You are on page 1of 9

STEP 1 ENSURE IT IS IN

"DRIVEABILITY"
MODE. NOT
OTHERS !

Shaft 1 = 1.0
Shaft 2 = 1.2 (Lower Bound)
Shaft 3 = 1.7 (Upper Bound)

Toe 1 = 1.0
GRL WEAP Default
Toe 2 and others = 0.0

GRL WEAP Default

Biarkan saje! Jgn


Choose "Steel" usik/ubah ape2 !

Refer to SI Report ->


"HAMMER and SOIL
DATA" chapter

Refer STEP 2
From Spreadsheet 4
From Spreadsheet 2 Pile Make Skin Damping
Up, take TOTAL Vertical Length;
not True Length From SI Report

From Spreadsheet
By default, GRL WEAP will call XSRD (TOTAL). To
from "D". Refer to STEP 3 key-in the Shaft
Resistance value,
change "Driveability"
to any "Bearing
Graph". After key-in
then, change back to
Refer STEP 4 "Driveability".
STEP 2

GRL Weap will


key-in
automatically.
Follow below
instructions:

1. Ensure Cursor
at Helmet
Weight box.

2. Press F3.

3. Click YES.

4. When "Drive
System Help"
appear (as
shown), click
"Check All".

5. Press "OK".
STEP 3
"Click "D""

24 Hr Welding at
Seam
Connection

Manually key-in.
Tak kisah nak guna berapa
pun intevals
(eg 5,10,15).

But ade 2 things yg


penting:

a) Elevation at pile
connection/weldment kena
correct. Refer Spreadsheet
2 Pile Make Up (Pile
Stoppage Below Mudline)

b) Depth paling bawah


kena BAWAH lagi dari
Bottomest Pile Stopage
Below Mudline in
Spreadsheet 2 Pile Make
Up. In this case, 160m is
greater than 136m
(Spreadsheet 2 Pile Make
Up -> Pile Stoppage Below
Mudline)

Vertical Length
from
Spreadsheet 2
Pile Make-up
STEP 4

GRL Weap will


key-in
automatically.
Follow below
instructions:

1. Ensure Cursor
at Section Area
box.

2. Press F3.

3. When "Area
Calculator"
appear (as
shown), fill in the
blanks.
blanks

5. Press "OK".
STEP 5

1. From GRL
WEAP main
page, click "S1".

2. Click "Edit"

3. Click "Paste
Special".
1. Copy from
4. Click "Soil
Spreadsheet 6
Distribution".
Preb - Pile.
5. When "Text
2. Ensure copy
Separation"
form "to weap"
appear, click "
folder.
Convert to
Column".
3. Highlight and
copy all Depth
6. Click "Yes".
(m), Unit Shaft
Resist and Toe
7. Click "OK".
Resist.
This is how it is
looks like after
copy and paste
activities !

Copy from
Spreadsheet Preb-
Pile (Predicted
Blowcount) and
Paste them in GRL
WEAP
STEP 6

2nd, click "O" to


show Output

First, click "A"


to analyze
STEP 7

Set-Up factor. We 1. After click "O",


can request for: output will appear
a) 1.0 insyaAllah. Open
(aka "End" in RNZ .gwd file.
Drivability report)
b) 1.2 2. For reporting, we
c) 1.7 require 2 types of
infos:

a) Blow count at Set-


Up factor 1.0 (End),
1.2 and 1.7.

b) Max Stress
(usually Comp
Stress) at Set-Up
Factor 1.7 only.

3. So, to change set-


up factor:

i) Click "View".
ii) Click "Ranges,
Selections".
iii) When "Graph
Properties" (as
shown) appear, click
desired set-up factor.

4. The Max Stress


shall be re-key-in in
Spreadsheet 1 Pile
Combined Stress at
"Driving Stress at
GRL WEAP".
STEP 8

1. From GRL WEAP


Output, generate
Blow Count curve for
every Hammer with
regards to every Set-
up factor.

2. Manual key-in
depth (m) and Blow
Count from GRL
WEAP output to
Spreadsheet 6
PREB-PILE for every
set-up factor.

This is how the


Blow Count graph
looks like !