si 20.15 62.02 62.02 62.02 37.837
Si 20.54 0.44 0.44 0.44 37.837
Si 20.54 1,048.91 1,048.91 1,048.91 37.837
Si 20.19 437.83 437.83 437.84 37.837
Si 20.19 0.02 0.02 - 37.837
Si 20.22 0.42 0.42 0.44 37.837
Si 20.22 101.88 101.88 101.88 37.837
Si 20.15 0.09 0.09 0.11 37.837
Si 20.15 136.96 136.96 136.98 37.837
Si 20.15 0.55 0.55 0.56 37.837
Si 20.15 427.00 427.00 427.00 37.837
Si 20.64 0.27 0.27 0.29 37.837
Si 20.15 1.10 1.10 1.11 37.837
Si 20.15 563.50 563.50 563.51 37.837
Si 20.54 - - - 37.837
Si 20.54 440.37 440.37 440.36 37.837
No 20.15 2,300.72 2,300.72 2,300.72 37.837
No 20.15 4,505.82 4,505.82 4,505.82 37.837
No 20.15 3.32 3.32 3.32 37.837
No 21.14 1,007.28 1,007.28 1,007.28 39.699
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.57 58.40 58.40 58.40 38.632


No 20.15 0.00 0.00 0.00 37.837
Si 20.22 146.00 146.00 146.00 37.962
No 20.99 860.80 860.80 860.80 39.415
No 20.99 5.55 5.55 5.55 37.837
No 20.15 5.02 5.02 5.02 37.837
No 20.22 3.20 3.20 3.20 37.837
No 20.22 386.69 386.69 386.69 37.962
No 20.22 330.13 330.13 330.13 37.962
No 20.22 568.04 568.04 568.04 37.962
No 20.22 650.40 650.40 650.40 37.962
No 20.22 274.06 274.06 274.06 37.962
No 20.22 206.00 206.00 206.00 37.962
No 20.22 22.97 22.97 22.97 37.962
No 20.22 245.24 245.24 245.24 37.962
No 20.22 24.33 24.33 24.33 37.962
No 20.22 282.60 282.60 282.60 37.962
No 20.22 969.47 969.47 969.47 37.962
No 20.57 1,783.72 1,783.72 1,783.72 38.442

No 20.15 102.34 102.34 102.34 37.837

Si 20.85 40.55 40.55 40.55 39.142


Si 20.15 74.99 74.99 74.99 37.837
Si 20.25 38.98 38.98 38.98 38.026
Si 20.85 0.02 0.02 0.02 39.142
Si 20.75 603.07 603.07 603.07 38.961
Si 20.15 168.70 168.70 168.70 37.837
Si 20.25 62.17 62.17 62.17 38.026
Si 20.85 90.38 90.38 90.38 39.142
Si 20.25 59.23 59.23 59.23 38.026
Si 20.85 337.52 337.52 337.52 39.142
Si 20.85 139.28 139.28 139.28 39.142
Si 20.85 87.45 87.45 87.45 39.142
Si 20.25 1,037.23 1,037.23 1,037.23 38.026
Si 20.15 89.17 89.17 89.17 37.837
Si 20.15 3.58 3.58 3.58 37.837
Si 20.15 203.32 203.32 203.32 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 17.64 17.64 17.64 37.837


Si 20.85 169.92 169.92 169.92 39.142
Si 20.85 390.82 390.82 390.82 39.142
Si 20.64 2,086.74 2,086.74 2,086.74 38.760
Si 20.22 5,958.67 5,958.67 5,958.67 37.962
Si 20.64 318.52 318.52 318.52 38.760
Si 20.22 11,397.73 11,397.73 11,397.73 37.962
Si 20.22 3,582.59 3,582.59 3,582.59 37.962
Si 20.62 32.83 32.83 32.83 38.726
Si 20.62 52.02 52.02 52.02 38.726
Si 20.62 185.08 185.08 185.08 38.726
Si 20.62 91.34 91.34 91.34 38.726
Si 20.21 1,489.16 1,489.16 1,489.16 37.954
Si 20.57 79.86 79.86 79.86 38.616
Si 20.21 329.68 329.68 329.68 37.954
Si 20.15 249.51 249.51 249.51 37.837
Si 20.22 122.85 122.85 122.85 37.969
Si 20.22 3,337.30 3,337.30 3,337.30 37.966
No 20.15 4,160.34 4,160.34 4,160.34 37.837

No 20.15 388.98 388.98 388.98 37.837

No 20.15 300.33 300.33 300.33 37.837


No 20.28 1,928.50 1,928.50 1,928.50 38.083
No 20.69 0.00 0.00 0.00 38.847
No 20.69 0.00 0.00 0.00 38.847
No 20.15 10.02 10.02 10.02 37.837
No 20.15 2,651.34 2,651.34 2,651.34 37.837

No 20.15 43.73 43.73 43.73 37.837

Si 20.32 210.02 210.02 210.02 38.147


Si 20.22 9.73 9.73 9.73 38.692
Si 20.15 976.33 976.33 976.33 37.837
Si 20.61 0.27 0.27 0.27 37.969
Si 20.44 45.06 45.06 45.06 38.374
Si 20.15 725.67 725.67 725.67 37.837
Si 20.61 12.23 12.23 12.23 38.692
Si 20.15 72.94 72.94 72.94 37.837
Si 20.32 133.27 133.27 133.27 38.147
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.22 284.28 284.28 284.28 37.969


Si 20.27 46.63 46.63 46.63 38.060
Si 20.61 9.95 9.95 9.95 38.692
Si 20.32 1,904.92 1,904.92 1,904.92 38.147
Si 20.61 383.27 383.27 383.27 38.692
No 20.15 1,033.44 1,033.44 1,033.44 37.837

No 20.15 3,345.51 3,345.51 3,345.51 37.837

No 20.47 41.99 41.99 41.99 38.442


No 20.15 0.00 0.00 0.00 37.837
No 20.54 925.74 925.74 925.74 38.571
No 20.15 1,096.78 1,096.78 1,096.78 37.837
No 20.15 181.65 181.65 181.65 37.837
No 20.15 853.66 853.66 853.66 37.837
No 20.15 2,698.57 2,698.57 2,698.57 37.837
No 20.15 71.99 71.99 71.99 37.837

No 20.64 315.95 315.95 315.95 37.837

No 20.74 386.31 386.31 386.31 37.837


Si 20.85 24.50 24.50 24.50 37.837
Si 20.15 434.50 434.50 434.50 37.837
Si 20.15 195.34 195.34 195.34 37.837
Si 20.15 332.76 332.76 332.76 37.837
Si 20.24 23.48 23.48 23.48 37.837
Si 20.24 22.83 22.83 22.83 37.837
Si 20.24 12.95 12.95 12.95 37.837
Si 20.15 158.55 158.55 158.55 37.837
Si 20.24 - 0.62 - 0.62 - 0.62 37.837
Si 20.15 105.47 105.47 105.47 37.837
Si 20.15 61.72 61.72 61.72 37.837
Si 20.61 2.74 2.74 2.74 37.837
Si 20.15 201.13 201.13 201.13 37.837
Si 20.15 958.20 958.20 958.20 37.837
Si 20.50 169.92 169.92 169.92 37.837
Si 20.50 - 0.08 - 0.08 - 0.08 37.837
Si 20.15 1,815.17 1,815.17 1,815.17 37.837
Si 20.50 161.84 161.84 161.84 37.837
Si 20.15 6,036.11 6,036.11 6,036.11 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 1,070.29 1,070.29 1,070.29 37.837


Si 20.50 502.22 502.22 502.22 37.837

No 20.64 0.00 0.00 0.00 37.837

No 20.51 113.56 113.56 113.56 37.837

No 20.15 15,055.80 15,055.80 15,055.80 37.837

No 20.15 14,454.38 14,454.38 14,454.38 37.837

No 20.15 5,512.33 5,512.33 5,512.33 37.837

No 20.15 900.80 900.80 900.80 37.837


Si 20.22 1,843.00 1,843.00 1,843.00 37.962
No 20.65 40.79 40.79 40.79 38.768
No 20.61 464.36 464.36 464.36 38.707
Si 20.85 513.86 513.86 513.86 39.143
Si 20.15 994.42 994.42 994.42 37.837
Si 20.25 543.29 543.29 543.29 38.026
Si 20.85 0.19 0.19 0.19 39.143
Si 20.75 7,263.26 7,263.26 7,263.26 38.961
Si 20.15 3,546.80 3,546.80 3,546.80 37.837
Si 20.25 803.88 803.88 803.88 38.026
Si 20.85 1,339.61 1,339.61 1,339.61 39.143
Si 20.25 769.46 769.46 769.46 38.026
No 20.75 424.71 424.71 424.71 38.961
Si 20.85 4,356.69 4,356.69 4,356.69 39.143
Si 20.85 1,734.92 1,734.92 1,734.92 39.143
Si 20.85 1,135.66 1,135.66 1,135.66 39.143
Si 20.25 14,497.58 14,497.58 14,497.58 38.026
Si 20.15 1,147.60 1,147.60 1,147.60 37.837
Si 20.15 48.48 48.48 48.48 37.837
Si 20.15 2,727.83 2,727.83 2,727.83 37.837
Si 20.15 24.41 24.41 24.41 37.837
No 20.75 82.32 82.32 82.32 38.961
No 20.75 617.07 617.07 617.07 38.961
Si 20.85 2,143.63 2,143.63 2,143.63 39.143
Si 20.85 3,498.03 3,498.03 3,498.03 39.143
Si 20.62 2,259.09 2,259.09 2,259.09 38.726
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.62 381.52 381.52 381.52 38.726


Si 20.62 633.03 633.03 633.03 38.726
Si 20.62 1,713.39 1,713.39 1,713.39 38.726
Si 20.21 3,691.07 3,691.07 3,691.07 37.954
Si 20.21 15,992.53 15,992.53 15,992.53 37.954
Si 20.57 1,009.55 1,009.55 1,009.55 38.616
Si 20.21 4,243.11 4,243.11 4,243.11 37.954
Si 20.15 3,122.81 3,122.81 3,122.81 37.837
Si 20.22 1,671.69 1,671.69 1,671.69 37.969
Si 20.22 46,555.92 46,555.92 46,555.92 37.965
Si 20.28 151.97 151.97 151.97 38.075
Si 20.28 138.36 138.36 138.36 38.075
Si 20.28 68.56 68.56 68.56 38.075
Si 20.24 455.37 455.37 455.37 38.015
Si 20.24 970.94 970.94 970.94 38.015
Si 20.28 2,966.40 2,966.40 2,966.40 38.075
Si 20.24 247.19 247.19 247.19 38.015
Si 20.24 2,325.27 2,325.27 2,325.27 38.015
Si 20.26 0.62 0.62 0.62 38.053
Si 20.26 15.27 15.27 15.27 38.053
Si 20.15 0.18 0.18 0.18 37.837
Si 20.15 821.02 821.02 821.02 37.837
Si 20.15 675.45 675.45 675.45 37.837
Si 20.39 87.86 87.86 87.86 38.295
Si 20.25 80.20 80.20 80.20 38.026
Si 20.15 2,857.11 2,857.11 2,857.11 37.837
Si 20.39 99.64 99.64 99.64 38.295
Si 20.28 663.16 663.16 663.16 38.083
Si 20.69 100.78 100.78 100.78 38.847
Si 20.69 77.81 77.81 77.81 38.847
Si 20.36 0.00 38.230
Si 20.36 363.71 363.71 363.71 38.230
Si 20.69 109.47 109.47 109.47 38.847
Si 20.36 172.81 172.81 172.81 38.230
Si 20.69 1,309.31 1,309.31 1,309.31 38.847
Si 20.69 65.46 65.46 65.46 38.847
Si 20.36 312.95 312.95 312.95 38.230
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.36 914.09 914.09 914.09 38.230


Si 20.15 803.78 803.78 803.78 37.837
Si 20.69 200.70 200.70 200.70 38.847
No 20.15 779.92 779.92 779.92 37.837
No 20.15 19,885.48 19,885.48 19,885.48 37.837

No 20.85 2,963.65 2,963.65 2,963.65 39.143

No 20.85 266.06 266.06 266.06 39.143

No 20.85 6.25 6.25 6.25 39.143

No 20.85 3,882.09 3,882.09 3,882.09 39.143

No 20.85 3,018.54 3,018.54 3,018.54 39.143

No 20.85 589.47 589.47 589.47 39.143

No 20.85 602.90 602.90 602.90 39.143

No 20.15 5,564.30 5,564.30 5,564.30 37.837

No 20.75 0.00 0.00 0.00 38.961

Si 20.15 5,016.15 5,016.15 5,016.15 37.837


Si 20.15 8,545.25 8,545.25 8,545.25 37.837
Si 20.24 603.04 603.04 603.04 38.007
Si 20.24 586.22 586.22 586.22 38.007
Si 20.24 332.66 332.66 332.66 38.007
Si 20.15 4,071.40 4,071.40 4,071.40 37.837
Si 20.24 -49.93 -49.93 -49.93 38.007
Si 20.15 2,708.35 2,708.35 2,708.35 37.837
Si 20.15 1,585.02 1,585.02 1,585.02 37.837
No 20.64 1,712.15 1,712.15 1,712.15 38.760
No 20.64 108.42 108.42 108.42 38.760
No 20.62 0.00 0.00 0.00 38.726
Si 20.32 3,002.06 3,002.06 3,002.06 38.147
Si 20.61 121.48 121.48 121.48 38.692
Si 20.15 12,767.56 12,767.56 12,767.56 37.837
Si 20.22 2.93 2.93 2.93 37.969
Si 20.44 754.26 754.26 754.26 38.374
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 9,614.61 9,614.61 9,614.61 37.837


Si 20.61 161.74 161.74 161.74 38.692
Si 20.15 914.33 914.33 914.33 37.837
Si 20.32 2,721.02 2,721.02 2,721.02 38.147
Si 20.22 2,828.58 2,828.58 2,828.58 37.969
Si 20.61 0.00 0.00 0.00 38.692
Si 20.61 0.00 0.00 0.00 38.692
Si 20.27 619.38 619.38 619.38 38.060
Si 20.61 126.00 126.00 126.00 38.692
Si 20.32 25,672.99 25,672.99 25,672.99 38.147
Si 20.61 4,892.14 4,892.14 4,892.14 38.692
Si 20.61 3.39 3.39 3.39 38.707
Si 20.15 1,997.17 1,997.17 1,997.17 37.837
Si 20.15 36.49 36.49 36.49 37.837
Si 20.15 1,183.90 1,183.90 1,183.90 37.837
Si 20.50 209.94 209.94 209.94 38.492
Si 20.50 - 0.43 - 0.43 - 0.43 38.492
Si 20.15 - - - 37.837
Si 20.15 2,242.74 2,242.74 2,242.74 37.837
Si 20.50 620.52 620.52 620.52 38.492
Si 20.50 199.96 199.96 199.96 38.492
Si 20.15 659.38 659.38 659.38 37.837
Si 20.15 7,457.90 7,457.90 7,457.90 37.837
Si 20.15 504.05 504.05 504.05 37.837
Si 20.15 1,322.39 1,322.39 1,322.39 37.837

No 20.15 222,397.68 222,397.68 222,397.68 37.837

No 20.15 5,712.62 5,712.62 5,712.62 37.837

No 20.15 0.00 0.00 0.00 37.837

No 20.85 1,190.30 1,190.30 1,190.30 39.143

No 20.75 1,356.72 1,356.72 1,356.72 38.961

No 20.85 904.54 904.54 904.54 39.143

No 20.75 172.31 172.31 172.31 38.961


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.75 1,916.64 1,916.64 1,916.64 38.961

No 20.15 2,114.11 2,114.11 2,114.11 37.837

No 20.85 178.97 178.97 178.97 39.143

No 20.85 282.88 282.88 282.88 39.143

No 20.75 1,582.20 1,582.20 1,582.20 38.961

No 20.16 4,352.14 4,352.14 4,352.14 37.864

No 20.15 1,832.60 1,832.60 1,832.60 37.837


No 20.50 65.20 65.20 65.20 38.492
Si 20.15 246.41 246.41 246.41 37.837
Si 20.54 1.01 1.01 1.01 38.571
Si 20.54 3,851.09 3,851.09 3,851.09 38.571
Si 20.19 1,520.70 1,520.70 1,520.70 37.916
Si 20.22 0.76 0.76 0.76 37.962
Si 20.22 351.81 351.81 351.81 37.962
Si 20.15 0.24 0.24 0.24 37.837
Si 20.15 492.86 492.86 492.86 37.837
Si 20.15 1.21 1.21 1.21 37.837
Si 20.15 1,535.26 1,535.26 1,535.26 37.837
Si 20.64 0.37 0.37 0.37 38.749
Si 20.15 2.76 2.76 2.76 37.837
Si 20.15 1,674.73 1,674.73 1,674.73 37.837
Si 20.54 0.00 0.00 0.00 38.571
Si 20.54 1,524.06 1,524.06 1,524.06 38.571

No 20.15 12,943.75 12,943.75 12,943.75 37.837

No 20.15 82,047.57 82,047.57 82,047.57 37.837

No 20.75 39.28 39.28 39.28 38.961

Si 20.21 15,889.15 15,889.15 15,889.15 37.954

Si 20.62 1,702.31 1,702.31 1,702.31 38.726

Si 20.62 25.66 25.66 25.66 38.726


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.62 1,952.91 1,952.91 1,952.91 38.726

Si 20.21 3,668.03 3,668.03 3,668.03 37.954

Si 20.62 547.23 547.23 547.23 38.726

Si 20.62 329.81 329.81 329.81 38.726

Si 20.57 872.72 872.72 872.72 38.616

Si 20.15 6,744.56 6,744.56 6,744.56 37.837

Si 20.44 529.11 529.11 529.11 38.374

Si 20.32 18,009.35 18,009.35 18,009.35 38.147

Si 20.61 3,431.79 3,431.79 3,431.79 38.692

Si 20.15 8,956.32 8,956.32 8,956.32 37.837

Si 20.61 85.22 85.22 85.22 38.692

Si 20.22 2.05 2.05 2.05 37.969

Si 20.15 641.39 641.39 641.39 37.837

Si 20.32 1,908.77 1,908.77 1,908.77 38.147

Si 20.61 113.46 113.46 113.46 38.692

Si 20.27 434.49 434.49 434.49 38.060

Si 20.61 88.38 88.38 88.38 38.692

Si 20.32 2,105.92 2,105.92 2,105.92 38.147

Si 20.22 1,984.22 1,984.22 1,984.22 37.969

Si 20.22 3,101.49 3,101.49 3,101.49 37.966

Si 20.15 208.04 208.04 208.04 37.837

Si 20.22 111.37 111.37 111.37 37.969


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 486.20 486.20 486.20 37.837

Si 20.15 421.30 421.30 421.30 37.837

Si 20.85 1,482.01 1,482.01 1,482.01 39.142

Si 20.15 1,155.70 1,155.70 1,155.70 37.837

Si 20.15 1,502.67 1,502.67 1,502.67 37.837

Si 20.75 3,077.22 3,077.22 3,077.22 38.961

Si 20.85 0.08 0.08 0.08 39.142

Si 20.25 230.17 230.17 230.17 38.026

Si 20.25 6,142.18 6,142.18 6,142.18 38.026

Si 20.85 481.14 481.14 481.14 39.142

Si 20.25 326.00 326.00 326.00 38.026

Si 20.85 567.55 567.55 567.55 39.142

Si 20.15 20.54 20.54 20.54 37.837

Si 20.15 10.34 10.34 10.34 37.837

Si 20.85 908.19 908.19 908.19 39.142

Si 20.85 217.71 217.71 217.71 39.142

Si 20.85 1,845.80 1,845.80 1,845.80 39.142

Si 20.85 735.03 735.03 735.03 39.142

Si 20.25 340.58 340.58 340.58 38.026

Si 20.15 1,026.86 1,026.86 1,026.86 37.837

Si 20.15 11,882.23 11,882.23 11,882.23 37.837

Si 20.54 1,612.50 1,612.50 1,612.50 38.571


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.54 4,074.58 4,074.58 4,074.58 38.571

Si 20.15 521.47 521.47 521.47 37.837

Si 20.15 260.70 260.70 260.70 37.837

Si 20.15 1,624.35 1,624.35 1,624.35 37.837

Si 20.56 372.22 372.22 372.22 38.613

Si 20.64 0.39 0.39 0.39 38.749

Si 20.19 1,608.95 1,608.95 1,608.95 37.916

Si 20.15 1,771.92 1,771.92 1,771.92 37.837

Si 20.15 6,226.16 6,226.16 6,226.16 37.837

Si 20.58 21,895.77 21,895.77 21,895.77 38.639

Si 20.69 3,865.65 3,865.65 3,865.65 38.847

Si 20.69 2,698.79 2,698.79 2,698.79 38.847

Si 20.28 1,957.96 1,957.96 1,957.96 38.083

Si 20.69 297.53 297.53 297.53 38.847

Si 20.69 229.74 229.74 229.74 38.847

Si 20.36 1,073.84 1,073.84 1,073.84 38.231

Si 20.69 323.21 323.21 323.21 38.847

Si 20.69 592.56 592.56 592.56 38.847

Si 20.69 193.27 193.27 193.27 38.847

Si 20.36 923.96 923.96 923.96 38.231

Si 20.36 491.22 491.22 491.22 38.231

Si 20.15 2,373.13 2,373.13 2,373.13 37.837


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.69 0.00 0.00 0.00 38.847

Si 20.36 510.21 510.21 510.21 38.231

Si 20.24 3,266.32 3,266.32 3,266.32 38.015

Si 20.24 347.24 347.24 347.24 38.015

Si 20.28 1,760.33 1,760.33 1,760.33 38.075

Si 20.28 4,166.92 4,166.92 4,166.92 38.075

Si 20.24 639.66 639.66 639.66 38.015

Si 20.24 1,363.88 1,363.88 1,363.88 38.015

Si 20.28 194.35 194.35 194.35 38.075

Si 20.28 213.48 213.48 213.48 38.075

Si 20.28 96.31 96.31 96.31 38.075

Si 20.15 10,692.04 10,692.04 10,692.04 37.837

Si 20.15 5,094.24 5,094.24 5,094.24 37.837

Si 20.15 3,388.75 3,388.75 3,388.75 37.837

Si 20.24 416.23 416.23 416.23 38.007

Si 20.24 754.54 754.54 754.54 38.007

Si 20.15 1,983.22 1,983.22 1,983.22 37.837

Si 20.15 6,276.33 6,276.33 6,276.33 37.837

Si 20.24 733.49 733.49 733.49 38.007

Si 20.15 14,376.95 14,376.95 14,376.95 37.837

Si 20.15 2,549.24 2,549.24 2,549.24 37.837

Si 20.15 2,282.27 2,282.27 2,282.27 37.837


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.50 1,196.21 1,196.21 1,196.21 38.492

