You are on page 1of 26

Main Brochure

PRE-ENGINEERED
STEEL BUILDINGS

Contact Us
Cambodia Office:
Add : No.598 St., Borey Vimean PhnomPenh,
Russei Keo, PhnomPenh, Cambodia
Phone : +855 23 666 7898

Thailand Office:
Add : No.350/114 Rama3 St., Chongnosee Yannawa
Bangkok 10120, Thailand

Vietnam Office:
Add : 54 Truong Quoc Dung St., Phu Nhuan Dist.,
Ho Chi Minh City
Phone : +84 8 3990 3777

Email: sales@uni-steelbuildings.com
Website: uni-steelbuildings.com
CONTENT
ABOUT US 4-5

MESSAGE FROM CEO 6-7

OUR VISION, OUR MISSION 8

ADVANTAGES 9

COMPANY PROCESS 10-11

READY WHY US ?

TO ACHIEVE
CONSULT & DESIGN 12-13

FABRICATION 14-15

THE PEAKS
QA & QC 16-17

ERECTION 18-19

PRE ENGINEERED STEEL BUILDING SYSTEM 20-35


GET QUOTATION within 24 HOURS PRODUCTS 36-39
DESIGN to DELIVERY within 4 WEEKS
FABRICATION 40-41
WATER PROOFING WARRANTY for 2 YEARS
PROJECT REFERENCES 42-51
ERAWAN PROJECT
THAILAND
US BUIDINGS
DURABLE
LIKE STEEL

US BUILDINGS specializes in Design, Manufacture, Supply and


Erection pre-engineered steel buildings for projects such as:
Industry, Hangar, Exhibition center ... ABOUT US
We have qualified team and specialized software to design to
provide the best cost and solution. UNIVERSAL STEEL
We are the particularly loyal partner and give a professional service. BUILDINGS
04 I Main Brochure Main Brochure I 05
MESSAGE FROM
CEO
“ US BUILDINGS dream is to create
projects that durable like steel ”

US Buildings has designed; fabricated


steel structures and concentrated in
the main business of Pre-engineering
buildings such as industry; hangar;
fertilizer factory...

We are now stepping forward to " The


most VIRAL NAME in excellent quality
with reasonable price in CAMBODIA
THAILAND MYANMAR "

To make our dream come true; we are


willing to serve you with the best
attitude and service. Let us be your a
friend; your consultant even you
don't choose us.

06 I Main Brochure Main Brochure I 07


OUR VISION ADVANTAGES
“INVENTING THE FUTURE OF INDUSTRIAL BUILDINGS”
Reduce construction time:
Due to the system approach, the use of high strength steel, use built-up sections which opti-
WE WANT TO PIONEER NEW WAYS OF SUPPLYING AND ERECTION mized by the computerized program and the use of continuous light weight secondary steel
STEEL STRUCTURE - PRE ENGINEERED STEEL BUILDINGS. section, there is an overall reduction in steel weight, cost and time relative to conventional
IT IS NOT JUST ABOUT PRODUCTS, IT IS ABOUT REALISING THE steel construction.
PREMIUM SERVICE AND PROFESSIONAL MANAGEMENT
Design:
Since pre-engineered steel buildings (PEBs) are mainly formed of standard sections and con-
nections, the design time is significantly reduced, specialized computer analysis custom
details, the light weight flexible frames offer higher resistance to seismic forces.

OUR MISSION Foundations:


Pre-engineered steel buildings are about 50% lighter than the conventional steel structures,
hence, the foundations are of simple design, easy to construct and lighter.
“CONSULT AND TO BE A GURU IN PRE ENGINEERED STEEL
BUILDINGS IN FEILDS” Erection:
All components are standard like the LEGO. The erection time is faster.
OUR ULTIMATE PURPOSE IS TO BE CONSULTANT AND GIVE
SOLUTION TO ACHIEVE SAFE, DURABLE STRUCTURE WITH A Flexible of expansion:
COUPLE “HIGH QUALITY - REASONABLE COST” Buildings can be easily expanded in length by adding more bays, also, expansion in width and
height is possible by pre-designing for future expansion.

Large clear spans:


Buildings can be supplied to around 90m clear spans.
Energy efficient roof and wall systems:
Buildings can be supplied with polyurethane insulated panels or fiberglass blanket insulation
to achieve required “U” values.

