Storage locations;

SFG storage location

Lot Size procedures

1. In-house production time: This is used to specify the number of calendar days needed
to produce the material. In-house production time is depends as per the order quantity.
The In-house production time will be taken from the Recipe and updated in the material
master work scheduling view.
The prerequisite for this are
a) All recipes to be uploaded in the system.
b) Scheduling of the recipes should be done in change mode of recipe.
c) After scheduling update of material master has to be done through transaction
CA96.
 Production scheduling profile: Specify that certain business transactions are carried out in
parallel in a process order (you can, for example, create and release an order at the same
time, or release an order and print the shop papers).
For all the profiles the below settings are made.
Automatic scheduling and capacities are booked at the time of release of process order.
Also while creating the process order depending on the Production scheduling

profile system will automatically pick the process order type

1. Production schedule: This indicator helps in determining the order types for process order.
Production Scheduler is responsible for the production activities for the material.
At Puniska production scheduler is also used for reporting purpose.
Each production block is created as production scheduler.

1. Person responsible: It is used to identify the production lines with in production area.
The following persons responsible would be used in resources.
Planned MD50 Material Materials Planning User should carefully
Independent Number are Dept select active mode of
Requirements Plant planned. (PPIC) version while
Planning planning else all the
Period requirements will be
passed on to
simulative MRP.
Change MD12 Material PIR are PP At plant level
Planned Number broken
Independent Plant down to
Requirements Planning day wise,
(Monthly to Period
daily)