Si 20.50 385.46 385.46 385.46 38.492

Si 20.50 404.71 404.71 404.71 38.492

Si 20.61 6.53 6.53 6.53 38.707

Si 20.15 4,323.43 4,323.43 4,323.43 37.837

Si 20.22 35.30 35.30 35.30 37.962

Si 20.50 451.21 451.21 451.21 38.492

Si 20.56 1,189.63 1,189.63 1,189.63 38.613

Si 20.64 127.87 127.87 127.87 38.760

Si 20.22 167.44 167.44 167.44 37.962

Si 20.24 115.13 115.13 115.13 38.007

Si 20.24 261.83 261.83 261.83 38.007

Si 20.15 27.92 27.92 27.92 37.837

Si 20.15 264.18 264.18 264.18 37.837

Si 20.75 3,014.92 3,014.92 3,014.92 38.961

Si 20.75 271.05 271.05 271.05 38.961

Si 20.75 2,488.83 2,488.83 2,488.83 38.961

Si 20.85 1,422.86 1,422.86 1,422.86 39.142

Si 20.85 1,872.36 1,872.36 1,872.36 39.142

Si 20.85 444.97 444.97 444.97 39.142

Si 20.85 281.52 281.52 281.52 39.142

Si 20.75 2,134.15 2,134.15 2,134.15 38.961


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 3,325.54 3,325.54 3,325.54 37.837

Si 20.15 7,614.04 7,614.04 7,614.04 37.837

No 20.15 28,801.83 28,801.83 28,801.83 37.837

No 20.15 7,878.94 7,878.94 7,878.94 37.837

No 20.15 0.00 0.00 0.00 37.837

No 20.15 12,235.96 12,235.96 12,235.96 37.837

No 20.15 1,544.94 1,544.94 1,544.94 37.837

No 20.15 12,528.77 12,528.77 12,528.77 37.837

No 20.15 2,381.70 2,381.70 2,381.70 37.837


No 20.15 3,547.58 3,547.58 3,547.58 37.837
No 20.15 3,200.21 3,200.21 3,200.21 37.837

No 20.15 91.56 91.56 91.56 37.837

No 20.15 32.48 32.48 32.48 37.837

No 20.15 3,203.31 3,203.31 3,203.31 37.837

No 20.15 431.69 431.69 431.69 37.829


No 20.15 557.69 557.69 557.69 37.829
No 20.15 1,483.15 1,483.15 1,483.15 37.829
No 20.15 609.59 609.59 609.59 37.829
No 20.15 1,282.94 1,282.94 1,282.94 37.829
No 20.15 859.74 859.74 859.74 37.829
No 20.15 0.00 0.00 0.00 37.829
No 20.15 355.26 355.26 355.26 37.829
No 20.15 232.13 232.13 232.13 37.829
No 20.15 82.16 82.16 82.16 37.829
No 20.15 232.54 232.54 232.54 37.829
No 20.15 264.36 264.36 264.36 37.829
No 20.15 1,551.85 1,551.85 1,551.85 37.829
No 20.15 1,182.27 1,182.27 1,182.27 37.829
No 20.15 146.70 146.70 146.70 37.829

No 20.15 667.68 667.68 667.68 37.829

No 20.15 23.40 23.40 23.40 37.829


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 24.96 24.96 24.96 37.829


No 20.15 27.18 27.18 27.18 37.829
No 20.15 1,262.67 1,262.67 1,262.67 37.829
No 20.15 420.16 420.16 420.16 37.829
No 20.15 496.09 496.09 496.09 37.829
No 20.15 0.00 0.00 0.00 37.829
No 20.15 2.39 2.39 2.39 37.829
No 20.15 70.96 70.96 70.96 37.829
No 20.15 2.99 2.99 2.99 37.829
No 20.15 38.77 38.77 38.77 37.829
No 20.15 0.00 0.00 0.00 37.829
No 20.15 0.00 0.00 0.00 37.829
No 20.15 411.01 411.01 411.01 37.829
No 20.15 179.92 179.92 179.92 37.829
No 20.15 614.02 614.02 614.02 37.829
No 20.15 142.62 142.62 142.62 37.829
No 20.15 106.91 106.91 106.91 37.829

No 20.15 247.47 247.47 247.47 37.829

No 20.15 461.29 461.29 461.29 37.829

No 20.15 385.60 385.60 385.60 37.829

No 20.15 529.58 529.58 529.58 37.829

No 20.15 120.71 120.71 120.71 37.829

No 20.15 462.41 462.41 462.41 37.829

No 20.15 533.01 533.01 533.01 37.829

No 20.15 574.26 574.26 574.26 37.829

No 20.15 86.42 86.42 86.42 37.829

No 20.15 21.96 21.96 21.96 37.829

No 20.15 379.21 379.21 379.21 37.829

No 20.15 78.19 78.19 78.19 37.829


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 76.54 76.54 76.54 37.829


No 20.15 718.10 718.10 718.10 37.829
No 0.00 0.00 0.00 0.00 0.000
No 20.15 282.09 282.09 282.09 37.829
No 0.00 0.00 0.00 0.00 0.000

No 20.15 0.00 0.00 0.00 37.829

No 20.15 47.17 47.17 47.17 37.829

No 20.15 11.23 11.23 11.23 37.829

No 20.15 46.72 46.72 46.72 37.829

No 20.15 14.37 14.37 14.37 37.829

No 20.15 159.70 159.70 159.70 37.829

No 20.15 288.89 288.89 288.89 37.829

No 20.15 565.51 565.51 565.51 37.829

No 20.15 324.11 324.11 324.11 37.829

No 20.15 216.74 216.74 216.74 37.829

No 20.15 5,628.51 5,628.51 5,628.51 37.829


No 20.15 623.80 623.80 623.80 37.829
No 20.15 2,308.63 2,308.63 2,308.63 37.829
No 20.15 876.24 876.24 876.24 37.829
No 20.15 2,710.21 2,710.21 2,710.21 37.829
No 20.15 2,608.47 2,608.47 2,608.47 37.829
No 20.15 3,529.58 3,529.58 3,529.58 37.829
No 21.03 0.00 0.00 0.00 0.000
No 20.15 0.00 0.00 0.00 0.000
No 20.21 0.00 0.00 0.00 0.000
No 20.94 0.00 0.00 0.00 0.000
No 21.03 0.00 0.00 0.00 0.000
No 20.15 0.00 0.00 0.00 0.000
No 20.15 0.00 0.00 0.00 0.000
No 20.21 0.00 0.00 0.00 0.000
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 21.03 0.00 0.00 0.00 0.000


No 21.03 0.00 0.00 0.00 0.000
No 21.03 0.00 0.00 0.00 0.000
No 21.03 0.00 0.00 0.00 0.000
No 20.21 0.00 0.00 0.00 0.000
No 20.15 0.00 0.00 0.00 0.000
No 20.15 0.00 0.00 0.00 0.000
No 20.15 0.00 0.00 0.00 0.000
No 21.03 0.00 0.00 0.00 0.000
No 21.03 0.00 0.00 0.00 0.000

No 20.15 289.95 289.95 289.95 37.829

No 20.15 877.75 877.75 877.75 37.829


Si 20.28 336.31 336.31 336.31 38.067
Si 20.28 330.57 330.57 330.57 38.007
Si 20.24 865.56 865.56 865.56 38.067
Si 20.24 2,558.26 2,558.26 2,558.26 38.007
Si 20.28 6,758.61 6,758.61 6,758.61 38.007
Si 20.28 0.00 0.00 0.00 38.067
Si 20.24 564.38 564.38 564.38 38.007
Si 20.24 5,327.64 5,327.64 5,327.64 37.829
Si 20.28 174.78 174.78 174.78 38.067
Si 20.26 3.02 3.02 3.02 37.829
Si 20.26 74.20 74.20 74.20 38.045
Si 20.15 0.85 0.85 0.85 37.829
Si 20.15 3,974.49 3,974.49 3,974.49 37.829
Si 20.15 3,110.62 3,110.62 3,110.62 38.018
Si 20.39 456.28 456.28 456.28 38.045
Si 20.25 376.30 376.30 376.30 37.961
Si 20.15 12,995.46 12,995.46 12,995.46 38.287
Si 20.39 468.30 468.30 468.30 38.287
Si 20.28 3,445.23 3,445.23 3,445.23 37.829
Si 20.69 521.23 521.23 521.23 38.222
Si 20.69 386.69 386.69 386.69 38.839
Si 20.69 0.00 0.00 0.00 38.839
Si 20.36 1,838.38 1,838.38 1,838.38 38.075
Si 20.69 541.33 541.33 541.33 38.222
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.36 983.29 983.29 983.29 38.839


Si 20.69 11,172.47 11,172.47 11,172.47 38.067
Si 20.69 0.00 0.00 0.00 38.839
Si 20.69 335.90 335.90 335.90 38.222
Si 20.36 1,607.48 1,607.48 1,607.48 38.839
Si 20.36 845.81 845.81 845.81 38.839
Si 20.69 0.00 0.00 0.00 38.839
Si 20.15 4,363.71 4,363.71 4,363.71 38.222
Si 20.69 977.57 977.57 977.57 38.839
No 20.15 1,595.78 1,595.78 1,595.78 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 53,199.23 53,199.23 53,199.23 37.829


Si 20.15 4,779.59 4,779.59 4,779.59 37.829
Si 20.15 45,088.87 45,088.87 45,088.87 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 89,539.69 89,539.69 89,539.69 37.829

Si 20.24 0.00 0.00 0.00 37.999

Si 20.24 5,847.79 5,847.79 5,847.79 37.999


Si 20.24 513.86 513.86 513.86 37.999
Si 20.24 3,488.79 3,488.79 3,488.79 37.999

Si 20.24 0.00 0.00 0.00 37.999

Si 20.24 306.57 306.57 306.57 37.999


Si 20.24 2,802.56 2,802.56 2,802.56 37.999

Si 20.24 0.00 0.00 0.00 37.999

Si 20.24 5,565.45 5,565.45 5,565.45 37.999

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 46,831.31 46,831.31 46,831.31 37.829


Si 20.15 4,207.47 4,207.47 4,207.47 37.829
Si 20.24 -4,004.33 -4,004.33 -4,004.33 37.999

Si 20.24 0.00 0.00 0.00 37.999

Si 20.24 -359.76 -359.76 -359.76 37.999


Si 20.15 27,883.92 27,883.92 27,883.92 37.829
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 14,041.31 14,041.31 14,041.31 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 16,071.99 16,071.99 16,071.99 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 8,093.26 8,093.26 8,093.26 37.829


No 20.15 406.43 406.43 406.43 37.829
No 20.15 194.06 194.06 194.06 37.829
No 20.15 3.99 3.99 3.99 37.829

No 20.15 47.42 47.42 47.42 37.829

No 20.15 458.85 458.85 458.85 37.829


No 20.15 56.25 56.25 56.25 37.829
No 20.15 132.16 132.16 132.16 37.829
No 20.15 123.55 123.55 123.55 37.829
No 20.15 125.80 125.80 125.80 37.829
No 20.15 870.24 870.24 870.24 37.829
No 20.15 529.86 529.86 529.86 37.829
No 20.15 126.67 126.67 126.67 37.829
No 20.15 135.03 135.03 135.03 37.829
No 20.15 170.73 170.73 170.73 37.829
No 20.15 688.06 688.06 688.06 37.829
Si 20.32 432.54 432.54 432.54 38.684
Si 20.61 18.57 18.57 18.57 37.829
Si 20.15 1,965.72 1,965.72 1,965.72 38.684
Si 20.22 0.38 0.38 0.38 38.684
Si 20.44 103.40 103.40 103.40 37.829
Si 20.15 1,494.72 1,494.72 1,494.72 37.829
Si 20.61 23.85 23.85 23.85 38.139
Si 20.15 134.74 134.74 134.74 37.961
Si 20.32 280.96 280.96 280.96 37.829
Si 20.22 601.92 601.92 601.92 38.684
Si 20.61 0.00 0.00 0.00 38.139
Si 20.61 0.00 0.00 0.00 38.684
Si 20.27 97.77 97.77 97.77 38.684
Si 20.61 18.67 18.67 18.67 38.052
Si 20.32 3,933.26 3,933.26 3,933.26 38.366
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.61 770.60 770.60 770.60 38.139

No 20.15 713.56 713.56 713.56 37.829

No 20.15 107.41 107.41 107.41 37.829


No 20.15 0.00 0.00 0.00 37.829
No 20.15 301.41 301.41 301.41 37.829
No 20.15 274.53 274.53 274.53 37.829
No 20.15 152.29 152.29 152.29 37.829
No 20.15 164.42 164.42 164.42 37.829
No 20.15 301.88 301.88 301.88 37.829
No 20.15 248.45 248.45 248.45 37.829
No 20.15 348.19 348.19 348.19 37.829
No 20.15 382.55 382.55 382.55 37.829
No 20.15 368.99 368.99 368.99 37.829
No 20.15 356.93 356.93 356.93 37.829
No 20.15 445.54 445.54 445.54 37.829
No 20.15 1,211.05 1,211.05 1,211.05 37.829
No 20.15 363.24 363.24 363.24 37.829
No 20.15 420.86 420.86 420.86 37.829
No 20.15 309.62 309.62 309.62 37.829

No 20.15 82,940.88 82,940.88 82,940.88 37.829

No 20.15 96.72 96.72 96.72 37.829

No 20.15 33.28 33.28 33.28 37.829


No 20.15 319.98 319.98 319.98 37.829
No 20.15 314.08 314.08 314.08 37.829
No 20.15 952.74 952.74 952.74 37.829
No 20.15 214.34 214.34 214.34 37.829
No 20.15 219.37 219.37 219.37 37.829
No 20.15 565.86 565.86 565.86 37.829

No 20.15 492.99 492.99 492.99 37.829

No 20.15 1,088.11 1,088.11 1,088.11 37.829

No 20.15 338.62 338.62 338.62 37.829

No 20.15 498.75 498.75 498.75 37.829


No 20.15 968.45 968.45 968.45 37.829
No 20.15 189.70 189.70 189.70 37.829
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 1,235.27 1,235.27 1,235.27 37.829

No 20.15 2,656.98 2,656.98 2,656.98 37.829

Si 20.61 39.95 39.95 39.95 38.699


Si 20.15 573.44 573.44 573.44 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 119.40 119.40 119.40 37.829


Si 20.15 13,957.62 13,957.62 13,957.62 37.829
Si 20.50 2,475.09 2,475.09 2,475.09 38.483
Si 20.50 - 1.17 - 1.17 - 1.17 38.483
Si 20.15 - - - 37.829
Si 20.15 26,440.72 26,440.72 26,440.72 37.829
Si 20.50 2,357.37 2,357.37 2,357.37 38.483
Si 20.15 87,924.88 87,924.88 87,924.88 37.829
Si 20.15 2,157.83 2,157.83 2,157.83 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 0.00 0.00 0.00 37.829

Si 20.15 1,649.51 1,649.51 1,649.51 37.829


Si 20.15 15,590.35 15,590.35 15,590.35 37.829
Si 20.50 7,315.63 7,315.63 7,315.63 38.483
No 20.15 406.30 406.30 406.30 37.829
No 20.15 569.94 569.94 569.94 37.829
No 20.15 0.00 0.00 0.00 37.829
No 20.15 156.14 156.14 156.14 37.829
No 20.15 221.37 221.37 221.37 37.829
No 20.15 467.58 467.58 467.58 37.829
No 20.15 218.19 218.19 218.19 37.829
No 20.15 348.61 348.61 348.61 37.829
No 20.15 237.44 237.44 237.44 37.829
No 20.15 175.36 175.36 175.36 37.829
No 20.15 4,087.43 4,087.43 4,087.43 37.829
No 20.15 295.50 295.50 295.50 37.829
No 20.15 3.42 3.42 3.42 37.829
No 20.15 216.81 216.81 216.81 37.829
No 20.15 686.87 686.87 686.87 37.829
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 9.55 9.55 9.55 37.829


No 20.15 570.00 570.00 570.00 37.829
No 20.15 494.90 494.90 494.90 37.829
No 20.15 365.45 365.45 365.45 37.829
No 20.15 200.15 200.15 200.15 37.829
No 20.15 734.14 734.14 734.14 37.829
No 20.15 416.60 416.60 416.60 37.829
No 20.15 178.54 178.54 178.54 37.829
No 20.15 2,158.84 2,158.84 2,158.84 37.829
No 20.15 0.00 0.00 0.00 37.829
No 20.15 119.80 119.80 119.80 37.829
No 20.15 154.84 154.84 154.84 37.829

No 20.15 670.90 670.90 670.90 37.829

No 20.15 2,356.60 2,356.60 2,356.60 37.829


No 20.15 598.58 598.58 598.58 37.829

No 20.15 8,804.96 8,804.96 8,804.96 37.829

No 20.15 11,715.95 11,715.95 11,715.95 37.829

No 20.15 106,490.87 106,490.87 106,490.87 37.829

No 20.15 76.74 76.74 76.74 37.829


No 20.15 438.29 438.29 438.29 37.829
No 20.15 143,778.98 143,778.98 143,778.98 37.829
No 20.15 20,735.10 20,735.10 20,735.10 37.829
No 20.15 932.42 932.42 932.42 37.829
No 20.15 490.05 490.05 490.05 37.829
No 20.15 280.62 280.62 280.62 37.829

No 20.15 192.61 192.61 192.61 37.829

No 20.15 527.29 527.29 527.29 37.829

No 20.15 1,549.49 1,549.49 1,549.49 37.829


No 20.15 490.17 490.17 490.17 37.829
No 20.15 136.94 136.94 136.94 37.829
No 20.15 575.95 575.95 575.95 37.829
No 20.15 2,121.04 2,121.04 2,121.04 37.829
No 20.15 719.31 719.31 719.31 37.829
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 1,939.68 1,939.68 1,939.68 37.829


No 20.15 150.31 150.31 150.31 37.829
No 20.15 21.58 21.58 21.58 37.829
No 20.15 144.42 144.42 144.42 37.829
No 20.15 34.11 34.11 34.11 37.829
No 20.15 0.00 0.00 0.00 37.829
No 20.15 30.68 30.68 30.68 37.829
No 20.15 112.50 112.50 112.50 37.829
No 20.15 42.81 42.81 42.81 37.829
No 20.15 0.00 0.00 0.00 37.829
No 20.15 90.75 90.75 90.75 37.829
No 20.15 71.81 71.81 71.81 37.829
No 20.15 22.97 22.97 22.97 37.829
No 20.15 58.79 58.79 58.79 37.829
No 20.15 206.71 206.71 206.71 37.829
No 20.15 217.05 217.05 217.05 37.829
No 20.15 24.98 24.98 24.98 37.829
No 20.15 44.66 44.66 44.66 37.829
No 20.15 14.23 14.23 14.23 37.829
No 20.15 17.53 17.53 17.53 37.829
No 20.15 153.30 153.30 153.30 37.829
No 20.15 1,819.59 1,819.59 1,819.59 37.829
No 20.15 280.80 280.80 280.80 37.829
No 20.15 7,643.96 7,643.96 7,643.96 37.829

No 20.15 13,658.46 13,658.46 13,658.46 37.829

No 20.15 408.15 408.15 408.15 37.829


No 20.15 466.96 466.96 466.96 37.829
No 20.15 201.53 201.53 201.53 37.829
No 20.15 294.97 294.97 294.97 37.829
No 20.15 85.72 85.72 85.72 37.829
No 20.15 1,119.96 1,119.96 1,119.96 37.829
No 20.15 351.99 351.99 351.99 37.829
No 20.15 632.16 632.16 632.16 37.829
No 20.15 128.58 128.58 128.58 37.829
Si 20.15 776.62 776.62 776.62 38.741
Si 20.54 5.06 5.06 5.06 38.563
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.54 12,137.91 12,137.91 12,137.91 38.563


Si 20.56 1,108.83 1,108.83 1,108.83 37.829
Si 20.56 5.55 5.55 5.55 38.605
Si 20.15 1,553.41 1,553.41 1,553.41 37.829
Si 20.15 1.22 1.22 1.22 37.829
Si 20.15 4,838.85 4,838.85 4,838.85 37.829
Si 20.15 7.36 7.36 7.36 37.829
Si 20.64 1.15 1.15 1.15 38.563
Si 20.54 0.00 0.00 0.00 38.563
Si 20.54 4,803.54 4,803.54 4,803.54 38.839

No 20.37 6,982.95 6,982.95 6,982.95 37.829

No 20.15 222.98 222.98 222.98 37.829

No 20.15 279.97 279.97 279.97 37.829


No 20.15 213.62 213.62 213.62 37.829
No 20.15 182.49 182.49 182.49 37.829
No 20.15 183.35 183.35 183.35 37.829
No 20.15 145.50 145.50 145.50 37.829
No 20.15 310.84 310.84 310.84 37.829
No 20.15 337.00 337.00 337.00 37.829
No 20.15 202.46 202.46 202.46 37.829
No 20.15 184.01 184.01 184.01 37.829

No 20.15 251.49 251.49 251.49 37.829

No 20.15 240.66 240.66 240.66 37.829

No 20.15 6,768.95 6,768.95 6,768.95 37.829


No 20.15 315.83 315.83 315.83 37.829
No 20.15 612.35 612.35 612.35 37.829

No 20.15 462.59 462.59 462.59 37.829

No 20.15 340.55 340.55 340.55 37.829

No 20.15 157.54 157.54 157.54 37.829

No 20.15 358.97 358.97 358.97 37.829

No 20.15 229.67 229.67 229.67 37.829


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 289.74 289.74 289.74 37.829

No 20.15 185.25 185.25 185.25 37.829

No 20.15 178.05 178.05 178.05 37.829

No 20.15 346.59 346.59 346.59 37.829

No 20.15 278.72 278.72 278.72 37.829

No 20.15 113.03 113.03 113.03 37.829

No 20.15 361.50 361.50 361.50 37.829

No 20.15 450.11 450.11 450.11 37.829

No 20.15 456.77 456.77 456.77 37.829

No 20.15 430.11 430.11 430.11 37.829

No 20.15 315.74 315.74 315.74 37.829

No 20.15 400.19 400.19 400.19 37.829

No 20.15 327.95 327.95 327.95 37.829

No 20.15 297.45 297.45 297.45 37.829

No 20.15 187.48 187.48 187.48 37.829

No 20.15 452.19 452.19 452.19 37.829


No 20.15 105.66 105.66 105.66 37.829
No 20.15 153.85 153.85 153.85 37.829
No 20.15 0.00 0.00 0.00 37.829
No 20.15 10.98 10.98 10.98 37.829
No 20.15 278.92 278.92 278.92 37.829
No 20.15 98.88 98.88 98.88 37.829
No 20.15 3,469.10 3,469.10 3,469.10 37.829

No 20.15 9,892.08 9,892.08 9,892.08 37.829

No 20.15 727.17 727.17 727.17 37.829


No 20.15 103.46 103.46 103.46 37.829
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 1,301.66 1,301.66 1,301.66 37.829


No 20.15 595.71 595.71 595.71 37.829
No 20.15 230.88 230.88 230.88 37.829

No 20.15 794.98 794.98 794.98 37.829

No 20.15 251.42 251.42 251.42 38.077


No 20.21 1,370.67 1,370.67 1,370.67 38.195
No 20.27 586.41 586.41 586.41 38.306
No 20.22 2,639.06 2,639.06 2,639.06 38.207
Si 20.28 58.69 58.69 58.69 38.317
Si 20.28 57.69 57.69 57.69 38.317
Si 20.24 151.05 151.05 151.05 38.256
Si 20.24 446.44 446.44 446.44 38.256
Si 20.28 1,179.43 1,179.43 1,179.43 38.317
Si 20.28 0.00 0.00 0.00 38.317
Si 20.24 98.49 98.49 98.49 38.256
Si 20.24 929.72 929.72 929.72 38.256
Si 20.28 30.50 30.50 30.50 38.317
Si 20.26 0.43 0.43 0.43 38.294
Si 20.26 10.52 10.52 10.52 38.294
Si 20.15 563.46 563.46 563.46 38.077
Si 20.15 440.99 440.99 440.99 38.077
Si 20.39 64.69 64.69 64.69 38.538
Si 20.25 53.35 53.35 53.35 38.267
Si 20.15 1,842.36 1,842.36 1,842.36 38.077
Si 20.39 66.39 66.39 66.39 38.538
Si 20.15 0.12 0.12 0.12 38.077
Si 20.28 418.90 418.90 418.90 38.325
Si 20.69 63.37 63.37 63.37 39.094
Si 20.69 47.02 47.02 47.02 39.094
Si 20.36 223.52 223.52 223.52 38.473
Si 20.69 65.82 65.82 65.82 39.094
Si 20.36 119.55 119.55 119.55 38.473
Si 20.69 796.51 796.51 796.51 39.094
Si 20.69 0.00 0.00 0.00 39.094
Si 20.69 40.84 40.84 40.84 39.094
Si 20.36 195.45 195.45 195.45 38.473
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.69 561.92 561.92 561.92 39.094


Si 20.36 102.84 102.84 102.84 38.473
Si 20.15 530.57 530.57 530.57 38.077
Si 20.69 118.86 118.86 118.86 39.094

Si 20.15 0.00 0.00 0.00 38.077

Si 20.15 8,274.32 8,274.32 8,274.32 38.077


Si 20.15 0.00 0.00 0.00 38.077
Si 20.15 0.00 0.00 0.00 38.077

Si 20.15 0.00 0.00 0.00 38.077

Si 20.15 13,926.52 13,926.52 13,926.52 38.077


Si 20.24 0.00 0.00 0.00 38.248
Si 20.24 909.53 909.53 909.53 38.248

Si 20.24 0.00 0.00 0.00 38.248

Si 20.24 865.62 865.62 865.62 38.248

Si 20.24 0.00 0.00 0.00 38.248

Si 20.24 0.00 0.00 0.00 38.248


Si 20.24 542.63 542.63 542.63 38.248
Si 20.24 0.00 0.00 0.00 38.248

Si 20.24 0.00 0.00 0.00 38.248

Si 20.15 0.00 0.00 0.00 38.077

Si 20.15 7,283.89 7,283.89 7,283.89 38.077


Si 20.15 0.00 0.00 0.00 38.077
Si 20.24 0.00 0.00 0.00 38.248
Si 20.24 -622.81 -622.81 -622.81 38.248

Si 20.24 0.00 0.00 0.00 38.248

Si 20.15 0.00 0.00 0.00 38.077


Si 20.15 4,336.91 4,336.91 4,336.91 38.077

Si 20.15 0.00 0.00 0.00 38.077

Si 20.15 2,499.75 2,499.75 2,499.75 38.077


Si 20.15 0.00 0.00 0.00 38.077

Si 20.15 0.00 0.00 0.00 38.077


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.27 2,350.62 2,350.62 2,350.62 38.306


No 20.22 4,470.64 4,470.64 4,470.64 38.210
No 20.15 419.47 419.47 419.47 38.077
No 20.15 948.99 948.99 948.99 38.077
No 20.15 1,203.34 1,203.34 1,203.34 38.077
No 20.15 0.00 0.00 0.00 38.077
No 20.15 0.00 0.00 0.00 38.077
No 20.50 928.36 928.36 928.36 38.736
Si 20.61 4.97 4.97 4.97 38.953
Si 20.15 76.71 76.71 76.71 38.077
Si 20.15 1,737.67 1,737.67 1,737.67 38.077

Si 20.15 0.00 0.00 0.00 38.077

Si 20.15 20.86 20.86 20.86 38.077


Si 20.50 308.14 308.14 308.14 38.736
Si 20.50 - 0.15 - 0.15 - 0.15 38.736
Si 20.15 - - - 38.077
Si 20.15 3,291.76 3,291.76 3,291.76 38.077
Si 20.50 293.48 293.48 293.48 38.736

Si 20.15 0.00 0.00 0.00 38.077

Si 20.15 10,946.29 10,946.29 10,946.29 38.077


Si 20.15 377.02 377.02 377.02 38.077
Si 20.15 1,940.94 1,940.94 1,940.94 38.077
Si 20.15 288.20 288.20 288.20 38.077

Si 20.15 0.00 0.00 0.00 38.077

Si 20.50 910.77 910.77 910.77 38.736


No 20.15 999.65 999.65 999.65 38.077
No 20.63 6,923.73 6,923.73 6,923.73 38.983
No 20.15 547.46 547.46 547.46 38.077
Si 20.15 96.75 96.75 96.75 38.077
Si 20.54 1,512.17 1,512.17 1,512.17 38.816
Si 20.54 0.62 0.62 0.62 38.816
Si 20.15 597.12 597.12 597.12 38.077
Si 20.15 0.03 0.03 0.03 38.077
Si 20.56 138.14 138.14 138.14 38.858
Si 20.56 0.59 0.59 0.59 38.858
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 193.53 193.53 193.53 38.077


Si 20.15 0.13 0.13 0.13 38.077
Si 20.15 0.78 0.78 0.78 38.077
Si 20.15 602.84 602.84 602.84 38.077
Si 20.64 0.14 0.14 0.14 38.995
Si 20.15 657.60 657.60 657.60 38.077
Si 20.15 1.55 1.55 1.55 38.077
Si 20.54 0.00 0.00 0.00 38.816
Si 20.54 598.44 598.44 598.44 38.816
No 20.50 1,910.80 1,910.80 1,910.80 38.736
Si 20.15 59,955.37 59,955.37 59,955.37 35.596
Si 20.15 28,565.84 28,565.84 28,565.84 35.596
Si 20.24 - 111.84 - 111.84 - 111.84 35.756
Si 20.15 19,002.36 19,002.36 19,002.36 35.596
Si 20.15 11,120.83 11,120.83 11,120.83 35.596
Si 20.24 4,231.05 4,231.05 4,231.05 35.756
Si 20.24 2,334.00 2,334.00 2,334.00 35.756
Si 20.24 4,113.02 4,113.02 4,113.02 35.756
Si 20.15 35,194.40 35,194.40 35,194.40 35.596
No 20.15 0.00 0.00 0.00 35.596
No 20.15 0.00 0.00 0.00 35.596
No 20.24 0.00 0.00 0.00 35.756
No 20.15 0.00 0.00 0.00 35.596
No 20.15 0.00 0.00 0.00 35.596
No 20.24 0.00 0.00 0.00 35.756
No 20.24 0.00 0.00 0.00 35.756
No 20.24 0.00 0.00 0.00 35.756
No 20.15 0.00 0.00 0.00 35.596
Si 20.15 14,826.78 14,826.78 14,826.78 35.596
Si 20.15 83,618.59 83,618.59 83,618.59 35.596
Si 20.15 13,274.01 13,274.01 13,274.01 35.596
Si 20.61 37.99 37.99 37.99 36.415
Si 20.50 2,353.87 2,353.87 2,353.87 36.212
Si 20.50 - 1.11 - 1.11 - 1.11 36.212
Si 20.50 6,957.33 6,957.33 6,957.33 36.212
Si 20.50 2,241.91 2,241.91 2,241.91 36.212
Si 20.15 25,145.73 25,145.73 25,145.73 35.596
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 1,708.78 1,708.78 1,708.78 35.596


Si 20.15 2,235.37 2,235.37 2,235.37 35.596
Si 20.15 123.69 123.69 123.69 35.596
Si 20.15 - - - 35.596

Si 20.15 0.00 0.00 0.00 35.596

Si 20.15 0.00 0.00 0.00 35.596

Si 20.15 2,969.18 2,969.18 2,969.18 35.596


Si 20.15 300.00 300.00 300.00 35.596
Si 20.15 7,700.00 7,700.00 7,700.00 35.596
Si 20.69 4,670.17 4,670.17 4,670.17 36.546
Si 20.69 3,294.67 3,294.67 3,294.67 36.546
Si 20.36 602.98 602.98 602.98 35.966
Si 20.36 700.98 700.98 700.98 35.966
Si 20.69 385.92 385.92 385.92 36.546
Si 20.69 696.91 696.91 696.91 36.546
Si 20.36 1,310.58 1,310.58 1,310.58 35.966
Si 20.69 275.67 275.67 275.67 36.546
Si 20.69 371.58 371.58 371.58 36.546
Si 20.28 2,456.10 2,456.10 2,456.10 35.827
Si 20.36 1,145.97 1,145.97 1,145.97 35.966
Si 20.69 239.46 239.46 239.46 36.546
Si 20.15 3,110.88 3,110.88 3,110.88 35.596

Si 20.15 0.00 0.00 0.00 35.596

No 20.69 0.00 0.00 0.00 36.546


Si 20.21 18,980.90 18,980.90 18,980.90 35.706
Si 20.62 1,585.92 1,585.92 1,585.92 36.433
Si 20.62 1,836.01 1,836.01 1,836.01 36.433
Si 20.21 3,521.56 3,521.56 3,521.56 35.706
Si 20.62 459.16 459.16 459.16 36.433
Si 20.62 294.40 294.40 294.40 36.433
Si 20.57 815.18 815.18 815.18 36.329
No 20.21 25.92 25.92 25.92 35.706
Si 20.56 376.00 376.00 376.00 36.324
Si 20.15 608.78 608.78 608.78 35.596
Si 20.54 10,295.97 10,295.97 10,295.97 36.287
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.56 1,000.00 1,000.00 1,000.00 35.713


Si 20.15 1,344.38 1,344.38 1,344.38 35.596
Si 20.15 4,191.37 4,191.37 4,191.37 35.596
Si 20.63 2.67 2.67 2.67 36.454
Si 20.54 4,322.57 4,322.57 4,322.57 35.774
Si 20.15 5,531.27 5,531.27 5,531.27 35.596
Si 20.15 4,297.71 4,297.71 4,297.71 35.596
Si 20.56 8.99 8.99 8.99 35.596
Si 20.54 0.00 0.00 0.00 35.774
Si 20.15 0.75 0.75 0.75 35.596
Si 20.15 4.53 4.53 4.53 35.596
Si 20.54 3.57 3.57 3.57 36.287
Si 20.56 3.42 3.42 3.42 35.713
Si 20.54 0.15 0.15 0.15 35.596
Si 20.25 179.66 179.66 179.66 35.774
Si 20.15 1,485.14 1,485.14 1,485.14 35.596
Si 20.15 1,897.59 1,897.59 1,897.59 35.596
Si 20.27 35.43 35.43 35.43 35.799
Si 20.27 1.44 1.44 1.44 35.799
Si 20.40 217.85 217.85 217.85 36.027
Si 20.40 223.59 223.59 223.59 36.027
Si 20.15 6,204.57 6,204.57 6,204.57 35.596
Si 20.15 0.41 0.41 0.41 35.596
No 20.25 35.774
No 20.15 35.596
No 20.15 35.596
No 20.27 35.799
No 20.27 35.799
No 20.40 36.027
No 20.40 36.027
No 20.15 1,943.58 1,943.58 1,943.58 35.596
Si 20.15 177.81 177.81 177.81 35.596
Si 20.32 370.75 370.75 370.75 35.888
Si 20.61 31.47 31.47 31.47 36.400
Si 20.22 794.30 794.30 794.30 35.721
Si 20.32 5,190.38 5,190.38 5,190.38 35.888
Si 20.61 1,016.90 1,016.90 1,016.90 36.400
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.61 24.64 24.64 24.64 36.400


Si 20.61 0.00 0.00 0.00 36.400
Si 20.15 2,593.99 2,593.99 2,593.99 35.596
Si 20.22 0.50 0.50 0.50 35.721
Si 20.61 24.50 24.50 24.50 36.400
Si 20.15 1,972.45 1,972.45 1,972.45 35.596
Si 20.44 136.45 136.45 136.45 36.101
Si 20.32 570.78 570.78 570.78 35.888
Si 20.27 129.02 129.02 129.02 35.806
Si 20.61 0.00 0.00 0.00 35.596
Si 20.15 233.62 233.62 233.62 35.596
Si 20.15 206.41 206.41 206.41 35.596
Si 20.85 1,047.23 1,047.23 1,047.23 36.824
Si 20.15 553.87 553.87 553.87 35.596
Si 20.15 730.12 730.12 730.12 35.596
Si 20.75 1,554.19 1,554.19 1,554.19 36.653
Si 20.85 0.04 0.04 0.04 36.824
Si 20.25 115.29 115.29 115.29 35.774
Si 20.25 3,058.22 3,058.22 3,058.22 35.774
Si 20.85 230.78 230.78 230.78 36.824
Si 20.25 172.67 172.67 172.67 35.774
Si 20.85 257.93 257.93 257.93 36.824
Si 20.85 463.74 463.74 463.74 36.824
Si 20.85 105.92 105.92 105.92 36.824
Si 20.85 923.78 923.78 923.78 36.824
Si 20.85 374.69 374.69 374.69 36.824
Si 20.25 167.85 167.85 167.85 35.774
Si 20.15 21.68 21.68 21.68 35.596
Si 20.15 9.37 9.37 9.37 35.596
Si 20.22 8,883.52 8,883.52 8,883.52 35.717
Si 20.15 502.64 502.64 502.64 35.596
Si 20.22 472.21 472.21 472.21 35.721
Si 20.24 699.47 699.47 699.47 35.763
Si 20.24 74.10 74.10 74.10 35.763
Si 20.28 887.34 887.34 887.34 35.820
Si 20.28 0.00 0.00 0.00 35.820
Si 20.24 335.88 335.88 335.88 35.763
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.24 113.64 113.64 113.64 35.763


Si 20.28 43.40 43.40 43.40 35.820
Si 20.28 44.15 44.15 44.15 35.820
Si 20.28 22.95 22.95 22.95 35.820

No 20.15 104,563.55 104,563.55 104,563.55 35.596

No 20.35 2,111.20 2,111.20 2,111.20 35.596

No 20.15 18,978.48 18,978.48 18,978.48 35.596

No 20.15 0.00 0.00 0.00 35.596

No 20.15 55,167.72 55,167.72 55,167.72 35.596

No 20.15 59,937.90 59,937.90 59,937.90 35.596

No 20.15 54,128.70 54,128.70 54,128.70 35.596

No 20.15 3,370.94 3,370.94 3,370.94 35.596


No 20.15 5,951.93 5,824.38 5,824.38 35.596
No 20.15 31.94 31.83 31.83 35.596
No 20.64 1,556.60 1,519.52 1,519.52 35.596
No 20.15 104.83 104.83 104.83 35.596

No 20.15 1,636.68 1,619.83 1,619.83 35.596

No 20.15 8,293.63 8,208.27 8,208.27 35.596

No 20.15 12,131.05 12,012.13 12,012.13 35.596

No 20.15 2,360.47 2,282.41 2,282.41 35.596

No 20.15 6,846.82 6,583.48 6,583.48 35.596

No 20.15 4,681.89 4,501.82 4,501.82 35.596

No 20.15 1,263.29 1,214.70 1,214.70 35.596

No 20.15 212.54 204.37 204.37 35.596

No 20.50 190.67 187.83 187.83 35.596


No 20.15 3,557.78 3,379.76 3,379.76 35.596
No 20.15 2,937.84 2,840.69 2,840.69 35.596
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 2,405.26 2,312.75 2,312.75 35.596


No 20.15 2,602.47 2,502.38 2,502.38 35.596
No 20.15 73.07 67.14 67.14 35.596
No 20.54 0.00 0.00 0.00 35.596
No 20.15 11,732.10 11,732.10 11,732.10 35.596
No 20.15 171.81 165.20 165.20 35.596
No 20.15 257.50 247.60 247.60 35.596
No 20.15 1,555.70 1,495.86 1,495.86 35.596
No 20.15 110.37 107.74 107.74 35.596
No 20.15 1,201.68 1,158.03 1,158.03 35.596
No 20.15 486.05 465.52 465.52 35.596
No 20.15 434.24 422.94 422.94 35.596
No 20.15 85.56 81.94 81.94 35.596

No 20.15 321.42 310.70 310.70 35.596

No 20.15 479.23 460.80 460.80 35.596

No 20.15 347.28 333.38 333.38 35.596

No 20.15 554.21 532.02 532.02 35.596

No 20.15 475.07 456.80 456.80 35.596

No 20.15 775.93 746.08 746.08 35.596


No 20.15 696.18 668.32 668.32 35.596
No 20.15 1,288.77 1,239.20 1,239.20 35.596
No 20.15 608.26 584.08 584.08 35.596
No 20.15 232.03 223.10 223.10 35.596
No 20.15 571.58 549.60 549.60 35.596

No 20.15 1,519.91 1,461.45 1,461.45 35.596

No 20.15 0.00 0.00 0.00 35.596


No 20.15 6,222.99 6,017.20 6,017.20 35.596
No 20.15 7,671.23 7,501.69 7,501.69 35.596
No 20.15 0.00 0.00 0.00 35.596

No 20.15 10.08 9.88 9.88 35.596

No 20.15 0.00 0.00 0.00 35.596


No 20.15 1,381.70 1,326.77 1,326.77 35.596
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 71.57 69.20 69.20 35.596


No 20.15 0.00 0.00 0.00 35.596
No 20.15 308.00 292.58 292.58 35.596
No 20.15 667.68 642.00 642.00 35.596
No 20.15 17,487.03 17,487.03 17,487.03 35.596
No 20.15 222.92 214.34 214.34 35.596
Si 20.15 0.00 0.00 0.00 35.596
Si 20.32 0.00 0.00 0.00 35.888
Si 20.61 0.00 0.00 0.00 36.400
Si 20.22 0.00 0.00 0.00 35.721
Si 20.32 0.00 0.00 0.00 35.888
Si 20.61 0.00 0.00 0.00 36.400
Si 20.61 0.00 0.00 0.00 36.400
Si 20.61 0.00 0.00 0.00 36.400
Si 20.15 0.00 0.00 0.00 35.596
Si 20.22 0.00 0.00 0.00 35.721
Si 20.61 0.00 0.00 0.00 36.400
Si 20.15 89.47 0.00 89.47 35.596
Si 20.44 11.71 0.00 11.71 36.101
Si 20.32 0.00 0.00 0.00 35.888
Si 20.27 0.00 0.00 0.00 35.806
Si 20.61 0.00 0.00 0.00 0.000
Si 20.15 35.596
Si 20.15 35.596
Si 20.85 36.824
Si 20.15 35.596
Si 20.15 35.596
Si 20.75 36.653
Si 20.85 36.824
Si 20.25 35.774
Si 20.25 35.774
Si 20.85 36.824
Si 20.25 35.774
Si 20.85 36.824
Si 20.85 36.824
Si 20.85 36.824
Si 20.85 36.824
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.85 36.824
Si 20.25 35.774
Si 20.15 35.596
Si 20.15 35.596
Si 20.22 2.50 2.50 2.50 35.717
Si 20.15 0.00 0.00 0.00 35.596
Si 20.22 0.00 0.00 0.00 35.721
Si 20.21 4.18 4.18 4.18 35.706
Si 20.62 0.00 0.00 0.00 36.433
Si 20.62 0.00 0.00 0.00 36.433
Si 20.21 0.00 0.00 0.00 35.706
Si 20.62 0.00 0.00 0.00 36.433
Si 20.62 0.00 0.00 0.00 36.433
Si 20.57 0.00 0.00 0.00 36.329
No 20.56 0.00 0.00 0.00 35.810
No 20.56 507.85 488.32 488.32 35.596
Si 20.15 1,183.52 1,183.52 1,183.52 37.837
Si 20.44 92.85 92.85 92.85 38.374
Si 20.32 3,160.24 3,160.24 3,160.24 38.147
Si 20.61 602.20 602.20 602.20 38.692
Si 20.15 1,571.63 1,571.63 1,571.63 37.837
Si 20.61 14.95 14.95 14.95 38.692
Si 20.22 0.36 0.36 0.36 37.969
Si 20.15 112.55 112.55 112.55 37.837
Si 20.32 334.95 334.95 334.95 38.147
Si 20.61 19.91 19.91 19.91 38.692
Si 20.27 76.24 76.24 76.24 38.060
Si 20.61 0.00 0.00 0.00 38.692
Si 20.61 15.51 15.51 15.51 38.692
Si 20.61 0.00 0.00 0.00 38.692
Si 20.32 369.54 369.54 369.54 38.147
Si 20.22 348.19 348.19 348.19 37.969
Si 20.22 5,733.16 5,733.16 5,733.16 37.965
Si 20.15 384.56 384.56 384.56 37.837
Si 20.22 205.86 205.86 205.86 37.969
Si 20.21 1,969.45 1,969.45 1,969.45 37.954
Si 20.62 211.00 211.00 211.00 38.726
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.62 278.31 278.31 278.31 38.726


