"DRIVEABILITY"
MODE. NOT
OTHERS !
Shaft 1 = 1.0
Shaft 2 = 1.2 (Lower Bound)
Shaft 3 = 1.7 (Upper Bound)
Toe 1 = 1.0
GRL WEAP Default
Toe 2 and others = 0.0
Refer STEP 2
From Spreadsheet 4
From Spreadsheet 2 Pile Make Skin Damping
Up, take TOTAL Vertical Length;
not True Length From SI Report
From Spreadsheet
By default, GRL WEAP will call XSRD (TOTAL). To
from "D". Refer to STEP 3 key-in the Shaft
Resistance value,
change "Driveability"
to any "Bearing
Graph". After key-in
then, change back to
Refer STEP 4 "Driveability".
STEP 2
1. Ensure Cursor
at Helmet
Weight box.
2. Press F3.
3. Click YES.
4. When "Drive
System Help"
appear (as
shown), click
"Check All".
5. Press "OK".
STEP 3
"Click "D""
24 Hr Welding at
Seam
Connection
Manually key-in.
Tak kisah nak guna berapa
pun intevals
(eg 5,10,15).
a) Elevation at pile
connection/weldment kena
correct. Refer Spreadsheet
2 Pile Make Up (Pile
Stoppage Below Mudline)
Vertical Length
from
Spreadsheet 2
Pile Make-up
STEP 4
1. Ensure Cursor
at Section Area
box.
2. Press F3.
3. When "Area
Calculator"
appear (as
shown), fill in the
blanks.
blanks
5. Press "OK".
STEP 5
1. From GRL
WEAP main
page, click "S1".
2. Click "Edit"
3. Click "Paste
Special".
1. Copy from
4. Click "Soil
Spreadsheet 6
Distribution".
Preb - Pile.
5. When "Text
2. Ensure copy
Separation"
form "to weap"
appear, click "
folder.
Convert to
Column".
3. Highlight and
copy all Depth
6. Click "Yes".
(m), Unit Shaft
Resist and Toe
7. Click "OK".
Resist.
This is how it is
looks like after
copy and paste
activities !
Copy from
Spreadsheet Preb-
Pile (Predicted
Blowcount) and
Paste them in GRL
WEAP
STEP 6
b) Max Stress
(usually Comp
Stress) at Set-Up
Factor 1.7 only.
i) Click "View".
ii) Click "Ranges,
Selections".
iii) When "Graph
Properties" (as
shown) appear, click
desired set-up factor.
2. Manual key-in
depth (m) and Blow
Count from GRL
WEAP output to
Spreadsheet 6
PREB-PILE for every
set-up factor.