Lower cost:
Due to the systems approach, there is a significant saving in design, manufacturing and site
erection cost, the structural elements are shaped to follow the stress diagram of the member,
thus reducing weight, cost and load to foundations, the secondary members and cladding
nest together reducing transportation cost, the overall price per square meter may be
reduced as much as 30% lower than conventional steel.

08 I Main Brochure Main Brochure I 09


COMPANY PROCESS
1. CONCEPT DRAWINGS

2. CONSULTING
1 2
3. CONTRACTING

4. MODELING & SHOP DRAWINGS

5. FABRICATION

6. QC CHECKING & PACKAGING


3 4
7. DELIVERY

8. ERECTION

5 6

7 8
10 I Main Brochure Main Brochure I 11
WHY US ? CODES TEKLA MODEL

ISO CERTIFICATE TEKLA CERTIFICATE

CONSULT & DESIGN UNIVERSAL STEEL BUILDINGS CO., LTD


MANUFACTURE AND SUPPLY OF PRE-ENGINEERED
UNIVERSAL STEEL BUILDINGS CO., LTD
STEEL BUILDINGS
This is a multi-site certificate. Additional site details are listed in the appendix to this certificate. ISO 9001:2008
Scope of certification
Bureau Veritas Certificate Holding SAS – UK Branch certifies that the Management
System of the above organization has been audited and found to be in accordance with
the requirements of the Management System Standards detailed below. MANUFACTURE AND SUPPLY OF PRE-ENGINEERED
STEEL BUILDINGS
This is to certify that

ISO 9001:2008
Site Address Scope

Scope of certification UNIVERSAL No 7 Street, VSIP II,


STEEL BUILDINGS BINH DUONG
DESIGN, DETAIL SHOP DRAWINGS AND
PROVIDE ERECTION SERVICE FOR PRE-
is the legel user of Tekla Structures.
CO., LTD ENGINEERED STEEL BUILDINGS
DESIGN, DETAIL SHOP DRAWINGS, MANUFACTURE, SUPPLY Product Code : Tekla Structures, Steel Detailing
AND PROVIDE ERECTION SERVICE FOR PRE-ENGINEERED
Version:1 Revision date: 24 July 2015 Number of License : 2 sets
STEEL BUILDINGS.
Maintenance Period : 31 Dec 2018
Certification cycle start date: 31 August 2015

Subject to the continued satisfactory operation of the organization’s Management


System, this certificate expires on: 30 August 2018
NGUYEN TU HAI
Original certification date: 8 August 2006
Signed on behalf of BVCH SAS - UK Branch

Certificate no.: VN.3470197 Version:1 Revision date: 24 July 2015 Certification body address: 66 Prescot Street, London, E1 8HG, United Kingdom
Local Office: Unit 4.4A, 4th Floor, E-town 1 Building, 364 Cong Hoa Street,
Tan Binh District, Ho Chi Minh City, Vietnam Tahir Sharif, Managing Director, Tekla M&C
Further clarifications regarding the scope of this certificate and the applicability of the
Management System requirements may be obtained by consulting the organization.
To check this certificate validity, please call +84-8-3812 2246.

NGUYEN TU HAI
Signed on behalf of BVCH SAS - UK Branch
Certification body address: 66 Prescot Street, London, E1 8HG, United Kingdom
Local Office: Unit 4.4A, 4th Floor, E-town 1 Building, 364 Cong Hoa Street,
Tan Binh District, Ho Chi Minh City, Vietnam
Further clarifications regarding the scope of this certificate and the applicability of the
Management System requirements may be obtained by consulting the organization.
To check this certificate validity, please call +84-8-3812 2246.

Page 2 of 2
Page 1 of 2

12 I Main Brochure Main Brochure I 13


WHY US ?

1 2

3 4
FABRICATION
1. CUTTING
2. FITTING UP
3. AUTO WELDING
4. MANUAL WELDING
5. FINISHING
6. PAINTING

5 6
14 I Main Brochure Main Brochure I 15
MILL TEST CERTIFICATE
WHY US ? WAKAI & CO., LTD.
!"#$%&'
Product Technical Data Sheet
WVA-00002PTDS

Product
Akis Hex Flange Head Self-Drilling Screw 5.5X25 with EPDM Packing Bonded Washer

Application
Akis Hex Flange Head Self-Drilling Screw 5.5X25 with EPDM Packing Bonded Washer is used
for fixing single skin roof panels at valley to steel purlins.

Drill Capacity
Steel up to 6.0 mm in total thickness

Features
Big Washer For prevention of the damage on the folded plate roof in case of too much fastening
Drill Point For quick drilling without dancing on the sheet metal
Coating Extreme corrosion performance to Salt Spray Test (JIS Z-2371) more than 2000 hours

Installation Steps
1. Use a powered or cordless screw driver with a 2,500 RPM speed.
2. Fit a screw into 5/16 Hex Head Driver Bit and place the screw on the fastening position.
3. Apply consistently firm pressure to the screw driver until the screw has fastened

Mechanical Properties
Material: Carbon Steel SAE 1022
Shaer Strength 750 N/m (
Tensile Strength 1,600 N/ m (
Torsion Strength 13.5 N-m
Pullout Strength Steel Purlin 1.6: 2,770 N | Steel Purlin 2.3:4,200 N | Steel Purlin 3.2: 7,230 N
All values are averages obtained under laboratory conditions and appropriate safety factors should be applies for design purposes.

Pachking
Small Box Qty. 250 pieces
Carton Qty. 3,000 pieces (250 pieces X 12 boxes)

L. Length S. Thread Length Efective Length


24.20~25.80 13.70~25.30 6 Min
B. Washer Diameter H. Head Height
13.95~14.45 3.80~4.20

ACTUAL CHECKING

TESTING
QA & QC

UNIVERSAL VIETNAM UNIVERSAL VIETNAM


KCN VSIP II, BÌNH DƯƠNG KCN VSIP II, BÌNH DƯƠNG

UNIVERSAL VIETNAM
KCN VSIP II, BÌNH DƯƠNG

16 I Main Brochure Main Brochure I 17


METHOD STATEMENT

WHY US ?

MATERIALS

MATERIALS OF PHASE 01
ARRANGED GL. BY GL.
Crane 25 tonne Kato 25 ton

Working radius : 18m


Boom length : Main boom = 33m
Max capacity load : 2.6 tonnes r= 1
8m
Max weight : 700 Kg

MATERIALS OF PHASE 02
ARRANGED GL. BY GL.

MATERIALS OF PHASE 01
ARRANGED GL. BY GL.
MOBILIZE MATERIALS

MATERIALS
TO ASSEMBLING AREA 1
DIRECTION OF ERECTION DIRECTION OF ERECTION
2 1

MATERIALS OF PHASE 02
ARRANGED GL. BY GL.

MATERIALS OF PHASE 01
ARRANGED GL. BY GL.
ASSEMBLING AREA

ASSEMBLING AREA
Kato 25 ton
MOBILIZE MATERIALS TO ASSEMBLING AREA 2

r=1
8m

MATERIALS OF PHASE 02
Crane 25 tonne

ARRANGED GL. BY GL.

MATERIALS OF PHASE 01
Working radius : 18m

ARRANGED GL. BY GL.


Boom length : Main boom = 33m
Max capacity load : 2.6 tonnes
Max weight : 700 Kg

32

01

28

07 09

08

40

21

30

PLAN FOR UNLOADING MATERIALS

ERECTION

ERECTION
1. METHOD STATEMENT
2. ERECTION
1 2
- Setting anchor bolts
- After setting anchor bolts
- Daily safety meeting
- Assembling members
- Erection