Si 20.21 522.73 522.73 522.73 37.954
Si 20.62 77.99 77.99 77.99 38.726
Si 20.62 47.00 47.00 47.00 38.726
Si 20.57 124.37 124.37 124.37 38.616
Si 20.15 148.13 148.13 148.13 37.837
Si 20.15 129.22 129.22 129.22 37.837
Si 20.85 463.91 463.91 463.91 39.143
Si 20.15 356.18 356.18 356.18 37.837
Si 20.15 353.32 353.32 353.32 37.837
Si 20.75 968.25 968.25 968.25 38.961
Si 20.85 0.03 0.03 0.03 39.143
Si 20.25 71.36 71.36 71.36 38.026
Si 20.25 1,915.06 1,915.06 1,915.06 38.026
Si 20.85 146.69 146.69 146.69 39.143
Si 20.25 101.49 101.49 101.49 38.026
Si 20.85 156.75 156.75 156.75 39.143
Si 20.85 295.66 295.66 295.66 39.143
Si 20.85 64.48 64.48 64.48 39.143
Si 20.85 576.71 576.71 576.71 39.143
Si 20.85 227.69 227.69 227.69 39.143
Si 20.25 112.44 112.44 112.44 38.026
Si 20.15 16.85 16.85 16.85 37.837
Si 20.15 5.61 5.61 5.61 37.837
Si 20.22 227.00 227.00 227.00 37.962
Si 20.15 106,322.75 106,322.75 106,322.75 37.837
Si 20.15 18,852.56 18,852.56 18,852.56 37.837
Si 20.15 16,878.18 16,878.18 16,878.18 37.837
Si 20.50 8,846.39 8,846.39 8,846.39 38.492
Si 20.50 - 1.42 - 1.42 - 1.42 38.492
Si 20.50 2,850.64 2,850.64 2,850.64 38.492
Si 20.50 2,993.00 2,993.00 2,993.00 38.492
Si 20.61 48.31 48.31 48.31 38.707
SI 20.15 31,973.31 31,973.31 31,973.31 37.837
Si 20.15 5,838.00 5,838.00 5,838.00 37.837
Si 20.15 2,674.37 2,674.37 2,674.37 37.837
Si 20.24 105.89 105.89 105.89 38.007
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 1,830.31 1,830.31 1,830.31 37.837


Si 20.24 228.83 228.83 228.83 38.007
Si 20.24 378.17 378.17 378.17 38.007
Si 20.15 1,042.14 1,042.14 1,042.14 37.837
Si 20.15 3,299.72 3,299.72 3,299.72 37.837
Si 20.24 337.03 337.03 337.03 38.007
Si 20.85 413.04 413.04 413.04 39.143
Si 20.15 3,659.22 3,659.22 3,659.22 37.837
Si 20.15 10,500.47 10,500.47 10,500.47 37.837
Si 20.15 10,273.36 10,273.36 10,273.36 37.837
Si 20.15 4,706.19 4,706.19 4,706.19 37.837
Si 20.24 186.34 186.34 186.34 38.007
Si 20.15 3,220.86 3,220.86 3,220.86 37.837
Si 20.24 402.67 402.67 402.67 38.007
Si 20.24 665.47 665.47 665.47 38.007
Si 20.15 1,833.90 1,833.90 1,833.90 37.837
Si 20.15 5,806.66 5,806.66 5,806.66 37.837
Si 20.24 593.09 593.09 593.09 38.007
No 20.15 933.94 933.94 933.94 37.837
No 20.15 427.84 427.84 427.84 37.837
No 20.24 16.94 16.94 16.94 38.007
No 20.15 292.81 292.81 292.81 37.837
No 20.24 36.61 36.61 36.61 38.007
No 20.24 60.50 60.50 60.50 38.007
No 20.15 166.72 166.72 166.72 37.837
No 20.15 527.88 527.88 527.88 37.837
No 20.24 53.92 53.92 53.92 38.007
No 20.32 437.26 437.26 437.26 38.147
No 20.15 1.85 1.85 1.85 37.837
No 20.32 23.38 23.38 23.38 38.147
No 20.21 16,417.03 16,417.03 16,417.03 37.954
No 20.62 583.77 583.77 583.77 38.726
No 20.21 3,272.88 3,272.88 3,272.88 37.954
No 20.22 2,135.98 2,135.98 2,135.98 37.965
No 20.25 1,198.26 1,198.26 1,198.26 38.026
No 20.15 6,060.41 6,060.41 6,060.41 37.837
No 20.15 1,436.71 1,436.71 1,436.71 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 154.75 154.75 154.75 37.837


No 20.15 45.00 45.00 45.00 37.837
No 20.15 68.38 68.38 68.38 37.837
No 20.15 1,338.29 1,338.29 1,338.29 37.837
No 20.15 702.00 702.00 702.00 37.837

No 20.15 11.92 11.92 11.92 37.837

No 20.15 351.98 351.98 351.98 37.837

No 20.15 691.47 691.47 691.47 37.837


No 20.15 111.07 111.07 111.07 37.837
No 20.15 627.15 627.15 627.15 37.837
No 20.15 731.76 731.76 731.76 37.837
No 20.15 692.50 692.50 692.50 37.837
No 20.15 15.31 15.31 15.31 37.837
No 20.15 2,223.26 2,223.26 2,223.26 37.837
No 20.15 226.17 226.17 226.17 37.837
No 20.15 547.01 547.01 547.01 37.837
No 20.15 318.09 318.09 318.09 37.837
No 20.15 579.25 579.25 579.25 37.837
No 20.15 73.92 73.92 73.92 37.837
No 20.15 727.08 727.08 727.08 37.837
No 20.15 0.00 0.00 0.00 37.837
No 20.15 259.58 259.58 259.58 37.837
No 20.15 0.00 0.00 0.00 37.837
No 20.15 18.12 18.12 18.12 37.837
No 20.15 164.80 164.80 164.80 37.837
No 20.15 160.44 160.44 160.44 37.837

No 20.15 91.37 91.37 91.37 33.655

No 20.15 232.44 232.44 232.44 37.837

No 20.15 79.12 79.12 79.12 37.837

No 20.15 0.00 0.00 0.00 37.837


No 20.15 73.17 73.17 73.17 37.837
No 20.15 17,534.96 17,534.96 17,534.96 37.837
No 20.15 686.81 686.81 686.81 37.837
No 20.24 -58.72 -58.72 -58.72 38.007
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 5,460.63 5,460.63 5,460.63 37.837


No 20.24 507.73 507.73 507.73 38.007
No 20.24 851.03 851.03 851.03 38.007
No 20.15 3,147.44 3,147.44 3,147.44 37.837
No 20.15 780.20 780.20 780.20 37.837
No 20.24 1,089.91 1,089.91 1,089.91 38.007
No 20.15 413.93 413.93 413.93 37.837

Si 20.15 83.27 83.27 83.27 36.086

Si 20.15 39.67 39.67 39.67 36.086

Si 20.38 -0.16 -0.16 -0.16 36.086

Si 20.15 26.39 26.39 26.39 36.086

Si 20.15 15.45 15.45 15.45 36.086

Si 20.38 3.24 3.24 3.24 36.086

Si 20.38 5.88 5.88 5.88 36.086

Si 20.15 48.88 48.88 48.88 36.086

Si 20.38 5.71 5.71 5.71 36.086

Si 20.15 267.57 267.57 267.57 36.086

Si 20.15 1,509.03 1,509.03 1,509.03 36.086

Si 20.15 239.55 239.55 239.55 36.086

Si 20.15 453.79 453.79 453.79 36.086

Si 20.50 42.48 42.48 42.48 36.086

Si 20.50 - 0.02 - 0.02 - 0.02 36.086

Si 20.50 125.56 125.56 125.56 36.086

Si 20.50 40.46 40.46 40.46 36.086

Si 20.61 0.69 0.69 0.69 36.086


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 52.15 52.15 52.15 36.086

Si 20.15 108.63 108.63 108.63 36.086

Si 20.85 5.45 5.45 5.45 36.086

No 20.15 3,000.00 3,000.00 3,000.00 36.086

No 20.75 2,498.40 2,498.40 2,498.40 36.086

No 20.75 3,220.05 3,220.05 3,220.05 36.086

No 20.85 1,703.93 1,703.93 1,703.93 36.086

No 20.15 1,453.02 1,453.02 1,453.02 36.086

No 20.61 88.80 88.80 88.80 36.086

No 20.61 43.20 43.20 43.20 36.086

No 20.15 2,459.46 2,459.46 2,459.46 36.086

No 20.15 3,083.00 3,083.00 3,083.00 37.837

No 20.15 2,600.00 2,600.00 2,600.00 37.837


No 20.15 464.00 464.00 464.00 37.837

No 20.15 9,888.00 9,888.00 9,888.00 37.837

No 20.15 7,615.00 7,615.00 7,615.00 37.837

No 20.15 17,735.00 17,735.00 17,735.00 37.837

No 20.15 5,279.00 5,279.00 5,279.00 37.837

No 20.15 5,179.00 5,179.00 5,179.00 37.837


No 20.15 4,102.00 4,102.00 4,102.00 37.837
No 20.15 6,802.00 6,802.00 6,802.00 37.837
No 20.15 3,602.00 3,602.00 3,602.00 37.837

No 20.15 10,028.00 10,028.00 10,028.00 37.837

No 20.15 100,254.00 100,254.00 100,254.00 37.837


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 82,417.00 82,417.00 82,417.00 37.837

No 20.15 1,046.00 1,046.00 1,046.00 37.837


No 20.15 302.00 302.00 302.00 37.837
No 20.15 5,558.00 5,558.00 5,558.00 37.837

No 20.15 10,241.00 10,241.00 10,241.00 37.837

No 20.15 9,443.00 9,443.00 9,443.00 37.837

No 20.15 12,604.00 12,604.00 12,604.00 37.837

No 20.15 1,514.00 1,514.00 1,514.00 37.837


No 20.15 826.00 826.00 826.00 37.837
No 20.15 1,958.00 1,958.00 1,958.00 37.837

No 20.15 9,091.00 9,091.00 9,091.00 37.837

No 20.15 9,422.00 9,422.00 9,422.00 37.837

No 20.15 672.00 672.00 672.00 37.837


No 20.15 2,082.00 2,082.00 2,082.00 37.837
No 20.15 1,767.00 1,767.00 1,767.00 37.837

No 20.15 4,180.39 4,180.39 4,180.39 37.837

No 20.15 4,353.86 4,353.86 4,353.86 37.837


No 20.15 686.95 686.95 686.95 37.837
No 20.15 346.16 346.16 346.16 37.837
No 20.15 353.88 353.88 353.88 37.837

No 20.15 2,275.06 2,275.06 2,275.06 37.837

No 20.15 412.67 412.67 412.67 37.837


No 20.15 1,162.03 1,162.03 1,162.03 37.837
No 20.15 0.00 0.00 0.00 37.837

No 20.15 337.49 337.49 337.49 37.837

No 20.15 257.43 257.43 257.43 37.837

No 20.15 4,695.04 4,695.04 4,695.04 37.837

No 20.15 2,230.43 2,230.43 2,230.43 37.837


No 20.15 162.79 162.79 162.79 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 602.80 602.80 602.80 37.837

No 20.15 234.63 234.63 234.63 37.837

No 20.15 230.97 230.97 230.97 37.837

No 20.15 188.93 188.93 188.93 37.837

No 20.15 829.96 829.96 829.96 37.837

No 20.15 572.69 572.69 572.69 37.837


No 20.15 411.76 411.76 411.76 37.837
No 20.15 121.49 121.49 121.49 37.837

No 20.15 489.31 489.31 489.31 37.837

No 20.15 220.31 220.31 220.31 37.837

No 20.15 431.39 431.39 431.39 37.837


No 20.15 237.51 237.51 237.51 37.837
No 20.15 135.50 135.50 135.50 37.837

No 20.15 0.00 0.00 0.00 37.837

No 20.15 0.00 0.00 0.00 37.837

No 20.15 3,525.41 3,525.41 3,525.41 37.837

No 20.15 321.17 321.17 321.17 37.837

No 20.15 1,250.98 1,250.98 1,250.98 37.837


No 20.15 103.55 103.55 103.55 37.837

No 20.15 225.72 225.72 225.72 37.837

No 20.15 746.27 746.27 746.27 37.837


No 20.15 354.48 354.48 354.48 37.837
No 20.15 1,178.87 1,178.87 1,178.87 37.837
No 20.15 94.99 94.99 94.99 37.837

No 20.15 365.81 365.81 365.81 37.837

No 20.15 243.01 243.01 243.01 37.837

No 20.15 330.86 330.86 330.86 37.837


No 20.15 177.56 177.56 177.56 37.837

No 20.15 320.98 320.98 320.98 37.837


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 806.10 806.10 806.10 37.837


No 20.15 242.56 242.56 242.56 37.837
No 20.15 272.53 272.53 272.53 37.837

No 20.15 247.11 247.11 247.11 37.837

No 20.15 734.49 734.49 734.49 37.837


No 20.15 415.44 415.44 415.44 37.837

No 20.15 420.43 420.43 420.43 37.837

No 20.15 782.21 782.21 782.21 37.837


No 20.15 404.96 404.96 404.96 37.837

No 20.15 423.31 423.31 423.31 37.837

No 20.15 436.25 436.25 436.25 37.837

Si 20.61 34.99 34.99 34.99 38.707


Si 20.15 23,158.80 23,158.80 23,158.80 37.837
Si 20.15 12,225.15 12,225.15 12,225.15 37.837
Si 20.15 117.57 117.57 117.57 37.837
Si 20.50 2,167.88 2,167.88 2,167.88 38.491
Si 20.50 -1.03 -1.03 -1.03 38.491
Si 20.50 6,407.59 6,407.59 6,407.59 38.491
Si 20.50 2,064.76 2,064.76 2,064.76 38.491
Si 20.15 77,011.34 77,011.34 77,011.34 37.837
Si 20.15 2,124.68 2,124.68 2,124.68 37.837
Si 20.15 13,655.22 13,655.22 13,655.22 37.837
Si 20.15 1,624.16 1,624.16 1,624.16 37.837

Si 20.15 0.00 0.00 0.00 37.837

Si 20.15 0.00 0.00 0.00 37.837

Si 20.15 0.00 0.00 0.00 37.837

Si 20.15 3,065.29 3,065.29 3,065.29 37.837


Si 20.32 1,061.32 1,061.32 1,061.32 38.147
Si 20.61 42.95 42.95 42.95 38.692
Si 20.15 4,513.73 4,513.73 4,513.73 37.837
Si 20.22 1.04 1.04 1.04 37.969
Si 20.44 266.66 266.66 266.66 38.374
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 3,399.07 3,399.07 3,399.07 37.837


Si 20.61 57.18 57.18 57.18 38.692
Si 20.15 323.24 323.24 323.24 37.837
Si 20.32 961.97 961.97 961.97 38.147

Si 20.27 218.97 218.97 218.97 38.060

Si 20.61 44.54 44.54 44.54 38.692


Si 20.61 1,729.53 1,729.53 1,729.53 38.692
Si 20.32 9,076.21 9,076.21 9,076.21 38.147
Si 20.22 999.99 999.99 999.99 37.969
Si 20.15 71,406.47 71,406.47 71,406.47 37.837
Si 20.24 5,039.16 5,039.16 5,039.16 38.007
Si 20.24 2,779.78 2,779.78 2,779.78 38.007
Si 20.15 34,021.73 34,021.73 34,021.73 37.837
Si 20.24 -133.20 -133.20 -133.20 38.007
Si 20.15 22,631.70 22,631.70 22,631.70 37.837
Si 20.15 13,244.84 13,244.84 13,244.84 37.837
Si 20.15 41,916.31 41,916.31 41,916.31 37.837
Si 20.24 4,898.58 4,898.58 4,898.58 38.007
Si 20.26 1.10 1.10 1.10 38.053
Si 20.26 27.01 27.01 27.01 38.053
Si 20.15 1,452.04 1,452.04 1,452.04 37.837
Si 20.15 1,194.59 1,194.59 1,194.59 37.837
Si 20.39 155.39 155.39 155.39 38.295
Si 20.25 141.84 141.84 141.84 38.026
Si 20.15 5,053.05 5,053.05 5,053.05 37.837
Si 20.39 176.22 176.22 176.22 38.295
Si 20.15 0.31 0.31 0.31 37.837
Si 20.69 3,870.14 3,870.14 3,870.14 38.847
Si 20.69 2,802.27 2,802.27 2,802.27 38.847
Si 20.36 487.75 487.75 487.75 38.230
Si 20.36 346.25 346.25 346.25 38.230
Si 20.69 329.48 329.48 329.48 38.847
Si 20.69 615.04 615.04 615.04 38.847
Si 20.36 1,059.08 1,059.08 1,059.08 38.230
Si 20.69 176.58 176.58 176.58 38.847
Si 20.69 283.29 283.29 283.29 38.847
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.28 1,815.31 1,815.31 1,815.31 38.083


Si 20.36 941.98 941.98 941.98 38.230
Si 20.69 205.75 205.75 205.75 38.847
Si 20.15 2,150.46 2,150.46 2,150.46 37.837
Si 20.15 629.49 629.49 629.49 37.837
Si 20.54 9,838.38 9,838.38 9,838.38 38.571
Si 20.54 3.21 3.21 3.21 38.571
Si 20.56 898.76 898.76 898.76 38.613
Si 20.56 2.44 2.44 2.44 38.613
Si 20.15 1,259.12 1,259.12 1,259.12 37.837
Si 20.15 0.76 0.76 0.76 37.837
Si 20.15 3,922.13 3,922.13 3,922.13 37.837
Si 20.15 3.86 3.86 3.86 37.837
Si 20.64 0.93 0.93 0.93 38.749
Si 20.19 3,884.93 3,884.93 3,884.93 37.916
Si 20.19 0.13 0.13 0.13 37.916
Si 20.15 4,278.44 4,278.44 4,278.44 37.837
Si 20.15 8.81 8.81 8.81 37.837
Si 20.54 3,893.51 3,893.51 3,893.51 38.571
Si 20.54 0.00 0.00 0.00 38.571
No 20.15 0.00 0.00 0.00 37.837
No 20.54 1,301.25 1,301.25 1,301.25 38.571
No 20.56 986.41 986.41 986.41 38.613
No 20.15 307.45 307.45 307.45 37.837
No 20.15 1,563.79 1,563.79 1,563.79 37.837
No 20.64 0.00 0.00 0.00 38.749
No 20.15 50.82 50.82 50.82 37.916
No 20.15 3,567.07 3,567.07 3,567.07 37.837
No 20.54 0.00 0.00 0.00 38.571
No 20.15 38,641.65 38,641.65 38,641.65 37.837
No 20.24 747.45 747.45 747.45 38.007
No 20.24 412.32 412.32 412.32 38.007
No 20.15 7,261.54 7,261.54 7,261.54 37.837
No 20.24 -28.43 -28.43 -28.43 38.007
No 20.15 12,247.15 12,247.15 12,247.15 37.837
No 20.15 7,167.45 7,167.45 7,167.45 37.837
No 20.15 8,946.54 8,946.54 8,946.54 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.24 2,650.88 2,650.88 2,650.88 38.007


No 20.15 172.00 172.00 172.00 37.837

No 20.15 18,985.85 18,985.85 18,985.85 37.837

No 20.15 5,330.93 5,330.93 5,330.93 37.844

No 20.15 1,607.62 1,607.62 1,607.62 37.844

No 20.15 20,385.37 20,385.37 20,385.37 37.844

No 20.15 11,999.64 11,999.64 11,999.64 37.844

No 20.15 1,289.18 1,289.18 1,289.18 37.844

No 20.15 33,333.93 33,333.93 33,333.93 37.837

No 20.15 1,265.72 1,265.72 1,265.72 37.837


No 20.15 355.40 355.40 355.40 37.844
No 20.15 107.17 107.17 107.17 37.844
No 20.15 1,359.02 1,359.02 1,359.02 37.844
No 20.15 799.98 799.98 799.98 37.844
No 20.15 85.95 85.95 85.95 37.844
No 20.15 2,222.26 2,222.26 2,222.26 37.837
Si 20.15 8,367.77 8,367.77 8,367.77 37.837
Si 20.15 723.14 723.14 723.14 37.837
Si 20.24 450.46 450.46 450.46 38.015
Si 20.24 2,300.23 2,300.23 2,300.23 38.015
Si 20.28 2,934.45 2,934.45 2,934.45 38.075
Si 20.28 1,239.67 1,239.67 1,239.67 38.075
Si 20.28 67.82 67.82 67.82 38.075
Si 20.24 960.48 960.48 960.48 38.015
Si 20.24 244.53 244.53 244.53 38.015
Si 20.28 150.34 150.34 150.34 38.075
Si 20.28 136.87 136.87 136.87 38.075
Si 20.54 1,135.57 1,135.57 1,135.57 38.571
Si 20.54 2,869.42 2,869.42 2,869.42 38.571
Si 20.64 0.27 0.27 0.27 38.749
Si 20.15 183.60 183.60 183.60 37.837
Si 20.15 1,143.91 1,143.91 1,143.91 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 367.23 367.23 367.23 37.837


Si 20.56 262.13 262.13 262.13 38.613
Si 20.15 1,247.83 1,247.83 1,247.83 37.837
Si 20.19 1,133.06 1,133.06 1,133.06 37.916
Si 20.69 136.10 136.10 136.10 38.847
Si 20.36 650.68 650.68 650.68 38.230
Si 20.36 756.22 756.22 756.22 38.230
Si 20.69 161.79 161.79 161.79 38.847
Si 20.69 209.53 209.53 209.53 38.847
Si 20.28 1,378.84 1,378.84 1,378.84 38.083
Si 20.69 2,722.29 2,722.29 2,722.29 38.847
Si 20.36 359.31 359.31 359.31 38.230
Si 20.69 227.61 227.61 227.61 38.847
Si 20.36 345.93 345.93 345.93 38.230
Si 20.69 1,900.56 1,900.56 1,900.56 38.847
Si 20.69 417.29 417.29 417.29 38.847
Si 20.15 1,671.22 1,671.22 1,671.22 37.837
Si 20.15 4,749.69 4,749.69 4,749.69 37.837
Si 20.44 372.61 372.61 372.61 38.374
Si 20.32 12,682.64 12,682.64 12,682.64 38.147
Si 20.61 2,416.75 2,416.75 2,416.75 38.692
Si 20.15 6,307.26 6,307.26 6,307.26 37.837
Si 20.61 60.01 60.01 60.01 38.692
Si 20.22 1.45 1.45 1.45 37.969
Si 20.15 451.69 451.69 451.69 37.837
Si 20.32 1,344.20 1,344.20 1,344.20 38.147
Si 20.61 79.90 79.90 79.90 38.692
Si 20.27 305.98 305.98 305.98 38.060
Si 20.32 1,483.04 1,483.04 1,483.04 38.147
Si 20.61 62.24 62.24 62.24 38.692
Si 20.22 1,397.34 1,397.34 1,397.34 37.969
Si 20.62 232.26 232.26 232.26 38.726
Si 20.62 385.37 385.37 385.37 38.726
Si 20.57 614.59 614.59 614.59 38.616
Si 20.21 2,583.12 2,583.12 2,583.12 37.954
Si 20.62 1,375.29 1,375.29 1,375.29 38.726
Si 20.21 11,189.54 11,189.54 11,189.54 37.954
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.62 1,198.81 1,198.81 1,198.81 38.726


