Professional Documents
Culture Documents
All the
Submissi dimensio Checking Tender Tender Calculatio
1 on of ns by sketch sketch n Vendor
design of the
calculatio equipmen authorise and and
n t d Tender tender sheets in
specificati specificati
inspector on on printed &
bounded
form
Welding
procedur Checking ASME ASME WPS
4 e Fixing the by Sec IX Sec IX sheet Vendor
specificati paramete Indenting
on r to get Officer
correct
properties
of
the
weldment
Welding Welding
procedur procedur Approved ASME ASME Test Ven Authorise Authorise
6 e e WPS Sec IX Sec IX report dor d d
of
qualificati important shall be inspector inspector
on test joints followed from lab of of
for a test
piece BARC BARC
welding
and
same
shall be
tested in
approved
lab
Shell
rolling & OD, ID, Measure Fabricatio ASME Inspectio Ven
7 end Out of ment, n Sec VIII n dor
cover
shell roundnes
rolling s template drawing Div1 report
matching
End Out of
covers roundnes Measure Fabricatio ASME Inspectio Ven
8 set up s ment n Sec VIII n dor
and Weld
joint drawing Div1 report
preparati
on
Nozzle
orientatio Orientatio Measure Fabricatio ASME Inspectio Ven
9 n n, length ment n Sec VIII n dor
and set and Weld
up joint drawing Div1 report
preparati
on
Final D.P. test, ASME ASME Inspectio Ven
10 welding Welding Visual Sec V Sec VIII n dor
paramete & Sec VIII report /
r Div Div1 PQR
1
Inspection Method:
❑ Solvent Removable
❑ Solvent Removable
Specification/Code: Procedure:
Equipment
Manufacturer Type
Cleaner
Penetrant
Developer
Emulsifier
Setup Data
Pre-Clean Time: Dwell Time:
Emulsifier Time: Developer Time:
Lighting Condition :
Test Result:
Quantity Inspected: Quantity Accepted:
Quantity Rejected:
Additional Information:
Part No/Item No: Weld Joint No Tested Length
(mm)
PROJECT NAME:
TEST INFORMATION
SYSTEM DESCRIPTION:
DESCRIPTION OF TEST BOUNDARIES: (Attach Sketch Showing Boundaries as Required. P&ID Recommended)
TEST REQUIREMENTS
REQUIRED TEST PRESSURE: TEST FLUID TEMPERATURE:
REQUIRED TEST DURATION: AMBIENT TEMPERATURE:
GAUGE PRESSURE CALCULATION (See Section 4.2.4)
ELEVATION DIFFERENCE BETWEEN GAUGE AND HIGH POINT:
X CONVERSION FACTOR:
PLUS REQUIRED TEST PRESSURE:
EQUALS REQUIRED GAUGE PRESSURE:
TEST RESULTS
TEST DATE: START TIME: AM PM
FINISH TIME: AM PM
TEST EQUIPMENT
TYPE: RANGE: CAL. DATE:
REMARKS:
TEST ACCEPTANCE
CODE EXAMINER: DATE:
d)
CAL. DUE: