IMPLEMENTATION WORK
3.1.1. Water
Water is a basic ingredient that is very important in the
manufacture of construction materials. In the concrete
construction, water is required to act with cement so that it can be
the adhesive between the coarse aggregate with fine aggregate.
Classification of water is good for the development of a
construction are as follows:
Water must be clean.
Should not contain more than 2 grams/liter of mud.
Should not contain oil sludge and other visible applied objects.
3.1.7. Decking
Decking or concrete tofu is concrete or specimens formed
according to the size of the concrete blanket that has been
planned. Concrete decking is usually box or cylindrical. The
purpose of the use of concrete decking is that there is
space/distance between iron and formwork.
3.1.9. Hebel
Hebel usage in construction projects used for work the wall
work, use Hebel aims to lighten the burden of the structure, speed
up implementation, and minimize material waste during the
installation process of the wall.
3.1.11. Calbond
Calbond is an adhesive liquid between the concrete has
been cast (hardened) with a new concrete mix to be cast. The
white liquid adhesive is also called concrete glue as shown in the
figure below. Calbond in this project is widely used in concrete
casting connection.
3.1.13.Metal Deck
Metal decks are lightweight steel materials with unique
technical material characteristics and deep profile shapes, which
serve as a sliding brace and increase the capacity of the profile.
Metal decks can be applied as concrete composite floor plates on
concrete structures and steel structures. The use of metal decks
in the work of the floor slab of concrete can save 17% s / d 25%.
3.2.8. Waterpass
Waterpass are tools used to measure the difference in
elevation from one reference point to the next. Waterpass can be
used to mark any level because it doesn’t have vertical angle drive.
It is used to determine the elevation of the floor, beam, and others
that require elevation.
a. Columns Work
Columns are vertical rods of the frame structures that bear the
burden of the beam. The column serves to pass the load from the
top elevation to the lower elevation up to the foundation soil. The
column is a press of a structural element that plays an important
role on the construction of the building so that collapse in a column
is a critical location that can cause the collapse of the floor in
question and the total collapse the entire structure of the building.
Therefore work must be observed column size, precision as the
column so that meet the quality standards that have been defined.
Start
Preparatory Work
Reinforcement Column
No
Check reinforcement
Yes
Installation of Formwork
No
Check Formwork
Yes
Preparatory Cast Concrete
Cast
4. Casting Column
This casting process will be done if the jobs above have been
approved by the supervisor or the project owner. F3 columns on the
casting floor using a concrete ready mix with concrete quality K-300.
Here are the tools needed for foundry work:
Tower crane
Bucket
Hose tremi
Vibrator Machine
Start
Preparatory Work
Installation Scaffolding
Installation Formwork
No
Check Formwork
Yes
Beam and Plate
Reinforcement
No
Check Reinforcement
Yes
Preparatory Cast Concrete
Cast
2. Installation Scaffolding
Scaffolding arranged so as to support the load thereon. If an
error occurs in the installation of such a mistake elevation,
scaffolding can beset again without the need to disassemble the
entire scaffolding, but only set the jack base to adjust the elevation.
Scaffolding for beams established by the position of the beam and
is usually established between the columns while the middle area
of the floor plate is established by adjusting the distance of the floor
plate of each frame as needed.
Figure 3.44. Reinforcement of beams and floor plates that are ready for
the cast
Figure 3.46. Beam and floor plate that has been release formwork
Material Schedule
Schedule of materials required for this project according to
the number and kind of unity of time.
Equipment Schedule
Schedule of equipment to be used in this project according
to the number and function of the unity of time.
Labor Schedule
Schedule of labour needed for this project in accordance with
a membership of a union.
Cost Schedule
Schedule of costs flow according to schedule materials,
equipment and labour per unit time.
From time Schedule/work plan, will get about the long work can
be completed, as well as parts of the related work. Fourthly it must
conform its procurement so that the implementation can work goes
according to plan and arranged for not raises issues that will make
the implementation of the work to be obstructed and made many
parties suffered losses.