Si 20.62 18.07 18.07 18.07 38.726
Si 20.25 4,325.48 4,325.48 4,325.48 38.026
Si 20.85 338.83 338.83 338.83 39.142
Si 20.25 229.57 229.57 229.57 38.026
Si 20.85 399.68 399.68 399.68 39.142
Si 20.85 1,299.86 1,299.86 1,299.86 39.142
Si 20.85 517.63 517.63 517.63 39.142
Si 20.85 639.57 639.57 639.57 39.142
Si 20.85 153.32 153.32 153.32 39.142
Si 20.25 239.84 239.84 239.84 38.026
Si 20.15 342.40 342.40 342.40 37.837
Si 20.15 296.69 296.69 296.69 37.837
Si 20.85 1,043.67 1,043.67 1,043.67 39.142
Si 20.15 813.87 813.87 813.87 37.837
Si 20.15 1,058.22 1,058.22 1,058.22 37.837
Si 20.75 2,167.06 2,167.06 2,167.06 38.961
Si 20.85 0.06 0.06 0.06 39.142
Si 20.25 162.09 162.09 162.09 38.026
Si 20.15 7.28 7.28 7.28 37.837
Si 20.15 14.47 14.47 14.47 37.837
Si 20.15 4,384.62 4,384.62 4,384.62 37.837
Si 20.15 7,529.61 7,529.61 7,529.61 37.837
Si 20.24 531.36 531.36 531.36 38.007
Si 20.24 293.12 293.12 293.12 38.007
Si 20.15 3,587.49 3,587.49 3,587.49 37.837
Si 20.24 0.00 0.00 0.00 38.007
Si 20.15 2,386.45 2,386.45 2,386.45 37.837
Si 20.15 1,396.63 1,396.63 1,396.63 37.837
Si 20.15 4,419.95 4,419.95 4,419.95 37.837
Si 20.24 516.54 516.54 516.540 38.007

Si 20.15 5,362.00 5,362.00 5,362.00 37.837

Si 20.75 2,123.18 2,123.18 2,123.18 38.961

Si 20.75 190.88 190.88 190.88 38.961


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.75 1,752.70 1,752.70 1,752.70 38.961

Si 20.85 1,002.01 1,002.01 1,002.01 39.142

Si 20.85 1,318.56 1,318.56 1,318.56 39.142

Si 20.85 313.36 313.36 313.36 39.142

Si 20.85 198.25 198.25 198.25 39.142

Si 20.75 1,502.92 1,502.92 1,502.92 38.961

Si 20.15 2,341.93 2,341.93 2,341.93 37.837

Si 20.22 78.43 78.43 78.43 37.969


Si 20.15 146.51 146.51 146.51 37.837
Si 20.22 2,184.15 2,184.15 2,184.15 37.966
Si 20.22 24.86 24.86 24.86 37.962
Si 20.50 317.75 317.75 317.75 38.491
Si 20.56 837.77 837.77 837.77 38.613
Si 20.64 90.05 90.05 90.05 38.760
Si 20.22 117.91 117.91 117.91 37.962
Si 20.24 81.07 81.07 81.07 38.007
Si 20.24 184.38 184.38 184.38 38.007
Si 20.15 19.66 19.66 19.66 37.837
Si 20.15 186.04 186.04 186.04 37.837
No 20.15 3,381.00 3,381.00 3,381.00 37.837
Si 20.61 4.60 4.60 4.60 38.707
Si 20.15 3,044.67 3,044.67 3,044.67 37.837
Si 20.15 1,607.23 1,607.23 1,607.23 37.837
Si 20.50 285.01 285.01 285.01 38.491
Si 20.50 0.00 0.00 0.00 38.491
Si 20.50 842.40 842.40 842.40 38.491
Si 20.50 271.45 271.45 271.45 38.491
Si 20.15 10,124.61 10,124.61 10,124.61 37.837
Si 20.15 1,795.24 1,795.24 1,795.24 37.837

Si 20.58 15,419.56 15,419.56 15,419.56 38.639

No 20.96 49.01 49.01 49.01 39.350


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.96 140.16 140.16 140.16 39.350

No 20.96 2,034.21 2,034.21 2,034.21 39.350


No 20.96 570.80 570.80 570.80 39.350
No 20.96 550.80 550.80 550.80 39.350
No 20.96 1,864.81 1,864.81 1,864.81 39.350
No 20.96 260.00 260.00 260.00 39.350
No 20.96 399.60 399.60 399.60 39.350
No 20.96 359.70 359.70 359.70 39.350
No 20.96 622.42 622.42 622.42 39.350
No 20.96 0.00 0.00 0.00 39.350
No 20.96 145.80 145.80 145.80 39.350
No 20.96 2,209.57 2,209.57 2,209.57 39.350
No 20.96 84.50 84.50 84.50 39.350
No 20.96 1,908.48 1,908.48 1,908.48 39.350
No 20.96 466.24 466.24 466.24 39.350
No 20.96 370.80 370.80 370.80 39.350
No 20.96 842.40 842.40 842.40 39.350
No 20.96 423.20 423.20 423.20 39.350
No 20.96 64.58 64.58 64.58 39.350
No 20.96 196.40 196.40 196.40 39.350
No 20.96 138.77 138.77 138.77 39.350
No 20.96 674.40 674.40 674.40 39.350
No 20.96 253.68 253.68 253.68 39.350
No 20.96 113.40 113.40 113.40 39.350
No 20.96 102.20 102.20 102.20 39.350
No 20.96 104.40 104.40 104.40 39.350
No 20.96 186.24 186.24 186.24 39.350
No 20.96 166.80 166.80 166.80 39.350
No 20.96 109.08 109.08 109.08 39.350
No 20.96 144.60 144.60 144.60 39.350

No 20.96 341.40 341.40 341.40 39.350

No 20.96 10.60 10.60 10.60 39.350

No 20.96 66.78 66.78 66.78 39.350

No 20.96 871.80 871.80 871.80 39.350


No 20.96 459.80 459.80 459.80 39.350
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.96 1,022.86 1,022.86 1,022.86 39.350


No 20.96 145.80 145.80 145.80 39.350
No 20.96 398.60 398.60 398.60 39.350
No 20.96 883.48 883.48 883.48 39.350
No 20.96 81.96 81.96 81.96 39.350
No 20.96 2,030.83 2,030.83 2,030.83 39.350
No 20.96 192.00 192.00 192.00 39.350
No 20.96 103.44 103.44 103.44 39.350
No 20.96 107.70 107.70 107.70 39.350
No 20.96 82.16 82.16 82.16 39.350
No 20.96 152.00 152.00 152.00 39.350
No 20.96 208.44 208.44 208.44 39.350

No 20.96 190.44 190.44 190.44 39.350

No 20.96 311.20 311.20 311.20 39.350

No 20.96 817.53 817.53 817.53 39.350


No 20.96 570.80 570.80 570.80 39.350

No 20.96 76.94 76.94 76.94 39.350

No 20.96 440.00 440.00 440.00 39.350


No 20.96 1,495.37 1,495.37 1,495.37 39.350
No 20.96 174.50 174.50 174.50 39.350
No 20.96 724.56 724.56 724.56 39.350
No 20.96 10.80 10.80 10.80 39.350
No 20.96 1,387.52 1,387.52 1,387.52 39.350
No 20.96 60.20 60.20 60.20 39.350
No 20.96 2.60 2.60 2.60 39.350
No 20.96 11.60 11.60 11.60 39.350

No 20.96 362.40 362.40 362.40 39.350

No 20.96 354.00 354.00 354.00 39.350


No 20.96 940.24 940.24 940.24 39.350
No 20.96 637.54 637.54 637.54 39.350
No 20.96 1,572.77 1,572.77 1,572.77 39.350
No 20.96 123.66 123.66 123.66 39.350
No 20.96 279.47 279.47 279.47 39.350
No 20.96 513.16 513.16 513.16 39.350
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.96 329.76 329.76 329.76 39.350


No 20.96 1,758.72 1,758.72 1,758.72 39.350
No 20.96 187.80 187.80 187.80 39.350

No 20.96 311.20 311.20 311.20 39.350

No 20.96 684.71 684.71 684.71 39.350

No 20.96 175.60 175.60 175.60 39.350

No 20.96 943.94 943.94 943.94 39.350


No 20.96 173.00 173.00 173.00 39.350
No 20.96 300.91 300.91 300.91 39.350
No 20.96 692.77 692.77 692.77 39.350
No 20.96 1,355.73 1,355.73 1,355.73 39.350
No 20.96 369.61 369.61 369.61 39.350
No 20.96 689.60 689.60 689.60 39.350
No 20.96 886.40 886.40 886.40 39.350
No 20.96 822.40 822.40 822.40 39.350
No 20.96 64.58 64.58 64.58 39.350
No 20.96 2,351.96 2,351.96 2,351.96 39.350
No 20.96 1,020.88 1,020.88 1,020.88 39.350
No 20.96 2,657.14 2,657.14 2,657.14 39.350
No 20.96 395.85 395.85 395.85 39.350
No 20.96 169.44 169.44 169.44 39.350
No 20.96 177.20 177.20 177.20 39.350
No 20.96 39.72 39.72 39.72 39.350
No 20.96 191.40 191.40 191.40 39.350
No 20.96 2,903.71 2,903.71 2,903.71 39.350

No 20.96 259.69 259.69 259.69 39.350

No 20.96 38.00 38.00 38.00 39.350

No 20.96 149.60 149.60 149.60 39.350

No 20.96 218.20 218.20 218.20 39.350

No 20.96 16.00 16.00 16.00 39.350


No 20.96 363.00 363.00 363.00 39.350
No 20.96 265.60 265.60 265.60 39.350
No 20.96 691.12 691.12 691.12 39.350
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.96 278.80 278.80 278.80 39.350


No 20.96 372.40 372.40 372.40 39.350
No 20.96 371.60 371.60 371.60 39.350
No 20.96 2,523.74 2,523.74 2,523.74 39.350
No 20.96 103.20 103.20 103.20 39.350
No 20.96 1,882.38 1,882.38 1,882.38 39.350
No 20.96 452.00 452.00 452.00 39.350
No 20.96 127.60 127.60 127.60 39.350

No 20.96 114.04 114.04 114.04 39.350

No 20.96 160.00 160.00 160.00 39.350

No 20.96 417.24 417.24 417.24 39.350


No 20.96 348.80 348.80 348.80 39.350

No 20.96 166.25 166.25 166.25 39.350

No 20.96 141.48 141.48 141.48 39.350

No 20.96 200.60 200.60 200.60 39.350


No 20.96 481.00 481.00 481.00 39.350
No 20.96 528.20 528.20 528.20 39.350
No 20.96 1,079.20 1,079.20 1,079.20 39.350
No 20.96 592.19 592.19 592.19 39.350
No 20.96 694.80 694.80 694.80 39.350
No 20.96 907.20 907.20 907.20 39.350
No 20.96 564.71 564.71 564.71 39.350

No 20.96 134.80 134.80 134.80 39.350

No 20.96 86.20 86.20 86.20 39.350

No 20.96 180.00 180.00 180.00 39.350

No 20.96 165.60 165.60 165.60 39.350

No 20.96 188.60 188.60 188.60 39.350

No 20.15 6,777.28 6,777.28 6,777.28 37.837

No 20.15 13,241.08 13,241.08 13,241.08 37.837


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 2,682.30 2,682.30 2,682.30 37.837


No 20.15 1,510.44 1,510.44 1,510.44 37.837
No 20.15 1,273.04 1,273.04 1,273.04 37.837
Si 20.15 1,849.86 1,849.86 1,849.86 37.837
Si 20.15 881.37 881.37 881.37 37.837
Si 20.15 586.30 586.30 586.30 37.837
Si 20.15 343.12 343.12 343.12 37.837
Si 20.24 - 3.45 - 3.45 - 3.45 37.837
Si 20.24 130.54 130.54 130.54 37.837
Si 20.24 72.01 72.01 72.01 37.837
Si 20.15 1,085.88 1,085.88 1,085.88 37.837
Si 20.24 126.90 126.90 126.90 37.837
Si 20.15 5,946.14 5,946.14 5,946.14 37.837
Si 20.15 33,534.44 33,534.44 33,534.44 37.837
Si 20.15 5,323.42 5,323.42 5,323.42 37.837
Si 20.50 944.00 944.00 944.00 37.837
Si 20.50 - 0.45 - 0.45 - 0.45 37.837
Si 20.50 2,790.17 2,790.17 2,790.17 37.837
Si 20.50 899.10 899.10 899.10 37.837
Si 20.61 15.24 15.24 15.24 37.837
Si 20.15 10,084.46 10,084.46 10,084.46 37.837
Si 20.15 1,153.10 1,153.10 1,153.10 37.837
Si 20.61 164.67 164.67 164.67 37.837
Si 20.61 273.22 273.22 273.22 37.837
Si 20.61 975.04 975.04 975.04 37.837
Si 20.61 696.56 696.56 696.56 37.837
Si 20.21 6,497.44 6,497.44 6,497.44 37.837
Si 20.55 435.73 435.73 435.73 37.837
Si 20.21 1,831.35 1,831.35 1,831.35 37.837
Si 20.22 14,069.11 14,069.11 14,069.11 37.837
Si 20.15 943.71 943.71 943.71 37.837
Si 20.15 505.18 505.18 505.18 37.837
Si 20.32 1,022.31 1,022.31 1,022.31 37.837
Si 20.61 41.37 41.37 41.37 37.837
Si 20.15 4,347.79 4,347.79 4,347.79 37.837
Si 20.22 1.00 1.00 1.00 37.837
Si 20.44 256.85 256.85 256.85 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 3,274.11 3,274.11 3,274.11 37.837


Si 20.61 55.08 55.08 55.08 37.837
Si 20.15 311.36 311.36 311.36 37.837
No 20.15 37.837
Si 20.32 926.60 926.60 926.60 37.837
Si 20.22 963.23 963.23 963.23 37.837
Si 20.61 0.00 0.00 0.00 37.837
Si 20.61 0.00 0.00 0.00 37.837
Si 20.27 210.92 210.92 210.92 37.837
Si 20.61 42.91 42.91 42.91 37.837
Si 20.32 8,742.54 8,742.54 8,742.54 37.837
Si 20.61 1,665.94 1,665.94 1,665.94 37.837
Si 20.85 153.42 153.42 153.42 37.837
Si 20.15 298.97 298.97 298.97 37.837
Si 20.25 167.00 167.00 167.00 37.837
Si 20.85 0.06 0.06 0.06 37.837
Si 20.75 2,251.12 2,251.12 2,251.12 37.837
Si 20.15 1,057.52 1,057.52 1,057.52 37.837
Si 20.25 243.11 243.11 243.11 37.837
Si 20.85 373.59 373.59 373.59 37.837
Si 20.25 250.10 250.10 250.10 37.837
Si 20.85 1,338.03 1,338.03 1,338.03 37.837
Si 20.85 542.71 542.71 542.71 37.837
Si 20.85 334.26 334.26 334.26 37.837
Si 20.25 4,429.58 4,429.58 4,429.58 37.837
Si 20.15 338.37 338.37 338.37 37.837
Si 20.15 13.57 13.57 13.57 37.837
Si 20.15 802.23 802.23 802.23 37.837
Si 20.15 31.40 31.40 31.40 37.837
Si 20.85 671.68 671.68 671.68 37.837
Si 20.85 1,516.83 1,516.83 1,516.83 37.837
Si 20.22 536.00 536.00 536.00 37.837
Si 20.85 130.44 130.44 130.44 37.837
Si 20.15 4,835.05 4,835.05 4,835.05 37.837
No 20.15 0.00 0.00 0.00 37.837
No 20.15 1,920.25 1,920.25 1,920.25 37.837
No 20.15 2,328.61 2,328.61 2,328.61 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 1,062.91 1,062.91 1,062.91 37.837


No 20.15 862.62 862.62 862.62 37.837
No 20.15 243.07 243.07 243.07 37.837
No 20.15 167.19 167.19 167.19 37.837
No 20.15 1,024.11 1,024.11 1,024.11 37.837
No 20.15 548.95 548.95 548.95 37.837
No 20.15 2,010.90 2,010.90 2,010.90 37.837
No 20.15 437.26 437.26 437.26 37.837
No 20.15 228.77 228.77 228.77 37.837
No 20.15 484.42 484.42 484.42 37.837
No 20.15 234.14 234.14 234.14 37.837
No 20.15 1,095.19 1,095.19 1,095.19 37.837
No 20.15 943.34 943.34 943.34 37.837
No 20.15 3,681.45 3,681.45 3,681.45 37.837
No 20.15 113.31 113.31 113.31 37.837
No 20.15 270.13 270.13 270.13 37.837
No 20.15 826.53 826.53 826.53 37.837
No 20.15 330.72 330.72 330.72 37.837
No 20.15 276.50 276.50 276.50 37.837
No 20.15 33.02 33.02 33.02 37.837
No 20.15 0.00 0.00 0.00 37.837
No 20.74 1,025.80 1,025.80 1,025.80 38.946
No 20.15 2,357.91 2,357.91 2,357.91 37.837
No 20.84 335.20 335.20 335.20 39.131
No 20.61 48.00 48.00 48.00 38.692
No 20.64 78.75 78.75 78.75 38.749
No 20.99 45.09 45.09 45.09 39.415
No 20.99 76.36 76.36 76.36 39.415
No 21.06 62.40 62.40 62.40 39.555
No 20.96 201.06 201.06 201.06 39.350
No 21.06 47.36 47.36 47.36 39.555
No 20.95 64.84 64.84 64.84 39.346
No 21.17 37.62 37.62 37.62 39.759
Si 20.85 13.25 13.25 13.25 39.143
No 20.15 9,814.97 9,814.97 9,814.97 37.837

No 20.58 0.00 0.00 0.00 38.639


PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 - - - 37.837
Si 20.15 241.64 241.64 241.64 37.837
No 20.15 684.37 684.37 684.37 37.837
No 20.24 - - - 38.015
No 20.24 - - - 38.015
No 20.28 - - - 38.075
No 20.28 2,398.10 2,398.10 2,398.10 38.075
No 20.28 - - - 38.075
No 20.28 - - - 38.075
No 20.24 - - - 38.015
No 20.24 - - - 38.015
No 20.28 - - - 38.075
No 20.15 5,953.78 5,953.78 5,953.78 37.837
No 21.67 33.59 33.59 33.59 40.696
Si 20.15 185.11 185.11 185.11 37.837
Si 20.24 - 0.35 - 0.35 - 0.35 38.007
Si 20.15 88.20 88.20 88.20 37.837
Si 20.15 58.67 58.67 58.67 37.837
Si 20.15 34.34 34.34 34.34 37.837
Si 20.24 7.21 7.21 7.21 38.007
Si 20.24 13.06 13.06 13.06 38.007
Si 20.15 108.66 108.66 108.66 37.837
Si 20.24 12.70 12.70 12.70 38.007
Si 20.15 594.61 594.61 594.61 37.837
Si 20.15 3,353.44 3,353.44 3,353.44 37.837
Si 20.15 532.34 532.34 532.34 37.837
Si 20.50 94.40 94.40 94.40 38.492
Si 20.50 -0.04 -0.04 -0.04 38.492
Si 20.15 1,008.45 1,008.45 1,008.45 37.837
Si 20.50 89.91 89.91 89.91 38.492
Si 20.61 1.52 1.52 1.52 38.707
Si 20.50 279.02 279.02 279.02 38.492
Si 20.15 111.32 111.32 111.32 37.837
No 20.15 175.55 175.55 175.55 37.837
Si 20.22 98.00 98.00 98.00 37.962
Si 20.85 26.33 26.33 26.33 39.143
Si 20.15 48.70 48.70 48.70 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.25 25.31 25.31 25.31 38.026


Si 20.85 0.01 0.01 0.01 39.143
Si 20.75 391.64 391.64 391.64 38.961
Si 20.15 109.56 109.56 109.56 37.837
Si 20.25 40.37 40.37 40.37 38.026
Si 20.85 58.69 58.69 58.69 39.143
Si 20.25 38.47 38.47 38.47 38.026
Si 20.85 219.19 219.19 219.19 39.143
Si 20.85 90.45 90.45 90.45 39.143
Si 20.85 56.79 56.79 56.79 39.143
Si 20.25 673.58 673.58 673.58 38.026
Si 20.15 57.91 57.91 57.91 37.837
Si 20.15 2.32 2.32 2.32 37.837
Si 20.15 132.04 132.04 132.04 37.837
Si 20.15 11.46 11.46 11.46 37.837
Si 20.85 110.35 110.35 110.35 39.143
Si 20.85 253.80 253.80 253.80 39.143
Si 20.62 21.32 21.32 21.32 38.726
Si 20.62 33.79 33.79 33.79 38.726
Si 20.62 120.21 120.21 120.21 38.726
Si 20.62 59.42 59.42 59.42 38.726
Si 20.21 962.51 962.51 962.51 37.954
Si 20.57 51.87 51.87 51.87 38.616
Si 20.21 214.12 214.12 214.12 37.954
Si 20.15 162.18 162.18 162.18 37.837
Si 20.22 79.85 79.85 79.85 37.837
Si 20.22 2,169.17 2,169.17 2,169.17 37.965
Si 20.32 136.52 136.52 136.52 38.147
Si 20.61 6.33 6.33 6.33 38.692
Si 20.15 634.64 634.64 634.64 37.837
Si 20.22 0.18 0.18 0.18 37.969
Si 20.44 29.29 29.29 29.29 38.374
Si 20.15 471.70 471.70 471.70 37.837
Si 20.61 7.95 7.95 7.95 38.692
Si 20.15 47.42 47.42 47.42 37.837
Si 20.32 86.63 86.63 86.63 38.147
Si 20.22 184.79 184.79 184.79 37.969
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.61 0.00 0.00 0.00 38.692


Si 20.61 0.00 0.00 0.00 38.692
Si 20.27 30.31 30.31 30.31 38.060
Si 20.61 6.46 6.46 6.46 38.692
Si 20.32 1,238.25 1,238.25 1,238.25 38.147
Si 20.61 249.14 249.14 249.14 38.692

