You are on page 1of 3

SUNNY BROOKS

------------------------------------(to be issued on clients letter head)

WORK ORDER FOR PAKAGE-1(South sector) (to be issued on contractor for execution )
(Name & Address of the Client)
GST No: (Client )
PAN No: (Client )
(Name & Address of the Agencies ) ORDER NO : -
DATE : -
PLEASE QUOTE ORDER NO & DATE

IN YOUR CHALLAN & INVOICE


Dear Sir,
In pursuance to your Quote and subsequent negotiations, we are pleased to award you the following work all as per the detailed quantities, rates &
specification mentioned below.
Sr Item description / Specification Quantity Rate [Rs] Unit Amount
(CONSULTANT’S ESTIMATE FOR
INFORMATION OF CLIENT ONLY)

PACKAGE-1 , PART -A Sewerage Work

Carrying out total station survey Job 0.00


For monitoring and controlling alignment,
grade and levels of sewerage system during
execution stage.
Excavation in tranches in ordinary soil after Rmt 0.00
dismantling the existing sewer mains together
with inspection chambers, portion of asphalt
road adjacent, including stacking the re-usable
materials at site , and disposal of debris away
2 350
from site. (Rate include temporary arrangement

Providing and laying PCC 1:3:6 using 40 mm & Cum 0.00


down size aggregate including mixing ,laying in
3 layers ,tamping to required level ,curing 2.5
complete
Providing & constructing 200 thick solid cement Sqm 0.00
block /burnt brick masonry in cm 1:6 for
4 inspection chambers including curing complete 33

Providing & laying M – 20 ready mix concrete Cum 0.00


using 20 mm and down grade granite aggregate,
including vibrating, compacting and curing
5 complete (rate exclusive of shutting & 1
reinforcement) for cover slab of chambers

Providing & fixing steel reinforcement tar steel Kg 0.00


round bars of approved make & quality
6 including bending, tying in position, all as 60
shown on the drawing
Providing & fixing plywood/steel shuttering for Sqm 0.00
the construction of RCC Drains as per drawing
with necessary brackets, soldiers, to fix to proper
7 alignment and plumb as per drawing for cover 14
slab of chambers.

Plastering20 mm thick in cm 1:4 for internal Sqm 0.00


8 face of wall & floor including cur ing complete. 31

Supplying & fixing RCC manhole covers of


approved make including placing in position

(a)600x600 mm size No 0.00


7
(b)600 dia circular No 0.00
1
Supplying & fixing pvc coated CI rungs of No 0.00
10 approved makes. 18
Supplying ,laying& fixing in trenches to the
designed grade and level PVC pipes (SWR
grade)including hydraulic testing complete

11 (a) 160 dia pipe 235 Rmt 0.00

(b) 200 dia pipe 115 Rmt 0.00

Returning and refilling the trenches after pipes Cum 0.00


are laid and tested using soil obtained from
12 excavation under item 1 above . 338

making good the excavated road surface at the Rmt 0.00


13 top using GSB to the required thickness and 350
level complete
SUB TOTAL AMOUNT Rs 0.00

PACKAGE-1 , PART -B ROAD AND DRAIN (SOUTHERN SECTOR)

Carrying out total station survey for monitoring Job


and controlling alignment, grade and levels of
roads & drains during execution stage.
1 1

Dismantling the existing BS Slabs drain Rmt 0.00


together with portion of asphalt road adjacent,
including stacking the re-usable materials at site
2 , & disposing the debris away from site 360

Providing & laying GSB sub base thick Cum 0.00


including watering & consolidation complete
for drains and road sub-base
3 460

Providing & laying M – 20 ready mix concrete Cum 0.00


using 20 mm and down grade granite aggregate,
including vibrating, compacting and curing
4 complete (rate exclusive of shuttering & 208
reinforcement)

Providing & fixing steel reinforcement using tar MT 0.00


steel round bars of approved make & quality
including bending, tying in position, all as
5 shown on the drawing 17.6

Providing & fixing plywood/steel shuttering for Sqm 0.00


the construction of RCC Drains as per drawing
with necessary brackets, soldiers , to fix to
6 2194
proper alignment and plumb as per drawing

(a) Forming embankment using soil obtained Cum 0.00


from excavation at sch item no.4 above
including watering & consolidation complete
800

7
(b) Do same as item 9 (a) above for forming Cum 0.00
embankment using approved barrowed soil from
out side 390

Supply of RCC Kerb Stone in size 450 x Rmt 0.00


300x100mm thick including setting over RCC
wall and jointing in cement mortar 1:4 , curing
8 710
complete

Miscellaneous and unforeseen items such as

(a)Providing temporary scaffolding / strutting Nill Sites


structure to support existing buildings where
drain excavation to be carried out close by

(b) Towards shifting of existing services Rmt 0.00


mains and re fitting into the new service drain
(labour charges only) 350

(c) Towards shifting of existing services mains Job 0.00


and re fitting into the new service drain (labour
charges only) 1

RS
SUB TOTAL AMOUNT 0.00

PACKAGE-1 , PART -C Culvarts across storm water drains

Carrying out total station survey for monitoring Job


and controlling alignment, grade and levels of
1 1
culvarts during execution stage.
Dismantling the existing BS Slabs drain No 0.00
together with portion of asphalt road adjacent,
2 26
including stacking the re-usable materials at site
& disposing the debris away from site
Providing & laying PCC 100 thik 1:3:6 using 40 Cum 0.00
mm & down grade aggrate including watering
3 & consolidation complete for Culvarts 21
foundation

Providing & constructing 200 mm thik solid Sqm 0.00


cement bolok masonary in CM 1:4 including
4 cu4ring complete 188

Providing & laying M – 20 ready mix concrete Cum 0.00


using 20 mm and down grade granite aggregate,
including vibrating, compacting and curing
4 complete for cover slab (rate exclusive of 27
shuttering & reinforcement)

Providing & fixing steel reinforcement using tar MT 0.00


steel round bars of approved make & quality
including bending, tying in position, all as
5 shown on the drawing 2.7

Providing & fixing plywood/steel shuttering for Sqm 0.00


the construction of Roof slab
6 246

Providing & fixingedge protection MS angel Sqm 0.00


25x25x3 mm with nessory clamps embeded into
concrite with nesary enamal painting to coats
6 246
over a base coat of redoxide primer

Providing & fixing plywood/steel shuttering for MT 0.00


the construction of Roof slab
6 1.25

Cement pointing to SBM masonary in cm 1:3 Sqm 0.00


6 188

Back filling using soil obtained from excavation Job


incliding macking good the brocken road
6 surface with GSB. 1

SUB TOTAL AMOUNT RS 0.00

SUMMARY OF PACKEG 1 COSTING


SEWRAGE WORKS (SOUTHERN WING)
PART -A RS
PART -B ROADS & DRAINS(SOUTHERN WING) RS
PART -C CULVARTS ACROSS S DRAINS RS

TOTAL AMOUNT( PKG -1) RS


Terms and
Conditions
1. Price: As 6. Staff & Labour accommodation: No staff or workman are allowed to dwell
t d b
2. Taxes:GST at site Ho e er contractor can p t p his temporar str ct re to ards his
P bl
3. Payment t
T
(a) 25%
d 25% after
(b)
l tion
(c) 25%
l ti on f
(d)) 25%
100%
4. Water & 7.Contractor to ensure that he maintains all statutory local labour loss and
Power:Water
5. also maintain safety norms at work site as instructed by consultant / client
commencemen
SR.NO ITEM DESCRIPTION QUANTITY RATEe [Rs] UNIT AMOUNT
(CONSULTANT’S ESTIMATE FOR
INFORMATION OF CLIENT ONLY)

PACKAGE-3, PART -A, BS Slab drain work ( along BWSSB nallah)


Carrying out total station survey for monitoring and Job 0.00

Excavation in tranches in ordinary soil after dismantling cum 0.00

Supplying & fixing in position 75 mm thk granite b.s. sqm 0.00


slabs & fixing in position for construction of drain
including setting the slab to the desired grade & level as
per drawing & pointing in cm 1:4 complete. 550
.
3
b) for floor slab using old slabs obtained after sqm 0.00
dismantling of existing drains
160

Returning and refilling the trenches after completing Cum 0.00


drain work using soil obtained from excavation under
4 item 2 above including watering and consolidation 160
complete

Forming embankment using soil obtained from cutting Cum 0.00


@ item 2 above including watering and consolidation
5 complete 200

Miscelaneous and unfore seen such as tree cutting and JOB LS


disposal of debris away from campus, dewatering of sub
soil water for working atmosphere, temporary supporting
structure for safety of structures located adjacent to the
6 drain. 1

Sub Total Rs 0.00

SR.NO ITEM DESCRIPTION /Specification QUANTITY RATE [Rs] UNIT AMOUNT


(CONSULTANT’S ESTIMATE FOR
INFORMATION OF CLIENT ONLY)

PACKAGE-3, PART -B, Box culvert renovation along BWSSB drain near Entry security gate

Carrying out total station survey for monitoring and Job 0.00
controlling alignment, grade and levels of BS slab drain
1 work during execution stages. 1

Dismanteling the present RCC deck slab roof to create pockets 0.00
inspection entry opening of size 600x900, including
strenthening the opened pocket with extra reinforcement
welded to the original rods, providing new hinged ms
door WIith MS grating using 75 dia ms tubes welded to
2 100X50X5MM SIZE MS angle frame, painted with 12
enamel paint 2 coats over a coat of redoxide primer
complete all as per drawing details including safety
precautions and divertion of traffic all as directed

Scavangers work for desilting the filthy/ silt deposition Rmt


and decomposed material from the deck slab floor
3 including necessary safety preciutions, traffic isolation 64
complete as directed

Excavation in ordinary / hard decayed soil in trenches Cum 0.00


including removable of the total excavated stuff away
4 from site for providing new hume pipe drain. 180