3 4 5

18 I English Brochure Main Brochure I 19


PRE ENGINEERED
STEEL BUILDING SYSTEM

20 I English Brochure Main Brochure I 21


PARAMETERS & PRIMARY FRAMING SYSTEMS

TIPS:
Building length
Tips: It is advisable to keep all bay
lengths equal. If this is not possible,
manintain all interior bays equal and
the end bays equal but shorter than
the interior bays.
Buiding Width:
Since the roof purlins are at 1500mm
c/c spacing make the building width a
multiple of 3M.
US Buildings Pre-Engineered Steel
Buildings are designed by our architects
solely with customer requirements in
mind and within the parameters of the
pre-engineered structures. Our basic
architectural measures include:
Building Width is the distance from The Building height forms the eave height, which is the
the outside of eave strut of one side- length from the foot of the main frame column base plate
wall to the outside of eave strut of the to the top outer point of the eave strut and can measure
facing sidewall. up to a height of 30m. In the case of columns that are
Building Length is the distance recessed o elevated from finished floor, the eave height
between the outside flanges of end- is the distance from finished floor to top of the eave
wall columns in facing endwall. strut.
The end Bay Length forms the The roof slopes, of thick any practical ones can be con-
distance from the outside of the outer structed by our architects, is the angle which the roof
flange of endwall columns to the forms with respect to horizontal and are commonly
center line of the first interior frame 0.5/10 and 1/10.
columns. US Buildings has minimum roof live design load of
The Interior Bay Length is measured 0.57kN/m2 and design wind speed of 110km/hr which
as the distance between the center are applicable in keeping with American codes.
lines of two adjacent interior main
frame columns which usually range
from 6m, 7.5m and 9m to 15m.

22 I English Brochure Main Brochure I 23


STRUCTURAL SUBSYSTEMS

24 I English Brochure Main Brochure I 25


CRANE SYSTEM MEZZANINES
When required by design loads, the main beams Our standard Mezzanine floor systems consist of
Two out of every five metal building systems are shall also be supported by intermediate columns. Galvanized Steel Decking Supported by joists
constructed for manufacturing facilities where The primary mezzanine beams usually run across framed onto main mezzanine beams.
cranes are frequently needed for material handling. the width of the building and the joists usually run A reinforced concrete slab (not Supplied by US
Our building can be designed to support any lengthwise (parallel to the roof purlins). The Econo- Buildings) in cast in situ on top of the metal deck
required crane system. Overhead travelling my of a mezzanine system depends on the applied with some floor finishes
cranes up to 15 metric tonnes are supported on loads such as dead load, live load and collateral load.
brackets. Higher capacities are usually supported
by an independent support system.
A building crane is a complex structural system
which consists of the actual crane with trolley and
hoist, crane rails with their fastenings, crane
runway beams, structural supports, stops, and
bumpers. A motorized crane would also included
electrical and mechanical components. Our
discussion is further limited to interior building
cranes.
We do required the customer’s complete crane
system information in order to design and
estimate buildings with cranes.
The costs involved in adding a crane system to a
metal building consist of:
1. Strengthening the building’s main frame to
support the crane loads.
2. Supplying the crane brackets and crane
runway beams that support the crane
system
3. Supplying and installing crane rails.
4. Supplying, installing and commissioning the
crane system.

26 I English Brochure Main Brochure I 27


STRUCTURAL COMPONENTS PANEL
Metal Panels are one of the most attractive (exterior) face. The polyester paint is made of a polymer
features of a Metal Building System, having that is equal to or superior to silicon polyester. The
Primary Built up Members contributed mightily for the growing popu- interior face is coated with a 5-7 microns polyurethane
(Minimum Yield Strength is 345 N/mm2) larity of metal buildings. The term “Panel” in compatible epoxy primer in RAL 7035 (Light gray color
High grade steel plate is conforming to ASTM this context refers to the metal skins used as on the interior face. Aluminum panel are offered in 3
A572M Grade 345 Type 1. Factory painted roof and wall panels, interior roof and wall finishes.
with a minimum of 40 microns (DFT) of primer liners, partition panels, fascia panels, soffit
as our standard or any other paint system as panels, etc. Single Skin Profile:
per customer choice. US Buildings Building System stocks two The Single Skin Profiled Sheets Are Ideal For Agircultur-
different base metals for the panels as al, Commercial And Industrial Buildings. These Profile
Secondary Members
below: Are Available With Design Flexibility To Suit Your
(Minimum Yield Strength is 345 N/mm2)
• Steel Design Requirements And Also Can Be Used As Wall
(Available in 1.5mm, 1.9mm, 2.4mm and
• Aluminum And Roof Panels.
3.0mm thicknesses) Galvanized steel coil is
The Profiles are as the figure:
conforming to ASTM A792M, Grade 50
equivalent, Zinc coating to Z180. Steel Panels: The base metal for standard
Bracing systems stocked steel panels have minimum yield Roof panel
Rod bracing shall conform to physical strength which is equal to 34.5 kN/cm2 and

55 mm
specifications of ASTM A36 Grade 36 or conforms to ASTM A792 Grade 50B. The
protective steel coating shall be aluminum

(3+1) mm
equivalent with minimum yield stress of 345
N/mm2. zinc alloy comprised of 55% Aluminum and - Washer T19 (EPDM)
45% Zinc, weighing 150 grams/m2 spread - 3mm thick
19 mm

over both sides.