No 20.38 698.39 698.39 698.39 38.266

No 20.15 3,993.06 3,993.06 3,993.06 37.837

No 20.15 1,542.23 0.00 0.00 37.837


No 20.15 8.00 8.00 8.00 37.837
No 20.15 1,491.53 1,491.53 1,580.00 37.837

No 20.15 11,765.00 11,765.00 11,765.00 37.837

No 20.15 227.00 227.00 227.00 37.837

No 20.15 49,441.00 49,441.00 49,441.00 37.837

No 20.15 437.56 437.56 437.56 37.837

No 20.15 30,438.51 30,438.51 30,438.51 37.837

No 20.30 261.27 261.27 268.97 38.103

No 20.30 89.60 89.60 93.67 38.108

No 20.15 13,369.31 13,369.31 13,369.31 37.837

No 20.15 12,156.74 12,156.74 12,156.74 37.837

No 20.15 2,219.28 2,219.28 2,219.28 37.837


No 20.74 364.90 364.90 364.90 37.837
No 20.65 2,671.98 2,671.98 2,671.98 37.837
No 20.65 3,443.61 3,443.61 3,443.61 37.837
No 20.65 411.25 411.25 411.25 37.837
No 20.74 601.99 601.99 601.99 37.837
No 20.74 6.18 6.18 6.18 37.837
No 20.65 253.13 253.13 253.13 37.837
No 20.15 505.57 505.57 505.57 37.837
Si 20.15 280.00 280.00 280.00 37.837
Si 20.15 239.49 239.49 239.49 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.85 1,248.14 1,248.14 1,248.14 39.143


Si 20.15 673.33 673.33 673.33 37.837
Si 20.15 638.65 638.65 638.65 37.837
Si 20.75 1,958.46 1,958.46 1,958.46 38.961
Si 20.85 0.05 0.05 0.05 39.143
Si 20.25 137.96 137.96 137.96 38.026
Si 20.25 3,664.36 3,664.36 3,664.36 38.026
Si 20.85 288.34 288.34 288.34 39.143
Si 20.25 216.40 216.40 216.40 38.026
Si 20.85 311.12 311.12 311.12 39.143
Si 20.85 554.16 554.16 554.16 39.143
Si 20.85 128.10 128.10 128.10 39.143
Si 20.85 1,102.45 1,102.45 1,102.45 39.143
Si 20.85 447.42 447.42 447.42 39.143
Si 20.25 187.48 187.48 187.48 38.026
Si 20.15 38.58 38.58 38.58 37.837
Si 20.15 11.37 11.37 11.37 37.837
Si 20.15 2,364.71 2,364.71 2,364.71 37.837
Si 20.44 185.51 185.51 185.51 38.374
Si 20.32 6,314.27 6,314.27 6,314.27 38.147
Si 20.61 1,203.22 1,203.22 1,203.22 38.692
Si 20.15 3,140.18 3,140.18 3,140.18 37.837
Si 20.61 29.88 29.88 29.88 38.692
Si 20.22 0.72 0.72 0.72 37.969
Si 20.15 224.88 224.88 224.88 37.837
Si 20.32 669.24 669.24 669.24 38.147
Si 20.61 39.78 39.78 39.78 38.692
Si 20.27 152.34 152.34 152.34 38.060
Si 20.61 0.00 0.00 0.00 38.692
Si 20.61 30.99 30.99 30.99 38.692
Si 20.32 738.36 738.36 738.36 38.147
Si 20.61 0.00 0.00 0.00 38.692
Si 20.22 695.69 695.69 695.69 37.969
Si 20.21 6,870.71 6,870.71 6,870.71 37.954
Si 20.62 736.11 736.11 736.11 38.726
Si 20.62 916.56 916.56 916.56 38.726
Si 20.21 1,721.52 1,721.52 1,721.52 37.954
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.62 256.83 256.83 256.83 38.726


Si 20.62 154.79 154.79 154.79 38.726
Si 20.57 409.60 409.60 409.60 38.616
Si 20.62 4.74 4.74 4.74 38.726
Si 20.22 5,727.87 5,727.87 5,727.87 37.965
Si 20.15 384.21 384.21 384.21 37.837
Si 20.22 205.67 205.67 205.67 37.969
Si 20.22 454.00 454.00 454.00 37.962

No 20.15 6,700.88 6,700.88 6,700.88 37.837

No 20.15 6,854.63 6,854.63 6,854.63 37.837


No 20.15 1,271.49 1,271.49 1,271.49 37.837
No 20.30 1.48 1.48 1.31 38.108
No 20.15 67.65 67.65 67.65 37.837
No 20.15 667.12 667.12 667.12 37.837
No 20.15 1,272.73 1,272.73 1,272.73 37.837

No 20.15 8,591.36 8,591.36 8,591.36 37.837

No 20.15 11,384.70 11,384.70 11,384.70 37.837

No 20.15 637.27 637.27 637.27 37.837

No 20.15 511.25 511.25 511.25 37.837

No 20.15 280.02 280.02 280.02 37.837

No 20.15 941.08 941.08 941.08 37.837

No 20.15 172.25 172.25 172.25 37.837

No 20.15 146.32 146.32 146.32 37.837

No 20.15 213.31 213.31 213.31 37.837


No 20.15 184.26 184.26 184.26 0.000
No 20.15 499.10 499.10 499.10 37.837
No 20.15 0.00 0.00 0.00 0.000
No 20.15 0.00 0.00 0.00 0.000
No 20.15 2,227.96 2,227.96 2,227.96 37.837
No 20.15 333.46 333.46 333.46 37.837
No 20.15 306.36 306.36 306.36 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 728.21 728.21 728.21 37.837

No 20.15 98.03 98.03 98.03 37.837

Si 20.15 307.11 307.11 307.11 37.837


Si 20.15 256.63 256.63 256.63 37.837
Si 20.85 1,337.46 1,337.46 1,337.46 39.143
Si 20.15 721.51 721.51 721.51 37.837
Si 20.15 684.35 684.35 684.35 37.837
Si 20.75 2,098.62 2,098.62 2,098.62 38.961
Si 20.85 0.06 0.06 0.06 39.143
Si 20.25 147.84 147.84 147.84 38.026
Si 20.25 3,926.59 3,926.59 3,926.59 38.026
Si 20.85 308.97 308.97 308.97 39.143
Si 20.25 231.89 231.89 231.89 38.026
Si 20.85 333.39 333.39 333.39 39.143
Si 20.85 593.82 593.82 593.82 39.143
Si 20.85 137.27 137.27 137.27 39.143
Si 20.85 1,181.34 1,181.34 1,181.34 39.143
Si 20.85 479.44 479.44 479.44 39.143
Si 20.25 200.90 200.90 200.90 38.026
Si 20.15 41.34 41.34 41.34 37.837
Si 20.15 12.18 12.18 12.18 37.837
Si 20.15 3,706.57 3,706.57 3,706.57 37.837
Si 20.44 290.78 290.78 290.78 38.374
Si 20.32 9,897.30 9,897.30 9,897.30 38.147
Si 20.61 1,885.99 1,885.99 1,885.99 38.692
Si 20.15 4,922.08 4,922.08 4,922.08 37.837
Si 20.61 46.83 46.83 46.83 38.692
Si 20.22 1.13 1.13 1.13 37.969
Si 20.15 352.49 352.49 352.49 37.837
Si 20.32 1,048.99 1,048.99 1,048.99 38.147
Si 20.61 62.35 62.35 62.35 38.692
Si 20.27 238.78 238.78 238.78 38.060
Si 20.61 0.00 0.00 0.00 38.692
Si 20.61 48.57 48.57 48.57 38.692
Si 20.32 1,157.34 1,157.34 1,157.34 38.147
Si 20.61 0.00 0.00 0.00 38.692
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.22 1,090.46 1,090.46 1,090.46 37.969


Si 20.21 8,466.56 8,466.56 8,466.56 37.954
Si 20.62 912.89 912.89 912.89 38.726
Si 20.62 1,047.27 1,047.27 1,047.27 38.726
Si 20.21 1,967.03 1,967.03 1,967.03 37.954
Si 20.62 293.46 293.46 293.46 38.726
Si 20.62 176.87 176.87 176.87 38.726
Si 20.57 468.01 468.01 468.01 38.616
Si 20.62 74.64 74.64 74.64 38.726
Si 20.22 13,126.01 13,126.01 13,126.01 37.965
Si 20.15 880.45 880.45 880.45 37.837
Si 20.22 471.32 471.32 471.32 37.969
Si 20.24 1,711.43 1,711.43 1,711.43 38.015
Si 20.24 183.18 183.18 183.18 38.015
Si 20.28 2,167.45 2,167.45 2,167.45 38.075
Si 20.28 0.00 0.00 0.00 0.000
Si 20.28 106.22 106.22 106.22 38.075
Si 20.28 108.02 108.02 108.02 38.075
Si 20.24 267.83 267.83 267.83 38.015
Si 20.24 828.28 828.28 828.28 38.015
Si 20.28 53.09 53.09 53.09 38.075
Si 20.15 3,526.24 3,526.24 3,526.24 37.837
Si 20.15 0.22 0.22 0.22 37.837
Si 20.26 0.77 0.77 0.77 38.053
Si 20.26 18.85 18.85 18.85 38.053
Si 20.25 98.98 98.98 98.98 38.026
Si 20.39 122.97 122.97 122.97 38.295
Si 20.39 108.44 108.44 108.44 38.295
Si 20.15 833.64 833.64 833.64 37.837
Si 20.15 1,013.29 1,013.29 1,013.29 37.837
Si 20.69 2,518.74 2,518.74 2,518.74 36.177
Si 20.36 188.48 188.48 188.48 35.602
Si 20.69 124.01 124.01 124.01 36.177
Si 20.36 195.77 195.77 195.77 35.602
Si 20.69 227.36 227.36 227.36 36.177
Si 20.69 114.16 114.16 114.16 36.177
Si 20.69 88.15 88.15 88.15 36.177
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.36 412.03 412.03 412.03 35.602


Si 20.69 74.15 74.15 74.15 36.177
Si 20.36 354.52 354.52 354.52 35.602
Si 20.28 751.26 751.26 751.26 35.465
Si 20.15 910.56 910.56 910.56 35.236
Si 20.54 1,685.88 1,685.88 1,685.88 38.571
Si 20.15 1,852.55 1,852.55 1,852.55 37.837
Si 20.54 4,259.99 4,259.99 4,259.99 38.571
Si 20.64 0.40 0.40 0.40 38.749
Si 20.15 272.57 272.57 272.57 37.837
Si 20.15 1,698.27 1,698.27 1,698.27 37.837
Si 20.15 545.19 545.19 545.19 37.837
Si 20.56 389.16 389.16 389.16 38.613
Si 20.15 1,682.16 1,682.16 1,682.16 37.916
No 20.15 644.45 644.45 644.45 37.837
No 20.85 193.59 193.59 193.59 39.143
No 20.32 5,084.32 5,084.32 5,084.32 38.147
No 20.61 565.65 565.65 565.65 38.692
No 20.15 286.53 286.53 286.53 37.837
No 20.15 1,717.96 1,717.96 1,717.96 37.837
No 20.32 7,460.69 7,460.69 7,460.69 38.147
No 20.32 833.85 833.85 833.85 38.147
No 20.15 67.15 67.15 67.15 37.837
No 20.21 3,939.05 3,939.05 3,939.05 37.954
No 20.62 110.55 110.55 110.55 38.726
No 20.21 971.83 971.83 971.83 37.954
No 20.57 323.52 323.52 323.52 38.616
No 20.22 436.21 436.21 436.21 37.965

No 20.15 6,145.09 6,145.09 6,145.09 33.655

No 20.15 503.77 503.77 503.77 33.655


No 20.15 5,396.74 5,396.74 5,396.74 33.655
No 20.15 6,138.85 6,138.85 6,138.85 33.655
No 20.50 337.34 337.34 337.34 33.655
No 20.15 9,680.18 9,680.18 9,680.18 33.655
No 20.15 4,448.04 4,448.04 4,448.04 33.655
Si 20.28 122.85 122.85 122.85 33.655
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.28 111.84 111.84 111.84 33.655


Si 20.24 368.10 368.10 368.10 33.655
Si 20.24 784.86 784.86 784.86 33.655
Si 20.28 2,397.89 2,397.89 2,397.89 33.655
Si 20.24 199.82 199.82 199.82 33.655
Si 20.24 1,879.64 1,879.64 1,879.64 33.655
Si 20.28 55.42 55.42 55.42 33.655
Si 20.26 0.50 0.50 0.50 33.655
Si 20.26 12.35 12.35 12.35 33.655
Si 20.15 663.57 663.57 663.57 33.655
Si 20.15 545.92 545.92 545.92 33.655
Si 20.39 71.01 71.01 71.01 33.655
Si 20.25 64.82 64.82 64.82 33.655
Si 20.15 2,309.19 2,309.19 2,309.19 33.655
Si 20.39 80.53 80.53 80.53 33.655
Si 20.15 0.14 0.14 0.14 33.655
Si 20.28 463.99 463.99 463.99 33.655
Si 20.69 81.80 81.80 81.80 33.655
Si 20.69 77.83 77.83 77.83 33.655
Si 20.36 290.14 290.14 290.14 33.655
Si 20.69 99.33 99.33 99.33 33.655
Si 20.36 95.01 95.01 95.01 33.655
Si 20.69 1,037.55 1,037.55 1,037.55 33.655
Si 20.69 0.00 0.00 0.00 33.655
Si 20.69 48.42 48.42 48.42 33.655
Si 20.36 253.10 253.10 253.10 33.655
Si 20.69 735.62 735.62 735.62 33.655
Si 20.36 135.48 135.48 135.48 33.655
Si 20.15 631.93 631.93 631.93 33.655
Si 20.69 159.76 159.76 159.76 33.655

No 20.15 2,269.88 2,269.88 2,269.88 33.655

Si 20.15 12,701.73 12,701.73 12,701.73 33.655


Si 20.15 21,638.00 21,638.00 21,638.00 33.655
Si 20.24 1,527.00 1,527.00 1,527.00 33.655
Si 20.24 1,484.40 1,484.40 1,484.40 33.655
Si 20.24 842.35 842.35 842.35 33.655
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 10,309.46 10,309.46 10,309.46 33.655


Si 20.24 - 40.36 - 40.36 - 40.36 33.655
Si 20.15 6,857.99 6,857.99 6,857.99 33.655
Si 20.15 4,013.53 4,013.53 4,013.53 33.655
No 20.15 200.80 200.80 200.80 33.655
No 20.15 968.46 968.46 968.46 33.655
No 20.15 1,288.80 1,288.80 1,288.80 33.655
No 20.15 3,438.02 3,438.02 3,438.02 33.655
No 20.15 785.67 785.67 785.67 33.655
Si 20.61 - - - 33.655
Si 20.15 1,563.17 1,563.17 1,563.17 33.655
Si 20.15 - - - 33.655
Si 20.15 - - - 33.655
Si 20.50 - - - 33.655
Si 20.50 - - - 33.655
Si 20.15 - - - 33.655
Si 20.15 - - - 33.655
Si 20.50 - - - 33.655
Si 20.15 - - - 33.655
Si 20.15 - - - 33.655
Si 20.15 - - - 33.655
Si 20.15 - - - 33.655
Si 20.50 - - - 33.655
No 20.15 2,304.82 2,304.82 2,304.82 33.655
No 20.15 2,986.90 2,986.90 2,986.90 33.655

No 20.15 1,030.32 1,030.32 1,030.32 33.655

No 20.15 108.28 108.28 108.28 33.655

Si 20.15 0.00 0.00 0.00 33.655


Si 20.15 199.18 199.18 199.18 33.655
Si 20.54 3,112.93 3,112.93 3,112.93 33.655
Si 20.54 0.80 0.80 0.80 33.655
Si 20.15 1,229.22 1,229.22 1,229.22 33.655
Si 20.15 0.03 0.03 0.03 33.655
Si 20.56 0.61 0.61 0.61 33.655
Si 20.56 284.37 284.37 284.37 33.655
Si 20.15 0.19 0.19 0.19 33.655
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 398.39 398.39 398.39 33.655


Si 20.15 0.96 0.96 0.96 33.655
Si 20.15 1,240.99 1,240.99 1,240.99 33.655
Si 20.64 0.30 0.30 0.30 33.655
Si 20.64 0.00 0.00 0.00 33.655
Si 20.15 2.19 2.19 2.19 33.655
Si 20.15 1,353.73 1,353.73 1,353.73 33.655
Si 20.54 - - - 33.655
Si 20.54 1,231.94 1,231.94 1,231.94 33.655
No 20.15 567.56 567.56 567.56 33.655
No 20.15 2,508.40 2,508.40 2,508.40 33.655
No 20.15 853.64 853.64 853.64 33.655

No 20.15 3,541.02 3,541.02 3,541.02 37.837

No 20.15 0.00 0.00 0.00 37.837

No 20.15 6,854.26 6,854.26 6,854.26 37.837

No 20.15 848.91 848.91 848.91 37.837


No 20.15 694.94 694.94 694.94 37.837
Si 20.15 2,219.46 2,219.46 2,219.46 37.837
Si 20.15 1,057.46 1,057.46 1,057.46 37.837
Si 20.15 703.44 703.44 703.44 37.837
Si 20.15 411.68 411.68 411.68 37.837
Si 20.24 - 4.14 - 4.14 - 4.14 37.837
Si 20.24 156.63 156.63 156.63 37.837
Si 20.24 86.40 86.40 86.40 37.837
Si 20.15 1,302.84 1,302.84 1,302.84 37.837
Si 20.24 152.26 152.26 152.26 37.837
Si 20.15 7,135.37 7,135.37 7,135.37 37.837
Si 20.15 40,241.33 40,241.33 40,241.33 37.837
Si 20.15 6,388.10 6,388.10 6,388.10 37.837
Si 20.50 1,132.80 1,132.80 1,132.80 37.837
Si 20.50 - 0.54 - 0.54 - 0.54 37.837
Si 20.50 3,348.21 3,348.21 3,348.21 37.837
Si 20.50 1,078.92 1,078.92 1,078.92 37.837
Si 20.61 18.28 18.28 18.28 37.837
Si 20.15 12,101.35 12,101.35 12,101.35 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.15 1,384.88 1,384.88 1,384.88 37.837


Si 20.61 100.14 100.14 100.14 37.837
Si 20.61 166.16 166.16 166.16 37.837
Si 20.61 592.97 592.97 592.97 37.837
Si 20.61 423.61 423.61 423.61 37.837
Si 20.21 3,951.39 3,951.39 3,951.39 37.837
Si 20.55 264.99 264.99 264.99 37.837
Si 20.21 1,113.74 1,113.74 1,113.74 37.837
Si 20.22 8,555.88 8,555.88 8,555.88 37.837
Si 20.15 573.90 573.90 573.90 37.837
Si 20.15 307.22 307.22 307.22 37.837
Si 20.32 621.65 621.65 621.65 37.837
Si 20.61 25.16 25.16 25.16 37.837
Si 20.15 2,643.84 2,643.84 2,643.84 37.837
Si 20.22 0.61 0.61 0.61 37.837
Si 20.44 156.19 156.19 156.19 37.837
Si 20.15 1,990.94 1,990.94 1,990.94 37.837
Si 20.61 33.49 33.49 33.49 37.837
Si 20.15 189.33 189.33 189.33 37.837
Si 20.32 563.45 563.45 563.45 37.837
Si 20.22 585.73 585.73 585.73 37.837
Si 20.61 0.00 0.00 0.00 37.837
Si 20.61 0.00 0.00 0.00 37.837
Si 20.27 128.26 128.26 128.26 37.837
Si 20.61 26.09 26.09 26.09 37.837
Si 20.32 5,316.22 5,316.22 5,316.22 37.837
Si 20.61 1,013.04 1,013.04 1,013.04 37.837
Si 20.85 93.28 93.28 93.28 37.837
Si 20.15 181.77 181.77 181.77 37.837
Si 20.25 101.53 101.53 101.53 37.837
Si 20.85 0.04 0.04 0.04 37.837
Si 20.75 1,368.68 1,368.68 1,368.68 37.837
Si 20.15 642.97 642.97 642.97 37.837
Si 20.25 147.81 147.81 147.81 37.837
Si 20.85 227.14 227.14 227.14 37.837
Si 20.25 152.06 152.06 152.06 37.837
Si 20.85 813.52 813.52 813.52 37.837
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

Si 20.85 329.97 329.97 329.97 37.837


Si 20.85 203.23 203.23 203.23 37.837
Si 20.25 2,693.18 2,693.18 2,693.18 37.837
Si 20.15 205.73 205.73 205.73 37.837
Si 20.15 8.25 8.25 8.25 37.837
Si 20.15 487.76 487.76 487.76 37.837
Si 20.15 19.09 19.09 19.09 37.837
Si 20.85 408.38 408.38 408.38 37.837
Si 20.85 922.23 922.23 922.23 37.837
Si 20.22 331.00 331.00 331.00 37.837
Si 20.85 156.26 156.26 156.26 37.837
Si 20.15 2,897.97 2,897.97 2,897.97 37.837
No 20.15 - - - 0.000

No 20.15 - - - 0.000

No 20.15 - - - 0.000
No 20.15 - - - 0.000

No 20.15 - - - 0.000

No 20.15 - - - 0.000
Si 20.15 0.00 0.00 0.00 35.596

No 20.15 388.98 388.98 388.98 37.837

Si 20.54 4,792.95 4,792.95 4,792.95 38.563


Si 20.56 5,278.44 5,278.44 5,278.44 37.829
No 20.15 3,179.88 3,179.88 3,179.88 37.837
No 20.15 5,417.09 5,417.09 5,417.09 37.837
No 20.24 382.28 382.28 382.28 37.837
No 20.24 371.62 371.62 371.62 37.837
No 20.24 210.88 210.88 210.88 37.837
No 20.15 2,580.98 2,580.98 2,580.98 37.837
No 20.24 - 10.11 - 10.11 - 10.11 37.837
No 20.15 1,716.90 1,716.90 1,716.90 37.837
No 20.15 1,004.79 1,004.79 1,004.79 37.837
No 20.15 4,088.42 4,088.42 4,088.42 35.596
No 20.15 6,964.82 6,964.82 6,964.82 35.596
No 20.24 491.51 491.51 491.51 35.756
No 20.15 477.80 477.80 477.80 35.596
PARA EGRESO DE POTENCIA PARA PEAJE POR CONEXIÓN

PRECIO POTENCIA POTENCIA EGRESO POTENCIA POTENCIA PEAJE UNITARIO S/


LICITACIÓN S/ /kW-mes kW CALCULADA (KW) DECLARADA (KW) /kW-mes

No 20.15 271.13 271.13 271.13 35.596


No 20.24 3,318.40 3,318.40 3,318.40 35.756
No 20.24 -12.99 -12.99 -12.99 35.756
No 20.24 2,207.44 2,207.44 2,207.44 35.756
No 20.15 1,291.87 1,291.87 1,291.87 35.596
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
CALIDAD

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Cont. LDS-Gen
Preliminar

Preliminar

Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen

Preliminar

Preliminar

Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
modelo
modelo
Preliminar
modelo
Preliminar
modelo
Preliminar
Preliminar
modelo
modelo
Preliminar
modelo
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
CALIDAD

mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
Re-carga
Re-carga
Re-carga
Re-carga
Re-carga
Re-carga
Re-carga
Re-carga
Re-carga
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
CALIDAD

modelo
Cont. LDS-Gen
mes anterior
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Re-carga
Re-carga
Re-carga
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
Re-carga
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Cont. SGB-EGM-ELP-ELOR (del
mensual)
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Final

Final
Preliminar
Preliminar
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
Cont. LDS-Gen
Preliminar
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
CALIDAD

Cont. LDS-Gen
Cont. LDS-Gen

Final

Final

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.


lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
CALIDAD

lunes 8/01/2018 7:57 p. m.


lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
CALIDAD

lunes 8/01/2018 7:57 p. m.


lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.


lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
CALIDAD

lunes 8/01/2018 7:57 p. m.


lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
Cont. LDS-Gen
lunes 8/01/2018 7:57 p. m.
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.