Pcc 1:4:8 using 40mm and down aggregate including Cum 0.00
spreading and leveling to the required levels and grade,
5 4.5
curing complete
Supplying and fixing RCC hume pipe (NP-2 class) for rmt
the drain including lowering in to the trench, aligning to
the desired slope and level including jointing with rubber
6 tyton / spun yarn cement grout joint in CM 1:3 curing, 44
(size of pipe 1500mm dia), including hydraulic testing,
curing complete

Back filling the trenches with imported soil, filling in Cum


7 layers, watering and compaction complete 155

Providing and lying PCC 1:2:4 0(as filler concrete to Cum


rectify the floor slope of RCC box culvert) using 20mm
and down size aggregate including leveling, and
8 tamping to the required grade and levels as per 32
drawings, curing complete

miscellaneous services such as diverting the running LS Job


strom water through a parallel temperory pumping
arrangement till the construction at deck slab area work
9 completes including rising and closing the gap around 1
1500 dia hume pipe at the point of delivery in to M/s
Manthri property.

Sub Total Rs

SR.NO ITEM DESCRIPTION QUANTITY RATE [Rs] UNIT AMOUNT


(CONSULTANT’S ESTIMATE FOR
INFORMATION OF CLIENT ONLY)
PACKAGE-3 , PART -C Sewerage Work (SOUTHERN SECTOR)
Carrying out total station survey For monitoring and Job
1 1
Excavation in tranches in ordinary soil after dismantling Rmt 0.00

Providing and laying PCC 1:3:6 using 40 mm & down Cum 0.00
size aggregate including mixing ,laying in layers
3 2
,tamping to required level ,curing complete
Providing & constructing 200 thick solid cement block Sqm 0.00
/burnt brick masonry in cm 1:6 for inspection chambers
4 including curing complete 17

Providing & laying M – 20 ready mix concrete using 20 Cum 0.00

Providing & fixing steel reinforcement tar steel round Kg 0.00

Providing & fixing plywood/steel shuttering for the Sqm 0.00


construction of RCC Drains as per drawing with
necessary brackets, soldiers, to fix to proper alignment
7 7
and plumb as per drawing for cover slab of chambers.

Plastering20 mm thick in cm 1:4 for internal face of Sqm 0.00


8 wall & floor including cur ing complete. 45

Supplying & fixing RCC manhole covers of approved


make including placing in position
(a)600x600 mm size 11 No 0.00
(b)600 dia circular 3 No 0.00
Supplying & fixing pvc coated CI rungs of approved No 0.00
10 makes. 42

Supplying ,laying& fixing in trenches to the designed


grade and level PVC pipes (SWR grade)including
hydraulic testing complete
11
(a) 160 dia pipe 180 Rmt 0.00
(b) 200 dia pipe 200 Rmt 0.00
Returning and refilling the trenches after pipes are laid Cum 0.00
and tested using soil obtained from excavation under
12 item 1 above . 360

making good the excavated road surface at the top Rmt 0.00
13 using GSB to the required thickness and level complete 385

SUB TOTAL AMOUNT Rs 0.00

PACKAGE-3, PART -D ROAD AND DRAIN (SOUTHERN SECTOR)


Carrying out total station survey for monitoring and Job
controlling alignment, grade and levels of roads &
1 drains during execution stage. 1

Dismantling the existing BS Slabs drain together with Rmt 0.00


portion of asphalt road adjacent, including stacking the
2 re-usable materials at site , & disposing the debris away 715
from site
Providing & laying GSB sub base thick including Cum 0.00
watering & consolidation complete for drains and road
3 sub-base 220

Inter site shifting and fixing in position granite slabs Sqm 0.00
from the dismanteld drains including fixing in position
4 for the new drain construction to the required levels, 500
grade etc complete allas per drawing details

Forming embankment using soil obtained from Cum 0.00


excavation at sch item no.2 above including watering &
consolidation complete. (a) 1015
Using soil from excavation
7
(b) Do same as item 7 (a) above for forming Cum
embankment using approved barrowed soil from out side 485 250

Supply of RCC Kerb Stone in size 450 x 300x100mm Rmt


thick including setting over RCC wall and jointing in
8 cement mortar 1:4 , curing complete 800 300

Miscellaneous and unforeseen items such as 0.00

(a)Providing temporary scaffolding / strutting structure Nill Sites


to support existing buildings where drain excavation to
be carried out close by 0

(b) Towards shifting of existing services mains and re Rmt 0.00


fitting into the new service drain (labour charges only) 562

SUB TOTAL AMOUNT RS

SUMMARY OF PACKEG 3 COSTING (SOUTHERN SECTOR)


PART -A BS Slab drain work ( along BWSSB nallah) RS
Box culvert renova on along BWSSB drain near
Entry security gate
PART -B RS
Sewerage Work
PART -C RS
ROAD AND DRAIN

PART -D RS

TOTAL AMOUNT( PKG -3) RS

NET SUMMARY OF PACKAGES 1+2+3 COSTING


PKG-1 South wing works RS
PKG-2 North wing works RS (Under hold)
PKG-3 PHE nallah renova on RS

TOTAL AMOUNT( PKG -3) RS

You might also like