This coating offers four times more corro-
sion resistance compared to the galvanized.
Per-painted Aluzinc coated steel have a 5
microns primer paint +20 microns polyester
paint applied at the mill on the weather 1000
(exterior) face and 5-7 microns polyure- 250
thane compatible epoxy primer in RAL 7035 32
O/S
(light gray) color on the interior face.
Siphon break 55 mm Screw at high Rib
I/S
Aluminum Panels: Aluminum is made of
alloy AA3105 having temper H16 for mill
finish and alloy H46 for pre-painted. The
yield strength shall be 145 N/mm2.
Pre-painted aluminum shall have a 5 Pressure too
Pressure too weak
weak Pressure correct
Pressure correct Pressure too
Pressure too strong
strong

microms primer paint+ 18 microns polyester


paint applied at the mill on the weather Wall panel

O/S
900

41 mm strong profile 41

28 I English Brochure Main Brochure I 29


A COMPLETE FACTORY FINISHING INSULATED
PANELS CLADDING SYSTEM
The profiles are available in different types:
Rigid polyurethane foam, sand-
Liner Sandwich panels Roof panel
wiched by metal or flexible
Leak-seam facings, is increasingly successful
in meeting the requirements of
the construction industry, empha-
sizing on cost-effective system
Liner building and energy conversation. LEAK-SEAM:
Their specific field of application Best solution for water proofing

1000 Clip for


covers the construction of indus-
125 125 Leak-seam trial and commercial buildings and
O/S 18
I/S Insulation Purlin the food supply (cold storages,
refrigerated transportation).
* Sandwich panels are available 50 & 100 mm thickness
Polyrethanes are three dimen-
sionally networked macrocellular Resistance to strong winds due to

thermosets as a result of a reac- 66


470
65
tion between a multifunctional
isocyanate in the presence of a Sealant
Distance between clips only 470mm
Sealant
blowing agent and additives.
Self-lock Fixing Supporter

Fixing Supporter

Self-lock

Step 1

Sandwich panel offer a wide range


of properties which are responsi- Standing Seam Roof 360O
ble for the increasing demand of
360o
Step 2
this unexcelled construction
metal. The list of properties
covers:
• Thermal insulation
• Impact resistance and stability Step 3

• Impermeability Thicker and Wider

• Fire resistance
• Weight and space saving
Decking 55mm Decking 76mm • Easy cleaning and decoration
• Low maintenance and long long
life
• Fast delivery due to fully
automated manufacturing
process
832 895
295
• Long lengths and wide
208
spanning characteristics means
55 76
rapid and simple site erection
• CFC-HCFC free

30 I English Brochure Main Brochure I 31


TRIMS BUILDING ACCESSORIES

32 I English Brochure Main Brochure I 33


BUILDING ACCESSORIES
At US Buildings Building Systems, we offer all
types of building accessories such as:

• Personnel Doors
• Double personnel Doors
• Sliding Doors
• Roll up Doors
• Window
• Frame Openings
• Fixed Louvers
• Adjustable Louvers
• Roof Curbs
• Translucent Panels
• Ridge Ventilators
• Power Ventilators
• Insulation
• Suspended Ceilings
• Roof Extensions
• Canopies
• Fascias
• Partitions
• Crane and Roof Monitors.