CALIDAD

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.


lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.
lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

lunes 8/01/2018 7:57 p. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.


CALIDAD

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.


CALIDAD

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.


CALIDAD

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

Cont. SGB-EGM-ELP-ELOR

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.


CALIDAD

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.


CALIDAD

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.


CALIDAD

martes 9/01/2018 10:14 a. m.

martes 9/01/2018 10:14 a. m.

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
CALIDAD

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar

Preliminar

Cont. LDS-Gen
Preliminar

Preliminar

Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen

Preliminar

Preliminar

Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
modelo
Preliminar
CALIDAD

modelo
modelo
Preliminar
modelo
Preliminar
modelo
Preliminar
modelo
Preliminar
modelo

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
CALIDAD

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar

Preliminar

Preliminar
Preliminar

Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Cont. LDS-Gen
Preliminar
Cont. LDS-Gen

Preliminar

Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen

Preliminar

Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen

Preliminar

Cont. LDS-Gen
Preliminar
Preliminar
Preliminar
modelo
modelo
Preliminar
modelo
Preliminar
modelo
Preliminar
CALIDAD

modelo
Preliminar
Preliminar
modelo
modelo
modelo
Preliminar
Preliminar
modelo
Preliminar
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
CALIDAD

Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
CALIDAD

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
CALIDAD

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
CALIDAD

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
CALIDAD

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
CALIDAD

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
CALIDAD

lunes 8/01/2018 4:59 p. m.


lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 4:59 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
CALIDAD

lunes 8/01/2018 5:15 p. m.


lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
CALIDAD

lunes 8/01/2018 5:15 p. m.


lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
CALIDAD

lunes 8/01/2018 5:15 p. m.


lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.

lunes 8/01/2018 5:15 p. m.

lunes 8/01/2018 5:15 p. m.

lunes 8/01/2018 5:15 p. m.


lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.

lunes 8/01/2018 5:15 p. m.

lunes 8/01/2018 5:15 p. m.

lunes 8/01/2018 5:15 p. m.

lunes 8/01/2018 5:15 p. m.


lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
CALIDAD

lunes 8/01/2018 5:15 p. m.


lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.
lunes 8/01/2018 5:15 p. m.

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11


CALIDAD

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes, 9 de enero de 2018 12:11

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


CALIDAD

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
CALIDAD

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


CALIDAD

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
CALIDAD

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
CALIDAD

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 2:12 p. m.
martes 9/01/2018 2:12 p. m.
martes 9/01/2018 2:12 p. m.
martes 9/01/2018 2:12 p. m.
martes 9/01/2018 2:12 p. m.
martes 9/01/2018 2:12 p. m.
martes 9/01/2018 2:12 p. m.
martes 9/01/2018 2:12 p. m.
CALIDAD

martes 9/01/2018 2:12 p. m.


martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
CALIDAD

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
CALIDAD

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
Cont. SGB-EGM-ELP-ELOR
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


CALIDAD

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.


martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.
martes 9/01/2018 10:10 a. m.

martes 9/01/2018 10:10 a. m.

Preliminar
CALIDAD

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar
Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

Preliminar

lunes 8/01/2018 6:27 p. m.

lunes 8/01/2018 6:27 p. m.


CALIDAD

lunes 8/01/2018 6:27 p. m.


lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
CALIDAD

lunes 8/01/2018 6:27 p. m.


lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
CALIDAD

lunes 8/01/2018 6:27 p. m.


lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
Cont. SGB-EGM-ELP-ELOR

martes 9/01/2018 11:59 a. m.


CALIDAD

martes 9/01/2018 11:59 a. m.


martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
martes 9/01/2018 11:59 a. m.
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
CALIDAD

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar
Preliminar
Preliminar

Preliminar

Preliminar

Preliminar

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.


lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
CALIDAD

lunes 8/01/2018 6:32 p. m.


lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
CALIDAD

lunes 8/01/2018 6:32 p. m.


lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.


lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.


mes anterior
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
CALIDAD

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.

lunes 8/01/2018 6:32 p. m.


lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
CALIDAD

lunes 8/01/2018 6:32 p. m.


lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
CALIDAD

lunes 8/01/2018 6:32 p. m.


lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.
lunes 8/01/2018 6:32 p. m.

Preliminar

Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Cont. TCH - Dist.
CALIDAD

Cont. TCH - Dist.


Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.

Preliminar

Cont. TCH - Dist.


Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
CALIDAD

Cont. TCH - Dist.


Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Preliminar
Preliminar
Preliminar
Preliminar
Preliminar
Cont. LDS-Gen
Preliminar
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Preliminar
Preliminar

Preliminar

Preliminar

Cont. TCH - Dist.


Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
CALIDAD

Cont. TCH - Dist.


Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Cont. TCH - Dist.
Preliminar
Preliminar
Preliminar

lunes 8/01/2018 6:27 p. m.

lunes 8/01/2018 6:27 p. m.

lunes 8/01/2018 6:27 p. m.

lunes 8/01/2018 6:27 p. m.


lunes 8/01/2018 6:27 p. m.
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
Cont. LDS-Gen
CALIDAD

lunes 8/01/2018 6:27 p. m.


lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
CALIDAD

mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
mes anterior
lunes 8/01/2018 6:27 p. m.
lunes 8/01/2018 6:27 p. m.
mes anterior
Non-listed

Non-listed

Non-listed
Non-listed

Non-listed

Non-listed
Borrado por cambio de barra
Cont. SGB-EGM-ELP-ELOR (del
mensual)
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
modelo
CALIDAD

modelo
modelo
modelo
modelo
modelo
RESUMEN DE INFORMACIÓN VTP
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 6
POTENCIA CONSUMIDA (kW) VALORIZACIÓN DE CONSUMOS (S/)
CLIENTES CLIENTES CLIENTES CLIENTES
EMPRESA CONTRATO CONTRATO SIN CONTRATO TOTAL CONTRATO CONTRATO SIN CONTRATO TOTAL
BILATERAL LICITACIONES BILATERAL LICITACIONES
AGROAURORA S.A.C. 2,053.803 0.000 0.000 2,053.803 41,507.359 0.000 0.000 41,507.359
CELEPSA 144,411.903 7,751.751 0.000 152,163.654 2,918,402.073 157,569.679 0.000 3,075,971.752
CHINANGO S.A.C. 0.000 92,622.790 0.000 92,622.790 0.000 1,871,641.155 0.000 1,871,641.155
EGASA 4,517.736 111,008.055 0.000 115,525.791 91,032.376 2,240,716.975 0.000 2,331,749.351
EGEMSA 32,027.945 37,888.470 0.000 69,916.415 648,764.323 768,630.708 0.000 1,417,395.031
EGESUR 15,670.132 12,289.015 0.000 27,959.147 316,262.698 247,939.211 0.000 564,201.909
EMPRESA DE GENERACION ELECTRICA
DE JUNIN 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

EMPRESA DE GENERACION ELECTRICA 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
RIO BAÑOS S.A.C.
EMPRESA DE GENERACION HUALLAGA 0.000 254,226.187 0.000 254,226.187 0.000 5,166,971.966 0.000 5,166,971.966
EMPRESA DE GENERACION HUANZA 75,447.280 0.000 0.000 75,447.280 1,520,262.692 0.000 0.000 1,520,262.692
EMPRESA ELECTRICA AGUA AZUL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
ENEL GENERACION PERU S.A.A. 534,596.440 595,080.921 0.000 1,129,677.361 10,773,654.515 12,019,956.379 0.000 22,793,610.894
ENEL GENERACION PIURA S.A. 25,550.624 71,892.938 0.000 97,443.562 520,094.526 1,451,667.972 0.000 1,971,762.497
ENGIE 434,621.080 452,338.497 0.000 886,959.577 8,759,616.637 9,142,390.160 0.000 17,902,006.797
FENIX POWER PERÚ 75,814.010 270,553.355 0.000 346,367.365 1,529,685.934 5,461,456.338 0.000 6,991,142.272
HIDROELECTRICA HUANCHOR S.A.C. 14,466.864 3,073.659 0.000 17,540.523 296,191.846 62,014.710 0.000 358,206.555
HIDROELECTRICA SANTA CRUZ 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
HIDROMARAÑON 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
KALLPA GENERACION S.A. 554,664.824 593,100.505 0.000 1,147,765.329 11,177,748.521 12,001,260.385 0.000 23,179,008.907
LUZ DEL SUR 68,691.835 0.000 0.000 68,691.835 1,439,780.862 0.000 0.000 1,439,780.862
ORAZUL ENERGY PERÚ 44,607.508 134,331.193 0.000 178,938.701 898,841.281 2,719,315.746 0.000 3,618,157.027
SAN GABAN 23,654.170 6,827.460 0.000 30,481.630 478,346.518 137,748.381 0.000 616,094.899
SDF ENERGIA 6,409.224 9,448.991 0.000 15,858.215 129,306.500 192,045.507 0.000 321,352.008
SHOUGESA 62,932.526 0.000 0.000 62,932.526 1,268,090.399 0.000 0.000 1,268,090.399
STATKRAFT 133,957.142 140,887.399 0.000 274,844.541 2,706,436.497 2,863,552.575 0.000 5,569,989.072
TERMOCHILCA 51,961.560 83,731.505 0.000 135,693.065 1,047,143.503 1,691,462.026 0.000 2,738,605.529
TERMOSELVA 11,939.133 120,650.586 0.000 132,589.719 240,573.531 2,439,771.254 0.000 2,680,344.786
TOTAL 2,734,017.005 3,260,202.932 0.000 5,994,219.936 55,199,198.229 65,962,766.756 0.000 121,161,964.986
Máxima Demanda a nivel de generación: 6,462,403.000
Demanda de Servicios Auxiliares de centrales de generación: 64,058.000
Potencia consumida por demanda de carácter no regulada sin contratos: 0.000

Pérdidas (%) : 625.35%


EGRESO POR COMPRA DE POTENCIA
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 7
EGRESO POR COMPRA DE EGRESO TOTAL POR
EMPRESA POTENCIA (S/) SALDO POR PEAJE (S/) COMPRA DE POTENCIA
(S/)
AGROAURORA S.A.C. 41,507.36 -1,494.26 40,013.099
CELEPSA 3,075,971.75 -111,031.21 2,964,940.538
CHINANGO S.A.C. 1,871,641.15 -67,564.76 1,804,076.395
EGASA 2,331,749.35 -84,051.79 2,247,697.557
EGEMSA 1,417,395.03 -51,168.18 1,366,226.846
EGESUR 564,201.91 -20,341.89 543,860.017
ELECTRICA SANTA ROSA 0.00 0.00 0.000
ELECTROPERU 13,724,111.27 -495,526.44 13,228,584.833
EMPRESA DE GENERACION ELECTRICA DE JUNIN 0.00 0.00 0.000
EMPRESA DE GENERACION ELECTRICA RIO BAÑOS
S.A.C. 0.00 0.00 0.000

EMPRESA DE GENERACION HUALLAGA 5,166,971.97 -186,557.05 4,980,414.916


EMPRESA DE GENERACION HUANZA 1,520,262.69 -54,892.25 1,465,370.446
EMPRESA ELECTRICA AGUA AZUL 0.00 0.00 0.000
ENEL GENERACION PERU S.A.A. 22,793,610.89 -822,745.12 21,970,865.777
ENEL GENERACION PIURA S.A. 1,971,762.50 -71,646.17 1,900,116.329
ENGIE 17,902,006.80 -643,490.77 17,258,516.030
FENIX POWER PERÚ 6,991,142.27 -252,422.05 6,738,720.218
HIDROELECTRICA HUANCHOR S.A.C. 358,206.56 -12,761.74 345,444.814
HIDROELECTRICA SANTA CRUZ 0.00 0.00 0.000
HIDROMARAÑON 0.00 0.00 0.000
KALLPA GENERACION S.A. 23,179,008.91 -836,923.82 22,342,085.090
LUZ DEL SUR 1,439,780.86 -51,975.73 1,387,805.134
ORAZUL ENERGY PERÚ 3,618,157.03 -130,188.22 3,487,968.806
SAN GABAN 616,094.90 -22,245.08 593,849.817
SDF ENERGIA 321,352.01 -10,480.30 310,871.711
SHOUGESA 1,268,090.40 -45,851.41 1,222,238.988
STATKRAFT 5,569,989.07 -200,540.01 5,369,449.063
TERMOCHILCA 2,738,605.53 -98,724.53 2,639,881.001
TERMOSELVA 2,680,344.79 -96,466.67 2,583,878.120
TOTAL 121,161,964.99 -4,369,089.44 116,792,875.544
DETERMINACIÓN DE LA POTENCIA FIRME
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 8

EMPRESA Central Unidad

TERMOSELVA C.T. AGUAYTIA TG-1


C.T. AGUAYTIA TG-2
STATKRAFT C.H. CAHUA
C.H. PARIAC
C.H. GALLITO CIEGO
C.H. SAN ANTONIO
C.H. SAN IGNACIO
C.H. HUAYLLACHO
C.H. MISAPUQUIO
ENEL GENERACION PERU S.A.A. C.H. HUINCO
C.H. MATUCANA
C.H. CALLAHUANCA
C.H. MOYOPAMPA
C.H. HUAMPANI
C.T. SANTA ROSA UTI-5
C.T. SANTA ROSA UTI-6
C.T. SANTA ROSA TG-7
C.T. SANTA ROSA TG8
C.T. VENTANILLA TG3+TG4 CCOMB F.DIREC.
ENEL GENERACION PIURA S.A. C.T. MALACAS TG-4
ORAZUL ENERGY C.H. CARHUAQUERO
C.H. CARHUAQUERO IV
C.H. CAÑA BRAVA
C.H. CAÑON DEL PATO
STATKRAFT C.H. MALPASO
C.H. OROYA
C.H. PACHACHACA
C.H. YAUPI
ELECTROPERU C.H. MANTARO
C.H. RESTITUCION
C.T. TUMBES MAK1
C.T. TUMBES MAK2
SHOUGESA C.T. SAN NICOLÁS TV-1
C.T. SAN NICOLÁS TV-2
C.T. SAN NICOLÁS TV-3
C.T. SAN NICOLÁS CUMMINS
DETERMINACIÓN DE LA POTENCIA FIRME
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 8

EMPRESA Central Unidad

EGASA C.H. CHARCANI I


C.H. CHARCANI II
C.H. CHARCANI III
C.H. CHARCANI IV
C.H. CHARCANI V
C.H. CHARCANI VI
C.T. MOLLENDO MIRLESS 1
C.T. MOLLENDO MIRLESS 2
C.T. MOLLENDO MIRLESS 3
C.T. PISCO TG-1
C.T. PISCO TG-2
C.T. CHILINA TG
C.T. CHILINA SULZER1
C.T. CHILINA SULZER2
EGEMSA C.H. MACHUPICCHU
SAN GABAN C.H. SAN GABAN II
EGESUR C.H. ARICOTA I
C.H. ARICOTA II
C.T. INDEPENDENCIA WARTSILA 1
C.T. INDEPENDENCIA WARTSILA 2
C.T. INDEPENDENCIA WARTSILA 3
C.T. INDEPENDENCIA WARTSILA 4
ENGIE C.T. ILO2 TVC1
C.H. YUNCAN
C.T. CHILCA TG1+TG2+TG3+TV
C.T. ILO - RESERVA FRIA TG1
HIDROELECTRICA HUANCHOR S.A.C. C.H. HUANCHOR
KALLPA GENERACION C.T. KALLPA TG1+TG2+TG3+TV
C.T. LAS FLORES TG-1
DETERMINACIÓN DE LA POTENCIA FIRME
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 8

EMPRESA Central Unidad

HIDROELECTRICA SANTA CRUZ C.H. HIDROELECTRICA SANTA CRUZ I


C.H. HIDROELECTRICA SANTA CRUZ II
SDF ENERGÍA C.T. OQUENDO TG1
CHINANGO S.A.C. C.H. YANANGO
C.H. CHIMAY
GENERADORA DE ENERGIA DEL PERU C.H. LA JOYA
CELEPSA C.H. PLATANAL
AGRO INDUSTRIAL PARAMONGA C.T. PARAMONGA TV1
MAJA ENERGÍA C.H. RONCADOR
SINERSA C.H. POECHOS II
ELECTRICA SANTA ROSA C.H. PURMACANA
HIDROELECTRICA SANTA CRUZ C.H. HUASAHUASI I
HIDROELECTRICA SANTA CRUZ C.H. HUASAHUASI II
PETRAMAS C.TB. HUAYCOLORO G1
C.TB. HUAYCOLORO G2
C.TB. HUAYCOLORO G3
HIDROCAÑETE S.A. C.H. NUEVO IMPERIAL
AGROAURORA S.A.C. C.T. MAPLE ETANOL TV
GTS REPARTICION S.A.C. C.S. REPARTICION SOLAR 20T
GTS MAJES S.A.C. C.S. MAJES SOLAR 20T
TACNA SOLAR S.A.C C.S. TACNA SOLAR 20T
PANAMERICANA SOLAR SAC. C.S. PANAMERICANA SOLAR 20TS
ELECTRICA YANAPAMPA SAC C.H. YANAPAMPA
EMPRESA ELECTRICA RIO DOBLE C.H. LAS PIZARRAS
TERMOCHILCA C.T. STO. DOMINGO DE LOS OLLEROS TG1
EMPRESA DE GENERACION HUANZA C.H. HUANZA
PARQUE EOLICO MARCONA S.R.L. C.E. MARCONA
FENIX POWER PERU C.T. FENIX GT11+GT12+TV
ENERGIA EOLICA S.A. C.E. CUPISNIQUE
ENERGIA EOLICA S.A. C.E. TALARA
EMPRESA DE GENERACION ELECTRICA DE JUNINC.H. RUNATULLLO III
EMPRESA DE GENERACION ELECTRICA DE JUNINC.H. RUNATULLLO II
MOQUEGUA FV S.A.C. C.S. MOQUEGUA SOLAR
EMPRESA DE GENERACION ELECTRICA CANCHAYC.H. CANCHAYLLO
STATKRAFT C.H. CHEVES I
EMPRESA CONCESIONARIA DE ENERGIA LIMPIA SC.T. LA GRINGA V G1
DETERMINACIÓN DE LA POTENCIA FIRME
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 8

EMPRESA Central Unidad

EMPRESA CONCESIONARIA DE ENERGIA LIMPIA SC.T. LA GRINGA V G2


MINERA CERRO VERDE C.T. RECKA
LUZ DEL SUR C.H. STA. TERESA
ENGIE C:H. QUITARACSA G1+G2
EMPRESA DE GENERACION HUALLAGA C.H. CHAGLLA G1
#REF! C.T. PUERTO BRAVO TG1
SAMAY I S.A. C.T. PUERTO BRAVO TG2
SAMAY I S.A. C.T. PUERTO BRAVO TG3
SAMAY I S.A. C.T. PUERTO BRAVO TG4
SAMAY I S.A. C.T. PUERTO BRAVO NE - Adicional TG1
ENGIE CHILCA DOS TG4/TG4+TV
KALLPA GENERACION S.A. CERRO DEL AGUILA G1/G2/G3
SINERSA CHANCAY G1/G2
EMPRESA DE GENERACION ELECTRICA RIO BAÑOS
RUCUY G1/G2
EMPRESA DE GENERACION HUALLAGA C.H. CHAGLLA G1/G2
ENGIE C.T. NEPI G41
G42
G43
EEPSA C.T. MALACAS TG-6
EMPRESA ELECTRICA AGUA AZUL C.H. POTRERO G1/G2
HIDROMARAÑON C.H. MARAÑON G1/G2
HUAURA POWER GROUP S.A. C.H. YARUCAYA G1/G2
KALLPA GENERACION S.A. P.C.H. CERRO DEL AGUILA G1
insert
TOTAL

Margen de Reserva (**) :


Máxima Demanda (kW) :
Reserva (kW) :
Máxima Demanda + Reserva (kW):
Potencia Efectiva Total (kW) :
CONDICION : Máxima Demanda + Reserva > Potencia Efectiva total

(*) Potencia incremental de la unidad TG1 de la C.T. Reserva Fria


(**) Valor de 38.9% (Fijan Margen de Reserva del SEIN para el periodo mayo 2017-abril 2018).
CIA FIRME

01 - 31 de dic.
Condición inicial

Pot. Efectiva Pot. Firme


(kW) (kW)

89,205 88,995
87,075 87,071
45,382 36,521
4,951 4,951
35,280 29,227
580 -
422 -
186 -
3,866 3,866
267,828 267,828
137,022 133,830

69,148 69,148
30,850 30,850
51,710 51,379
53,075 52,848
120,956 118,799
187,218 186,706
479,271 474,332
105,947 105,186
94,532 94,532
9,983 -
5,670 5,670
265,565 261,543
48,448 48,021
9,480 9,480
9,743 9,743
113,686 113,686
678,714 678,714
219,436 219,436
9,547 9,451
6,396 6,090
17,792 17,524
19,323 19,256
25,145 24,591
1,241 1,241
CIA FIRME

01 - 31 de dic.
Condición inicial

Pot. Efectiva Pot. Firme


(kW) (kW)