34 I English Brochure Main Brochure I 35


PRODUCTS
1. Crane Beam

2. Galvanize Truss

3. Hangar

4. High Slope Factory 1 2

5. Insulation

6. Staircase

3 4

5 6

36 I English Brochure Main Brochure I 37


PRODUCTS PRODUCTS
Material Specifications for Project Paint System
MAIN FRAME COLOR CARD
Material Specifications
Minimum yield
No Components Specifications Applicable Design Code
strength

ASTM A572 – Gr50 AISC – American Institute of


1 Built –up
(or equivalent) Fy = 34.5 kN/cm 2 Steel Construction – Latest
(Plates)
<20mm Edition

AISC – American Institute of


ASTM A-36
Angles Fy = 24.5 kN/cm2 Steel Construction – Latest
(or equivalent)
Edition
2 Hot Rolled RED LIGHT BLUE LIGHT GREY GREY
AISC – American Institute of
ASTM A-36
Beams Fy = 24.5 kN/cm2 Steel Construction – Latest
(or equivalent)
Edition
PANEL COLOR CARD
ASTM A-653 (M) SS AISI – American Iron & Steel
3 Cold Form Galvanized
GR 50 Fy = 34.5 kN/cm2 Institute – 2001 Edition
(Z275) (Z275)
(or equivalent.)

AZ150
AISI – American Iron & Steel
4 Roof panel Zinc Aluminum Base Fy = 34.5 kN/cm2 Institute – 2001 Edition
ASTM A792 Gr. 50

Galvanized ASCE –American Society of


DIN 3066
5 X-Bracing cable Fy = 157 kN/cm2 Civil Engineers Standards
(or equivalent)
bracing US-ALU US-SILL US-WHITECREAM US-GREEN

AISC – American Institute of


6 Anchor bolts ASTM A36
Fy = 40.0 kN/cm 2 Steel Construction – Latest
(Galvanized) (or equivalent)
Edition

AISC – American Institute of


7 High strength Bolts ASTM A325 Type 1 Ft = 30.3 kN/cm2 Steel Construction – Latest
(Galvanized) (or equivalent) Fu = 72 to 83 kN/cm2 Edition

AISC – American Institute of


Machine Bolts ASTM – A 307 Ft = 13.8 kN/cm2
8 Steel Construction – Latest
(Galvanized) (or equivalent) Fu = 41.0 kN/cm2 US-OGREEN US-ALUMIN US-BLUE US-DBLUE
Edition

US Buildings reserves the right to substitute partly some of the


materials in case of material non-availability or supply shortages

38 I English Brochure Main Brochure I 39


FABRICATION

40 I English Brochure Main Brochure I 41


PROJECT REFERENCES

PROJECT AREA (m2) LOCATION


PROJECT AREA (m2) LOCATION
AUTOMOBILE
COMPONENTS 120000 CAMBODIA
COMESTICS
FACTORY 35000 VIETNAM
FACTORY
* 3500 TON, 2 STOREYS
* ROOF SYSTEMS, 120 FEET HEIGHT

42 I Main Brochure Main Brochure I 43


PROJECT REFERENCES

PROJECT AREA (m2) LOCATION

PROJECT LOCATION FURNITURE 40000 THAILAND


AREA (m2)
WORKSHOP

FERTILIZER PLANT 86000 CAMBODIA * 4 WEEK DELIVERY

* CANOPY 15M

44 I Main Brochure Main Brochure I 45


PROJECT REFERENCES

PROJECT AREA (m2) LOCATION

MACHINERY 160000 CAMBODIA


FACTORY

* LOKSEAM PANEL 40m LENGTH

PROJECT AREA (m2) LOCATION

BIKE SHED 15000 CAMBODIA

46 I Main Brochure Main Brochure I 47


PROJECT REFERENCES

PROJECT AREA (m2) LOCATION

SUGAR WAREHOUSE 30000 THAILAND

* PIPERACK SYSTEM
PROJECT AREA (m2) LOCATION

SHOES FACTORY 18000 CAMBODIA

48 I Main Brochure Main Brochure I 49


PROJECT REFERENCES

Other Steel Structure


Our structural steel division has the capability and
capacity to supply Structural Steel Buildings for any
type of project such as Desalination and power type of
project such as Power Plants, Steel Mills, High Rises,
Bridge Girders, Office Buildings, Factory Buildings,
Water Towers, Steel Platforms and other complex
structures.
In special cases where complex design is required for
projects like petrochemical or oil and gas sector, we use
the technical skills of experts in the field with whom we
have signed joint venture agreements.

PROJECT AREA (m2) LOCATION

TEXTILE FACTORY 30000 CAMBODIA

50 I Main Brochure Main Brochure I 51

You might also like