1,729 1,334
600 600
4,580 3,740
15,367 15,367
146,575 135,048
8,913 8,913
8,214 8,028
8,459 8,149
8,425 8,294
35,359 35,227
34,910 34,679
11,756 11,640
5,307 4,966
4,824 4,644
168,825 110,034
115,728 115,590
22,500 22,500
12,400 12,400
5,751 5,726
5,727 5,657
5,781 5,738
5,775 5,734
140,345 137,869
136,691 136,691
815,183 808,190
43,346 43,095
19,768 19,768
863,417 857,900
196,751 196,709
CIA FIRME

01 - 31 de dic.
Condición inicial

Pot. Efectiva Pot. Firme


(kW) (kW)

6,959 2,035
7,424 2,317
29,384 27,518
43,114 14,068
154,771 151,759
7,745 2,951
222,498 222,498
12,656 7,375
3,480 609
9,566 5,355
1,790 159
9,850 2,561
10,222 2,395
1,439 1,426
1,408 1,396
1,415 1,404
3,970 2,636
16,059 -
- -
- -
- -
- -
3,916 2,325
19,200 2,994
201,368 200,020
98,316 98,316
- -
565,477 552,938
- -
- -
19,966 4,556
19,967 3,501
- -
5,189 5,189
176,345 176,345
1,473 1,448
CIA FIRME

01 - 31 de dic.
Condición inicial

Pot. Efectiva Pot. Firme


(kW) (kW)

1,481 1,456
177,449 175,485
89,849 61,615
117,780 117,780
6,390 6,390
134,436 132,915
159,547 156,669
159,178 156,536
156,807 153,880
21,846 21,570
112,831 109,277
545,090 545,090

470,350 402,396
203,546 199,963
203,436 199,855
203,705 200,119
51,280 49,047
19,900 -
19,400 15,198
15,000 12,236
9,900 9,900

10,691,850 10,248,213

38.9%
6,462,403
2,513,875
8,976,278
10,691,850
Ejecutar Flujo Óptimo
INGRESOS POR POTENCIA POR GENERADOR INTEGRANTE Y CENTRAL DE GENERACIÓN
2017.Diciembre/Mensual
Importes Expresados en Soles (S/))
COES/D/DO/STR-INF-003-2018
CUADRO N° 9
Periodo 1
EMPRESA CENTRAL / UNIDAD PROMEDIO
Condicion inicial
AGRO INDUSTRIAL PARAMONGA PARAMONGA 100,694.16 100,694.16
AGROAURORA S.A.C. C.T. MAPLE ETANOL 0.00 0.00
CELEPSA CH EL PLATANAL 3,078,023.56 3,078,023.56
CHINANGO S.A.C. C.H. CHIMAY 2,098,774.69 2,098,774.69
CHINANGO S.A.C. C.H. YANANGO 193,104.70 193,104.70
EGASA C.H. CHARCANI I 17,913.00 17,913.00
EGASA C.H. CHARCANI II 7,773.91 7,773.91
EGASA C.H. CHARCANI III 51,201.48 51,201.48
EGASA C.H. CHARCANI IV 212,117.79 212,117.79
EGASA C.H. CHARCANI V 1,868,575.22 1,868,575.22
EGASA C.H. CHARCANI VI 122,759.97 122,759.97
EGASA CHILTG_TG 108.17 108.17
EGASA CHI_SLZ12_SLZ1 40.34 40.34
EGASA CHI_SLZ12_SLZ2 40.34 40.34
EGASA MOLL123_GD1 40.34 40.34
EGASA MOLL123_GD2 40.34 40.34
EGASA MOLL123_GD3 40.34 40.34
EGASA PISCO_TG1 486,049.17 486,049.17
EGASA PISCO_TG2 443,639.18 443,639.18
EGEMSA C.H. MACHUPICCHU 1,521,950.43 1,521,950.43
EGESUR C.H. ARICOTA I 310,780.46 310,780.46
EGESUR C.H. ARICOTA II 170,991.22 170,991.22
EGESUR INDEP_WAR1 77,711.62 77,711.62
EGESUR INDEP_WAR2 76,763.71 76,763.71
EGESUR INDEP_WAR3 76,778.38 76,778.38
EGESUR INDEP_WAR4 77,825.29 77,825.29
ELECTRICA SANTA ROSA C.H. PURMACANA 1,479.61 1,479.61
ELECTRICA YANAPAMPA SAC C.H. YANAPAMPA 30,840.80 30,840.80
ELECTROPERU C.H. MANTARO 9,392,073.61 9,392,073.61
ELECTROPERU C.H. RESTITUCION 3,035,292.71 3,035,292.71
ELECTROPERU MAK1 38.50 38.50
ELECTROPERU MAK2 38.50 38.50
EMPRESA DE GENERACION ELECTRICA CANCHAYLLO SAC C.H. CANCHAYLLO 70,341.07 70,341.07
EMPRESA DE GENERACION ELECTRICA DE JUNIN C.H. RUNATULLO II 46,768.15 46,768.15
EMPRESA DE GENERACION ELECTRICA DE JUNIN C.H. RUNATULLO III 61,349.73 61,349.73
EMPRESA DE GENERACION ELECTRICA RIO BAÑOS S.A.C. C.H. RUCUY 0.00 0.00
EMPRESA DE GENERACION HUALLAGA C.H. CHAGLLA 5,567,827.85 5,567,827.85
EMPRESA DE GENERACION HUALLAGA P.C.H CHAGLLA 85,766.05 85,766.05
EMPRESA DE GENERACION HUANZA C.H HUANZA 1,359,314.32 1,359,314.32
EMPRESA ELECTRICA AGUA AZUL C.H. POTRERO 0.01 0.01
EMPRESA ELECTRICA RIO DOBLE C.H. LAS PIZARRAS 40,158.49 40,158.49
ENEL GENERACION PERU S.A.A. C.H. HUAMPANI 425,594.17 425,594.17
ENEL GENERACION PERU S.A.A. C.H. HUINCO 3,705,513.93 3,705,513.93
ENEL GENERACION PERU S.A.A. C.H. MATUCANA 1,850,797.90 1,850,797.90
ENEL GENERACION PERU S.A.A. C.H. MOYOPAMPA 955,593.45 955,593.45
ENEL GENERACION PERU S.A.A. C.T. VENTANILLA 6,563,484.44 6,563,484.44
ENEL GENERACION PERU S.A.A. TG7 WEST 1,623,675.00 1,623,675.00
ENEL GENERACION PERU S.A.A. TG8 SIEMENS 2,417,750.76 2,417,750.76
UTI5
ENEL GENERACION PERU S.A.A. 190,158.32 190,158.32
UTI6
ENEL GENERACION PERU S.A.A. 537,842.86 537,842.86
ENEL GENERACION PIURA S.A. M_TG4 1,454,251.39 1,454,251.39
ENEL GENERACION PIURA S.A. TG6 1,934.31 1,934.31

ENERGÍA EÓLICA S.A. C.E. PARQUE EÓLICA CUPISNIQUE 0.00 0.00


(SSAA)
ENERGÍA EÓLICA S.A. C.E. TALARA 0.00 0.00
ENGIE C.H. QUITARACSA 1,628,731.71 1,628,731.71
ENGIE C.H. YUNCAN 1,890,303.67 1,890,303.67
ENGIE C.T. CHILCA 1 11,184,061.13 11,184,061.13
ENGIE C.T. CHILCA 2 1,483,693.25 1,483,693.25
ENGIE C.T. RESERVA FRIA PLANTA ILO 181.51 181.51
ENGIE ILO2_CARB_TV1 676,469.68 676,469.68
ENGIE NEPI_TG41 203.52 203.52
ENGIE NEPI_TG42 199.85 199.85
ENGIE NEPI_TG43 198.01 198.01
FENIX POWER PERÚ CENTRAL TERMICA FENIX 7,651,483.74 7,651,483.74
GENERADORA ENERGÍA DEL PERÚ C.H. LA JOYA 40,270.33 40,270.33
GTS MAJES S.A.C CS-MAJES SOLAR 20T 0.00 0.00
GTS REPARTICION S.A.C. CS-REPARTICION 0.00 0.00
HIDROCAÑETE S.A. CH-IMPERIAL 35,118.28 35,118.28
HIDROELECTRICA HUANCHOR S.A.C. C.H. HUANCHOR 271,980.57 271,980.57
HIDROELECTRICA SANTA CRUZ HUASAHUASI I 33,985.20 33,985.20
HIDROELECTRICA SANTA CRUZ HUASAHUASI II 31,693.36 31,693.36
HIDROELECTRICA SANTA CRUZ SANTA CRUZ I 26,865.83 26,865.83
HIDROELECTRICA SANTA CRUZ SANTA CRUZ II 30,760.12 30,760.12
HIDROMARAÑON C.H. MARAÑON 208,764.37 208,764.37
HUAURA POWER GROUP S.A. C.H. YARUCAYA 167,877.99 167,877.99
KALLPA GENERACION S.A. C.H. CERRO DEL AGUILA 7,538,624.51 7,538,624.51
KALLPA GENERACION S.A. C.T. KALLPA 11,869,474.47 11,869,474.47
KALLPA GENERACION S.A. MCH CERRO DEL AGUILA 131,397.45 131,397.45
KALLPA GENERACION S.A. TG1-LAS FLORES 2,369,526.84 2,369,526.84
LUZ DEL SUR C.H. SANTA TERESA 852,077.58 852,077.58
MAJA ENERGIA S.A.C. CH. RONCADOR 7,262.37 7,262.37
MINERA CERRO VERDE C.T. RECKA 170.51 170.51
INGRESOS POR POTENCIA POR GENERADOR INTEGRANTE Y CENTRAL DE GENERACIÓN
2017.Diciembre/Mensual
Importes Expresados en Soles (S/))
COES/D/DO/STR-INF-003-2018
CUADRO N° 9
Periodo 1
EMPRESA CENTRAL / UNIDAD PROMEDIO
Condicion inicial
MOQUEGUA FV S.A.C. CS MOQUEGUA FV 0.00 0.00
ORAZUL ENERGY PERÚ C.H. CARHUAQUERO 1,306,996.26 1,306,996.26
ORAZUL ENERGY PERÚ C.H. CARHUAQUERO IV 0.00 0.00
ORAZUL ENERGY PERÚ C.H. CAÑA BRAVA 77,124.91 77,124.91
ORAZUL ENERGY PERÚ C.H. CAÑON DEL PATO 3,618,534.12 3,618,534.12
PANAMERICANA SOLAR SAC. CS PANAMERICANA SOLAR 0.00 0.00
PARQUE EOLICO MARCONA S.R.L. C.E. MARCONA 0.00 0.00
PETRAMAS Gringa_G1 38.50 38.50
PETRAMAS Gringa_G2 18,807.73 18,807.73
PETRAMAS Huay_G1 18,386.03 18,386.03
PETRAMAS Huay_G2 17,973.50 17,973.50
PETRAMAS Huay_G3 38.50 38.50
SAMAY I S.A. C.T. PUERTO BRAVO_TG1 (SSAA) 212.68 212.68
SAMAY I S.A. PUERTO BRAVO TG1 212.68 212.68
SAMAY I S.A. PUERTO BRAVO TG2 214.52 214.52
SAMAY I S.A. PUERTO BRAVO TG3 212.68 212.68
SAMAY I S.A. PUERTO BRAVO TG4 214.52 214.52
SAN GABAN C.H. SAN GABAN II 1,599,181.68 1,599,181.68
SDF ENERGIA OQUENDO_TG1 379,152.38 379,152.38
SHOUGESA CUMMINS 196.18 196.18
SHOUGESA SH_TV1 38.50 38.50
SHOUGESA SH_TV2 205.35 205.35
SHOUGESA SH_TV3 212.68 212.68
SINERSA C.H. CHANCAY 0.00 0.00
SINERSA C.H. POECHOS II 72,788.75 72,788.75
STATKRAFT C.H. CAHUA 504,013.51 504,013.51
STATKRAFT C.H. CHEVES 2,439,294.03 2,439,294.03
STATKRAFT C.H. GALLITO CIEGO 403,108.50 403,108.50
STATKRAFT C.H. HUAYLLACHO 0.00 0.00
STATKRAFT C.H. MALPASO 663,019.34 663,019.34
STATKRAFT C.H. MISAPUQUIO 52,860.77 52,860.77
STATKRAFT C.H. OROYA 129,631.81 129,631.81
STATKRAFT C.H. PACHACHACA 133,111.74 133,111.74
STATKRAFT C.H. PARIAC 67,136.16 67,136.16
STATKRAFT C.H. SAN ANTONIO 0.00 0.00
STATKRAFT C.H. SAN IGNACIO 0.00 0.00
STATKRAFT C.H. YAUPI 1,571,895.98 1,571,895.98
TACNA SOLAR SAC. CS TACNA SOLAR 0.00 0.00
TERMOCHILCA OLLEROS TG1 2,766,951.58 2,766,951.58
TERMOSELVA AGE_TG1 1,216,391.69 1,216,391.69
TERMOSELVA AGE_TG2 1,191,718.69 1,191,718.69
SALDOS VTP
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 10
INGRESO POR POTENCIA EGRESO POR POTENCIA SALDO NETO
EMPRESA (S/) (S/) 2017.Mayo (S/) 2017.Junio (S/) 2017.Julio (S/) 2017.Agosto (S/) 2017.Noviembre (S/) AJUSTE DEL MES(S/) MENSUAL(S/)

AGRO INDUSTRIAL PARAMONGA 100,694.16 0.00 -0.087 -134.940 -164.049 -137.613 -27.254 0.000 100,230.217
AGROAURORA S.A.C. 0.00 40,013.10 0.000 0.000 -0.037 0.000 156.500 0.000 -39,856.635
AGUAS Y ENERGIA PERU 0.00 0.00 -0.087 0.000 0.000 0.000 0.000 0.000 -0.087
CELEPSA 3,078,023.56 2,964,940.54 -1.627 -2,654.455 -2,943.566 -3,170.778 -129,988.800 0.000 -25,676.200
CERRO DEL AGUILA S.A. 0.00 0.00 -3.984 -6,500.918 -6,199.063 -22,345.363 0.000 35,049.329 0.000
CHINANGO S.A.C. 2,291,879.39 1,804,076.39 -1.222 -1,992.522 -2,207.872 -2,378.966 -21,847.544 0.000 459,374.871
EGASA 3,210,339.57 2,247,697.56 -1.719 -2,804.879 -3,109.469 -3,349.505 -32,007.341 0.000 921,369.105
EGEMSA 1,521,950.43 1,366,226.85 -0.802 -1,309.553 -1,452.506 -1,564.535 -118,959.917 0.000 32,436.269
EGESUR 790,850.69 543,860.02 -0.418 -683.907 -756.128 -814.369 1,357.531 0.000 246,093.378
ELECTRICA SANTA ROSA 1,479.61 0.00 -0.001 -1.540 -1.596 -1.727 29.551 0.000 1,504.298
ELECTRICA YANAPAMPA SAC 30,840.80 0.00 -0.016 -25.535 -27.762 -29.970 106.908 0.000 30,864.420
ELECTROPERU 12,427,443.33 13,228,584.83 -6.565 -10,715.785 -11,876.376 -12,798.020 1,642,400.192 0.000 805,861.942
EMPRESA CONCESIONARIA ENERGIA LIMPIA SAC 0.00 0.00 -0.020 -32.510 -31.735 -37.454 116.489 -14.769 0.000
EMPRESA DE GENERACION ELECTRICA CANCHAYLLO SAC 70,341.07 0.00 -0.037 -60.595 -66.450 -71.670 104.815 0.000 70,247.131
EMPRESA DE GENERACION ELECTRICA DE JUNIN 108,117.88 0.00 -0.058 -94.677 -101.371 -110.109 467.107 0.000 108,278.771
EMPRESA DE GENERACION ELECTRICA RIO BAÑOS S.A.C. 0.00 0.00 -0.068 -111.137 -83.231 0.000 0.000 0.000 -194.436
EMPRESA DE GENERACION HUALLAGA 5,653,593.90 4,980,414.92 -3.370 -5,044.025 -5,512.754 -6,023.889 -255,610.813 0.000 400,984.129
EMPRESA DE GENERACION HUANZA 1,359,314.32 1,465,370.45 -0.718 -1,172.185 -1,299.363 -1,399.765 303.855 0.000 -109,624.297
EMPRESA ELECTRICA AGUA AZUL 0.01 0.00 -0.025 -39.924 -43.716 -47.164 103.266 0.000 -27.557
EMPRESA ELECTRICA RIO DOBLE 40,158.49 0.00 -0.025 -41.061 -45.054 -48.610 98.756 0.000 40,122.494
ENEL GENERACION PERU S.A.A. 18,270,410.82 21,970,865.78 -9.042 -14,179.876 -15,240.043 -16,421.710 120,100.164 0.000 -3,626,205.462
ENEL GENERACION PIURA S.A. 1,456,185.70 1,900,116.33 -0.939 -959.123 -6.537 -16.327 -15,386.235 0.000 -460,299.789
ENERGÍA EÓLICA S.A. 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000
ENGIE 16,864,042.33 17,258,516.03 50.371 80,475.250 88,125.025 96,787.433 -1,522,300.206 0.000 -1,651,335.829
FENIX POWER PERÚ 7,651,483.74 6,738,720.22 -4.063 -6,615.181 -7,368.007 -7,936.561 15,464.565 0.000 906,304.278
GENERADORA ENERGÍA DEL PERÚ 40,270.33 0.00 -0.025 -41.312 -45.867 -49.327 -394.505 0.000 39,739.294
GTS MAJES S.A.C 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000
GTS REPARTICION S.A.C. 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000
HIDROCAÑETE S.A. 35,118.28 0.00 -0.019 -31.340 -34.093 -36.902 110.723 0.000 35,126.649
HIDROELECTRICA HUANCHOR S.A.C. 271,980.57 345,444.81 -0.144 -234.484 -258.959 -279.394 277.162 0.000 -73,960.059
HIDROELECTRICA SANTA CRUZ 123,304.51 0.00 -0.068 -110.786 -120.223 -129.660 481.296 0.000 123,425.069
HIDROMARAÑON 208,764.37 0.00 0.000 -47.990 -198.543 -214.039 -67.129 0.000 208,236.668
HUAURA POWER GROUP S.A. 167,877.99 0.00 0.000 0.000 0.000 -76.845 -48.496 0.000 167,752.652
KALLPA GENERACION 0.00 0.00 -6.277 -10,240.571 -12,815.336 0.000 0.000 23,062.184 0.000
KALLPA GENERACION S.A. 21,909,023.27 22,342,085.09 0.000 0.000 0.000 0.000 -6,107.374 -58,111.513 -497,280.709
LUZ DEL SUR 852,077.58 1,387,805.13 -0.449 -733.251 -813.219 -876.056 233.396 0.000 -537,917.136
MAJA ENERGIA S.A.C. 7,262.37 0.00 -0.005 -7.532 -7.966 -8.613 98.004 0.000 7,336.262
MINERA CERRO VERDE 170.51 0.00 0.000 -0.027 -0.037 -0.040 3.481 0.000 173.890
MOQUEGUA FV S.A.C. 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000
ORAZUL ENERGY 0.00 0.00 -2.673 -4,362.807 -4,837.454 -5,210.912 0.000 14,413.846 0.000
ORAZUL ENERGY PERÚ 5,002,655.29 3,487,968.81 0.000 0.000 0.000 0.000 -40,243.512 -14,413.846 1,460,029.126
PANAMERICANA SOLAR SAC. 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000
PARQUE EOLICO MARCONA S.R.L. 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000
PETRAMAS 55,244.28 0.00 -0.029 -46.393 -45.305 -53.385 232.869 14.769 55,346.804
SAMAY I S.A. 1,067.08 0.00 0.000 -0.174 -0.237 -0.256 -128.752 0.000 937.660
SAN GABAN 1,599,181.68 593,849.82 -0.846 -1,380.386 -1,530.816 -1,649.146 -17,312.588 0.000 983,458.076
SDF ENERGIA 379,152.38 310,871.71 -0.201 -334.017 -358.479 -399.561 69.979 0.000 67,258.393
SHOUGESA 652.72 1,222,238.99 -0.001 -0.810 -0.998 -0.995 1,622.112 0.000 -1,219,966.965
SINERSA 72,788.75 0.00 -0.113 -184.454 -161.120 -77.830 59.228 0.000 72,424.461
STATKRAFT 5,964,071.84 5,369,449.06 -3.160 -5,152.452 -5,704.192 -6,149.960 -140,260.960 0.000 437,352.051
TACNA SOLAR SAC. 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000
TERMOCHILCA 2,766,951.58 2,639,881.00 -1.465 -2,390.552 -2,643.720 -2,847.633 -4,105.614 0.000 115,081.593
TERMOSELVA 2,408,110.37 2,583,878.12 -0.001 -1.586 -11.775 -22.774 520,799.094 0.000 344,995.212
TOTAL 116,792,875.54 116,792,875.54 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Ajustes del Mes:


Incluye transferencias de saldos de empresas retiradas a las empresas sucesoras.
RECAUDACION CVOA-CMG
2017.Diciembre/Mensual
COES/D/DO/STR-INF-003-2018
CUADRO N° 11

EMPRESA Cargo Unitario por CVOA-CMg

AGROAURORA S.A.C. 13,681.01


CELEPSA 1,069,596.55
CHINANGO S.A.C. 632,042.55
EGASA 786,849.34
EGEMSA 511,913.87
EGESUR 187,597.74
ELECTRICA SANTA ROSA 0.00
ELECTROPERU 4,038,823.97
EMPRESA DE GENERACION ELECTRICA DE JUNIN 0.00
EMPRESA DE GENERACION ELECTRICA RIO BAÑOS S.A.C. 0.00
EMPRESA DE GENERACION HUALLAGA 1,809,508.71
EMPRESA DE GENERACION HUANZA 507,688.12
EMPRESA ELECTRICA AGUA AZUL 0.00
ENEL GENERACION PERU S.A.A. 7,776,279.77
ENEL GENERACION PIURA S.A. 668,137.92
ENGIE 6,011,943.97
FENIX POWER PERÚ 2,329,170.38
HIDROELECTRICA HUANCHOR S.A.C. 118,030.91
HIDROELECTRICA SANTA CRUZ 0.00
HIDROMARAÑON 0.00
KALLPA GENERACION S.A. 7,730,979.22
LUZ DEL SUR 480,703.28
ORAZUL ENERGY PERÚ 1,216,615.95
SAN GABAN 211,144.66
SDF ENERGIA 96,337.82
SHOUGESA 424,071.26
STATKRAFT 1,900,819.41
TERMOCHILCA 914,408.47
TERMOSELVA 899,457.70
TOTAL 40,335,802.56